Extension of Upazila Complex Project (EUCP). (2nd Revised)

Serial District Name District Code/ID Upazila Name Upazila Code/ID Project ID Package No Scheme Name Road ID Length of Scheme(Km) - Road Length of Scheme(m) - Bridge/Culverts Building Quantity Estimated Amount(LAC) Contractor Name Contract Amount(LAC) Date of Contract (DD/MM/YYYY) Date of commencement (DD/MM/YYYY) Date of Completion (DD/MM/YYYY) Physical Progress(%) Financial Progress (Amount) (LAC) Financial Progress(%) Date of Progress Update (DD/MM/YYYY) Remarks
1 B.baria 14 bancharampur 103 253 PWA-UZC- Bancharampur-74 Construction of Upazila Complex Extention Building & Hall Room 2.00 344.09 M/S Tushi & Hazi ALi AKbar(JV) 354.24 14/03/2012 13/03/2013 100 100 03/07/2019 Building Qty: 2
2 B.baria 14 kasba 105 253 PWA-UZC- Kashba-75 Construction of Upazila Complex Extention Building & Hall Room 445.00 M/S Business Syndicate International 405.29 12/11/2014 31/10/2018 100 20/12/2021 Complete
3 B.baria 14 nabinagar 106 253 PWA-UZC- Nabinagar-76 Construction of Upazila Complex Extention Building & Hall Room 2.00 344.09 M/S Smriti Enterprise 378.08 27/03/2012 26/03/2013 100 100 03/07/2019 Building Qty: 2
4 B.baria 14 nasirnagar 83 253 PWA-UZC- Nasirnagar-77 Construction of Upazila Complex Extention Building & Hall Room 479.68 MBC & MZH (JV) 378.99 13/04/2016 12/07/2017 75 19/12/2018 Building Qty: 2
5 Bagerhat 44 fakirhat 319 253 PWA-UZC- Fakirhat-156 Construction of Upazila Complex Extention Building & Hall Room 476.23 M/S Hemel Enterprise 375.49 35 19/12/2018 Building Qty: 2
6 Bagerhat 44 kachua 318 253 PWA-UZC- Kachua-158 Construction of Upazila Complex Extention Building & Hall Room 682.16 Dhaly Construction Ltd 589.90 01/06/2016 01/09/2017 85 19/12/2018 Building Qty: 2
7 Bagerhat 44 morrelganj 321 253 PWA-UZC- Morolgonj-157 Construction of Upazila Complex Extention Building & Hall Room 2.00 882.46 M/S S.S. Brothers 1075.80 03/11/2019 18/11/2019 31/12/2021 80 811.39 75 20/12/2021 Building Qty: 2
8 Bagerhat 44 rampal 316 253 PWA-UZC- Rampal-155 Construction of Upazila Complex Extention Building & Hall Room 552.00 M/S SN Builders 496.08 25/06/2012 24/06/2013 100 19/12/2018 Building Qty: 2
9 Bandarban 15 ruma 127 253 PWA-UZC- Ruma-65 Construction of Upazila Complex Extention Building & Hall Room 496.43 Mohammad Eunus & Brothers Pvt. Ltd. 511.82 25/01/2016 11/05/2017 65 19/12/2018 Building Qty: 2
10 Bandarban 15 thanchi 119 253 PWA-UZC-OW-10 Construction of Internal Road 21.63 M/S Zawad Enterprise 20.55 0 19/12/2018 Building Qty: 0
11 Bandarban 15 thanchi 119 253 PWA-UZC- Thanchi-234 Construction of Dormitory 210.66 Mr. U.T.Mong 189.60 28/09/2017 28/10/2018 35 19/12/2018 Building Qty: 1
12 Bandarban 15 thanchi 119 253 PWA-UZC- Thanchi-232 Construction of UNO Qrtr. 105.47 Mr. U.T.Mong 92.21 15/02/2017 14/02/2018 93 19/12/2018 Building Qty: 1
13 Bandarban 15 thanchi 119 253 PWA-UZC- Thanchi-64 Construction of Upazila Complex Extention Building & Hall Room 712.64 M/S Zawad Enterprise 925.90 23/10/2014 23/10/2015 100 19/12/2018 Building Qty: 2
14 Barguna 2 bamna 17 253 PWA-UZC- Bamna-194 Construction of Upazila Complex Extention Building & Hall Room 490.44 M/S Alam Construction & F.H. enterprise (JV) 592.88 04/02/2013 04/02/2014 100 19/12/2018 Building Qty: 1
15 Barguna 2 barguna-s 18 253 PWA-UZC- Barguna-S-195 Construction of Upazila Complex Extention Building & Hall Room 624.59 M/S Poly Construction 647.74 0 19/12/2018 Building Qty: 2
16 Barguna 2 betagi 2 253 PWA-UZC- Betagi-193 Construction of Upazila Complex Extention Building & Hall Room 679.45 M/S Khandaker Shahin Ahmed 611.51 23/08/2017 22/08/2018 40 19/12/2018 Building Qty: 1
17 Barguna 2 patharghata 40 253 PWA-UZC- Patharghata-192 Construction of Upazila Complex Extention Building & Hall Room 832.49 M/S Islam Brothers 749.24 15/10/2017 14/10/2018 35 19/12/2018 Building Qty: 1
18 Barishal 5 agailjhara 21 253 PWA-UZC- Agailjhara-240 Construction of Dormitory 0.00   0.00 0 19/12/2018 Building Qty: 1
19 Barishal 5 agailjhara 21 253 PWA-UZC- Agailjhara-238 Construction of UNO Qrtr 132.91 M/S Mother Engineering 136.91 17/07/2018 30/06/2019 30 19/12/2018 Building Qty: 1
20 Barishal 5 agailjhara 21 253 PWA-UZC- Agailjhara-239 Construction of Twin Qrtr 0.00   0.00 0 19/12/2018 Building Qty: 1
21 Barishal 5 agailjhara 21 253 PWA-UZC- Agailjhara-230 Construction of Upazila Complex Extention Building & Hall Room 548.81 MME-AEC (JV) 602.00 13/06/2017 28/06/2018 80 19/12/2018 Building Qty: 2
22 Barishal 5 babuganj 26 253 PWA-UZC- Babugonj-182 Construction of Upazila Complex Extention Building & Hall Room 535.98 M/S Podder Enterprise 423.86 25/02/2016 16/07/2017 95 19/12/2018 Building Qty: 2
23 Barishal 5 banaripara 20 253 PWA-UZC- Banaripara-183 Construction of Upazila Complex Extention Building & Hall Room 534.98 M/S Kohinoor Enterprise 586.60 20/04/2015 18/07/2016 100 19/12/2018 Building Qty: 2
24 Barishal 5 gouranadi 22 253 PWA-UZC- Gaurnadi-181 Construction of Upazila Complex Extention Building & Hall Room 530.82 M/S Santu Traders 583.78 07/07/2015 30/09/2016 100 19/12/2018 Building Qty: 2
25 Barishal 5 uzirpur 29 253 PWA-UZC- Ujirpur-180 Construction of Upazila Complex Extention Building & Hall Room 535.20 M/S Poly Engineering 561.31 100 19/12/2018 Building Qty: 2
26 Bhola 4 bhola-s 4 253 PWA-UZC- Bhola-S-216 Construction of Upazila Complex Extention Building & Hall Room 558.44 M/S Elli Enterprise 458.39 100 19/12/2018 Building Qty: 1
27 Bhola 4 charfassion 5 253 PWA-UZC- Charfasion-196 Construction of Upazila Complex Extention Building & Hall Room 529.54 Md. Abdul Khaleque 631.89 06/11/2013 05/11/2014 100 19/12/2018 Building Qty: 1
28 Bhola 4 daulatkhan 30 253 PWA-UZC- OW-05 Construction of Internal Road 17.92 Mohammad Eunus & Brothers Pvt. Ltd. 17.91 100 19/12/2018 Building Qty: 0
29 Bhola 4 daulatkhan 30 253 PWA-UZC- Daulatkhan-198 Construction of Upazila Complex Extention Building & Hall Room 591.54 Mohammad Eunus & Brothers Pvt. Ltd. 621.12 100 19/12/2018 Building Qty: 1
30 Bhola 4 lalmohan 6 253 PWA-UZC- Lalmohon-197 Construction of Upazila Complex Extention Building & Hall Room 518.09 Md. Rasheduzzaman 687.92 13/01/2013 13/01/2014 100 19/12/2018 Building Qty: 1
31 Bogura 51 dhupchancia 350 253 PWA-UZC- Dhupchancia-27 Construction of Upazila Complex Extention Building & Hall Room 378.84 M/S Das Traders 359.30 03/06/2018 03/09/2019 5 19/12/2018 Building Qty: 1
32 Bogura 51 kahaloo 352 253 PWA-UZC- Kahaloo-220 Construction of Upazila Complex Extention Building & Hall Room 470.34 MIM & Mondol (JV) 383.65 18/09/2018 22/06/2019 75 19/12/2018 Building Qty: 2
33 Bogura 51 nandigram 353 253 PWA-UZC- Nandigram-30 Construction of Upazila Complex Extention Building & Hall Room 430.47 M/S Kabir Traders 428.84 16/04/2014 15/04/2015 100 19/12/2018 Building Qty: 2
34 Bogura 51 sonatala 357 253 PWA-UZC- Sonatala-26 Construction of Upazila Complex Extention Building & Hall Room 483.40 RTSC (JV) 406.82 15/02/2017 14/05/2018 100 19/12/2018 Building Qty: 2
35 C. nawabganj 47 nachol 339 253 PWA-UZC- Nachol-41 Construction of Upazila Complex Extention Building & Hall Room 473.36 Md. Moyen Khan & HE (JV) 368.11 08/03/2017 10/01/2018 90 19/12/2018 Building Qty: 2
