Project Scheme Detail List
SL No. Package No. Name Length (Km) Allotment (Lac) Name of Contractor Contract Amount (Lac) Date of Commencement Date of Completion Physical Progress (%) Date of Progress Update Remarks
1 Begumganj
1 IRIDP-2/NOA/DW-251 Improvement of Shahid Muktijuddha Rafique Ullah Road (Sujayetpur Bapary Bari-Chawpolly R&H) (Ch. 00-203m). 0.2030 11.270 Pinnacle Construction Company 11.270 08/05/2019 100 24/07/2019
2 IRIDP-2/NOA/DW-249 Improvement of Abdullahpur Asa Kinter Garden- Alaiyapur Lower Pool Road (Ch. 1000-1500m). 0.5000 31.250 Pinnacle Construction Company 31.250 23/05/2019 100 24/07/2019
3 IRIDP-2/NOA/DW-248 a) Improvement of Durgapur Mohammad Mia Boro Hazi bari BC road- Boiddha bari via Mollah bari Road (Ch. 00-827m).b) Construction of 1No. 0.625mx0.600m Slab Culvert at ch. 246m on the same road. 0.8270 54.630 M/S. Mona Construction 54.630 19/12/2018 100 24/07/2019
4 IRIDP-2/NOA/DW-234 a) Improvement of Darafpur- Jirtoli UP Road (Etbaria UP Connecting Road) (Ch. 00-675m).b) Construction of 1No. 0.625mx0.600m Slab Culvert at ch. 230m on the same road. 0.6750 43.070 Mohana Bricks Manufacture 43.070 28/05/2018 100 24/07/2019
5 IRIDP-2/NOA/DW-233 a) Improvement of Banglabazar Padipara road- Gopalpur UP Road (Ch. 00-615m).b) Construction of 1No. 0.900mx0.900m Slab Culvert at ch. 320m on the same road. 0.6150 37.000 Pinnacle Construction Company 37.000 08/06/2016 100 24/07/2019
6 IRIDP-2/NOA/DW-232 a) Improvement of Napiter pool- Sultanpur College via Hirapur Road (Ch. 1810-2810m).b) Construction of 1No. 0.625mx0.600m Slab Culvert at ch. 2440m on the same road. 1.0000 70.930 Pinnacle Construction Company 70.930 20/11/2018 100 24/07/2019
7 IRIDP-2/NOA/DW-231 a) Improvement of Titahazra- Chankasimpur Road (Ch. 1100-2010m).b) Construction of 1No. 0.625mx0.600m Slab Culvert at ch. 1230m on the same road. 0.9100 55.620 Mohana Bricks Manufacture 55.620 30/06/2018 100 24/07/2019
8 IRIDP-2/NOA/DW-230 a) Improvement of Jaynarayan Pur- Kachi Hata Road (Ch. 1600-2520m).b) Construction of 1No. 0.625mx0.600m Slab Culvert at ch. 2270m on the same road.c) Construction of 1No. 2x3.50mx4.00m RCC Box Culvert at ch. 2507m on the same road. 0.9200 69.790 M/S. Mona Construction 69.790 20/12/2018 100 24/07/2019
9 IRIDP-2/NOA/DW-229 a) Improvement of Shibpur- Lowtoli Road (Lowtoli Munsi bari to Torikullha Master bari- Pachim Lowtoli Sagar Master bari Road) (Ch. 00-1005m).b) Construction of 1No. 0.625mx0.600m Slab Culvert at ch. 75m on the same road. 1.0050 65.620 Pinnacle Construction Company 65.620 20/09/2018 100 24/07/2019
10 IRIDP-2/NOA/DW-228 a) Improvement of Hossanpur Pordhar Bari Dorja- Sindurkit via Salim Dilar Bari Road (Ch. 00-875m).b) Construction of 1No. 0.625mx0.600m Slab Culvert at ch. 130m on the same road. 0.8750 57.110 Pinnacle Construction Company 57.110 24/05/2018 100 24/07/2019
11 IRIDP-2/NOA/DW-227 Improvement of Jahanabad Ganu Moulabi bari- Chilla bari batan pool Via Jahanabad Mosque Road (Ch. 00-420m). 0.4200 29.620 Pinnacle Construction Company 29.620 28/04/2019 100 24/07/2019
12 IRIDP-2/NOA/DW-225 a) Improvement of Rajapur Sowmail- Rajapur badu mia bari Via Shahadatullah bari Road (Ch. 00-1208m).b) Construction of 2Nos. 0.625mx0.600m Slab Culvert at ch. 450m & 820m on the same road.c) Construction of 1No. 1x2.00mx2.00m RCC Box Culvert at ch. 5m on the same road. 1.2080 79.750 Pinnacle Construction Company 79.750 28/04/2019 100 24/07/2019
13 IRIDP-2/NOA/DW-224 a) Improvement of Majdee Bashur hat R&H road- Paloan Bari pool Road (Masterda Surjasen Road) (Ch. 00-810m & 1130-1480m).b) Construction of 1No. 0.625mx0.600m Slab Culvert at ch. 760m on the same road. 1.1600 68.640 M/S. Mona Construction 68.640 09/04/2018 100 24/07/2019
14 IRIDP-2/NOA/SDW-171 Improvement of Setubanga Bridge (DFID)-Kutubpur Road (Ch. 987-1592m). 0.6050 36.690 M/S. Allardan Store 36.690 08/02/2018 100 24/07/2019
15 IRIDP-2/NOA/DW-164 a) Improvement of Kazir hat to Lohar pool (Julu Mia) Road (Ch. 00-1018m).b) Construction of 1No. 0.625mx0.600m Slab Culvert at ch. 840m on the same road. 1.0180 38.300 M/S. F. N. Enterprise 38.300 07/06/2017 100 24/07/2019
16 IRIDP-2/NOA/DW-158 Improvement of Maijdee Basurhat Road Miaje bari- Bangobondhu Road via Boro Mahadipur Jame Mosque Road (Ch. 00-988m).Construction of 1No. 2x3.00mx3.00m RCC Box Culvert at ch. 418m on the same road. 0.9880 61.810 M/S. F. N. Enterprise 61.810 28/05/2019 100 24/07/2019
17 IRIDP-2/NOA/DW-157 Improvement of Alayarpur Lal Mia Hazi bari- Horibhallappur Govt. Pry. School Road (Chowpally- Alaiyarpur (Talanshibari)) (Ch. 1000-2030m) & School Link Road at ch. 1660m (ch. 00-80m).Construction of 1No. 0.600mx0.600m Slab Culvert at ch. 1580m on the same road. 1.1100 57.650 Mohana Bricks Manufacture 57.650 05/02/2018 100 24/07/2019
18 IRIDP-2/NOA/DW-156 Improvement of Lakkhonpur Chayani Balika High School- Talibpur Ibrahim Member bari Road (Ch. 00-1095m).Construction of 1No. 0.600mx0.600m Slab Culvert at ch. 345m on the same road. 1.0950 55.990 Pinnacle Construction Company 55.990 17/06/2017 100 24/07/2019
19 IRIDP-2/NOA/DW-155 Improvement of Matoola bari pool- Chowkider bari pool Road (Ch. 00-555m).Construction of 1No. 0.600mx0.600m Slab Culvert at ch. 335m on the same road. 0.5550 28.290 Pinnacle Construction Company 28.290 24/12/2017 100 24/07/2019
20 IRIDP-2/NOA/DW-154 Improvement of Miapur Dhudmia Nutun bari- Abid Mahuri bari Road (Ch. 00-525m). 0.5250 26.760 Pinnacle Construction Company 26.760 20/02/2018 100 24/07/2019
21 IRIDP-2/NOA/DW-127 a) Improvement of Anantapur old Collage connecting Road (Choto Ramdebpur Hasan Karani road) (Ch. 00-543m).b) Construction of 2Nos. 0.625mx0.625m Slab Culvert at ch. 193m & 451m on the same road. 0.5430 43.220 M/S. Perfect Builders 43.220 17/06/2017 100 24/07/2019
