Project Scheme Detail List
SL No. Package No. Name Length (Km) Allotment (Lac) Name of Contractor Contract Amount (Lac) Date of Commencement Date of Completion Physical Progress (%) Date of Progress Update Remarks
1 Jhalokathi-s
1 SP62028/Bazitpur DR Subproject Re-excavation of Balokdia Sarder Barir Khal (Ch-0+000km to 1+900km) Re-excavation of Uttam Nagar Dasher Barir (Part-1) Khal (Ch-0+000km to 0+990km) Re-excavation of Uttam Nagar Dasher Barir (Part-2) Khal (Ch-0+000km to 1+235km) Re-excavation of Bajitpur Khal (Ch-0+000km to 2+300km) Re-excavation of Kalyankati Khal (Ch-0+000km to 1+860km) Re-excavation of Gagan Sailatala Khal (Ch-0+000km to 1+493km) Re-excavation of Shibaikati Grameen Bank Khal (Ch-0+000km to 3+300km) Re-excavation of Gagan Bazar Khal (Ch-0+000km to 3+115km) Re-excavation of Alokdia Chowkider Barir Khal (Ch-0+00km to 1+580km) Ref. Lined Section 22 Nos. On 9 Khals, And SP Identf. Signboard (2 nos.) Construction of WMCA office 157.960 OTM 157.960 13/01/2023 97 13/08/2024 Ongoing
2 SP46239/Kirtipasha Subproject Re-exacavation of Badhakhali Khal (Ch-0+00km to 2+600km) Re-exacavation of Khardarbahar Khal (Ch-0+000km to 1+800km) Re-exacavation of Dumuria Khal (Ch-0+000km to 1+650km) Re-exacavation of Andir Khal (Ch-0+000km to 0+700km) Re-exacavation of Kamli Kanda Khal (Ch-0+000km to 0+560km) Ref. Lined Section 13 Nos. On 5 Khals, And SP Identf. Signboard (2 nos.) Construction of WMCA office building Sangkar Dhabal Khal re-xcavation (Ch:0.00m - 1600.00m) 2023-24 Uttar Basin Khal re-xcavation (Ch:0.00m - 700.00m) 2023-24 Khajura Branch Khal 1 re-xcavation (Ch:0.00m - 750.00m) 2023-24 Andir Khal re-xcavation (Ch:0.00m - 150.00m) 2023-24 Const. of 06 Nos. Ref. lined Section on 03 Khals and SP Area Indication Post 2 Nos. | 2023-24 93.768 OTM 93.768 29/05/2022 29/05/2022 79 13/08/2024 Ongoing
3 SP46235/Ashiar DR Subproject Nur Muhammad Barir Khal Re-excavation(ch0.00-1800m) Talukdar Barir Khal Re-excavation(ch0.00-1200m) Noya Barir Khal Re-excavation(ch0.00-950m) Karim Shikdar Barir Khal Re-excavation(ch0.00-1750m) Gawchar Pali Khal Re-excavation(ch0.00-1500m) Reference Lined Section 10 Nos. On 5 Khals, And SP Identification Signboard (2 nos.) Construction of WMCA Office, Electrification Works and Furniture Supply 77.496 OTM 77.496 20/04/2021 30/04/2021 100 13/08/2024 Completed
4 SP44117/Deulkathi-Binnapara Subproject Re-Excavation of Astakhan Majhibarir Khal (Ch.0+000 Km to 1+900 Km) Re-Excavation of Dewolkathi Berpasha Khal (Ch.0+000 Km to 3+200 Km) Re-Excavation of Binnapara Biler Khal (Ch.0+000 Km to 2+100 Km) Re-Excavation of Shudharam Branch Khal (Ch.0+000 Km to 0+900 Km) Const. of 11 Nos. Reference lined Section on 4 Khals, SP Identf. sign board 2 Nos. and SP Indication Post 2 Nos. 63.820 LCS 63.820 02/03/2023 28/05/2023 100 13/08/2024 Completed
