Project Scheme Detail List
SL No. Package No. Name Length (Km) Allotment (Lac) Name of Contractor Contract Amount (Lac) Date of Commencement Date of Completion Physical Progress (%) Date of Progress Update Remarks
1 Azmiriganj
1 HFMLIP/Habi/17-18/W-252 Improvement of Paschimbag-Azmiriganj Road at ch. 5400-9030 m by RCC under Dist. Habiganj. (Road ID: 636023001) 3.6300 484.440 M/S Hasan Enterprise 484.440 01/09/2018 30/06/2020 100 04/07/2024
2 HFMLIP/ Habi/17-18/W-219 Improvement of Azmiriganj-Paharpur Road at ch. 12000-15890m by RCC under Dist. Habiganj. (Road ID: 636022003) 3.8900 757.610 Shahil-Mortuja (JV), Habiganj 757.610 22/04/2018 31/03/2022 100 27/06/2024
3 HFMLIP/Habi/17-18/W-176 Improvement of Anandapur Ghat-Anandapur Village Road at Ch. 00-2600 by RCC under Dist. Habiganj.(Road ID: 636025034), Submergible 1.6670 168.050 Md Golam Faruk 168.050 07/01/2018 31/12/2019 100 27/06/2024
4 HFMLIP/Habi/16-17/W-119 Improvement of Kakailsow GCCR-Rasulpur Road from Ch 00-2720m by RCC under District:Habiganj (Road ID: 636025023) 2.7200 212.750 M/S Hasan Enterprise 212.750 15/02/2017 30/06/2020 100 27/06/2024
5 HFMLIP/ Habi/17-18/W-173 Improvement of Azmiriganj-Paharpur Road at Ch. 8600m-12000m by RCC under Dist. Habiganj. (Road ID: 636022003) Submergible 3.4000 727.790 Shahil-Mortuja (JV), Habiganj 727.790 19/03/2018 31/03/2023 100 27/06/2024
6 HFMLIP/Habi/16-17/EW-133 Re-excavation of Dhan Gang Beel Ganga Beel at Upazila -Azmirigonj, Dist. Habigang. 871593.000 LCS 871593.000 19/03/2017 25/11/2017 100 23/05/2024
7 HFMLIP/Habi/16-17/EW-146 Re-excavation of Dhangong Ganga Beel connecting khal at ch: 00-2100m under Azmiriganj Dist. Habigang. 2.1000 3567788.000 LCS 3567788.000 19/03/2017 25/12/2017 100 23/05/2024
8 HFMLIP/Habi/16-17/EW-137 Re-excavation of Shapla Khal at Upazila -Azmiriganj Dist. Habigang. 4.0000 6438553.000 LCS 6438553.000 15/03/2017 25/11/2017 100 23/05/2024
9 HFMLIP/Habi/15-16/EW-79 Re-excavation of Kayerdala Khal from Jolsukha to Shibpasa at Ch 00-2370m Upazila: Ajmiriganj, District: Habigang 2.3700 2410508.000 LCS 2410508.000 22/03/2016 30/06/2016 100 23/05/2024
10 HFMLIP/Habi/16-17/W-119 Improvement of Kakailsow GCCR-Rasulpur Road from Ch 00-2720m by RCC 2.7200 212.750 M/S Hasan Enterprise 212.750 22/02/2017 31/05/2020 100 23/05/2024
11 HFMLIP/Habi/16-17/W-120 Improvement of Pirojpur-Launch Ghat-Jalshuka Bazar Road at Ch 00-2000m by RCC underDistrict:Habiganj (Road ID: 636024002) 2.0000 159.909 LCS 159.909 13/02/2017 12/10/2017 100 13/08/2020 FinaL Bill Paid
12 HFMLIP/Habi/15-16/W-52 Improvement of Azmiriganj-Paharpur Road at Ch 6400-8600 m by RCC , District: Hobiganj (Road ID: 636022003), Submergible 2.2000 237.729 HE-UM(JV) 237.729 29/03/2016 29/03/2017 100 13/08/2020 Final Bill paid