22 IRIDP-2/NOA/SDW-126 a) Improvement of Fani road to Surugopool road via Madrasha Road (Durgapur) (Ch. 00-1082m).b) Construction of 3Nos. 0.625mx0.625m Slab Culvert at ch. 543m, 807m & 1035m on the same road. 1.0820 52.230 M/S. Mona Construction 52.230 24/01/2018 100 24/07/2019
23 IRIDP-2/NOA/DW-124 Improvement of Dakhin Lautali Govt. Pry. School to Bokshirhat Road (Lautali- Rafikpur Road) (Ch. 800-1550m). 0.7500 37.580 M/S. Yasin Traders 37.580 15/01/2018 100 24/07/2019
24 IRIDP-2/NOA/DW-123 Improvement of Tamuhani to Bashtola Road (Hajipur Hasan Ali road- Sanu Mia bari to Tamuhani Road) (Ch. 00-409m). 0.4090 21.700 Pinnacle Construction Company 21.700 01/05/2017 100 24/07/2019
25 IRIDP-2/NOA/DW-122 Improvement of Dokhin Kutubpur Advocate Aktarujjaman Ansarir bari to Paschim side Sohag Member bari to Uttar side Kumar barir Road (Ch. 00-800m). 0.8000 40.080 Mohana Bricks Manufacture 40.080 15/02/2018 100 24/07/2019
26 IRIDP-2/NOA/DW-121 Improvement of Lal Miar Haji bari to Mollar Teck Road (Kutubpur UP- Ambornagor UP Road) (Kirtanerhat north face-Rajapur Road) (Ch. 00-638m). 0.6380 31.640 Pinnacle Construction Company 31.640 11/06/2017 100 23/07/2019
27 IRIDP-2/NOA/DW-120 a) Improvement of Bahar Charman bari to Pasker Market Bridge Road (Mojahidpur- Amanatpur Road) (Ch. 00-500m).b) Construction of 1No. 0.625mx0.625m Slab Culvert at ch. 273m on the same road. 0.5000 27.520 Pinnacle Construction Company 27.520 31/12/2017 100 23/07/2019
28 IRIDP-2/NOA/DW-119 a) Improvement of West Noruttampur- Dakhin Noruttampur (Hamid Bapari bari) Road (Ch. 00-500m).b) Construction of 2Nos. 0.625mx0.625m Slab Culvert at ch. 125m & 430m on the same road. 0.5000 25.830 M/S. Rahman Construction 25.830 31/12/2017 100 23/07/2019
29 IRIDP-2/NOA/DW-118 a) Improvement of Madhya Narottampur near Choto Hazi bari- Purba Narottampur Hakim Mia bari Road (Sabu Sardar road) (Ch. 00-565m).b) Construction of 1No. 0.625mx0.625m Slab Culvert at ch. 379m on the same road. 0.5650 29.350 M/S. Nur Traders 29.350 01/06/2017 100 23/07/2019
30 IRIDP-2/NOA/DW-117 a) Improvement of Mirwarishpur Mirza bari- Mirwarishpur Buser Dokan Road (Mirwarishpur Rashedia Road) (Ch. 00-1000m).b) Construction of 2Nos. 0.625mx0.625m Slab Culvert at ch. 11m & 529m on the same road. 1.0000 53.110 M/S. Rahman Construction 53.110 09/05/2017 100 23/07/2019
31 IRIDP-2/NOA/SMW-114 Maintenance of Fenaghata- Miahpur- Rajullahpur (Miapur Primary School road) Road (Ch. 00-996m). 0.9960 32.890 M/S. Shahadat Traders 32.890 19/02/2017 100 23/07/2019
32 IRIDP-2/NOA/DW-113 Improvement of Titahazra- Chan Kasimpur Road (Ch. 00-1105m). 1.1050 56.860 M/S. Mohana Bricks Manufacturing 56.860 23/02/2017 100 23/07/2019
33 IRIDP-2/NOA/DW-106 a) Improvement of Chayani Kalikapur Govt. Primary School Road (Ch. 136-878m).b) Construction of 2Nos. 625mmx600mm Slab Culvert at ch. 652m & 834m on the same road. 0.7420 38.180 M/S. Maa Enterprise 38.180 30/11/2017 100 23/07/2019
34 IRIDP-2/NOA/MW-82 Maintenance of Kadirpur Badhirteker uttar side to Kalam profasar bari road (Kadirpur Nobir tack to Yusafar Dokan road) (Ch. 00-1050m). 1.0500 21.500 M/S. Rahaman Construction 21.500 15/03/2017 100 23/07/2019
35 IRIDP-2/NOA/MW-81 Maintenance of Arif Hazir Pool-Mondar Bari Road (Chaumuhani Arif Hazir Pool-Baro Sharifpur- Sharifpur UP office) (Ch. 2750-3580m). 0.8300 18.790 M/S. Shahadat Traders 18.790 20/08/2016 100 23/07/2019
36 IRIDP-2/NOA/MW-80 Maintenance of Surgo pool- Malaker Bapar Dokan (Surgo pool- Horonbibi Road (Ch. 00-830m). 0.8300 21.870 M/S. Jannatul Ferdous 21.870 20/03/2018 100 23/07/2019
37 IRIDP-2/NOA/MW-79 Maintenance of Uttar Jirtoli Noab Ali road to Jirtoli Bazar Road (Barkat Ullah Bulu Road (Banglabazar- Jirtoli-Hoillarhat- Eklashpur road) (Ch. 00-2780m) 2.7800 61.120 M/S. Mona Construction 61.120 12/11/2016 100 23/07/2019
38 IRIDP-2/NOA/DW-66 a) Improvement of Sujayetpur (R&H)-Bhahadipur via Alayerpur Road (BaraNewazpur-Aleyarpur Health and F.P. Road) (Ch. 1000-1515m).b) Improvement of Alayerpur Gov. Prymary School Road (Ch. 00-375m). 0.8950 47.410 M/S. Mohana Bricks Manufacturing 47.410 21/03/2017 100 23/07/2019
39 IRIDP-2/NOA/DW-8 Improvement of Kismot Karimpur Durgapur road (Bali Mosque to Durgapur High School road) from ch. 1500-2170m. 0.6700 35.000 M/S. Mona Construction 35.000 20/08/2016 100 23/07/2019
40 IRIDP-2/NOA/DW-7 a) Improvement of Mannan Market to Ohed Ali Bari Road (Patowarihat-Bashurhat-Khanpur-Chowrasta-Munshirhat road) from ch. 00-1000m.b) Construction of 2Nos. 625mmx625mm Drain Culvert at ch. 180m & ch. 431m on the same road. 1.0000 51.390 M/S. Maa Enterprise 51.390 20/08/2016 100 23/07/2019
41 IRIDP-2/NOA/DW-6 Improvement of Mirwarishpur majumderhat to UP Road from ch. 1330-2068m. 0.7380 43.190 M/S. Maa Enterprise 43.190 22/12/2016 100 23/07/2019
42 IRIDP-2/NOA/DW-5 Improvement of Joykisnapur Pana Mia Hazi bari to Mostafa member bari road (Joykrishnapur road) from ch.2000-2750m. 0.7500 39.170 M/S. Mizan Traders 39.170 04/08/2016 100 23/07/2019
43 IRIDP-2/NOA/DW-4 a) Improvement of Shadari pool uttar Jangimanrajpur to Tyabpur via Abad Ullah Cherang pool road (Rafiqpur-Janginanrajpur road) from ch.20-1020m. b) Construction of 1No. 625mmx625mm Drain Culvert at ch. 435m on the same road. 1.0000 49.920 M/S. Mona Construction 49.920 24/12/2016 100 23/07/2019
44 IRIDP-2/NOA/DW-3 Improvement of Sultanpur Arman miar bari to Hazi market (Sridharpur) Road (Sultanpur Mosque pool to Jugikhali road) from ch.00-1666m. 1.6660 81.860 M/S. Progati Traders 81.860 19/11/2016 100 23/07/2019
45 IRIDP-2/NOA/DW-3 Improvement of Sultanpur Arman miar bari to Hazi market (Sridharpur) Road (Sultanpur Mosque pool to Jugikhali road) from ch.00-1666m. 1.6660 81.860 M/S. Progati Traders 81.860 19/11/2016 100 22/07/2019
46 IRIDP-2/NOA/DW-2 Improvement of Chufi Ahamed bari to Peshker bari road (Kalikapur village road upto Kalikapur Madrasha at Gopalpur UP) from ch.1100-1688m. 0.5880 30.330 M/S. Rahman Construction 30.330 20/11/2016 100 22/07/2019