36 C. nawabganj 47 nawabganj-s 340 253 PWA-UZC- Nawabganj-S-520 Construction of Upazila Complex Extention Building & Hall Room 456.91 Uday-Fair (JV) 349.61 16/10/2016 15/01/2018 100 19/12/2018 Building Qty: 2
37 C. nawabganj 47 shibganj 341 253 PWA-UZC- Shibganj-40 Construction of Upazila Complex Extention Building & Hall Room 434.81 MIM & Selim (JV) 393.01 15/10/2014 07/01/2016 100 19/12/2018 Building Qty: 2
38 Chandpur 12 chandpur-s 77 253 PWA-UZC- Chandpur-S-73 Construction of Upazila Complex Extention Building & Hall Room 362.37 M/S Niaz traders 389.25 18/06/2012 17/06/2013 100 19/12/2018 Building Qty: 2
39 Chandpur 12 faridganj 78 253 PWA-UZC- Faridgonj-71 Construction of Upazila Complex Extention Building & Hall Room 461.39 Appollo Engineering & Consortium 405.90 01/07/2016 24/09/2017 75 19/12/2018 Building Qty: 2
40 Chandpur 12 kachua 90 253 PWA-UZC- Kachua-293 Construction of Twin Qrtr. 0.00   0.00 0 19/12/2018 Building Qty: 1
41 Chandpur 12 kachua 90 253 PWA-UZC- Kachua-292 Construction of Upazila Complex Extention Building & Hall Room 614.01 MAZ-MMK (JV) 552.61 23/07/2017 15/07/2018 40 19/12/2018 Building Qty: 2
42 Chandpur 12 shahrasti 74 253 PWA-UZC- Shahrajtri-72 Construction of Upazila Complex Extention Building & Hall Room 484.42 MRE-MRTA (JV) 455.03 01/03/2018 28/02/2019 5 19/12/2018 Building Qty: 2
43 Chattogram 11 anwara 73 253 PWA-UZC- Anwara-53 Construction of Upazila Complex Extention Building & Hall Room 643.87 Consonance & Abul Bashar (JV) 579.48 0 19/12/2018 Building Qty: 2
44 Chattogram 11 banskhali 62 253 PWA-UZC- Banshkhali-214 Construction of Upazila Complex Extention Building & Hall Room 618.05 Mohammad Eunus & Brothers Pvt. Ltd. 570.66 09/02/2015 19/07/2016 80 19/12/2018 Building Qty: 1
45 Chattogram 11 mirsharai 68 253 PWA-UZC- Mirsarai-52 Construction of Upazila Complex Extention Building & Hall Room 474.84 Delta Engineering & Consortium 521.87 100 19/12/2018 Building Qty: 2
46 Chattogram 11 rangunia 67 253 PWA-UZC- Rangunia-54 Construction of Upazila Complex Extention Building & Hall Room 351.22 Consonance Engineers & Builders 391.27 27/06/2012 26/06/2013 100 19/12/2018 Building Qty: 2
47 Chattogram 11 raojan 66 253 PWA-UZC- OW-01 Construction of Retaining Wall 20.51 M/S Iqbal & Brothers 20.50 100 19/12/2018 Building Qty: 0
48 Chattogram 11 raojan 66 253 PWA-UZC- Raujan-50 Construction of Upazila Complex Extention Building & Hall Room 404.22 M/S Choudhury Enterprise-Kashem Construction (JV) 444.90 13/06/2013 12/06/2014 100 19/12/2018 Building Qty: 2
49 Chattogram 11 satkania 58 253 PWA-UZC- Satkania-49 Construction of Upazila Complex Extention Building & Hall Room 519.75 M/S Friends International 468.13 21/11/2017 21/02/2019 0 19/12/2018 Building Qty: 2
50 Chattogram 11 sitakunda 64 253 PWA-UZC- Shitakunda-51 Construction of Upazila Complex Extention Building & Hall Room 548.88 Mohammad Eunus & Brothers Pvt. Ltd. 449.35 23/02/2016 23/05/2017 100 19/12/2018 Building Qty: 2
51 Chuadanga 42 alamdanga 311 253 PWA-UZC- Alamdanga-178 Construction of Upazila Complex Extention Building & Hall Room 0.00   0.00 0 19/12/2018 Building Qty: 2
52 Chuadanga 42 jibannagar 295 253 PWA-UZC- Jibannagar-179 Construction of Upazila Complex Extention Building & Hall Room 438.42 Jahirul Limited 394.58 15/05/2017 06/08/2018 85 19/12/2018 Building Qty: 2
53 Cox's bazar 13 chakoria 123 253 PWA-UZC- Chakoria-527 Construction of Upazila Complex Extention Building & Hall Room 623.86 M/S Noor Syndicate 639.91 12/07/2018 12/11/2019 10 19/12/2018 Building Qty: 2
54 Cox's bazar 13 cox's bazar-s 100 253 PWA-UZC- Cox'sbazar-S-58 Construction of Upazila Complex Extention Building & Hall Room 466.05 Delta Engineers & Consortium Ltd. 442.53 15/03/2015 14/06/2016 100 19/12/2018 Building Qty: 2
55 Cox's bazar 13 moheskhali 126 253 PWA-UZC- Maheshkhali-57 Construction of Upazila Complex Extention Building & Hall Room 650.03 Delta Engineering & Hasan Enterprise 649.72 30/05/2018 30/08/2019 0 19/12/2018 Building Qty: 2
56 Cox's bazar 13 ramu 129 253 PWA-UZC- Ramu-56 Construction of Upazila Complex Extention Building & Hall Room 0.00   0.00 0 19/12/2018 Building Qty: 2
57 Cox's bazar 13 teknaf 135 253 PWA-UZC- Teknaf-55 Construction of Upazila Complex Extention Building & Hall Room 470.65 The Engineers & Construction - The Engineers & Builders (JV) 437.00 22/05/2016 22/11/2017 45 19/12/2018 Building Qty: 2
58 Cumilla 10 barura 72 253 PWA-UZC- Barura-67 Construction of Upazila Complex Extention Building & Hall Room 344.09 M/S MI EnterPrise 355.74 22/02/2012 17/04/2014 100 19/12/2018 Building Qty: 2
59 Cumilla 10 burichong 93 253 PWA-UZC- Burichang-68 Construction of Upazila Complex Extention Building & Hall Room 481.18 M/S R-ta Enterprise 441.30 28/04/2016 29/07/2017 100 19/12/2018 Building Qty: 2
60 Cumilla 10 chouddagram 94 253 PWA-UZC- Chaddagram-66 Construction of Upazila Complex Extention Building & Hall Room 344.09 M/S R-ta Enterprise 361.22 29/02/2012 28/02/2013 100 19/12/2018 Building Qty: 2
61 Cumilla 10 debidwar 54 253 PWA-UZC- Debidar-70 Construction of Upazila Complex Extention Building & Hall Room 443.46 M/S R-ta Enterprise & M/S Sumi Enterprise (JV) 487.67 25/09/2014 28/02/2017 100 19/12/2018 Building Qty: 2
62 Cumilla 10 nangalkot 97 253 PWA-UZC- Langalkot-69 Construction of Upazila Complex Extention Building & Hall Room 453.75 M/S R-TA Enterprise 498.86 31/08/2013 24/08/2014 100 19/12/2018 Building Qty: 2
63 Dhaka 24 keraniganj 178 253 PWA-UZC- Keranigonj-98 Construction of Upazila Complex Extention Building & Hall Room 506.31 M/S Noor Construction 473.36 100 19/12/2018 Building Qty: 2
64 Dhaka 24 savar 176 253 PWA-UZC- Savar-99 Construction of Upazila Complex Extention Building & Hall Room 346.19 M/S Urmi Enterprise 360.87 07/03/2012 07/03/2013 100 19/12/2018 Building Qty: 2
65 Dinajpur 58 birol 412 253 PWA-UZC- Birol-06 Construction of Upazila Complex Extention Building & Hall Room 442.10 KT-TE (JV) 371.83 08/11/2015 08/02/2017 100 19/12/2018 Building Qty: 2
66 Dinajpur 58 dinajpur-s 420 253 PWA-UZC- Dinajpur-S-11 Construction of Upazila Complex Extention Building & Hall Room 439.50 M/S Rafiqul Islam 401.37 11/06/2015 10/09/2016 100 19/12/2018 Building Qty: 2
67 Dinajpur 58 fulbari 415 253 PWA-UZC- Fulbari-09 Construction of Upazila Complex Extention Building & Hall Room 465.59 Dhaly Construction Ltd. 479.04 16/07/2017 22/07/2018 80 19/12/2018 Building Qty: 2
68 Dinajpur 58 ghoraghat 416 253 PWA-UZC- Ghoraghat-07 Construction of Upazila Complex Extention Building & Hall Room 443.86 Techbay International 382.60 18/04/2016 17/07/2017 90 19/12/2018 Building Qty: 2
69 Dinajpur 58 kaharol 418 253 PWA-UZC- Kaharol-08 Construction of Upazila Complex Extention Building & Hall Room 435.31 Real & Habibur (JV) 357.03 09/11/2015 15/02/2017 100 19/12/2018 Building Qty: 2
70 Dinajpur 58 khanshama 419 253 PWA-UZC- Khansama-10 Construction of Upazila Complex Extention Building & Hall Room 323.88 Md. Nazir Hossain 343.61 17/09/2012 16/09/2013 100 19/12/2018 Building Qty: 2
