1
|
Chattogram
|
11
|
patiya
|
59
|
674
|
Pancha-Boda-Cit-VR-20/16-17
|
i) Improvement of JM Jute Mill (North side)-Gorerdanga hat via Putimari (Gaighata) Chitmohal road at (Ch. 00-1500m). Road ID 177254023. [BODA] ii) Const.of 1.50x1.50m RCC box culvert on same road. Ch. 407m
|
|
1.50
|
|
|
95.67
|
Md. Abdul Mannan, Boda, Panchagarh
|
94.14
|
|
|
31/12/2017
|
100
|
|
|
09/04/2019
|
|
|
2
|
Chattogram
|
11
|
patiya
|
59
|
674
|
Pancha-Debi-Cit-VR-45/16-17
|
Improvement of UpenChuwki Vajni Satter House to Bodapara Fultolapara Eidgah Field Road Ch: 2100 to 4850m. Road ID 177345181 , Debiganj
|
|
|
|
|
237.62
|
M/S. Sajol Enterprise & JV, Monirumpur Bazar, Shahzadpur, Sirajganj.
|
233.51
|
|
27/12/2017
|
26/12/2018
|
100
|
|
|
09/04/2019
|
|
|
3
|
Chattogram
|
11
|
patiya
|
59
|
674
|
Pancha-Debi-Cit-VR-19/15-16
|
(i) Improvement of Sher-e-Bangla FRB to Miraganj Pacca roadat ch 4600m to 6100m. Road ID 177345005. [DEBIGANJ]. (ii)Const of 2 nos U-drain of 0.625x0.60 on same road at ch. 4960m, 5520m.
|
|
1.50
|
|
|
116.58
|
S.M.A Moin, Thakurgaon Road Thakurganon
|
122.25
|
|
13/11/2016
|
19/10/2017
|
100
|
|
|
09/04/2019
|
|
|
4
|
Chattogram
|
11
|
patiya
|
59
|
674
|
Pancha-Debi-Cit-VR-18/15-16
|
(i) Improvement of Dinbazar More to Tokravasha pacca road via Khamarpara road at ch 1700 to 3254m. Road ID 177344117. [DEBIGANJ]. (ii) Construction of 2 nos U-drain of 0.625x0.60m on the same road at ch 1863 & 2800m. (iii) Construction 2 vent box culvert of 2x3.00x2.00m on the same road at ch 2940m. (iv) Construction 3 vent box culvert of 3x4.50x2.50m on the same road at ch 1732m.
|
|
11.75
|
|
|
144.45
|
M.H. Corporation .Boda, Panchagarh
|
135.13
|
|
13/11/2016
|
|
100
|
|
|
09/04/2019
|
|
|
5
|
Chattogram
|
11
|
patiya
|
59
|
674
|
Pancha-Debi-Cit-VR-16/15-16
|
(i) Improvement of Sher-e-Bangla FRB to Miraganj Pacca roadat ch 2500m to 4600m. Road ID 177345005. [DEBIGANJ]. (ii)Const of 4 nos U-drain of 4x0.625x0.60m of same road at ch. 2870m, 3230m, 3660m and Ch. 227m of link road (at ch. 3190m).. (iii) Construction 1 vent box culvert of 1.5mx1.5m on the same road at ch 3320m.
|
|
4.00
|
|
|
122.07
|
S.M.A Moin, Thakurgaon Road Thakurganon
|
125.91
|
|
13/11/2016
|
|
100
|
|
|
09/04/2019
|
|
|
6
|
Chattogram
|
11
|
patiya
|
59
|
674
|
Pancha-Debi-Cit-VR-15/15-16
|
(i) Improvement of Sher-e-Bangla FRB to Mirganj Pacca roadat ch 500m to 2500m. Road ID 177345005. [DEBIGANJ]. (ii) Const of 3 nos U-drain of 2x0.62x0.60m on same road at ch. 620m,1530m & 1732m.
|
|
1.85
|
|
|
112.55
|
S.M.A Moin, Thakurgaon Road Thakurganon
|
113.18
|
|
|
23/12/2017
|
100
|
|
|
09/04/2019
|
|
|
7
|
Chattogram
|
11
|
patiya
|
59
|
674
|
Pancha-Debi-Cit-VR-14/15-16
|
(i) Improvement of Tepriganj UP road to Badeshari Mandir via Kalidahopar road at ch 4800m to 7000m. Road ID 177345032. [DEBIGANJ]. (ii) Construction of 1 vent 1.5x1.5m box culvert on the same road at ch 6692m.
|
|
1.50
|
|
|
133.78
|
Md.Deloar Hossian, Boda, Panchagarh
|
140.21
|
|
13/11/2016
|
|
100
|
|
|
09/04/2019
|
|
|
8
|
Chattogram
|
11
|
patiya
|
59
|
674
|
Pancha-Debi-Cit-VR-13/15-16
|
(i) Improvement of Tepriganj UP road to Badeshari Mandir via Kalidahopar road at ch 2400m to 4800m. Road ID 177345032. [DEBIGANJ]. (ii) Construction of 1 nos U-drain of 0.625x0.6m at Ch3650m on the same road. (iii) Construction of 1 vent 1.5x1.5m box culvert on the same road at ch 3010m.
|
|
2.13
|
|
|
149.26
|
S.M.A Moin, Thakurgaon Road Thakurganon
|
154.44
|
|
13/11/2016
|
19/10/2017
|
100
|
|
|
09/04/2019
|
|
|
9
|
Chattogram
|
11
|
patiya
|
59
|
674
|
Pancha-Debi-Cit-VR-12/15-16
|
(i) Improvement of Tepriganj UP road to Badeshari Mandir via Kalidahopar road at ch 00 to 2400m. Road ID 177345032. [DEBIGANJ]. (ii) Construction of 3 nos U-drain of 0.625x0.6m at Ch524m, 1747m & 2280m. (iii) Construction of 1 vent 1.5x1.5m box culvert on the same road at ch 1750m
|
|
3.38
|
|
|
144.11
|
Md.Deloar Hossian, Boda, Panchagarh
|
151.08
|
|
13/11/2016
|
|
100
|
|
|
09/04/2019
|
|
|
10
|
Chattogram
|
11
|
patiya
|
59
|
674
|
Pancha-Debi-Cit-VR-11/15-16
|
(i) Improvement of Tepriganj to Balarampur road (Ch 00 to 1500m). ID 177344022. [DEBIGANJ] (ii) Construction of 2 nos Udrain of 0.625 x 0.6m at ch 197m, & 619m. (iii) Construction of 2 nos box culvert of 1.5x1.5m at ch. 333m & 682m on the same road.
|
|
4.25
|
|
|
120.05
|
M/S. M.H. Corp.Boda, Panchagarh
|
121.33
|
|
27/07/2016
|
26/07/2017
|
100
|
|
|
09/04/2019
|
|
|
11
|
Chattogram
|
11
|
patiya
|
59
|
674
|
Pancha-Debi-Cit-VR-10/15-16
|
(i) Improvement by HBB from Paylavasha Bridge to Dinbazar Mosque Tetul road (Ch 00 to 3000m). ID 177344112. [DEBIGANJ] (ii) Construction of 8 nos Udrain of 0.625 x 0.6m at ch 470m, 990m, 1200m, 1313m, 1360m, 1537m, 1810m & 2407m. (iii) Construction of 3 vent Box culvert of 3x4.50x2.50m on the same road.
|
|
18.50
|
|
|
134.70
|
Md. Aynul Haque, Kalibari, Thakurgaon
|
140.69
|
|
|
25/07/2017
|
100
|
|
|
09/04/2019
|
|
|
12
|
Chattogram
|
11
|
patiya
|
59
|
674
|
Pancha-Tetulia-Cit-VR-25/16-17
|
i) Improvement of Ranchandi hat-Shalbahan Notunbosti FRB road (Ch. 3000-4000m). Road ID 177904047. [TETULIA] ii) Const. of 1 vent 3.00x2.00m RCC box culvert on same road at Ch. 3613m iii) Const. of 1 vent 2.00x2.00m RCC box culvert on same road at Ch.3235m
|
|
5.00
|
|
|
67.08
|
Md. Bazlur Rahman Thkurgaon Road, Thakurgaon
|
71.05
|
|
|
|
100
|
|
|
09/04/2019
|
|
|
13
|
Chattogram
|
11
|
patiya
|
59
|
674
|
Pancha-Tetulia-Cit-VR-08/15-16
|
(i) Improvement of Ranchandi hat to Shalbahan Notun bosti FRB road (Ch 2000m to 3000m). ID 177904047. [TETULIA] (ii) Construction of U drain on same road at ch 2725m.
|
|
0.63
|
|
|
54.76
|
M/S. M.A Engineering, G-4, South Banasri, East Goran, Khilgaow, Dhaka.
|
56.82
|
|
16/02/2017
|
08/02/2018
|
100
|
|
|
09/04/2019
|
|
|
14
|
Chattogram
|
11
|
patiya
|
59
|
674
|
Pancha-Sadar-Cit-VR-46/17-18
|
Improvement of Road from (i) Talma to Modelhat BC Road at Ambari to Garati-78 Forkania Madrasha Road at Ch: 00 to 1575m. (ii) Construction of 1 nos 1.5m x 1.5m RCC Box Culvert at Ch: 705m and 4 nos U-Drain at Ch: 657m, 605m, 870m, 1185m and Palisading work on the same Road. Road ID 177735322.
|
|
|
|
|
98.28
|
Md. Abdul Mannan, Boda, Panchagarh
|
105.15
|
|
24/04/2018
|
19/12/2018
|
100
|
|
|
09/04/2019
|
|
|
15
|
Chattogram
|
11
|
patiya
|
59
|
674
|
Pancha-Sadar-Cit-VR-35/16-17
|
(i) Improvement of Thakorparahat to Jugivita via Rajar Bosh Ganti Cit 80 H/O. Aminul Road at Ch. 0.00m-1705m. Road ID17774055. Panhagarh Sadar. (ii) Construction of 5 nos U-Drain at Ch. 283m, 445m, 970m & 13330m.
|
|
|
|
|
107.92
|
M/S. Sohel Enterprise, Kalibari, Thakurgaon
|
113.29
|
|
07/12/2017
|
31/08/2018
|
100
|
|
|
09/04/2019
|
|
|
16
|
Chattogram
|
11
|
patiya
|
59
|
674
|
Pancha-Sadar-Cit-VR-34/16-17
|
(i) Improvement of Yarpara to Haluapara Road H/O. Razzak at Ch: 000m-1090m. Road ID-177735326 (Pnachagarh Sadar) (ii) Construction of 3.00x2.00m RCC Box Culvert at Ch: 710m. (iii) Construction of 5 nos U-Drain at Ch: 284m, 620m, 845m, 935m & 1075m.
|
|
|
|
|
78.16
|
Nandita Construction, Islambag, Panchagarh.
|
82.02
|
|
14/11/2017
|
17/05/2018
|
100
|
|
|
09/04/2019
|
|
|
17
|
Chattogram
|
11
|
patiya
|
59
|
674
|
Pancha-Sadar-Cit-VR-33/116-17
|
(i) Jhachupara (Garati) to Yarpara (Garati) Road at Ch.0.00m-1025m. (ii) Construction of 1 nos 3.00mx2.00m RCC Box Culvert at Ch.250m. (iii) Construction of 1.50mx1.50m RCC Box Culvert at Ch. 440m. (iv) Construction of 4nos U-Drain at Ch. 305m, 525m, 845m, 930m & 1017m.
|
|
|
|
|
80.67
|
Md. Shajahan, Alam Nagar, Sadar, Rangpur
|
84.68
|
|
18/09/2017
|
18/06/2018
|
100
|
|
|
09/04/2019
|
|
|
18
|
Chattogram
|
11
|
patiya
|
59
|
674
|
Pancha-Sadar-Cit-VR-32/116-17
|
(i) Improvement of Jhachupara to Kamarpara Garati Road at Ch. 00m to 700m Road ID 177735323, Panchagarh-S (ii) Construction of 2 nos U-Drain at Ch. 96m and 135m.
|
|
|
|
|
43.15
|
M/S. Abul Hossain Baniapara, Panchagarh.
|
44.50
|
|
10/12/2017
|
08/07/2018
|
100
|
|
|
09/04/2019
|
|
|
19
|
Chattogram
|
11
|
patiya
|
59
|
674
|
Pancha-Sadar-Cit-VR-06/15-16
|
Improvement of road from (i) Harivasa to Modelhat BC road via Ambari to Narayanpara mosque via Jugivita at ch 00 to 1740m. (ii) Construction of 2x3.00x3.00m RCC box culvert on same road at ch 380m (iii) Construction of 3 nos U-drain on same road at ch 715m, 1200m and 1290m. ID 177735103
|
|
7.88
|
|
|
118.37
|
M/S. Md. Saifiul Alom, Noor Hotel, Old, Bus Stand, Thakurgaon
|
123.67
|
|
17/07/2016
|
16/07/2017
|
100
|
|
|
09/04/2019
|
|
|
20
|
Chattogram
|
11
|
patiya
|
59
|
674
|
Pancha-Sadar-Cit-VR-05/15-16
|
Improvement of road from (i) Talma to Modelhat BC roadat Tokapara to Kanapara via amirabad Madrsha road at ch 1700m to 3400m. (ii) Construction of 2x3.00x2.50m RCC box culvert on same road at ch 2365m (iii) Construction of 1.5x1.5m RCC box culvert on same road at ch 1800m. (iv) Construction of 3 nos 0.625m x 0.600m x 6.00m long U-drain on same road at ch 2065m, 2322m and 2880m. ID 177734108.
|
|
3.38
|
|
|
124.60
|
Md. Abdul Mannan, Boda, Panchagarh
|
127.44
|
|
18/07/2016
|
17/07/2017
|
100
|
|
|
09/04/2019
|
|
|
21
|
Chattogram
|
11
|
patiya
|
59
|
674
|
Pancha-Sadar-Cit-VR-04/15-16
|
Improvement of road from (i) Harivasa to Modelhat BC road near Shaheberhat to Pakuridanga hat via Narayanpara Mosque and Jhakuapara road at ch 1700m to 3375m (ii) Const. of 1.50x1.50m RCC box culvert on same road at ch 2420m. (iii) Const. of 2 nos U drain on same road at ch 2483m and 2755m ID 177734098.