47 IRIDP-2/NOA/DW-1 Improvement of Aiyebpur Pathan Bari to Kazi bari Road (Khemchadrapur-Aiyubpur road) from ch.2000-3076m. 1.0760 51.720 M/S. Mohana Bricks Manufacturing 51.720 11/06/2016 100 22/07/2019
48 IRIDP-2/NOA/DW-6 Improvement of Mirwarishpur majumderhat to UP Road from ch. 1330-2068m. 0.7600 43.200 M/S. Maa Enterprise 43.200 09/02/2016 30/12/2016 100 23/12/2018  
49 IRIDP-2/NOA/DW-2 Improvement of Chufi Ahamed bari to Peshker bari road (Kalikapur village road upto Kalikapur Madrasha at Gopalpur UP) from ch.1100-1688m. 0.5880 30.330 M/S. Rahman Construction 30.330 15/02/2016 30/12/2016 100 23/12/2018  
50 IRIDP-2/NOA/DW-1 Improvement of Aiyebpur Pathan Bari to Kazi bari Road (Khemchadrapur-Aiyubpur road) from ch.2000-3076m. 1.0700 51.730 M/S. Mohana Bricks Manufacturing 51.730 15/02/2016 14/07/2016 100 23/12/2018  
2 Chatkhil
1 IRIDP-2/NOA/DW-177 a) Improvement of Datterbag MP Shahebe wahab Taiyeba hospital- Kazi Office via Wamim house east side, Muktizodda Fazlul Haque house- Hospital (Noakhola) Road (Ch. 660-1132m). b) Construction of 1No. 2.50mx2.00m RCC Box Culvert at ch. 1060m on the same road. 0.4720 38.080 M/S. Shakil Construction 38.080 30/04/2019 60 22/07/2019
2 IRIDP-2/NOA/SDW-258 a) Improvement of Khoajerbiti Dholabari to Dhormapur Abbaser Dokan via Sekherbari Road (Ch. 00-500m). b) Construction of 1No. 0.625mx0.600m Slab Culvert at ch. 415m on the same road. 0.5000 31.870 M/S. Kabir Traders 31.870 21/10/2018 100 16/07/2019
3 IRIDP-2/NOA/SDW-247 Improvement of Manikpur- Mutki Road (Ch. 500-1725m). 1.2250 72.000 M/S. Rahman Construction 72.000 20/12/2018 100 16/07/2019
4 IRIDP-2/NOA/SDW-246 Improvement of Purba Abutorab Gonar bari- Baitul Aman Jame Mosjid Road (East Abutorab Rafiq diller house Road) (Ch. 00-970m). 0.9700 60.410 M/S. Masudur Rahman 60.410 15/07/2018 100 16/07/2019
5 IRIDP-2/NOA/MW-208 Maintenance of Bansha- Rezzakpur Road (Ch. 00-500m). 0.5000 17.890 M/S. Sumon & Nazrul Traders 17.890 26/11/2017 100 16/07/2019
6 IRIDP-2/NOA/DW-207 Improvement of Ghtlabag Binoytola to Ghatlabag Khalifa bari Road (Ch. 00-500m). 0.5000 30.720 M/S. M Hossain & Sons 30.720 20/04/2018 100 16/07/2019
7 IRIDP-2/NOA/DW-206 a) Improvement of Binatolla- Kesurbag Gonir Dokan Road (Ch. 00-500m). b) Construction of 1No. 0.625mx0.600m Slab Culvert at ch. 400m on the same road. 0.5000 32.820 M/S. M Hossain & Sons 32.820 23/04/2018 100 16/07/2019
8 IRIDP-2/NOA/DW-205 Improvement of Hatpukuriya- Rezzakpur Road (Ch. 1100-1600m). 0 3,007,710.79 1-Nov-17 3,007,470.59 6-Dec-17 100% 0.5000 30.070 M/S. Shakil Construction 30.070 06/12/2017 100 16/07/2019
9 IRIDP-2/NOA/DW-204 Improvement of Dasgoria- Dattapara Road (Dewanji Bazar- Dattapara Collage road) (Ch. 7210-7710m). 0.5000 30.550 MS. Emdad Ullah 30.550 25/04/2018 100 16/07/2019
10 IRIDP-2/NOA/DW-203 a) Improvement of Banglabazar Narayanpur road- Latif Contractor bari Road (Sahapur) (Ch. 00-500m). b) Construction of 1No. 1x2.50mx2.00m RCC Box Culvert at ch. 260m on the same road. 0.5000 36.340 MS. Rahim Enterprise 36.340 18/04/2018 100 16/07/2019
11 IRIDP-2/NOA/DW-202 Improvement of Middha Parokot to Arshad Contractor Road (Ch. 00-500m). 0.5000 28.370 MS. Galaxy Enterprise 28.370 26/12/2017 100 16/07/2019
12 IRIDP-2/NOA/DW-201 Improvement of Sreeray Bhuyan bari to Aguni bari Road (Kadamtala Mosque to Sreeray Primary School Road) (Ch.1050-1640m). 0.5900 36.300 MS. Rahim Enterprise 36.300 19/05/2018 100 16/07/2019
13 IRIDP-2/NOA/DW-200 a) Improvement of Daleyai- Podder bazar Road via Dewanji Bazar Road (Khilpara to Gomatali Road) (Ch. 3800-4600m). b) Construction of 1No. 1.00mx1.00m Slab Culvert at ch. 4130m on the same road. 0.8000 51.340 MS. Emdad Ullah 51.340 25/05/2018 100 16/07/2019
14 IRIDP-2/NOA/DW-195 Improvement of Ramnarayanpur Dr. Sultan Mahmud Road (Jahir Ahmed house- Khalper via Shaha house, Dr. Siraj house) (Ch. 00-520m). 0.5200 36.340 MS. Emdad Ullah 36.340 25/04/2018 100 16/07/2019
15 IRIDP-2/NOA/DW-194 Improvement of Ghatlabag Nur A Ali Munsi bari- Binoytola Road (Ch. 00-500m). 0.5100 36.710 MS. Rahim Enterprise 36.710 18/04/2018 100 16/07/2019
16 IRIDP-2/NOA/DW-193 Improvement of Sonachaka- Khilpara connected road via Dimland school Road (Dimland School- Sonacaka bazar- Manna Kerani bari) (Ch. 750-1450m). 0.7000 45.040 M/S. Rasel Enterprise 45.040 28/04/2019 100 16/07/2019
17 IRIDP-2/NOA/DW-178 Improvement of Paranpur- Hashor Road (Paranpur- Daspara- Amirothi Road) (Ch. 00-500m). 0.5000 29.860 M/S. Allardan Store 29.860 20/05/2019 100 15/07/2019
18 IRIDP-2/NOA/DW-176 Improvement of Uttar Badolkot Dorga bari- West side Murad Bhuyan Mosjid Road (Dalta- Munshir Road) (Ch. 00-1105m). 1.1050 73.900 MS. Rahim Enterprise 73.900 19/04/2018 100 15/07/2019
19 IRIDP-2/NOA/DW-175 a) Improvement of Badolkot U.P. BaishSindur Bazar (Ramdebpur to BaishSindur Bazar more- Sagor Dactor bari to Siddik Member Dokan) Road (Ch. 1217-2060m). b) Construction of 2Nos. 0.625mx0.600m Slab Culvert at ch. 1517m & 2024m on the same road. 0.8430 55.880 M/S. Gulshan International 55.880 28/06/2018 100 15/07/2019
20 IRIDP-2/NOA/DW-139 a) Improvement of Badolkot- Hashor road via Sholla Janata Bazar Road (Ch. 00-2000m). b) Construction of 3x4.50mx4.50m RCC Box Culvert at ch. 5m on the same road. 2.0000 139.750 M/S. Shakil Construction 139.750 28/03/2018 100 14/07/2019
21 IRIDP-2/NOA/SDW-105 Improvement of Saterdigir per- Sompara Road from Dharmapur to Chilardigir per via Bangulat bari Road (Ch. 00-100m). 0.1000 4.580 M/S. Shakil Construction 4.580 13/12/2016 100 14/07/2019
22 IRIDP-2/NOA/DW-104 Improvement of Sreenagar Government Primary School Road (Ch. 1400-1720m). 0.3200 18.990 M/S. Shakil Construction 18.990 30/11/2016 100 14/07/2019
23 IRIDP-2/NOA/DW-103 Improvement of Molongmuri- Fawra Road (Fulsree boro bari- South Khalpar poul road) (Ch. 1000-1540m). 0.5400 27.160 M/S. Shakil Construction 27.160 03/04/2017 100 14/07/2019