13 HFMLIP/Habi/15-16/W-63 Improvement of Kamalpur Ghat to Kamalpur primary school Road at Ch 00-2750 m by RCC ,District: Hobiganj (Road ID: 636025026), Submergible 2.7500 214.165 Challenger & M.Hasan (JV) 214.165 19/04/2016 19/04/2017 100 13/08/2020 FB U/P
14 HFMLIP/Habi/17-18/W-178 Improvement of Bong Road-Paddy Land Road at Ch. 2000m-5000m by RCC under , Dist. Habiganj. (Road ID: 636025006), Submergible 3.0000 313.016 RBL-MRS JV 313.016 27/11/2017 26/11/2018 100 13/08/2020 Work canceled
15 HFMLIP/ Habi/17-18/W-198 Improvement of Azmiriganj-Paharpur Road at ch. 2000-6400m by slope protection work with CC block under Dist. Habiganj. (Road ID: 636112008) 103.012 M/S Mostofa kamal, Niaz Park,B'baria 103.012 18/02/2018 17/02/2019 100 12/08/2020 Final bill paid
16 (Pack No: HFMLIP/Habi/17-18/W-186) Maintenance of Azmiriganj-Kakailsew Road at Ch. 1000m-6500m under Azmiriganj Upazila, Dist. Habiganj. (Road ID: 636022002) 5.5000 205.281 M/S Mostofa Kamal 205.281 17/12/2017 16/12/2018 100 12/08/2020 final bill paid
17 HFMLIP/Habi/16-17/W-127 Improvement of Bong Road-Paddy Land Road from Ch 00-2000m by under District:Habiganj (Road ID: 636025006), Submergible 2.0000 144.150 Challenger & M.Hasan (JV) 144.150 11/04/2017 05/02/2018 100 12/08/2020 FinaL Bill Paid
18 HFMLIP/Habi/15-16/W-51 Improvement of Azmiriganj-Paharpur Road at Ch 4200-6400 m by RCC ,District: Hobiganj (Road ID: 636022003), Submergible 2.2000 324.548 M/S Hasan Enterprise 324.548 29/03/2016 29/03/2017 100 12/08/2020 Final Bill paid
19 HFMLIP/Habi/15-16/W-62 Improvement of Solori-Shibpasa Road at Ch 3000-6000 m by RCC , , District: Hobiganj (Road ID: 636025035), Submergible 3.0000 197.150 Challenger & M.Hasan (JV) 197.150 07/06/2016 06/06/2017 100 12/08/2020 Final Bill paid
20 HFMLIP/Habi/16-17/W-139 Improvement of Solori-Shibpasa Road at Ch 5868-7148 m by RCC , , District: Hobiganj (Road ID: 636025035), Submergible 1.2800 109.655 SE-MA JVC 109.655 25/05/2017 30/03/2018 100 12/08/2020 FB U/P
21 HFMLIP/Habi/16-17/W-114 Maintenane of Baniachong GC -Kumri Durgapur GC via Jonab Ali College and Bithangol GC from Ch 00-2000 m 2.0000 118.820 Md. Taz Uddin 118.820 04/12/2016 01/05/2017 100 09/08/2020 Final bill paid
22 HFMLIP/Habi/16-17/W-139 Improvement of Solori-Shibpasa Road at Ch 5868-7148 m by RCC 1.2800 109.660 SE-MA JVC 109.660 25/05/2017 30/06/2019 100 09/08/2020 FB U/P
23 HFMLIP/Habi/16-17/W-127 Improvement of Bong Road-Paddy Land Road from Ch 00-2000m 2.0000 144.150 Challenger & M.Hasan (JV) 144.150 11/04/2017 05/02/2018 100 09/08/2020 FinaL Bill Paid
24 HFMLIP/Habi/16-17/W-120 Improvement of Pirojpur-Launch Ghat-Jalshuka Bazar Road at Ch 00-2000m by RCC 2.0000 159.910 LCS 159.910 13/02/2017 12/10/2017 100 09/08/2020 FinaL Bill Paid
