SL No.
|
Package No.
|
Name
|
Length (Km)
|
Allotment (Lac)
|
Name of Contractor
|
Contract Amount (Lac)
|
Date of Commencement
|
Date of Completion
|
Physical Progress (%)
|
Date of Progress Update
|
Remarks
|
|
1
|
Bhurungamari
|
|
1
|
Kuri-Bhu-Cit-Culvert-05/16-17
|
Construction of 3 nos 1x0.625x0.600m U-drain on road from H/O Barkat Ali-H/O Tara road [Road ID- 149065049] [Bhurungamari]
|
1.8750
|
2.146
|
Md. Wahed Ali, Fulbari, Kurigram
|
2.146
|
28/09/2017
|
05/02/2018
|
100
|
19/01/2019
|
|
|
2
|
Kuri-Bhu-Cit-Culvert-04/16-17
|
Construction of 2x4.50x3.00m RCC Box Culvert on road from H/O Barkat Ali-H/O Tara road [Road ID- 149065049] [Bhurungamari]
|
9.0000
|
21.493
|
Md. Nuruzzaman, Kanthalbari, Kurigram
|
21.493
|
28/09/2017
|
10/04/2018
|
100
|
19/01/2019
|
|
|
3
|
Kuri-Bhu-Cit-Culvert-03/16-17
|
Construction of 2 nos 1x0.625x0.600m U-drain on road from H/O Gomir Big road-H/O Solim at south side [Road ID- 149065048] [Bhurungamari]
|
1.2500
|
1.441
|
Md. Alah Baks, Khalilgonj, Kurigram
|
1.441
|
28/09/2017
|
10/02/2018
|
100
|
19/01/2019
|
|
|
4
|
Kuri-Bhu-Cit-Culvert-02/16-17
|
Construction of 1x3.00x2.00m RCC Box Culvert on road from Anower Hossain-H/O Moynal via H/O Alam road [Road ID- 149065044] [Bhurungamari]
|
3.0000
|
7.581
|
Md. Alamgir Jahan, Shahajadpur, Shirajgonj.
|
7.581
|
28/09/2017
|
10/02/2018
|
100
|
19/01/2019
|
|
|
5
|
Kuri-Bhurung-Cit-VR-19/15-16
|
Improvement of road by HBB from Mukti bazar near H/O Hobibor- Badsha Armi road from ch: 00m-975m [Road ID- 149065056]
|
0.9750
|
24.720
|
M/s. Aroshi Construction, Nageswari, Kurigram
|
24.720
|
18/07/2016
|
17/09/2017
|
100
|
19/01/2019
|
|
|
6
|
Kuri-Bhurung-Cit-VR-18/15-16
|
Improvement of road by HBB from Basjani Sarkerpara Jame mosque road from ch: 00m-460m [Road ID- 149065054]
|
0.4600
|
11.049
|
M/s. Aroshi Construction, Nageswari, Kurigram
|
11.049
|
18/07/2016
|
17/09/2017
|
100
|
19/01/2019
|
|
|
7
|
Kuri-Bhurung-Cit-VR-17/15-16
|
Improvement of road by HBB from H/O Jillu more - H/O Moslem road from ch: 00m-390m [Road ID- 149065053]
|
0.3900
|
9.079
|
M/s. Aroshi Construction, Nageswari, Kurigram
|
9.079
|
18/07/2016
|
17/09/2017
|
100
|
19/01/2019
|
|
|
8
|
Kuri-Bhurung-Cit-VR-16/15-20
|
Improvement of road by HBB from Moydum Camp Jame Mosque more - Moydum beel bridge via H/O Abdul Gagur road from ch: 00m-467m [Road ID- 149065052]
|
0.4670
|
10.643
|
M/s. Aroshi Construction, Nageswari, Kurigram
|
10.643
|
18/07/2016
|
17/09/2017
|
100
|
19/01/2019
|
|
|
9
|
Kuri-Bhurung-Cit-VR-15/15-19
|
Improvement of road by HBB from Pucca road near shop of Motin - H/O Shahid Ali via H/O Mokaddws road from ch: 00m-210m [Road ID- 149065051]
|
0.2100
|
5.005
|
M/s. Aroshi Construction, Nageswari, Kurigram
|
5.005
|
18/07/2016
|
17/09/2017
|
100
|
19/01/2019
|
|
|
10
|
Kuri-Bhurung-Cit-VR-14/15-18
|
Improvement of road by HBB from Pucca road near H/O Mojibor - H/O Korban road from ch: 00m-230m [Road ID- 149065050]
|
0.2300
|
5.874
|
M/s. Aroshi Construction, Nageswari, Kurigram
|
5.874
|
18/07/2016
|
17/09/2017
|
100
|
19/01/2019
|
|
|
11
|
Kuri-Bhurung-Cit-VR-13/15-17
|
Improvement of road by HBB from H/O Barkat Ali - H/O Tara road from ch: 00m-570m [Road ID- 149065049]
|
0.5700
|
14.316
|
M/s. Aroshi Construction, Nageswari, Kurigram
|
14.316
|
18/07/2016
|
17/09/2017
|
100
|
19/01/2019
|
|
|
12
|
Kuri-Bhurung-Cit-VR-12/15-16
|
Improvement of road by HBB from H/O Goni Big road- H/O Solim at South side road from ch: 00m-870m [Road ID- 149065048
|
0.8700
|
21.591
|
M/s. Aroshi Construction, Nageswari, Kurigram
|
21.591
|
18/07/2016
|
17/09/2017
|
100