24 IRIDP-2/NOA/MW-70 a) Maintenance of Khilpara- Sonachaka Road Via Sreeray Mohila Madrasha Road (Ch.00-1320m).b) Construction of 1No. 625mmx600mm Slab Culvert at ch. 1195m on the same road. 1.3200 34.840 M/S. M Hossain & Sons 34.840 30/11/2016 100 14/07/2019
25 IRIDP-2/NOA/MW-69 Maintenance of Badolkot- Janata bazar road via Thaner Hat, Palla bazar Road (Ch.7000-8225m). 1.2250 31.900 M/S. Nantu & Brothers 31.900 28/12/2017 100 14/07/2019
26 IRIDP-2/NOA/MW-68 Maintenance of Khilpara- Abir para bazar road Via Sree pur Road (Ch.00-1790m). 1.7900 38.990 MS. Shad Enterprise 38.990 01/12/2016 100 14/07/2019
27 IRIDP-2/NOA/DW-34 Improvement of Datterbag MP Shahebe wahab Taiyeba Hospital- Kazi Office Via Wamim house east side, Muktizodda fazlul haque house-Hospital Road from ch.00-660m. 0.6600 35.080 M/S. Shakil Construction 35.080 20/09/2016 100 07/07/2019
28 IRIDP-2/NOA/DW-33 Improvement of Molongmuri- Fawra Road (Kulsree boro bari-south khalpar poul road) from ch.00-1000m. 1.0000 52.980 M/S. Shakil Construction 52.980 15/09/2016 100 07/07/2019
29 IRIDP-2/NOA/DW-32 a) Improvement of Khilpara-Gomatoli road (South Fomatoli Khalper Bridge to Gomatoli Gov. Primary School and Samsul huda high school via Khorshed member bari front via Kotowal bari Jame Mosjid road) from ch.1950-2950m.b) Construction of 3x3.50mx3.50m R.C.C Box Culvert at ch. 1950m on the same road. 1.0000 80.680 M/S. Bhai Bhai Engineering Works 80.680 15/03/2017 100 07/07/2019
30 IRIDP-2/NOA/DW-31 Improvement of Hatpukuria-Razzakpur Road from ch.500-1100m. 0.6000 36.760 M/S. Shakil Brothers 36.760 16/11/2016 100 07/07/2019
31 IRIDP-2/NOA/DW-30 Improvement of Sompara-Korpara Road (Battala-Sampur Dargha Road) from ch.00-1000m. 1.0000 60.230 M/S. Shakil Construction 60.230 15/09/2016 100 07/07/2019
3 Companiganj
1 IRIDP-2/NOA/DW-20 a) Improvement of Char Hajari N. Jaman Road from ch.800-1500m.b) Construction of 2Nos. 625mmx600mm Drain Culvert at ch. 1700m on the same road. 0.7000 39.670 M/S. Raju Enterprise 39.670 25/12/2016 100 25/07/2019
2 IRIDP-2/NOA/DW-19 Improvement of Mollar Shop to Shimul Toli Road from ch.89-870m 0.7800 32.830 M/S. Century Traders 32.830 05/08/2016 100 25/07/2019
3 IRIDP-2/NOA/DW-18 a) Improvement of Badu Mia Road from ch.1500-2200m.b) Construction of 1No. 625mmx600mm Drain Culvert at ch. 1700m on the same road. 0.7000 33.550 M/S. Winer Construction 33.550 08/02/2017 100 25/07/2019
4 IRIDP-2/NOA/DW-17 Improvement of Char Parboti Central Road from ch.00-600m. 0.6000 28.190 M/S. Maa Enterprise 28.190 20/08/2016 100 25/07/2019
5 IRIDP-2/NOA/DW-16 a) Improvement of Sirajpur Udrajpur Mosque Road from ch.00-600m.b) Construction of 1No. 625mmx600mm Drain Culvert at ch. 1700m on the same road. 0.6000 25.970 M/S. Maa Enterprise 25.970 20/08/2016 100 25/07/2019
4 Noakhali-s
1 IRIDP-2/NOA/DW-15 Improvement of Neazpur-Machimpur late Mofiz Ullah Master (St. from Chuni khondakar-Mirdharhat road) from ch.00-600m 0.6000 31.120 M/S. Khan Enterprise 31.120 14/07/2016 100 25/07/2019
2 IRIDP-2/NOA/SDW-265 a) Improvement of Mahatapur Etvata (R&H)- Monir Uddin Bhuiyan Bari- Mahatapur Jame Mosque (Ch. 350-1350m).b) Construction of 1No. 0.625x0.600m Slab Culvert at ch. 400m on the same road.c) Improvement of Shahapur Bonikbari- Horishava Road (Muktijodda Abdul Hai Road) (Ch. 00-300m) under Chatkhil Upazila. 1.3000 110.130 110.130 0 25/07/2019
3 IRIDP-2/NOA/DW-260 a) Improvement of Killaarhat- Shampur- Ashwadia- Kalachandpur School Road (Ch. 00-755m). b) Construction of 1No. 0.625mx0.900m Slab Culvert at ch. 654m on Killaarhat-Shampur-Ashwadia- Kalachandpur School Road.c) Improvement of Neazpur UP Office- Hasanhat Bazar (Yeasir Arafath) Road (Ch. 959-1700m). d) Construction of 2Nos. 0.625mx0.900m Slab Culvert at ch. 1125m & 1450m on Neazpur UP Office- Hasanhat Bazar (Yeasir Arafath) Road. 1.4960 107.610 M/S. Ekram Brothers 107.610 15/04/2019 100 25/07/2019
4 IRIDP-2/NOA/MW-254 a) Maintenance of RHD (Mannanagar)-Haydermiar hat-Chowdhury hat- Rajgonj GC Road from Ch.3300-8767m.b) Maintenance of Dadpur bazar-Thekar hat Road from Ch.330-2330m.c) Construction of 0.900x0.900m culvert at ch. 1210m on Dadpur bazar-Thekar hat Road 7.4670 199.420 M/S. Perfect Builders 199.420 03/03/2018 100 25/07/2019
5 IRIDP-2/NOA/DW-136 a) Improvement of Surjonarayanbahar GPS- Bangla Bazar Road (Abdul Malek Ukil Road) (Ch. 00-550m). b) Construction of 2Nos. 0.625mx0.900m Slab Culvert at ch. 120m & 300m on the same road. 0.5500 33.020 M/S. Perfect Builders 33.020 10/02/2017 100 25/07/2019
6 IRIDP-2/NOA/DW-135 a) Improvement of Char Motua Embk Sluice gate- Uttar Underchar GPS Road (Abdul Malek Ukil Road) (Ch. 2613-4113m). b) Construction of 1No. 0.625mx0.900m Slab Culvert at ch. 3713m on the same road. 1.5000 79.770 M/S. T.H Enterprise 79.770 15/02/2017 100 25/07/2019
7 IRIDP-2/NOA/DW-134 a) Improvement of Udaysadurhat- Shafigonj- Chowdhuryhat- Banglabazar- Shantirhat- Koromullah bazar Road (Ch. 13400-15700m). b) Construction of 5Nos. 0.625mx0.900m Slab Culvert at ch. 14132m, 14430m, 14686m, 15259m & 15526m on the same road. 2.3000 151.270 M/S. Md. Mahmudur Rahman 151.270 28/02/2017 100 25/07/2019
8 IRIDP-2/NOA/DW-133 Improvement of Banglabazar- Chowkiderhat Abuar Dogi Reg. School Road (Ch. 2455-4055m). 1.6000 97.740 M/S. S.R Traders 97.740 04/03/2017 100 25/07/2019
9 IRIDP-2/NOA/DW-132 Improvement of Kanchanpur (Hinsha Market)- Laxminarayanpur-Jaykrishnapur Road(Ch. 1050-1200m). 0.1500 7.670 M/S. Perfect Builders 7.670 01/01/2017 100 25/07/2019
10 IRIDP-2/NOA/DW-131 a) Improvement of Scince & Technology University (Alualar dokan)- Khalilpur Road (Ch. 00-1465m). b) Construction of 1No. 0.625mx0.900m Slab Culvert at ch. 1200m on the same road. 1.4650 78.150 M/S. S.R Traders 78.150 18/02/2017 100 25/07/2019
