1
|
Bandarban
|
15
|
alikadam
|
122
|
614
|
BAN/ALIKADAM/ UNR /W60
|
Maintenance of Amtali Road-Asuti Tripura para Dochari Road.
|
|
0.58
|
|
|
11.85
|
M/S Milton Traders, Rowangchari, Bandarban
|
11.84
|
|
08/01/2018
|
11/11/2018
|
100
|
|
|
26/12/2018
|
|
2
|
Bandarban
|
15
|
alikadam
|
122
|
614
|
BAN/ALIKADAM/ UNR/W69
|
Improvement of Chikkan para (cioni para) road
|
|
1.00
|
|
|
114.80
|
|
0.00
|
|
|
|
0
|
|
|
26/12/2018
|
|
3
|
Bandarban
|
15
|
alikadam
|
122
|
614
|
BAN/ALIKADAM/ BRIDGE/W52
|
Construction of 75.00m Long PSC Girder Bridge on Fasiakhali - Alikadam main (R&H) road- Alis Suronga road ch.2600m)
|
|
|
|
|
332.37
|
M/S PK-AC (JV), Bandarban, Sadar, Bandarban
|
361.61
|
|
09/09/2018
|
08/02/2020
|
25
|
|
|
26/12/2018
|
|
4
|
Bandarban
|
15
|
alikadam
|
122
|
614
|
BAN/ALIKADAM/ UNR/W41
|
Improvement of Chikkan para (cioni para) road
|
|
0.75
|
|
|
63.93
|
Mr.UT Mong,Maddayum Para Bandarban
|
57.54
|
|
11/05/2017
|
18/02/2018
|
100
|
|
|
26/12/2018
|
|
5
|
Bandarban
|
15
|
alikadam
|
122
|
614
|
BAN/ALIKADAM/ UNR/W40
|
Improvement of Sonaichori R&H-Varirmukh Road.(Ch.821-1571m)
|
|
0.75
|
|
|
68.00
|
Mr.UT Mong,Maddayum Para Bandarban
|
61.20
|
|
|
23/12/2018
|
65
|
|
|
26/12/2018
|
|
6
|
Bandarban
|
15
|
alikadam
|
122
|
614
|
BAN/ALIKADAM/UZR/W39
|
Improvement of Alikadam Bazar- Naikhongchari Border via Rombow road.
|
|
2.88
|
|
|
247.20
|
Mr.UT Mong,Maddayum Para Bandarban
|
222.48
|
|
|
23/03/2019
|
45
|
|
|
26/12/2018
|
|
7
|
Bandarban
|
15
|
alikadam
|
122
|
614
|
BAN/ ALI / BRIDGE/W22
|
Construction of 81.00m long PSC Gider Bridge on Alikadam Bazar- Naikhongchari Border via Rombow road. Ch.1193m)
|
|
|
|
|
442.56
|
M/S Noor Syndicate, Pachalish,Chittagong
|
396.77
|
|
|
11/06/2018
|
45
|
|
|
26/12/2018
|
|
8
|
Bandarban
|
15
|
alikadam
|
122
|
614
|
BAN/ALI/ UNR/W14
|
Improvement of Alikadam-Dochori Road
|
|
2.00
|
|
|
130.37
|
M/S Prasanna kant Amu, Hospital raod, Bandarban
|
107.29
|
|
|
03/07/2018
|
100
|
|
|
26/12/2018
|
|
9
|
Bandarban
|
15
|
alikadam
|
122
|
614
|
BAN/ALI/ UNR/W10
|
Fasiakhali - Alikadam main (R&H) road- Alis Suronga road
|
|
1.60
|
|
|
152.95
|
M/S Emmu Construction, Rowangchari, Bandarban
|
135.98
|
|
|
04/04/2017
|
100
|
|
|
26/12/2018
|
|
10
|
Bandarban
|
15
|
alikadam
|
122
|
614
|
BAN/ALI/ UNR/W03
|
Fasiakhali - Alikadam main (R&H) road- Alis Suronga road
|
|
1.00
|
|
|
95.64
|
M/S Milton Traders, Rowangchari
|
81.21
|
|
|
02/04/2017
|
100
|
|
|
26/12/2018
|
|
11
|
Bandarban
|
15
|
bandarban-s
|
109
|
614
|
BAN/SADAR/UZR/W30
|
Periodic Maintenance of Khanshama-Bagmara road start B-Ban Rowangchari Road.
|
|
4.81
|
|
|
109.64
|
M/S Selim & Brothers, Baitus Sharaf Mosque Road, Arambag, Khagrachari.
|
98.67
|
|
08/03/2017
|
09/08/2018
|
100
|
|
|
26/12/2018
|
|
12
|
Bandarban
|
15
|
bandarban-s
|
109
|
614
|
BAN/SADAR/ UNR/W23
|
Periodic Maintenance of Balaghata-Bagman Bazar Road start from B-ban Chandraghona.
|
|
3.00
|
|
|
103.85
|
M/S marma enterprise, Mayd ampara, Bandarban
|
93.46
|
|
05/07/2017
|
13/05/2018
|
100
|
|
|
26/12/2018
|
|
13
|
Bandarban
|
15
|
bandarban-s
|
109
|
614
|
BAN/SADAR/UNR/W66
|
Rehabilitation of Udalbunia-Jhanka Road start from Udalbunia – Rajvilla Road.
|
|
2.50
|
|
|
209.10
|
Ms. Lumbini Enterprise, Rangamati
|
198.64
|
|
|
17/07/2019
|
10
|
|
|
26/12/2018
|
|
14
|
Bandarban
|
15
|
bandarban-s
|
109
|
614
|
WD/RIDPCHT-2/BAN/ SADAR/ BRIDGE/W64
|
(1) Construction of 22.00m long RCC Girder Bridge on Holudia-Vaggakul - Tankbati Road; at Ch.2310m.
(ii) Construction of RCC Box Culvert Size; 1.50m X 1.50m; at Ch.1190m.
ID No.403143005
|
|
|
|
|
91.53
|
Mr.UT Mong,Maddayum Para Bandarban
|
82.38
|
|
07/10/2018
|
09/07/2019
|
20
|
|
|
26/12/2018
|
|
15
|
Bandarban
|
15
|
bandarban-s
|
109
|
614
|
WD/RIDPCHT-2/BAN/ SADAR/ BRIDGE/W21
|
Construction of 18.0m long RCC Girder Bridge on Holudia – Vaggakul – Tonkabati via Chimbuk R & H road at ch. 3015.0m
|
|
|
|
|
71.82
|
M/S Milton Traders, Rowangchari
|
55.58
|
|
01/08/2017
|
11/12/2017
|
100
|
|
|
26/12/2018
|
|
16
|
Bandarban
|
15
|
bandarban-s
|
109
|
614
|
WD/RIDPCHT-2/BAN/ SADAR/ BRIDGE/W20
|
Construction of 18.0m long RCC Girder Bridge on Holudia – Vaggakul – Tonkabati via Chimbuk R & H road at ch. 1430.0m
|
|
|
|
|
67.85
|
M/S Milton Traders, Rowangchari
|
52.79
|
|
01/08/2017
|
11/12/2017
|
100
|
|
|
26/12/2018
|
|
17
|
Bandarban
|
15
|
bandarban-s
|
109
|
614
|
WD/RIDPCHT-2/BAN/ SADAR/ BRIDGE/W19
|
Construction of 12.0m long RCC Girder Bridge on Holudia – Vaggakul – Tonkabati via Chimbuk R & H road at ch. 780.0m
|
|
|
|
|
60.71
|
Mr.UT Mong,Maddayum Para Bandarban
|
47.95
|
|
01/08/2017
|
15/12/2017
|
100
|
|
|
26/12/2018
|
|
18
|
Bandarban
|
15
|
bandarban-s
|
109
|
614
|
BAN/SADR/UNR/W08
|
Holudia-Vaggakul-Tankbati Road.
|
|
1.35
|
|
|
107.35
|
M/S Milton Traders, Bandarban
|
82.71
|
|
|
18/05/2017
|
100
|
|
|
26/12/2018
|
|
19
|
Bandarban
|
15
|
bandarban-s
|
109
|
614
|
BAN/SADR/UNR/W07
|
Holudia-Vaggakul-Tankbati Road.
|
|
2.00
|
|
|
229.72
|
M/S Arpmilton (JV), Bandarban
|
171.35
|
|
|
29/03/2017
|
100
|
|
|
26/12/2018
|
|
20
|
Bandarban
|
15
|
lama
|
120
|
614
|
BAN/LAMA/ UNR /W59
|
Maintenance of Daluchari Bazar-Lulying Bazar Road. Ch.5490-9560m
ID No:
|
|
4.07
|
|
|
69.34
|
M/S Milton Traders, Rowangchari, Bandarban
|
62.40
|
|
|
22/02/2019
|
100
|
|
|
26/12/2018
|
|
21
|
Bandarban
|
15
|
lama
|
120
|
614
|
BAN/LAMA/ UNR /W58
|
Maintenance of Daluchari Bazar-Lulying Bazar Road.
|
|
2.99
|
|
|
112.69
|
M/S Milton Traders, Rowangchari, Bandarban
|
101.42
|
|
|
22/02/2019
|
100
|
|
|
26/12/2018
|
|
22
|
Bandarban
|
15
|
lama
|
120
|
614
|
BAN/LAMA/ UZR /W57
|
Maintenance of Lama-Suwalac Road.
