|
1
|
SP33092
|
Nokhorier Chhara Sub-project: Rehabilition of Nokhorier Chhara WRS at (Ch. 0+000km), Construction of WRS at ch.0 (700km), Construction of irrigation inlet str.1 at U/S of Nakhorier chhara existing 4v WRS, Construction of irrigation inlet str.2at ch. 0+
|
2.7000
|
155.340
|
LCS
|
155.340
|
|
|
0
|
21/08/2020
|
On going
|
|
2
|
SP34104
|
Bongaon Chhara Sub-project: Rehabilition of Bongaon Chhara WRS at (Ch. 0+000km), Construction of irrigation inlet structure at (1+400km) on right bank, bank raising of bongaon chhara left bank(at ch.0+000km to ch. 1+400), Bank raising of bongaon chhara ri
|
2.8000
|
67.200
|
LCS
|
67.200
|
|
|
90
|
21/08/2020
|
On going
|