11 IRIDP-2/NOA/DW-130 a) Improvement of RHD (Dactar hat)- Bangla bazar-Rahamatnagar Road (Obayedullah Road) (Ch. 7500-8080m). b) Construction of 4Nos. 0.625mx0.900m Slab Culvert at ch. 7571m, 7650m, 7844m & 7940m on the same road. 0.5800 34.610 M/S. T.H Enterprise 34.610 19/02/2017 100 25/07/2019
12 IRIDP-2/NOA/DW-129 a) Improvement of Muktijodda Abdul Kaium Road (St. from east side of vetirtak chowmuni bazar) (Ch. 00-2000m). b) Construction of 1No. 2x4.00mx3.50m RCC Box Culvert at ch. 650m on the same road.c) Construction of 1No. 0.625mx0.900m Slab Culvert at ch. 1800m on the same road. 2.0000 141.460 M/S. Perfect Builders 141.460 10/03/2017 100 25/07/2019
13 IRIDP-2/NOA/DW-128 a) Improvement of Sonapur road- Motipur Road (Hazi Idris) (Ch. 00-1874m). b) Construction of 1No. 2x4.00mx3.50m RCC Box Culvert at ch. 00m on the same road.c) Construction of 5Nos. 0.625mx0.900m Slab Culvert at ch. 70m, 900m, 1387m, 1600m & 1767m on the same road. 1.8740 124.680 M/S. Md. Mahmudur Rahman 124.680 04/04/2017 100 25/07/2019
14 IRIDP-2/NOA/SDW-90 Improvement of Goripur Jame Mosque- Hugly- Kashipur Road (Ch. 590-1630m). 1.0400 49.670 MD. Kamal Uddin 49.670 02/03/2017 100 25/07/2019
15 IRIDP-2/NOA/MW-88 Maintenance of Sonapur- Lalpur- Khalifar Hat Road (Ch.00-2000m). 2.0000 56.050 M/S. Perfect Builders 56.050 02/02/2017 100 25/07/2019
16 IRIDP-2/NOA/DW-62 a) Improvement of Hazir Hat- Nolua Road (Ch. 00-1020m)b) Construction of 2Nos. 625mmx900mm Slab Culvert at ch. 377m & 977m on the same road. 1.0200 52.450 Abdul Khalek 52.450 15/03/2017 100 24/07/2019
17 IRIDP-2/NOA/DW-61 a) Improvement of Matipur- Vatirtak Road (Ch. 8000-9000m)b) Construction of 1No. 625mmx900mm Slab Culvert at ch. 8230m on the same road. 1.0000 55.340 M/S. Mizan Traders 55.340 18/02/2017 100 24/07/2019
18 IRIDP-2/NOA/DW-14 Improvement of Rob bazar-Khalifer hat-Khonar Mosque (Karamullah GC-Road) from ch.3326-4300m 0.9750 48.230 M/S. Perfect Builders 48.230 20/08/2016 100 24/07/2019
19 IRIDP-2/NOA/DW-13 Improvement of Shibpur chowdhury Hat-Sonamia Market-Krisnarampur-Ratanpur -Gopinathpur Road from ch.1500-1885m. 0.3850 20.470 M/S. Perfect Builders 20.470 14/07/2016 100 24/07/2019
20 IRIDP-2/NOA/DW-12 Improvement of Uttar Sullakia (Hazi Amin Ullah Bazar)- Kaladaraf UP Road from ch.00-1000m. 1.0000 53.290 M/S. Perfect Builders 53.290 20/08/2016 100 24/07/2019
21 IRIDP-2/NOA/DW-11 a) Improvement of RHD (Datter hat)-Zamider Hat- Khalifar Hat Road from ch. 2540-3770m & ch. 4588-4903mb) Construction of 1x3.00mx2.50m RCC Box Culvert at ch. 3315m on the same road. 1.5450 98.120 M/S. Perfect Builders 98.120 30/10/2016 100 24/07/2019
22 IRIDP-2/NOA/DW-10 Improvement of Choto Ramdebpur-Anantapur old Noakhali college (Hossain Karani) Road from ch.00-700m. 0.7000 45.470 M/S. Khan Enterprise 45.470 14/07/2016 100 24/07/2019
23 IRIDP-2/NOA/DW-15 Improvement of Neazpur-Machimpur late Mofiz Ullah Master (St. from Chuni khondakar-Mirdharhat road) from ch.00-600m 0.6000 31.130 M/S. Khan Enterprise 31.130 27/02/2016 15/07/2016 100 23/12/2018  
24 IRIDP-2/NOA/DW-11 a) Improvement of RHD (Datter hat)-Zamider Hat- Khalifar Hat Road from ch. 2540-3770m & ch. 4588-4903mb) Construction of 1x3.00mx2.50m RCC Box Culvert at ch. 3315m on the same road. 1.5500 98.120 M/S. Perfect Builders 98.120 27/02/2016 15/01/2017 100 23/12/2018  
5 Senbag
1 IRIDP-2/NOA/DW-116 Improvement of Dakhin Manikpur Hazi Md. Hanif Road end of pacca point to Dotala Mosque Road via Hafiz Nadrar Zaman House(Dakhin Manikpur Hazi Md. Hanif Road)(Ch. 1000-1880m). 0.8800 50.000 M/S. Salam Traders 50.000 20/05/2017 100 22/07/2019
2 IRIDP-2/NOA/DW-213 Improvement of Dedishingpur Hazara Bari Bridge- Kamor Ali maiji Bari Road (Ch. 00-550m). 0.5500 36.510 M/S. F. N. Enterprise 36.510 28/02/2019 90 22/07/2019
3 IRIDP-2/NOA/DW-187 Improvement of Gazi Hat- Gazi bari to Elius More Road (Elius Morr- Gazir Mazar- Dumurua GPS Road) (Ch. 00-500m). 0.5000 35.660 M/S. Keya Enterprise 35.660 15/05/2018 100 22/07/2019
4 IRIDP-2/NOA/SDW-262 a) Improvement of Hosna Hossain Technical - Debishinghpur Islam Miaji Bari Road (Volontia bari Sofi Khondhaker bari front Santirhat Bazar Road) (Ch. 550-1250m).b) Construction of 1No. 0.625mx0.600m Slab Culvert at ch. 978m on the same road. 0.7000 51.730 M/S. Abul Khayer Bachu 51.730 25/06/2019 100 22/07/2019
5 IRIDP-2/NOA/DW-256 Improvement of Birkot Purbopara Mosque Road Birkot Ramchandra Mondir Road (Ch. 00-200m) 0.2000 7.940 M/S. Mona Construction 7.940 27/05/2018 100 22/07/2019
6 IRIDP-2/NOA/DW-250 Improvement of Baracharigaon- Chowrasta Amin Ullah Custom Bari- Charigaon Kazi bari Zame Mosque Road (Ch. 00-500m). 0.5000 32.580 M/S. Abul Khayer Bachu 32.580 28/05/2018 100 22/07/2019
7 IRIDP-2/NOA/DW-217 Improvement of Nalua Brick Field Link Road (Late Dr. Shiraj Uddin bari Road) (Ch. 00-150m). 0.1500 10.920 Hazi Traders 10.920 15/02/2019 100 22/07/2019
8 IRIDP-2/NOA/DW-216 Improvement of Nutan Bazar- Tazipukur Road (Ch. 00-820m). 0.8200 50.890 Pinnacle Construction Company 50.890 30/09/2018 100 22/07/2019
9 IRIDP-2/NOA/DW-215 Improvement of Mahatabpur- Chiladi West Chatterpiya Pry. School Road (Ch. 550-1050m). 0 3,086,931.74 16-Nov-17 3,086,423.01 5-Dec-18 100% 0.5000 30.860 MS. Nurbanu Bricks Manufacturing 30.860 05/12/2018 100 22/07/2019
10 IRIDP-2/NOA/DW-214 Improvement of Batakandi Bari & Compani Bari- Fashiganch Link Road (Ch. 00-520m). 0.5200 35.700 Hazi Traders 35.700 15/02/2019 100 22/07/2019
11 IRIDP-2/NOA/DW-212 Improvement of Taherpur Razzak Company Bari- Korban Ali Pandith Bari Bridge Road (Ch. 00-1000m). 1.0000 58.100 M/S. Yasin Traders 58.100 06/06/2018 100 22/07/2019
12 IRIDP-2/NOA/DW-211 Improvement of Fatehpur– Saestanagar Road (Fatepur- Hafizeai Madrasha- Prof. Harun Kabir house via Lion Zahangir Alam old house via Hazi Nasir Uddin Jame Mosque via Forid Master’s house via Dargha bari) (Ch. 1500-2500m). 1.0000 61.580 Hazi Traders 61.580 15/02/2019 100 22/07/2019
