Project Scheme Detail List
SL No. Package No. Name Length (Km) Allotment (Lac) Name of Contractor Contract Amount (Lac) Date of Commencement Date of Completion Physical Progress (%) Date of Progress Update Remarks
1 Sayedpur
1 MGSP/SAD/2015-16/W-03 (a)Rehabilition and widening of patchmatha moar to Upazilla road (parbotipur road) (Ch.0+00 to 2+125) and Airport to park moar ch0+000 to 1+325 under Saidpur Pourashava, Nilphamari. (Total length -3450.00m) (b) Construction of RCC drains patchmatha moar to Upazilla road (parbotipur road) Ch.0+00 to 2+125m. Cover slab construction for Ch.0+125 to 0+840, 0+840 to 1+550, 1+550 to 1+970 (Left side) and Airport to park moar Ch0+000 to 1+325km (Both side) under Saidpur Pourashava, Nilphamari. c) Supplying, fitting and fixing of street lights of roadside from Patchmatha moar to Upazilla road (parbotipur road) Ch.0+000-2+125 and Airport to park moar Ch. 0+000-1+325 under Saidpur Pourashava (Total lenght-3450.00m) (d) Environmental works for MGSP/SAID/2015-16/W-03 13.5200 186616263.000 RAB-RC((PVT) Ltd & BC (JV) 186616263.000 07/11/2016 06/02/2018 53 27/09/2017  
2 MGSP/SAD/W-02 a) Improvement of Shahid Zahurul Haque road by BC work from Dinajpur road to Bashuniapara last area of Pourashava. (Ch. 00-2985m) with Link-1(Fire Survice road Ch: 00-200m) under Saidpur Pourashava. (Total Lenth=3185.00m) b) Construction of Drain at East side of Shahid Zahurul Haque road (Length 459.00m) and RCC Drain Both side of Pourashava road (Length. 717.00m) and Fire Survice road, (Ch 270.00) with Slab & 8 Nos Cross Drain under Saidpur Pourashava. (Total Length=1446.00m) 4.6310 35401188.000 Md. Mostafizur Rahman 35401188.000 01/04/2015 19/03/2016 100 27/09/2017 Completed
3 MGSP/SAD/W-01 a) Improvement of Shahid Dr. Zikrul Haque road by B.C work from Railway Crossing (2no) to G.R.P More Ch: 0.00 m-630m with Link-1 (Thanks Cloth & Muktijudah Lane Ch: 0.00m-75.00m), Link-2 (Mosque Road Ch:0.00m-65.00m), Link-3 (Front of Post Office Ch:0.00-65.00m) under Saidpur Pourashava . (Total Length=835.00m) b) Construction of Drain with Cover (Length=762.00m) at West & East side of Shahid Dr. Zikrul Haque Road and North side of Bazar Road Link-1 (Length=75.00m), Link-2 (Length=65.00) & 3Nos Cross Drain under Saidpur Pourashava. (Total Length=902.00m) c) Improvement of BC Road Shahid Dr. Shamsul Haque road to Zikrul Haque road to Railway Crossing (1no) Ch: 0.00m-605.00m) with Link-1 (Lovely Steadio Road Ch: 0.00m-210.00m) under Saidpur Pourashava. (Total Length=815.00m) d) Improvement of Sher-E-Bangla Road by BC work From Ch: 0.00-620.00m & 1420.00m-2480.00m under Saidpur Pourashava. (Total Length=1680.00m) e) Construction of RCC Drain at ch: 1450.00m-1900.00m (Length=450.00m) West side with 01 no. Cross drain of Sher-E-Bangla Road under Saidpur Pourashava. 4.6820 36452371.000 M/S Mahbub Alam 36452371.000 01/04/2015 19/03/2016 100 27/09/2017 Completed
Total : 22.8330 (Km) 258469822.00 (Lac) 258469822.00 (Lac)