1
|
IRIDP-2/NOA/DW-251
|
Improvement of Shahid Muktijuddha Rafique Ullah Road (Sujayetpur Bapary Bari-Chawpolly R&H) (Ch. 00-203m).
|
0.2030
|
11.270
|
Pinnacle Construction Company
|
11.270
|
|
08/05/2019
|
100
|
24/07/2019
|
|
|
2
|
IRIDP-2/NOA/DW-249
|
Improvement of Abdullahpur Asa Kinter Garden- Alaiyapur Lower Pool Road (Ch. 1000-1500m).
|
0.5000
|
31.250
|
Pinnacle Construction Company
|
31.250
|
|
23/05/2019
|
100
|
24/07/2019
|
|
|
3
|
IRIDP-2/NOA/DW-248
|
a) Improvement of Durgapur Mohammad Mia Boro Hazi bari BC road- Boiddha bari via Mollah bari Road (Ch. 00-827m).b) Construction of 1No. 0.625mx0.600m Slab Culvert at ch. 246m on the same road.
|
0.8270
|
54.630
|
M/S. Mona Construction
|
54.630
|
|
19/12/2018
|
100
|
24/07/2019
|
|
|
4
|
IRIDP-2/NOA/DW-234
|
a) Improvement of Darafpur- Jirtoli UP Road (Etbaria UP Connecting Road) (Ch. 00-675m).b) Construction of 1No. 0.625mx0.600m Slab Culvert at ch. 230m on the same road.
|
0.6750
|
43.070
|
Mohana Bricks Manufacture
|
43.070
|
|
28/05/2018
|
100
|
24/07/2019
|
|
|
5
|
IRIDP-2/NOA/DW-233
|
a) Improvement of Banglabazar Padipara road- Gopalpur UP Road (Ch. 00-615m).b) Construction of 1No. 0.900mx0.900m Slab Culvert at ch. 320m on the same road.
|
0.6150
|
37.000
|
Pinnacle Construction Company
|
37.000
|
|
08/06/2016
|
100
|
24/07/2019
|
|
|
6
|
IRIDP-2/NOA/DW-232
|
a) Improvement of Napiter pool- Sultanpur College via Hirapur Road (Ch. 1810-2810m).b) Construction of 1No. 0.625mx0.600m Slab Culvert at ch. 2440m on the same road.
|
1.0000
|
70.930
|
Pinnacle Construction Company
|
70.930
|
|
20/11/2018
|
100
|
24/07/2019
|
|
|
7
|
IRIDP-2/NOA/DW-231
|
a) Improvement of Titahazra- Chankasimpur Road (Ch. 1100-2010m).b) Construction of 1No. 0.625mx0.600m Slab Culvert at ch. 1230m on the same road.
|
0.9100
|
55.620
|
Mohana Bricks Manufacture
|
55.620
|
|
30/06/2018
|
100
|
24/07/2019
|
|
|
8
|
IRIDP-2/NOA/DW-230
|
a) Improvement of Jaynarayan Pur- Kachi Hata Road (Ch. 1600-2520m).b) Construction of 1No. 0.625mx0.600m Slab Culvert at ch. 2270m on the same road.c) Construction of 1No. 2x3.50mx4.00m RCC Box Culvert at ch. 2507m on the same road.
|
0.9200
|
69.790
|
M/S. Mona Construction
|
69.790
|
|
20/12/2018
|
100
|
24/07/2019
|
|
|
9
|
IRIDP-2/NOA/DW-229
|
a) Improvement of Shibpur- Lowtoli Road (Lowtoli Munsi bari to Torikullha Master bari- Pachim Lowtoli Sagar Master bari Road) (Ch. 00-1005m).b) Construction of 1No. 0.625mx0.600m Slab Culvert at ch. 75m on the same road.
|
1.0050
|
65.620
|
Pinnacle Construction Company
|
65.620
|
|
20/09/2018
|
100
|
24/07/2019
|
|
|
10
|
IRIDP-2/NOA/DW-228
|
a) Improvement of Hossanpur Pordhar Bari Dorja- Sindurkit via Salim Dilar Bari Road (Ch. 00-875m).b) Construction of 1No. 0.625mx0.600m Slab Culvert at ch. 130m on the same road.