13 IRIDP-2/NOA/DW-191 Improvement of Bijbag house of Samad Ali Sardar to Miarhat Road (Uttar Bizbag Mendi Sardar Bari - Parchim Bizbag Baccur tak Road) (Ch. 00-750m). 0.7500 45.050 M/S. F. N. Enterprise 45.050 30/05/2019 100 22/07/2019
14 IRIDP-2/NOA/DW-190 Improvement of Gopal Pukur to house of Pear Ahammad Road (Uttar Mohammadpur Gopal Pukur Jan (RHD)- Purba Mohammadpur GPS Road) (Ch. 00-600m). 0.6000 36.200 Hazi Traders 36.200 28/09/2018 100 22/07/2019
15 IRIDP-2/NOA/DW-189 Improvement of Mogua house of Azim Chowdhary at end of Pacca road to North Joynagar near the house of Patowary (Kadra- Mogoa Bazar Road) (Ch. 880-1700m). 0.8200 49.500 Hazi Traders 49.500 25/09/2018 100 22/07/2019
16 IRIDP-2/NOA/DW-188 Improvement of Majirkhil- Nalua Pry. School Road (Majirkhil- Nalua Road) (Ch. 00-1000m). 1.0000 61.240 M/S. Kalam Bricks Manufacturing 61.240 29/09/2018 100 22/07/2019
17 IRIDP-2/NOA/SDW-170 Improvement of Azizpur Khan Para Road (Ch. 00-588m). 0.5880 31.450 M/S. Karim Brother 31.450 27/05/2019 100 22/07/2019
18 IRIDP-2/NOA/DW-159 Improvement of Surerhat- Sadekpur Primary School via Nur Nubi Chowdhury bari Road (Kabilpur-Sadekpur Surerhat road) (Ch. 00-1050m). 1.0500 54.640 Hazi Traders 54.640 12/11/2017 100 22/07/2019
19 IRIDP-2/NOA/DW-109 Improvement of Moishai- Tarabaria Pacca North side of Mosque to Takia Road (Waker Bari Tarabaria Road) (Ch. 1400-1900m). 0.5000 27.140 M/S. Kalam Bricks Manufacturing 27.140 11/12/2016 100 21/07/2019
20 IRIDP-2/NOA/DW-108 Improvement of Uttar Arjuntala GPS Road (Batakandi) (Ch. 00-1150m). 1.1500 65.860 M/S. Kalam Bricks Manufacturing 65.860 06/01/2017 100 21/07/2019
21 IRIDP-2/NOA/DW-107 Improvement of Basantapur Muslim Beparir Culvert- Chilade (VP Mostafa Bari) Road (Ch. 1150-1400m). 0.2500 16.310 M/S. Kalam Bricks Manufacturing 16.310 30/03/2017 100 21/07/2019
22 IRIDP-2/NOA/MW-73 Maintenance of Kesherpar- Khajuria Road (Ch. 00-928m) 0.9280 20.150 M/S. Allardhan Store 20.150 05/04/2017 100 17/07/2019
23 IRIDP-2/NOA/MW-72 Maintenance of Kadra- Mogua Bazar Road (Ch. 00-880m) 0.8800 19.220 M/S. Salma Traders 19.220 27/06/2016 100 17/07/2019
24 IRIDP-2/NOA/MW-71 Maintenance of Gazirhat- Gazir Mazar Road (Ch. 00-600m). 0.6000 9.530 M/S. Salma Traders 9.530 20/06/2016 100 17/07/2019
25 IRIDP-2/NOA/DW-44 Improvement of Kadra (R&H)-Ghorkata (Bottola) Road (ch.00-600m) 0.6000 37.200 M/S. Kalam Bricks Manufacturing 37.200 13/12/2016 100 17/07/2019
26 IRIDP-2/NOA/DW-43 Improvement of Rajarampur Waji Ullah Mesturi Bari-Hada Bepari Bari Road (ch.00-400m) 0.4000 23.670 M/S. Moshrof Brothers 23.670 27/03/2017 100 17/07/2019
27 IRIDP-2/NOA/DW-42 Improvement of Homnabad Sreepur Moisshi Boxgonj Road (ch.00-500m) 0.5000 29.970 M/S. Kalam Bricks Manufacturing 29.970 07/12/2016 100 17/07/2019
28 IRIDP-2/NOA/DW-41 Improvement of Kabilpur Shariet Ullah Shop- Sheikh Sufy Road (ch.450-1050m) 0.6000 34.320 M/S. Abul Khair Bachu 34.320 20/08/2016 100 17/07/2019
29 IRIDP-2/NOA/DW-40 Improvement of Basantapur Muslim Beparir Culvert-Chilade (VP Mostafa Bari) Road( ch.550-1150m) 0.6000 37.560 M/S. Kalam Bricks Manufacturing 37.560 08/03/2017 100 17/07/2019
30 IRIDP-2/NOA/DW-39 Improvement of Dakhin Manikpur Hazi Md. Hanif Road (ch.400-1000m) 0.6000 37.780 M/S. Keya Enterprise 37.780 09/04/2017 100 17/07/2019
6 Sonaimuri
1 IRIDP-2/NOA/DW-261 Improvement of Washakpur Zoorpol - Puccim Washakpur Oji Bari Road via Puccim Washakpur GPS Road (Ch. 00-1220m). 1.2200 99.540 M/S. Mokka Enterprise 99.540 07/03/2019 100 22/07/2019
2 IRIDP-2/NOA/DW-244 a) Improvement of Patwary Bari Hudaloa Mosque via Bahar Master Bari Road (Ch. 00-427m).b) Construction of 2Nos. 0.625mx0.600m Slab Culvert at ch. 277m & 350m on the same road. 0.4270 30.860 M/S. Yasin Traders 30.860 28/06/2018 100 22/07/2019
3 IRIDP-2/NOA/DW-223 Improvement of Barogon Beer Muktijodha Golam Sarowar House- Mukilla Madrasha Road (St. from Beer Muktijodha Golam Sarowar House to Rahim Master New house via Mukilla Madrasha) (Ch. 00-992m). 0.9920 60.560 M/S. Allardan Store 60.560 28/10/2018 100 22/07/2019
4 IRIDP-2/NOA/DW-222 Improvement of Hossainpur Bridge to Doulatpur Noutan Bazar Road (Doulatpur Zamader house- North side Arob Ali Member house) (Ch. 00-750m). 0.7500 46.270 M/S. Momena Khatun Construction 46.270 29/12/2018 100 22/07/2019
5 IRIDP-2/NOA/DW-221 Improvement of Doulatpur Arob Ali Miah Member bari-Natun Bazar Road (Doulatpur Motaleb Shop to Natun Bazar road) (Ch. 400-905m). 0.5050 31.630 M/S. Momena Khatun Construction 31.630 28/12/2018 100 22/07/2019
6 IRIDP-2/NOA/DW-220 Improvement of Miapur Bazar to Singhder Hat Road (Ch. 400-1000m). 0.6000 36.720 M/S. M Hossain & Sons 36.720 24/04/2019 100 22/07/2019
7 IRIDP-2/NOA/DW-219 Improvement of Tabar pol to Modha Nateswar south Road (Ch. 400-1000m). 0.6000 36.190 M/S. M Hossain & Sons 36.190 24/04/2019 100 22/07/2019
8 IRIDP-2/NOA/DW-218 Improvement of Beer Mukittijudha Abdul Hai Mil- Mofij Londani house Road (Ch. 400-800m). 0.4000 23.770 M/S. M Hossain & Sons 23.770 21/03/2019 100 22/07/2019
9 IRIDP-2/NOA/DW-192 a) Improvement of Nateshwar Shak sobi Road to Singdharhat Road.Via Hazi Kobir Mia House (Ch. 00-650m).b) Construction of 1No. 0.625mx0.600m Slab Culvert at ch. 255m on the same road. 0.6500 44.670 M/S. Allardan Store 44.670 26/07/2018 100 22/07/2019
10 IRIDP-2/NOA/DW-125 a) Improvement of Ambarnagor Haji Ershad Ulla Road (Purbo Ambarnagor Haji Eashad Ulla road- Chaharia Bazar Purbo side Bridge road via Sayd Bari- Habibulla Master bari) (Ch. 00-330m).b) Improvement of Chaharia Bazar Bridge to Senbag pucca Road (Purbo Ambarnagor Haji Eashad Ulla road- Chaharia Bazar Purbo side Bridge road via Sayd Bari- Habibulla Master bari) (Ch. 00-590m).c) Construction of 2Nos. 0.600mx0.600m Slab Culvert at ch. 00m & 65m on the same road.d) Improvement of Ambarnagor to Chaharia Bazar Connecting Road (Purbo Ambarnagor Haji Eashad Ulla road- Chaharia Bazar Purbo side Bridge road via Sayd Bari- Habibulla Master bari) (Ch. 00-360m). 1.2800 84.850 /S. Momena Khatun Construction 84.850 25/12/2017 100 22/07/2019