71 Faridpur 31 alfadanga 254 253 PWA-UZC- Alfadanga-140 Construction of Upazila Complex Extention Building & Hall Room 470.59 Mr. Atiar Rahman 420.46 28/10/2014 20/01/2016 100 19/12/2018 Building Qty: 2
72 Faridpur 31 boalmari 256 253 PWA-UZC- Boalmari-228 Construction of Upazila Complex Extention Building & Hall Room 464.49 M/S Rafia Construction 706.22 11/04/2018 17/07/2019 35 19/12/2018 Building Qty: 2
73 Faridpur 31 faridpur-s 258 253 PWA-UZC- OW-03 Construction of Pre-Cast Pile 149.96 M/S Rafia Construction 149.85 28/12/2016 27/03/2017 100 19/12/2018 Building Qty: 0
74 Faridpur 31 faridpur-s 258 253 PWA-UZC- Faridpur-S-141 Construction of Upazila Complex Extention Building & Hall Room 499.90 M/S Rafia Construction 524.74 21/08/2016 20/11/2017 95 19/12/2018 Building Qty: 2
75 Faridpur 31 madhukhali 262 253 PWA-UZC- Modhukhali-295 Construction of Dormitory 0.00   0.00 0 19/12/2018 Building Qty: 1
76 Faridpur 31 madhukhali 262 253 PWA-UZC- Modhukhali-294 Construction of Twin Qrtr. 0.00   0.00 0 19/12/2018 Building Qty: 1
77 Faridpur 31 madhukhali 262 253 PWA-UZC- Modhukhali-227 Construction of Upazila Complex Extention Building & Hall Room 468.77 M/S Rafia Construction 491.85 30/10/2017 29/10/2018 0 19/12/2018 Building Qty: 2
78 Faridpur 31 nagarkanda 253 253 PWA-UZC- Nagarkanda-139 Construction of Upazila Complex Extention Building & Hall Room 351.52 M/S Khondokar Shaheen Ahmed 386.50 07/03/2012 06/03/2013 100 19/12/2018 Building Qty: 2
79 Feni 8 chhagalniya 43 253 PWA-UZC- sagalnaia-82 Construction of Upazila Complex Extention Building & Hall Room 448.80 TBEAL-RU (JV) 488.93 02/03/2016 01/06/2017 100 19/12/2018 Building Qty: 2
80 Feni 8 feni-s 63 253 PWA-UZC- Feni-S-83 Construction of Upazila Complex Extention Building & Hall Room 458.39 The Builders Engineers Associates Ltd. 490.41 20/01/2015 19/01/2016 100 19/12/2018 Building Qty: 2
81 Gaibandha 60 gobindaganj 441 253 PWA-UZC- Gobindaganj-24 Construction of Upazila Complex Extention Building & Hall Room 431.36 M/S Masuma Begum 407.25 100 19/12/2018 Building Qty: 2
82 Gaibandha 60 saghata 428 253 PWA-UZC- Saghata-525 Construction of Upazila Complex Extention Building & Hall Room 449.98 Dhaly Construction Ltd. 404.98 05/07/2017 27/06/2018 80 19/12/2018 Building Qty: 2
83 Gaibandha 60 sundarganj 439 253 PWA-UZC- Sundarganj-25 Construction of Upazila Complex Extention Building & Hall Room 466.88 Md. Saidur Rahman 398.71 25/08/2016 22/05/2017 100 19/12/2018 Building Qty: 2
84 Gazipur 21 kaliakoir 173 253 PWA-UZC- Kaliakair-100 Construction of Upazila Complex Extention Building & Hall Room 425.14 Md. Rofiqul Islam 414.60 20/11/2014 20/11/2015 100 19/12/2018 Building Qty: 2
85 Gazipur 21 sreepur 159 253 PWA-UZC- Sreepur-101 Construction of Upazila Complex Extention Building & Hall Room 346.19 M/S Apon Enterprise 353.25 18/01/2012 17/01/2013 100 19/12/2018 Building Qty: 2
86 Gopalganj 28 kasiani 245 253 PWA-UZC- Kasiani-146 Construction of Upazila Complex Extention Building & Hall Room 475.84 M/S Islam Traders & Md. Nayeb Ali Khan (JV) 387.10 28/05/2017 27/04/2018 60 19/12/2018 Building Qty: 2
87 Gopalganj 28 kotwalipara 230 253 PWA-UZC- Kotalipara-205 Others Construction 174.40 Mazid Sons Construction 156.96 0 19/12/2018 Building Qty: 0
88 Gopalganj 28 kotwalipara 230 253 PWA-UZC- Kotalipara-200 Land Development 0.00   0.00 0 19/12/2018 Building Qty: 0
89 Gopalganj 28 kotwalipara 230 253 PWA-UZC- Kotalipara-203 Construction of UNO Qrtr 82.99 M/S Hazi Joynal Abedin & Sons 69.95 0 19/12/2018 Building Qty: 1
90 Gopalganj 28 kotwalipara 230 253 PWA-UZC- Kotalipara-202 Construction of Chairman Qrtr 82.99 M/S Hazi Joynal Abedin & Sons 71.18 0 19/12/2018 Building Qty: 1
91 Gopalganj 28 kotwalipara 230 253 PWA-UZC- Kotalipara-204 Construction of Dormitory 105.21 M/S Dulal Chandra Saha 99.95 21/02/2012 21/02/2013 100 19/12/2018 Building Qty: 1
92 Gopalganj 28 kotwalipara 230 253 PWA-UZC- Kotalipara-201 Construction of Gazzeted Qrtr 168.09 M/S Delowar Hossain Shikder 159.79 21/02/2012 21/02/2013 100 19/12/2018 Building Qty: 1
93 Gopalganj 28 kotwalipara 230 253 PWA-UZC- Kotalipara-199 Construction of Upazila Complex Extention Building with Hall Room 815.30 GKB & Md. Badrul Iqbal (JV) 807.79 11/03/2012 12/06/2013 100 19/12/2018 Building Qty: 1
94 Gopalganj 28 muksudpur 220 253 PWA-UZC- Moksudpur-236 Construction of Twin Qrtr 0.00   0.00 0 19/12/2018 Building Qty: 1
95 Gopalganj 28 muksudpur 220 253 PWA-UZC- Moksudpur-235 Construction of UNO Qrtr 116.63 Starlite Services Limited 104.97 0 19/12/2018 Building Qty: 1
96 Gopalganj 28 muksudpur 220 253 PWA-UZC- Moksudpur-237 Construction of Dormitory 0.00   0.00 0 19/12/2018 Building Qty: 1
97 Gopalganj 28 muksudpur 220 253 PWA-UZC- Moksudpur-145 Construction of Upazila Complex Extention Building & Hall Room 569.78 M/S Lalin Traders (JV) 468.50 14/05/2015 21/08/2016 100 19/12/2018 Building Qty: 2
98 Gopalganj 28 tungipara 232 253 PWA-UZC- Tungipara-212 Others Construction 0.00   0.00 0 19/12/2018 Building Qty: 0
99 Gopalganj 28 tungipara 232 253 PWA-UZC- Tungipara-207(b) Land Development 0.00   0.00 0 19/12/2018 Building Qty: 0
100 Gopalganj 28 tungipara 232 253 PWA-UZC- Tungipara-210 Construction of UNO Qrtr 134.22 Md. Eunus & Brothers Pvt. Ltd. 120.79 25/07/2017 24/08/2018 60 19/12/2018 Building Qty: 1
101 Gopalganj 28 tungipara 232 253 PWA-UZC- Tungipara-209 Construction of Chairman Qrtr 152.47 Md. Eunus & Brothers Pvt. Ltd. 137.22 25/07/2017 24/08/2018 60 19/12/2018 Building Qty: 1
102 Gopalganj 28 tungipara 232 253 PWA-UZC- Tungipara-211 Construction of Dormitory 105.21 M/S Rana Construction 99.95 21/02/2012 20/02/2013 100 19/12/2018 Building Qty: 1
103 Gopalganj 28 tungipara 232 253 PWA-UZC- Tungipara-208 Construction of Gazzeted Qrtr 175.45 M/S Satarupa fabrics 166.68 25/02/2012 24/02/2013 100 19/12/2018 Building Qty: 1
104 Gopalganj 28 tungipara 232 253 PWA-UZC- Tungipara-207(a) Construction of Hall Room 99.76 M/S Abdur Rakib Sikder 94.77 25/02/2012 20/11/2012 100 19/12/2018 Building Qty: 1
105 Gopalganj 28 tungipara 232 253 PWA-UZC- Tungipara-206 Construction of Upazila Complex Extention Building 793.46 M/S Dhaka Mercantile Corporation Ltd. 928.83 15/03/2012 08/06/2013 100 19/12/2018 Building Qty: 1
106 Habiganj 63 bahubal 480 253 PWA-UZC- Bahubal-94 Construction of Upazila Complex Extention Building & Hall Room 533.06 MBC & NB (JV) 476.74 02/03/2017 22/05/2018 5 19/12/2018 Building Qty: 2
107 Habiganj 63 baniachong 458 253 PWA-UZC- Baniachong-96 Construction of Upazila Complex Extention Building & Hall Room 470.05 M/S Haque Trading Corporation 417.17 20/02/2017 12/02/2018 35 19/12/2018 Building Qty: 2
108 Habiganj 63 chunarughat 479 253 PWA-UZC- Chunarughat-95 Construction of Upazila Complex Extention Building & Hall Room 427.08 M/S Shikder Enterprise 426.56 30/04/2015 30/08/2017 95 19/12/2018 Building Qty: 2
109 Habiganj 63 habiganj-s 478 253 PWA-UZC-Habiganj-S-97 Construction of Upazila Complex Extention Building & Hall Room 485.84 MBC & NB (JV) 408.84 05/03/2017 04/09/2018 35 19/12/2018 Building Qty: 2
110 Jamalpur 27 dewanganj 202 253 PWA-UZC- Dewanganj-225 Construction of Upazila Complex Extention Building & Hall Room 0.00   0.00 0 19/12/2018 Building Qty: 2