25 HFMLIP/Habi/15-16/W-63 Improvement of Kamalpur Ghat to Kamalpur primary school Road at Ch 00-2750 m by RCC 2.7500 214.170 Challenger & M.Hasan (JV) 214.170 19/04/2016 31/03/2018 100 09/08/2020 FB U/P
26 HFMLIP/Habi/15-16/W-62 Improvement of Solori-Shibpasa Road at Ch 3000-6000 m by RCC , 3.0000 197.150 Challenger & M.Hasan (JV) 197.150 07/06/2016 06/06/2017 100 09/08/2020 Final Bill paid
27 HFMLIP/Habi/15-16/W-52 Improvement of Azmiriganj-Paharpur Road at Ch 6400-8600 m by RCC 2.2000 237.730 HE-UM(JV) 237.730 29/03/2016 29/03/2017 100 09/08/2020 Final Bill paid
28 HFMLIP/Habi/15-16/W-51 Improvement of Azmiriganj-Paharpur Road at Ch 4200-6400 m by RCC 2.2000 324.550 M/S Hasan Enterprise 324.550 29/03/2016 15/03/2018 100 09/08/2020 Final Bill paid
29 HFMLIP/Habi/15-16/W-50 Improvement of Azmiriganj-Paharpur Road at Ch 2000-4200 m by RCC 2.2000 341.470 M/S Hasan Enterprise 341.470 29/03/2016 29/03/2017 100 09/08/2020 Final Bill paid
2 Bahubal
1 HFMLIP/Habi/17-18/W-175 Improvement of Satkapon UP Office (Chalitatala)-Bakterpur Via Shoaia Bazar Road at Ch. 10320-12580m by RCC under Dist. Habiganj. (Road ID: 636053004), Submergible 2.2600 436.940 M/S Hasan Enterprise, T.A Road, B'Baria 436.940 28/11/2017 31/03/2023 100 04/07/2024
2 HFMLIP/Habi/16-17/W-131 Improvement of Shuaiya Bazar-Ruyail Road by RCC at Ch 1000-2000 m by RCC under District:Habiganj (Road ID: 636055058) , Submergible 1.0000 101.114 M/s Vigilant Construction 101.114 17/04/2017 30/06/2020 100 04/07/2024
3 HFMLIP/Habi/16-17/W-118 Improvement of Guharua Pry. School -Panchparia Road via Sluice gate Durgapur at Ch 00-5000 m by BC ,District: Hobiganj (Road ID: 636054079) 5.0000 266.990 M/s. Maitry Builders & RS Construction -JV 266.990 22/02/2017 30/04/2018 100 04/07/2024
4 HFMLIP/Habi/14-15/EW-14 Re-excavation of Nidhonpur-Kalisiri Khal at Ch. 00-3600m Upazila: Bahubal 3.6000 3302342.000 LCS 3302342.000 21/05/2015 30/06/2015 100 23/05/2024
5 HFMLIP/Habi/16-17/W-131 Improvement of Shuaiya Bazar-Ruyail Road by RCC at Ch 1000-2000 m by RCC under Upazila: Bahubal, District:Habiganj (Road ID: 636055058) 1.0000 101.110 M/s Vigilant Construction 101.110 17/04/2017 30/06/2020 100 23/05/2024
6 HFMLIP/Habi/16-17/W-118 Improvement of Guharua Pry. School -Panchparia Road via Sluice gate Durgapur at Ch 00-5000 m by BC 5.0000 266.990 M/s. Maitry Builders & RS Construction -JV 266.990 22/02/2017 21/02/2018 100 23/05/2024
7 HFMLIP/Kishore/15-16/W-35 Improvement of Ujanchar Bazar-Halimpur UP Road by BC at Ch 4226-6516m District: Kihoregonj (Road ID: 348063001) 2.2900 160.119 M/S Momo Construction 160.119 03/02/2016 27/01/2017 100 18/08/2020 Final bill paid
