SL No.
|
Package No.
|
Name
|
Length (Km)
|
Allotment (Lac)
|
Name of Contractor
|
Contract Amount (Lac)
|
Date of Commencement
|
Date of Completion
|
Physical Progress (%)
|
Date of Progress Update
|
Remarks
|
|
1
|
Aditmari
|
|
1
|
RDRIIP/LAL/
TR-017
|
Tree Plantation work on Bhadai UP office (Manan’s Mill) - Burrirdigirhat road.(Ch.00-2000m).(effective length=2000m).
|
2.0000
|
3.006
|
LCS women
|
3.006
|
|
30/06/2016
|
100
|
06/01/2019
|
|
|
2
|
RDRIIP/LAL/
LCS-27
|
jvjgwbinvU †Rjvi Avw`Zgvix Dc‡Rjvaxb 8wU BDwbq‡bi MÖvgxY `yt¯’ gwnjv‡`i Øviv moK iÿYv‡eÿY KvR|
|
154.2166
|
92.530
|
LCS
|
92.530
|
01/07/2015
|
30/06/2017
|
100
|
06/01/2019
|
|
|
3
|
RDRIIP/LAL/
VR -320
|
Improvement of UZR-3 at Hazirthan - UZR-2 at Amena bazar Road (Ch. 00-500m).
|
0.5000
|
38.751
|
M/S Nufa Construction, Aditmari, Lalmonirhat.
|
38.751
|
20/07/2016
|
30/10/2017
|
100
|
06/01/2019
|
|
|
4
|
RDRIIP/LAL/
VR -319
|
Improvement of Mohishkhocha LGED Godawn - Ablar bazar Road (Ch. 00-500m).
|
0.5000
|
30.588
|
M/S Nufa Construction, Aditmari, Lalmonirhat.
|
30.588
|
30/07/2016
|
30/10/2017
|
100
|
06/01/2019
|
|
|
5
|
RDRIIP/LAL/
VR -254
|
Improvement of Boshiltari Amtola more - Ferduser Chatal Road (Mogolhat Ziran Mondir - Boshintari Bodar Chowpotee) (Ch. 00-500m).
|
0.5000
|
35.383
|
Md. Jahirul Islam Titu, Rail Bazar, Lalmonirhat.
|
35.383
|
05/04/2016
|
15/06/2018
|
100
|
06/01/2019
|
|
|
6
|
RDRIIP/LAL/
VR -205
|
Improvement of Bamaner Basha – Lohakuchi via Sahidul dilar house (Burirdighirhat – UZR-2 near Bamuner Chowpati) Road (Ch. 00-1100m).
|
1.1000
|
57.706
|
M/S Abu Taleb Milu Kaligonj, Lalmonirhat.
|
57.706
|
09/07/2015
|
15/01/2016
|
100
|
06/01/2019
|
|
|
7
|
RDRIIP/LAL/
VR -148
|
Improvement of Hurmurirhat - Anandabazar Road (Ch. 00-500m).
|
0.5000
|
28.565
|
M/S S.S Enterprise Khatapara, Aditmari Lalmonirhat.
|
28.565
|
09/04/2015
|
30/06/2016
|
100
|
06/01/2019
|
|
|
8
|
RDRIIP/LAL/
VR -147
|
Improvement of Purboo Dailjhor - Durakuti Road (Ch. 00-500m).
|
0.5000
|
27.446
|
M/S S.S Enterprise Khatapara, Aditmari Lalmonirhat.
|
27.446
|
09/04/2015
|
16/06/2016
|
100
|
06/01/2019
|
|
|
9
|
RDRIIP/LAL/ UN-346
|
Improvement Of Sakowar Bazar - Shaptibari UPC Debirpat Bazar Road Ch. 2430 - 3490m
|
|
71.413
|
M/S Onto Enterprise, Thanapara, Lalmonirhat.
|
71.413
|
29/03/2018
|
05/08/2018
|
100
|
06/01/2019
|
|
|
10
|
RDRIIP/LAL/
UN -262
|
Improvement of Durgapur UP at Shatibari Bazer -Mogalhat via G/Morua school.Road (Ch. 123-623m).
|
0.5000
|
29.896
|
Md. Hasibul Hassan, Robertsongonj, Alamnagar, Rangpur.
|
29.896
|
28/06/2016
|
30/06/2018
|
100
|
06/01/2019
|
|
|
11
|
RDRIIP/LAL/
UN -261
|
Improvement of Saptibari UP (Chowrasta ZR Road) - Kumrirhat.Road (Ch. 534-943m & 1257-1348m).
|
0.5000
|
29.459
|
M/S Rahid Traders, Purbo Thana Para, Sadar, Lalmonirhat.
|
29.459
|
28/06/2016
|
30/06/2018
|
100
|
06/01/2019
|
|
|
12
|
RDRIIP/LAL/
UN -260
|
Improvement of Durgapur UP Office - Moshistali Ferrey Ghat road ( Israiler Chatal - Mohistoli hat road) (Ch. 00-500m).
|
0.5000
|
46.207
|
Md. Hasibul Hassan, Robertsongonj, Alamnagar, Rangpur.