5 SP44106/Sachilapur Subproject Ref. Lined Section 11 Nos. On 6 Khals, And SP Identf. Signboard (2 nos.) Re-excavation of Bepari Barir Khal (Ch-0+00km to 2+450km) Re-excavation of Yousufdee Khal (Ch-0+000km to 1+300km) Re-excavation of Bepari Barir Branch Khal (Ch-0+000km to 0+600km) Re-excavation of Khan Barir Khal (Ch-0+000km to 0+400km) Re-excavation of Dattar Khal (Ch-0+000km to 0+350km) Re-excavation of Mafiruddin Khal (Ch-0+000km to 0+400km) Rehabilitation of WMCA office - 60.669 OTM 60.669 24/01/2023 30/05/2022 100 13/08/2024 Completed
6 SP44104/Sarengal Subproject Ashutash Mazumdar Barir Khal Re-excavation (Ch: 0.00 - 2010 m) ChannuDev Barir Khal Re-excavation (Ch: 0.00 - 1700 m) Sheikh Mujibar Barir Khal Re-excavation (Ch: 0.00 - 650.00 m) Chatarji Barir Khal Re-excavation (Ch: 0.00 - 650.00 m) Kali Barir Khal Re-excavation (Ch: 0.00 - 600 m) Pakmahar GPS Khal Re-excavation (Ch: 0.00 - 650.00 m) Galaikhala Khal Re-excavation (Ch: 0.00 - 500.00 m) Mawlana Jahiruddin Khal Re-excavation (Ch: 0.00 - 300.00 m) Reference Lined Section (12 nos.) + SP Identification Signboard (2 nos.) Abdul Haque Talukdar Barir Khal re-xcavation (Ch:0.00m - 1260.00m) 2023-24 Badal Khan Barir Khal re-xcavation (Ch:0.00m - 670.00m) 2023-24 Masud Khan Barir Khal re-xcavation (Ch:0.00m - 650.00m) 2023-24 Mir Adbul Barir Khal re-xcavation (Ch:0.00m - 400.00m) 2023-24 Sarengal Madrasha Khal re-xcavation (Ch:0.00m - 325.00m) 2023-24 Mridha Barir Khal re-xcavation (Ch:0.00m - 315.00m) 2023-24 Const. of 07 Nos. Ref. lined Section on 06 Khals, SP Identf. sign board 2, SP Area Indication Post 2 Nos. | 2023-24 99.393 LCS 99.393 25/01/2021 26/04/2021 86 13/08/2024 Ongoing
7 SP44077/Saorakathi Subproject Construction of 9 RCC reference-line sections in 4 canals, and SP Signboard Re-excavation of Ramzankathi Napitbari khal (Ch: 0.00m to 2495m) Re-excavation of Nur Mohammad Shikdarbari khal (Ch: 0.00m to 1910m) Re-excavation of Haoladarbarir khal (Ch: 0.00m to 1200m) Re-excavation of Majed Mollikbarir khal (Ch: 0.00m to 900m) Sharif Bari Khal re-xcavation (Ch:0.00m - 1590.00m) 2023-24 Shaiz Uddin Barir Khal re-xcavation (Ch:0.00m - 2310.00m) 2023-24 Abid Mulla Barir Khal re-xcavation (Ch:0.00m - 1450.00m) 2023-24 Jorapul Khal re-xcavation (Ch:0.00m - 850.00m) 2023-24 Gohuder Hat Khal re-xcavation (Ch:0.00m - 800.00m) 2023-24 Const. of 10 Nos. Ref. lined Section on 05 Khals, SP Identf. sign board 2, SP Area Indication Post 2 Nos. | 2023-24 116.004 LCS 116.004 25/04/2023 28/05/2023 77 13/08/2024 Ongoing
8 SP22002/Nabogram Subproject Betora khal re-excavation (Ch.00-1500m) Rampura khal re-excavation (Ch.00-3000m) Napitkhali khal re-excavation (Ch.00-2300m) Gudighata khal re-excavation (Ch.00-600m) Referenced line section 9 Nos. Bamboo bridge 9 Nos. Ganginar Khal re-xcavation (Ch:0.00m - 3100.00m) 2023-24 Const. of 03 Nos. Ref. lined Section on 01 Khal, SP Identf. sign board 2, SP Area Indication Post 2 Nos. | 2023-24 105.206 LCS 105.206 26/03/2024 30/04/2019 87 13/08/2024 Ongoing