11 IRIDP-2/NOA/DW-112 Improvement of Chowmuhani- Nateswar- Mollapara Road (Doulatpur Osmania Jame Mosque to Mollapara Road) (Ch. 00-500m). 0.5000 23.600 M/S. Kalam Bricks Manufacturing 23.600 03/12/2016 100 21/07/2019
12 IRIDP-2/NOA/DW-111 a) Improvement of Daibari Bridge- Ekata Market- Digirjan Road (Atim Ali Shop- Haji Belal house Road) (Ch. 2202-3276m).b) Construction of 1No. 625mmx600mm Slab Culvert at ch. 2526m on the same road. 1.0740 59.600 M/S. Kalam Bricks Manufacturing 59.600 15/05/2017 100 21/07/2019
13 IRIDP-2/NOA/DW-110 a) Improvement of Nateshwar Bacha Gazi Bari- Shek Sobi Road (Morshed Alam Road) (Ch. 00-1000m).b) Construction of 1No. 625mmx600mm Slab Culvert at ch. 153m on the same road. 1.0000 50.310 M/S. Kalam Bricks Manufacturing 50.310 26/12/2016 100 21/07/2019
14 IRIDP-2/NOA/SDW-102 a) Improvement of Rajibpur- Bargoan Road (St. from Bargoan Chowdhury bari Bridge Bargoan Mia bari road to Vorer Bazar UP Office road via Arabiya Daliliya Madrasha) (Ch. 00-1520m).b) Construction of 1No. 625mmx600mm Slab Culvert at ch. 220m on the same road. 1.5200 79.390 M/S. Nur Banu Brick Manuf: 79.390 14/05/2017 100 21/07/2019
15 IRIDP-2/NOA/DW-89 a) Improvement of Ambarnagor Road- Hossainpur Maa Amina Asrsy Kendro Road (Ch. 600-1405m).b) Construction of 1No. 625mmx600mm Slab Culvert at ch. 1200m on the same road. 0.8050 41.430 M/S. Momena Khatun Construction 41.430 05/01/2017 100 17/07/2019
16 IRIDP-2/NOA/MW-78 Maintenance of Ramprashad Dighi to Takia (Rampara-Napit Bari) Road (Ch. 00-900m). 0.9000 19.940 M/S. Bakul & Sons 19.940 01/03/2017 100 17/07/2019
17 IRIDP-2/NOA/MW-77 Maintenance of Kazir hat to Hazir hat Road (Ch. 00-1650m) 1.6500 42.230 M/S. Mohammad Ullah 42.230 12/01/2017 100 17/07/2019
18 IRIDP-2/NOA/MW-76 Maintenance of SK. Shabi Road (Digir jahan-Abdullar hat Road) (Ch. 00-1350m). 1.3500 27.370 M/S. Bakul & Sons 27.370 19/02/2017 100 17/07/2019
19 IRIDP-2/NOA/MW-75 a) Maintenance of Battali Bazar to Bhangti Road (Ch. 00-550m).b) Construction of 1No. 625mmx600mm Slab Culvert at ch. 10m on the same road. 0.5500 13.180 M/S. Bakul & Sons 13.180 22/02/2017 100 17/07/2019
20 IRIDP-2/NOA/MW-74 Maintenance of Bazra- Nateshwar- Durgapur (Purba Chandpur Milgor-Nateshwar UP Akota Market) Road (Ch. 00-2820m). 2.8200 61.760 M/S. Lucky Prakawshali 61.760 18/12/2016 100 17/07/2019
21 IRIDP-2/NOA/DW-51 Improvement of D.C Pacca road-Muktar bari front side-Ambornagor Govt. Pry. School (ch.00-400m) 0.4000 19.660 M/S. Santu Enterprise 19.660 28/01/2017 100 17/07/2019
22 IRIDP-2/NOA/DW-50 Improvement of Aslam Patwary bari-Abdul Karim Moulovi bari Road (ch.00-400m) 0.4000 20.180 /S. Santu Enterprise 20.180 30/01/2017 100 17/07/2019
23 IRIDP-2/NOA/DW-49 Improvement of Doulatpur Arob Ali Mia Member Bari-Natun bazar Road (ch.00-400m) 0.4000 18.730 M/S. Momena Khatun Construction 18.730 11/01/2017 100 17/07/2019
24 IRIDP-2/NOA/DW-48 Improvement of Goskamta Natun Mosque Pacca-Goskamta Loder Pol pacca Road (ch.00-490m) 0.4900 22.660 M/S. Allardhan Store 22.660 20/12/2016 100 17/07/2019
25 IRIDP-2/NOA/DW-47 Improvement of Miapur Bazar-Shingdar Hat Road (ch.00-400m) 0.4000 21.390 M/S. Allardhan Store 21.390 25/12/2016 100 17/07/2019
26 IRIDP-2/NOA/DW-46 Improvement of Tobar pol to Modha Nateswar south side Road (ch.00-400m) 0.4000 19.590 M/S. Allardhan Store 19.590 04/04/2017 100 17/07/2019
27 IRIDP-2/NOA/DW-45 Improvement of Beer Muktijodha Abul Hai Mill-Mofij Londoni Road (ch.00-400m) 0.4000 19.580 M/S. Kalam Bricks Manufacturing 19.580 02/12/2016 100 17/07/2019
28 IRIDP-2/NOA/DW-264 a) Improvement of Muktijuddha M A Razzak Road (Bhuyan Bazar Bridge To Khodkhasta Uttor Para Jame Moquse) (Ch. 1140-1525m).b) Construction of 1No. 2x4.00mx4.00m RCC Box Culvert at ch. 00m on the same road. 0.3850 50.220 MS. Nurbanu Bricks Manufacturing 50.220 20/06/2019 100 16/07/2019
29 IRIDP-2/NOA/MW-243 Maintenance of Khodkasta Road (Sonaimury-Chashir hat-Naya Bazar- Tehemuhany Road) (Ch. 00-1280m). 1.2800 29.550 M/S. Sahadat Traders 29.550 25/02/2018 100 16/07/2019
30 IRIDP-2/NOA/DW-210 Improvement of Jayag- ZugiKhilpara- Mahutala Road (Vaorkot GPS- Thanarhat- Kachihata upto Mohiuddin Member house via Bhuyan house Mosque & Madrasha road) (Ch. 00-500m). 0.5000 29.830 MS. Nurbanu Bricks Manufacturing 29.830 20/10/2018 100 16/07/2019
31 IRIDP-2/NOA/DW-209 Improvement of Amishapara- Noagoan Mostak Doctor bari- Noagoan Govt. Pry. School Road (Bottali to East side Narayan Battro Patwary bari & Miazan Patwart bari road) (Ch. 00-766m). 0.7660 47.100 M/S. Sahadat Traders 47.100 04/09/2018 100 16/07/2019
32 IRIDP-2/NOA/DW-199 Improvement of Hatgaon Rafiqullah Master bari- Tintara Market Road (Ch. 500-1000m). 0.5000 36.340 M/S. Sahadat Traders 36.340 24/09/2018 100 16/07/2019
33 IRIDP-2/NOA/DW-198 Improvement of Nadona UP- Golamnabi- Gopalpur Up Road via Boropit- Gazaria- Sonapur Up to Banglabazar Road (Ch. 3100-3600m). 0.5000 29.430 M/S. Allardan Store 29.430 04/04/2018 100 16/07/2019
34 IRIDP-2/NOA/DW-197 a) Improvement of East Chandpur Rail Line to Rasulpur Regd. Non Govt. Pry. School Road (Ch. 00-535m). b) Construction of 1No. 0.625mx0.600m Slab Culvert at ch. 110m on the same road. 0.5350 41.360 MS. Nurbanu Bricks Manufacturing 41.360 30/12/2018 100 16/07/2019
35 IRIDP-2/NOA/DW-196 Improvement of Rothi Govt. Pry. School to North face Notun Bazar Road via Shop of Lokman (Ch. 500-1500m). 1.0000 60.920 M/S. Allardan Store 60.920 27/09/2018 100 16/07/2019
36 IRIDP-2/NOA/DW-180 Improvement of Abirpara Bazar Eidgah- Kazirkhil Road (Ch. 1000-1550m). 0.5500 35.390 M/S. Allardan Store 35.390 03/04/2018 100 16/07/2019
37 IRIDP-2/NOA/DW-179 Improvement of Papua Village road (Papua Board Pucca road to Gazaria Road) (Papua Eye hoapital South side to Jogjibon GPS Road) (Ch. 1600-2760m). 1.1600 69.770 M/S. Chayan Enterprise 69.770 02/06/2018 100 15/07/2019