|
0.8750
|
57.110
|
Pinnacle Construction Company
|
57.110
|
|
24/05/2018
|
100
|
24/07/2019
|
|
|
11
|
IRIDP-2/NOA/DW-227
|
Improvement of Jahanabad Ganu Moulabi bari- Chilla bari batan pool Via Jahanabad Mosque Road (Ch. 00-420m).
|
0.4200
|
29.620
|
Pinnacle Construction Company
|
29.620
|
|
28/04/2019
|
100
|
24/07/2019
|
|
|
12
|
IRIDP-2/NOA/DW-225
|
a) Improvement of Rajapur Sowmail- Rajapur badu mia bari Via Shahadatullah bari Road (Ch. 00-1208m).b) Construction of 2Nos. 0.625mx0.600m Slab Culvert at ch. 450m & 820m on the same road.c) Construction of 1No. 1x2.00mx2.00m RCC Box Culvert at ch. 5m on the same road.
|
1.2080
|
79.750
|
Pinnacle Construction Company
|
79.750
|
|
28/04/2019
|
100
|
24/07/2019
|
|
|
13
|
IRIDP-2/NOA/DW-224
|
a) Improvement of Majdee Bashur hat R&H road- Paloan Bari pool Road (Masterda Surjasen Road) (Ch. 00-810m & 1130-1480m).b) Construction of 1No. 0.625mx0.600m Slab Culvert at ch. 760m on the same road.
|
1.1600
|
68.640
|
M/S. Mona Construction
|
68.640
|
|
09/04/2018
|
100
|
24/07/2019
|
|
|
14
|
IRIDP-2/NOA/SDW-171
|
Improvement of Setubanga Bridge (DFID)-Kutubpur Road (Ch. 987-1592m).
|
0.6050
|
36.690
|
M/S. Allardan Store
|
36.690
|
|
08/02/2018
|
100
|
24/07/2019
|
|
|
15
|
IRIDP-2/NOA/DW-164
|
a) Improvement of Kazir hat to Lohar pool (Julu Mia) Road (Ch. 00-1018m).b) Construction of 1No. 0.625mx0.600m Slab Culvert at ch. 840m on the same road.
|
1.0180
|
38.300
|
M/S. F. N. Enterprise
|
38.300
|
|
07/06/2017
|
100
|
24/07/2019
|
|
|
16
|
IRIDP-2/NOA/DW-158
|
Improvement of Maijdee Basurhat Road Miaje bari- Bangobondhu Road via Boro Mahadipur Jame Mosque Road (Ch. 00-988m).Construction of 1No. 2x3.00mx3.00m RCC Box Culvert at ch. 418m on the same road.
|
0.9880
|
61.810
|
M/S. F. N. Enterprise
|
61.810
|
|
28/05/2019
|
100
|
24/07/2019
|
|
|
17
|
IRIDP-2/NOA/DW-157
|
Improvement of Alayarpur Lal Mia Hazi bari- Horibhallappur Govt. Pry. School Road (Chowpally- Alaiyarpur (Talanshibari)) (Ch. 1000-2030m) & School Link Road at ch. 1660m (ch. 00-80m).Construction of 1No. 0.600mx0.600m Slab Culvert at ch. 1580m on the same road.
|
1.1100
|
57.650
|
Mohana Bricks Manufacture
|
57.650
|
|
05/02/2018
|
100
|
24/07/2019
|
|
|
18
|
IRIDP-2/NOA/DW-156
|
Improvement of Lakkhonpur Chayani Balika High School- Talibpur Ibrahim Member bari Road (Ch. 00-1095m).Construction of 1No. 0.600mx0.600m Slab Culvert at ch. 345m on the same road.
|
1.0950
|
55.990
|
Pinnacle Construction Company
|
55.990
|
|
17/06/2017
|
100
|
24/07/2019
|
|
|
19
|
IRIDP-2/NOA/DW-155
|
Improvement of Matoola bari pool- Chowkider bari pool Road (Ch. 00-555m).Construction of 1No. 0.600mx0.600m Slab Culvert at ch. 335m on the same road.
