1
|
MGSP/RAN/2015-16/W-05
|
(a) Rehabilitation and widening of road from Sodapir mazar to khatkhatia Bazar Ch. 0+000 to 1+400 including one cross drain.
(b) Supplying, fitting & fixing of Street Lights of roadside from Sodapir mazar to Khatkhatia Bazar Ch.0+000 to 1+400.
(c) i) Rehabilitation and widening of road from Khatkhatia road to maina Kuthi via Shamlar Bazar, Ch. 0+000 to 6+500 including 8 nos. cross drains
(c) ii) Construction of two culverts Ch.1309 and Ch.1482. in Shamalr Bazar road..
(d) Supplying, fitting & fixing of Street Light of roadside from Khatkhatia road to Mania Kuthi via Shamlar Bazar, Ch.0+000 to 6+500.
(e) Rehabilitation and widening of Kukrul road from Shamlar bazar road (Fulamer road) to New Jummapara Pakarmatha Ch. 0+000 to 1+800 including 4 cross drains.
(f) Supplying, fitting & fixing of Street Lightsof roadside from Shamlar bazar road (Foulamer road) to New Jummapara Pakarmatha Ch. 0+000 to 1+ 800.
|
19.4070
|
139249458.070
|
|
139249458.070
|
|
|
0
|
27/09/2017
|
NOA issued
|
|
2
|
MGSP/RAN/2015-16/W-04
|
A) i) Re-habilitation Widening of Bituminous Carpeting road (Station Road) Starting from Shapla Chottor Moor via Rail gate up to R.K Road & cross drain Ch. 0+00 to 2+990,
A) (ii) Supplying, fitting & fixing of Street Light in Median (Start from Shapla Chottor Moor via Rail gate up to R.K Road) Ch.0+00 to 2+990.
B) Construction of RCC Drain and foot path at Station Road (Start from Rail gate up to Taj hat R.K Road Ch. 1+100 to 1+760 ( L/S), Ch. 1+760 to 2+980 ( both side) & Ch.2+980 to 3+640 (R/S).
|
8.5200
|
143368394.730
|
Raka Enterprise (JV)
|
143368394.730
|
19/06/2016
|
18/06/2017
|
48
|
27/09/2017
|
|
|
3
|
MGSP/RAN/W-03
|
a) Rehabilitation of Mahigonj Taltola road tarting from R.K. road upto Mahigonj Taltola Mosque Ch 0.00-405.00 (Total Length=405m)
b) Improvement of (i) Angure Meya road starting from G.L. Roy Road up to Kashbag road Ch 0.00-400.00m(ii) Improvement of Kashbag road starting from Kashbag road upto Kashbag Jame Mosquech Ch 0.00-490.00m (Total Length=890m)
c) Improvement of road from (a) Kanongotola Mollapara Dimla bridge to Dimia Kali MondirCh 0.00-760.00m (b) Dimla Bridge to Damdoma road Ch 0.00-1+050.00m (Total Length=1756m)
d) Rehabilitation of road Topodhan UP Office starting from Fulamer more to Khalisakuri hat. Ch 0.00-1+080.00m (Total Length=1080m)
e) Rehabilitation of (a) starting from Nurpur Graveyard moure to Huda Mohury's hhouse via H/O Journalist Wadud Ch0.00-440.00m(b) Improvement of road from Mahadevpur Kalam Godown to Mohadevpur Jame Mosque Ch 0.00-580.00m (Total Length=1020m)
f) Improvement of Kasna Thakitari road starting from Thakarpar more Upto Thakitari H/O Mr. Sadek Ch 0.00-1+100.00m (Total Length=1100m)
g) Construction of RCC U-Drain starting from Station road Mohedebpur Kalam godown to Mohedebour Jame Mosque Ch 0.00-415.00m (Total Length=415m)
h) Rehabilitation of Existing BC road starting from Burirhat moure towards Gajghanta Upto ch. 0.00-975m (Total Length=975m)
i) Rehabilitation of Pakpara boro mondir road. Ch 0.00-600.00m (Total Length=600m)
j) Construction of Station road bylane starting from Grand Hotel mour upto Dhakhin Guptapara mosque by RCC road and Drain & CC Road. Ch 0.00-527.00m (Total Length Road=446m, Drain=270)
k) Rehabilitation of Rokeya Sarak Bylane to Harahacha road. Ch 0.00-370.00m (Total Length=370m)
l) Improvement of Ex. Councilar Asakali House starting from Shadgara Jeme Mosque to Anondo Jorna House Ch0.00-575.00m (Total Length=575m)
m) i) Construction of RCC U-Drain Starting from UCEP school to Jummapara Existing Drain Via New Jummapara Puccar MathaCh 0.00-740.00m & ii) Construction of RCC U-Drain Starting from C.S Road to Jummapara Jame Mosque Via Mithu Hotel Ch 0.00-240.00m (Total Length=970m)
|
10.8720
|
52262876.000
|
Md. Khairul Kabir Rana
|
52262876.000
|
16/02/2015
|
16/02/2016
|
100
|
27/09/2017
|
Completed
|
|
4
|
MGSP/RAN/W-02
|
a) Rehabilitation & Widening of Nisbetgonj road (Kachari Bazaar to Badargonj road near Central Bus Terminal.) Ch 0.00-2410.00m (Total Length=2410m)
b) Rehabilitation of (a)Babupara Ashratpur road starting from Tajhat road via chakbazar upto RK road Ch 0.00-1300.00m (b) R.K road to college road. Ch 0.00-610.00m (Total Length=1910m)
c) Rehabilitation & Widening of Terminal road starting from Shapla moure to Central Bus Terminal.) Ch 0.00-2150.00m (Total Length=2150m)
d) Rehabilitation of RK Road Bylane Near starting from Twenty Megawat road to Bhendabary road Ch 0.00-865.00m (Total Length=865m)
e) Construction of RCC U-Drain starting from Babupara to City Biscuit Factory drain. Ch 0.00-310.00m (Total Length=210m)
|
7.5450
|
42023437.000
|
Md. Khairul Kabir Rana
|
42023437.000
|
16/02/2015
|
16/02/2016
|
100
|
27/09/2017
|
Completed
|
|
5
|
MGSP/RAN/W-01
|
a) Construction of RCC U-Drain Starting from Mouvasha to KD Canel Ch 0.00-1250m & link 0.00-310.00m . (Total Length=1560m)
b) Construction of RCC U-Drain Starting from Rangpur Community Centre to Pakpara Ch 0.00-470.0 & link0.00- 345.00m (Total Length=815m)
c) Construction of RCC U-Drain from Dhap Hazipara to Pakamatha Ch 0.00-760.00m (Total Length=760m)
d) Construction of RCC U-Drain at beside Gonganath road Vh 0.00-520.00m (Total Length=520m)
e) Construction of RCC U-Drain Starting from Keranipara Nasirbad Mosque to Gariantari MoreCh 0.00-505.00m (Total Length=505m)
f) Construction of RCC U-Drain from Kamarpara road to Babu Kha road & Link H/O Fazlul Haque Ch 0.00-500.00m (Total Length=500m)
g) Construction of RCC U-Drain from Pirgacha Bus Stand to Tatipara Existing Drain Ch 0.00-458.00. (Total Length=458m)
h) Construction of RCC U-Drain and BC road from Mahigonj Bangabanddhu Hospital to Girls School. (Total Length= Road 195m, drain 120m)
|
7.0680
|
41626106.000
|
Khairul-ujjal-Reazul(JV)
|
41626106.000
|
16/02/2015
|
16/02/2016
|
100
|
27/09/2017
|
Completed
|