|
19/01/2019
|
|
|
13
|
Kuri-Bhurung-Cit-VR-11/15-16
|
Improvement of road by HBB from H/O Moghol - H/O Mohir road from ch: 00m-280m [Road ID- 149065047]
|
0.2800
|
7.300
|
M/s. Aroshi Construction, Nageswari, Kurigram
|
7.300
|
18/07/2016
|
17/09/2017
|
100
|
19/01/2019
|
|
|
14
|
Kuri-Bhurung-Cit-VR-10/15-16
|
Improvement of road by HBB from H/O Siddik - Kader road from ch: 00m-540m [Road ID- 149065046]
|
0.5400
|
12.477
|
M/s. Aroshi Construction, Nageswari, Kurigram
|
12.477
|
18/07/2016
|
17/09/2017
|
100
|
19/01/2019
|
|
|
15
|
Kuri-Bhurung-Cit-VR-09/15-16
|
Improvement of road by HBB from H/O Jahangir - H/O Abdus Sattar via H/O Amir road from ch: 00m-480m [Road ID- 149065045]
|
0.4800
|
11.697
|
M/s. Aroshi Construction, Nageswari, Kurigram
|
11.697
|
18/07/2016
|
17/09/2017
|
100
|
19/01/2019
|
|
|
16
|
Kuri-Bhurung-Cit-VR-08/15-16
|
Improvement of road by HBB from H/O Anower Hossain - H/O Alam road from ch: 00m-586m [Road ID- 149065044]
|
0.5860
|
14.801
|
M/s. Aroshi Construction, Nageswari, Kurigram
|
14.801
|
18/07/2016
|
17/09/2017
|
100
|
19/01/2019
|
|
|
17
|
Kuri-Bhurung-Cit-VR-07/15-16
|
Improvement of road by HBB from Humaun more - H/O Lavlu road from ch: 00m-660m [Road ID- 149065043]
|
0.6600
|
18.537
|
M/s. Aroshi Construction, Nageswari, Kurigram
|
18.537
|
18/07/2016
|
17/09/2017
|
100
|
19/01/2019
|
|
|
18
|
Kuri-Bhurung-Cit-VR-06/15-16
|
Improvement of road by HBB from H/O Momin ( Pucca road) - H/O Reajul Master road from ch: 00m-420m [Road ID- 149065042]
|
0.4200
|
10.418
|
M/s. Aroshi Construction, Nageswari, Kurigram
|
10.418
|
18/07/2016
|
17/09/2017
|
100
|
19/01/2019
|
|
|
19
|
Kuri-Bhrung-Cit-UNR-02/15-16
|
Improvement of Paglar hat - Pathordubi UP road via Bashjani road from ch: 5170m-6670m [Road ID- 149063001]
|
1.5000
|
79.149
|
Md. Alah Baks, Khalilgonj, Kurigram
|
79.149
|
18/07/2016
|
17/09/2017
|
100
|
19/01/2019
|
|
|
|
2
|
Chilmari
|
|
1
|
Kuri-Chilmari-Cit-Ghat & Shed-01/15-16
|
Construction of Chilmari Ramna Ghat & Passenger Shed.[Chilmari]
|
|
12.591
|
Md. Lutfar Rahman Bakshi, Krishnapur, Kurigram
|
12.591
|
18/07/2016
|
17/09/2017
|
0
|
19/01/2019
|
|
|
|
3
|
Fulbari
|
|
1
|
Kuri-Cit-mosque-07/18-19
|
Construction of Beautification Work at (1) Chairmantari, (2) Kamalpur (3) Shomonnai para & (4) Chottokemot Jame Mosque [Fulbari]
|
|
51.693
|
M/S Noshin Traders
|
51.693
|
10/12/2018
|
10/05/2019
|
70
|
10/04/2019
|
|
|
2
|
Kuri-Fulbari-Cit-bridge-06/17-18
|
Construction of 44.00m long RCC girder bridge over Nilkomor River ChandroKhana - Hanif House road at ch. 300m [Road ID: 149185037] [Fulbari]
|
44.0000
|
242.895
|
RAB-RC& BC=JV Khalilgonj, Kurigram
|
242.895
|
17/12/2017
|
23/12/2018
|
100
|
10/03/2019
|
|
|
3
|
Kuri-Ful-Cit-Shasan-02/16-17
|
Construction of Shasan Ghat on the Nil Kumor river near H/O Protap Vice-Chairman at Dashirchara Chitmahal [Fulbari]
|
|
9.774
|
M/S Khairul Enterprise,Khalilgonj,kurigram
|
9.774
|
24/10/2017
|
26/04/2018
|
100
|
19/01/2019
|
|
|
4
|
Kuri-Ful-Cit-Shasan-01/16-17
|
Construction of Shasan Ghat on the Nil Kumor river near H/O Mohanando in Soto Kamat at Dashirchara Chitmahal [Fulbari]
|
|
9.774
|
M/S Khairul Enterprise,Khalilgonj,kurigram
|
9.774
|
24/10/2017
|
26/04/2018
|
100
|
19/01/2019
|
|
|
5
|
Kuri-Ful-Cit-Mondir-01/16-17
|
Kalir Hat Kali Mondir at Dashirchara Chitmahal
|
|
17.870
|
Md. Mahmud Alam Liton, Fulbari, Dinajpur
|
17.870
|
24/07/2017
|
23/01/2018
|
100
|
19/01/2019
|
|
|
6
|
Kuri-Ful-Cit-Mosq-05/16-17
|
Construction of Kamalpur Jame Mosque at Dashirchara Chitmahal [Fulbari]
|
|
18.014
|
Md. Ayub Ali, Nageswari, Kurigram.