|
0.5550
|
28.290
|
Pinnacle Construction Company
|
28.290
|
|
24/12/2017
|
100
|
24/07/2019
|
|
|
20
|
IRIDP-2/NOA/DW-154
|
Improvement of Miapur Dhudmia Nutun bari- Abid Mahuri bari Road (Ch. 00-525m).
|
0.5250
|
26.760
|
Pinnacle Construction Company
|
26.760
|
|
20/02/2018
|
100
|
24/07/2019
|
|
|
21
|
IRIDP-2/NOA/DW-127
|
a) Improvement of Anantapur old Collage connecting Road (Choto Ramdebpur Hasan Karani road) (Ch. 00-543m).b) Construction of 2Nos. 0.625mx0.625m Slab Culvert at ch. 193m & 451m on the same road.
|
0.5430
|
43.220
|
M/S. Perfect Builders
|
43.220
|
|
17/06/2017
|
100
|
24/07/2019
|
|
|
22
|
IRIDP-2/NOA/SDW-126
|
a) Improvement of Fani road to Surugopool road via Madrasha Road (Durgapur) (Ch. 00-1082m).b) Construction of 3Nos. 0.625mx0.625m Slab Culvert at ch. 543m, 807m & 1035m on the same road.
|
1.0820
|
52.230
|
M/S. Mona Construction
|
52.230
|
|
24/01/2018
|
100
|
24/07/2019
|
|
|
23
|
IRIDP-2/NOA/DW-124
|
Improvement of Dakhin Lautali Govt. Pry. School to Bokshirhat Road (Lautali- Rafikpur Road) (Ch. 800-1550m).
|
0.7500
|
37.580
|
M/S. Yasin Traders
|
37.580
|
|
15/01/2018
|
100
|
24/07/2019
|
|
|
24
|
IRIDP-2/NOA/DW-123
|
Improvement of Tamuhani to Bashtola Road (Hajipur Hasan Ali road- Sanu Mia bari to Tamuhani Road) (Ch. 00-409m).
|
0.4090
|
21.700
|
Pinnacle Construction Company
|
21.700
|
|
01/05/2017
|
100
|
24/07/2019
|
|
|
25
|
IRIDP-2/NOA/DW-122
|
Improvement of Dokhin Kutubpur Advocate Aktarujjaman Ansarir bari to Paschim side Sohag Member bari to Uttar side Kumar barir Road (Ch. 00-800m).
|
0.8000
|
40.080
|
Mohana Bricks Manufacture
|
40.080
|
|
15/02/2018
|
100
|
24/07/2019
|
|
|
26
|
IRIDP-2/NOA/DW-121
|
Improvement of Lal Miar Haji bari to Mollar Teck Road (Kutubpur UP- Ambornagor UP Road) (Kirtanerhat north face-Rajapur Road) (Ch. 00-638m).
|
0.6380
|
31.640
|
Pinnacle Construction Company
|
31.640
|
|
11/06/2017
|
100
|
23/07/2019
|
|
|
27
|
IRIDP-2/NOA/DW-120
|
a) Improvement of Bahar Charman bari to Pasker Market Bridge Road (Mojahidpur- Amanatpur Road) (Ch. 00-500m).b) Construction of 1No. 0.625mx0.625m Slab Culvert at ch. 273m on the same road.
|
0.5000
|
27.520
|
Pinnacle Construction Company
|
27.520
|
|
31/12/2017
|
100
|
23/07/2019
|
|
|
28
|
IRIDP-2/NOA/DW-119
|
a) Improvement of West Noruttampur- Dakhin Noruttampur (Hamid Bapari bari) Road (Ch. 00-500m).b) Construction of 2Nos. 0.625mx0.625m Slab Culvert at ch. 125m & 430m on the same road.
|
0.5000
|
25.830
|
M/S. Rahman Construction
|
25.830
|
|
31/12/2017
|
100
|
23/07/2019
|
|
|
29
|
IRIDP-2/NOA/DW-118
|
a) Improvement of Madhya Narottampur near Choto Hazi bari- Purba Narottampur Hakim Mia bari Road (Sabu Sardar road) (Ch. 00-565m).b) Construction of 1No. 0.625mx0.625m Slab Culvert at ch. 379m on the same road.