|
|
3.38
|
|
|
107.23
|
Md. Noor Nabi Majumder, Thanapara, Boda, Panchagarh
|
111.88
|
|
18/07/2016
|
17/07/2017
|
100
|
|
|
09/04/2019
|
|
|
22
|
Chattogram
|
11
|
patiya
|
59
|
674
|
Pancha-Sadar-Cit-VR-03/15-16
|
Improvement of road from (i) Harivasa to Modelhat BC road near Shaheberhat to Pakuridanga hat via Narayanpara Mosque and Jhakuapara road at ch 00 to 1700m. (ii) Const. of 2x3x2.5m RCC box culvert on same road at ch 1485m. (iii) Const. of 1.50x1.50m RCC box culvert on same road at ch 505m. (iv) Const. of 4 nos U drain on same road at ch 15m, 260m, 1265m,1685m. ID 177734098.
|
|
5.40
|
|
|
113.83
|
Md. Noor Nabi Majumder, Thanapara ,Boda, Panchagarh
|
123.08
|
|
18/07/2016
|
17/07/2017
|
100
|
|
|
09/04/2019
|
|
|
23
|
Chattogram
|
11
|
patiya
|
59
|
674
|
Pancha-Sadar-Cit-VR-02/15-16
|
Improvement of road from (i) Talma to Modelhat BC road at Tokapara (Chowrasta) to Thakurparahat via Garati78 Forkania Madrasha and Kanapara amirabad Madrsha road at ch3400 to 4875m. (ii) Construction of 1.5x1.5m RCC box culvert on same road at ch 4210m. (iii) Construction of U-drain on same road at ch 3920m. ID 177734069
|
|
0.60
|
|
|
90.65
|
M/S. M.A Engineering, G-4, South Banasri, East Goran, Khilgaow, Dhaka.
|
81.59
|
|
|
|
100
|
|
|
09/04/2019
|
|
|
24
|
Chattogram
|
11
|
patiya
|
59
|
674
|
Pancha-Sadar-Cit-VR-01/15-16
|
Improvement of road from (i) Talma to Model hat BC road at Tokapara - Kanapara via amirabad Madrsha road at ch 00 to 1700m. (ii) Construction of 1.5x1.5m RCC box culvert on same road at ch 28m. (iii) Construction of 2 nos 0.625m x 0.600m x 6.00m long U-drain on same road at ch 225m & 1625m. ID 177734108.
|
|
2.70
|
|
|
100.83
|
M/S. Md. Saifiul Alom, Noor Hotel, Old, Bus Stand, Thakurgaon
|
105.40
|
|
17/01/2016
|
16/07/2017
|
100
|
|
|
09/04/2019
|
|
|
25
|
Chattogram
|
11
|
patiya
|
59
|
674
|
Pancha-Debi-Cit-UNR-04/15-16
|
(i) Improvement of Bhawlagonj Chilahati R&H from Majhati GPS to Ghajokhatihat road at ch 4600 to 6500m. Road ID 177343007. [Debiganj]. (ii) Const. of 4nos U-drain 0.625x0.6m on same road at ch 4820m, 4925m, 5048m & 5145m. (iii) Const. of 1-vent 1.5x1.5m box culvert on same road at ch 5442m.
|
|
7.50
|
|
|
119.30
|
Md.Deloar Hossian, Boda, Panchagarh
|
117.96
|
|
13/11/2016
|
|
100
|
|
|
09/04/2019
|
|
|
26
|
Chattogram
|
11
|
patiya
|
59
|
674
|
Pancha-Debi-Cit-UNR-02/15-16
|
(i) Improvement of Bhawlagonj Chilahati R&H from Majhati GPS to Ghajokhatihat road at ch 1000 to 2800m. Road ID 177343007. [Debiganj]. (ii) Const. of 2nos 1-vent 1.5x1.5m box culvert on same road at ch 2067m & 2735m
|
|
3.00
|
|
|
114.81
|
S.M.A Moin, Thakurgaon Road Thakurganon
|
112.50
|
|
13/11/2016
|
03/08/2017
|
100
|
|
|
09/04/2019
|
|
|
27
|
Chattogram
|
11
|
patiya
|
59
|
674
|
Panch-Tetulia.-Cit-UZR-01/15-16
|
i) Pamchagarh -Banglabandha R&H (Dargashing) Shalbahan GCroad at Ch.3400--4400m ii) Const. of 1-vent 2.00x2.00m RCC box culvert on same road at Ch.3712m
|
|
2.00
|
|
|
82.53
|
M/S. K-Hassan, Enterprise,New Market, Panchagarh
|
82.67
|
|
25/07/2016
|
24/07/2017
|
100
|
|
|
09/04/2019
|
|
|
28
|
Chattogram
|
11
|
patiya
|
59
|
674
|
Pancha-Boda-Cit-Ghat-02/17-18
|
Construction of Daikhata & Shalbari to Korotoa river at oposit of Barobatia ghat & Passenger shed under Boda Upazila.
|
|
|
|
|
12.36
|
M/S. Sheikh Traders Panchagarh Bazar Panchagarh
|
11.13
|
|
01/04/2018
|
19/07/2018
|
0
|
|
|
22/01/2019
|
|
|
29
|
Chattogram
|
11
|
patiya
|
59
|
674
|
Pancha-Boda-Cit-Ghat-01/17-18
|
R-Excavation of Rangapani Khal from Ch: 00 to 3050m under Debiganj Upazila, Dist. Panchagarh
|
|
|
|
|
80.09
|
Md. Ashraful Alam Robcrt Songanj, Alamnagar 520402, Rangpur
|
72.08
|
|
26/11/2017
|
27/05/2018
|
0
|
|
|
22/01/2019
|
|
|
30
|
Chattogram
|
11
|
patiya
|
59
|
674
|
Pancha-Debi-Cit-Khal-01/17-18
|
Construction of Dewladanga Graveyard at Chilahat Union under Debiganj Upazila, Dist. Panchagarh.
|
|
|
|
|
14.34
|
M/S. Mst. Siren Akter, Sarkerpara, Thakurgaon
|
13.48
|
|
28/06/2017
|
31/08/2017
|
0
|
|
|
22/01/2019
|
|
|
31
|
Chattogram
|
11
|
patiya
|
59
|
674
|
Pancha-Debi-Cit-Graveyard-01/16-17
|
Development of Moti & PM Market under Sadar Upazila, District: Panchagarh.
|
|
|
|
|
41.87
|
M/S. Azaz Construction Pulhat, Dinajpur.
|
39.77
|
|
06/06/2018
|
02/12/2018
|
0
|
|
|
22/01/2019
|
|
|
32
|
Chattogram
|
11
|
patiya
|
59
|
674
|
Pancha-Sadar-Cit-GC/ RM-05/ 17-18
|
Construction of Panidubi Hat under Boda Upazila, Dist. Panchagarh.
|
|
|
|
|
43.93
|
SA Engineering Apt 5B.Hardzin, Bari 21, Road # 17, Banani, Dhaka-1213
|
39.54
|
|
03/12/2017
|
03/05/2018
|
-344
|
|
|
22/01/2019
|
|
|
33
|
Chattogram
|
11
|
patiya
|
59
|
674
|
Pancha-Boda-Cit-GC/ RM-04/ 17-18
|
Construction of Kajoldighi Kaliaganj Hat under Boda Upazila, Dist. Panchagarh.
|
|
|
|
|
42.61
|
SA Engineering Apt 5B.Hardzin, Bari 21, Road # 17, Banani, Dhaka-1213
|
38.35
|
|
03/12/2017
|
03/05/2018
|
0
|
|
|
22/01/2019
|
|
|
34
|
Chattogram
|
11
|
patiya
|
59
|
674
|
Pancha-Boda-Cit-GC/ RM-03/ 17-18
|
Construction of Hazi Hat Fari Thana Hat under Debiganj Upazila, Dist. Panchagarh.
|
|
|
|
|
43.37
|
M/S. Mst. Siren Akter, Sarkerpara, Thakurgaon
|
42.62
|
|
28/06/2017
|
24/12/2017
|
-333
|
|
|
22/01/2019
|
|
|
35
|
Chattogram
|
11
|
patiya
|
59
|
674
|
Pancha-Debi-Cit-GC/RM-02/16-17
|
Construction of Dinbazar R/M under Debiganj Upazila, Dist. Panchagarh.
|
|
|
|
|
43.42
|
Amit Kumar Das Domar, Nilfamari
|
45.71
|
|
10/07/2017
|
06/01/2018
|
0
|
|
|
22/01/2019
|
|
|
36
|
Chattogram
|
11
|
patiya
|
59
|
674
|
Pancha-Debi-Cit-GC/RM-01/16-17
|
Construction of Coatvajni Hindupara Dangapara Mondir under Debiganj Upazila, Dist. Panchagarh.
|
|
|
|
|
17.83
|
M/S. Mst. Siren Akter, Sarkerpara, Thakurgaon
|
16.73
|
|
28/06/2017
|
24/12/2017
|
-322
|
|
|
22/01/2019
|
|
|
37
|
Chattogram
|
11
|
patiya
|
59
|
674
|
Pancha-Debi-Cit-Mondir-04/16-17
|
Construction of Daikahata Kali Mondir under Boda Upazila, Dist. Panchagarh.
|
|
|
|
|
18.01
|
M/S. Mst. Siren Akter, Sarkerpara, Thakurgaon
|
16.40
|
|
15/11/2017
|
16/05/2018
|
0
|
|
|
22/01/2019
|
|
|
38
|
Chattogram
|
11
|
patiya
|
59
|
674
|
Pancha-Boda-Cit-Mondir-03/16-17
|
Construction of Nazirganj Kayetpara Kali Mondir under Boda Upazila, Dist. Panchagarh.
|
|
|
|
|
18.01
|
M/S. Sohel Enterprise, Kalibari, Thakurgaon
|
16.50
|
|
03/12/2017
|
01/06/2018
|
-311
|
|
|
22/01/2019
|
|
|
39
|
Chattogram
|
11
|
patiya
|
59
|
674
|
Pancha-Boda-Cit-Mondir-02/16-17
|
Construction of Putimari Kali Mondir under Boda Upazila, Dist. Panchagarh.
|
|
|
|
|
18.01
|
ASM Mostata Sarwar Islambag, Panchagarh
|
16.21
|
|
05/12/2017
|
03/06/2018
|
0
|
|
|
22/01/2019
|
|
|
40
|
Chattogram
|
11
|
patiya
|
59
|
674
|
Pancha-Boda-Cit-Mondir-01/16-17
|
Const. of 3x4.50x4.00m RCC Box Culvert over Setnai river at ch. 1320m with protective work on the road of NHW JM Jute mill Putimarry Citmohol to Gorerdanga hat road under Boda Upazila Dist. Panchagarh.
|
|
13.50
|
|
|
49.82
|
M/S. Asma Enterprise Hazipara Thakurgaon
|
47.33
|
|
15/07/2018
|
11/01/2019
|
-300
|
|
|
22/01/2019
|
|
|
41
|
Chattogram
|
11
|
patiya
|
59
|
674
|
Pancha-Boda-Cit-Culvert-10/17-18
|
Construction of 36m RCC Girder Bridge on the road of Brommotor Kumarpara to Shalbari Chitmohol via Mondir Road UZR/003 at East Side of Narungonj to VRB/171 at Daikhata High school road. Road ID 177255174 at Ch. 360m under Boda Upazila Dist. Panchagarh.
|
|
36.00
|
|
|
213.41
|
M/S. Richi Enterprise Kalibari Thakurgaon
|
202.74
|
|
12/07/2018
|
07/05/2019
|
0
|
|
|
22/01/2019
|
|
|
42
|
Chattogram
|
11
|
patiya
|
59
|
674
|
Pancha-Boda-Cit-Bridge-09/17-18
|
Construction of 2x3.00m x 2.50m RCC Box Culvert at Ch: 1570m on Talma to Modelhat BC Road via Ambari to Garati-78 Jhachupara Road under Sadar Upazila, Dist. Panchagarh. Road ID 177735322
|
|
6.00
|
|
|
13.66
|
Md. Abdul Mannan, Boda, Panchagarh
|
12.30
|
|
16/01/2018
|
18/03/2018
|
-289
|
|
|
22/01/2019
|
|
|
43
|
Chattogram
|
11
|
patiya
|
59
|
674
|
Pancha-Sadar-Cit-Culvert-02/2017-18
|
Construction of 36.00m Long RCC Girder Bridge on the Road of NHW at JM Jute Mill North Side VRA-007 via Putimari Gaighata Citmohol Road under Boda Upazila, District: Panchagarh. Road ID-1777255161
|
|
36.00
|
|
|
201.17
|
SA-Mishuk-SE (JV) Food Office Road, Nilphamari
|
181.05
|
|
06/02/2018
|
16/12/2018
|
0
|
|
|
22/01/2019
|
|
|
44
|
Chattogram
|
11
|
patiya
|
59
|
674
|
Pancha-Boda-Cit- Bridge-04/2017-2018
|
Construction of 39.00m Long RCC Girder Bridge on the Road of UZR 2003 at west side of High Bridge-Korotoa River Borabatia Ghat via Daikhahata Citmohol Road under Boda Upazila, District: Panchagarh. Road ID-1777255171
|
|
39.00
|
|
|
17.40
|
Md. Khairul Kabir Rana SMC Road Guptapara Rangpur
|
156.63
|
|
11/02/2018
|
04/12/2018
|
-278
|
|
|
22/01/2019
|
|
|
45
|
Chattogram
|
11
|
patiya
|
59
|
674
|
Pancha-Boda-Cit- Bridge-05/2017-2018
|
Construction of 60.00m Long RCC Girder Bridge on Tepriganj UP Road to Bodashri Mondir via Kalidaha at Ch: 4500m under Debiganj Upazila, District: Panchagarh.