|
|
3.60
|
|
|
44.56
|
M/S Milton Traders, Rowangchari, Bandarban
|
48.92
|
|
05/03/2018
|
09/02/2019
|
100
|
|
|
26/12/2018
|
|
23
|
Bandarban
|
15
|
lama
|
120
|
614
|
BAN/LAMA/ UZR /W56
|
Maintenance of Lama-Suwalac Road.
|
|
3.50
|
|
|
72.29
|
M/S Milton Traders, Rowangchari, Bandarban
|
77.30
|
|
05/03/2018
|
09/02/2019
|
100
|
|
|
26/12/2018
|
|
24
|
Bandarban
|
15
|
lama
|
120
|
614
|
BAN/LAMA/VILL/W73
|
Improvement of Dulahazara – Sangu Rajpara Road.
|
|
8.04
|
|
|
998.83
|
|
0.00
|
|
|
|
0
|
|
|
26/12/2018
|
|
25
|
Bandarban
|
15
|
lama
|
120
|
614
|
BAN/LAMA /BRIDGE /W70
|
Construction of 184.00.0m long PC with RCC Girder Bridge on Shelertua-Rupashi Para Road at ch. 170m;
|
|
|
|
|
1064.90
|
|
0.00
|
|
|
|
0
|
|
|
26/12/2018
|
|
26
|
Bandarban
|
15
|
lama
|
120
|
614
|
BAN/LAMA/V.ROAD/W65
|
Rehabilation of Dulahajra – Hargasa (Shapergara) Road . Effective length=2685.00 m;
|
|
2.69
|
|
|
242.42
|
Mr.UT Mong,Maddayum Para Bandarban
|
218.18
|
|
07/05/2018
|
19/05/2019
|
85
|
|
|
26/12/2018
|
|
27
|
Bandarban
|
15
|
lama
|
120
|
614
|
BAN/LAMA/UNR/W51
|
Improvement of Daluchari Bazar lulying Bazar Road
|
|
4.01
|
|
|
407.06
|
m/s marma enterprise, Nayankhan, Bandarban Sadar, Bandarban
|
406.52
|
|
|
11/06/2019
|
65
|
|
|
26/12/2018
|
|
28
|
Bandarban
|
15
|
lama
|
120
|
614
|
/BAN/LAMA/BRIDGE/W50
|
Construction of 60m long RCC Girder Bridge on Polokhal Tetulia Moor-Quantum Cosmo College via Bodhechora public Schooll Road. At ch.30m
|
|
|
|
|
255.87
|
Mr.UT Mong,Maddayum Para Bandarban
|
230.28
|
|
|
20/05/2019
|
60
|
|
|
26/12/2018
|
|
29
|
Bandarban
|
15
|
lama
|
120
|
614
|
BAN/LAMA/ V.Road/W45
|
Improvement of Bodhe Chora Bamboorian Mor - Quantum Shabujan Pry School via Ground Olympian & Chompajhiri Para Mor Road by HBB
|
|
2.50
|
|
|
154.27
|
Mr.UT Mong,Maddayum Para Bandarban
|
138.84
|
|
|
20/02/2019
|
90
|
|
|
26/12/2018
|
|
30
|
Bandarban
|
15
|
lama
|
120
|
614
|
BAN/LAMA/ V.Road/W44
|
Improvement of Polokhal Tetulia Moor-Quantum Cosmo College via Bodhechora public School Road. by HBB
|
|
2.48
|
|
|
177.47
|
Mr.UT Mong,Maddayum Para Bandarban
|
159.72
|
|
|
05/02/2019
|
90
|
|
|
26/12/2018
|
|
31
|
Bandarban
|
15
|
lama
|
120
|
614
|
BAN/ LAMA/ BRIDGE/W29
|
Construction of 33.0m long RCC Girder Bridge on Shelertua-Rupashi Para Road at ch. 930m
|
|
|
|
|
199.00
|
Mr U T Mong, Madhyampara, Bandarban
|
179.10
|
|
08/10/2017
|
25/11/2018
|
45
|
|
|
26/12/2018
|
|
32
|
Bandarban
|
15
|
lama
|
120
|
614
|
BAN/LAMA/UNR/W16
|
Imrovement of Lama muk-Selertua road
|
|
3.30
|
|
|
205.46
|
S. Ananta Bikash Tripura, Milonpur, Khagrachari
|
160.32
|
|
|
17/11/2017
|
100
|
|
|
26/12/2018
|
|
33
|
Bandarban
|
15
|
naikhyongchari
|
121
|
614
|
BAN/NAIK/UZR/W74
|
Rehabilitation of Road from Baishari Bazar GC-Edgor Bazar Road By 25mm Dense Carpeting
from
(Effective Length: 8131m)
|
|
8.13
|
|
|
754.27
|
|
0.00
|
|
|
|
0
|
|
|
26/12/2018
|
|
34
|
Bandarban
|
15
|
naikhyongchari
|
121
|
614
|
BAN/NAIK/UNR/W72
|
i) Improvement of Road from Naikhyongchari UZH/Q – Tumbru G.C Road by 25mm Thick Bituminous Carpating With 7mm Seal Coat at ch. 32675-33825.00 m
ID No.
ii) Improvement of Road from Bodderchar Bazar – Patabhaari Moricha G.C Road by 25mm Thick Bituminous C
|
|
2.65
|
|
|
222.70
|
|
0.00
|
|
|
|
0
|
|
|
26/12/2018
|
|
35
|
Bandarban
|
15
|
naikhyongchari
|
121
|
614
|
BAN/NAIKHONG/UNR/W67
|
Improvement of Baishari Bazar - Dochari Bazar via Longgudhu mukh Bakkhali road.
|
|
4.00
|
|
|
406.04
|
M/S Milton Traders, Rowangchari
|
399.20
|
|
|
|
0
|
|
|
26/12/2018
|
|
36
|
Bandarban
|
15
|
naikhyongchari
|
121
|
614
|
BAN/NAIKHONG/ UNR/W66
|
Improvement of Dochori - Ali Kadam road
|
|
5.16
|
|
|
636.52
|
Mr. U.T Mong Madhyampara, Bandarban
|
681.01
|
|
|
|
0
|
|
|
26/12/2018
|
|
37
|
Bandarban
|
15
|
naikhyongchari
|
121
|
614
|
BAN/NAIKHONG/ UNR/W55
|
Development of Lemuchari BDR Camp-Bahirmath-Kalurghat Road.(Lemuchari BGB Camp-Mathongpara Road via Kalurghat-Painchari Murongpara road)
|
|
2.30
|
|
|
171.65
|
M/S Al-Noor Enterprise, Coxs'bazar
|
171.49
|
|
|
13/05/2019
|
0
|
|
|
26/12/2018
|
|
38
|
Bandarban
|
15
|
naikhyongchari
|
121
|
614
|
BAN/NAIKHONG/ UZR /W54
|
Naikhongchari - Lemouchari road.(Ch.4000-6800m), ID No.403733001(Development of Naikhyongchari UZ HQ – Alikadam UZ HQ via Dochari UP Road.
|
|
2.80
|
|
|
326.62
|
M/S Millon Traders, Rowangchari, Bandarban
|
355.18
|
|
|
27/08/2019
|
0
|
|
|
26/12/2018
|
|
39
|
Bandarban
|
15
|
naikhyongchari
|
121
|
614
|
BAN/NAIKHONG/ UNR/W47
|
Development of Lemuchari BDR Camp-Bahirmath-Kalurghat Road.(Lemuchari BGB Camp-Mathongpara Road via Kalurghat-Painchari Murongpara road) (Effective Length 815m) ;
|
|
0.82
|
|
|
84.72
|
Mr. U.T Mong Madhyampara, Bandarban
|
78.12
|
|
04/02/2018
|
08/04/2019
|
65
|
|
|
26/12/2018
|
|
40
|
Bandarban
|
15
|
naikhyongchari
|
121
|
614
|
BAN/NAIKHONG/ UNR/W53
|
Development of North Ghumdum - Tumbru Bazar road. (Effective Length 1159m) ;
|
|
1.16
|
|
|
142.33
|
M/S Millon Traders, Rowangchari, Bandarban
|
150.15
|
|
|
01/05/2019
|
0
|
|
|
26/12/2018
|
|
41
|
Bandarban
|
15
|
naikhyongchari
|
121
|
614
|
BAN/NAIKHONG/ UNR/W48
|
Development of North Ghumdum - Tumbru Bazar road.(Ch.1000-2800m); ID No: 403733008
(Development of Uttot Ghumdum – Tumbru Bazar GC Road..(Effective Length 1790m)
|
|
1.79
|
|
|
272.79
|
M/S Millon Traders, Rowangchari, Bandarban
|
297.27
|
|
|
01/05/2019
|
0
|
|
|
26/12/2018
|
|
42
|
Bandarban
|
15
|
naikhyongchari
|
121
|
614
|
BAN/NAIKHONG/ UNR/W46
|
Development of Lemuchari BDR Camp-Bahirmath-Kalurghat Road.(Lemuchari BGB Camp-Mathongpara Road via Kalurghat-Painchari Murongpara road) Ch. (Effective Length 1588m)
|
|
1.59
|
|
|
187.26
|
Mayadhan Chakma, Gagra, Rangamati
|
168.53
|
|
|
26/03/2019
|
25
|
|
|
26/12/2018
|
|
43
|
Bandarban
|
15
|
naikhyongchari
|
121
|
614
|
BAN/ NAIKHONG / BRIDGE/W42
|
Construction of 33.0m long RCC Girder Bridge on Lemuchari BDR Camp-Bahirmath-Kalurghat Road.(Lemuchari BGB Camp-Mathongpara Road via Kalurghat-Painchari Murongpara road).