9 SP15236/Natullabad DR Subproject Shah Bangol khal Re-excavation(ch.00-1500m) Latimsar khal Re-excavation(ch.00-1350m) Hazi Barir khal Re-excavation(ch.00-1800m) Khalifa Barir khal Re-excavation(ch.00-650m) Sikder Barir khal Re-excavation(ch.00-425m) Referenced line section(9 Nos.) Bamboo bridge(9 Nos.) WMCA Office and Others 68.460 OTM 68.460 25/03/2019 30/04/2019 100 13/08/2024 Completed
10 SP15233/Ponabalia DR Subproject Kalia Barir Khal re-excavation (Ch:0.00-2100m) Baritala Khal re-excavation (Ch:0.00-2350m) Nager Bari Khal re-excavation (Ch:0.00-1250m) Hazragati Khal re-excavation (Ch:0.00-2050m) Balmari Khal re-excavation (Ch:0.00-0.500m) Ichalia Khal re-excavation (Ch:0.00-1350m) Dhalu Fakirbari Khal re-excavation (Ch:0.00-2400m) Kulitala Khal re-excavation (Ch:0.00-2350m) Const. of 20 Nos. Ref. lined Section on 8 Khals, SP Identf. sign board 2, SP Indication Post 2 and Demarcation Post. 44 Nos. 120.845 LCS 120.845 21/12/2023 81 13/08/2024 Ongoing
11 SP14206/Basanda DR Subproject Re-Excavation of NarBarir Khal (Ch.0+000 Km to 2+030 Km) Re-Excavation of Bousher Khal (Ch.0+700 Km to 2+025 Km) Re-Excavation of Bousher Branch Khal (Ch.0+000 Km to 0+600 Km) Re-Excavation of Chawpala Khal (Ch.0+000 Km to 1+330 Km) Re-Excavation of Raja Miar Khal (Ch.0+000 Km to 1+790 Km) Const. of 10 Nos. Ref. lined Section on 5 Khals, SP Identf. sign board 2 and SP Indication Post 2 62.158 LCS 62.158 25/04/2023 29/05/2023 100 13/08/2024 Completed
12 SP13059/Binoykathi DR Subproject Khagutia khal re-excavation(ch.00-2460m) Dokkhin Manpasa khondoker barir khal re-excavation(ch.00-18500m) Khagutia Majhibarir khal re-excavation(ch.00-650m) Bishnudia Hawladar barir khal re-excavation(ch.00-1000m) Referenced line section(8 Nos.) Bamboo bridge(7 Nos.) 60.539 LCS 60.539 28/02/2019 30/04/2019 100 13/08/2024 Completed
13 SP11009/Kafurkathi Khal DR Subproject Poschim Kafurkathi rambala barir khal re-excavation(ch.00-1775m) Kafurkathi Sunil beparir khal re-excavation(ch.00-1650m) Sotodaskathi Sorojit Howladar barir khal re-excavation(ch.00-1516m) Poschim Kafurkathi majhi barir khal re-excavation(ch.00-350m) Referenced line section(7 Nos.) Bamboo bridge(7 Nos.) Construction of WMCA Office(12m X 6m), Electrification Works and Furniture Supply 120.726 OTM 120.726 26/04/2021 25/04/2019 100 13/08/2024 Completed
2 Kathalia
1 SP44085/Aorabunia Subproject Re-excavation of Bansh Tala Katakhali Khal (Ch-0+00km to 2+000km) Re-excavation of ChayAni Khal (Ch-0+000km to 1+000km) Re-excavation of Minar Khal (Ch-0+000km to 1+700km) Re-excavation of ShimulTala Boro Barir Khal (Ch-0+000km to 1+600km) Re-excavation of Rayer MadarGachia Khal (Ch-0+000km to 1+200km) Re-excavation of Boro Barir Khal (Ch-0+000km to 0+600km) Ref. Lined Section 14 Nos. On 6 Khals, And SP Identf. Signboard (2 nos.) 86.885 LCS 86.885 28/03/2022 30/05/2022 100 13/08/2024 Completed