|
18.014
|
29/03/2017
|
26/12/2017
|
100
|
19/01/2019
|
|
|
7
|
Kuri-Ful-Cit-Mosq-04/16-17
|
Construction of Chairman Tari Jame Mosque at Dashirchara Chitmahal [Fulbari]
|
|
18.014
|
Md. Ayub Ali, Nageswari, Kurigram.
|
18.014
|
29/03/2017
|
26/12/2017
|
100
|
19/01/2019
|
|
|
8
|
Kuri-Ful-Cit-Mosq-03/16-17
|
Construction of Samonnay Para Jame Mosque at Dashirchara Chitmahal [Fulbari]
|
|
18.014
|
M/s. Fahim Traders, R.K Road, Kurigram.
|
18.014
|
29/03/2017
|
26/12/2017
|
100
|
19/01/2019
|
|
|
9
|
Kuri-Ful-Cit-Mosq-02/16-17
|
Construction of Soto Kamat Jame Mosque at Dashirchara Chitmahal [Fulbari]
|
|
18.014
|
M/s. Fahim Traders, R.K Road, Kurigram.
|
18.014
|
29/03/2017
|
26/12/2017
|
100
|
19/01/2019
|
|
|
10
|
Kuri-Ful-Cit-Mosq-01/16-17
|
Construction of Kalir Hat Jame Mosque at Dashirchara Chitmahal [Fulbari]
|
|
18.014
|
Md. Ruhul Amin, Kanthalbari, Kurigram.
|
18.014
|
29/03/2017
|
26/12/2017
|
100
|
19/01/2019
|
|
|
11
|
Kuri-Ful-Cit-VR-05/15-16
|
(i) Ajowatari mouza at H/O Tale Pagla - Rash mala Via Joynal Hajil house road from ch: 0-1760m; (ii) Const. of 3 nos 0.600mx0.625m U-drain on Ajowatari mouza at H/O Tale Pagla - Rash mala Via Joynal Hajil house road at ch: 350m, 1063m & 1500m; (iii) Const. of 2x3.00mx3.00m RCC box culvert on Ajowatari mouza at H/O Tale Pagla - Rash mala Via Joynal Hajil house road at ch: 5m [Road ID- 149185049]
|
6.0400
|
119.129
|
M/s. Mahabubar Rahman, Goshpara, Kurigram.
|
119.129
|
07/06/2016
|
15/06/2017
|
100
|
19/01/2019
|
|
|
12
|
Kuri-Ful-Cit-VR-04/15-16
|
(i) Rash mala - Mokter Dhonee house via Nagdho Pacca road near h/o Noren Mistriy road from ch: 0-1450m; (ii) Const. of 2 nos 0.600mx0.625m U-drain on Rash mala - Mokter Dhonee house via Nagdho Pacca road near h/o Noren Mistriy road at ch: 1110m & 1300m [Road ID- 149185048]
|
0.2500
|
100.549
|
M/s. Saju Hardware, Khalilgonj, Kurigram.
|
100.549
|
07/06/2016
|
15/06/2017
|
100
|
19/01/2019
|
|
|
13
|
Kuri-Ful-Cit-VR-03/15-16
|
(i) Indererpar - Boder hat Shimul tola Bazar (Dashiar Chara Chit Mahal) road from ch: 0-3503m; (ii) Const. of 5 nos 0.600mx0.625m U-drain on Indererpar - Boder hat Shimul tola Bazar (Dashiar Chara Chit Mahal) road at ch: 71m, 123m, 400m, 500m, & 974m; (iii) Const. of 3.00mx3.00m RCC box culvert on Indererpar - Boder hat Shimul tola Bazar (Dashiar Chara Chit Mahal) road at ch: 2125m [Road ID- 149185047]
|
2.4970
|
236.836
|
JV M/s. Basundhara & M/s. Khairul Enterprise, R K Road, Kurigram
|
236.836
|
07/06/2016
|
15/12/2017
|
100
|
19/01/2019
|
|
|
14
|
Kuri-Ful-Cit-VR-02/15-16
|
(i) Kosalertol - Shimulertola via Mostsfa house road from ch: 0-1483m; (ii) Const. of 2 nos 2.00mx2.00m RCC box culvert on Kosalertol - Shimulertola via Mostsfa house road at ch: 122m & 296m; (iii) Const. of 2x3.00mx3.00m RCC box culvert on Kosalertol - Shimulertola via Mostsfa house road at ch: 630m (iv) Const. of 4 nos 0.600mx0.625m U-drain on Kosalertol - Shimulertola via Mostsfa house road at ch: 440m, 588m, 1155m & 1379m; [Road ID- 149185046]
|
10.9170
|
125.924
|
M/s. Hamid Traders, Dadamore, Kurigram.