(Dochari UP office (Lemochari)-Powamohuri Bazar via Kalurghat, Painchari Bazar BGB
|
|
|
|
|
143.74
|
M/S Abser Construction, Bhandarban
|
140.97
|
|
|
15/11/2018
|
0
|
|
|
26/12/2018
|
|
44
|
Bandarban
|
15
|
naikhyongchari
|
121
|
614
|
BAN/ NAIKHONG/ UNR/W38
|
Improvement of Baishari Bazar - Dochari Bazar via Longgudhu mukh Bakkhali road
|
|
3.15
|
|
|
247.56
|
M/S Abser Construction, Memberpara, Bandarban
|
247.18
|
|
|
20/06/2018
|
100
|
|
|
26/12/2018
|
|
45
|
Bandarban
|
15
|
naikhyongchari
|
121
|
614
|
BAN/ NAIKHONG/ UNR/W37
|
Improvement of Dochori - Ali Kadam road
|
|
3.00
|
|
|
246.34
|
M/s Kashem Construction, katalgong, Chittagong.
|
267.51
|
|
05/06/2018
|
10/08/2019
|
65
|
|
|
26/12/2018
|
|
46
|
Bandarban
|
15
|
naikhyongchari
|
121
|
614
|
BAN/ NAIKHONG / BRIDGE/W36
|
Construction of 33.0m long RCC Girder Bridge on Baishari Bazar - Dochari Bazar via Longgudhu mukh Bakkhali road. Ch.3000m
|
|
|
|
|
181.52
|
M/S MA Zaher,Adarsha Sadar Comilla.
|
168.35
|
|
|
16/12/2018
|
95
|
|
|
26/12/2018
|
|
47
|
Bandarban
|
15
|
naikhyongchari
|
121
|
614
|
BAN/ NAIKHONG/ BRIDGE/W35
|
Construction of 33.0m long RCC Girder Bridge on North Ghumdum - Tumbru Bazar road.Ch.2600m
|
|
|
|
|
180.86
|
Mr. U.T Mong Madhyampara, Bandarban
|
169.97
|
|
|
03/03/2019
|
75
|
|
|
26/12/2018
|
|
48
|
Bandarban
|
15
|
naikhyongchari
|
121
|
614
|
BAN/ NAIKHONG / BRIDGE/W34
|
Construction of 85.0m long RCC Girder Bridge on Lemuchari BDR Camp-Bahirmath-Kalurghat Road.(Lemuchari BGB Camp-Mathongpara Road via Kalurghat-Painchari Murongpara road) Ch.4970m
|
|
|
|
|
281.52
|
R R Construction, Comilla
|
302.02
|
|
03/01/2018
|
06/05/2019
|
15
|
|
|
26/12/2018
|
|
49
|
Bandarban
|
15
|
naikhyongchari
|
121
|
614
|
BAN/ NAIKHONG / BRIDGE/W33
|
Construction of 36.0m long RCC Girder Bridge on Lemuchari BDR Camp-Bahirmath-Kalurghat Road.(Lemuchari BGB Camp-Mathongpara Road via Kalurghat-Painchari Murongpara road) Ch.3780m
|
|
|
|
|
181.79
|
M/S MA Zaher,Adarsha Sadar Comilla.
|
163.61
|
|
|
05/01/2019
|
45
|
|
|
26/12/2018
|
|
50
|
Bandarban
|
15
|
naikhyongchari
|
121
|
614
|
BAN/ NAIKHONG / BRIDGE/W32
|
Construction of 85.0m long RCC Girder Bridge on Lemuchari BDR Camp-Bahirmath-Kalurghat Road.(Lemuchari BGB Camp-Mathongpara Road via Kalurghat-Painchari Murongpara road) Ch.1600m
|
|
|
|
|
303.56
|
Mr. U.T Mong Madhyampara, Bandarban
|
273.20
|
|
|
03/03/2019
|
45
|
|
|
26/12/2018
|
|
51
|
Bandarban
|
15
|
naikhyongchari
|
121
|
614
|
BAN/NAIK/UNR/W18
|
Lemuchari BDR Camp-Bahirmath-Kalurghat Road.(Lemuchari BGB Camp-Mathongpara Road via Kalurghat-Painchari Murongpara road)
|
|
1.00
|
|
|
97.86
|
Mr. U.T Mong Madhyampara, Bandarban
|
92.65
|
|
07/06/2017
|
25/09/2018
|
70
|
|
|
26/12/2018
|
|
52
|
Bandarban
|
15
|
rowangchari
|
118
|
614
|
BAN/ROWANG/ UNR /W63
|
Maintenance of Rowangchari-Gharow Road. Ch.1025-3025m
|
|
2.00
|
|
|
164.11
|
Mr. Prasanna Kanti Amu, Bandarban
|
178.68
|
|
|
12/08/2019
|
40
|
|
|
26/12/2018
|
|
53
|
Bandarban
|
15
|
rowangchari
|
118
|
614
|
BAN/ROWANG/ UZR /W62
|
Maintenance of Rowangchari- Bagmara G.C via Liragong Road at Ch.5700-7760m
(Maintenance of Rowangchari- Liragong Road. at m
|
|
2.06
|
|
|
200.30
|
Mr.UT Mong,Maddayum Para Bandarban
|
218.33
|
|
|
13/08/2019
|
10
|
|
|
26/12/2018
|
|
54
|
Bandarban
|
15
|
rowangchari
|
118
|
614
|
BAN/ROWANG/ UZR /W61
|
Maintenance of Khansama-Bagmara-Antapara-Kanaijupara Road.
|
|
2.00
|
|
|
46.26
|
Mr.UT Mong,Maddayum Para Bandarban
|
48.84
|
|
07/01/2018
|
04/04/2019
|
90
|
|
|
26/12/2018
|
|
55
|
Bandarban
|
15
|
rowangchari
|
118
|
614
|
BAN/ROW/BRIDGE/W71
|
Construction of 99.10m long PSC Girder Bridge on Kalaghata to Taracha UP office road at Ch.5.250 km,
|
|
|
|
|
604.53
|
|
0.00
|
|
|
|
0
|
|
|
26/12/2018
|
|
56
|
Bandarban
|
15
|
rowangchari
|
118
|
614
|
BAN/ROW/UNR/W68
|
Development of Kalaghata to Taracha UP office road at
|
|
2.22
|
|
|
357.99
|
|
316.17
|
|
|
|
0
|
|
|
26/12/2018
|
|
57
|
Bandarban
|
15
|
rowangchari
|
118
|
614
|
BAN/ROWAN/ UNR/W49
|
Development of Taracha UP - Meufapara(Ruma Road - Tarasa UP Office Road) road.(Ch.4200-6500m) ID No: 403893007(Development of Ruma RHD Road – Meufpara via tarasa UP office).
|
|
2.19
|
|
|
459.09
|
M/S Marma Enterprise, Bandarban
|
458.69
|
|
|
12/06/2019
|
20
|
|
|
26/12/2018
|
|
58
|
Bandarban
|
15
|
rowangchari
|
118
|
614
|
BAN/ROW/BRIDGE/W31
|
Construction of 60.0m long RCC Girder Bridge on Kalaghata to Taracha UP office road at Ch.2885m,
|
|
|
|
|
261.34
|
S. Ananta Bikash Tripura, Milonpur, Khagrachari
|
235.21
|
|
08/10/2017
|
16/11/2018
|
90
|
|
|
26/12/2018
|
|
59
|
Bandarban
|
15
|
rowangchari
|
118
|
614
|
BAN/ROW/UNR/W01
|
Development of Kalaghata to Taracha UP office road at
|
|
1.00
|
|
|
9827478.00
|
M/S Milton Traders, Rowangchari
|
8044900.03
|
|
|
22/04/2018
|
1
|
|
|
26/12/2018
|
|
60
|
Bandarban
|
15
|
ruma
|
127
|
614
|
BAN/RUMA/BRIDGE/W28
|
Construction of 68.0m long PSC & RCC Girder Bridge on Thana HQ (Ruma Mukh)-Gallanga UP office Road. Ch.1120m
|
|
|
|
|
365.27
|
Mohammed Eunus & Brothers (Pvt) Ltd, Chittagong.
|
398.41
|
|
|
30/12/2018
|
0
|
|
|
26/12/2018
|
|
61
|
Bandarban
|
15
|
ruma
|
127
|
614
|
BAN/RUMA/BRIDGE/W27
|
Construction of 66.0m long RCC Girder Bridge on Thana HQ (Ruma Mukh)-Gallanga UP office Road. Ch.850m
|
|
|
|
|
245.64
|
M/S Abser Construction, Bandarban
|
253.28
|
|
|
17/12/2018
|
40
|
|
|
26/12/2018
|
|
62
|
Bandarban
|
15
|
thanchi
|
119
|
614
|
BAN/THANCHI/
UZR/W43
|
Rehabilitation of Thanchi-Balipara road.