2 SP44083/Amua Patikhalghata Subproject Construction of 6 RCC reference-line sections on 3 canals and SP Signboard. Re-excavation of Kewabuniya khal (Ch: 0.00m to 2200.00m) Re-excavation of Kewabuniya Branch khal (Ch: 0.00m to 1400.00m) Re-excavation of Thakur Bari khal (Ch: 0.00m to 1600.00m) 45.738 LCS 45.738 21/04/2023 29/05/2023 100 13/08/2024 Completed
3 Nalchity
1 SP61003/Kulkathi Drainage Sbproject WMCA Office and Others Re-exacavation of Baworer khal (Ch-0+500khm to 3+078km) Re-exacavation of Baworer Branch khal (Ch-0+000khm to 1+803km) Re-exacavation of Akota khal (Ch-0+000khm to 1+618km) Re-exacavation of Aokta Branch khal (Ch-0+000khm to 0+471km) Re-exacavation of Mali bari khal (Ch-0+000khm to 1+677km Re-exacavation of Soroi khal (Ch-0+000khm to 3+008km) Re-exacavation of Kulkathi khal (Ch-0+000khm to 1+040km) Ref. Lined sections ( 13 Nos. ) , SP signboard 108.052 OTM 108.052 28/12/2020 30/04/2021 100 13/08/2024 Completed
2 SP44076/Paschim Gopalpur Subproject Re-Excavation of NapitKhali Khal (Ch.0+000 Km to 2+000 Km) Re-Excavation of BudaiKhali Khal (Ch.0+700 Km to 1+200 Km) Re-Excavation of Maddha Katakhali Khal (Ch.0+000 Km to 1+050 Km) Re-Excavation of Bhadra Khal (Ch.0+000 Km to 2+000 Km) Re-Excavation of MemberKhali Khal (Ch.0+000 Km to 1+650 Km) Const. of 12 Nos. Ref. lined Section on 5 Khal, SP Identf. sign board 2 Nos. and SP Indication Post 2 Nos. 63.366 LCS 63.366 26/04/2023 100 13/08/2024 Completed
3 SP43070/Panchagram Subproject Kaparkathi Pawta Khal re-xcavation (Ch:0.00m - 3000m) Maluhar Mukhiya Khal re-xcavation (Ch:0.00m - 2750m) Mukhiya Branch-1 Khal re-xcavation (Ch:0.00m - 500m) Const. of 05 Nos. Ref. lined Section on 03 Khals, SP Identf. sign board 2, SP Area Indication Post 2 Nos. 59.916 LCS 59.916 26/02/2024 61 13/08/2024 Ongoing
4 SP25331/Kathipara-Tetulbari Subproject AkonBarir khal re-excavation(ch.00-2000m) Gazi Barir khal re-excavation(ch.00-1100m) Molla Barir khal re-excavation(ch.00-1230m) Ukil Barir khal re-excavation(ch.00-1100m) Referenced line section(9 Nos.) Bamboo Bridge(9 Nos.) 61.223 LCS 61.223 04/04/2019 30/04/2019 100 13/08/2024 Completed
5 SP25320/Rajabaria Subproject Katakhali khal re-excavation(ch.00-4500m) Referenced Line section(5 Nos.) Bamboo bridge(3 Nos.) 59.455 LCS 59.455 28/02/2019 30/04/2019 100 13/08/2024 Completed
6 SP25319/Kusangal-Manapasa Subproject Sharif Khali Khal Re-excavation(ch0.00-3200m) Sarmahal Singha Barir Khal Re-excavation(ch0.00-1950m) Ref. Line Section(7nos), SP Identification signboard (2nos.) and Provisional Sum Repair of WMCA Office Building - 67.001 OTM 67.001 08/04/2020 29/04/2020 100 13/08/2024 Completed
7 SP25310/Subidpur-Nalbunia Subprject Bowniar Khal re-excavation (Ch:0.00m - 1600m) Bagher Khal re-excavation (Ch:0.00 - 1460m) Uzirbarir Khal re-excavation (Ch:0.00 - 1200m) Shudhir Barir Khal re-excavation (Ch:0.00 - 1150m) Bowniar Branch Khal re-excavation (Ch:0.00 - 840m) Shonarvita Khal re-excavation (Ch:0.00 - 580m) Fakir Barir Khal re-excavation (Ch:0.00 - 500m) Const. of 11 Nos. Ref. lined Section on 07 Khals, SP Identf. sign board 2, SP Area Indication Post 2 Nos. 53.462 LCS 53.462 04/03/2024 72 13/08/2024 Ongoing