|
|
60.00
|
|
|
266.71
|
Md. Khairul Kabir Rana SMC Road Guptapara Rangpur
|
240.04
|
|
01/03/2018
|
25/12/2018
|
0
|
|
|
22/01/2019
|
|
|
46
|
Chattogram
|
11
|
patiya
|
59
|
674
|
Pancha-Debi-Bridge-03/2017-18
|
Construction of 69.00m RCC Girder Bridge on Hossener Ghat to Mirjaganj road over Tista river at ch. 190m. Debiganj.
|
|
69.00
|
|
|
301.80
|
Islam & Sheikh JV Panchagarh Bazar Panchagarh.
|
271.63
|
|
16/04/2018
|
11/12/2018
|
-267
|
|
|
22/01/2019
|
|
|
47
|
Chattogram
|
11
|
patiya
|
59
|
674
|
Pancha-Debi-Cit-Culvert-08/2017-18
|
(a) Construction of double vent 2x3.00x2.50m RCC Box Culvert on the Kalidaho Bridge to Sirajul Chairman House to Tepriganj Road at Ch:2620m, 2890m. (b) Construction of 1x2.00x2.50m RCC Box Culvert on Paylavasa Bridge to Din Bazar Mosque Tetultala Road at Ch:1360m. (c) Construction of 3x4.50x3.00m RCC Box Culvert at Gajokati to Mirzaganj Bazar via Onkupara Road at Ch:5175m and 75m Approach Road. Road ID 177344113, 177345023, 177344112 (Debiganj).
|
|
21.50
|
|
|
73.21
|
Prapty Construction Munshipara, Debiganj, Panchagarh.
|
72.07
|
|
15/05/2017
|
14/05/2018
|
-256
|
|
|
22/01/2019
|
|
|
48
|
Chattogram
|
11
|
patiya
|
59
|
674
|
Pancha-Boda-Cit-Community Centre-03/16-18
|
Construction of Nazirganj Community Centre at Kajaldighi Union under Boda Upazila, Dist. Panchagarh.
|
|
|
|
|
61.79
|
AKM Akter Hossain Vasainagar, Boda, Panchagarh.
|
58.28
|
|
28/05/2017
|
28/01/2018
|
-245
|
|
|
22/01/2019
|
|
|
49
|
Chattogram
|
11
|
patiya
|
59
|
674
|
Pancha-Boda-Cit-Community Centre-02/16-17
|
Construction of Garati Community Centre at Harivasa under Panchagarh Sadar Upazila, Dist. Panchagarh.
|
|
|
|
|
61.80
|
Md. Abul Kashem Rumal, Baniapara Panchagarh
|
60.36
|
|
15/05/2017
|
10/01/2018
|
0
|
|
|
22/01/2019
|
|
|
50
|
Chattogram
|
11
|
patiya
|
59
|
674
|
Pancha-Sadar-Cit-Community Centre-01/16-17
|
Construction of Coat Vajni Adarshagram Jame Mosque under Debiganj Upazila, Dist. Panchagarh.
|
|
|
|
|
19.34
|
M/S. Bhai Bhai Traders Ranishankail, Thakurgaon
|
18.76
|
|
16/01/2018
|
15/07/2018
|
-234
|
|
|
22/01/2019
|
|
|
51
|
Chattogram
|
11
|
patiya
|
59
|
674
|
Panch-Boda-Cit-Mosq-04/16-17
|
Part-A. Construction of Kanapara Jame Mosque Civil Work. Part-B. Construction of Kanapara Jame Mosque Electrical Work. Part-C. Construction of Sanitary Latrine including urinal and Panrt-D. Installation of 01 no 38mm dia Hand Tube-well at Kanapara Jame Mosque at Garati Chitmohal under Sadar Upazila, Dist. Panachagarh.
|
|
|
|
|
17.96
|
M/S. Mst. Siren Akter, Sarkerpara, Thakurgaon
|
16.69
|
|
27/09/2017
|
25/03/2018
|
-223
|
|
|
22/01/2019
|
|
|
52
|
Chattogram
|
11
|
patiya
|
59
|
674
|
Panch-Sadar-Cit-Mosq-03/16-17
|
Part-A. Construction of Construction of Bauladanga Jame Mosque Upazial Debiganj, Panachagarh.
|
|
|
|
|
17.75
|
Prapty Construction Munshipara, Debiganj, Panchagarh.
|
16.22
|
|
03/04/2017
|
25/01/2018
|
0
|
|
|
22/01/2019
|
|
|
53
|
Chattogram
|
11
|
patiya
|
59
|
674
|
Pancha-Debi-Cit-Mosq-02/16-17
|
Construction of South Earpara Jame Mosque Upazila Sadar
|
|
|
|
|
17.85
|
AKM Akter Hossain W-01, Vasainagar, Boda, Panchagarh.
|
16.20
|
|
11/04/2017
|
13/01/2018
|
-212
|
|
|
22/01/2019
|
|
|
54
|
Chattogram
|
11
|
patiya
|
59
|
674
|
Pancha-Sadar-Cit-Mosq-01/16-17
|
i)Rehabilitation of 4-Vent RCC Box Culvert 4x4.00x4.00m at UZR 2001 Taltola more to Mirjaganj Bazar Pacca Link Road at Ch.1535m. ID-177344107. (ii) Improvement of Approach Road with Bridge Connecting Okrabari High School and Pacca Road Connecting at from Chit Under Debiganj Upazila, District: Panchagarh
|
|
15.00
|
|
|
143.51
|
Md.Azizul Haque, Narayanpur, Chaklahat, Panchagarh
|
136.34
|
|
01/08/2018
|
28/03/2019
|
0
|
|
|
22/01/2019
|
|
|
55
|
Chattogram
|
11
|
patiya
|
59
|
674
|
Pancha-Debi-Cit-VR-49/17-18
|
Improvement of Upen Chuwki Vajni Satter House to Bodapara Fultolapara Eidgah Field Road at Ch: 00m to 2100m Road ID 177345181 (Debiganj)
|
|
|
|
|
169.00
|
Mrs. Akid Traders Thakurgaon Road Thakurgaon.
|
160.55
|
|
24/05/2018
|
18/01/2019
|
-201
|
|
|
22/01/2019
|
|
|
56
|
Chattogram
|
11
|
patiya
|
59
|
674
|
Pancha-Debi-Cit-VR-44/16-17
|
i Improvement of Tistapara Natun Hat to Gajokati hat road at ch 3583 to 6105m. Road ID 177344027. .(Debiganj)ii Const of 1 nos 0.625x0.6m U-drain on the same road.
|
|
0.63
|
|
|
163.98
|
M/S. MA Engineering G-4 South Banasrri East Goran, Khilgaon, Dhaka
|
170.53
|
|
16/02/2017
|
15/02/2018
|
0
|
|
|
22/01/2019
|
|
|
57
|
Chattogram
|
11
|
patiya
|
59
|
674
|
Pancha-Debi-Cit-VR-31/16-17
|
i Improvement of Tistapara Natun Hat to Gajokati hat road at ch 00 to 3583m. Road ID 177344027. .(Debiganj)ii Const of 1 nos 0.625x0.6m U-drain on the same road.
|
|
0.63
|
|
|
174.77
|
M/S. MA Engineering G-4 South Banasrri East Goran, Khilgaon, Dhaka
|
180.00
|
|
16/02/2017
|
15/02/2018
|
-190
|
|
|
22/01/2019
|
|
|
58
|
Chattogram
|
11
|
patiya
|
59
|
674
|
Pancha-Debi-Cit-VR-30/16-17
|
i Improvement of Hossener Ghat to Mirzaganj via Kamatpara at Ch 2200m to 4370m. Road ID. 177344051. .(Debiganj) ii Const. of 1 nos 0.625x0.60m U-drain on the same road.iii Const. of single vent RCC Box culvert 1x4.00x2.50m on the same road.iv Const. of single vent RCC Box culvert 1x3.00x2.50m on the same road at Ch 2603m.
|
|
7.65
|
|
|
183.23
|
M/S. MA Engineering G-4 South Banasrri East Goran, Khilgaon, Dhaka
|
185.05
|
|
16/02/2017
|
15/02/2018
|
0
|
|
|
22/01/2019
|
|
|
59
|
Chattogram
|
11
|
patiya
|
59
|
674
|
Pancha-Debi-Cit-VR-29/16-17
|
i Improvement of Hossener Ghat to Mirzaganj via Kamatpara at Ch 00 to 2200m. Road ID. 177344051. .(Debiganj) ii Const. of 1 nos 0.625x0.60m U-drain on the same road.
|
|
0.63
|
|
|
166.86
|
Prapty Construction Munshipara, Debiganj, Panchagarh.
|
170.00
|
|
26/04/2017
|
25/04/2018
|
-179
|
|
|
22/01/2019
|
|
|
60
|
Chattogram
|
11
|
patiya
|
59
|
674
|
Pancha-Debi-Cit-VR-28/16-17
|
i) Improvement of Gajokati to Mirzaganj via Onkupara Road at Ch 2900m to 5540m. Road ID 177344108.(Debiganj)ii) Const. of 3 nos. U-drain at ch 4100m 4828m and 5420m on the same road.iii Const. of 3 nos RCC box culvert 1x4.00x2.50m on the same road at ch 3893m 4337m and 5378m.iv Const. of RCC box culvert 2x3.00x2.50m on the same road at ch 3659m.v Const. of RCC box culvert 2x4.00x2.50m on the same road at ch 4723m. Package No: Pancha-Debi-Cit-VR-27/16-17
|
|
27.87
|
|
|
255.41
|
Md. Aynul Haque, Kalibari, Thakurgaon
|
256.92
|
|
15/05/2017
|
14/05/2018
|
0
|
|
|
22/01/2019
|
|
|
61
|
Chattogram
|
11
|
patiya
|
59
|
674
|
Pancha-Debi-Cit-VR-27/16-17
|
i) Improvement of Gajokati to Mirzaganj via Onkupara Road at Ch 00 to 2900m. Road ID 177344108.(Debiganj) ii) Const. of 1 nos. 0.625m x 0.625m U-drain on the same road.(iii) Const. of single vent RCC box culvert 1x4.00x2.50m on the same road at ch 1040m.
|
|
4.62
|
|
|
188.00
|
Md. Alamgir Hossain Debiganj, Panchagarh
|
199.69
|
|
17/09/2017
|
14/05/2018
|
-168
|
|
|
22/01/2019
|
|
|
62
|
Chattogram
|
11
|
patiya
|
59
|
674
|
Pancha-Debi-Cit-VR-26/16-17
|
Improvement of road by bituminous carpeting of Brommotor Kumarpara to Shalbari Chitmohol via Mondir RoadUZR/003 at East Side of Narungonj to VRB/171 at daikhata High school road. Road ID 177255174 at Ch. 00 to 625m with link road 160m under Boda Upazila Dist. Panchagarh.
|
|
|
|
|
118.60
|
M./S. Shohel Enterp, Kalibari, Thakurgaon
|
112.67
|
|
01/07/2018
|
04/03/2019
|
0
|
|
|
22/01/2019
|
|
|
63
|
Chattogram
|
11
|
patiya
|
59
|
674
|
Pancha-Boda-Cit-VR-48/17-18
|
Improvement of Road by Bituminous Carpeting of UZR/003 at Palkuritola more to Last Border of Shalbari Citmohol via H/O. Younus Master Bayatipara more H/O. Battchu member and Kazaldighi Bazar Road Ch: 00 to 5600m. Road ID 177254059. under Boda Upazila
|
|
|
|
|
444.76
|
Dolly Construction Ltd.-Infratech (JV) Sena Kallyan Bhaban, 195 Motijheel C/A, Suit # 1602, Dhaka-1000.
|
404.54
|
|
28/06/2017
|
27/02/2018
|
-157
|
|
|
22/01/2019
|
|
|
64
|
Chattogram
|
11
|
patiya
|
59
|
674
|
Pancha-Boda-Cit-VR-43/16-17
|
(1) Improvement of Road By Bituminous Carpeting of UZR/003 at Dariar more-Aowlia Ghat of Kortoa River via Briommattar Kumarpara (Tshalbari Chitmohol) Road from Ch.0.00m-2440.00m (Effective Length-2.463) (2) Construction of 1no 2Vent 3.00mx3.00m RCC Box Cuvert at (C W=7.32m) at Ch. 65m on the Road of UZR/003 at Dariar more-Aowlia Ghat of Kortoa River via Brommattar Kumarpara (TShalbari Chitmohol) Road. (3) Construction 1x625mmx600mm (4Nos) U-Drain at Ch.207m, 870m, 1581m & 2300m on Road of UZR/003 at Dariar more-Aowlia Ghat of Kortoa River via Brommattar Kumarpara (TShalbari Chitmohol) Road. (4) Protective work at Pond or River side on the Road of UZR/003 at Dariar more-Aowlia Ghat of Kortoa River via Brommattar Kuarpara (TShalbari Chitmohol) Road. Road ID 177254064
|
|
7.87
|
|
|
189.05
|
M/S. Saiful Alam, Old Bus-Stand, Thakurgaon
|
196.42
|
|
21/08/2017
|
20/08/2018
|
0
|
|
|
22/01/2019
|
|
|
65
|
Chattogram
|
11
|
patiya
|
59
|
674
|
Pancha-Boda-Cit-VR-42/16-17
|
(1) Improvement of Road By Bituminous Carpeting of UZR 2001 North side of Marey Hat- Korotoa River via H/O. Abdul Latif at Shalbari (Dewour) Chilmohol Road {UZR/001 at North side of Marey Hat- Korotoa River via H/O. Abdul Latif at Shalbari (Betbari) Chitmohol Road} from Ch.0.00m-2300m (Effective Length-2.286). (2) Construction of 1x625mmx600mm (3Nos) U-Drain at Ch.480m, 1500m & 1900m on the Road of UZR/001 at North side of Marey Hat- Korotoa River via H/O. Abdul Latif at Shalbari (Betbari) Chitmohol Road. (3) Construction of 2Nos 2Vent 3.00mx3.00m RCC Box Culvert at Ch. 200m & 400m on the Road of UZR/001 at North side of Marey Hat- Korotoa River via H/O. Abdul Latif at Shalbari (Betbari) Chitmohol Road. (4) Protective work at Pond or Dich side on the Road of UZR/001 at North side of Marey Hat- Korotoa River via H/O. Abdul Latif at Shalbari (Betbari) Chilmohol Road.