|
|
1.00
|
|
|
177.37
|
Mr.UT Mong,Maddayum Para Bandarban
|
193.19
|
|
|
03/02/2019
|
30
|
|
|
26/12/2018
|
|
63
|
Bandarban
|
15
|
thanchi
|
119
|
614
|
BAN/ THANCHI/ BRIDGE/W26
|
Construction of 45.0m long RCC Girder Bridge on Thanchi-Balipara road at ch. 1958.0m
|
|
|
|
|
166.36
|
M/S M M Traders, M R Pharmacy, Bandarban Bazar, Bandarban.
|
149.73
|
|
08/02/2017
|
17/02/2019
|
30
|
|
|
26/12/2018
|
|
64
|
Bandarban
|
15
|
thanchi
|
119
|
614
|
BAN/ THANCHI/ BRIDGE/W25
|
Construction of 20.0m long RCC Girder Bridge on Thanchi-Balipara road at ch. 3623.0m
|
|
|
|
|
126.45
|
M/S M M Traders, M R Pharmacy, Bandarban Bazar, Bandarban.
|
126.44
|
|
08/02/2017
|
17/02/2019
|
30
|
|
|
26/12/2018
|
|
65
|
Bandarban
|
15
|
thanchi
|
119
|
614
|
BAN/ THANCHI/ BRIDGE/W24
|
Construction of 20.0m long RCC Girder Bridge on Thanchi-Balipara road at ch. 2467.0m
|
|
|
|
|
98.71
|
M/S M M Traders, M R Pharmacy, Bandarban Bazar, Bandarban.
|
98.69
|
|
08/02/2017
|
17/02/2019
|
30
|
|
|
26/12/2018
|
|
66
|
Bandarban
|
15
|
thanchi
|
119
|
614
|
BAN/THAN/UZR/W02
|
Thanchi-Balipara road.
|
|
1.00
|
|
|
211.59
|
M/S Milton Traders, Rowangchari
|
184.37
|
|
|
30/06/2018
|
100
|
|
|
26/12/2018
|
|
67
|
Khagrachari
|
16
|
dighinala
|
112
|
614
|
KHAGRA/DIGHI/ UNR /W48
|
Maintenance of Merung Union HQ-Maidha Boalkhali Bazar via Battali Bazar Road from
|
|
1.80
|
|
|
32.15
|
|
32.10
|
|
|
04/10/2018
|
100
|
|
|
26/12/2018
|
|
68
|
Khagrachari
|
16
|
dighinala
|
112
|
614
|
KHAGRA/DIGHI/ UZR /W47
|
Maintenance of Dighinala GC-Bhaibonchara GC Road from
|
|
1.38
|
|
|
27.33
|
|
27.32
|
|
|
01/06/2019
|
100
|
|
|
26/12/2018
|
|
69
|
Khagrachari
|
16
|
dighinala
|
112
|
614
|
KHAGRA/DHIGI/ UZR/W14
|
Choto Merung Bazar R&H - Baghaichari Upazila HQ Road
|
|
2.80
|
|
|
265.84
|
|
289.39
|
|
|
30/12/2018
|
85
|
|
|
26/12/2018
|
|
70
|
Khagrachari
|
16
|
dighinala
|
112
|
614
|
KHAGRA/DHIGI/ UZR/W06
|
Panchari-Langadu road. [Dighinala GC-Panchari GC Via Nunchari Road] (Dighinala Part)
|
|
1.00
|
|
|
83.18
|
|
90.34
|
|
12/07/2016
|
17/04/2017
|
100
|
|
|
26/12/2018
|
|
71
|
Khagrachari
|
16
|
dighinala
|
112
|
614
|
KHAGRA/DHIGI/ UZR/W01
|
Panchari-Langadu road. [Dighinala GC-Panchari GC Via Nunchari Road] (Dighinala Part)
|
|
1.00
|
|
|
87.22
|
|
87.35
|
|
|
24/12/2016
|
100
|
|
|
26/12/2018
|
|
72
|
Khagrachari
|
16
|
Guimara
|
490
|
614
|
KHAGRA/GUMARA/UNR/W41
|
Development of Patachara Union H/Q-Guimara GC Road via Parshuramghat (Gumara Part) . (Patachara Union H/Q-Guimara GC Road via Parshuramghat (Ramgarh Part) (Ch: 4950-6500m). ID No. 4468030
|
|
1.55
|
|
|
64.45
|
|
67.80
|
|
02/05/2018
|
12/11/2019
|
100
|
|
|
26/12/2018
|
|
73
|
Khagrachari
|
16
|
Guimara
|
490
|
614
|
KHAGRA/GUMARA/UNR/W40
|
Development of Sindukchari Union H/Q-Tinduck Chari Bazar Road
|
|
2.00
|
|
|
120.41
|
|
132.33
|
|
03/04/2018
|
01/11/2019
|
25
|
|
|
26/12/2018
|
|
74
|
Khagrachari
|
16
|
khagrachari-s
|
110
|
614
|
KHAGRA/SADAR/ UNR /W50
|
Maintenance of Golobari union H/Q(Upper perachara)-pora Bazar via Bhuachari & Cristianpara Road from
|
|
2.36
|
|
|
38.42
|
|
38.00
|
|
|
10/04/2018
|
10
|
|
|
26/12/2018
|
|
75
|
Khagrachari
|
16
|
khagrachari-s
|
110
|
614
|
WD/RIDPCHT-2/ KHAGRA/ SADAR / UZR/W53
|
Improvement of Bhaibonchara GC-Gumti GC via Chota Bari Para Road (Sadar Part)
|
|
3.09
|
|
|
326.35
|
|
308.71
|
|
05/07/2018
|
14/11/2019
|
20
|
|
|
26/12/2018
|
|
76
|
Khagrachari
|
16
|
khagrachari-s
|
110
|
614
|
KHAGRA/SADAR/ UNR/W36
|
Improvement of Bichitola Bazar-Khagrachari Sadar HQ (Battali) Road
|
|
2.00
|
|
|
133.66
|
|
133.66
|
|
|
06/12/2018
|
80
|
|
|
26/12/2018
|
|
77
|
Khagrachari
|
16
|
khagrachari-s
|
110
|
614
|
KHAGRA/SADAR/ UNR/W17
|
Improvement of Golabari Union H/Q (Upper Perachara)-Pora Bazar via Bhuachari & Cristian Para Road
|
|
2.94
|
|
|
230.67
|
|
227.68
|
|
12/12/2016
|
23/03/2018
|
100
|
|
|
26/12/2018
|
|
78
|
Khagrachari
|
16
|
khagrachari-s
|
110
|
614
|
KHAGRA/SADAR/ UZR/W16
|
Improvement of Bhaibonchara GC-Gumti GC via Chota Bari Para Road (Sadar Part)
|
|
2.00
|
|
|
208.41
|
|
201.95
|
|
|
23/06/2018
|
85
|
|
|
26/12/2018
|
|
79
|
Khagrachari
|
16
|
khagrachari-s
|
110
|
614
|
KHAGRA/SADAR/ UZR/W10
|
Bhaibonchara Gc-Gumti GC via Chota Bari Para Road (Sadar part)
|
|
2.00
|
|
|
174.74
|
|
180.81
|
|
|
25/09/2017
|
100
|
|
|
26/12/2018
|
|
80
|
Khagrachari
|
16
|
khagrachari-s
|
110
|
614
|
KHAGRA/SADAR/ UZR/W07
|
Bhaibonchara GC-Dighinala GC (Thana Bazar) via Laxmimura Road (Sadar Part)
|
|
1.94
|
|
|
188.63
|
|
205.18
|
|
12/07/2016
|
07/12/2017
|
100
|
|
|
26/12/2018
|
|
81
|
Khagrachari
|
16
|
khagrachari-s
|
110
|
614
|
KHAGRA/SADAR/ UZR/W02
|
Bhaibonchara GC-Dighinala GC (Thana Bazar) via Laxmimura Road (Sadar Part)
|
|
1.00
|
|
|
94.80
|
|
94.91
|
|
|
24/12/2016
|
100
|
|
|
26/12/2018
|
|
82
|
Khagrachari
|
16
|
laxmichari
|
117
|
614
|
KHAGRA/LAXMI/ UZR /W52
|
Maintenance of Laxichari GC (Upazilla HQ –Kawkhali Upazilla HQ Road via Barmachari UP H/Q & Barmachari Muk Bazar road at
(Laxmichari Upazila H/Q-Barmachari union H/Q Road at ch. 1500-3170m ID No: 446613001)
|
|
1.67
|
|
|
45.92
|
|
48.40
|
|
05/07/2018
|
14/11/2018
|
25
|
|
|
26/12/2018
|
|
83
|
Khagrachari
|
16
|
mahalchari
|
111
|
614
|
KHAGRA/MAHAL/ UZR /W58
|
Periodic Maintenance Mohalchari GC (Chengikhal)-Longadu GC Road
|
|
0.72
|
|
|
28.74
|
|
27.30
|
|
|
25/07/2019
|
0
|
|
|
26/12/2018
|
|
84
|
Khagrachari
|
16
|
mahalchari
|
111
|
614
|
KHAGRA/MAHAL/ UZR /W46
|
Maintenance of Mahalchari GC(Singinala) - Khagrachari Sadar Upazilla H/Q Road at
|
|
0.71
|
|
|
21.67
|
|
21.60
|
|
|
25/09/2019
|
100
|
|
|
26/12/2018
|
|
85
|
Khagrachari
|
16
|
mahalchari
|
111
|
614
|
KHAGRA/MAHAL/ UZR /W45
|
Rehabilitation of 2x4.0x4.0m RCC Box Culvert at Ch. 393.00m and 1x3.0x3.0m RCC Box Culvert at Ch. 479.00m on Mahalchari GC (Chengikhal)-Langadu GC Road.