|
46.207
|
28/06/2016
|
30/06/2018
|
100
|
06/01/2019
|
|
|
13
|
RDRIIP/LAL/
UN - 219
|
Improvement of Durgapur UP Office -Moshistali Ferrey Ghat Road (Ch. 00-1000m).
|
1.0000
|
62.389
|
M/S Abdul Hakim, Aditmari, Lalmonirhat.
|
62.389
|
06/04/2016
|
30/10/2017
|
100
|
06/01/2019
|
|
|
14
|
RDRIIP/LAL/
UN - 218
|
Improvement of Moshiskhocha UP office (Akabarer Chowpotee) - Palashi Bazer via Chowdhury Bazer Road (Ch. 1300-2300m).
|
1.0000
|
64.978
|
M/S Nufa Construction, Aditmari, Lalmonirhat.
|
64.978
|
06/04/2016
|
30/10/2017
|
100
|
06/01/2019
|
|
|
15
|
RDRIIP/LAL/
UN - 217
|
Improvement of Bhadai UP office (Kachari Bazar) - Galandhi hat via House of Suresh Master Road (Ch. 3320-4320m).
|
1.0000
|
58.026
|
M/S Milon Construction, Guratipara, Rangpur.
|
58.026
|
06/04/2016
|
30/12/2017
|
100
|
06/01/2019
|
|
|
16
|
RDRIIP/LAL/
UN-022
|
Improvement of Sharpukur UP - Bhelabari UP Road (Ch. 00-1000m).
|
1.0000
|
62.864
|
M/S Sheikh Traders Sadar, Lalmonirhat.
|
62.864
|
12/08/2014
|
20/01/2016
|
100
|
06/01/2019
|
|
|
17
|
RDRIIP/LAL/
UZ -092
|
Improvement of Zila Road at Saptibari-Mohishocha GC Road (Ch. 2600-2834m & 5234-5409m).
|
0.4090
|
27.775
|
M/S Abdul Hakim, Aditmari, Lalmonirhat.
|
27.775
|
09/04/2015
|
30/10/2017
|
100
|
06/01/2019
|
|
|
18
|
RDRIIP/LAL/
UZ -061
|
Improvement of Zila Road at Saptibari-Mohishocha GC Road (Ch. 4234-5234m).
|
1.0000
|
68.219
|
M/S Nufa Construction
Aditmari Lalmonirhat.
|
68.219
|
09/04/2015
|
30/06/2016
|
100
|
06/01/2019
|
|
|
19
|
RDRIIP/LAL/
UZ -060
|
Improvement of Zila Road at Saptibari-Mohishocha GC Road (Ch. 3234-4234m).
|
1.0000
|
70.592
|
M/S S.S Enterprise Khatapara, Aditmari Lalmonirhat.
|
70.592
|
09/04/2015
|
15/04/2016
|
100
|
06/01/2019
|
|
|
|
2
|
Hatibandha
|
|
1
|
RDRIIP/LAL/
LCS-29
|
jvjgwbinvU †Rjvi nvwZevÜv Dc‡Rjvaxb 12wU BDwbq‡bi MÖvgxY `yt¯’ gwnjv‡`i Øviv moK iÿYv‡eÿY KvR|
|
228.2833
|
136.970
|
LCS
|
136.970
|
01/07/2015
|
30/06/2017
|
100
|
06/01/2019
|
|
|
2
|
RDRIIP/LAL/
HB-05
|
Improvement of Digirhat Rural Market under Singimari UP.
|
1.0000
|
29.990
|
Md. Zahedul Islam, Patgram, Lalmonirhat.
|
29.990
|
26/06/2016
|
02/01/2017
|
100
|
06/01/2019
|
|
|
3
|
RDRIIP/LAL/
M-018
|
Maintenance of Barakhata GC - Hatibandha GC Road (Ch. 00-6108m).
|
6.1080
|
82.403
|
Bijoy Kumar Sur, Patgram, Lalmonirhat.
|
82.403
|
31/05/2016
|
06/12/2016
|
100
|
06/01/2019
|
|
|
4
|
RDRIIP/LAL/
BR-023
|
Construction of 42.00m Long RCC Girder Bridge on Shadur Bazar - Goddimari raod at Ch. 2800.00m.
|
42.0000
|
188.776
|
M/S K M Abu Bakar, College Road, Kurigram.
|
188.776
|
08/09/2016
|
31/05/2018
|
45
|
06/01/2019
|
|
|
5
|
RDRIIP/LAL/
VR -505
|
Improvement of Daikhowahat - Amjhol Pry.School Road (Ch. 1500-2000m).
|
0.5000
|
26.717
|
M/S Rifat Traders, House No-491, G.L. Roy Road, Rangpur.
|
26.717
|
12/08/2017
|
28/06/2018
|
100
|
06/01/2019
|
|
|
6
|
RDRIIP/LAL/
VR -504
|
Improvement of Jaurani hat - Latabor Mouza Road (Ch. 00-500m).
|
0.5000
|
26.377
|
M/S Rifat Traders, House No-491, G.L. Roy Road, Rangpur.