|
|
13.87
|
|
|
179.49
|
M/S. Saiful Alam, Old Bus-Stand, Thakurgaon
|
190.46
|
|
21/08/2017
|
20/08/2018
|
-146
|
|
|
22/01/2019
|
|
|
66
|
Chattogram
|
11
|
patiya
|
59
|
674
|
Pancha-Boda-Cit-VR-41/16-17
|
1 Improvment of Road By Bituminous Carpeting of UZR 2003 at West side of High Bridge- Korotoa River Borobatia Ghat via Daikhata Chitmohol Road UZR/003 at West side of High Bridge- Korotoa River Borobatia Ghat via Daikhata Chitmohol Road from ch. 0.00m-1100m. Effective lenght-1.060 .Road ID 177255171. BODA2 Construction of 1x625mmx600mm 3Nos U-Drain at ch 120m 400m & 435m on the Road of UZR/003 at West side of High Bridge- Korotoa River Borobatia Ghat via Daikhata Chitmohol Road.
|
|
1.88
|
|
|
60.67
|
Sajol Enterprise Monirampur Shahzedpur Sirajganj.
|
60.34
|
|
08/05/2017
|
07/05/2018
|
0
|
|
|
22/01/2019
|
|
|
67
|
Chattogram
|
11
|
patiya
|
59
|
674
|
Pancha-Boda-Cit-VR-39/16-17
|
1 Improvment of Road By Bituminous Carpeting of Bodeshari Hat-Deen Bazar via Amtola Road form Ch.00m-2850.00m. Effective lenght-2.839. ID 177254058. BODA2 Construction of 1x625mmx600mm 3Nos U-Drain at ch 403m 1500m & 2100m onthe Road of Bodeshari Hat-Deen Bazar via Amtola Road. 3 Construction of 1No 1x1.50m RCC B/C CW.7.32 at ch. 925.00m on the Road of Bodeshari Hat-Deen Bazar via Amtola Road. 4 Construction of 3nos 1x2.50mx2.5m RCC Box Culvert CW.7.32 at ch. 1007m1280 & 2325m on the Road of Bodeshari Hat-Deen Bazar via Amtola Road.5 Protective work at Pond or Dich side on the Road of Bodeshari Hat-Deen Bazar via Amtola Road.
|
|
10.82
|
|
|
199.31
|
Sajal Enterprise, Shahzadpur, Serajganj
|
213.43
|
|
03/07/2017
|
03/05/2018
|
-135
|
|
|
22/01/2019
|
|
|
68
|
Chattogram
|
11
|
patiya
|
59
|
674
|
Pancha-Boda-Cit-VR-38/16-17
|
1 Improvment of Road By Bituminous Carpeting of UZR/003 at South side Danakata BGB Camp-UZR/003 at Kaliagang Mosque & Kaliaganj Primary School via Nazirgtanj Danakaka Chitmohol Road form Ch.0.00m-2250m.2 Construction of 2x4.50mx4.00m RCC Box Culvert at ch. 625m on the Road UZR/003 at South side of Danakata BGB Camp-UZR/003 at Kaliagang Mosque & Kaliaganj Primary School via Nazirgtanj Danakaka Chitmohol Road.3 Construction of 1x625mmx600mm 5Nos U-Drain at ch 745m 1123m 15481695m & 1924m on UZR/003 at South side Danakata BGB Camp-UZR/003 at Kaliagang Mosque & Kaliaganj Primary School via Nazirgtanj Danakaka Chitmohol Road. ID 177254057. BODA4 Protective work at Pond or Dich side on the Road of UZR/003 at South side of Danakata BGB Camp-UZR/003 at Kaliaganj Mosque & Kaliaganj Nazirganj Middle- UNR/007 at Abalpara Mosque Primary School via Nazirgtanj Danakaka Chitmohol Road.
|
|
12.10
|
|
|
180.99
|
M/S. Saiful Alam, Old Bus-Stand, Thakurgaon
|
188.07
|
|
21/08/2017
|
20/08/2018
|
0
|
|
|
22/01/2019
|
|
|
69
|
Chattogram
|
11
|
patiya
|
59
|
674
|
Pancha-Boda-Cit-VR-37/16-17
|
1 Improvment of Road By Bituminous Carpeting of UZR/3007 at Nazirgtanj Chitmohol 2viii Road UNR/007 at Nazirganj Chitmohol Road form Ch.0.00m-2180.00 with 260m Link Road. Road ID 177254056. BODA2 Construction of INo 1x625mmx600mm 5 nos U-Drain at ch. 455m 717m 1335m 1747m & 2236m on the Road of UNR/007 at Nazirganj Middle- UNR/007 at Abalpara Mosque via Nazirganj Chitmohol Road. 3 Construction of 1 No 1.50mx1.50m RCC B/C at ch. 7.00m on the Road of UNR/007 at Nazirganj Middle- UNR/007 at Abalpara Mosque via Nazirganj Chitmohol Road.4 Protective work at Pond or Dich side on the Road of UNR/007 at Nazirganj Middle- UNR/007 at Abalpara Mosque via Nazirganj Chitmohol Road.
|
|
|
|
|
167.45
|
M/S. Saiful Alam, Old Bus-Stand, Thakurgaon
|
176.94
|
|
21/08/2017
|
20/08/2018
|
-124
|
|
|
22/01/2019
|
|
|
70
|
Chattogram
|
11
|
patiya
|
59
|
674
|
Pancha-Boda-Cit-VR-36/16-17
|
(1) Improvment of Road By Bituminous Carpeting of UZR/003 at North side of Amtola Bora Moszid to Nazirganj Chitmohol Road form Ch.00m to 750.00m. road ID 177255166. BODA (2) Construction of INo 1x1.50m RCC Box Culvert at ch. 690.00m on the Road of UZR/003 at North side of Atola Bora Moszid to Nazirganj Chitmohol Road. (3) Construction of 1x625mmx600mm INo U Drain at ch. 50 on the Road of UZR/003 North side of Amtola Bora Moszid to Nazirganj Chitmohol Road (4) Protective work at Pond or Dich side on the Road of UZR/003 at North side of Amtola Bora Moszid-Naziganj Chitmohol Road.
|
|
|
|
|
53.67
|
M/S. Sohel Enterprise, Kalibari, Thakurgaon
|
54.68
|
|
07/12/2017
|
06/12/2018
|
0
|
|
|
22/01/2019
|
|
|
71
|
Chattogram
|
11
|
patiya
|
59
|
674
|
Pancha-Boda-Cit-VR-24/16-17
|
i) Improvement of Abalpara Mosque-Panidubihat road at Nazirgonj mosque-UNR 2007 at Madrasha (West side of Kaliagonj hat) road at (Ch. 00-1475m). Road ID 177254055. [BODA] ii) Const. of U-drain at ch. 2800m on same road iii) Prote ctive work at pond or Dich side on same road.
|
|
0.63
|
|
|
91.01
|
M/S. MB Motors, Goalpara, Thakurgaon
|
97.06
|
|
|
31/01/2018
|
-113
|
|
|
22/01/2019
|
|
|
72
|
Chattogram
|
11
|
patiya
|
59
|
674
|
Pancha-Boda-Cit-VR-23/16-17
|
i) Improvement of UNR 3007 at east Abalpara Mosque-UZR 2003 at Panidubi hat via Nazirgonj Chitmohal 2(iii) road {UNR 3007 at Abalpara mosque-UZR 2003 at Panidubihat via Nazirgonj Citmohal road} at (Ch. 00-2460m.) . Road ID 177254054. [BODA] ii) Const. of 2 nos/ U-drain at ch. 1605m &1755m on same road iii) Const. of 2 nos 2.50x2.50m RCC box culvert at ch. 753m & 2270m same road iv) Const. of 1 nos 2x3.00x3.00m RCC box culvert at ch. 2256m same road. v) Const. of 1 nos 1.50x1.50m RCC box culvert at ch. 190m same road. vi) Protective work at pond or Dich side on same road.
|
|
13.75
|
|
|
193.77
|
Md. Khairul Kabir Rana SMC Road Guptapara Rangpur
|
186.10
|
|
|
31/12/2017
|
0
|
|
|
22/01/2019
|
|
|
73
|
Chattogram
|
11
|
patiya
|
59
|
674
|
Pancha-Boda-Cit-VR-22/16-17
|
i) Improvement of UNR 3007 at east side of Nazirgonj Citmohal 2(i)-Connecting of Nazirgonj Citmohal. Road ID 177254053. [BODA] 2(iii) at Abalpara-Panidubi road. {UNR 3007 at Kayetpara weast side of Nazirgonj Citmohal-Connecting of Nazirgonj Citmohal at Abalpara to Panidubihat road} at (Ch. 00-1263m.) ii) Const. of 1 nos/ U-drain at ch. 750m on same road iii) Repair work for Existing OFC at ch.. 165m on same road. iv) Const. of 2x4.50x4.00m RCC box culvert at ch. 1230m on same road vi) Protective work at pond or Dich side on same road.
|
|
9.63
|
|
|
109.25
|
Md. Abdul Mannan, Boda, Panchagarh
|
106.22
|
|
|
31/12/2017
|
-102
|
|
|
22/01/2019
|
|
|
74
|
Chattogram
|
11
|
patiya
|
59
|
674
|
Pancha-Boda-Cit-VR-21/16-17
|
i)Improvement of NHWR at JM Jute Mill (North side)-VRA 4007 via Putimari (Gaighata) Chitmohal road {NHW at JM Jute Mill (North side) â??Gaighata Natun hat via Putimari (Gaighata ) Citmohal road} at (Ch. 00-2320m). Road ID 177255161. [BODA] ii) Const. of 5 nos U-drain at ch. 296m,1307m, 1498m, 1550m & 1680m on same road at Ch. 407m ii) Const. of 3x4.5x4.00m RCC box culvert at ch. 890m on same road at Ch. 407m iii) Const. of 1 nos 2.50x2.50m RCC box culvert at ch. 08m same road at Ch. 407m iv) Const. of 1 nos 1.50x1.50m RCC box culvert at ch. 1937m same road at Ch. 407m v) Const. of Toe wall with GC Pannel at khal on same road Ch. 407m vi) Protective work at pond or Dich side on same road at Ch. 407m
|
|
7.13
|
|
|
191.18
|
Md. Khairul Kabir Rana SMC Road Guptapara Rangpur
|
149.01
|
|
|
31/12/2017
|
0
|
|
|
22/01/2019
|
|
|
75
|
Chattogram
|
11
|
patiya
|
59
|
674
|
Pancha-Debi-Cit-UNR-03/15-16
|
(i) Improvement of Bhawlagonj Chilahati R&H from Majhati GPS to Ghajokhatihat road at ch 2800 to 4600m. Road ID 177343007. [Debiganj]. (ii) Const. of 1nosU-drain 0.625x0.6m on same road at ch 2998m. (iii) Const. of 3-vent 3x4.5x2.5m box culvert on same road at ch 3234m.
|
|
15.00
|
|
|
135.18
|
Md.Deloar Hossian, Boda, Panchagarh
|
130.83
|
|
13/11/2016
|
|
100
|
|
|
22/01/2019
|
|
|
76
|
Chattogram
|
11
|
patiya
|
59
|
674
|
Panch-Sadar-Cit-UNR-01/15-16
|
Shaheberhat-Garati-75 via Uttar Haluapara H/Q Surat Ali Munshiroad at Ch. 00--750m
|
|
|
|
|
42.64
|
Tanha Steel & HimuPlastic House,Raniganj Sadar,Dinajpur
|
43.44
|
|
19/07/2016
|
18/07/2017
|
100
|
|
|
22/01/2019
|
|
|
77
|
Kurigram
|
56
|
bhurungamari
|
404
|
674
|
Kuri-Bhu-Cit-Culvert-05/16-17
|
Construction of 3 nos 1x0.625x0.600m U-drain on road from H/O Barkat Ali-H/O Tara road [Road ID- 149065049] [Bhurungamari]
|
|
1.88
|
|
|
2.15
|
Md. Wahed Ali, Fulbari, Kurigram
|
1.93
|
|
28/09/2017
|
05/02/2018
|
100
|
|
|
19/01/2019
|
|
|
78
|
Kurigram
|
56
|
bhurungamari
|
404
|
674
|
Kuri-Bhu-Cit-Culvert-04/16-17
|
Construction of 2x4.50x3.00m RCC Box Culvert on road from H/O Barkat Ali-H/O Tara road [Road ID- 149065049] [Bhurungamari]
|
|
9.00
|
|
|
21.49
|
Md. Nuruzzaman, Kanthalbari, Kurigram
|
19.34
|
|
28/09/2017
|
10/04/2018
|
100
|
|
|
19/01/2019
|
|
|
79
|
Kurigram
|
56
|
bhurungamari
|
404
|
674
|
Kuri-Bhu-Cit-Culvert-03/16-17
|
Construction of 2 nos 1x0.625x0.600m U-drain on road from H/O Gomir Big road-H/O Solim at south side [Road ID- 149065048] [Bhurungamari]
|
|
1.25
|
|
|
1.44
|
Md. Alah Baks, Khalilgonj, Kurigram
|
1.30
|
|
28/09/2017
|
10/02/2018
|
100
|
|
|
19/01/2019
|
|
|
80
|
Kurigram
|
56
|
bhurungamari
|
404
|
674
|
Kuri-Bhu-Cit-Culvert-02/16-17
|
Construction of 1x3.00x2.00m RCC Box Culvert on road from Anower Hossain-H/O Moynal via H/O Alam road [Road ID- 149065044] [Bhurungamari]
|
|
3.00
|
|
|
7.58
|
Md. Alamgir Jahan, Shahajadpur, Shirajgonj.