|
|
|
|
|
72.03
|
|
66.47
|
|
|
04/10/2018
|
10
|
|
|
26/12/2018
|
|
86
|
Khagrachari
|
16
|
mahalchari
|
111
|
614
|
WD/RIDPCHT-2/ KHAGRA/ MAHAL / UZR/W55
|
Construction of 1x3.00x3.00m RCC Box Culvert on Mahalchari GC to Maischari GC at ch.5920m
|
|
|
|
|
17.90
|
|
16.20
|
|
|
03/05/2019
|
10
|
|
|
26/12/2018
|
|
87
|
Khagrachari
|
16
|
mahalchari
|
111
|
614
|
WD/RIDPCHT-2/ KHAGRA/ MAHAL / UZR/W54
|
Improvement of Mahalchari GC (Singinala)- Khagrachari Sadar Upazilla H/Q road (Mahalchari Part)
|
|
1.03
|
|
|
161.00
|
|
159.38
|
|
|
07/09/2019
|
15
|
|
|
26/12/2018
|
|
88
|
Khagrachari
|
16
|
mahalchari
|
111
|
614
|
KHAGRA/MAHAL/UZR/W28
|
Construction of 1X3.0mX 3.0m RCC box culvert Mahalchari GC-Maischari GC Road at Ch: 3051m).
|
|
|
|
|
17.08
|
|
16.30
|
|
|
05/06/2018
|
100
|
|
|
26/12/2018
|
|
89
|
Khagrachari
|
16
|
mahalchari
|
111
|
614
|
KHAGRA/MAHAL/UZR/W27
|
Improvement of Maischari GC (Juramyachari)-Longadu GC Road (Mahalchari Part) EL=2000m
|
|
2.00
|
|
|
251.58
|
|
274.59
|
|
|
24/12/2018
|
98
|
|
|
26/12/2018
|
|
90
|
Khagrachari
|
16
|
mahalchari
|
111
|
614
|
KHAGRA/MAHAL/ UZR/W26
|
(i) Construction of 2 X 4.00X 4.00m RCC Box Culvert on Mahalchari GC-Maischari GC Road Ch: 4130-m..
.ID No.
(PART A)
(ii) Construction of 2 X 4.00X 4.00m RCC Box Culvert on Maischari GC (Juramyachari)-Longadu GC Road. (Mahalchari Part) Ch. 4750m ID N
|
|
|
|
|
82.76
|
|
80.55
|
|
|
15/11/2018
|
95
|
|
|
26/12/2018
|
|
91
|
Khagrachari
|
16
|
mahalchari
|
111
|
614
|
KHAGRA/MAHAL/ BRIDGE/W25
|
Construction of 60.00m RCC Girder Bridge on Mahalchari GC-Maischari GC Road
|
|
|
|
|
297.97
|
|
325.95
|
|
02/04/2018
|
10/05/2019
|
30
|
|
|
26/12/2018
|
|
92
|
Khagrachari
|
16
|
mahalchari
|
111
|
614
|
KHAGRA/MAHAL/ UZR/W13
|
Mahalchari GC (Singinala)-Khagrachari Sadar Upazila H/Q Road (Mahalchari Part)
|
|
1.70
|
|
|
83.32
|
|
84.72
|
|
|
28/06/2017
|
100
|
|
|
26/12/2018
|
|
93
|
Khagrachari
|
16
|
mahalchari
|
111
|
614
|
KHAGRA/MAHAL/ UZR/W12
|
Mahalchari GC-Maischari GC Road
|
|
2.23
|
|
|
111.87
|
|
119.09
|
|
08/03/2017
|
30/12/2018
|
90
|
|
|
26/12/2018
|
|
94
|
Khagrachari
|
16
|
manikchari
|
116
|
614
|
KHAGRA/MANIK/ UNR /W49
|
Maintenance of Manikchari Union H/Q(Babrabill)-Chadurkhill Bazar Road from
|
|
1.67
|
|
|
140.64
|
|
153.96
|
|
12/04/2018
|
19/04/2019
|
30
|
|
|
26/12/2018
|
|
95
|
Khagrachari
|
16
|
manikchari
|
116
|
614
|
KHAGRA/MANIK/ UNR/W56
|
Improvement of Manikchari Union H/Q (Mohamuni)-Hatimura Bazar Road via Gaidhan
|
|
1.00
|
|
|
137.11
|
|
136.92
|
|
06/03/2018
|
30/11/2019
|
10
|
|
|
26/12/2018
|
|
96
|
Khagrachari
|
16
|
manikchari
|
116
|
614
|
KHAGRA/MANIK/ BRIDGE/W35
|
Construction of 33.00m long RCC Girder Bridge on Jogyachola Bazar-Batnatali Union H/Q Road. Over Manikchari Khal at Ch: 3275m. .ID No.
|
|
|
|
|
155.96
|
|
170.31
|
|
|
18/11/2018
|
100
|
|
|
26/12/2018
|
|
97
|
Khagrachari
|
16
|
manikchari
|
116
|
614
|
KHAGRA/MANIK/ BRIDGE/W32
|
Construction of 48.00m long RCC Girder Bridge on Jogyachola Bazar-Batnatali Union H/Q Road via Chadurkhil Bazar
|
|
|
|
|
213.22
|
|
209.68
|
|
09/10/2017
|
08/01/2019
|
65
|
|
|
26/12/2018
|
|
98
|
Khagrachari
|
16
|
manikchari
|
116
|
614
|
KHAGRA/ MANIK / UNR/W20
|
Improvement of Manikchari Union H/Q (Mohamuni)-Hatimura Bazar Road via Gaidhan
|
|
2.47
|
|
|
106.73
|
|
102.46
|
|
12/12/2016
|
12/12/2017
|
100
|
|
|
26/12/2018
|
|
99
|
Khagrachari
|
16
|
manikchari
|
116
|
614
|
KHAGRA/MANIK/ UNR/W19
|
Improvement of Jogyachola Bazar-Batnatali Union H/Q Road via Chadurkhil Bazar
|
|
2.39
|
|
|
80.29
|
|
77.39
|
|
12/12/2016
|
12/12/2017
|
100
|
|
|
26/12/2018
|
|
100
|
Khagrachari
|
16
|
matiranga
|
124
|
614
|
KHAGRA/MATIRA/ UNR /W51
|
Maintenance of Bornal UP Office (R&H)-Ramsira Bazar via Bhutto para & Choto ramsira para Road from
|
|
0.55
|
|
|
14.11
|
|
14.10
|
|
|
22/09/2018
|
100
|
|
|
26/12/2018
|
|
101
|
Khagrachari
|
16
|
matiranga
|
124
|
614
|
KHAGRA/MATIRA/Vill/W43
|
Development of Police Inqury Center to Muktal Hossain House Road
|
|
1.50
|
|
|
97.74
|
|
107.47
|
|
|
31/01/2019
|
20
|
|
|
26/12/2018
|
|
102
|
Khagrachari
|
16
|
matiranga
|
124
|
614
|
KHAGRA/MATIRA/UNR/W33
|
Belchari Union H/Q-Ajuddah Bazar Road
|
|
1.50
|
|
|
116.11
|
|
108.75
|
|
03/11/2018
|
18/03/2019
|
10
|
|
|
26/12/2018
|
|
103
|
Khagrachari
|
16
|
matiranga
|
124
|
614
|
KHAGRA/MATIRA/UNR/W09
|
Gumti Bazar-Ramsharia Bazar Road
|
|
1.00
|
|
|
68.28
|
|
74.92
|
|
02/05/2018
|
11/12/2018
|
75
|
|
|
26/12/2018
|
|
104
|
Khagrachari
|
16
|
matiranga
|
124
|
614
|
KHAGRA/MATIRA/ UNR/W18
|
Improvement of Gumti UP Office-Bhibonchara GC via Tailafang & Gakulmani BDR Camp Road
|
|
1.30
|
|
|
97.96
|
|
97.67
|
|
12/12/2016
|
12/12/2017
|
75
|
|
|
26/12/2018
|
|
105
|
Khagrachari
|
16
|
matiranga
|
124
|
614
|
KHAGRA/MATIRA/ UNR/W11
|
Gumti Bazar-Ramsharia Bazar Road
|
|
2.00
|
|
|
142.88
|
|
148.17
|
|
|
01/07/2017
|
100
|
|
|
26/12/2018
|
|
106
|
Khagrachari
|
16
|
matiranga
|
124
|
614
|
KHAGRA/MATIRA/ BRIDGE/W21
|
Construction of 64.06m Bridge on BGumti GC-Bhibonchara GC Road Ch: 40m.