|
125.924
|
07/06/2016
|
15/06/2017
|
100
|
19/01/2019
|
|
|
15
|
Kuri-Ful-Cit-VR-01/15-16
|
(i) Ajizal Bridge near Poschimpara - Amtola via Moddhapara Kamalpur Mosque road from ch: 0-4342m; (ii) Const. of 14 nos 0.600mx0.625m U-drain on Ajizal Bridge near Poschimpara - Amtola via Moddhapara Kamalpur Mosque road road at ch: 230m, 575m, 645m, 950m, 1226m, 1370m, 1490m, 1550m, 1600m, 2350m, 2460m, 3280m & 4200m; (iii) Const. of 2.00mx2.00m RCC box culvert on Ajizal Bridge near Poschimpara - Amtola via Moddhapara Kamalpur Mosque road at ch: 670m; (iv) Const. of 3.00mx2.50m RCC box culvert on Ajizal Bridge near Poschimpara - Amtola via Moddhapara Kamalpur Mosque road at ch: 2910m; (v) Const. of 2x4.50mx3.00m RCC box culvert on Ajizal Bridge near Poschimpara - Amtola via Moddhapara Kamalpur Mosque road at ch: 00m [Road ID- 149185045]
|
18.0580
|
295.053
|
M/s. Zahurul Haque Dulal, Goshpara, Kurigram.
|
295.053
|
07/06/2016
|
15/06/2017
|
100
|
19/01/2019
|
|
|
16
|
Kuri-Ful-Cit-UNR-01/15-16
|
(i) Kalirhat - Nawdanga Pularper via Botertol end at R&H (Dashiar Chara Chit Mahal) road from ch: 0-3825m; (ii) Const. of 10 nos 0.600mx0.625m U-drain on Kalirhat - Nawdanga Pularper via Botertol end at R&H (Dashiar Chara Chit Mahal) road at ch: 1560m, 1764m, 2065, 2196m, 2310m, 2560m, 3105m, 3186m, 3396m & 3290m; (iii) Const. of 2x3.00mx3.00m RCC box culvert on Kalirhat - Nawdanga Pularper via Botertol end at R&H (Dashiar Chara Chit Mahal) road at ch: 2600m [Road ID- 149183015]
|
8.1750
|
255.591
|
M/s. Zahurul Haque Dulal, Goshpara, Kurigram.
|
255.591
|
07/06/2016
|
15/06/2017
|
100
|
19/01/2019
|
|
|
17
|
Kuri-Ful-Cit-UZR-01/15-16
|
(i) Khoribari GC ( Nagdoho )- Gongerhat R & H Road Via Kalirhat (Dashiar Chara Chit Mahal) road from ch: 0-6300m; (ii) Const. of 11 nos 0.600mx0.625m U-drain on Khoribari GC ( Nagdoho)- Gongerhat R & H Road Via Kalirhat (Dashiar Chara Chit Mahal) road at ch: 748m, 1122m, 1336m, 1510m, 1670m, 2458m, 2690m, 3045m, 3280m, 3342m & 5245m; (iii) Const. of 2x3.00mx3.00m RCC box culvert on Khoribari GC ( Nagdoho )- Gongerhat R & H Road Via Kalirhat (Dashiar Chara Chit Mahal) road at ch: 2015m [Road ID- 149182007]
|
6.3000
|
435.415
|
M/s. Belal Construction, Khalilgonj, Kurigram.
|
435.415
|
07/06/2016
|
15/06/2017
|
100
|
19/01/2019
|
|
|
|
4
|
Kurigram-s
|
|
1
|
Kuri-Cit-mosque-07/18-19
|
Construction of Beautification Work at (1) Chairmantari, (2) Kamalpur (3) Shomonnai para & (4) Chottokemot Jame Mosque [Fulbari]
|
|
51.693
|
M/S Noshin Traders
|
51.693
|
10/12/2018
|
10/05/2019
|
0
|
22/01/2019
|
|
|
2
|
Kuri-Fulbari-Cit-bridge-06/17-18
|
Construction of 44.00m long RCC girder bridge over Nilkomor River ChandroKhana - Hanif House road at ch. 300m [Road ID: 149185037] [Fulbari]
|
44.0000
|
242.895
|
RAB-RC& BC=JV Khalilgonj, Kurigram
|
242.895
|
17/12/2017
|
23/12/2018
|
95
|
22/01/2019
|
|
|
3
|
Kuri-Row-Cit-UNR-02/16-17
|
Improvement of Rowmari-Baliamari GC road via Chuliarchar road (Rowmari portion) (Ch. 7694-8025m) [Road ID: 149792001] [Rowmari]
|
|
39.572
|
M/s. Shamim Enterprise, Old Registri office para, Kurigram
|
39.572
|
28/09/2017
|
26/04/2018
|
30
|
22/01/2019
|
|
|
4
|
Kuri-Row-Cit-UNR-01/16-17
|
Improvement of Kartimari GC-Boraibari BOP Camp via Bawairgram (Ch. 3875-7500m) [Road ID: 149793012] [Rowmari]
|
|
242.839
|
M/S Khairul Kabir Rana, Gupta para, Rangpur
|
242.839
|
23/11/2017
|
30/07/2018
|
45
|
22/01/2019
|
|
|
5
|
Kuri-Row-Cit-Bridge-01/16-17
|
Construction of 66.00m long RCC girder bridge Kartimari GC - Boraibari BGP Camp road via Bawairgram at ch. 4760m [Road ID: 149703012] [Rowmari]
|
66.0000
|
251.921
|
M/S Shondi Traders, Belkuchi, Sirajgonj.