|
6.82
|
|
28/09/2017
|
10/02/2018
|
100
|
|
|
19/01/2019
|
|
|
81
|
Kurigram
|
56
|
bhurungamari
|
404
|
674
|
Kuri-Bhurung-Cit-VR-19/15-16
|
Improvement of road by HBB from Mukti bazar near H/O Hobibor- Badsha Armi road from ch: 00m-975m [Road ID- 149065056]
|
|
0.98
|
|
|
24.72
|
M/s. Aroshi Construction, Nageswari, Kurigram
|
24.43
|
|
18/07/2016
|
17/09/2017
|
100
|
|
|
19/01/2019
|
|
|
82
|
Kurigram
|
56
|
bhurungamari
|
404
|
674
|
Kuri-Bhurung-Cit-VR-18/15-16
|
Improvement of road by HBB from Basjani Sarkerpara Jame mosque road from ch: 00m-460m [Road ID- 149065054]
|
|
0.46
|
|
|
11.05
|
M/s. Aroshi Construction, Nageswari, Kurigram
|
11.10
|
|
18/07/2016
|
17/09/2017
|
100
|
|
|
19/01/2019
|
|
|
83
|
Kurigram
|
56
|
bhurungamari
|
404
|
674
|
Kuri-Bhurung-Cit-VR-17/15-16
|
Improvement of road by HBB from H/O Jillu more - H/O Moslem road from ch: 00m-390m [Road ID- 149065053]
|
|
0.39
|
|
|
9.08
|
M/s. Aroshi Construction, Nageswari, Kurigram
|
9.06
|
|
18/07/2016
|
17/09/2017
|
100
|
|
|
19/01/2019
|
|
|
84
|
Kurigram
|
56
|
bhurungamari
|
404
|
674
|
Kuri-Bhurung-Cit-VR-16/15-20
|
Improvement of road by HBB from Moydum Camp Jame Mosque more - Moydum beel bridge via H/O Abdul Gagur road from ch: 00m-467m [Road ID- 149065052]
|
|
0.47
|
|
|
10.64
|
M/s. Aroshi Construction, Nageswari, Kurigram
|
10.62
|
|
18/07/2016
|
17/09/2017
|
100
|
|
|
19/01/2019
|
|
|
85
|
Kurigram
|
56
|
bhurungamari
|
404
|
674
|
Kuri-Bhurung-Cit-VR-15/15-19
|
Improvement of road by HBB from Pucca road near shop of Motin - H/O Shahid Ali via H/O Mokaddws road from ch: 00m-210m [Road ID- 149065051]
|
|
0.21
|
|
|
5.01
|
M/s. Aroshi Construction, Nageswari, Kurigram
|
5.03
|
|
18/07/2016
|
17/09/2017
|
100
|
|
|
19/01/2019
|
|
|
86
|
Kurigram
|
56
|
bhurungamari
|
404
|
674
|
Kuri-Bhurung-Cit-VR-14/15-18
|
Improvement of road by HBB from Pucca road near H/O Mojibor - H/O Korban road from ch: 00m-230m [Road ID- 149065050]
|
|
0.23
|
|
|
5.87
|
M/s. Aroshi Construction, Nageswari, Kurigram
|
6.22
|
|
18/07/2016
|
17/09/2017
|
100
|
|
|
19/01/2019
|
|
|
87
|
Kurigram
|
56
|
bhurungamari
|
404
|
674
|
Kuri-Bhurung-Cit-VR-13/15-17
|
Improvement of road by HBB from H/O Barkat Ali - H/O Tara road from ch: 00m-570m [Road ID- 149065049]
|
|
0.57
|
|
|
14.32
|
M/s. Aroshi Construction, Nageswari, Kurigram
|
14.38
|
|
18/07/2016
|
17/09/2017
|
100
|
|
|
19/01/2019
|
|
|
88
|
Kurigram
|
56
|
bhurungamari
|
404
|
674
|
Kuri-Bhurung-Cit-VR-12/15-16
|
Improvement of road by HBB from H/O Goni Big road- H/O Solim at South side road from ch: 00m-870m [Road ID- 149065048
|
|
0.87
|
|
|
21.59
|
M/s. Aroshi Construction, Nageswari, Kurigram
|
21.54
|
|
18/07/2016
|
17/09/2017
|
100
|
|
|
19/01/2019
|
|
|
89
|
Kurigram
|
56
|
bhurungamari
|
404
|
674
|
Kuri-Bhurung-Cit-VR-11/15-16
|
Improvement of road by HBB from H/O Moghol - H/O Mohir road from ch: 00m-280m [Road ID- 149065047]
|
|
0.28
|
|
|
7.30
|
M/s. Aroshi Construction, Nageswari, Kurigram
|
7.26
|
|
18/07/2016
|
17/09/2017
|
100
|
|
|
19/01/2019
|
|
|
90
|
Kurigram
|
56
|
bhurungamari
|
404
|
674
|
Kuri-Bhurung-Cit-VR-10/15-16
|
Improvement of road by HBB from H/O Siddik - Kader road from ch: 00m-540m [Road ID- 149065046]
|
|
0.54
|
|
|
12.48
|
M/s. Aroshi Construction, Nageswari, Kurigram
|
12.45
|
|
18/07/2016
|
17/09/2017
|
100
|
|
|
19/01/2019
|
|
|
91
|
Kurigram
|
56
|
bhurungamari
|
404
|
674
|
Kuri-Bhurung-Cit-VR-09/15-16
|
Improvement of road by HBB from H/O Jahangir - H/O Abdus Sattar via H/O Amir road from ch: 00m-480m [Road ID- 149065045]
|
|
0.48
|
|
|
11.70
|
M/s. Aroshi Construction, Nageswari, Kurigram
|
11.75
|
|
18/07/2016
|
17/09/2017
|
100
|
|
|
19/01/2019
|
|
|
92
|
Kurigram
|
56
|
bhurungamari
|
404
|
674
|
Kuri-Bhurung-Cit-VR-08/15-16
|
Improvement of road by HBB from H/O Anower Hossain - H/O Alam road from ch: 00m-586m [Road ID- 149065044]
|
|
0.59
|
|
|
14.80
|
M/s. Aroshi Construction, Nageswari, Kurigram
|
14.50
|
|
18/07/2016
|
17/09/2017
|
100
|
|
|
19/01/2019
|
|
|
93
|
Kurigram
|
56
|
bhurungamari
|
404
|
674
|
Kuri-Bhurung-Cit-VR-07/15-16
|
Improvement of road by HBB from Humaun more - H/O Lavlu road from ch: 00m-660m [Road ID- 149065043]
|
|
0.66
|
|
|
18.54
|
M/s. Aroshi Construction, Nageswari, Kurigram
|
18.00
|
|
18/07/2016
|
17/09/2017
|
100
|
|
|
19/01/2019
|
|
|
94
|
Kurigram
|
56
|
bhurungamari
|
404
|
674
|
Kuri-Bhurung-Cit-VR-06/15-16
|
Improvement of road by HBB from H/O Momin ( Pucca road) - H/O Reajul Master road from ch: 00m-420m [Road ID- 149065042]
|
|
0.42
|
|
|
10.42
|
M/s. Aroshi Construction, Nageswari, Kurigram
|
10.19
|
|
18/07/2016
|
17/09/2017
|
100
|
|
|
19/01/2019
|
|
|
95
|
Kurigram
|
56
|
bhurungamari
|
404
|
674
|
Kuri-Bhrung-Cit-UNR-02/15-16
|
Improvement of Paglar hat - Pathordubi UP road via Bashjani road from ch: 5170m-6670m [Road ID- 149063001]
|
|
1.50
|
|
|
79.15
|
Md. Alah Baks, Khalilgonj, Kurigram
|
71.23
|
|
18/07/2016
|
17/09/2017
|
100
|
|
|
19/01/2019
|
|
|
96
|
Kurigram
|
56
|
chilmari
|
407
|
674
|
Kuri-Chilmari-Cit-Ghat & Shed-01/15-16
|
Construction of Chilmari Ramna Ghat & Passenger Shed.[Chilmari]
|
|
|
|
|
12.59
|
Md. Lutfar Rahman Bakshi, Krishnapur, Kurigram
|
9.79
|
|
18/07/2016
|
17/09/2017
|
0
|
|
|
19/01/2019
|
|
|
97
|
Kurigram
|
56
|
fulbari
|
408
|
674
|
Kuri-Cit-mosque-07/18-19
|
Construction of Beautification Work at (1) Chairmantari, (2) Kamalpur (3) Shomonnai para & (4) Chottokemot Jame Mosque [Fulbari]
|
|
|
|
|
51.69
|
M/S Noshin Traders
|
49.11
|
|
10/12/2018
|
10/05/2019
|
70
|
|
|
10/03/2019
|
|
|
98
|
Kurigram
|
56
|
fulbari
|
408
|
674
|
Kuri-Fulbari-Cit-bridge-06/17-18
|
Construction of 44.00m long RCC girder bridge over Nilkomor River ChandroKhana - Hanif House road at ch. 300m [Road ID: 149185037] [Fulbari]
|
|
44.00
|
|
|
242.90
|
RAB-RC& BC=JV Khalilgonj, Kurigram
|
218.61
|
|
17/12/2017
|
23/12/2018
|
100
|
|
|
26/02/2019
|
|
|
99
|
Kurigram
|
56
|
fulbari
|
408
|
674
|
Kuri-Ful-Cit-Shasan-02/16-17
|
Construction of Shasan Ghat on the Nil Kumor river near H/O Protap Vice-Chairman at Dashirchara Chitmahal [Fulbari]
|
|
|
|
|
9.77
|
M/S Khairul Enterprise,Khalilgonj,kurigram
|
8.80
|
|
24/10/2017
|
26/04/2018
|
100
|
|
|
19/01/2019
|
|
|
100
|
Kurigram
|
56
|
fulbari
|
408
|
674
|
Kuri-Ful-Cit-Shasan-01/16-17
|
Construction of Shasan Ghat on the Nil Kumor river near H/O Mohanando in Soto Kamat at Dashirchara Chitmahal [Fulbari]
|
|
|
|
|
9.77
|
M/S Khairul Enterprise,Khalilgonj,kurigram
|
8.80
|
|
24/10/2017
|
26/04/2018
|
100
|
|
|
19/01/2019
|
|
|
101
|
Kurigram
|
56
|
fulbari
|
408
|
674
|
Kuri-Ful-Cit-Mondir-01/16-17
|
Kalir Hat Kali Mondir at Dashirchara Chitmahal
|
|
|
|
|
17.87
|
Md. Mahmud Alam Liton, Fulbari, Dinajpur
|
20.78
|
|
24/07/2017
|
23/01/2018
|
100
|
|
|
19/01/2019
|
|
|
102
|
Kurigram
|
56
|
fulbari
|
408
|
674
|
Kuri-Ful-Cit-Mosq-05/16-17
|
Construction of Kamalpur Jame Mosque at Dashirchara Chitmahal [Fulbari]
|
|
|
|
|
18.01
|
Md. Ayub Ali, Nageswari, Kurigram.
|
16.21
|
|
29/03/2017
|
26/12/2017
|
100
|
|
|
19/01/2019
|
|
|
103
|
Kurigram
|
56
|
fulbari
|
408
|
674
|
Kuri-Ful-Cit-Mosq-04/16-17
|
Construction of Chairman Tari Jame Mosque at Dashirchara Chitmahal [Fulbari]
|
|
|
|
|
18.01
|
Md. Ayub Ali, Nageswari, Kurigram.
|
16.21
|
|
29/03/2017
|
26/12/2017
|
100
|
|
|
19/01/2019
|
|
|
104
|
Kurigram
|
56
|
fulbari
|
408
|
674
|
Kuri-Ful-Cit-Mosq-03/16-17
|
Construction of Samonnay Para Jame Mosque at Dashirchara Chitmahal [Fulbari]
|
|
|
|
|
18.01
|
M/s. Fahim Traders, R.K Road, Kurigram.
|
16.21
|
|
29/03/2017
|
26/12/2017
|
100
|
|
|
19/01/2019
|
|
|
105
|
Kurigram
|
56
|
fulbari
|
408
|
674
|
Kuri-Ful-Cit-Mosq-02/16-17
|
Construction of Soto Kamat Jame Mosque at Dashirchara Chitmahal [Fulbari]
|
|
|
|
|
18.01
|
M/s. Fahim Traders, R.K Road, Kurigram.
|
16.21
|
|
29/03/2017
|
26/12/2017
|
100
|
|
|
19/01/2019
|
|
|
106
|
Kurigram
|
56
|
fulbari
|
408
|
674
|
Kuri-Ful-Cit-Mosq-01/16-17
|
Construction of Kalir Hat Jame Mosque at Dashirchara Chitmahal [Fulbari]
|
|
|
|
|
18.01
|
Md. Ruhul Amin, Kanthalbari, Kurigram.
|
16.21
|
|
29/03/2017
|
26/12/2017
|
100
|
|
|
19/01/2019
|
|
|
107
|
Kurigram
|
56
|
fulbari
|
408
|
674
|
Kuri-Ful-Cit-VR-05/15-16
|
(i) Ajowatari mouza at H/O Tale Pagla - Rash mala Via Joynal Hajil house road from ch: 0-1760m; (ii) Const. of 3 nos 0.600mx0.625m U-drain on Ajowatari mouza at H/O Tale Pagla - Rash mala Via Joynal Hajil house road at ch: 350m, 1063m & 1500m; (iii) Const. of 2x3.00mx3.00m RCC box culvert on Ajowatari mouza at H/O Tale Pagla - Rash mala Via Joynal Hajil house road at ch: 5m [Road ID- 149185049]
|
|
6.04
|
|
|
119.13
|
M/s. Mahabubar Rahman, Goshpara, Kurigram.