ID No.
|
|
|
|
|
232.00
|
|
232.39
|
|
|
30/04/2019
|
75
|
|
|
26/12/2018
|
|
107
|
Khagrachari
|
16
|
matiranga
|
124
|
614
|
KHAGRA/MATIRA/ UZR/W08
|
BGumti GC-Bhibonchara GC Road. (Matiranga Part)
|
|
1.35
|
|
|
120.36
|
|
130.12
|
|
|
15/12/2018
|
90
|
|
|
26/12/2018
|
|
108
|
Khagrachari
|
16
|
matiranga
|
124
|
614
|
KHAGRA/MATIRA/ UZR/W03
|
BGumti GC-Bhibonchara GC Road. (Matiranga Part)
|
|
1.00
|
|
|
106.64
|
|
106.64
|
|
|
27/03/2017
|
100
|
|
|
26/12/2018
|
|
109
|
Khagrachari
|
16
|
panchari
|
113
|
614
|
KHAGRA/PANCHA/ UNR/W23
|
Periodic Maintenance of 2 X 4.00m X 4.00m RCC box culvert on Logong Union H/Q-Tanakkya Para Bazar Road (Panchari Part) Structure (Ch: 1710m) & Road
|
|
|
|
|
56.24
|
|
52.86
|
|
|
27/08/2018
|
100
|
|
|
26/12/2018
|
|
110
|
Khagrachari
|
16
|
panchari
|
113
|
614
|
KHAGRA/PANCHA/ UZR/W22
|
Periodic Maintenance of Panchari-Langadu Road [Panchari GC (College Gate)-Dighinala GC via Gonggaram Para Road] (Panchari Part)
|
|
1.54
|
|
|
54.00
|
|
48.81
|
|
|
27/08/2018
|
100
|
|
|
26/12/2018
|
|
111
|
Khagrachari
|
16
|
panchari
|
113
|
614
|
KHAGRA/PANCHA/UNR/W39
|
Development of Logong Union H/Q-Tanakkya Para Bazar Road (Panchari Part)
|
|
5.00
|
|
|
787.35
|
|
864.39
|
|
|
30/11/2019
|
45
|
|
|
26/12/2018
|
|
112
|
Khagrachari
|
16
|
panchari
|
113
|
614
|
KHAGRA/PANCHARI/ BRIDGE/W38
|
Construction of 48.06m Bridge on Panchari GC-Bhaibonchara GC via Shantipur Road (Panchari Part)
|
|
|
|
|
297.60
|
|
324.19
|
|
|
13/02/2019
|
70
|
|
|
26/12/2018
|
|
113
|
Khagrachari
|
16
|
panchari
|
113
|
614
|
KHAGRA/PANCHARI/ UZR/W29
|
Panchari-Langadu Road. [Panchari GC (College Gate)-Dighinala GC via Gonggaram Para Road] (Panchari Part)
|
|
2.12
|
|
|
289.65
|
|
287.40
|
|
|
25/01/2020
|
10
|
|
|
26/12/2018
|
|
114
|
Khagrachari
|
16
|
panchari
|
113
|
614
|
KHAGRA/PANCHARI/ UZR/W15
|
Panchari GC-Bhaibonchara GC via Shantipur Road (Panchari Part)
|
|
1.22
|
|
|
158.08
|
|
172.23
|
|
|
01/10/2017
|
100
|
|
|
26/12/2018
|
|
115
|
Khagrachari
|
16
|
panchari
|
113
|
614
|
KHAGRA/PANCHARI/ UZR/W24
|
Panchari-Langadu Road. [Panchari GC (College Gate)-Dighinala GC via Gonggaram Para Road] (Panchari Part)
|
|
1.00
|
|
|
149.87
|
|
146.70
|
|
|
30/06/2018
|
70
|
|
|
26/12/2018
|
|
116
|
Khagrachari
|
16
|
panchari
|
113
|
614
|
KHAGRA/PANCHARI/ UZR/W04
|
Panchari-Langadu Road. [Panchari GC (College Gate)-Dighinala GC via Gonggaram Para Road] (Panchari Part)
|
|
1.00
|
|
|
124.15
|
|
121.08
|
|
|
30/06/2018
|
70
|
|
|
26/12/2018
|
|
117
|
Khagrachari
|
16
|
ramgarh
|
114
|
614
|
KHAGRA/RAMGHAR/ UNR/W30
|
Periodic Maintenance of Nakapa GC-Batnatali Union H/Q Road via Taichakma & Kumari Belchari (Ramghar Part)
|
|
1.57
|
|
|
130.62
|
|
137.20
|
|
02/07/2018
|
15/11/2018
|
100
|
|
|
26/12/2018
|
|
118
|
Khagrachari
|
16
|
ramgarh
|
114
|
614
|
KHAGRA/RAMGHA/ UZR/W37
|
Development of Patachara RHD Guimara GC via Parshuramghat road (Ramgarh Part)
(Improvement of Patachara Union H/Q-Guimara GC Road via Parshuramghat (Ramgarh Part) (Ch: 4000-4950m). ID No: 446803002)
|
|
0.95
|
|
|
71.29
|
|
71.00
|
|
|
12/03/2018
|
100
|
|
|
26/12/2018
|
|
119
|
Khagrachari
|
16
|
ramgarh
|
114
|
614
|
KHAGRA/RAMGHA/ UZR/W34
|
Improvement of Khagrabill GC-Manikchari GC via Batnatali Bazar Road (Ramghar Part)
|
|
2.25
|
|
|
220.45
|
|
239.23
|
|
12/11/2017
|
18/11/2018
|
100
|
|
|
26/12/2018
|
|
120
|
Khagrachari
|
16
|
ramgarh
|
114
|
614
|
KHAGRA/RAMGHA/ UZR/W05
|
Sonaipul GC-Hayako GC via Khagrabill Road (Ramghar Part)
|
|
1.35
|
|
|
156.33
|
|
167.86
|
|
|
27/03/2017
|
100
|
|
|
26/12/2018
|
|
121
|
Rangamati
|
17
|
baghaichari
|
132
|
614
|
RANG/BAGHAI/ BRIDGE/W44
|
Construction of 105.00m long PC Girder Bridge on Marishya bazar-Durchari bazar road at ch.10170m
ID No:
|
|
|
|
|
578.83
|
M/S Nipa Enterprise – MNS (JV) R. F Classic Point (1st Floor), 8 Katalgonj Road(Beside Oil kha Mosque), Chawkbazar, Chittagong
|
634.77
|
|
|
16/10/2019
|
15
|
|
|
26/12/2018
|
|
122
|
Rangamati
|
17
|
baghaichari
|
132
|
614
|
RANG/BAGHAI/UZR/W15
|
Development of Durchari bazar-Karallyachari bazar Road up to Supari Pata Chara
|
|
1.26
|
|
|
157.09
|
M/S Shaleha Enterprise
|
157.82
|
|
|
30/11/2018
|
70
|
|
|
26/12/2018
|
|
123
|
Rangamati
|
17
|
baghaichari
|
132
|
614
|
RANG/BAGHAI/BRIDGE/W34
|
Construction of 54.06m Long RCC Girder Bridge on Durchari bazar-Karallyachari bazar Road up to Supari Pata Chara Ch.3940m, ID No.
|
|
|
|
|
205.26
|
M/S Nipa Enterprise
|
204.44
|
|
|
01/10/2019
|
100
|
|
|
26/12/2018
|
|
124
|
Rangamati
|
17
|
baghaichari
|
132
|
614
|
RANG/BAGHAI/UNR/W14
|
Development of Thana H/Q-Doser road
|
|
0.91
|
|
|
87.44
|
M/S Byagio Enterprise
|
86.59
|
|
|
14/05/2019
|
100
|
|
|
26/12/2018
|
|
125
|
Rangamati
|
17
|
baghaichari
|
132
|
614
|
RANG/BAGHAI/UNR/W07
|
Thana H/Q-Doser road
|
|
1.09
|
|
|
89.09
|
Mayadhan Chakma
|
73.48
|
|
|
28/02/2018
|
100
|
|
|
26/12/2018
|
|
126
|
Rangamati
|
17
|
baghaichari
|
132
|
614
|
RANG/BAGHAI/UZR/W06
|
Development of Durchari bazar-Karallyachari bazar Road up to Supari Pata Chara
|
|
1.74
|
|
|
191.12
|
Suvanankar Chakma
|
181.86
|
|
|
30/06/2018
|
70
|
|
|
26/12/2018
|
|
127
|
Rangamati
|
17
|
baghaichari
|
132
|
614
|
RANG/BAGHAI/UZR/W05
|
Development of Marishya bazar-Durchari bazar road
|
|
1.72
|
|
|
166.46
|
Nishith Baran Talukder, Art Council, Rangamati
|
150.88
|
|
|
30/06/2018
|
75
|
|
|
26/12/2018
|
|
128
|
Rangamati
|
17
|
barkal
|
138
|
614
|
/ RANG/BARKAL/V.Road//W45
|
Development of Barkal Upazila HQ (BGB Mosque) to – Barkal College via Barkal Simanta Vocational Institute road by HBB Pavment; (Barkal H/Q-TO Choto Horina Road (Ch: 1+888-3.388km)=1.5km; ID No: 484212001)
|
|
1.08
|
|
|
92.23
|
M/S U. M Traders, Majerbasti, Rangamati, Sadar, Rangamati
|
96.75
|
|
04/01/2018
|
08/04/2019
|
100
|
|
|
26/12/2018
|
|
129
|
Rangamati
|
17
|
belaichari
|
128
|
614
|
RANG/BAGHAI/ UZR/W60
|
Rehabilitation of Marishya Bazar-Durchari Bazar Road from Effective Length-2475m
|
|
2.48
|
|
|
211.78
|
Mr.UT Mong,Maddayum Para Bandarban.