|
26.377
|
22/08/2017
|
28/06/2018
|
75
|
06/01/2019
|
|
|
7
|
RDRIIP/LAL/
VR -383
|
Improvement of IDB Road Tarur more - Goddimari Road (Ch. 500-1075m).
|
0.5750
|
36.109
|
M/S Khandakaer Traders, Thana Road, Lalmonirhat.
|
36.109
|
06/11/2016
|
12/05/2017
|
100
|
06/01/2019
|
|
|
8
|
RDRIIP/LAL/
VR -382
|
Improvement of Votemari Bazar - Site of River Road (Ch. 00-465m).
|
0.4650
|
19.357
|
M/S Asrafi Traders, Tushbhander, Kaligonj, Lalmonirhat.
|
19.357
|
03/11/2016
|
09/05/2017
|
100
|
06/01/2019
|
|
|
9
|
RDRIIP/LAL/
VR -308
|
Improvement of Saniajan Pucca road - Badher Par Road (Ch. 1210-1710m).
|
1.2000
|
28.943
|
A.K.M Majedur Rahman, Hatibandha, Lalmonirhat.
|
28.943
|
12/07/2016
|
30/06/2017
|
100
|
06/01/2019
|
|
|
10
|
RDRIIP/LAL/
VR -307
|
Improvement of Jorapukur - Dalalpara GPS Road (Jhora Pukur R&H - Makligonj road) (Ch. 495-995m).
|
1.2000
|
26.857
|
Md. Golam Rabbani Prodhan, Patgram, Lalmonirhat.
|
26.857
|
26/06/2016
|
30/06/2017
|
100
|
06/01/2019
|
|
|
11
|
RDRIIP/LAL/
VR-244
|
Improvement of Barakhata BOP – Singimari BOP Road ( Barakhata Bazar – Dolapara BOP camp Khabibor Army House) (Ch. 2000-3200m).
|
1.2000
|
67.312
|
M/S Abu Taleb Milu Kaligonj, Lalmonirhat.
|
67.312
|
13/03/2016
|
19/09/2016
|
100
|
06/01/2019
|
|
|
12
|
RDRIIP/LAL/
VR-191
|
Improvement of Barakhata Paikertati GPS – Vangha Mosque Road (Ch. 500-2410m).
|
1.9100
|
125.474
|
M/S Alomgir Hossain
Kaligonj, Lalmonirhat.
|
125.474
|
19/07/2015
|
24/07/2016
|
100
|
06/01/2019
|
|
|
13
|
RDRIIP/LAL/
VR -162
|
Improvement of East side of Gendukuri Hat – North side Daikhowa Hat Road (Ch. 500-1000m).
|
0.5000
|
25.253
|
M/S Abu Taleb Milu Kaligonj, Lalmonirhat.
|
25.253
|
07/05/2015
|
13/11/2015
|
100
|
06/01/2019
|
|
|
14
|
RDRIIP/LAL/
VR -161
|
Improvement of Fakirpara UP Office – Fakirpara GPS Road (Ch. 500-1000m).
|
0.5000
|
25.253
|
M/S Abu Taleb Milu Kaligonj, Lalmonirhat.
|
25.253
|
07/04/2014
|
13/11/2015
|
100
|
06/01/2019
|
|
|
15
|
RDRIIP/LAL/
VR-101
|
Improvement of Barakhata BOP – Singimari BOP Road ( Barakhata Bazar – Dolapara BOP camp Khabibor Army House) (Ch. 00-1000m).
|
1.0000
|
57.206
|
M/S Alomgir Hossain
Kaligonj, Lalmonirhat.
|
57.206
|
05/01/2015
|
11/07/2015
|
100
|
06/01/2019
|
|
|
16
|
RDRIIP/LAL/
VR-100
|
Improvement of Barakhata BOP – Singimari BOP Road ( Barakhata Bazar – Dolapara BOP camp Khabibor Army House) (Ch. 1000-2000m).
|
1.0000
|
51.246
|
M/S Abul Hakim
Aditmari, Lalmonirhat.
|
51.246
|
15/01/2015
|
21/07/2015
|
100
|
06/01/2019
|
|
|
17
|
RDRIIP/LAL/
VR-022
|
Improvement of Goddimari Doctor Para Jame Mosque to Pandit Para GPS Road (Ch. 00-500m).
|
0.5000
|
25.031
|
Md. Kolam Rabbani Prodhan, Patgram, Lalmonirhat.
|
25.031
|
20/08/2014
|
30/11/2015
|
100
|
06/01/2019
|
|
|
18
|
RDRIIP/LAL/
VR-021
|
Improvement of Hatibandha Hat – Chaddabari via Salbari Road (Ch. 00-700m).
|
0.7000
|
36.437
|
Md. Kolam Rabbani Prodhan, Patgram, Lalmonirhat.
|
36.437
|
20/08/2014
|
15/10/2015
|
100
|
06/01/2019
|
|
|
19
|
RDRIIP/LAL/
VR-020
|
Improvement of Milon Bazar – Singimari BOP Camp Road (Ch. 00-500m).