|
105.86
|
|
07/06/2016
|
15/06/2017
|
100
|
|
|
19/01/2019
|
|
|
108
|
Kurigram
|
56
|
fulbari
|
408
|
674
|
Kuri-Ful-Cit-VR-04/15-16
|
(i) Rash mala - Mokter Dhonee house via Nagdho Pacca road near h/o Noren Mistriy road from ch: 0-1450m; (ii) Const. of 2 nos 0.600mx0.625m U-drain on Rash mala - Mokter Dhonee house via Nagdho Pacca road near h/o Noren Mistriy road at ch: 1110m & 1300m [Road ID- 149185048]
|
|
0.25
|
|
|
100.55
|
M/s. Saju Hardware, Khalilgonj, Kurigram.
|
88.48
|
|
07/06/2016
|
15/06/2017
|
100
|
|
|
19/01/2019
|
|
|
109
|
Kurigram
|
56
|
fulbari
|
408
|
674
|
Kuri-Ful-Cit-VR-03/15-16
|
(i) Indererpar - Boder hat Shimul tola Bazar (Dashiar Chara Chit Mahal) road from ch: 0-3503m; (ii) Const. of 5 nos 0.600mx0.625m U-drain on Indererpar - Boder hat Shimul tola Bazar (Dashiar Chara Chit Mahal) road at ch: 71m, 123m, 400m, 500m, & 974m; (iii) Const. of 3.00mx3.00m RCC box culvert on Indererpar - Boder hat Shimul tola Bazar (Dashiar Chara Chit Mahal) road at ch: 2125m [Road ID- 149185047]
|
|
2.50
|
|
|
236.84
|
JV M/s. Basundhara & M/s. Khairul Enterprise, R K Road, Kurigram
|
199.21
|
|
07/06/2016
|
15/12/2017
|
100
|
|
|
19/01/2019
|
|
|
110
|
Kurigram
|
56
|
fulbari
|
408
|
674
|
Kuri-Ful-Cit-VR-02/15-16
|
(i) Kosalertol - Shimulertola via Mostsfa house road from ch: 0-1483m; (ii) Const. of 2 nos 2.00mx2.00m RCC box culvert on Kosalertol - Shimulertola via Mostsfa house road at ch: 122m & 296m; (iii) Const. of 2x3.00mx3.00m RCC box culvert on Kosalertol - Shimulertola via Mostsfa house road at ch: 630m (iv) Const. of 4 nos 0.600mx0.625m U-drain on Kosalertol - Shimulertola via Mostsfa house road at ch: 440m, 588m, 1155m & 1379m; [Road ID- 149185046]
|
|
10.92
|
|
|
125.92
|
M/s. Hamid Traders, Dadamore, Kurigram.
|
107.84
|
|
07/06/2016
|
15/06/2017
|
100
|
|
|
19/01/2019
|
|
|
111
|
Kurigram
|
56
|
fulbari
|
408
|
674
|
Kuri-Ful-Cit-VR-01/15-16
|
(i) Ajizal Bridge near Poschimpara - Amtola via Moddhapara Kamalpur Mosque road from ch: 0-4342m; (ii) Const. of 14 nos 0.600mx0.625m U-drain on Ajizal Bridge near Poschimpara - Amtola via Moddhapara Kamalpur Mosque road road at ch: 230m, 575m, 645m, 950m, 1226m, 1370m, 1490m, 1550m, 1600m, 2350m, 2460m, 3280m & 4200m; (iii) Const. of 2.00mx2.00m RCC box culvert on Ajizal Bridge near Poschimpara - Amtola via Moddhapara Kamalpur Mosque road at ch: 670m; (iv) Const. of 3.00mx2.50m RCC box culvert on Ajizal Bridge near Poschimpara - Amtola via Moddhapara Kamalpur Mosque road at ch: 2910m; (v) Const. of 2x4.50mx3.00m RCC box culvert on Ajizal Bridge near Poschimpara - Amtola via Moddhapara Kamalpur Mosque road at ch: 00m [Road ID- 149185045]
|
|
18.06
|
|
|
295.05
|
M/s. Zahurul Haque Dulal, Goshpara, Kurigram.
|
277.21
|
|
07/06/2016
|
15/06/2017
|
100
|
|
|
19/01/2019
|
|
|
112
|
Kurigram
|
56
|
fulbari
|
408
|
674
|
Kuri-Ful-Cit-UNR-01/15-16
|
(i) Kalirhat - Nawdanga Pularper via Botertol end at R&H (Dashiar Chara Chit Mahal) road from ch: 0-3825m; (ii) Const. of 10 nos 0.600mx0.625m U-drain on Kalirhat - Nawdanga Pularper via Botertol end at R&H (Dashiar Chara Chit Mahal) road at ch: 1560m, 1764m, 2065, 2196m, 2310m, 2560m, 3105m, 3186m, 3396m & 3290m; (iii) Const. of 2x3.00mx3.00m RCC box culvert on Kalirhat - Nawdanga Pularper via Botertol end at R&H (Dashiar Chara Chit Mahal) road at ch: 2600m [Road ID- 149183015]
|
|
8.18
|
|
|
255.59
|
M/s. Zahurul Haque Dulal, Goshpara, Kurigram.
|
255.59
|
|
07/06/2016
|
15/06/2017
|
100
|
|
|
19/01/2019
|
|
|
113
|
Kurigram
|
56
|
fulbari
|
408
|
674
|
Kuri-Ful-Cit-UZR-01/15-16
|
(i) Khoribari GC ( Nagdoho )- Gongerhat R & H Road Via Kalirhat (Dashiar Chara Chit Mahal) road from ch: 0-6300m; (ii) Const. of 11 nos 0.600mx0.625m U-drain on Khoribari GC ( Nagdoho)- Gongerhat R & H Road Via Kalirhat (Dashiar Chara Chit Mahal) road at ch: 748m, 1122m, 1336m, 1510m, 1670m, 2458m, 2690m, 3045m, 3280m, 3342m & 5245m; (iii) Const. of 2x3.00mx3.00m RCC box culvert on Khoribari GC ( Nagdoho )- Gongerhat R & H Road Via Kalirhat (Dashiar Chara Chit Mahal) road at ch: 2015m [Road ID- 149182007]
|
|
6.30
|
|
|
435.42
|
M/s. Belal Construction, Khalilgonj, Kurigram.
|
378.81
|
|
07/06/2016
|
15/06/2017
|
100
|
|
|
19/01/2019
|
|
|
114
|
Kurigram
|
56
|
kurigram-s
|
409
|
674
|
Kuri-Cit-mosque-07/18-19
|
Construction of Beautification Work at (1) Chairmantari, (2) Kamalpur (3) Shomonnai para & (4) Chottokemot Jame Mosque [Fulbari]
|
|
|
|
|
51.69
|
M/S Noshin Traders
|
49.11
|
|
10/12/2018
|
10/05/2019
|
0
|
|
|
22/01/2019
|
|
|
115
|
Kurigram
|
56
|
kurigram-s
|
409
|
674
|
Kuri-Fulbari-Cit-bridge-06/17-18
|
Construction of 44.00m long RCC girder bridge over Nilkomor River ChandroKhana - Hanif House road at ch. 300m [Road ID: 149185037] [Fulbari]
|
|
44.00
|
|
|
242.90
|
RAB-RC& BC=JV Khalilgonj, Kurigram
|
218.61
|
|
17/12/2017
|
23/12/2018
|
95
|
|
|
22/01/2019
|
|
|
116
|
Kurigram
|
56
|
kurigram-s
|
409
|
674
|
Kuri-Row-Cit-UNR-02/16-17
|
Improvement of Rowmari-Baliamari GC road via Chuliarchar road (Rowmari portion) (Ch. 7694-8025m) [Road ID: 149792001] [Rowmari]
|
|
|
|
|
39.57
|
M/s. Shamim Enterprise, Old Registri office para, Kurigram
|
41.42
|
|
28/09/2017
|
26/04/2018
|
30
|
|
|
22/01/2019
|
|
|
117
|
Kurigram
|
56
|
kurigram-s
|
409
|
674
|
Kuri-Row-Cit-UNR-01/16-17
|
Improvement of Kartimari GC-Boraibari BOP Camp via Bawairgram (Ch. 3875-7500m) [Road ID: 149793012] [Rowmari]
|
|
|
|
|
242.84
|
M/S Khairul Kabir Rana, Gupta para, Rangpur
|
253.79
|
|
23/11/2017
|
30/07/2018
|
45
|
|
|
22/01/2019
|
|
|
118
|
Kurigram
|
56
|
kurigram-s
|
409
|
674
|
Kuri-Row-Cit-Bridge-01/16-17
|
Construction of 66.00m long RCC girder bridge Kartimari GC - Boraibari BGP Camp road via Bawairgram at ch. 4760m [Road ID: 149703012] [Rowmari]
|
|
66.00
|
|
|
251.92
|
M/S Shondi Traders, Belkuchi, Sirajgonj.
|
229.58
|
|
21/08/2017
|
30/06/2018
|
75
|
|
|
22/01/2019
|
|
|
119
|
Kurigram
|
56
|
kurigram-s
|
409
|
674
|
Kuri-Rowmari-Cit-Ghat & Shed-02/15-16
|
Construction of Roofing Faluarchar Ghat & Passenger Shed under Bondaber Union.[Rowmari]
|
|
|
|
|
3.39
|
M/s. Shamim Enterprise, Old Registri office para, Kurigram
|
2.62
|
|
18/07/2016
|
17/09/2017
|
100
|
|
|
22/01/2019
|
|
|
120
|
Kurigram
|
56
|
kurigram-s
|
409
|
674
|
Kuri-Rajibpur-Cit-Ghat & Shed-03/15-16
|
Construction of Rajibpur Ghat & Passenger Shed.
|
|
|
|
|
3.99
|
M/s. Shamim Enterprise, Old Registri office para, Kurigram
|
3.07
|
|
18/07/2016
|
17/09/2017
|
100
|
|
|
22/01/2019
|
|
|
121
|
Kurigram
|
56
|
kurigram-s
|
409
|
674
|
Kuri-Chilmari-Cit-Ghat & Shed-01/15-16
|
Construction of Chilmari Ramna Ghat & Passenger Shed.[Chilmari]
|
|
|
|
|
12.59
|
Md. Lutfar Rahman Bakshi, Krishnapur, Kurigram
|
9.79
|
|
18/07/2016
|
17/09/2017
|
0
|
|
|
22/01/2019
|
|
|
122
|
Kurigram
|
56
|
kurigram-s
|
409
|
674
|
Kuri-Bhu-Cit-Culvert-05/16-17
|
Construction of 3 nos 1x0.625x0.600m U-drain on road from H/O Barkat Ali-H/O Tara road [Road ID- 149065049] [Bhurungamari]
|
|
1.88
|
|
|
2.15
|
Md. Wahed Ali, Fulbari, Kurigram
|
1.93
|
|
28/09/2017
|
05/02/2018
|
100
|
|
|
22/01/2019
|
|
|
123
|
Kurigram
|
56
|
kurigram-s
|
409
|
674
|
Kuri-Bhu-Cit-Culvert-04/16-17
|
Construction of 2x4.50x3.00m RCC Box Culvert on road from H/O Barkat Ali-H/O Tara road [Road ID- 149065049] [Bhurungamari]
|
|
9.00
|
|
|
21.49
|
Md. Nuruzzaman, Kanthalbari, Kurigram
|
19.34
|
|
28/09/2017
|
10/04/2018
|
100
|
|
|
22/01/2019
|
|
|
124
|
Kurigram
|
56
|
kurigram-s
|
409
|
674
|
Kuri-Bhu-Cit-Culvert-03/16-17
|
Construction of 2 nos 1x0.625x0.600m U-drain on road from H/O Gomir Big road-H/O Solim at south side [Road ID- 149065048] [Bhurungamari]
|
|
1.25
|
|
|
1.44
|
Md. Alah Baks, Khalilgonj, Kurigram
|
1.30
|
|
28/09/2017
|
10/02/2018
|
100
|
|
|
22/01/2019
|
|
|
125
|
Kurigram
|
56
|
kurigram-s
|
409
|
674
|
Kuri-Bhu-Cit-Culvert-02/16-17
|
Construction of 1x3.00x2.00m RCC Box Culvert on road from Anower Hossain-H/O Moynal via H/O Alam road [Road ID- 149065044] [Bhurungamari]
|
|
3.00
|
|
|
7.58
|
Md. Alamgir Jahan, Shahajadpur, Shirajgonj.