111 Jamalpur 27 jamalpur-s 204 253 PWA-UZC- Jamalpur-S-224 Construction of Upazila Complex Extention Building & Hall Room 487.16 M/S Dhrobe Trade Agency 486.92 26/02/2017 25/05/2018 75 19/12/2018 Building Qty: 2
112 Jamalpur 27 madarganj 205 253 PWA-UZC- Madargonj-129 Construction of Upazila Complex Extention Building & Hall Room 361.34 M/S Mirza Construction 349.99 05/06/2012 04/06/2013 100 19/12/2018 Building Qty: 2
113 Jamalpur 27 sarishabari 207 253 PWA-UZC- Sharishabari-128 Construction of Upazila Complex Extention Building & Hall Room 442.48 M/S R-TA Enterprise &Mitu Traders (Jv) 365.77 15/02/2014 15/02/2015 82 19/12/2018 Building Qty: 2
114 Jashore 41 bagherpara 300 253 PWA-UZC- Bagharpara-165 Construction of Upazila Complex Extention Building & Hall Room 466.19 MIM Construction 466.33 08/05/2018 07/05/2019 45 19/12/2018 Building Qty: 2
115 Jashore 41 jhikargacha 302 253 PWA-UZC- Jhikorgacha-164 Construction of Upazila Complex Extention Building & Hall Room 444.64 Dhaly Construction Ltd 490.18 18/01/2018 07/01/2019 10 19/12/2018 Building Qty: 2
116 Jashore 41 keshabpur 303 253 PWA-UZC- Kesabpur-167 Construction of Upazila Complex Extention Building & Hall Room 0.00   0.00 0 19/12/2018 Building Qty: 2
117 Jashore 41 monirampur 305 253 PWA-UZC- Manirampur-163 Construction of Upazila Complex Extention Building & Hall Room 459.09 EP-ZK (JV) 417.86 100 19/12/2018 Building Qty: 2
118 Jashore 41 sarsha 306 253 PWA-UZC- Sharsha-166 Construction of Upazila Complex Extention Building & Hall Room 420.76 M/S Mohidul Islam 398.59 16/04/2015 15/07/2016 100 19/12/2018 Building Qty: 2
119 Jhalokathi 6 kathalia 32 253 PWA-UZC- Kathalia-184 Construction of Upazila Complex Extention Building & Hall Room 605.50 M/S Kohinoor Enterprise 544.95 25/09/2017 01/10/2018 60 19/12/2018 Building Qty: 2
120 Jhalokathi 6 nalchity 33 253 PWA-UZC- Nalchiti-185 Construction of Upazila Complex Extention Building & Hall Room 645.22 M/S Amir Engineering 674.32 0 19/12/2018 Building Qty: 2
121 Jhenaidah 36 kaliganj 309 253 PWA-UZC- Kaligonj-169 Construction of Upazila Complex Extention Building & Hall Room 562.74 Md. Moyenuddin Bashi 556.87 05/09/2015 04/12/2016 90 19/12/2018 Building Qty: 2
122 Jhenaidah 36 shailkupa 265 253 PWA-UZC- Sailokupa-170 Construction of Upazila Complex Extention Building & Hall Room 497.16 UCL-MME-MPT (JV) 521.09 100 19/12/2018 Building Qty: 2
123 Joypurhat 50 joypurhat-s 346 253 PWA-UZC- Joypurhat-S--28 Construction of Upazila Complex Extention Building & Hall Room 439.47 M/S MI Trading & CO. 379.47 17/01/2016 17/03/2017 100 19/12/2018 Building Qty: 2
124 Joypurhat 50 khetlal 361 253 PWA-UZC- Khetlal-526 Construction of Upazila Complex Extention Building & Hall Room 467.04 Mc Ke Re (JV) 420.33 31/03/2018 30/03/2019 0 19/12/2018 Building Qty: 2
125 Khagrachari 16 dighinala 112 253 PWA-UZC- Dighinala-63 Construction of Upazila Complex Extention Building & Hall Room 488.90 M/S Rupali Traders 440.01 03/01/2017 27/06/2018 45 19/12/2018 Building Qty: 2
126 Khagrachari 16 Guimara 490 253 PWA-UZC- Guimara-290 Others Construction (Water Supply) 0.00   0.00 0 19/12/2018 Building Qty: 0
127 Khagrachari 16 Guimara 490 253 PWA-UZC- Guimara-289 Others Construction (Electrification) 0.00   0.00 0 19/12/2018 Building Qty: 0
128 Khagrachari 16 Guimara 490 253 PWA-UZC- Guimara-288 Others Construction (Internal Road & Boundary wall) 0.00   0.00 0 19/12/2018 Building Qty: 0
129 Khagrachari 16 Guimara 490 253 PWA-UZC- Guimara-287 Land Development 0.00   0.00 0 19/12/2018 Building Qty: 0
130 Khagrachari 16 Guimara 490 253 PWA-UZC- Guimara-286 Construction of Dormitory 0.00   0.00 0 19/12/2018 Building Qty: 1
131 Khagrachari 16 Guimara 490 253 PWA-UZC- Guimara-285 Construction of Twin Qrtr. 0.00   0.00 0 19/12/2018 Building Qty: 1
132 Khagrachari 16 Guimara 490 253 PWA-UZC- Guimara-284 Construction of UNO Qrtr. 0.00   0.00 0 19/12/2018 Building Qty: 1
133 Khagrachari 16 Guimara 490 253 PWA-UZC- Guimara-283 Construction of Upazila Chairman Qrtr. 0.00   0.00 0 19/12/2018 Building Qty: 1
134 Khagrachari 16 Guimara 490 253 PWA-UZC- Guimara-278 Construction of Upazila Complex Extention Building & Hall Room 0.00   0.00 0 19/12/2018 Building Qty: 2
135 Khagrachari 16 matiranga 124 253 PWA-UZC- Matiranga-62 Construction of Upazila Complex Extention Building & Hall Room 506.91 Delta Engineering & Consortium 466.00 20/10/2016 20/01/2018 90 19/12/2018 Building Qty: 2
136 Khulna 35 dighalia 270 253 PWA-UZC- Dighalia-153 Construction of Upazila Complex Extention Building & Hall Room 638.65 M/S Azam Construction-MH (JV) 523.60 100 19/12/2018 Building Qty: 2
137 Khulna 35 dumuria 274 253 PWA-UZC- Dumuria-154 Construction of Upazila Complex Extention Building & Hall Room 752.85 Esha-Mbpl-Mohiuddin (JV) 677.57 20/11/2017 20/11/2018 20 19/12/2018 Building Qty: 2
138 Khulna 35 koira 275 253 PWA-UZC- Kayra-151 Construction of Upazila Complex Extention Building & Hall Room 440.14 M/S Esha Enterprise 625.35 21/11/2012 20/11/2013 100 19/12/2018 Building Qty: 1
139 Khulna 35 terokhada 278 253 PWA-UZC- Terokhada-529 Construction of Upazila Complex Extention Building & Hall Room 548.21 M/S Ziaul Traders 547.89 09/08/2017 08/08/2018 15 19/12/2018 Building Qty: 2
140 Kishoreganj 19 austagram 195 253 PWA-UZC- Austagram-126 Construction of Upazila Complex Extention Building & Hall Room 499.14 M/S Shahidul Islam 433.97 03/08/2015 03/11/2016 100 19/12/2018 Building Qty: 2
141 Kishoreganj 19 bhairab 197 253 PWA-UZC- Bhairab-123 Construction of Upazila Complex Extention Building & Hall Room 468.27 M/S R-TA Enterprise 397.57 10/08/2016 09/11/2017 65 19/12/2018 Building Qty: 2
142 Kishoreganj 19 hossainpur 201 253 PWA-UZC- Hosainpur-125 Construction of Upazila Complex Extention Building & Hall Room 453.59 S.M.Kamrul Hasan 469.71 20/07/2013 15/07/2014 100 19/12/2018 Building Qty: 2
143 Kishoreganj 19 katiadi 155 253 PWA-UZC- Katiadi-124 Construction of Upazila Complex Extention Building & Hall Room 464.00 BB-SC (JV) 399.73 22/05/2016 21/09/2017 80 19/12/2018 Building Qty: 2
144 Kishoreganj 19 kishoreganj-s 141 253 PWA-UZC- Kishorgonj-S-127 Construction of Upazila Complex Extention Building & Hall Room 442.00 M/S Shahil Enterprise 391.25 100 19/12/2018 Building Qty: 2
145 Kurigram 56 bhurungamari 404 253 PWA-UZC- Bhurungamari-23 Construction of Upazila Complex Extention Building & Hall Room 454.05 M/S Abdul Hakim 398.33 01/02/2017 30/04/2018 100 19/12/2018 Building Qty: 2
146 Kurigram 56 nageswari 430 253 PWA-UZC- Nageswari-219 Construction of Upazila Complex Extention Building & Hall Room 493.08 MM Builders & Engineers Ltd. 443.77 25/04/2018 24/01/2019 25 19/12/2018 Building Qty: 2
147 Kurigram 56 rowmari 437 253 PWA-UZC- Rowmari-22 Construction of Upazila Complex Extention Building & Hall Room 404.27 M/S Uttoron Construction Company Ltd. 451.63 25/09/2013 24/09/2014 100 19/12/2018 Building Qty: 2
148 Kurigram 56 ulipur 445 253 PWA-UZC- Ulipur-218 Construction of Upazila Complex Extention Building & Hall Room 464.74 Hakim-ZHD (JV) 418.27 21/01/2018 15/05/2018 75 19/12/2018 Building Qty: 2