|
200.90
|
|
|
31/10/2019
|
0
|
|
|
26/12/2018
|
|
130
|
Rangamati
|
17
|
belaichari
|
128
|
614
|
RANG/BAGHAI/ UZR/W59
|
Rehabilitation of Marishya Bazar-Durchari Bazar Road from & Thana Link Road Ch. 00-62m .; Effective length-2087m
ID No.
|
|
2.09
|
|
|
230.04
|
Mr.UT Mong,Maddayum Para Bandarban.
|
183.41
|
|
|
31/10/2019
|
10
|
|
|
26/12/2018
|
|
131
|
Rangamati
|
17
|
belaichari
|
128
|
614
|
RANG/BELAI/ UZR/W48
|
Development of Belaichari -Farua bazar road Effective Length =1300.00m;
|
|
1.30
|
|
|
293.07
|
Mr U. T. Mong, Madyam Para, 4 no. Ward, Bandarban Pourosava, Bandarban
|
306.19
|
|
|
17/03/2019
|
80
|
|
|
26/12/2018
|
|
132
|
Rangamati
|
17
|
juraichari
|
136
|
614
|
WD/RIDPCHT-2/ RANG/ JURAI / UNR/W30
|
Periodic Maintenance of Jurachari H/Q-Eraichari Ghat road at
|
|
0.42
|
|
|
39.39
|
M/S Milton Traders, Roangchari,Bandarban
|
35.45
|
|
|
31/05/2018
|
100
|
|
|
26/12/2018
|
|
133
|
Rangamati
|
17
|
juraichari
|
136
|
614
|
RANG/JURAI/ UZR/W47
|
Development of Jurachari H/Q-Shilchari G.C. road Effective Length =1440.00m;
|
|
1.44
|
|
|
429.91
|
M/S RIP ENTERPRISE, Narankhya, Khagrachari, Sadar, Khagrachari
|
458.74
|
|
11/01/2018
|
08/11/2019
|
0
|
|
|
26/12/2018
|
|
134
|
Rangamati
|
17
|
juraichari
|
136
|
614
|
RANG/JURAI/ UZR/W46
|
Development of Jurachari H/Q-Shilchari G.C. road Effective Length =2260.00m;
|
|
2.26
|
|
|
294.64
|
M/S RIP ENTERPRISE, Narankhya, Khagrachari, Sadar, Khagrachari
|
285.70
|
|
07/03/2018
|
13/03/2019
|
30
|
|
|
26/12/2018
|
|
135
|
Rangamati
|
17
|
juraichari
|
136
|
614
|
RANG/JURAI/ BRIDGE/W43
|
Construction of 210.00m long PC Girder Bridge on Jurachari H/Q-Shilchari G.C. road at ch.5970m
ID No: 484472002
|
|
|
|
|
1393.52
|
Quashem Construction & Nahin Enterprise (JV), Millennium Tower (4th Floor) 1558, Agrabad Access Road, Chittagong.
|
1511.98
|
|
01/04/2018
|
03/10/2019
|
15
|
|
|
26/12/2018
|
|
136
|
Rangamati
|
17
|
juraichari
|
136
|
614
|
|
Juraichari G.C.-Chalka para Via Lulang Chari road.(Ch: 00-2444m=2.44km) & (Ch: 3944-4944m=1.00km) =3.44km
|
|
|
|
|
0.00
|
|
0.00
|
|
|
|
0
|
|
|
26/12/2018
|
|
137
|
Rangamati
|
17
|
juraichari
|
136
|
614
|
RANG/JURAI/ UZR/W01
|
Jurachari H/Q-Shilchari G.C. road
|
|
1.50
|
|
|
121.54
|
M/S Rip Enterprise
|
139.07
|
|
03/07/2016
|
12/03/2018
|
80
|
|
|
26/12/2018
|
|
138
|
Rangamati
|
17
|
juraichari
|
136
|
614
|
RANG/JURAI/ UZR/W10
|
Jurachari H/Q-Shilchari G.C. road
|
|
1.53
|
|
|
14995914.00
|
M/S Rip Enterprise
|
17195385.00
|
|
|
29/03/2018
|
1
|
|
|
26/12/2018
|
|
139
|
Rangamati
|
17
|
kaptai
|
133
|
614
|
RANG/KAPTAI/UNR/W53
|
Rehabilitation of Baraghonia Market-Debotachari bazar via Tanchangapara road.
|
|
2.80
|
|
|
241.08
|
M/S RIP ENTERPRISE, Narankhya, Khagrachari, Sadar, Khagrachari
|
226.75
|
|
|
25/06/2019
|
10
|
|
|
26/12/2018
|
|
140
|
Rangamati
|
17
|
kaptai
|
133
|
614
|
RANG/KAPTAI/UZR/W20
|
Periodic Maintenance of Raikhali Barakolapara-Bangalhalia R&H ctg. Border via Bongnal road.
|
|
1.00
|
|
|
33.33
|
M/S Marma Enterprise, Ruma, Bandarban
|
30.01
|
|
|
30/07/2017
|
100
|
|
|
26/12/2018
|
|
141
|
Rangamati
|
17
|
kaukhali
|
139
|
614
|
RANG/KAWK/UNR/W52
|
Periodic Maintenance of Goiatal-Sonaichari road.
|
|
3.00
|
|
|
100.88
|
S. Ananta Bikash Tripura, Milonpur Khagrachari
|
90.80
|
|
04/01/2018
|
17/04/2019
|
40
|
|
|
26/12/2018
|
|
142
|
Rangamati
|
17
|
kaukhali
|
139
|
614
|
RANG/KAWK/UZR/W56
|
Periodic Maintenance of Kawkhali HQ- Gagra bazar road.
|
|
5.00
|
|
|
71.54
|
Mr U. T. Mong, Madyam Para, 4 no. Ward, Bandarban Pourosava, Bandarban
|
78.37
|
|
|
16/08/2019
|
0
|
|
|
26/12/2018
|
|
143
|
Rangamati
|
17
|
kaukhali
|
139
|
614
|
RANG/KAWK/UZR/W04
|
Periodic Maintenance of Kawkhali HQ- Sugarmil Road ch.
|
|
1.00
|
|
|
129.16
|
M/S SS Traders
|
119.42
|
|
|
31/12/2017
|
100
|
|
|
26/12/2018
|
|
144
|
Rangamati
|
17
|
kaukhali
|
139
|
614
|
RANG/KAWKH/ BRIDGE/W41
|
Construction of 20m long RCC Girder Bridge on Kawkhali H/Q-Sugarmill road at ch. 2430m. ID No:
|
|
|
|
|
79.96
|
M/S RIP ENTERPRISE, Narankhya, Khagrachari, Sadar, Khagrachari
|
83.89
|
|
|
25/06/2019
|
5
|
|
|
26/12/2018
|
|
145
|
Rangamati
|
17
|
kaukhali
|
139
|
614
|
RANG/KAWK/ UZR/W50
|
Development of Ghilachari - Panchari Road ; Effective Length =1912.00m;
|
|
1.91
|
|
|
264.36
|
Mr U. T. Mong, Madyam Para, 4 no. Ward, Bandarban Pourosava, Bandarban
|
271.99
|
|
|
03/02/2019
|
20
|
|
|
26/12/2018
|
|
146
|
Rangamati
|
17
|
kaukhali
|
139
|
614
|
RANG/KAWKHALI/ BRIDGE/W27
|
Construction of 42.06m long RCC Bridge on Ghilachari - Panchari Road road at ch. 7519m. ID No:
|
|
|
|
|
131.89
|
Mr U.T Mong, Bandarban sadar,Bandarban, Khagrachari
|
129.31
|
|
|
30/04/2018
|
90
|
|
|
26/12/2018
|
|
147
|
Rangamati
|
17
|
kaukhali
|
139
|
614
|
RANG/KAWKHALI/ BRIDGE/W33
|
Construction of 50.06m long RCC Girder Bridge on Ghilachari - Panchari Road road at ch. 6510m. ID No:
|
|
|
|
|
208.76
|
Mr U.T Mong, Bandarban sadar,Bandarban, Khagrachari
|
223.32
|
|
|
20/06/2018
|
5
|
|
|
26/12/2018
|
|
148
|
Rangamati
|
17
|
kaukhali
|
139
|
614
|
RANG/KAWKHALI/ BRIDGE/W24
|
Construction of 20m long RCC Girder Bridge on Kawkhali H/Q to Sugarmil road at ch. 700m
ID No:
|
|
|
|
|
153.52
|
Mr U.T Mong, Bandarban sadar,Bandarban, Khagrachari
|
133.01
|
|
|
11/12/2017
|
100
|
|
|
26/12/2018
|
|
149
|
Rangamati
|
17
|
kaukhali
|
139
|
614
|
RANG/KAWK/UZR/W02
|
Ghilachari - Panchari Road
|
|
1.01
|
|
|
136.72
|
Mayadhan Chakma
|
134.53
|
|
|
15/02/2017
|
100
|
|
|
26/12/2018
|
|
150
|
Rangamati
|
17
|
langadu
|
137
|
614
|
RANG/LANGU/ UZR/W36
|
Periodic Maintenance of Longadu-Mainimukh road. BC & HBB road
|
|
0.51
|
|
|
56.49
|
Jatnashar Tripura, Madhupur, khagrachari
|
50.84
|
|
|
21/05/2018
|
95
|
|
|
26/12/2018
|
|
151
|
Rangamati
|
17
|
langadu
|
137
|
614
|
RANG/LANGU/ UZR/W35
|
Periodic Maintenance of Longadu-Mainimukh road. BC & HBB road
|
|
0.60
|
|
|
67.44
|
M/S Milton Traders, Rowangchari, Bandarban
|
60.70
|
|
|
27/05/2018
|
100
|
|
|
26/12/2018
|
|
152
|
Rangamati
|
17
|
langadu
|
137
|
614
|
RANG/LANGU/VILL/W61
|
Development of Attrakchara UPC Islamabad R& H Road at the Shop of Jalil PC-Sonai Market via the H/O Barek Chowkider Road
|
|
0.90
|
|
|
53.67
|
|
0.00
|
|
|
|
0
|
|
|
26/12/2018
|
|
153
|
Rangamati
|
17
|
langadu
|
137
|
614
|
RANG/LANGU/BRIDGE//W60
|
Construction of 84.00m long RCC Girder Bridge Noksobil Canal on Mainimukh -Forest office to Durchari Bazar road Ch.9+054 km, ID No.