38 IRIDP-2/NOA/SDW-153 Improvement of Padipara- Krishnopur Road (St. from Padipara Kachihata- Thanar hat road) (Ch. 00-667m). 0.6670 34.080 M/S. Kalam Bricks Manufacturing 34.080 14/01/2018 100 15/07/2019
39 IRIDP-2/NOA/DW-143 a) Improvement of Pachim Chadpur Shahid Beer Bikrom Mojaffar Ahamed Road (Ch. 00-735m). b) Construction of 1No. 0.600mx0.600m Slab Culvert at ch. 570m on the same road. 0.7350 39.950 M/S. Kalam Bricks Manufacturing 39.950 24/12/2017 100 15/07/2019
40 IRIDP-2/NOA/DW-142 Improvement of Kalikapur Golam Nobi pucca road to Barul Road (Kalikapur Golam Nobi pucca road to Barul Muktijuddah Abu Nacer Bhuiyan Road) (Ch. 00-400m). 0.4000 21.720 M/S. Kalam Bricks Manufacturing 21.720 26/12/2017 100 15/07/2019
41 IRIDP-2/NOA/DW-141 Improvement of BSR Road- Keghna- Bhatpara- Doiara- Dhuliapara Road (BSR Road- Keghna GPS Road) (Ch. 600-1600m). 1.0000 50.540 M/S. Kalam Bricks Manufacturing 50.540 06/04/2017 100 15/07/2019
42 IRIDP-2/NOA/DW-140 Improvement of Hatgaon Rafiqullah Master bari- Tintara Market Road (Ch. 00-500m). 0.5000 28.480 M/S. Kalam Bricks Manufacturing 28.480 06/04/2017 100 15/07/2019
43 IRIDP-2/NOA/DW-92 Improvement of Asia Govt. Primary School Road (Ch. 00-510m). (RHD- Ex-Chairman Mohammadullah house- Asia Govt. Primary School Road) 0.5100 32.960 M/S. Nur Banu Brick Manuf: 32.960 20/04/2017 100 14/07/2019
44 IRIDP-2/NOA/DW-38 Improvement of Kachihata pucca road to Hannan Master house front side road from -Ramdebpur-Sonaimuri-Korihati pacca Road from ch.00-1150m. 1.1500 59.730 M/S. Allardhan Store 59.730 15/01/2017 100 14/07/2019
45 IRIDP-2/NOA/DW-37 Improvement of Nodona Golam Nobi road to Mowlana Badiul Alam Madrasha road to Nodona bazar connecting Road from ch.00-515m. 0.5150 27.110 M/S. Allardhan Store 27.110 03/04/2017 100 14/07/2019
46 IRIDP-2/NOA/DW-36 a) Improvement of Bangla Bazar Pucca road to Kegna-Compani Bazar Road from ch.500-1650m.b) Construction of 2Nos 625mmx600mm Drain Culvert at ch. 520m & 925m on the same road. 1.1500 57.110 M/S. Momena Khatun Construction 57.110 17/01/2017 100 14/07/2019
47 IRIDP-2/NOA/DW-35 Improvement of Rothi Primary School near connecting road to Nodona bazar connecting Road from ch.00-1000m. 1.0000 52.120 M/S. Momena Khatun Construction 52.120 28/12/2016 100 14/07/2019
7 Subarna char
1 IRIDP-2/NOA/DW-253 a) Improvement of UNR Charbata UP- Shibcharan- Panditeer Hat- Char Mohiuddin Bazar Connecting Road from Ch.00-860m.b) Construction of 3Nos 0.900x0.900m culvert at ch. 284m, 408m & 582m on the same road. 0.8600 50.420 M/S. S.R Traders 50.420 13/05/2018 100 25/07/2019
2 IRIDP-2/NOA/DW-252 Improvement of UNR Atkopalia-Tonur Dokan- Ponditerhat Bhuiyan Bari Road (RHD. Atkopalia Shaheed Joynal Abedin High School- Thana Council connecting Road) from Ch.00-750m. 0.7500 40.120 M/S. T.H Enterprise 40.120 12/04/2018 100 25/07/2019
3 IRIDP-2/NOA/SDW-245 a) Improvement of UNR Moddhayo Char Bata Hazi Mohammad Muhori Jame-E-Mosque Road (Doctor Nasir Uddin Ahmed Road) from Ch.00-244m.b) Construction of 0.900x0.900m culvert at ch.5m on the same road. 0.2440 13.670 M/S. KMC Brick 13.670 02/05/2018 100 25/07/2019
4 IRIDP-2/NOA/DW-184 a) Improvement of Kala Mosjid- Bottoli Bazar- Karim Bazar- Renu miar Bazar Road (Ch. 00-3376m). b) Construction of 1No. 1x2.00mx2.00m RCC Box Culvert at ch. 2916m on the same road.c) Construction of 3Nos. 0.900mx0.900m Slab Culvert at ch. 420m, 899m & 1103m on the same road. 3.3760 212.490 M/S. Perfect Builders 212.490 28/04/2018 100 25/07/2019
5 IRIDP-2/NOA/DW-183 Construction of 20.00m Long RCC Grider Bridge on Upazilla H.Q- Halim Bazar- Alamin Bazar- Banglabazar Road at ch. 4340m. 147.230 M/S. Md. Mahmudur Rahman 147.230 28/04/2018 100 25/07/2019
6 IRIDP-2/NOA/DW-138 a) Improvement of RHD-Uttar Kasapia Sirajul Islam Madrasha- Chatki Bari Madrasha- Golam Mowla School Zaderpur Road (Ch. 00-1709m). b) Construction of 5Nos. 0.625mx0.900m Slab Culvert at ch. 606m, 935m, 1085m, 1271m & 1304m on the same road. 1.7090 95.840 M/S. T.H Enterprise 95.840 11/04/2017 100 25/07/2019
7 IRIDP-2/NOA/DW-137 Improvement of RHD Chaiakhali bazar- Bhuiyerhat- Kanchan bazar- Parishkar bazar- Atkopalia GC Road (Ch. 7458-7683m). 0.2250 17.330 M/S. Perfect Builders 17.330 13/12/2016 100 25/07/2019
8 IRIDP-2/NOA/MW-87 Maintenance of Kallarhat- Abdullahmiarhat (west char Jabbar) Road (Ch.00-2000m). 2.0000 26.790 M/S. S.R Traders 26.790 16/01/2017 100 25/07/2019
9 IRIDP-2/NOA/MW-85 Maintenance of RHD Bhuiyarhat- Juhayermiarhat-Renumiar Bazar- Shantirhat Road (Ch.00-1000m). 1.0000 15.100 M/S. Bakul & Sons 15.100 15/12/2016 100 24/07/2019
10 IRIDP-2/NOA/MW-86 a) Maintenance of Atkopalia Bazar- Jublee road (Abdus Salam road) (Ch.00-1415m).b) Construction of 3Nos. 625mmx600mm Slab Culvert at ch. 642m, 726m & 1237m on the same road. 1.4150 24.880 M/S. Bakul & Sons 24.880 20/08/2016 100 24/07/2019
11 IRIDP-2/NOA/MW-84 Maintenance of Atkopalia (Qudduser Saw mill)- Pankhar Bazar- Ramgoti Ferry Ghat Road (Ch.00-1006m). 1.0060 18.970 M/S. Perfect Builders 18.970 20/08/2016 100 24/07/2019
12 IRIDP-2/NOA/MW-83 Maintenance of UZR Ghose Field Bazar- Remgubinda High School- Kala Mosque Road (Ch.00-1094m). 1.0940 17.860 M/S. Bakul & Sons 17.860 20/08/2016 100 24/07/2019
13 IRIDP-2/NOA/DW-60 a) Improvement of RHD Atkopalia- Panditer Hat- Pankhar Bazar Road. (Ch. 7660-9497m)b) Construction of 1No. 900mmx900mm Slab Culvert at ch. 7955m on the same road. 1.8370 114.640 M/S. Perfect Builders 114.640 20/08/2016 100 24/07/2019
14 IRIDP-2/NOA/DW-9 a) Improvement of RHD Chaiakhali Bazar-Bhuiyerhat-Kanchan Bazar-Poriskarer Bazar- Atkopalia Bazar Road from ch.2794-4566m b) Construction of 5Nos. 900mmx900mm Drain Culvert at ch. 2914m, 3238m, 3762m, 3859m & 4447m on the same road. 1.7720 145.360 M/S. Rupali Traders 145.360 26/08/2016 100 24/07/2019
Total : 179.9780 (Km) 9461.33 (Lac) 9461.33 (Lac)