149 Kushtia 40 bheramara 288 253 PWA-UZC- Veramara-173 Construction of Upazila Complex Extention Building & Hall Room 493.88 Galaxy Associates 513.11 17/05/2015 16/08/2016 100 19/12/2018 Building Qty: 2
150 Kushtia 40 daulatpur 289 253 PWA-UZC- Daulatpur-174 Construction of Upazila Complex Extention Building & Hall Room 0.00   0.00 0 19/12/2018 Building Qty:
151 Kushtia 40 kushtia-s 297 253 PWA-UZC- Kushtia-S-176 Construction of Upazila Complex Extention Building & Hall Room 487.96 Galaxy Associates 511.86 100 19/12/2018 Building Qty: 2
152 Kushtia 40 mirpur 293 253 PWA-UZC- Mirpur-175 Construction of Upazila Complex Extention Building & Hall Room 429.30 Md. Sarwar hossain 448.45 100 19/12/2018 Building Qty: 2
153 Lalmonirhat 54 aditmari 393 253 PWA-UZC- Aditmari-19 Construction of Upazila Complex Extention Building & Hall Room 460.37 M/S Kohinoor Enterprise 414.34 27/02/2018 26/02/2019 75 19/12/2018 Building Qty: 2
154 Lalmonirhat 54 hatibandha 392 253 PWA-UZC- Hatibandha-20 Construction of Upazila Complex Extention Building & Hall Room 326.37 M/S K. A. & H (JV) 341.97 05/02/2012 05/02/2013 100 19/12/2018 Building Qty: 2
155 Lalmonirhat 54 lalmonirhat-s 390 253 PWA-UZC- Lalmonirhat-S-21 Construction of Upazila Complex Extention Building & Hall Room 457.81 MD. Khairul Kobir Rana 374.66 09/06/2016 19/09/2017 65 19/12/2018 Building Qty: 2
156 Laxmipur 9 laxmipur-s 55 253 PWA-UZC- Laxmipur-S-81 Construction of Upazila Complex Extention Building & Hall Room 450.57 M/S Niaz traders 429.34 100 19/12/2018 Building Qty: 2
157 Laxmipur 9 ramgati 45 253 PWA-UZC- Ramgati-80 Construction of Upazila Complex Extention Building & Hall Room 626.89   0.00 0 19/12/2018 Building Qty: 2
158 Madaripur 30 kalkini 226 253 PWA-UZC- Kalkini-150 Construction of Upazila Complex Extention Building & Hall Room 558.76 KSA-PMPL (JV) 502.89 03/05/2018 01/08/2019 40 19/12/2018 Building Qty: 2
159 Madaripur 30 madaripur-s 227 253 PWA-UZC- Madaripur-S-521 Construction of Upazila Complex Extention Building & Hall Room 497.85 M/S Hamim International 405.07 15/04/2017 14/04/2018 65 19/12/2018 Building Qty: 2
160 Madaripur 30 rajoir 228 253 PWA-UZC- Rajoir-215 Construction of Upazila Complex Extention Building & Hall Room 544.85 M/S Mohiuddin Ahmed 490.88 23/05/2015 24/05/2016 100 19/12/2018 Building Qty: 2
161 Madaripur 30 shibchar 231 253 PWA-UZC- Shibchar-149 Construction of Upazila Complex Extention Building & Hall Room 445.76 M/S Munshi Traders 485.61 23/04/2012 22/04/2013 100 19/12/2018 Building Qty: 2
162 Magura 38 mohammadpur 272 253 PWA-UZC- Mohammadpur-168 Construction of Upazila Complex Extention Building & Hall Room 474.64 Aroma Traders 471.99 100 19/12/2018 Building Qty: 2
163 Manikganj 34 daulatpur 248 253 PWA-UZC- Daulatpur-102 Construction of Upazila Complex Extention Building & Hall Room 433.43 MIM Construction 419.77 17/08/2015 16/11/2016 100 19/12/2018 Building Qty: 2
164 Manikganj 34 saturia 251 253 PWA-UZC- Saturia-104 Construction of Upazila Complex Extention Building & Hall Room 462.66 M/S Anik Trading Corporation 430.73 10/11/2015 10/02/2017 100 19/12/2018 Building Qty: 2
165 Manikganj 34 shivalaya 252 253 PWA-UZC- Shibalay-103 Construction of Upazila Complex Extention Building & Hall Room 432.29 Starlite Services Limited 535.62 26/07/2015 15/09/2016 100 19/12/2018 Building Qty: 2
166 Meherpur 43 meherpur-s 310 253 PWA-UZC- Meherpur-S-177 Construction of Upazila Complex Extention Building & Hall Room 471.71 Jahirul Limited-M/S Rezvi Construction (JV) 424.54 28/02/2018 27/02/2019 25 19/12/2018 Building Qty: 2
167 Moulvibazar 62 barlekha 482 253 PWA-UZC- Baralekha-92 Construction of Upazila Complex Extention Building & Hall Room 418.82 Md. Nurul Alam Numan 412.04 100 19/12/2018 Building Qty: 2
168 Moulvibazar 62 kamalganj 449 253 PWA-UZC- Kamalgonj-93 Construction of Upazila Complex Extention Building & Hall Room 519.20 Md. Fazlur Rahman 543.18 04/10/2014 03/03/2016 100 19/12/2018 Building Qty: 2
169 Munshiganj 33 gazaria 240 253 PWA-UZC- Gajaria-105 Construction of Upazila Complex Extention Building & Hall Room 511.49 M/S Borna Enterprise & M/S S.S. Construction & Associates (JV) 549.40 21/12/2013 21/12/2014 100 19/12/2018 Building Qty: 2
170 Munshiganj 33 sreenagar 246 253 PWA-UZC- Shrinagar-106 Construction of Upazila Complex Extention Building & Hall Room 600.03 Mohammad Eunus & Brothers Pvt. Ltd. 630.03 19/06/2018 18/09/2019 20 19/12/2018 Building Qty: 2
171 Mymensingh 22 bhaluka 218 253 PWA-UZC- Valuka-116 Construction of Upazila Complex Extention Building & Hall Room 440.71 M/S Das & Kundu (JV) 426.80 05/05/2015 09/07/2016 95 19/12/2018 Building Qty: 2
172 Mymensingh 22 gaffargaon 188 253 PWA-UZC- Gafargaon-115 Construction of Upazila Complex Extention Building & Hall Room 470.82 Md. Monjurul Haque Monju & M/S Kundu Traders 440.95 24/06/2015 02/09/2016 100 19/12/2018 Building Qty: 2
173 Mymensingh 22 haluaghat 181 253 PWA-UZC- Haluaghat-119 Construction of Upazila Complex Extention Building & Hall Room 543.98 Md. Monjurul Haque Monju & M/S Kundu Traders 491.10 08/02/2015 25/05/2016 80 19/12/2018 Building Qty: 2
174 Mymensingh 22 nandail 163 253 PWA-UZC- Nandail-118 Construction of Upazila Complex Extention Building & Hall Room 436.56 MIM Construction 380.53 19/06/2016 10/02/2017 100 19/12/2018 Building Qty: 2
175 Mymensingh 22 phulpur 216 253 PWA-UZC- Fulpur-117 Construction of Upazila Complex Extention Building & Hall Room 468.82 MPE-MF (JV) 399.41 25/01/2016 17/04/2017 80 19/12/2018 Building Qty: 2
176 Mymensingh 22 Tarakanda 982 253 PWA-UZC- Tarakandah-261 Others Construction (Water Supply) 0.00   0.00 0 19/12/2018 Building Qty: 0
177 Mymensingh 22 Tarakanda 982 253 PWA-UZC- Tarakandah-260 Others Construction (Electrification) 0.00   0.00 0 19/12/2018 Building Qty: 0
178 Mymensingh 22 Tarakanda 982 253 PWA-UZC- Tarakandah-259 Others Construction (Internal Road & Boundary Wall) 121.20 Md. Eunus & Brothers Pvt. Ltd. 109.08 18/10/2017 17/07/2018 75 19/12/2018 Building Qty: 0
179 Mymensingh 22 Tarakanda 982 253 PWA-UZC- Tarakandah-250 Land Development 146.59 Associate Builders Ltd. 146.56 11/10/2017 10/04/2018 60 19/12/2018 Building Qty: 0
180 Mymensingh 22 Tarakanda 982 253 PWA-UZC- Tarakandah-249 Construction of Dormitory 0.00   0.00 0 19/12/2018 Building Qty: 1
181 Mymensingh 22 Tarakanda 982 253 PWA-UZC- Tarakandah-248 Construction of Twin Qrtr. 0.00   0.00 0 19/12/2018 Building Qty: 1
182 Mymensingh 22 Tarakanda 982 253 PWA-UZC- Tarakandah-247 Construction of UNO Qrtr. 0.00   0.00 0 19/12/2018 Building Qty: 1
183 Mymensingh 22 Tarakanda 982 253 PWA-UZC- Tarakandah-246 Construction of Upazila Complex Extention Building & Hall Room 984.11 DCL & KSE (JV) 982.50 18/04/2018 18/07/2019 30 19/12/2018 Building Qty: 2
184 Naogaon 45 atrai 336 253 PWA-UZC- Atrai-29 Construction of Upazila Complex Extention Building & Hall Room 339.92 M/S Biswas Enterprise & Amin Traders(JV) 373.64 21/06/2012 30/04/2015 100 19/12/2018 Building Qty: 2
185 Naogaon 45 badalgachi 376 253 PWA-UZC- Badalgachi-243 Construction of Dormitory 0.00   0.00 0 19/12/2018 Building Qty: 1