8 HFMLIP/Habi/15-16/W-89 Construction of 4.00mx4.00m size RCC Box Culvert at Ch: 300m and 2.50mx2.50m size RCC Box Culvert at Ch: 1988m of Khagura-Bagdair Road, Dist: Habiganj. 0.0520 31.855 Md Abdul Quayum 31.855 21/09/2016 20/03/2017 100 13/08/2020 Final Bill paid
9 HFMLIP/Habi/14-15/W-16 Improvement of Khagaura-Bagdair road at Ch. 00-2000m & construction of 8 Nos. RCC structure at 1480m (Road ID: 636025035), Submergible 1.9880 113.996 LCS 113.996 26/05/2015 25/06/2016 100 13/08/2020 Final bill paid
10 HFMLIP/Habi/15-16/W-39 Improvement of Satkapon UP Office (Chalitatala) Bakterpur via Shoaia Bazar Road at Ch 8920-10320 m , , District: Hobiganj ( Road ID: 636053004), Submergible 1.4000 138.581 MS RS Construction 138.581 20/03/2016 05/07/2018 100 13/08/2020 Final Bill paid
11 HFMLIP/Habi/15-16/W-89 Construction of 4.00mx4.00m size RCC Box Culvert at Ch: 300m and 2.50mx2.50m size RCC Box Culvert at Ch: 1988m of Khagura-Bagdair Road 0.0520 31.860 Md Abdul Quayum 31.860 21/09/2016 20/03/2017 100 10/08/2020 Final Bill paid
12 HFMLIP/Habi/15-16/W-39 Improvement of Satkapon UP Office (Chalitatala) Bakterpur via Shoaia Bazar Road at Ch 8920-10320 m 1.4000 138.580 MS RS Construction 138.580 21/03/2016 05/07/2018 100 10/08/2020 Final Bill paid
13 HFMLIP/Habi/14-15/W-16 Improvement of Khagaura-Bagdair road at Ch. 00-2000m & construction of 8 Nos. RCC structure at 1480m 1.9880 114.000 LCS 114.000 26/05/2015 25/06/2016 100 09/08/2020 Final bill paid
14 HFMLIP/Habi/15-16/EW-55 Re-excavation of Jainal Khal from Chok Habijpur to Goharoa at Ch 00-4000m Upazila: Bahubal, District: Habigang 4.0000 3411774.000 LCS 3411774.000 0 21/09/2017 work delayed due to flood
15 HFMLIP/Habi/15-16/EW-54 Re-excavation of Mara Khal from Choto Boroiuri to Ponarabda at Ch 00-2000m Upazila: Bahubal, District: Habigang 2.0000 1111870.000 LCS 1111870.000 0 21/09/2017 work delayed due to flood
16 HFMLIP/Habi/14-15/W-13 Re-excavation of Dhorial Khal at Ch. 00-900m Upazila: Bahubal 0.9000 898682.000 LCS 898682.000 0 21/09/2017  
3 Baniachong
1 HFMLIP/Habi/17-18/W-184 Improvement of Subidpur UP Office-Awal Mohal Bazar via Kabirpur Niamatpur Road at Ch. 3000-4749m by RCC under, Dist. Habiganj. (Road ID: 636113013), Submergible 1.7490 758.860 M/S Challenger & M. Hasan JV 758.860 27/11/2017 30/11/2022 100 04/07/2024
2 HFMLIP/Habi/16-17/EW-136 Re-excavation of Choto Beri Beel at Upazila -Baniachong, Dist. Habigang. 1227954.000 LCS 1227954.000 100 23/05/2024
3 HFMLIP/Habi/16-17/EW-135 Re-excavation of Kutiara Beel at Upazila Baniachongj, Dist. Habigang. 1405377.000 LCS 1405377.000 100 23/05/2024
4 HFMLIP/Habi/16-17/EW-134 Re-excavation of Kacha Singra Beel at Upazila Baniachongj, Dist. Habigang. 1050531.000 LCS 1050531.000 100 23/05/2024
5 HFMLIP/Habi/16-17/EW-124 Re-excavation of Sudam Khali Khal at Ch 00-1500m Upazila: Baniachong, District: Habigang 1.5000 2554432.000 LCS 2554432.000 23/03/2016 15/12/2017 100 23/05/2024