|
251.921
|
21/08/2017
|
30/06/2018
|
75
|
22/01/2019
|
|
|
6
|
Kuri-Rowmari-Cit-Ghat & Shed-02/15-16
|
Construction of Roofing Faluarchar Ghat & Passenger Shed under Bondaber Union.[Rowmari]
|
|
3.391
|
M/s. Shamim Enterprise, Old Registri office para, Kurigram
|
3.391
|
18/07/2016
|
17/09/2017
|
100
|
22/01/2019
|
|
|
7
|
Kuri-Rajibpur-Cit-Ghat & Shed-03/15-16
|
Construction of Rajibpur Ghat & Passenger Shed.
|
|
3.986
|
M/s. Shamim Enterprise, Old Registri office para, Kurigram
|
3.986
|
18/07/2016
|
17/09/2017
|
100
|
22/01/2019
|
|
|
8
|
Kuri-Chilmari-Cit-Ghat & Shed-01/15-16
|
Construction of Chilmari Ramna Ghat & Passenger Shed.[Chilmari]
|
|
12.591
|
Md. Lutfar Rahman Bakshi, Krishnapur, Kurigram
|
12.591
|
18/07/2016
|
17/09/2017
|
0
|
22/01/2019
|
|
|
9
|
Kuri-Bhu-Cit-Culvert-05/16-17
|
Construction of 3 nos 1x0.625x0.600m U-drain on road from H/O Barkat Ali-H/O Tara road [Road ID- 149065049] [Bhurungamari]
|
1.8750
|
2.146
|
Md. Wahed Ali, Fulbari, Kurigram
|
2.146
|
28/09/2017
|
05/02/2018
|
100
|
22/01/2019
|
|
|
10
|
Kuri-Bhu-Cit-Culvert-04/16-17
|
Construction of 2x4.50x3.00m RCC Box Culvert on road from H/O Barkat Ali-H/O Tara road [Road ID- 149065049] [Bhurungamari]
|
9.0000
|
21.493
|
Md. Nuruzzaman, Kanthalbari, Kurigram
|
21.493
|
28/09/2017
|
10/04/2018
|
100
|
22/01/2019
|
|
|
11
|
Kuri-Bhu-Cit-Culvert-03/16-17
|
Construction of 2 nos 1x0.625x0.600m U-drain on road from H/O Gomir Big road-H/O Solim at south side [Road ID- 149065048] [Bhurungamari]
|
1.2500
|
1.441
|
Md. Alah Baks, Khalilgonj, Kurigram
|
1.441
|
28/09/2017
|
10/02/2018
|
100
|
22/01/2019
|
|
|
12
|
Kuri-Bhu-Cit-Culvert-02/16-17
|
Construction of 1x3.00x2.00m RCC Box Culvert on road from Anower Hossain-H/O Moynal via H/O Alam road [Road ID- 149065044] [Bhurungamari]
|
3.0000
|
7.581
|
Md. Alamgir Jahan, Shahajadpur, Shirajgonj.
|
7.581
|
28/09/2017
|
10/02/2018
|
100
|
22/01/2019
|
|
|
13
|
Kuri-Bhurung-Cit-VR-19/15-16
|
Improvement of road by HBB from Mukti bazar near H/O Hobibor- Badsha Armi road from ch: 00m-975m [Road ID- 149065056]
|
|
24.720
|
M/s. Aroshi Construction, Nageswari, Kurigram
|
24.720
|
18/07/2016
|
17/09/2017
|
100
|
22/01/2019
|
|
|
14
|
Kuri-Bhurung-Cit-VR-18/15-16
|
Improvement of road by HBB from Basjani Sarkerpara Jame mosque road from ch: 00m-460m [Road ID- 149065054]
|
|
11.049
|
M/s. Aroshi Construction, Nageswari, Kurigram
|
11.049
|
18/07/2016
|
17/09/2017
|
100
|
22/01/2019
|
|
|
15
|
Kuri-Bhurung-Cit-VR-17/15-16
|
Improvement of road by HBB from H/O Jillu more - H/O Moslem road from ch: 00m-390m [Road ID- 149065053]
|
|
9.079
|
M/s. Aroshi Construction, Nageswari, Kurigram
|
9.079
|
18/07/2016
|
17/09/2017
|
100
|
22/01/2019
|
|
|
16
|
Kuri-Bhurung-Cit-VR-16/15-20
|
Improvement of road by HBB from Moydum Camp Jame Mosque more - Moydum beel bridge via H/O Abdul Gagur road from ch: 00m-467m [Road ID- 149065052]
|
|
10.643
|
M/s. Aroshi Construction, Nageswari, Kurigram
|
10.643
|
18/07/2016
|
17/09/2017
|
100
|
22/01/2019
|
|
|
17
|
Kuri-Bhurung-Cit-VR-15/15-19
|
Improvement of road by HBB from Pucca road near shop of Motin - H/O Shahid Ali via H/O Mokaddws road from ch: 00m-210m [Road ID- 149065051]
|
|
5.005
|
M/s. Aroshi Construction, Nageswari, Kurigram
|
5.005
|
18/07/2016
|
17/09/2017
|
100
|
22/01/2019
|
|
|
18
|
Kuri-Bhurung-Cit-VR-14/15-18
|
Improvement of road by HBB from Pucca road near H/O Mojibor - H/O Korban road from ch: 00m-230m [Road ID- 149065050]
