Project Scheme Detail List
SL No. Package No. Name Length (Km) Allotment (Lac) Name of Contractor Contract Amount (Lac) Date of Commencement Date of Completion Physical Progress (%) Date of Progress Update Remarks
1 Habiganj-s
1 MGSP/STG/2015-16/W-02 a) Widening and Rehabilatation of National Highway (adjacent to Police Sation) to Noor Mansion Road.CH.00-1310 m b) (i) Consturction of RCC drain from National Highway (adjacent Police Station) to Koromali Plaza road via Shaistaganj Railway junction CH.00 – 1310 m (Both side) b(ii) Construction of secondary RCC drain with street lights starting from Noor Mansion to mondir road culvert via Shaistagonj Girl's High School and Mohalul Sonam Jame Mosque, Ch. 0 + 000 to 0 + 600m under Shaistagonj Pourashava. C) Supplying, fitting & fixing of street lights starting from National Highway(adjacent to Shaistaganj Police Station) to Korom Ali Plaza via Shaistaganj Railway Junction Ch. 0 + 000 to 1 + 310m(Staggered) (d) Supplying, fitting & fixing of street lights for Construction of Secondary RCC drain with street lighting starting from Noor Mansion to Mondir Road Culvert via Shaistaganj Girl's High School and Mohalul Sonam Jame Mosque(Ch. 00 - 600m) Single side. e) Environment works for MGSP/STG/2015-16/W-02 7.0400 108778986.670 MAH Construction Ltd. & MAM Construction Ltd. (JV) 108778986.670 06/11/2016 29/10/2017 34 27/09/2017  
2 MGSP/STG/W-01 a) (i) Improvement of South Lanja Para starting from R&H road to Hazi Zahir Ahmed road via Hobigonj PBS Ward-08, (Ch: 00-535m, Link-1-4 Length: 460m) 08 nos. Road X-drain, guidewall 470m (Total length=1030m) (ii) Construction of drain South Lanja Para starting from R&H road to Hazi Zahir Ahmed road via Hobigonj PBS Ward-08, (Ch: 00-640m) (Total Length=640), b) (i) Improvement of South Lenja Para Workshop road starting from R&H road to Hazi Zahir Ahmed road via Khairul Alam Councilor's house. Ward-08 (Ch: 00-657m), link-1 (ch: 00-30m) 09 nos. Road X-drain, guide wall 405m, (Total Length: 687m) (ii) Construction of drain South Lenja Para Workshop road starting from R&H road to Hazi Zahir Ahmed road via Khairul Alam Councilor's house. Ward-08 (Ch: 00-675m) Total Length: 675m) c) (i) Improvement of RCC road starting from East Borchor road to Rail Way Pond via BD Mithro Saheb's house and Palasading Construction . Ward No-03. (Ch: 00-790), Link-1-3, Ch: 00-310m, (Total Length= 1100m), 07 nos. Road X-drain. (ii) 2.5mx 2.5m Double Vent Box-Culvert at Ch: 495m d) Improvement of RCC road starting from Sudikhola BC road to Sudikhola Old BC road via Kodar Ali's house and Palisading, Ward No-04, 05. (Ch: 00-605m), Link 1: 180m, Link 2: 00-85m) (Total Length: 870m), 05 nos. Road X-drain, Guidewall 76m e) (i) Improvement of RCC road at Biramchar starting from Syed Elias Saheb's Boiler to Dhaka-Sylhet highway. Ward-09 (Ch:00-670m), Total Length: 670m, 04 Nos. Road X=drain, Guidewall length: 350m (ii) Construction ofdrain at Biramchar starting from Syed Elias Saheb's Boiler to Dhaka-Sylhet highway. Ward-09 (Ch: 00-400m), Total Length: 400m f) (i) Improvement of RCC road Construction starting from East Borchor BC Road to Bagunipara BC Road Via Protima House. Ward No-03 (Ch: 00-267m), Total Length: 267m, 03 Nos. Road X-drain (ii) Construction of drain East Borchor BC Road to Bagunipara BC Road Via Protima House. Ward No-03 (Length: 260m) 6.6015 45582790.000 M/S M. Alam 45582790.000 29/03/2015 23/05/2016 100 27/09/2017 Completed
2 Madhabpur
1 MGSP/MDP/2015-16/W-03 (a) Construction of 36.00m RCC slab bridge over Sonai River at the connecting point of Ganganagar and Noagaon road (350.00 m up-stream from the existing bgidge on Dhaka-Sylhet Highway) under Madhabpur Pourashava, Habigonj District. (a) Construction of 36.00m RCC slab bridge over Sonai River at the connecting point of Ganganagar and Noagaon road (350.00 m up-stream from the existing bgidge on Dhaka-Sylhet Highway) under Madhabpur Pourashava, Habigonj District. (Bridge Approach Road work) (a) Construction of 36.00m RCC slab bridge over Sonai River at the connecting point of Ganganagar and Noagaon road (350.00 m up-stream from the existing bgidge on Dhaka-Sylhet Highway) under Madhabpur Pourashava, Habigonj District. (Bridge work) (i) Street light to be provided from south abutment wall of bridge towards south (Ch. 0+000 to Ch. 0+080m) (ii) Street light to be provided from north abutment wall of bridge towards east up to proposed box culvert (Ch. 0+000 to Ch. 0+030m) (iii) Street light to be provided from north abutment wall of bridge towards west up to proposed box culvert (Ch. 0+000 to Ch. 0+030m) (iv) Street light to be provided from east side of the proposed abutment wall box culvert (Ch. 0+000 to Ch. 0+030m) (v) Street light to be provided from abutment wall of proposed box culvert towards north (Ch. 0+000 to Ch. 0+030m) (b) Widening and replacement of the