|
1
|
IRIDP-2/SUN/DW-2
|
a) Improvement of Nowdar Madrasha- Balijori via Chakiachapur Road (Ch. 00-2500m). b) Construction of 4Nos. 1x2.00mx2.00m RCC Box Culvert at ch. 210m, 865m, 1100m & 1525m on the same road.
|
2.5000
|
191.360
|
Baset Prokousholi
|
191.360
|
10/03/2016
|
31/12/2017
|
20
|
23/12/2018
|
|
|
2
|
IRIDP-2/SUN/DW-1
|
a) Improvement of Bongshikonda GC- Bishorpasha GC via Hamidpur Road (Ch. 00-2500m). b) Construction of 4Nos. 300mmx450mm Slab Culvert at ch. 610m, 820m, 1230m & 1490m on the same road.
|
2.5000
|
279.630
|
M/S. Subroto Suttradhar
|
279.630
|
29/02/2016
|
30/03/2017
|
100
|
23/12/2018
|
|