186 Naogaon 45 badalgachi 376 253 PWA-UZC- Badalgachi-241 Construction of UNO Qrtr. 112.03 Dhaly Construction Ltd. 183.00 16/10/2017 15/08/2018 50 19/12/2018 Building Qty: 1
187 Naogaon 45 badalgachi 376 253 PWA-UZC- Badalgachi-242 Construction of Twin Qrtr. 0.00   0.00 0 19/12/2018 Building Qty: 1
188 Naogaon 45 badalgachi 376 253 PWA-UZC- Badalgachi-221 Construction of Upazila Complex Extention Building & Hall Room 472.21 Dhaly Construction Ltd. 445.78 14/01/2016 09/01/2018 100 19/12/2018 Building Qty: 2
189 Naogaon 45 dhamoirhat 328 253 PWA-UZC- Dhamoirhat-31 Construction of Upazila Complex Extention Building & Hall Room 450.88 AHM & DT (JV) 427.62 15/11/2016 14/02/2018 100 19/12/2018 Building Qty: 2
190 Naogaon 45 manda 367 253 PWA-UZC- Lohagara-172 Construction of Upazila Complex Extention Building & Hall Room 364.42 M/S Shahid Construction 400.76 07/05/2012 30/06/2014 100 19/12/2018 Building Qty: 2
191 Naogaon 45 mohadevpur 322 253 PWA-UZC- Mohadevpur-30 Construction of Upazila Complex Extention Building & Hall Room 529.77 Rupali & Selim (JV) 509.99 16/10/2016 15/01/2018 90 19/12/2018 Building Qty: 2
192 Naogaon 45 raninagar 325 253 PWA-UZC- Raninagar-32 Construction of Upazila Complex Extention Building & Hall Room 435.20 MIM Construction 398.20 28/06/2015 27/09/2016 100 19/12/2018 Building Qty: 2
193 Narail 37 kalia 268 253 PWA-UZC- Kalia-171 Construction of Upazila Complex Extention Building & Hall Room 611.53 NC-RE (JV) 489.48 15/12/2016 14/03/2018 25 19/12/2018 Building Qty: 2
194 Narayanganj 20 araihazar 157 253 PWA-UZC- Araihazar-107 Construction of Upazila Complex Extention Building & Hall Room 346.19 M/S SS Construction 362.99 18/03/2012 17/03/2013 100 19/12/2018 Building Qty: 2
195 Narayanganj 20 bandar 161 253 PWA-UZC- Bandar-110 Construction of Upazila Complex Extention Building & Hall Room 542.51 M/S Ahsan Enterprise & M/S S.R. Enterprise (JV) 542.30 08/08/2017 07/08/2018 80 19/12/2018 Building Qty: 2
196 Narayanganj 20 narayanganj-s 198 253 PWA-UZC- Narayangonj-S-111 Construction of Upazila Complex Extention Building & Hall Room 550.61 M/S Ahsan Enterprise & M/S S.R. Enterprise (JV) 572.64 08/07/2015 07/10/2016 95 19/12/2018 Building Qty: 2
197 Narayanganj 20 rupganj 160 253 PWA-UZC- Rupgonj-109 Construction of Upazila Complex Extention Building & Hall Room 346.19 M/S Toma Construction 337.70 22/01/2012 30/11/2014 100 19/12/2018 Building Qty: 2
198 Narayanganj 20 sonargaon 162 253 PWA-UZC- Sonargaon-108 Construction of Upazila Complex Extention Building & Hall Room 583.70 Dhaly Construction Ltd. 521.87 12/12/2016 11/03/2018 95 19/12/2018 Building Qty: 2
199 Narshingdi 23 monohardi 179 253 PWA-UZC- OW-08 Construction of Internal Road 16.31 M/S Shanta Enterprise 14.68 29/03/2018 28/04/2018 100 19/12/2018 Building Qty: 0
200 Narshingdi 23 monohardi 179 253 PWA-UZC- Monohordi-112 Construction of Upazila Complex Extention Building & Hall Room 450.25 Md. Rafique Construction 416.10 17/09/2014 16/03/2016 100 19/12/2018 Building Qty: 2
201 Narshingdi 23 narshingdi-s 167 253 PWA-UZC- OW-04 Construction of Pre-Cast Pile 78.33 Dhaly Construction Ltd. 70.50 20/09/2017 20/12/2017 100 19/12/2018 Building Qty: 0
202 Narshingdi 23 narshingdi-s 167 253 PWA-UZC- Narsingdi-S-114 Construction of Upazila Complex Extention Building & Hall Room 466.80 Dhaly Construction Ltd. 405.52 16/05/2018 16/08/2019 25 19/12/2018 Building Qty: 2
203 Narshingdi 23 raipura 168 253 PWA-UZC- Raypura-113 Construction of Upazila Complex Extention Building & Hall Room 455.73 NHB - TBEA (JV) 405.45 12/02/2016 12/02/2018 100 19/12/2018 Building Qty: 2
204 Natore 46 baraigram 330 253 PWA-UZC- Baraigram-35 Construction of Upazila Complex Extention Building & Hall Room 496.10 MIM Construction 475.49 29/01/2014 28/01/2015 100 19/12/2018 Building Qty: 2
205 Natore 46 lalpur 334 253 PWA-UZC- Lalpur-34 Construction of Upazila Complex Extention Building & Hall Room 555.23 MIM Construction 453.85 09/01/2017 08/04/2018 100 19/12/2018 Building Qty: 2
206 Natore 46 Naldanga 489 253 PWA-UZC- Naldanga-269 Others Construction (Water Supply) 0.00   0.00 0 19/12/2018 Building Qty: 0
207 Natore 46 Naldanga 489 253 PWA-UZC- Naldanga-268 Others Construction (Electrification) 0.00   0.00 0 19/12/2018 Building Qty: 0
208 Natore 46 Naldanga 489 253 PWA-UZC- Naldanga-267 Others Construction (Internal Road & Boundary wall) 0.00   0.00 0 19/12/2018 Building Qty: 0
209 Natore 46 Naldanga 489 253 PWA-UZC- Naldanga-266 Land Development 192.29 RAB-RC (JV) 173.06 22/03/2018 19/07/2018 80 19/12/2018 Building Qty: 0
210 Natore 46 Naldanga 489 253 PWA-UZC- Naldanga-265 Construction of Dormitory 0.00   0.00 0 19/12/2018 Building Qty: 1
211 Natore 46 Naldanga 489 253 PWA-UZC- Naldanga-263 Construction of UNO Qrtr. 0.00   0.00 0 19/12/2018 Building Qty: 1
212 Natore 46 Naldanga 489 253 PWA-UZC- Naldanga-264 Construction of Twin Qrtr. 0.00   0.00 0 19/12/2018 Building Qty: 1
213 Natore 46 Naldanga 489 253 PWA-UZC- Naldanga-262 Construction of Upazila Complex Extention Building & Hall Room 980.89 Mahabub brothers pvt Ltd. & Mir Habibul Alam (JV) 926.94 01/04/2018 30/06/2019 18 19/12/2018 Building Qty: 2
214 Natore 46 singra 345 253 PWA-UZC- Singra-33 Construction of Upazila Complex Extention Building & Hall Room 422.81 MIM Construction 452.08 14/10/2014 13/01/2016 100 19/12/2018 Building Qty: 2
215 Netrokona 25 barhatta 186 253 PWA-UZC- Barhatta-121 Construction of Upazila Complex Extention Building & Hall Room 507.81   0.00 0 19/12/2018 Building Qty: 2
216 Netrokona 25 kalmakanda 189 253 PWA-UZC- Kalmakanda-122 Construction of Upazila Complex Extention Building & Hall Room 449.90 sit-akmaqsk (jv) 419.96 07/02/2017 06/05/2018 35 19/12/2018 Building Qty: 2
217 Netrokona 25 madan 191 253 PWA-UZC- Madan-120 Construction of Upazila Complex Extention Building & Hall Room 481.47   0.00 0 19/12/2018 Building Qty: 2
218 Nilphamari 55 domar 399 253 PWA-UZC- Domar-13 Construction of Upazila Complex Extention Building & Hall Room 326.37 M/S Talukder Enterprise 318.63 23/02/2012 22/02/2013 100 19/12/2018 Building Qty: 2
219 Nilphamari 55 kishoreganj 401 253 PWA-UZC- Kishorganj-12 Construction of Upazila Complex Extention Building & Hall Room 438.25 MD. Khairul Kobir Rana 379.76 06/08/2016 09/01/2017 100 19/12/2018 Building Qty: 2
220 Nilphamari 55 nilphamari-s 402 253 PWA-UZC- Nilphamari-S-14 Construction of Upazila Complex Extention Building & Hall Room 326.37 MD. Khairul Kobir Rana 324.91 22/02/2012 21/02/2013 100 19/12/2018 Building Qty: 1
221 Noakhali 7 noakhali-s 51 253 PWA-UZC- Noakhali-S-79 Construction of Upazila Complex Extention Building & Hall Room 435.60 M/S Hasan-Rupali (JV) 479.07 28/04/2013 27/04/2014 100 19/12/2018 Building Qty: 2
222 Noakhali 7 senbag 89 253 PWA-UZC- Senbag-78 Construction of Upazila Complex Extention Building & Hall Room 466.34 M/S Forida & Riasat (JV) 459.47 100 19/12/2018 Building Qty: 2
223 Pabna 49 atghoria 342 253 PWA-UZC- Atghoria-42 Construction of Upazila Complex Extention Building & Hall Room 448.54 Md. Jinnat Ali Zinnah 393.25 100 19/12/2018 Building Qty: 2