|
|
5.874
|
M/s. Aroshi Construction, Nageswari, Kurigram
|
5.874
|
18/07/2016
|
17/09/2017
|
100
|
22/01/2019
|
|
|
19
|
Kuri-Bhurung-Cit-VR-13/15-17
|
Improvement of road by HBB from H/O Barkat Ali - H/O Tara road from ch: 00m-570m [Road ID- 149065049]
|
|
14.316
|
M/s. Aroshi Construction, Nageswari, Kurigram
|
14.316
|
18/07/2016
|
17/09/2017
|
100
|
22/01/2019
|
|
|
20
|
Kuri-Bhurung-Cit-VR-12/15-16
|
Improvement of road by HBB from H/O Goni Big road- H/O Solim at South side road from ch: 00m-870m [Road ID- 149065048
|
|
21.591
|
M/s. Aroshi Construction, Nageswari, Kurigram
|
21.591
|
18/07/2016
|
17/09/2017
|
100
|
22/01/2019
|
|
|
21
|
Kuri-Bhurung-Cit-VR-11/15-16
|
Improvement of road by HBB from H/O Moghol - H/O Mohir road from ch: 00m-280m [Road ID- 149065047]
|
|
7.300
|
M/s. Aroshi Construction, Nageswari, Kurigram
|
7.300
|
18/07/2016
|
17/09/2017
|
100
|
22/01/2019
|
|
|
22
|
Kuri-Bhurung-Cit-VR-10/15-16
|
Improvement of road by HBB from H/O Siddik - Kader road from ch: 00m-540m [Road ID- 149065046]
|
|
12.477
|
M/s. Aroshi Construction, Nageswari, Kurigram
|
12.477
|
18/07/2016
|
17/09/2017
|
100
|
22/01/2019
|
|
|
23
|
Kuri-Bhurung-Cit-VR-09/15-16
|
Improvement of road by HBB from H/O Jahangir - H/O Abdus Sattar via H/O Amir road from ch: 00m-480m [Road ID- 149065045]
|
|
11.697
|
M/s. Aroshi Construction, Nageswari, Kurigram
|
11.697
|
18/07/2016
|
17/09/2017
|
100
|
22/01/2019
|
|
|
24
|
Kuri-Bhurung-Cit-VR-08/15-16
|
Improvement of road by HBB from H/O Anower Hossain - H/O Alam road from ch: 00m-586m [Road ID- 149065044]
|
|
14.801
|
M/s. Aroshi Construction, Nageswari, Kurigram
|
14.801
|
18/07/2016
|
17/09/2017
|
100
|
22/01/2019
|
|
|
25
|
Kuri-Bhurung-Cit-VR-07/15-16
|
Improvement of road by HBB from Humaun more - H/O Lavlu road from ch: 00m-660m [Road ID- 149065043]
|
|
18.537
|
M/s. Aroshi Construction, Nageswari, Kurigram
|
18.537
|
18/07/2016
|
17/09/2017
|
100
|
22/01/2019
|
|
|
26
|
Kuri-Bhurung-Cit-VR-06/15-16
|
Improvement of road by HBB from H/O Momin ( Pucca road) - H/O Reajul Master road from ch: 00m-420m [Road ID- 149065042]
|
|
10.418
|
M/s. Aroshi Construction, Nageswari, Kurigram
|
10.418
|
18/07/2016
|
17/09/2017
|
100
|
22/01/2019
|
|
|
27
|
Kuri-Bhrung-Cit-UNR-02/15-16
|
Improvement of Paglar hat - Pathordubi UP road via Bashjani road from ch: 5170m-6670m [Road ID- 149063001]
|
|
79.149
|
Md. Alah Baks, Khalilgonj, Kurigram
|
79.149
|
18/07/2016
|
17/09/2017
|
100
|
22/01/2019
|
|
|
28
|
Kuri-Ful-Cit-Shasan-02/16-17
|
Construction of Shasan Ghat on the Nil Kumor river near H/O Protap Vice-Chairman at Dashirchara Chitmahal [Fulbari]
|
|
9.774
|
M/S Khairul Enterprise,Khalilgonj,kurigram
|
9.774
|
24/10/2017
|
26/04/2018
|
100
|
22/01/2019
|
|
|
29
|
Kuri-Ful-Cit-Shasan-01/16-17
|
Construction of Shasan Ghat on the Nil Kumor river near H/O Mohanando in Soto Kamat at Dashirchara Chitmahal [Fulbari]
|
|
9.774
|
M/S Khairul Enterprise,Khalilgonj,kurigram
|
9.774
|
24/10/2017
|
26/04/2018
|
100
|
22/01/2019
|
|
|
30
|
Kuri-Ful-Cit-Mondir-01/16-17
|
Kalir Hat Kali Mondir at Dashirchara Chitmahal
|
|
17.870
|
Md. Mahmud Alam Liton, Fulbari, Dinajpur
|
17.870
|
24/07/2017
|
23/01/2018
|
100
|
22/01/2019
|
|
|
31
|
Kuri-Ful-Cit-Mosq-05/16-17
|
Construction of Kamalpur Jame Mosque at Dashirchara Chitmahal [Fulbari]
|
|
18.014
|
Md. Ayub Ali, Nageswari, Kurigram.