|
0.5650
|
29.350
|
M/S. Nur Traders
|
29.350
|
|
01/06/2017
|
100
|
23/07/2019
|
|
|
30
|
IRIDP-2/NOA/DW-117
|
a) Improvement of Mirwarishpur Mirza bari- Mirwarishpur Buser Dokan Road (Mirwarishpur Rashedia Road) (Ch. 00-1000m).b) Construction of 2Nos. 0.625mx0.625m Slab Culvert at ch. 11m & 529m on the same road.
|
1.0000
|
53.110
|
M/S. Rahman Construction
|
53.110
|
|
09/05/2017
|
100
|
23/07/2019
|
|
|
31
|
IRIDP-2/NOA/SMW-114
|
Maintenance of Fenaghata- Miahpur- Rajullahpur (Miapur Primary School road) Road (Ch. 00-996m).
|
0.9960
|
32.890
|
M/S. Shahadat Traders
|
32.890
|
|
19/02/2017
|
100
|
23/07/2019
|
|
|
32
|
IRIDP-2/NOA/DW-113
|
Improvement of Titahazra- Chan Kasimpur Road (Ch. 00-1105m).
|
1.1050
|
56.860
|
M/S. Mohana Bricks Manufacturing
|
56.860
|
|
23/02/2017
|
100
|
23/07/2019
|
|
|
33
|
IRIDP-2/NOA/DW-106
|
a) Improvement of Chayani Kalikapur Govt. Primary School Road (Ch. 136-878m).b) Construction of 2Nos. 625mmx600mm Slab Culvert at ch. 652m & 834m on the same road.
|
0.7420
|
38.180
|
M/S. Maa Enterprise
|
38.180
|
|
30/11/2017
|
100
|
23/07/2019
|
|
|
34
|
IRIDP-2/NOA/MW-82
|
Maintenance of Kadirpur Badhirteker uttar side to Kalam profasar bari road (Kadirpur Nobir tack to Yusafar Dokan road) (Ch. 00-1050m).
|
1.0500
|
21.500
|
M/S. Rahaman Construction
|
21.500
|
|
15/03/2017
|
100
|
23/07/2019
|
|
|
35
|
IRIDP-2/NOA/MW-81
|
Maintenance of Arif Hazir Pool-Mondar Bari Road (Chaumuhani Arif Hazir Pool-Baro Sharifpur- Sharifpur UP office) (Ch. 2750-3580m).
|
0.8300
|
18.790
|
M/S. Shahadat Traders
|
18.790
|
|
20/08/2016
|
100
|
23/07/2019
|
|
|
36
|
IRIDP-2/NOA/MW-80
|
Maintenance of Surgo pool- Malaker Bapar Dokan (Surgo pool- Horonbibi Road (Ch. 00-830m).
|
0.8300
|
21.870
|
M/S. Jannatul Ferdous
|
21.870
|
|
20/03/2018
|
100
|
23/07/2019
|
|
|
37
|
IRIDP-2/NOA/MW-79
|
Maintenance of Uttar Jirtoli Noab Ali road to Jirtoli Bazar Road (Barkat Ullah Bulu Road (Banglabazar- Jirtoli-Hoillarhat- Eklashpur road) (Ch. 00-2780m)
|
2.7800
|
61.120
|
M/S. Mona Construction
|
61.120
|
|
12/11/2016
|
100
|
23/07/2019
|
|
|
38
|
IRIDP-2/NOA/DW-66
|
a) Improvement of Sujayetpur (R&H)-Bhahadipur via Alayerpur Road (BaraNewazpur-Aleyarpur Health and F.P. Road) (Ch. 1000-1515m).b) Improvement of Alayerpur Gov. Prymary School Road (Ch. 00-375m).
|
0.8950
|
47.410
|
M/S. Mohana Bricks Manufacturing
|
47.410
|
|
21/03/2017
|
100
|
23/07/2019
|
|
|
39
|
IRIDP-2/NOA/DW-8
|
Improvement of Kismot Karimpur Durgapur road (Bali Mosque to Durgapur High School road) from ch. 1500-2170m.
|
0.6700
|
35.000
|
M/S. Mona Construction
|
35.000
|
|
20/08/2016
|
100
|
23/07/2019
|
|
|
40
|
IRIDP-2/NOA/DW-7
|
a) Improvement of Mannan Market to Ohed Ali Bari Road (Patowarihat-Bashurhat-Khanpur-Chowrasta-Munshirhat road) from ch. 00-1000m.b) Construction of 2Nos. 625mmx625mm Drain Culvert at ch. 180m & ch. 431m on the same road.