6 HFMLIP/Habi/15-16/EW-59 Re-excavation of Majhergul Khal at Ch 00-600m Upazila: Baniachong, District: Habigang 0.6000 863872.000 LCS 863872.000 17/02/2016 30/06/2016 100 23/05/2024
7 HFMLIP/Habi/15-16/EW-58 Re-excavation of Phataria Khal in Mokar Haor at Ch 00-635m Upazila: Baniachong, District: Habigang 0.6350 1057746.000 LCS 1057746.000 17/02/2016 30/06/2016 100 23/05/2024
8 HFMLIP/Habi/15-16/EW-57 Re-excavation of Battuna Khal from Burajura to Sutki River at Ch 00-800m Upazila: Baniachong, District: Habigang 0.8000 1232539.000 LCS 1232539.000 100 23/05/2024
9 HFMLIP/Habi/15-16/EW-56 Re-excavation of Ratna Khal from Pukra to Chapbill at Ch 00-2500m Upazila: Baniachong, District: Habigang 2.5000 2654885.000 LCS 2654885.000 17/02/2016 30/06/2016 100 23/05/2024
10 HFMLIP/Habi/17-18/W-177) Improvement of Pukra UP Office-Kandipura Village Road Via Darowa, Sathgram High School at Ch. 00-2150m by BC under Dist. Habiganj.(Road ID: 636114049), Submergible 2.1500 153.762 MRS-AKC (JV), Habiganj 153.762 10/12/2017 09/12/2018 100 18/08/2020 Final bill paid
11 HFMLIP/Habi/15-16/W-41 Improvement of Subidpur UP Office Aowar Mohal Bazar via Kabirpur, Niamatpur Road at Ch 2000-3000 m by BC ,District: Hobiganj (Road ID: 636113013), Non-Submergible 1.0000 76.315 M/S Mason Ent 76.315 20/03/2016 16/01/2018 100 13/08/2020 FinaL Bill Paid
12 HFMLIP/Habi/16-17/W-132 Improvement of Shibgonj Bazar to Halderpur Chilori Road by RCC at Ch 00-3000 m by RCC under District:Habiganj (Road ID: 636114019), Submergible 3.0000 228.300 Md. Mizanur Rahman Shamim 228.300 11/04/2017 16/01/2018 100 13/08/2020 FinaL Bill Paid
13 HFMLIP/Habi/15-16/W-53 Improvement of Kadirganu GC-Paharpur GC via Karcha Road at Ch 1300-5920 m by BC , District: Hobiganj (Road ID: 636112007), Non-Submergible 4.6200 366.648 Md Mizanur Rahman Shamim 366.648 17/03/2016 28/05/2017 100 13/08/2020 Final Bill paid
14 HFMLIP/Habi/15-16/W-40 Improvement of Hobiganj Baniachong RHD via Sonaro Village Road by RCC at Ch 1000-1850 m , District: Hobiganj (Road ID: 636114013), Submergible 0.8500 52.259 LCS 52.259 07/03/2016 30/04/2017 100 13/08/2020 Final Bill paid
15 (Pack No: HFMLIP/Habi/17-18/W-191) Maintenance of Ilias Academy- Sharifuddin Road at Ch. 1100m-1411m under Baniachong Upazila, Dist. Habiganj. (Road ID No. 636114015) 0.3110 37.727 Md Ahsan Uddin Chowdhury 37.727 21/12/2017 19/06/2018 100 13/08/2020 FB u/p
16 (Pack No: HFMLIP/Habi/17-18/W-189) Maintenance of Baniachong GC-Paharpur GC Via Adarsha Bazar Ariamugur Road at Ch. 00m-1260 m under Baniachong Upazila, Dist. Habiganj. (Road ID: 636112008) 1.2600 186.146 HE-UM (JV) 186.146 21/12/2017 20/12/2018 100 13/08/2020 final bill paid