224 Pabna 49 bera 343 253 PWA-UZC- Bera-45 Construction of Upazila Complex Extention Building & Hall Room 351.47 S.S. Engineering and Construction Ltd. 386.44 02/07/2012 30/11/2014 100 19/12/2018 Building Qty: 2
225 Pabna 49 chatmohar 344 253 PWA-UZC- Chatmohor-43 Construction of Upazila Complex Extention Building & Hall Room 447.70 BI & RE (JV) 354.87 11/05/2016 10/08/2017 100 19/12/2018 Building Qty: 2
226 Pabna 49 faridpur 369 253 PWA-UZC- Faridpur-44 Construction of Upazila Complex Extention Building & Hall Room 490.58   0.00 0 19/12/2018 Building Qty: 2
227 Panchagarh 59 atwari 429 253 PWA-UZC- Atuari-01 Construction of Upazila Complex Extention Building & Hall Room 325.71 MR. Rambabu 318.46 19/02/2012 19/02/2013 100 19/12/2018 Building Qty: 2
228 Panchagarh 59 debiganj 431 253 PWA-UZC-Debigonj-02 Construction of Upazila Complex Extention Building & Hall Room 325.71 M/S Siful Alam & Faruk Enterprise (JV) 338.06 01/02/2012 01/02/2013 100 19/12/2018 Building Qty: 2
229 Patuakhali 1 bauphal 19 253 PWA-UZC- Bauphal-217 Construction of Upazila Complex Extention Building & Hall Room 0.00   0.00 0 19/12/2018 Building Qty: 2
230 Patuakhali 1 galachipa 1 253 PWA-UZC- Galachipa-189 Construction of Upazila Complex Extention Building & Hall Room 812.42 SE-AEC (JV) 689.78 24/07/2018 23/07/2019 10 19/12/2018 Building Qty: 2
231 Patuakhali 1 kalapara 12 253 PWA-UZC- Kalapara-190 Construction of Upazila Complex Extention Building & Hall Room 753.00 MGU-MRA (JV) 592.68 31/01/2017 24/04/2018 20 19/12/2018 Building Qty: 2
232 Patuakhali 1 mirjaganj 13 253 PWA-UZC- Mirzaganj-528 Construction of Upazila Complex Extention Building & Hall Room 461.98   0.00 0 19/12/2018 Building Qty: 2
233 Patuakhali 1 patuakhali-s 14 253 PWA-UZC- Patuakhali-S-191 Construction of Upazila Complex Extention Building & Hall Room 517.13 M/S Mohiuddin Ahmed 568.69 100 19/12/2018 Building Qty: 2
234 Patuakhali 1 Rangabali 484 253 PWA-UZC- Rangabali-245 Construction of Twin Qrtr 0.00   0.00 0 19/12/2018 Building Qty: 1
235 Patuakhali 1 Rangabali 484 253 PWA-UZC- Rangabali-244 Construction of UNO Qrtr 0.00   0.00 0 19/12/2018 Building Qty: 1
236 Pirojpur 3 bhandaria 35 253 PWA-UZC- Bhandaria-231 Construction of Upazila Complex Extention Building & Hall Room 574.07 NT-RE (JV) 501.39 100 19/12/2018 Building Qty: 2
237 Pirojpur 3 kawkhali 36 253 PWA-UZC- Kawkhali-187 Construction of Upazila Complex Extention Building & Hall Room 859.54 Toma Construction & Co. Ltd 773.58 25/01/2018 24/01/2019 30 19/12/2018 Building Qty: 2
238 Pirojpur 3 mothbaria 37 253 PWA-UZC- Matbaria-186 Construction of Upazila Complex Extention Building & Hall Room 737.08 Niaz-Rana (JV) 663.37 25/02/2018 25/05/2019 0 19/12/2018 Building Qty: 2
239 Pirojpur 3 pirojpur-s 9 253 PWA-UZC- Pirojpur-S-188 Construction of Upazila Complex Extention Building & Hall Room 583.75 M/S Ahmed Steel Industries 583.30 12/01/2016 100 19/12/2018 Building Qty: 2
240 Rajbari 29 baliakandi 221 253 PWA-UZC- Baliakandi-143 Construction of Upazila Complex Extention Building & Hall Room 339.54 M/S Anan Construction 382.50 05/03/2012 05/03/2013 100 19/12/2018 Building Qty: 2
241 Rajbari 29 pangsha 223 253 PWA-UZC- Pangsha-142 Construction of Upazila Complex Extention Building & Hall Room 500.42 Kingdom Builders Limited 485.89 18/05/2016 17/08/2017 100 19/12/2018 Building Qty: 2
242 Rajbari 29 rajbari-s 224 253 PWA-UZC- Rajbari-S-144 Construction of Upazila Complex Extention Building & Hall Room 436.98 M/S Rafique Construction 425.80 100 19/12/2018 Building Qty: 2
243 Rajshahi 48 bagmara 364 253 PWA-UZC- Bagmara-36 Construction of Upazila Complex Extention Building & Hall Room 439.60 MIM Construction 383.99 13/11/2016 24/01/2017 100 19/12/2018 Building Qty: 2
244 Rajshahi 48 bagmara 364 253 PWA-UZC- Batiaghata-152 Construction of Upazila Complex Extention Building & Hall Room 493.39 M/S S.N.Builders 440.98 16/06/2014 15/06/2015 100 19/12/2018 Building Qty: 2
245 Rajshahi 48 charghat 365 253 PWA-UZC- Charghat-38 Construction of Upazila Complex Extention Building & Hall Room 451.92 MIM Construction 443.32 12/10/2014 30/12/2015 100 19/12/2018 Building Qty: 2
246 Rajshahi 48 durgapur 366 253 PWA-UZC- Durgapur-39 Construction of Upazila Complex Extention Building & Hall Room 434.12 MSA-GM (JV) 379.57 15/11/2015 08/03/2017 100 19/12/2018 Building Qty: 2
247 Rajshahi 48 godagari 338 253 PWA-UZC- Godagari-37 Construction of Upazila Complex Extention Building & Hall Room 437.35 mmhw.mahjv 369.73 06/09/2015 05/12/2016 100 19/12/2018 Building Qty: 2
248 Rangamati 17 barkal 138 253 PWA-UZC- Borkal-60 Construction of Upazila Complex Extention Building & Hall Room 639.50 M/S Lumbini Enterprise 482.93 13/05/2017 06/08/2018 45 19/12/2018 Building Qty: 2
249 Rangamati 17 belaichari 128 253 PWA-UZC- Belaichari-61 Construction of Upazila Complex Extention Building & Hall Room 518.58 M/S Prominent Engineers 543.23 21/02/2018 20/05/2019 0 19/12/2018 Building Qty: 2
250 Rangamati 17 kaptai 133 253 PWA-UZC- Kaptai-59 Construction of Upazila Complex Extention Building & Hall Room 458.96 S.Ananta Bikash Tripura 429.28 19/07/2016 13/10/2017 90 19/12/2018 Building Qty: 2
251 Rangpur 53 gangachara 424 253 PWA-UZC- Gangachara-16 Construction of Upazila Complex Extention Building & Hall Room 432.23 SMAH-GME-RC (JV) 377.55 12/11/2015 04/02/2017 100 19/12/2018 Building Qty: 2
252 Rangpur 53 kaunia 403 253 PWA-UZC- Kaunia-17 Construction of Upazila Complex Extention Building & Hall Room 437.93 Rafiq Construction & Co. Ltd. 415.12 11/12/2014 18/05/2016 100 19/12/2018 Building Qty: 2
253 Rangpur 53 mithapukur 396 253 PWA-UZC- Mithapukur-18 Construction of Upazila Complex Extention Building & Hall Room 461.87 M/S Kabir Traders 384.36 01/02/2017 24/04/2018 100 19/12/2018 Building Qty: 2
254 Rangpur 53 pirganj 395 253 PWA-UZC- Pirganj-03 Construction of Upazila Complex Extention Building & Hall Room 407.90 Parvez Construction Ltd 385.85 08/10/2013 01/10/2014 100 19/12/2018 Building Qty: 2
255 Satkhira 39 assasuni 280 253 PWA-UZC- Ashashuni-160 Construction of Upazila Complex Extention Building & Hall Room 776.32 WE & KE (JV) 698.69 01/03/2018 01/03/2019 0 19/12/2018 Building Qty: 2
256 Satkhira 39 kalaroa 281 253 PWA-UZC- Kalaroa-159 Construction of Upazila Complex Extention Building & Hall Room 618.58 Dhaly Construction Ltd 605.17 0 19/12/2018 Building Qty: 2
257 Satkhira 39 kaliganj 285 253 PWA-UZC- Kaligonj-161 Construction of Upazila Complex Extention Building & Hall Room 717.55   0.00 0 19/12/2018 Building Qty: 2
258 Satkhira 39 shyamnagar 292 253 PWA-UZC- Samnagar-162 Construction of Upazila Complex Extention Building & Hall Room 730.47 M/S Esha Enterprise 569.03 19/02/2017 18/05/2018 80 19/12/2018 Building Qty: 1
259 Shariatpur 32 damuddya 234 253 PWA-UZC- Damudda-147 Construction of Upazila Complex Extention Building & Hall Room 502.31 M/S Progati-Sheikh (JV) 435.24 01/01/2018 29/03/2019 35 19/12/2018 Building Qty: 2
260 Shariatpur 32 goshairhat 235 253 PWA-UZC- Gosairhat-522 Construction of Upazila Complex Extention Building & Hall Room 665.75   0.00 0 19/12/2018 Building Qty: 2