|
1.0000
|
51.390
|
M/S. Maa Enterprise
|
51.390
|
|
20/08/2016
|
100
|
23/07/2019
|
|
|
41
|
IRIDP-2/NOA/DW-6
|
Improvement of Mirwarishpur majumderhat to UP Road from ch. 1330-2068m.
|
0.7380
|
43.190
|
M/S. Maa Enterprise
|
43.190
|
|
22/12/2016
|
100
|
23/07/2019
|
|
|
42
|
IRIDP-2/NOA/DW-5
|
Improvement of Joykisnapur Pana Mia Hazi bari to Mostafa member bari road (Joykrishnapur road) from ch.2000-2750m.
|
0.7500
|
39.170
|
M/S. Mizan Traders
|
39.170
|
|
04/08/2016
|
100
|
23/07/2019
|
|
|
43
|
IRIDP-2/NOA/DW-4
|
a) Improvement of Shadari pool uttar Jangimanrajpur to Tyabpur via Abad Ullah Cherang pool road (Rafiqpur-Janginanrajpur road) from ch.20-1020m. b) Construction of 1No. 625mmx625mm Drain Culvert at ch. 435m on the same road.
|
1.0000
|
49.920
|
M/S. Mona Construction
|
49.920
|
|
24/12/2016
|
100
|
23/07/2019
|
|
|
44
|
IRIDP-2/NOA/DW-3
|
Improvement of Sultanpur Arman miar bari to Hazi market (Sridharpur) Road (Sultanpur Mosque pool to Jugikhali road) from ch.00-1666m.
|
1.6660
|
81.860
|
M/S. Progati Traders
|
81.860
|
|
19/11/2016
|
100
|
23/07/2019
|
|
|
45
|
IRIDP-2/NOA/DW-3
|
Improvement of Sultanpur Arman miar bari to Hazi market (Sridharpur) Road (Sultanpur Mosque pool to Jugikhali road) from ch.00-1666m.
|
1.6660
|
81.860
|
M/S. Progati Traders
|
81.860
|
|
19/11/2016
|
100
|
22/07/2019
|
|
|
46
|
IRIDP-2/NOA/DW-2
|
Improvement of Chufi Ahamed bari to Peshker bari road (Kalikapur village road upto Kalikapur Madrasha at Gopalpur UP) from ch.1100-1688m.
|
0.5880
|
30.330
|
M/S. Rahman Construction
|
30.330
|
|
20/11/2016
|
100
|
22/07/2019
|
|
|
47
|
IRIDP-2/NOA/DW-1
|
Improvement of Aiyebpur Pathan Bari to Kazi bari Road (Khemchadrapur-Aiyubpur road) from ch.2000-3076m.
|
1.0760
|
51.720
|
M/S. Mohana Bricks Manufacturing
|
51.720
|
|
11/06/2016
|
100
|
22/07/2019
|
|
|
48
|
IRIDP-2/NOA/DW-6
|
Improvement of Mirwarishpur majumderhat to UP Road from ch. 1330-2068m.
|
0.7600
|
43.200
|
M/S. Maa Enterprise
|
43.200
|
09/02/2016
|
30/12/2016
|
100
|
23/12/2018
|
|
|
49
|
IRIDP-2/NOA/DW-2
|
Improvement of Chufi Ahamed bari to Peshker bari road (Kalikapur village road upto Kalikapur Madrasha at Gopalpur UP) from ch.1100-1688m.
|
0.5880
|
30.330
|
M/S. Rahman Construction
|
30.330
|
15/02/2016
|
30/12/2016
|
100
|
23/12/2018
|
|
|
50
|
IRIDP-2/NOA/DW-1
|
Improvement of Aiyebpur Pathan Bari to Kazi bari Road (Khemchadrapur-Aiyubpur road) from ch.2000-3076m.
|
1.0700
|
51.730
|
M/S. Mohana Bricks Manufacturing
|
51.730
|
15/02/2016
|
14/07/2016
|
100
|
23/12/2018
|
|