|
18.014
|
29/03/2017
|
26/12/2017
|
100
|
22/01/2019
|
|
|
32
|
Kuri-Ful-Cit-Mosq-04/16-17
|
Construction of Chairman Tari Jame Mosque at Dashirchara Chitmahal [Fulbari]
|
|
18.014
|
Md. Ayub Ali, Nageswari, Kurigram.
|
18.014
|
29/03/2017
|
26/12/2017
|
100
|
22/01/2019
|
|
|
33
|
Kuri-Ful-Cit-Mosq-03/16-17
|
Construction of Samonnay Para Jame Mosque at Dashirchara Chitmahal [Fulbari]
|
|
18.014
|
M/s. Fahim Traders, R.K Road, Kurigram.
|
18.014
|
29/03/2017
|
26/12/2017
|
100
|
22/01/2019
|
|
|
34
|
Kuri-Ful-Cit-Mosq-02/16-17
|
Construction of Soto Kamat Jame Mosque at Dashirchara Chitmahal [Fulbari]
|
|
18.014
|
M/s. Fahim Traders, R.K Road, Kurigram.
|
18.014
|
29/03/2017
|
26/12/2017
|
100
|
22/01/2019
|
|
|
35
|
Kuri-Ful-Cit-Mosq-01/16-17
|
Construction of Kalir Hat Jame Mosque at Dashirchara Chitmahal [Fulbari]
|
|
18.014
|
Md. Ruhul Amin, Kanthalbari, Kurigram.
|
18.014
|
29/03/2017
|
26/12/2017
|
100
|
22/01/2019
|
|
|
36
|
Kuri-Ful-Cit-VR-05/15-16
|
(i) Ajowatari mouza at H/O Tale Pagla - Rash mala Via Joynal Hajil house road from ch: 0-1760m; (ii) Const. of 3 nos 0.600mx0.625m U-drain on Ajowatari mouza at H/O Tale Pagla - Rash mala Via Joynal Hajil house road at ch: 350m, 1063m & 1500m; (iii) Const. of 2x3.00mx3.00m RCC box culvert on Ajowatari mouza at H/O Tale Pagla - Rash mala Via Joynal Hajil house road at ch: 5m [Road ID- 149185049]
|
7.8000
|
119.129
|
M/s. Mahabubar Rahman, Goshpara, Kurigram.
|
119.129
|
07/06/2016
|
15/06/2017
|
100
|
22/01/2019
|
|
|
37
|
Kuri-Ful-Cit-VR-04/15-16
|
(i) Rash mala - Mokter Dhonee house via Nagdho Pacca road near h/o Noren Mistriy road from ch: 0-1450m; (ii) Const. of 2 nos 0.600mx0.625m U-drain on Rash mala - Mokter Dhonee house via Nagdho Pacca road near h/o Noren Mistriy road at ch: 1110m & 1300m [Road ID- 149185048]
|
1.2000
|
100.549
|
M/s. Saju Hardware, Khalilgonj, Kurigram.
|
100.549
|
07/06/2016
|
15/06/2017
|
100
|
22/01/2019
|
|
|
38
|
Kuri-Ful-Cit-VR-03/15-16
|
(i) Indererpar - Boder hat Shimul tola Bazar (Dashiar Chara Chit Mahal) road from ch: 0-3503m; (ii) Const. of 5 nos 0.600mx0.625m U-drain on Indererpar - Boder hat Shimul tola Bazar (Dashiar Chara Chit Mahal) road at ch: 71m, 123m, 400m, 500m, & 974m; (iii) Const. of 3.00mx3.00m RCC box culvert on Indererpar - Boder hat Shimul tola Bazar (Dashiar Chara Chit Mahal) road at ch: 2125m [Road ID- 149185047]
|
6.0000
|
236.836
|
JV M/s. Basundhara & M/s. Khairul Enterprise, R K Road, Kurigram
|
236.836
|
07/06/2016
|
15/12/2017
|
100
|
22/01/2019
|
|
|
39
|
Kuri-Ful-Cit-VR-02/15-16
|
(i) Kosalertol - Shimulertola via Mostsfa house road from ch: 0-1483m; (ii) Const. of 2 nos 2.00mx2.00m RCC box culvert on Kosalertol - Shimulertola via Mostsfa house road at ch: 122m & 296m; (iii) Const. of 2x3.00mx3.00m RCC box culvert on Kosalertol - Shimulertola via Mostsfa house road at ch: 630m (iv) Const. of 4 nos 0.600mx0.625m U-drain on Kosalertol - Shimulertola via Mostsfa house road at ch: 440m, 588m, 1155m & 1379m; [Road ID- 149185046]
|
12.4000
|
125.924
|
M/s. Hamid Traders, Dadamore, Kurigram.