261 Shariatpur 32 janjira 238 253 PWA-UZC- Zajira-524 Construction of Upazila Complex Extention Building & Hall Room 366.68 M/S Niaz Traders 330.01 12/02/2018 12/02/2019 30 19/12/2018 Building Qty: 2
262 Shariatpur 32 naria 236 253 PWA-UZC- Naria-148 Construction of Upazila Complex Extention Building & Hall Room 532.27 M/S Farjana Khan 517.31 12/02/2018 12/02/2019 30 19/12/2018 Building Qty: 2
263 Sherpur 26 nakla 200 253 PWA-UZC- Nakla-130 Construction of Upazila Complex Extention Building & Hall Room 556.26 M/S Das & Elias (JV) 501.72 19/07/2015 19/10/2016 95 19/12/2018 Building Qty: 2
264 Sherpur 26 nalitabari 211 253 PWA-UZC- Nalitabari-131 Construction of Upazila Complex Extention Building & Hall Room 539.65 M/S Dhrobe Trade Agency 512.10 100 19/12/2018 Building Qty: 2
265 Sherpur 26 sherpur-s 212 253 PWA-UZC- Sherpur-S-132 Construction of Upazila Complex Extention Building & Hall Room 588.09 Dhaly Construction Ltd. 529.28 25/04/2017 19/04/2018 70 19/12/2018 Building Qty: 2
266 Sirajganj 52 belkuchi 382 253 PWA-UZC- Belkuchi-48 Construction of Upazila Complex Extention Building & Hall Room 337.93 M/S F.M. Trade International 336.56 07/01/2012 31/12/2012 100 19/12/2018 Building Qty: 2
267 Sirajganj 52 kamarkhand 386 253 PWA-UZC- Kamarkhand-47 Construction of Upazila Complex Extention Building & Hall Room 451.70 M/S Khondokar Business International 396.84 15/01/2015 14/01/2016 100 19/12/2018 Building Qty: 2
268 Sirajganj 52 kazipur 380 253 PWA-UZC- Kazipur-222 Construction of Upazila Complex Extention Building & Hall Room 545.21 M/S Dhrobe Trade Agency 490.69 18/05/2017 14/07/2018 95 19/12/2018 Building Qty: 2
269 Sirajganj 52 tarash 373 253 PWA-UZC- Tarash-46 Construction of Upazila Complex Extention Building & Hall Room 511.14 MIM Construction 469.17 100 19/12/2018 Building Qty: 2
270 Sunamganj 64 jagannathpur 469 253 PWA-UZC- Jagannathpur-90 Construction of Upazila Complex Extention Building & Hall Room 354.06 JR Trading Limited 347.49 20/07/2012 31/12/2014 100 19/12/2018 Building Qty: 2
271 Sunamganj 64 sulla 467 253 PWA-UZC- OW-02 Earth Filling 36.94 MAM Construction Ltd. 28.74 100 19/12/2018 Building Qty: 0
272 Sunamganj 64 sulla 467 253 PWA-UZC- Shalla-91 Construction of Upazila Complex Extention Building & Hall Room 527.71 JV of Kazi Sirajul Islam-M/S R.R.S. Enterprise 527.56 100 19/12/2018 Building Qty: 2
273 Sylhet 61 beanibazar 460 253 PWA-UZC- Beanibazar-85 Construction of Upazila Complex Extention Building & Hall Room 446.78 M/S IC-ME (JV) 409.91 31/10/2016 30/01/2018 50 19/12/2018 Building Qty: 2
274 Sylhet 61 biswanath 459 253 PWA-UZC- Biswanath-84 Construction of Upazila Complex Extention Building & Hall Room 542.15 M/S Akter Traders 465.07 07/03/2017 06/06/2018 30 19/12/2018 Building Qty: 2
275 Sylhet 61 fenchuganj 457 253 PWA-UZC- Fensugonj-88 Construction of Upazila Complex Extention Building & Hall Room 554.60 MBB & MEFTI (JV) 512.49 04/05/2018 03/06/2019 20 19/12/2018 Building Qty: 2
276 Sylhet 61 gowainghat 455 253 PWA-UZC- Gowainghat-87 Construction of Upazila Complex Extention Building & Hall Room 560.32 M/S Akter Traders 478.81 13/10/2016 12/01/2018 55 19/12/2018 Building Qty: 2
277 Sylhet 61 kanaighat 447 253 PWA-UZC- Kanaighat-86 Construction of Upazila Complex Extention Building & Hall Room 546.62 M/S Ekramul Haque 458.88 20/02/2017 26/04/2018 85 19/12/2018 Building Qty: 2
278 Sylhet 61 Osmaninagar 491 253 PWA-UZC- Osmaninagar-277 Others Construction (Water Supply) 0.00   0.00 0 19/12/2018 Building Qty: 0
279 Sylhet 61 Osmaninagar 491 253 PWA-UZC- Osmaninagar-276 Others Construction (Electrification) 0.00   0.00 0 19/12/2018 Building Qty: 0
280 Sylhet 61 Osmaninagar 491 253 PWA-UZC- Osmaninagar-275 Others Construction (Internal Road & Boundary wall) 0.00   0.00 0 19/12/2018 Building Qty: 0
281 Sylhet 61 Osmaninagar 491 253 PWA-UZC- Osmaninagar-274 Land Development 57.97 M/S Reza Construction 55.07 06/09/2018 05/12/2018 0 19/12/2018 Building Qty: 0
282 Sylhet 61 Osmaninagar 491 253 PWA-UZC- Osmaninagar-273 Construction of Dormitory 0.00   0.00 0 19/12/2018 Building Qty: 1
283 Sylhet 61 Osmaninagar 491 253 PWA-UZC- Osmaninagar-272 Construction of Twin Qrtr. 0.00   0.00 0 19/12/2018 Building Qty: 1
284 Sylhet 61 Osmaninagar 491 253 PWA-UZC- Osmaninagar-271 Construction of UNO Qrtr. 128.52 M/S S Construction 122.09 04/09/2018 03/09/2019 0 19/12/2018 Building Qty: 1
285 Sylhet 61 Osmaninagar 491 253 PWA-UZC- Osmaninagar-270 Construction of Upazila Complex Extention Building & Hall Room 953.30 Bengal-Nirman-RS (JV) 914.44 0 19/12/2018 Building Qty: 2
286 Sylhet 61 sylhet-s 452 253 PWA-UZC- Sylhet-S-89 Construction of Upazila Complex Extention Building & Hall Room 395.05 IC,ME,NE(JV) 453.20 10/05/2012 09/05/2013 100 19/12/2018 Building Qty: 2
287 Tangail 18 ghatail 140 253 PWA-UZC- Ghatail-134 Construction of Upazila Complex Extention Building & Hall Room 346.62 M/S Das & Kundu Traders 406.63 12/06/2012 11/06/2013 100 19/12/2018 Building Qty: 2
288 Tangail 18 kalihati 146 253 PWA-UZC- Kalihati-135 Construction of Upazila Complex Extention Building & Hall Room 532.29 PTSL-IB-DURGA Enterprise (JV) 479.06 22/03/2018 21/06/2019 35 19/12/2018 Building Qty: 2
289 Tangail 18 madhupur 145 253 PWA-UZC- Madhupur-133 Construction of Upazila Complex Extention Building & Hall Room 494.02 M/S Das Traders 428.88 09/04/2017 08/07/2018 82 19/12/2018 Building Qty: 2
290 Tangail 18 mirzapur 143 253 PWA-UZC- Mirzapur-226 Construction of Upazila Complex Extention Building & Hall Room 387.55 M/S Das Traders 323.03 16/01/2017 15/04/2018 90 19/12/2018 Building Qty: 2
291 Tangail 18 nagarpur 148 253 PWA-UZC- Nagarpur-137 Construction of Upazila Complex Extention Building & Hall Room 421.16 M/S Syed Mojibor Rahman 453.46 100 19/12/2018 Building Qty: 2
292 Tangail 18 shakhipur 142 253 PWA-UZC- Shakhipur-136 Construction of Upazila Complex Extention Building & Hall Room 444.36 M/S Das & Kundu (JV) 482.61 06/11/2014 31/01/2016 100 19/12/2018 Building Qty: 2
293 Tangail 18 tangail-s 144 253 PWA-UZC- OW-07 Construction of Internal Road 18.29 Desh Engineering & Development Agency Pvt. Ltd 16.46 100 19/12/2018 Building Qty: 0
294 Tangail 18 tangail-s 144 253 PWA-UZC- Tangail-S-138 Construction of Upazila Complex Extention Building & Hall Room 436.72 Md. Abdul Jalil Sarker & M/S Sunve Traders (JV) 479.93 16/11/2014 15/11/2015 100 19/12/2018 Building Qty: 2
295 Thakurgaon 57 haripur 425 253 PWA-UZC- Haripur-04 Construction of Upazila Complex Extention Building & Hall Room 435.25 Real & Habibur (JV) 361.81 15/12/2015 15/03/2017 100 19/12/2018 Building Qty: 2
296 Thakurgaon 57 pirganj 426 253 PWA-UZC- Pirgonj-03 Construction of Upazila Complex Extention Building & Hall Room 426.82 M/S MI Trading & CO. 371.29 22/10/2017 20/01/2019 60 19/12/2018 Building Qty: 2
297 Thakurgaon 57 thakurgaon-s 405 253 PWA-UZC- OW-09 Construction of Internal Road 22.01 Md. Haider Ali 20.91 100 19/12/2018 Building Qty: 0
298 Thakurgaon 57 thakurgaon-s 405 253 PWA-UZC- Thakurgaon-S-05 Construction of Upazila Complex Extention Building & Hall Room 426.82 MD. Khairul Kobir Rana 382.65 07/09/2015 07/12/2016 100 19/12/2018 Building Qty: 2