existing structure by providing 2X5.00mX5.5X8.00m RCC box culvert on the Ganganagar road adjacent 36.00m proposed RCC slab bridge under Madhabpur Pourashava, Hobigonj District. (Box Culvert work.) (b) Widening and replacement of the existing structure by providing 2X5.00mX5.5X8.00m RCC box culvert on the Ganganagar road adjacent 36.00m proposed RCC slab bridge under Madhabpur Pourashava, Hobigonj District. (Environmental works.) (b) Widening and replacement of the existing structure by providing 2X5.00mX5.5X8.00m RCC box culvert on the Ganganagar road adjacent 36.00m proposed RCC slab bridge under Madhabpur Pourashava, Hobigonj District. (Box culvert Approach Road work) 0.1720 49266817.000 M/s. Isahil Enterprise & M/s. Tisha & Tusher Enterprise (JV) 49266817.000 10/05/2017 0 27/09/2017  
2 MGSP/MDP/2015-16/W-02 a) Widening and rehabilitation of bituminous carpeting (BC) road including road, drain, street light and allied works starting from the Gudampara Mosque to Bualia Bridge (Ch. 0+000 to 2+075m) under Madhabpur Pourashava in Hobiganj District. a1) Widening and rehabilitation of bituminous carpeting (BC) road including road, drain, street light and allied works starting from the Gudampara Mosque to Bualia Bridge (Ch. 0+000 to 2+075m) under Madhabpur Pourashava in Hobiganj District.(Road work) a2) Widening and rehabilitation of bituminous carpeting (BC) road including road, drain, street light and allied works starting from the Gudampara Mosque to Bualia Bridge (Ch. 0+000 to 2+075m) under Madhabpur Pourashava in Hobiganj District.(Cross drain/ Structure) a3) Widening and rehabilitation of bituminous carpeting (BC) road including road, drain, street light and allied works starting from the Gudampara Mosque to Bualia Bridge (Ch. 0+000 to 2+075m) under Madhabpur Pourashava in Hobiganj District.(Drain work) a4) Widening and rehabilitation of bituminous carpeting (BC) road including road, drain, street light and allied works starting from the Gudampara Mosque to Bualia Bridge (Ch. 0+000 to 2+075m) under Madhabpur Pourashava in Hobiganj District.(Street light & Electrical work) a5) Widening and rehabilitation of bituminous carpeting (BC) road including road, drain, street light and allied works starting from the Gudampara Mosque to Bualia Bridge (Ch. 0+000 to 2+075m) under Madhabpur Pourashava in Hobiganj District.(HBB work at Ch. 0+000 to 0+150km) (b1) Wedening and Rehabilitation of bituminous carpeting(BC) road including road, drain, electrification and allied works starting from Highway road to Ganganagar road via Shamoly para (Ch. 0+000 to 0+455m) under Madhabpur Pourashava in Hobiganj District. (Road work) (b2) Wedening and Rehabilitation of bituminous carpeting(BC) road including road, drain, electrification and allied works starting from Highway road to Ganganagar road via Shamoly para (Ch. 0+000 to 0+455m) under Madhabpur Pourashava in Hobiganj District. (Drain with Cross drain work from Ch. 0 to 300m (Both side) and Ch. 300 to 455m (only R/S)) (b3) Wedening and Rehabilitation of bituminous carpeting(BC) road including road, drain, electrification and allied works starting from Highway road to Ganganagar road via Shamoly para (Ch. 0+000 to 0+455m) under Madhabpur Pourashava in Hobiganj District. (Street light & Electrical work) (b4) Wedening and Rehabilitation of bituminous carpeting(BC) road including road, drain, electrification and allied works starting from Highway road to Ganganagar road via Shamoly para (Ch. 0+000 to 0+455m) under Madhabpur Pourashava in Hobiganj District. (Environmental works.) 6.1400 91297537.980 M/s. Bhuiyan & Brothers-M/s. Nilu Enterprise (JV) 91297537.980 01/02/2017 30/04/2018 9 27/09/2017  
3 MGSP/MDP/W-01 a) Construction of Bituminous Carpeting road from Highway to Rajghat Road (Ch. 0+000-1+150m) (Total Length:1150m) b) Construction of RCC Drain beside road from Highway to Rajghat Road (Ch. 0+000-0+200km) (Total Length:200m) c) Construction of Bituminous Carpeting road from Highway to Sonai Abason (Gucchagram) (Ch.0+000-0+700m) (Total Length:700m) d) Construction of Bituminous Carpeting road from Highway to Ganganagar near house of Probesh Rishi (Ch. 0+000-0+600m) (Total Length:600m) e) Construction of RCC Drain Beside road from Highway to Ganganagar.(L/S: Ch. 0+040-0+120m),(R/S:Ch. 0+070-0+150m) (Total Length:160m) f) Construction of RCC Drain beside road from Gumutia road near Gasfield to Kabarstan road around Krishnanagar.(Ch.0+000-0+530m) (Total Length:530m) g) Construction of Bituminous Carpeting road from old Cattle market to kasti Bridge. (0+000-0+350m) (Total Length:350m) h) Construction of RCC Drain beside road from old Cattle market to kasti Bridge. (0+000-0+200m) (Total Length:200m) 3.8900 39925102.000 M/S Hasan Enterprise 39925102.000 22/02/2015 05/05/2016 98 27/09/2017  
Total : 23.8435 (Km) 334851233.65 (Lac) 334851233.65 (Lac)