1
|
MGSP/SAD/2015-16/W-03
|
(a)Rehabilition and widening of patchmatha moar to Upazilla road (parbotipur road) (Ch.0+00 to 2+125) and Airport to park moar ch0+000 to 1+325 under Saidpur Pourashava, Nilphamari. (Total length -3450.00m)
(b) Construction of RCC drains patchmatha moar to Upazilla road (parbotipur road) Ch.0+00 to 2+125m. Cover slab construction for Ch.0+125 to 0+840, 0+840 to 1+550, 1+550 to 1+970 (Left side) and Airport to park moar Ch0+000 to 1+325km (Both side) under Saidpur Pourashava, Nilphamari.
c) Supplying, fitting and fixing of street lights of roadside from Patchmatha moar to Upazilla road (parbotipur road) Ch.0+000-2+125 and Airport to park moar Ch. 0+000-1+325 under Saidpur Pourashava (Total lenght-3450.00m)
(d) Environmental works for MGSP/SAID/2015-16/W-03
|
13.5200
|
186616263.000
|
RAB-RC((PVT) Ltd & BC (JV)
|
186616263.000
|
07/11/2016
|
06/02/2018
|
53
|
27/09/2017
|
|
|
2
|
MGSP/SAD/W-02
|
a) Improvement of Shahid Zahurul Haque road by BC work from Dinajpur road to Bashuniapara last area of Pourashava. (Ch. 00-2985m) with Link-1(Fire Survice road Ch: 00-200m) under Saidpur Pourashava. (Total Lenth=3185.00m)
b) Construction of Drain at East side of Shahid Zahurul Haque road (Length 459.00m) and RCC Drain Both side of Pourashava road (Length. 717.00m) and Fire Survice road, (Ch 270.00) with Slab & 8 Nos Cross Drain under Saidpur Pourashava. (Total Length=1446.00m)
|
4.6310
|
35401188.000
|
Md. Mostafizur Rahman
|
35401188.000
|
01/04/2015
|
19/03/2016
|
100
|
27/09/2017
|
Completed
|
|
3
|
MGSP/SAD/W-01
|
a) Improvement of Shahid Dr. Zikrul Haque road by B.C work from Railway Crossing (2no) to G.R.P More Ch: 0.00 m-630m with Link-1 (Thanks Cloth & Muktijudah Lane Ch: 0.00m-75.00m), Link-2 (Mosque Road Ch:0.00m-65.00m), Link-3 (Front of Post Office Ch:0.00-65.00m) under Saidpur Pourashava . (Total Length=835.00m)
b) Construction of Drain with Cover (Length=762.00m) at West & East side of Shahid Dr. Zikrul Haque Road and North side of Bazar Road Link-1 (Length=75.00m), Link-2 (Length=65.00) & 3Nos Cross Drain under Saidpur Pourashava. (Total Length=902.00m)
c) Improvement of BC Road Shahid Dr. Shamsul Haque road to Zikrul Haque road to Railway Crossing (1no) Ch: 0.00m-605.00m) with Link-1 (Lovely Steadio Road Ch: 0.00m-210.00m) under Saidpur Pourashava. (Total Length=815.00m)
d) Improvement of Sher-E-Bangla Road by BC work From Ch: 0.00-620.00m & 1420.00m-2480.00m under Saidpur Pourashava. (Total Length=1680.00m)
e) Construction of RCC Drain at ch: 1450.00m-1900.00m (Length=450.00m) West side with 01 no. Cross drain of Sher-E-Bangla Road under Saidpur Pourashava.
|
4.6820
|
36452371.000
|
M/S Mahbub Alam
|
36452371.000
|
01/04/2015
|
19/03/2016
|
100
|
27/09/2017
|
Completed
|