|
0.5000
|
25.031
|
Kazi Nazrul Islam, Goshala Bazar
Lalmonirhat.
|
25.031
|
20/08/2014
|
16/08/2015
|
100
|
06/01/2019
|
|
|
20
|
RDRIIP/LAL/
VR-019
|
Improvement of Hafiz Sahabuddin Mazar – Goddimarihat U.P office Pucca Road (Ch. 1748-2248m).
|
0.5000
|
25.031
|
Kazi Nazrul Islam, Goshala Bazar
Lalmonirhat.
|
25.031
|
20/08/2014
|
27/02/2015
|
100
|
06/01/2019
|
|
|
21
|
RDRIIP/LAL/
UN -323
|
Improvement of Gotamari GC to Chetnai hat - Near Abdul Kalam Vice-Chairman house Road (Ch. 3100-3800m).
|
0.7000
|
37.404
|
M/S Rifat Traders, House No-491, G.L. Roy Road, Rangpur.
|
37.404
|
22/08/2017
|
28/06/2018
|
100
|
06/01/2019
|
|
|
22
|
RDRIIP/LAL/
UN -322
|
Improvement of Zosnar Bazar to Chaparhat via Bhelaguri UP Road (Ch. 00-500m).
|
0.5000
|
26.761
|
M/S Abu Taleb Milu Kaligonj, Lalmonirhat.
|
26.761
|
30/08/2017
|
28/06/2018
|
100
|
06/01/2019
|
|
|
23
|
RDRIIP/LAL/
UN - 207
|
Improvement of Gotamari GC - Chetnai hat Road (Ch. 1110-2110m).
|
1.0000
|
59.559
|
A.K.M. Majedur Rahman, Hatibandha, Lalmonirhat.
|
59.559
|
07/03/2016
|
30/04/2017
|
100
|
06/01/2019
|
|
|
24
|
RDRIIP/LAL/
UN - 206
|
Improvement of Velaguri UP - Jawranir Hat (Boderhat to Velaguri UP Via Jawranir hat) Road (Ch. 1000-2000m).
|
1.0000
|
58.890
|
M/S Rifat Traders, House No-491, G.L. Roy Road, Rangpur.
|
58.890
|
13/03/2016
|
30/03/2017
|
100
|
06/01/2019
|
|
|
25
|
RDRIIP/LAL/
UN - 205
|
Improvement of Hatiabndha Auditorium - Jahir Miah House Via BGP Camp Road (Hatibandha Auditorium - Dhubni Primary School) Road (Ch. 945-1945m).
|
1.0000
|
56.571
|
A.K.M. Majedur Rahman, Hatibandha, Lalmonirhat.
|
56.571
|
07/03/2016
|
13/09/2016
|
100
|
06/01/2019
|
|
|
26
|
RDRIIP/LAL/
UN -126
|
Improvement of Barakhata – Patgram Thana Border Road (Ch. 2380-2880m).
|
0.5000
|
25.660
|
M/S Abu Taleb Milu Kaligonj, Lalmonirhat.
|
25.660
|
07/05/2015
|
13/11/2015
|
100
|
06/01/2019
|
|
|
27
|
RDRIIP/LAL/
UZ-047
|
Improvement of Barakhata GC – Boura GC Road via Tjhangjhara ( Rail corssing - Dalapara Via Thanghara Road (Ch. 1000-1925 & 3940-4515m).
|
1.5000
|
88.713
|
M/S Nufa Construction, Aditmari, Lalmonirhat.
|
88.713
|
05/01/2015
|
30/05/2016
|
100
|
06/01/2019
|
|
|
28
|
RDRIIP/LAL/
UZ-046
|
Improvement of Barakhata GC – Boura GC Road via Tjhangjhara ( Rail corssing - Dalapara Via Thanghara Road (Ch. 00-1000m).
|
1.0000
|
62.529
|
Md. Samsul Haque, Patgram, Lalmonirhat.
|
62.529
|
31/12/2014
|
30/12/2015
|
100
|
06/01/2019
|
|
|
|
3
|
Kaliganj
|
|
1
|
RDRIIP/LAL/
TR-018
|
Tree Plantation work on Kazirhat – Chandrapur UP via Chalbala UP road.(Ch.00-3000m).(effective length=3000m).
|
3.0000
|
4.491
|
LCS women
|
4.491
|
|
30/06/2016
|
100
|
06/01/2019
|
|
|
2
|
RDRIIP/LAL/
LCS-28
|
jvjgwbinvU †Rjvi KvjxMÄ Dc‡Rjvaxb 8wU BDwbq‡bi MÖvgxY `yt¯’ gwnjv‡`i Øviv moK iÿYv‡eÿY KvR|
|
154.2166
|
92.530
|
LCS
|
92.530
|
01/07/2015
|
30/06/2017
|
100
|
06/01/2019
|
|
|
3
|
RDRIIP/LAL/
M-048
|
Maintenance of Kakina R&H - Shankardah - Mohipur - Burirhat GC Road (Ch. 00-5280m).
|
5.2800
|
974.630
|
Kamal Associates, New Airport Road, Banani, Dhaka.