|
6.82
|
|
28/09/2017
|
10/02/2018
|
100
|
|
|
22/01/2019
|
|
|
126
|
Kurigram
|
56
|
kurigram-s
|
409
|
674
|
Kuri-Bhurung-Cit-VR-19/15-16
|
Improvement of road by HBB from Mukti bazar near H/O Hobibor- Badsha Armi road from ch: 00m-975m [Road ID- 149065056]
|
|
|
|
|
24.72
|
M/s. Aroshi Construction, Nageswari, Kurigram
|
24.43
|
|
18/07/2016
|
17/09/2017
|
100
|
|
|
22/01/2019
|
|
|
127
|
Kurigram
|
56
|
kurigram-s
|
409
|
674
|
Kuri-Bhurung-Cit-VR-18/15-16
|
Improvement of road by HBB from Basjani Sarkerpara Jame mosque road from ch: 00m-460m [Road ID- 149065054]
|
|
|
|
|
11.05
|
M/s. Aroshi Construction, Nageswari, Kurigram
|
11.10
|
|
18/07/2016
|
17/09/2017
|
100
|
|
|
22/01/2019
|
|
|
128
|
Kurigram
|
56
|
kurigram-s
|
409
|
674
|
Kuri-Bhurung-Cit-VR-17/15-16
|
Improvement of road by HBB from H/O Jillu more - H/O Moslem road from ch: 00m-390m [Road ID- 149065053]
|
|
|
|
|
9.08
|
M/s. Aroshi Construction, Nageswari, Kurigram
|
9.06
|
|
18/07/2016
|
17/09/2017
|
100
|
|
|
22/01/2019
|
|
|
129
|
Kurigram
|
56
|
kurigram-s
|
409
|
674
|
Kuri-Bhurung-Cit-VR-16/15-20
|
Improvement of road by HBB from Moydum Camp Jame Mosque more - Moydum beel bridge via H/O Abdul Gagur road from ch: 00m-467m [Road ID- 149065052]
|
|
|
|
|
10.64
|
M/s. Aroshi Construction, Nageswari, Kurigram
|
10.62
|
|
18/07/2016
|
17/09/2017
|
100
|
|
|
22/01/2019
|
|
|
130
|
Kurigram
|
56
|
kurigram-s
|
409
|
674
|
Kuri-Bhurung-Cit-VR-15/15-19
|
Improvement of road by HBB from Pucca road near shop of Motin - H/O Shahid Ali via H/O Mokaddws road from ch: 00m-210m [Road ID- 149065051]
|
|
|
|
|
5.01
|
M/s. Aroshi Construction, Nageswari, Kurigram
|
5.03
|
|
18/07/2016
|
17/09/2017
|
100
|
|
|
22/01/2019
|
|
|
131
|
Kurigram
|
56
|
kurigram-s
|
409
|
674
|
Kuri-Bhurung-Cit-VR-14/15-18
|
Improvement of road by HBB from Pucca road near H/O Mojibor - H/O Korban road from ch: 00m-230m [Road ID- 149065050]
|
|
|
|
|
5.87
|
M/s. Aroshi Construction, Nageswari, Kurigram
|
6.22
|
|
18/07/2016
|
17/09/2017
|
100
|
|
|
22/01/2019
|
|
|
132
|
Kurigram
|
56
|
kurigram-s
|
409
|
674
|
Kuri-Bhurung-Cit-VR-13/15-17
|
Improvement of road by HBB from H/O Barkat Ali - H/O Tara road from ch: 00m-570m [Road ID- 149065049]
|
|
|
|
|
14.32
|
M/s. Aroshi Construction, Nageswari, Kurigram
|
14.38
|
|
18/07/2016
|
17/09/2017
|
100
|
|
|
22/01/2019
|
|
|
133
|
Kurigram
|
56
|
kurigram-s
|
409
|
674
|
Kuri-Bhurung-Cit-VR-12/15-16
|
Improvement of road by HBB from H/O Goni Big road- H/O Solim at South side road from ch: 00m-870m [Road ID- 149065048
|
|
|
|
|
21.59
|
M/s. Aroshi Construction, Nageswari, Kurigram
|
21.54
|
|
18/07/2016
|
17/09/2017
|
100
|
|
|
22/01/2019
|
|
|
134
|
Kurigram
|
56
|
kurigram-s
|
409
|
674
|
Kuri-Bhurung-Cit-VR-11/15-16
|
Improvement of road by HBB from H/O Moghol - H/O Mohir road from ch: 00m-280m [Road ID- 149065047]
|
|
|
|
|
7.30
|
M/s. Aroshi Construction, Nageswari, Kurigram
|
7.26
|
|
18/07/2016
|
17/09/2017
|
100
|
|
|
22/01/2019
|
|
|
135
|
Kurigram
|
56
|
kurigram-s
|
409
|
674
|
Kuri-Bhurung-Cit-VR-10/15-16
|
Improvement of road by HBB from H/O Siddik - Kader road from ch: 00m-540m [Road ID- 149065046]
|
|
|
|
|
12.48
|
M/s. Aroshi Construction, Nageswari, Kurigram
|
12.45
|
|
18/07/2016
|
17/09/2017
|
100
|
|
|
22/01/2019
|
|
|
136
|
Kurigram
|
56
|
kurigram-s
|
409
|
674
|
Kuri-Bhurung-Cit-VR-09/15-16
|
Improvement of road by HBB from H/O Jahangir - H/O Abdus Sattar via H/O Amir road from ch: 00m-480m [Road ID- 149065045]
|
|
|
|
|
11.70
|
M/s. Aroshi Construction, Nageswari, Kurigram
|
11.75
|
|
18/07/2016
|
17/09/2017
|
100
|
|
|
22/01/2019
|
|
|
137
|
Kurigram
|
56
|
kurigram-s
|
409
|
674
|
Kuri-Bhurung-Cit-VR-08/15-16
|
Improvement of road by HBB from H/O Anower Hossain - H/O Alam road from ch: 00m-586m [Road ID- 149065044]
|
|
|
|
|
14.80
|
M/s. Aroshi Construction, Nageswari, Kurigram
|
14.50
|
|
18/07/2016
|
17/09/2017
|
100
|
|
|
22/01/2019
|
|
|
138
|
Kurigram
|
56
|
kurigram-s
|
409
|
674
|
Kuri-Bhurung-Cit-VR-07/15-16
|
Improvement of road by HBB from Humaun more - H/O Lavlu road from ch: 00m-660m [Road ID- 149065043]
|
|
|
|
|
18.54
|
M/s. Aroshi Construction, Nageswari, Kurigram
|
18.00
|
|
18/07/2016
|
17/09/2017
|
100
|
|
|
22/01/2019
|
|
|
139
|
Kurigram
|
56
|
kurigram-s
|
409
|
674
|
Kuri-Bhurung-Cit-VR-06/15-16
|
Improvement of road by HBB from H/O Momin ( Pucca road) - H/O Reajul Master road from ch: 00m-420m [Road ID- 149065042]
|
|
|
|
|
10.42
|
M/s. Aroshi Construction, Nageswari, Kurigram
|
10.19
|
|
18/07/2016
|
17/09/2017
|
100
|
|
|
22/01/2019
|
|
|
140
|
Kurigram
|
56
|
kurigram-s
|
409
|
674
|
Kuri-Bhrung-Cit-UNR-02/15-16
|
Improvement of Paglar hat - Pathordubi UP road via Bashjani road from ch: 5170m-6670m [Road ID- 149063001]
|
|
|
|
|
79.15
|
Md. Alah Baks, Khalilgonj, Kurigram
|
71.23
|
|
18/07/2016
|
17/09/2017
|
100
|
|
|
22/01/2019
|
|
|
141
|
Kurigram
|
56
|
kurigram-s
|
409
|
674
|
Kuri-Ful-Cit-Shasan-02/16-17
|
Construction of Shasan Ghat on the Nil Kumor river near H/O Protap Vice-Chairman at Dashirchara Chitmahal [Fulbari]
|
|
|
|
|
9.77
|
M/S Khairul Enterprise,Khalilgonj,kurigram
|
8.80
|
|
24/10/2017
|
26/04/2018
|
100
|
|
|
22/01/2019
|
|
|
142
|
Kurigram
|
56
|
kurigram-s
|
409
|
674
|
Kuri-Ful-Cit-Shasan-01/16-17
|
Construction of Shasan Ghat on the Nil Kumor river near H/O Mohanando in Soto Kamat at Dashirchara Chitmahal [Fulbari]
|
|
|
|
|
9.77
|
M/S Khairul Enterprise,Khalilgonj,kurigram
|
8.80
|
|
24/10/2017
|
26/04/2018
|
100
|
|
|
22/01/2019
|
|
|
143
|
Kurigram
|
56
|
kurigram-s
|
409
|
674
|
Kuri-Ful-Cit-Mondir-01/16-17
|
Kalir Hat Kali Mondir at Dashirchara Chitmahal
|
|
|
|
|
17.87
|
Md. Mahmud Alam Liton, Fulbari, Dinajpur
|
20.78
|
|
24/07/2017
|
23/01/2018
|
100
|
|
|
22/01/2019
|
|
|
144
|
Kurigram
|
56
|
kurigram-s
|
409
|
674
|
Kuri-Ful-Cit-Mosq-05/16-17
|
Construction of Kamalpur Jame Mosque at Dashirchara Chitmahal [Fulbari]
|
|
|
|
|
18.01
|
Md. Ayub Ali, Nageswari, Kurigram.
|
16.21
|
|
29/03/2017
|
26/12/2017
|
100
|
|
|
22/01/2019
|
|
|
145
|
Kurigram
|
56
|
kurigram-s
|
409
|
674
|
Kuri-Ful-Cit-Mosq-04/16-17
|
Construction of Chairman Tari Jame Mosque at Dashirchara Chitmahal [Fulbari]
|
|
|
|
|
18.01
|
Md. Ayub Ali, Nageswari, Kurigram.
|
16.21
|
|
29/03/2017
|
26/12/2017
|
100
|
|
|
22/01/2019
|
|
|
146
|
Kurigram
|
56
|
kurigram-s
|
409
|
674
|
Kuri-Ful-Cit-Mosq-03/16-17
|
Construction of Samonnay Para Jame Mosque at Dashirchara Chitmahal [Fulbari]
|
|
|
|
|
18.01
|
M/s. Fahim Traders, R.K Road, Kurigram.
|
16.21
|
|
29/03/2017
|
26/12/2017
|
100
|
|
|
22/01/2019
|
|
|
147
|
Kurigram
|
56
|
kurigram-s
|
409
|
674
|
Kuri-Ful-Cit-Mosq-02/16-17
|
Construction of Soto Kamat Jame Mosque at Dashirchara Chitmahal [Fulbari]
|
|
|
|
|
18.01
|
M/s. Fahim Traders, R.K Road, Kurigram.
|
16.21
|
|
29/03/2017
|
26/12/2017
|
100
|
|
|
22/01/2019
|
|
|
148
|
Kurigram
|
56
|
kurigram-s
|
409
|
674
|
Kuri-Ful-Cit-Mosq-01/16-17
|
Construction of Kalir Hat Jame Mosque at Dashirchara Chitmahal [Fulbari]
|
|
|
|
|
18.01
|
Md. Ruhul Amin, Kanthalbari, Kurigram.
|
16.21
|
|
29/03/2017
|
26/12/2017
|
100
|
|
|
22/01/2019
|
|
|
149
|
Kurigram
|
56
|
kurigram-s
|
409
|
674
|
Kuri-Ful-Cit-VR-05/15-16
|
(i) Ajowatari mouza at H/O Tale Pagla - Rash mala Via Joynal Hajil house road from ch: 0-1760m; (ii) Const. of 3 nos 0.600mx0.625m U-drain on Ajowatari mouza at H/O Tale Pagla - Rash mala Via Joynal Hajil house road at ch: 350m, 1063m & 1500m; (iii) Const. of 2x3.00mx3.00m RCC box culvert on Ajowatari mouza at H/O Tale Pagla - Rash mala Via Joynal Hajil house road at ch: 5m [Road ID- 149185049]
|
|
7.80
|
|
|
119.13
|
M/s. Mahabubar Rahman, Goshpara, Kurigram.
|
105.86
|
|
07/06/2016
|
15/06/2017
|
100
|
|
|
22/01/2019
|
|
|
150
|
Kurigram
|
56
|
kurigram-s
|
409
|
674
|
Kuri-Ful-Cit-VR-04/15-16
|
(i) Rash mala - Mokter Dhonee house via Nagdho Pacca road near h/o Noren Mistriy road from ch: 0-1450m; (ii) Const. of 2 nos 0.600mx0.625m U-drain on Rash mala - Mokter Dhonee house via Nagdho Pacca road near h/o Noren Mistriy road at ch: 1110m & 1300m [Road ID- 149185048]
|
|
1.20
|
|
|
100.55
|
M/s. Saju Hardware, Khalilgonj, Kurigram.
|
88.48
|
|
07/06/2016
|
15/06/2017
|
100
|
|
|
22/01/2019
|
|
|
151
|
Kurigram
|
56
|
kurigram-s
|
409
|
674
|
Kuri-Ful-Cit-VR-03/15-16
|
(i) Indererpar - Boder hat Shimul tola Bazar (Dashiar Chara Chit Mahal) road from ch: 0-3503m; (ii) Const. of 5 nos 0.600mx0.625m U-drain on Indererpar - Boder hat Shimul tola Bazar (Dashiar Chara Chit Mahal) road at ch: 71m, 123m, 400m, 500m, & 974m; (iii) Const. of 3.00mx3.00m RCC box culvert on Indererpar - Boder hat Shimul tola Bazar (Dashiar Chara Chit Mahal) road at ch: 2125m [Road ID- 149185047]
|
|
6.00
|
|
|
236.84
|
JV M/s. Basundhara & M/s. Khairul Enterprise, R K Road, Kurigram
|
199.21
|
|
07/06/2016
|
15/12/2017
|
100
|
|
|
22/01/2019
|
|
|
152
|
Kurigram
|
56
|
kurigram-s
|
409
|
674
|
Kuri-Ful-Cit-VR-02/15-16
|
(i) Kosalertol - Shimulertola via Mostsfa house road from ch: 0-1483m; (ii) Const. of 2 nos 2.00mx2.00m RCC box culvert on Kosalertol - Shimulertola via Mostsfa house road at ch: 122m & 296m; (iii) Const. of 2x3.00mx3.00m RCC box culvert on Kosalertol - Shimulertola via Mostsfa house road at ch: 630m (iv) Const. of 4 nos 0.600mx0.625m U-drain on Kosalertol - Shimulertola via Mostsfa house road at ch: 440m, 588m, 1155m & 1379m; [Road ID- 149185046]
|
|
12.40
|
|
|
125.92
|
M/s. Hamid Traders, Dadamore, Kurigram.