|
|
|
|
|
422.70
|
|
0.00
|
|
|
|
0
|
|
|
26/12/2018
|
|
154
|
Rangamati
|
17
|
langadu
|
137
|
614
|
RANG/LANGU/UNR/W57
|
Development of Bagachattar- CO's Tila road
Effective Length-1020m.
ID No.
|
|
1.02
|
|
|
112.32
|
M/S Shalaha Enterprise
|
108.91
|
|
|
24/07/2019
|
50
|
|
|
26/12/2018
|
|
155
|
Rangamati
|
17
|
langadu
|
137
|
614
|
RANG/LANGU/UNR/W51
|
Development of Kalapakuzza Union (Mahilla)-Mainimukh growth center road
|
|
1.28
|
|
|
101.54
|
M/S U. M Traders, Majerbasti, Rangamati, Sadar, Rangamati
|
101.16
|
|
|
17/04/2019
|
55
|
|
|
26/12/2018
|
|
156
|
Rangamati
|
17
|
langadu
|
137
|
614
|
RANG/LANGU/ BRIDGE/W42
|
Construction of 105.00m long PC Girder Bridge on Kalapakuzza Union(Mahilla) -Mainimukh growth center Road at ch.2045m.
ID No:
|
|
|
|
|
708.91
|
M/S Nipa Enterprise, & S. Ananta Bikash Tripura (JV)
|
759.10
|
|
|
16/02/2019
|
0
|
|
|
26/12/2018
|
|
157
|
Rangamati
|
17
|
langadu
|
137
|
614
|
RANG/LANGU/ BRIDGE/W40
|
Construction of 90.00m long RCC Girder Bridge on Maini Mukh Forest office to Durchari Bazar road ch.8454m
ID No:
|
|
|
|
|
319.24
|
M/S Rip Enterprise
|
347.25
|
|
|
19/03/2019
|
80
|
|
|
26/12/2018
|
|
158
|
Rangamati
|
17
|
langadu
|
137
|
614
|
RANG/LANGU/ BRIDGE/W39
|
Construction of 140.00m long RCC Girder Bridge on Kalapakuzza Union(Mahilla) -Mainimukh growth center Road at ch. 3520m.
ID No:
|
|
|
|
|
569.80
|
Mr U.T Mong, Bandarban sadar,Bandarban, Khagrachari
|
592.50
|
|
|
19/03/2019
|
20
|
|
|
26/12/2018
|
|
159
|
Rangamati
|
17
|
langadu
|
137
|
614
|
RANG/LANGU/UNR/W19
|
Development of Bagachattar- CO's Tila road
|
|
0.59
|
|
|
52.96
|
M/S Mita Tripura, Rangamati
|
52.87
|
|
|
31/05/2018
|
85
|
|
|
26/12/2018
|
|
160
|
Rangamati
|
17
|
langadu
|
137
|
614
|
RANG/LANGU/UNR/W18
|
Development of Bagachattar- CO's Tila road
|
|
0.39
|
|
|
67.17
|
M/S Mita Tripura, Rangamati
|
66.75
|
|
18/07/2016
|
31/05/2018
|
85
|
|
|
26/12/2018
|
|
161
|
Rangamati
|
17
|
langadu
|
137
|
614
|
RANG/LANGU/UZR/W12
|
Development of Mainimukh -Forest office to Durchari Bazar road
|
|
1.82
|
|
|
187.55
|
M/S Milton Traders, Rowangchari, Bandarban
|
203.65
|
|
|
19/11/2017
|
60
|
|
|
26/12/2018
|
|
162
|
Rangamati
|
17
|
langadu
|
137
|
614
|
RANG/LANGU/UZR/W11
|
Development of Mainimukh -Forest office to Durchari Bazar road
|
|
2.02
|
|
|
241.30
|
Nishith Baran Talukder, Art Council, Rangamati
|
261.07
|
|
|
01/10/2018
|
100
|
|
|
26/12/2018
|
|
163
|
Rangamati
|
17
|
langadu
|
137
|
614
|
RANG/LANGU/UNR/W09
|
Development of Kalapakuzza Union (Mahilla)-Mainimukh growth center road
|
|
1.00
|
|
|
130.26
|
M/S Shaleha Enterprise
|
134.95
|
|
|
30/11/2018
|
95
|
|
|
26/12/2018
|
|
164
|
Rangamati
|
17
|
langadu
|
137
|
614
|
RANG/LANGU/UZR/W08
|
(Part-A) Mainimukh -Forest office to Durchari Bazar road (Part -B) Mainimukh -Forest office to Durchari Bazar road.
|
|
2.11
|
|
|
172.42
|
M/S Salim & Brothers
|
178.72
|
|
|
30/11/2017
|
100
|
|
|
26/12/2018
|
|
165
|
Rangamati
|
17
|
langadu
|
137
|
614
|
RANG/LANGU/UNR/W13
|
Development of Kalapakuzza Union (Mahilla)-Mainimukh growth center road
|
|
1.88
|
|
|
18620265.00
|
M/S Shaleha Enterprise
|
20329478.25
|
|
|
25/05/2018
|
1
|
|
|
26/12/2018
|
|
166
|
Rangamati
|
17
|
nanniarchar
|
134
|
614
|
RANG/NANIA/UZR/W03
|
Development of R & H road - Karatchari via Golachari road
|
|
1.00
|
|
|
116.32
|
M/S Dewan Enterprise
|
127.49
|
|
|
11/08/2016
|
100
|
|
|
26/12/2018
|
|
167
|
Rangamati
|
17
|
rajosthali
|
115
|
614
|
RANG/RAJOS/UZR/W55
|
Periodic Maintenance of Rajosthali H/Q-Khansama para road
|
|
2.00
|
|
|
30.63
|
Mr. U T Mong, Maddampara, Bandarban
|
27.57
|
|
|
25/04/2019
|
100
|
|
|
26/12/2018
|
|
168
|
Rangamati
|
17
|
rajosthali
|
115
|
614
|
RANG/RAJOS/UNR/W54
|
Periodic Maintenance of Bangalhalia-Raikhali Barakhola para via Dongnala road.
|
|
2.00
|
|
|
22.99
|
Nishith Baran Talukder, Tobolchari, Rangamati
|
20.69
|
|
|
25/04/2019
|
0
|
|
|
26/12/2018
|
|
169
|
Rangamati
|
17
|
rajosthali
|
115
|
614
|
RANG/RAJOS/ UZR/W58
|
Development of Rajasthali H/Q-Khansama para road (To words Bagmara GC)
Effective Length-3000m.
|
|
3.00
|
|
|
299.51
|
M/S RIP ENTERPRISE, Narankhya, Khagrachari, Sadar, Khagrachari
|
310.22
|
|
|
27/06/2019
|
0
|
|
|
26/12/2018
|
|
170
|
Rangamati
|
17
|
rajosthali
|
115
|
614
|
RANG/RAJOS/ UZR/W17
|
Development of Rajasthali H/Q-Khansama para road (To words Bagmara GC)
|
|
0.65
|
|
|
165.62
|
Mr. UT Mong, Madham para, Sadar, Bandarban
|
156.30
|
|
|
28/05/2018
|
100
|
|
|
26/12/2018
|
|
171
|
Rangamati
|
17
|
rajosthali
|
115
|
614
|
RANG/RAJOS/ UZR/W16
|
Development of Rajasthali H/Q-Khansama para road (To words Bagmara GC)
|
|
0.66
|
|
|
151.60
|
Mr. UT Mong, Madham para, Sadar, Bandarban
|
144.93
|
|
|
30/05/2018
|
100
|
|
|
26/12/2018
|
|
172
|
Rangamati
|
17
|
rangamati-s
|
131
|
614
|
RANG/SADAR/UZR/W23
|
Periodic Maintenance of Jhagrabil (R&H) - Kaptai (R&H) via Baradam Road . Effectiove length 2500m,
|
|
2.50
|
|
|
103.13
|
Mayadhan Chakma
|
83.55
|
|
|
22/11/2017
|
100
|
|
|
26/12/2018
|
|