|
974.630
|
20/06/2017
|
25/05/2018
|
100
|
06/01/2019
|
|
|
4
|
RDRIIP/LAL/
BR-027
|
Construction of 36.00m Long RCC Girder Bridge on Tushbhandar UP - Awliarhat via Aminganj road at Ch.4620.00m.
|
36.0000
|
146.337
|
M/S Basundhara, RK Road, Kurigram.
|
146.337
|
04/10/2016
|
31/05/2018
|
50
|
06/01/2019
|
|
|
5
|
RDRIIP/LAL/
VR-361
|
Improvement of Baninagar- Durakuti (Chaparhat)-Chandrapurhat via Kadamtoli Bridge(Baninagar-Durakuti(Chaparhat) to Kadamtola Bridge via Latabor Dakhil Madrasha) Road (Ch.00-500m).
|
0.5000
|
28.408
|
Md. Alahe Baks, Kaliganj, Lalmonirhat.
|
28.408
|
28/09/2016
|
30/07/2017
|
100
|
06/01/2019
|
|
|
6
|
RDRIIP/LAL/
VR -324
|
Improvement of Kaliganj H/Q - Dologram UP Road at H/O Pintu - Sreekhata via Gegra Road (Ch. 00-750m).
|
0.7500
|
42.493
|
M/S Alomgir Hossain, Kaliganj, Lalmonirhat.
|
42.493
|
09/08/2016
|
13/01/2017
|
100
|
06/01/2019
|
|
|
7
|
RDRIIP/LAL/
VR -323
|
Improvement of Keranipara Milu House -Gegra GPS (Rubeya Sorok) road (Ch. 00-650m).
|
0.6500
|
56.854
|
Md. Alahe Baks, Kaliganj, Lalmonirhat.
|
56.854
|
09/08/2016
|
30/06/2017
|
100
|
06/01/2019
|
|
|
8
|
RDRIIP/LAL/
VR-160
|
Improvement of Hazrania R&H - Baburbari Hat Road (Ch. 00-500m).
|
0.5000
|
28.543
|
Md. Allhe Baks, Kaligonj, Lalmonirhat.
|
28.543
|
23/04/2015
|
31/01/2016
|
100
|
06/01/2019
|
|
|
9
|
RDRIIP/LAL/
VR-153
|
Improvement of R&H - Hospital - Chamta via H/O Nosiuddin at Balapara Mosque Road (Ch. 00-1650m) at Ch. 500m & 643m Connecting road 165m & 380m Length).
|
2.1950
|
122.463
|
M/S Abu Taleb Milu Kaligonj, Lalmonirhat.
|
122.463
|
09/04/2015
|
15/04/2016
|
100
|
06/01/2019
|
|
|
10
|
RDRIIP/LAL/
VR-135
|
Improvement of Kaligonj Bazar Petrol Pump – H/O Sadar Moktar (Kaliganj Substation – Sreekhata) Road (Ch. 220-1226m). (Effective Length = 1000m).
|
1.0000
|
58.109
|
M/S Abu Taleb Milu Kaligonj, Lalmonirhat.
|
58.109
|
25/03/2015
|
30/11/2015
|
100
|
06/01/2019
|
|
|
11
|
RDRIIP/LAL/
VR-025
|
Improvement of Pachmata bazar - uttar gopal raye Md. Abdur Rashid house (Chapartal R&H – Baninagar Namurirhat UZR at Kazirhat via Panchabati) Road (Ch. 00-500m).
|
0.5000
|
26.895
|
Md. Alahe Baks Kaligonj, Lalmonirhat.
|
26.895
|
27/07/2014
|
31/01/2016
|
100
|
06/01/2019
|
|
|
12
|
RDRIIP/LAL/
VR-024
|
Improvement of Kazirhat Baninogre at Gopal Roy GPS – H/O Md Babor Ali Road (Ch. 00-500m).
|
0.5000
|
26.895
|
M/S Alomgir Hossain
Kaligonj, Lalmonirhat.
|
26.895
|
12/08/2014
|
27/02/2015
|
100
|
06/01/2019
|
|
|
13
|
RDRIIP/LAL/
UN -325
|
Improvement of Madati UP Office - Valabari UP Office Via Dado Bairagi Bridge Road (Ch. 1400-2400m).
|
1.0000
|
56.443
|
Md. Allhe Baks, Kaligonj, Lalmonirhat.
|
56.443
|
30/08/2017
|
28/06/2018
|
100
|
06/01/2019
|
|
|
14
|
RDRIIP/LAL/
UN -324
|
Improvement of Tushbander UP - Dalagram UP Road (Ch. 4300-5996m).
|
1.6960
|
106.769
|
Md. Allhe Baks, Kaligonj, Lalmonirhat.
|
106.769
|
30/08/2018
|
30/06/2018
|
100
|
06/01/2019
|
|
|
15
|
RDRIIP/LAL/
UN -196
|
Improvement of Chanrdopur UP - Lohakuchi via Bolairhat Road (Ch. 00-1000m).