17 (Pack No: HFMLIP/Habi/17-18/W-187 Maintenance of Pukra Bazar-Pukra UP Office Road at Ch. 00m-3139 m under Baniachong Upazila, Dist. Habiganj. (Road ID: 636113005) ) 3.1390 145.882 M/S Jamal Enterprise 145.882 12/12/2017 11/12/2018 100 13/08/2020 final bill paid
18 HFMLIP/Habi/16-17/W-128 Improvement of Subidpur UP Office Aowal Mohal Bazar via Kabirpur Niamatpur Road at Ch 4704-6704 m by RCC under District:Habiganj (Road ID: 636113013), Submergible 2.0000 182.046 MAM CONSTRUCTION LTD. 182.046 11/04/2017 05/02/2018 100 13/08/2020 FinaL Bill Paid
19 HFMLIP/Habi/16-17/W-132 Improvement of Shibgonj Bazar to Halderpur Chilori Road by RCC at Ch 00-3000 m by RCC 3.0000 228.300 Md. Mizanur Rahman Shamim 228.300 11/04/2017 16/01/2018 100 10/08/2020 FinaL Bill Paid
20 HFMLIP/Habi/16-17/W-128 Improvement of Subidpur UP Office Aowal Mohal Bazar via Kabirpur Niamatpur Road at Ch 4704-6704 m by RCC 2.0000 182.050 MAM CONSTRUCTION LTD. 182.050 11/04/2017 28/02/2018 100 10/08/2020 FinaL Bill Paid
21 HFMLIP/Habi/15-16/W-53 Improvement of Kadirganu GC-Paharpur GC via Karcha Road at Ch 1300-5920 m by BC 4.6200 366.650 Md Mizanur Rahman Shamim 366.650 17/03/2016 28/05/2017 100 10/08/2020 Final Bill paid
22 HFMLIP/Habi/15-16/W-41 Improvement of Subidpur UP Office Aowar Mohal Bazar via Kabirpur, Niamatpur Road at Ch 2000-3000 m by BC 1.0000 76.320 M/S Mason Ent 76.320 27/03/2016 31/10/2018 100 10/08/2020 final Bill paid
23 HFMLIP/Habi/15-16/W-40 Improvement of Hobiganj Baniachong RHD via Sonaro Village Road by RCC at Ch 1000-1850 m 0.8500 52.260 LCS 52.260 07/06/2016 30/04/2017 100 10/08/2020 Final Bill paid
4 Habiganj-s
1 HFMLIP/Habi/15-16/W-36 Improvement of Poli-Pachparia Road by BC at Ch 1500-5700 m 4.2000 293.250 FS JV 293.250 05/07/2016 30/06/2018 100 03/03/2021 Final Bill paid
2 HFMLIP/Habi/15-16/W-36 Improvement of Poli-Pachparia Road by BC at Ch 1500-5700 m , District: Hobiganj (Road ID: 636444035), Non-Submergible 4.2000 293.253 FS JV 293.253 05/07/2016 30/06/2018 100 18/08/2020 Final Bill paid
3 (Pack No: HFMLIP/Habi/17-18/W-188) Maintenance of Lakhai R&H-Rajiura UP-Uchail Bazar Road at Ch. 00m-3636 m under Sadar Upazila, Dist. Habiganj. (Road ID: 636443011) 1.5700 87.782 Md Golam Faruk 87.782 03/12/2017 09/12/2018 100 18/08/2020 final bill paid
4 (Road ID: 636444047) (Pack No: HFMLIP/Habi/17-18/W-185) Maintenance of Biswa Road to Ladia Road Via Morora Kazirgonj Road at Ch. 00m-975m under Sadar Upazila, Dist. Habiganj. 0.9750 40.257 M/S Mukhis Traders 40.257 07/12/2017 29/03/2018 100 18/08/2020 final bill paid
5 HFMLIP/Habi/16-17/W-101 Improvemen Poil Natun Bazar Hat t 79.790 M/S Mason Enterprise 79.790 12/11/2016 11/05/2017 100 09/08/2020 Final bill paid
Total : 152.5160 (Km) 34072655.61 (Lac) 34072655.61 (Lac)