|
125.924
|
07/06/2016
|
15/06/2017
|
100
|
22/01/2019
|
|
|
40
|
Kuri-Ful-Cit-VR-01/15-16
|
(i) Ajizal Bridge near Poschimpara - Amtola via Moddhapara Kamalpur Mosque road from ch: 0-4342m; (ii) Const. of 14 nos 0.600mx0.625m U-drain on Ajizal Bridge near Poschimpara - Amtola via Moddhapara Kamalpur Mosque road road at ch: 230m, 575m, 645m, 950m, 1226m, 1370m, 1490m, 1550m, 1600m, 2350m, 2460m, 3280m & 4200m; (iii) Const. of 2.00mx2.00m RCC box culvert on Ajizal Bridge near Poschimpara - Amtola via Moddhapara Kamalpur Mosque road at ch: 670m; (iv) Const. of 3.00mx2.50m RCC box culvert on Ajizal Bridge near Poschimpara - Amtola via Moddhapara Kamalpur Mosque road at ch: 2910m; (v) Const. of 2x4.50mx3.00m RCC box culvert on Ajizal Bridge near Poschimpara - Amtola via Moddhapara Kamalpur Mosque road at ch: 00m [Road ID- 149185045]
|
22.4000
|
295.053
|
M/s. Zahurul Haque Dulal, Goshpara, Kurigram.
|
295.053
|
07/06/2016
|
15/06/2017
|
100
|
22/01/2019
|
|
|
41
|
Kuri-Ful-Cit-UNR-01/15-16
|
(i) Kalirhat - Nawdanga Pularper via Botertol end at R&H (Dashiar Chara Chit Mahal) road from ch: 0-3825m; (ii) Const. of 10 nos 0.600mx0.625m U-drain on Kalirhat - Nawdanga Pularper via Botertol end at R&H (Dashiar Chara Chit Mahal) road at ch: 1560m, 1764m, 2065, 2196m, 2310m, 2560m, 3105m, 3186m, 3396m & 3290m; (iii) Const. of 2x3.00mx3.00m RCC box culvert on Kalirhat - Nawdanga Pularper via Botertol end at R&H (Dashiar Chara Chit Mahal) road at ch: 2600m [Road ID- 149183015]
|
12.0000
|
255.591
|
M/s. Zahurul Haque Dulal, Goshpara, Kurigram.
|
255.591
|
07/06/2016
|
15/06/2017
|
100
|
22/01/2019
|
|
|
42
|
Kuri-Ful-Cit-UZR-01/15-16
|
(i) Khoribari GC ( Nagdoho )- Gongerhat R & H Road Via Kalirhat (Dashiar Chara Chit Mahal) road from ch: 0-6300m; (ii) Const. of 11 nos 0.600mx0.625m U-drain on Khoribari GC ( Nagdoho)- Gongerhat R & H Road Via Kalirhat (Dashiar Chara Chit Mahal) road at ch: 748m, 1122m, 1336m, 1510m, 1670m, 2458m, 2690m, 3045m, 3280m, 3342m & 5245m; (iii) Const. of 2x3.00mx3.00m RCC box culvert on Khoribari GC ( Nagdoho )- Gongerhat R & H Road Via Kalirhat (Dashiar Chara Chit Mahal) road at ch: 2015m [Road ID- 149182007]
|
12.6000
|
435.415
|
M/s. Belal Construction, Khalilgonj, Kurigram.
|
435.415
|
07/06/2016
|
15/06/2017
|
100
|
22/01/2019
|
|
|
|
5
|
Rajibpur
|
|
1
|
Kuri-Rajibpur-Cit-Ghat & Shed-03/15-16
|
Construction of Rajibpur Ghat & Passenger Shed.
|
|
3.986
|
M/s. Shamim Enterprise, Old Registri office para, Kurigram
|
3.986
|
18/07/2016
|
17/09/2017
|
100
|
19/01/2019
|
|
|
|
6
|
Rowmari
|
|
1
|
Kuri-Row-Cit-UNR-02/16-17
|
Improvement of Rowmari-Baliamari GC road via Chuliarchar road (Rowmari portion) (Ch. 7694-8025m) [Road ID: 149792001] [Rowmari]
|
0.3310
|
39.572
|
M/s. Shamim Enterprise, Old Registri office para, Kurigram
|
39.572
|
28/09/2017
|
26/04/2018
|
70
|
10/04/2019
|
|
|
2
|
Kuri-Row-Cit-Bridge-01/16-17
|
Construction of 66.00m long RCC girder bridge Kartimari GC - Boraibari BGP Camp road via Bawairgram at ch. 4760m [Road ID: 149703012] [Rowmari]
|
66.0000
|
251.921
|
M/S Shondi Traders, Belkuchi, Sirajgonj.
|
251.921
|
21/08/2017
|
30/06/2018
|
80
|
10/04/2019
|
|
|
3
|
Kuri-Row-Cit-UNR-01/16-17
|
Improvement of Kartimari GC-Boraibari BOP Camp via Bawairgram (Ch. 3875-7500m) [Road ID: 149793012] [Rowmari]
|
3.6250
|
242.839
|
M/S Khairul Kabir Rana, Gupta para, Rangpur
|
242.839
|
23/11/2017
|
30/07/2018
|
45
|
19/01/2019
|
|
|
4
|
Kuri-Rowmari-Cit-Ghat & Shed-02/15-16
|
Construction of Roofing Faluarchar Ghat & Passenger Shed under Bondaber Union.[Rowmari]
|
|
3.391
|
M/s. Shamim Enterprise, Old Registri office para, Kurigram
|
3.391
|
18/07/2016
|
17/09/2017
|
100
|
19/01/2019
|
|
|
|
Total :
|
389.4810 (Km)
|
5668.38 (Lac)
|
5668.38 (Lac)
|
|
|
|
|
|
|
|