|
1.0000
|
63.961
|
M/S Rifat Traders, House No-491, G.L. Roy Road, Rangpur.
|
63.961
|
25/02/2016
|
31/12/2017
|
100
|
06/01/2019
|
|
|
16
|
RDRIIP/LAL/
UN -125
|
Improvement of Zila Road at Kaligonj to Kakina UP Uttar Bangla Collage via Amingonj Hat Road (Ch. 8791-9800m, Effective Length = 1000m).
|
1.0000
|
51.796
|
Md. Allhe Baks, Kaligonj, Lalmonirhat.
|
51.796
|
23/04/2015
|
31/01/2016
|
100
|
06/01/2019
|
|
|
17
|
RDRIIP/LAL/
UN-118
|
Improvement of Boirati Kashur Bari - Mojiborer Bari Road (Zila road near Kaliganj – Kakina UP office via Aminganj. (Ch. 380-1380m).
|
1.0000
|
61.324
|
Md. Allhe Baks, Kaligonj, Lalmonirhat.
|
61.324
|
04/03/2015
|
31/01/2016
|
100
|
06/01/2019
|
|
|
|
4
|
Lalmonirhat-s
|
|
1
|
RDRIIP/LAL/
LCS-26
|
jvjgwbinvU †Rjvi m`i Dc‡Rjvaxb 9wU BDwbq‡bi MÖvgxY `yt¯’ gwnjv‡`i Øviv moK iÿYv‡eÿY KvR|
|
172.7333
|
103.640
|
LCS
|
103.640
|
01/07/2015
|
30/06/2017
|
100
|
06/01/2019
|
|
|
2
|
RDRIIP/LAL/
WID-01
|
Widening work of Kulaghat - Borobari Road (Ch. 00-6502m).
|
6.5020
|
566.428
|
Hakim-Nufa (JV) , Aditmari, Lalmonirhat.
|
566.428
|
21/07/2016
|
30/06/2018
|
100
|
06/01/2019
|
|
|
3
|
RDRIIP/LAL/
VR-503
|
Improvement of Tista North Dalalpara - Char Gokunda via Community Clinic Road (Ch. 00-2690m).
|
2.6900
|
179.688
|
M/S Onto Enterprise, Thanapara, Lalmonirhat.
|
179.688
|
16/08/2017
|
30/06/2018
|
100
|
06/01/2019
|
|
|
4
|
RDRIIP/LAL/
VR-370
|
Improvement of Mogulhat UP - Patur Gate Road (Ch. 00-800m).
|
0.8000
|
46.340
|
Md. Jahirul Islam Titu, Rail Bazar, Lalmonirhat.
|
46.340
|
10/11/2016
|
30/04/2018
|
70
|
06/01/2019
|
|
|
5
|
RDRIIP/LAL/
VR - 292
|
Improvement of Kodal Khata GPS-Fulgach Rail Gate Road (Ch. 500-1000m).
|
0.5000
|
29.707
|
M/S Mostofa Traders, Kalilganj, Kurigram.
|
29.707
|
15/06/2016
|
30/10/2018
|
70
|
06/01/2019
|
|
|
6
|
RDRIIP/LAL/
VR-256
|
Improvement of Dewtirhat - Tista Razarhat UZR at Singerdabri & Railway station Road (Ch. 1050-1550m).
|
0.5000
|
26.621
|
Md. Golam Sarwar Bakul, Fire Service Road, Lalmonirhat.
|
26.621
|
26/05/2016
|
30/06/2017
|
100
|
06/01/2019
|
|
|
7
|
RDRIIP/LAL/
VR-255
|
Improvement of Faring dighi - haramanik Bazar Via-Dhaknai collage) Road (Ch. 1000-1500m).
|
0.5000
|
30.240
|
S.H. Electronics, BDR Road, Lalmonirhat.
|
30.240
|
05/04/2016
|
20/03/2018
|
100
|
06/01/2019
|
|
|
8
|
RDRIIP/LAL/
VR-246
|
Improvement of Gokunda Union ar Achaner Bari More - Mustofi Bazer Road (Ch. 00-2485m).
|
2.4850
|
140.282
|
Md. Mominul Islam Mithu, Tista, Sadar, Lalmonirhat.
|
140.282
|
01/03/2016
|
30/06/2017
|
100
|
06/01/2019
|
|
|
9
|
RDRIIP/LAL/
VR-245
|
Improvement of Harati Union Khandokar bari - Jame Mosque - Saptibari Degree College Road (Ch.00-2000m).
|
2.0000
|
119.941
|
Md. Hasibul Hasan, Robertsonganj, Alamnagar, Rangpur.
|
119.941
|
28/02/2016
|
30/04/2018
|
65
|
06/01/2019
|
|
|
10
|
RDRIIP/LAL/
VR-225
|
Improvement of Borobari – Sindurmoti UZR - Singerdabrihat Road (Ch. 00-1024m).
|
1.0240
|
61.748
|
M/S S.S Enterprise Khatapara, Aditmari Lalmonirhat.
