MGSP/FNI/2015-16/W-04
|
Construction of RCC Drain with Top slab at Feni- Comilla Trunk Road East side (Feni Shishu Niketon to Dewangonj Khal) Ch .0.00m to Ch. 3200.00m) & 01 No. Box Culvert at Feni – Comilla Trunk Road, Ward No.- 08 & 09 under Feni Pourashava.
|
3.2000
|
164541905.000
|
Saleh Ahmed-M.A.H. Construction Ltd. (JV)
|
164541905.000
|
15/09/2016
|
15/03/2018
|
92
|
27/09/2017
|
|
|
2
|
MGSP/FNI/2015-16/W-03
|
Construction of RCC Road Work at Rampur Bhuiyan Bari Road (Start from Dhaka-Chittagong Highway to S.S K Road link by Takia Mazar & Rampur Saowdagor para Road. Length 2,200m (main Ch 0+00 to 1+100m, Link 1- Ch 00 to 0+600m, Link 2 Ch 0+00 to 0+400m) & Link 3 Ch 0+100 to 0+200m) under Feni Pourashava, Feni
|
2.2000
|
50988293.000
|
SA-AH (JV)
|
50988293.000
|
22/06/2016
|
30/03/2017
|
100
|
27/09/2017
|
|
|
3
|
MGSP/FNI/W-02
|
a) Construction of RCC Drain at Kadal Gazi Rail Gate to Kumra Chara Khal (Besides of Accademy Road) (Ch. 0.00 to 2+410m) (Total Length=2410m)
b) Construction of RCC Drain at Trunk Road East side (PTI Khal) up tp Amin Matal workshop (Ch. 0.00 to 470m) (Total Length=470m)
|
2.8800
|
44941609.000
|
SA-SE (JV)
|
44941609.000
|
18/03/2015
|
24/05/2016
|
100
|
27/09/2017
|
Completed
|
|
4
|
MGSP/FNI/W-01
|
a) Construction of BC Road Work at Hazrat Phagla Miah road (Ch: 0.00 - 1+380km) St. from Feni-Comilla road to Dhaka - Chittagong highway at Word No.-12 (Total Length=1380m)
b) Construction of RCC Drain Work at Hazrat Phagla Miah road side (Ch: 0.00 - 1+350km) St. from Dhaka - Chittagong highway road side to trunk road side drain in Word No.-12 (Total Length=1350m)
c) Improvement of BC Road Work at East Bezoysing Lotif Bhuiyan road (Ch: 0.00 - 1+165km) St. from Sercit house road to Sona miah mosque road) (Total Length=1165m)
|
3.8950
|
36277434.000
|
Saleh Ahmed
|
36277434.000
|
18/03/2015
|
24/04/2016
|
100
|
27/09/2017
|
Completed
|