|
107.84
|
|
07/06/2016
|
15/06/2017
|
100
|
|
|
22/01/2019
|
|
|
153
|
Kurigram
|
56
|
kurigram-s
|
409
|
674
|
Kuri-Ful-Cit-VR-01/15-16
|
(i) Ajizal Bridge near Poschimpara - Amtola via Moddhapara Kamalpur Mosque road from ch: 0-4342m; (ii) Const. of 14 nos 0.600mx0.625m U-drain on Ajizal Bridge near Poschimpara - Amtola via Moddhapara Kamalpur Mosque road road at ch: 230m, 575m, 645m, 950m, 1226m, 1370m, 1490m, 1550m, 1600m, 2350m, 2460m, 3280m & 4200m; (iii) Const. of 2.00mx2.00m RCC box culvert on Ajizal Bridge near Poschimpara - Amtola via Moddhapara Kamalpur Mosque road at ch: 670m; (iv) Const. of 3.00mx2.50m RCC box culvert on Ajizal Bridge near Poschimpara - Amtola via Moddhapara Kamalpur Mosque road at ch: 2910m; (v) Const. of 2x4.50mx3.00m RCC box culvert on Ajizal Bridge near Poschimpara - Amtola via Moddhapara Kamalpur Mosque road at ch: 00m [Road ID- 149185045]
|
|
22.40
|
|
|
295.05
|
M/s. Zahurul Haque Dulal, Goshpara, Kurigram.
|
277.21
|
|
07/06/2016
|
15/06/2017
|
100
|
|
|
22/01/2019
|
|
|
154
|
Kurigram
|
56
|
kurigram-s
|
409
|
674
|
Kuri-Ful-Cit-UNR-01/15-16
|
(i) Kalirhat - Nawdanga Pularper via Botertol end at R&H (Dashiar Chara Chit Mahal) road from ch: 0-3825m; (ii) Const. of 10 nos 0.600mx0.625m U-drain on Kalirhat - Nawdanga Pularper via Botertol end at R&H (Dashiar Chara Chit Mahal) road at ch: 1560m, 1764m, 2065, 2196m, 2310m, 2560m, 3105m, 3186m, 3396m & 3290m; (iii) Const. of 2x3.00mx3.00m RCC box culvert on Kalirhat - Nawdanga Pularper via Botertol end at R&H (Dashiar Chara Chit Mahal) road at ch: 2600m [Road ID- 149183015]
|
|
12.00
|
|
|
255.59
|
M/s. Zahurul Haque Dulal, Goshpara, Kurigram.
|
255.59
|
|
07/06/2016
|
15/06/2017
|
100
|
|
|
22/01/2019
|
|
|
155
|
Kurigram
|
56
|
kurigram-s
|
409
|
674
|
Kuri-Ful-Cit-UZR-01/15-16
|
(i) Khoribari GC ( Nagdoho )- Gongerhat R & H Road Via Kalirhat (Dashiar Chara Chit Mahal) road from ch: 0-6300m; (ii) Const. of 11 nos 0.600mx0.625m U-drain on Khoribari GC ( Nagdoho)- Gongerhat R & H Road Via Kalirhat (Dashiar Chara Chit Mahal) road at ch: 748m, 1122m, 1336m, 1510m, 1670m, 2458m, 2690m, 3045m, 3280m, 3342m & 5245m; (iii) Const. of 2x3.00mx3.00m RCC box culvert on Khoribari GC ( Nagdoho )- Gongerhat R & H Road Via Kalirhat (Dashiar Chara Chit Mahal) road at ch: 2015m [Road ID- 149182007]
|
|
12.60
|
|
|
435.42
|
M/s. Belal Construction, Khalilgonj, Kurigram.
|
378.81
|
|
07/06/2016
|
15/06/2017
|
100
|
|
|
22/01/2019
|
|
|
156
|
Kurigram
|
56
|
rajibpur
|
406
|
674
|
Kuri-Rajibpur-Cit-Ghat & Shed-03/15-16
|
Construction of Rajibpur Ghat & Passenger Shed.
|
|
|
|
|
3.99
|
M/s. Shamim Enterprise, Old Registri office para, Kurigram
|
3.07
|
|
18/07/2016
|
17/09/2017
|
100
|
|
|
19/01/2019
|
|
|
157
|
Kurigram
|
56
|
rowmari
|
437
|
674
|
Kuri-Row-Cit-UNR-02/16-17
|
Improvement of Rowmari-Baliamari GC road via Chuliarchar road (Rowmari portion) (Ch. 7694-8025m) [Road ID: 149792001] [Rowmari]
|
|
0.33
|
|
|
39.57
|
M/s. Shamim Enterprise, Old Registri office para, Kurigram
|
41.42
|
|
28/09/2017
|
26/04/2018
|
70
|
|
|
10/03/2019
|
|
|
158
|
Kurigram
|
56
|
rowmari
|
437
|
674
|
Kuri-Row-Cit-Bridge-01/16-17
|
Construction of 66.00m long RCC girder bridge Kartimari GC - Boraibari BGP Camp road via Bawairgram at ch. 4760m [Road ID: 149703012] [Rowmari]
|
|
66.00
|
|
|
251.92
|
M/S Shondi Traders, Belkuchi, Sirajgonj.
|
229.58
|
|
21/08/2017
|
30/06/2018
|
80
|
|
|
09/04/2019
|
|
|
159
|
Kurigram
|
56
|
rowmari
|
437
|
674
|
Kuri-Row-Cit-UNR-01/16-17
|
Improvement of Kartimari GC-Boraibari BOP Camp via Bawairgram (Ch. 3875-7500m) [Road ID: 149793012] [Rowmari]
|
|
3.63
|
|
|
242.84
|
M/S Khairul Kabir Rana, Gupta para, Rangpur
|
253.79
|
|
23/11/2017
|
30/07/2018
|
45
|
|
|
19/01/2019
|
|
|
160
|
Kurigram
|
56
|
rowmari
|
437
|
674
|
Kuri-Rowmari-Cit-Ghat & Shed-02/15-16
|
Construction of Roofing Faluarchar Ghat & Passenger Shed under Bondaber Union.[Rowmari]
|
|
|
|
|
3.39
|
M/s. Shamim Enterprise, Old Registri office para, Kurigram
|
2.62
|
|
18/07/2016
|
17/09/2017
|
100
|
|
|
19/01/2019
|
|
|
161
|
Lalmonirhat
|
54
|
aditmari
|
393
|
674
|
Lal-Pat-Cit-VR-21/17-18
|
Improvement of Bituminous Carpeting Road on Patgram - Boura GCCR at Ch.00-1935m, H/O Ajgor to H/O Abdul Member via H/O Monoroangan (ii)Construction of 3Nos 1x2.00x1.50 RCC Box Culvert on Patgram-Boura GCCR at Ch.250m H/O Ajgor to H/O Abdul Member via H/O Monoroangan at Ch.900,1091,& 1380m (iii) Construction of 2Nos 1x1.00x1.00 RCC Box Culvert on Patgram-Boura GCCR at Ch.250m H/O Ajgor to H/O Abdul Member via H/O Monoroangan at Ch.1610 &1773m Upazila-Patgram Dist.-Lalmonirhat.
|
|
5.00
|
|
|
159.06
|
Md. Ashraful Alom Mondol,Fulbari,Kurigram.
|
151.10
|
|
|
30/06/2019
|
0
|
|
|
22/01/2019
|
|
|
162
|
Lalmonirhat
|
54
|
aditmari
|
393
|
674
|
Lal-Hati-Cit-VR-17/17-18
|
Improvement of Uttor Gotamari Eid-gah math-Blupto Chhitmohol Community Centre Road ch.00m-1000m Under Upazila-Hatibandha Dist.-Lalmonirhat.
|
|
|
|
|
61.89
|
H.S Enterprise ,Middle Goddimari, Milon bazar , Hatibandha.Lalmonirhat
|
58.80
|
|
|
31/12/2018
|
35
|
|
|
22/01/2019
|
|
|
163
|
Lalmonirhat
|
54
|
aditmari
|
393
|
674
|
Lal-Pat-Cit-VR-16/16-17
|
a) Improvement of road from Awliarhat GC to 17 No. Chit. Hasem bari via Veluar bari Road at ch. 00-2675m. (b) Construction of 1 no. 1x2.00mx1.50m RCC Box Culvert on the same road at ch. 595m. (c) Construction of 1 no. 3x4.50mx3.00 RCC Box Culvert on the same road at ch. 2320m. (d) Construction of 2 nos. 1x1.50mx1.00 RCC Box Culvert on the same road at ch. 2439m & 2516m under Patgram Upazila Dist-Lalmonirhat. Road ID No.152704091
|
|
18.50
|
|
|
216.60
|
M/S. Kohinoor Enterprise Dadpur Lodge, Kawnia 1st Lane, Barisal
|
194.94
|
|
|
15/10/2018
|
50
|
|
|
22/01/2019
|
|
|
164
|
Lalmonirhat
|
54
|
aditmari
|
393
|
674
|
Lal-Pat-Cit-VR-10/16-17
|
a) Improvement of road from Kochuar bazar Kodur Bazar to Chinakata road at ch. 00-2430m. (b) Construction of 4 nos. 1x1.50mx1.00m RCC Box Culvert on same road at ch. 850m 1310m 1515m & 2250m under Patgram Upazila Dist-Lalmonirhat Road ID No. 152704090.
|
|
6.00
|
|
|
151.38
|
Md. Hasibul Hasan Robertsonganj, Alamnagar , Rangpur
|
147.30
|
|
|
20/06/2018
|
35
|
|
|
22/01/2019
|
|
|
165
|
Lalmonirhat
|
54
|
aditmari
|
393
|
674
|
Lal-Hati-Cit-VR-18/17-18
|
Improvement of Chitmohol Amtola to Gendukuri Hat Road ch.00m-2235m Under Upazila-Hatibandha Dist.-Lalmonirhat.
|
|
|
|
|
152.94
|
MD. SAMSUL HAQUE Mirzar Court,Patgram, Lalmonirhat
|
145.29
|
|
30/07/2018
|
31/12/2018
|
35
|
|
|
22/01/2019
|
|
|
166
|
Lalmonirhat
|
54
|
aditmari
|
393
|
674
|
Lal-Pat-Cit-VR-20/17-18
|
(i)Improvement of Patgram - Awilarhat GCCR at (Ramdoiler Kamat) to 21 no. Panishala Chitmohol via H/O Shofiar to Dangapara Road from Ch.00-1035m (ii)Construction of 1Nos 1x2.00x1.50 RCC Box Culvert on Same Road at ch. 608m Under Upazila-Patgram Dist.-Lalmonirhat.
|
|
2.00
|
|
|
70.60
|
MD. GOLAM RABBANI PRODHAN Rasulgong, Patgram, Lalmonirhat
|
67.07
|
|
16/07/2018
|
31/12/2018
|
0
|
|
|
22/01/2019
|
|
|
167
|
Lalmonirhat
|
54
|
aditmari
|
393
|
674
|
Lal-Pat-Cit-VR-19/17-18
|
Improvement of obrotulla house more -Lolitarhat high school via 4nos Balakhangir chhitmohol Road from at Ch.00-1925m (ii)Construction of 2Nos 1x2.00x1.50 RCC Box Culvert on Same Road at Ch.347m & 745m (iii))Construction of 2Nos 1x0.625x0.600x7.00m U- Drain on Same Road at ch.650m & 1705m Under Upazila-Patgram Dist.-Lalmonirhat.
|
|
5.25
|
|
|
138.49
|
Md.Alomgir Hossain Hatibandha , Lalmonirhat
|
131.57
|
|
|
31/12/2018
|
25
|
|
|
22/01/2019
|
|
|
168
|
Lalmonirhat
|
54
|
aditmari
|
393
|
674
|
Lal-sadar-Cit-VR-23/17-18
|
Improvement of Dharlla River Ghat - Fulbari Upazila H/Q via Boshpochai Cit Mohal Road Ch.00-3200m. Upazila-Sadar Dist.-Lalmonirhat.
|
|
|
|
|
241.69
|
Md. Ashraful Alam Robertsongonj Rangpur.
|
229.61
|
|
30/09/2018
|
30/06/2019
|
0
|
|
|
22/01/2019
|
|
|
169
|
Lalmonirhat
|
54
|
aditmari
|
393
|
674
|
Lal-Pat-Cit-UNR-22/17-18
|
Improvement of HBB Road on Patgram-Boura GCCR at Ghospara Bazar-Jongra UP at Ch.1550-1840m. Upazila-Patgram Dist.-Lalmonirhat.
|
|
|
|
|
55.74
|
M/S Shohage Enterprise Patgram,Lalmonirhat.
|
52.95
|
|
|
30/06/2019
|
0
|
|
|
22/01/2019
|
|
|
170
|
Lalmonirhat
|
54
|
hatibandha
|
392
|
674
|
Lal-Hati-Cit-VR-18/17-18
|
Improvement of Chitmohol Amtola to Gendukuri Hat Road ch.00m-2235m Under Upazila-Hatibandha Dist.-Lalmonirhat.
|
|
2.24
|
|
|
152.94
|
MD. SAMSUL HAQUE Mirzar Court,Patgram, Lalmonirhat
|
145.29
|
|
|
31/12/2018
|
70
|
|
|
10/03/2019
|
|
|
171
|
Lalmonirhat
|
54
|
lalmonirhat-s
|
390
|
674
|
Lal-sadar-Cit-VR-23/17-18
|
Improvement of Dharlla River Ghat - Fulbari Upazila H/Q via Boshpochai Cit Mohal Road Ch.00-3200m. Upazila-Sadar Dist.-Lalmonirhat.
|
|
3.20
|
|
|
241.69
|
Md. Ashraful Alam Robertsongonj Rangpur.
|
229.61
|
|
|
30/06/2019
|
20
|
|
|
10/03/2019
|
|
|
172
|
Lalmonirhat
|
54
|
patgram
|
389
|
674
|
Lal-Pat-Cit-VR-20/17-18
|
(i)Improvement of Patgram - Awilarhat GCCR at (Ramdoiler Kamat) to 21 no. Panishala Chitmohol via H/O Shofiar to Dangapara Road from Ch.00-1035m (ii)Construction of 1Nos 1x2.00x1.50 RCC Box Culvert on Same Road at ch. 608m Under Upazila-Patgram Dist.-Lalmonirhat.
|
|
0.97
|
|
|
70.60
|
MD. GOLAM RABBANI PRODHAN Rasulgong, Patgram, Lalmonirhat
|
67.07
|
|
|
31/12/2018
|
20
|
|
|
10/03/2019
|
|