|
61.748
|
18/11/2015
|
24/05/2016
|
100
|
06/01/2019
|
|
|
11
|
RDRIIP/LAL/
VR-202
|
Improvement of Mustofirhat – Khuniagach UZR at Afder Amin house – Ratipur UZR Road (Ch. 00-950m).
|
0.9500
|
51.744
|
M/S Sheikh Traders Goshala Bazar, Sadar, Lalmonirhat.
|
51.744
|
09/07/2015
|
30/06/2016
|
100
|
06/01/2019
|
|
|
12
|
RDRIIP/LAL/
VR-201
|
Improvement of Rangpur – Kurigram R&H at House of Abul – Hasan Bazar - Mondolerhat Road (Ch. 00-1050m).
|
1.0500
|
61.991
|
M/S Sheikh Traders Goshala Bazar, Sadar, Lalmonirhat.
|
61.991
|
09/07/2015
|
30/06/2016
|
100
|
06/01/2019
|
|
|
13
|
RDRIIP/LAL/
VR-200
|
Improvement of Kacharirpar Govt. Pry. School – Old DC Road via Anser Dhoni House Road (Ch. 500-1500m).
|
1.0000
|
51.755
|
M/S Sheikh Traders Goshala Bazar, Sadar, Lalmonirhat.
|
51.755
|
09/07/2015
|
31/03/2016
|
100
|
06/01/2019
|
|
|
14
|
RDRIIP/LAL/
VR-120
|
Improvement of Bolaipart – Sindurmoti via Jokemari Road (500 -1500m).
|
1.0000
|
60.947
|
M/S Sheikh Traders Goshala Bazar, Sadar, Lalmonirhat.
|
60.947
|
08/02/2015
|
30/09/2015
|
100
|
06/01/2019
|
|
|
15
|
RDRIIP/LAL/
UN - 253
|
Improvement of Borobari UP at Shimultala UZR - Sindurmatihat via Singimari Road (Ch. 5200-6200m).
|
1.0000
|
56.571
|
M/S Mostofa Traders, Kalilganj, Kurigram.
|
56.571
|
15/06/2016
|
30/08/2018
|
100
|
06/01/2019
|
|
|
16
|
RDRIIP/LAL/
UN - 216
|
Improvement of Borobari GC - Kulaghat at Borohat Kali via Auliarpat GPS Road (Ch. 3800-4494m & 5265-6571m).
|
2.0000
|
117.962
|
M/S Kamokar Agency, Thana Road, Lalmonirhat.
|
117.962
|
07/04/2016
|
30/10/2017
|
100
|
06/01/2019
|
|
|
17
|
RDRIIP/LAL/
UN-097
|
Improvement of Gokunda UP at Kharkharia Bridge – Rajpur UP Road (1620-2620m).
|
1.0000
|
50.336
|
M/S Alomgir Hossain
Kaligonj, Lalmonirhat.
|
50.336
|
08/02/2015
|
30/03/2017
|
100
|
06/01/2019
|
|
|
|
5
|
Patgram
|
|
1
|
RDRIIP/LAL/
LCS-30
|
jvjgwbinvU †Rjvi cvUMÖvg Dc‡Rjvaxb 8wU BDwbq‡bi MÖvgxY `yt¯’ gwnjv‡`i Øviv moK iÿYv‡eÿY KvR|
|
154.2166
|
92.530
|
LCS
|
92.530
|
01/07/2015
|
30/06/2017
|
100
|
06/01/2019
|
|
|
2
|
RDRIIP/LAL/
M-026
|
Maintenance of Dhagram UP - Haripara via Nayarhat Road (Ch. 485-1524m).
|
1.0390
|
15.803
|
M/S Lablu Traders, Patgram, Lalmonirhat.
|
15.803
|
10/10/2016
|
16/01/2017
|
100
|
06/01/2019
|
|
|
3
|
RDRIIP/LAL/
VR -507
|
Improvement of Dhabolsuti Mosque - Kamarer hat Road (Ch. 00-500m).
|
0.5000
|
29.238
|
Md. Golam Rabbani Prodhan. Patgram, Lalmonirhat.
|
29.238
|
16/08/2017
|
28/06/2018
|
100
|
06/01/2019
|
|
|
4
|
RDRIIP/LAL/
VR-506
|
Improvement of Jamgram p/school to Boura thangjhra GCCR Road (Ch. 800-1300m).
|
0.5000
|
26.739
|
Bijoy Kumar Sur, Patgram, Lalmonirhat.
|
26.739
|
28/08/2017
|
28/06/2018
|
100
|
06/01/2019
|
|
|
5
|
RDRIIP/LAL/
VR -502
|
Improvement of Aftab more - Shafinogorhat via Hosnabad Community Clinic & Mokbul Jahanara GPS Road (Ch. 00-775m).
|
0.7750
|
44.331
|
Bijoy Kumar Sur, Patgram, Lalmonirhat.
|
44.331
|
13/08/2017
|
28/06/2018
|
100
|
06/01/2019
|
|
|
6
|
RDRIIP/LAL/
VR-501
|
Improvement of Rotary Bazar - Dhagram GPS Via Khatipara Road (Ch. 00-500m).