8 SP15218/Dapdapia FCD Subproject Gohalkathi-Kajem Ali khan barir khal re-excavation(ch.00-4000m) Nager barir khal re-excavation(ch.00-1500m) Talukder barir khal re-excavation(ch.00-1500m) Biswas barir khal re-excavation(ch.00-1000m) Referenced line section (9 Nos.) Bamboo bridge (9 Nos.) Embankment re-sectioning(ch.00-1385m) 92.336 LCS 92.336 01/01/2019 30/04/2019 100 13/08/2024 Completed
9 SP14214/Magor FCD Subproject Re-excavation of Khaokhir khal (Ch. 0.00 - 2950 m) Re-excavation of Mirhar khal (Ch. 0.00 - 2100 m) Re-excavation of Khaokhir-Srirampur khal (Ch. 0.00 - 900 m) Reference lined Section (9nos.) Bamboo bridge (61.5m, 6nos.) and SP identification signboard (2nos.) Construction of WMCA building (Semi pacca) 111.261 OTM 111.261 20/01/2021 28/04/2021 100 13/08/2024 Completed
10 SP14174/Bhairabpasa FCD Subproject Pramahar Mallik Bari. Khal re-excavation (Ch:0.00m - 2700m) Pramahar Jamaddar Barir Khal re-excavation (Ch:0.00 - 1600m) Dhapar Gazi Barir Khal re-excavation (Ch:0.00 - 1350m) Pratap Sharif Barir Khal re-excavation (Ch:0.00 - 1200m) Ghatakhalilr Khal re-excavation (Ch:1700 - 2850m) Nalir Khal re-excavation (Ch:2150 - 3300m) Pratap Khalir Khalifa Bari Khal re-excavation (Ch:0.00 - 1050m) Pratap Hawladar Bari Khal re-excavation (Ch:0.00 - 1015m) Khalifa Bari Khal re-excavation (Ch:0.00 - 600m) Bhairab Pasha Khal re-excavation (Ch:3300 - 3750m) Const. of 12 Nos. Ref. lined Section on 10 Khals, SP Identf. sign board 2, SP Area Indication Post 2 Nos. 134.082 LCS 134.082 26/02/2024 77 13/08/2024 Ongoing
4 Rajapur
1 SP44080/Chollish Kawnia Subproject Kandir Barir Khal re-excavation (Ch:0.00 - 2685m) Chun Pori Khal re-excavation (Ch:0.00 - 2560m) Bilash Kurir Khal re-excavation (Ch:0.00 - 1505m) Butmara Khal re-excavation (Ch:0.00 - 1600m) Mirdha Barir Khal re-excavation (Ch:0.00 - 1420m) Const. of 12 Nos. Ref. lined Section on 5 Khals, SP Identf. sign board 2, SP Area Indication Post 2 Nos. 69.408 LCS 69.408 08/02/2024 72 13/08/2024 Ongoing
2 SP15288/Rajapur DR Subproject Construction of WMCA Building (Semi pacca) Re-excavation of Boro Khaibatra khal (Ch: 0.00 - 4810 m) Re-excavation of Rajpur dulu hawladar khal (Ch: 0.00 - 1720 m) Re-excavation of Algi pona khal (Ch: 0.00 - 3910 m) Re-excavation of Choto Boro Khaibatra shikdar bari khal (Ch: 0.00 - 1400 m) Reference Lined section (14 nos.) and Subproject Identification Signboard (2 nos.) 104.445 OTM 104.445 20/01/2021 26/04/2021 96 13/08/2024 Ongoing
3 SP15217/Saturia DR Subproject WMCA Office & Others Re-excavation of Boro Molla khal Re-excavation of Halder khalir branch khal Re-excavation of Tolatala khal Re-excavation of Majhi Barir khal Rfeference line section (9nos, 4nos.khal) Bamboo bridge (9nos, 95m) Tree Plantation (6544nos.) and Subproject Identification signboard (2nos.) 117.807 OTM 117.807 20/01/2021 27/04/2020 88 13/08/2024 Ongoing
Total : 0.0000 (Km) 2441.48 (Lac) 2441.48 (Lac)