|
0.5000
|
26.325
|
Md. Golam Rabbani Prodhan. Patgram, Lalmonirhat.
|
26.325
|
16/08/2017
|
28/06/2018
|
100
|
06/01/2019
|
|
|
7
|
RDRIIP/LAL/
VR -281
|
Improvement of Patgram - Boura GCCR at H/O Asraf Ali - Tupamari Primary School (Boura Thangghara GCCR) Road (Ch. 00-500m).
|
0.5000
|
26.754
|
Md. Zahedul Islam, Patgram, Lalmonirhat.
|
26.754
|
24/05/2016
|
30/06/2017
|
100
|
06/01/2019
|
|
|
8
|
RDRIIP/LAL/
VR -280
|
Improvement of Khangti Mouza (JRC Road) - Shahajada Prodhan House Road (Ch. 1000-1500m).
|
0.5000
|
26.584
|
Ali Ahmed, Patgram, Lalmonirhat.
|
26.584
|
29/05/2016
|
04/12/2016
|
100
|
06/01/2019
|
|
|
9
|
RDRIIP/LAL/
VR-098
|
Improvement of Olerpar - BOP camp of Dhagram Road (Ch. 00-500m).
|
0.5000
|
25.287
|
Md. Golam Rabbani Prodhan. Patgram, Lalmonirhat.
|
25.287
|
11/01/2015
|
30/06/2016
|
100
|
06/01/2019
|
|
|
10
|
RDRIIP/LAL/
VR-099
|
Improvement of Patgram Ghat ( Mohila Collage) - Patgram Awliarhat GCCR Road (Ch. 1650-2310m).
|
0.6600
|
33.476
|
Md. Golam Rabbani Prodhan. Patgram, Lalmonirhat.
|
33.476
|
11/01/2015
|
31/12/2015
|
100
|
06/01/2019
|
|
|
11
|
RDRIIP/LAL/
VR-039
|
Improvement of Jamgram Primary School - Boura - Thangjhara GCCR Road (Ch. 00-500m).
|
0.5000
|
26.647
|
Ali Ahmed, Patgram, Lalmonirhat.
|
26.647
|
18/08/2014
|
27/02/2014
|
100
|
06/01/2019
|
|
|
12
|
RDRIIP/LAL/
VR-038
|
Improvement of Machirpar Bridge – Gathiarvita Road (Ch. 00-500m).
|
0.5000
|
26.183
|
Ali Ahmed, Patgram, Lalmonirhat.
|
26.183
|
18/08/2014
|
27/02/2015
|
100
|
06/01/2019
|
|
|
13
|
RDRIIP/LAL/
UN -326
|
Improvement of Patgram Zila road at kabarstanhat - Lalitarhat Kuchlibari UP Road (Ch. 935-1435m).
|
0.5000
|
28.626
|
Md. Golam Rabbani Prodhan. Patgram, Lalmonirhat.
|
28.626
|
16/08/2017
|
28/06/2018
|
100
|
06/01/2019
|
|
|
14
|
RDRIIP/LAL/
UN - 204
|
Improvement of Kuchlibari UP – Panbari Bazar Road (Ch. 2300-3300m).
|
1.0000
|
58.569
|
M/S Zaman, Traders, Patgram, Lalmonirhat.
|
58.569
|
09/05/2016
|
25/12/2016
|
100
|
06/01/2019
|
|
|
15
|
RDRIIP/LAL/
UN - 203
|
Improvement of Baura UP at Alhamdulilla Bazar - Shafinogor hat via 3 no Shibram GPS Road (Ch. 00-2000m).
|
2.0000
|
113.149
|
Md. Hasibul Hassan, Robertsonganj, Alamnagar, Rangpur.
|
113.149
|
28/02/2016
|
04/09/2016
|
35
|
06/01/2019
|
|
|
16
|
RDRIIP/LAL/
UN-129
|
Improvement of Sreerampur UP at Burimari GC – Kawamari Hat via Baniadangi Ghat Road (Ch. 1640-2640m).
|
1.0000
|
50.859
|
Md. Samsul Haque
Patgram, Lalmonirhat.
|
50.859
|
08/06/2015
|
14/06/2016
|
100
|
06/01/2019
|
|
|
17
|
RDRIIP/LAL/
UN-128
|
Improvement of Sreerampur UP at Burimari GC – Kawamari Hat via Baniadangi Ghat Road (Ch. 00-700m & 1300-1640m).
|
1.0400
|
45.144
|
Md. Samsul Haque
Patgram, Lalmonirhat.
|
45.144
|
08/06/2015
|
14/06/2016
|
100
|
06/01/2019
|
|
|
18
|
RDRIIP/LAL/
UN-083
|
Improvement of Kamarerhat - Sreerampur UP Via Dr. Hamidul House Road (Ch. 00-1000m).
|
1.0000
|
60.282
|
Md. Hasibul Hassan.
|
60.282
|
01/01/2015
|
07/07/2015
|
100
|
06/01/2019
|
|
|
|
Total :
|
1040.8194 (Km)
|
6849.06 (Lac)
|
6849.06 (Lac)
|
|
|
|
|
|
|
|