1
|
Habiganj
|
63
|
azmiriganj
|
472
|
782
|
SDIRIIP/Habi/S(OTR)/W-001
|
Improvement of a) Kakailchew Bazar-Union Parishod Road by RCC Ch.00-900m & b) Construction of 1No. 1x2.50x2.50m Drainage Culvert on the Same road at Ch. 535m.
|
|
0.90
|
0.00
|
0.00
|
81.41
|
M/S Email Enterprise 01756580100
|
73.27
|
01/01/1900
|
03/06/2018
|
07/02/2020
|
100
|
73.14
|
100
|
13/08/2020
|
|
|
2
|
Habiganj
|
63
|
azmiriganj
|
472
|
782
|
SDIRIIP/Habi/S(OTR)/W-002
|
Improvement of a) Jalsukha Bazar-Azmirigonj Via Patulipara Road by RCC Ch.1000-3500m & b) Construction of 5Nos 0.60x0.60m U-Draine Culvert & 1No. 1x2.50x2.50m Drinage Culvert on the Same road at Ch. 535m.
|
|
2.50
|
0.00
|
0.00
|
210.34
|
M/S Bhawal Construction 01711002347
|
189.30
|
01/01/1900
|
03/06/2018
|
30/12/2019
|
100
|
154.13
|
100
|
13/08/2020
|
|
|
3
|
Habiganj
|
63
|
azmiriganj
|
472
|
782
|
SDIRIIP/Habi/S(OTR)/W-009
|
Improvement of a) Madhabpasa School-Malihati Via Sharifuddin Road by RCC Ch.00-1000m b) Construction of 3Nos 0.60x0.60m U-Draine culvert & c) Const. of 200m. Protection Works on the Same road.
|
|
1.00
|
0.00
|
0.00
|
93.92
|
M/S Priti & Razsree Traders 0171111040
|
89.22
|
01/01/1900
|
21/10/2018
|
07/01/2020
|
0
|
0.00
|
0
|
13/08/2020
|
|
|
4
|
Habiganj
|
63
|
azmiriganj
|
472
|
782
|
SDIRIIP/Habi/S(OTR)/W-010
|
Improvement of a) Azmirigonj-Paharpur GCC (Katakhali) Kayagopi Ferryghat Road by RCC Ch.00-2000m b) Construction of 5Nos 0.60x0.60m U-Draine Culvert on the Same road.
|
|
2.00
|
0.00
|
0.00
|
162.19
|
M/S Sumon Enterprise 07126-181767
|
154.08
|
01/01/1900
|
21/10/2018
|
03/01/2020
|
100
|
140.12
|
100
|
13/08/2020
|
|
|
5
|
Habiganj
|
63
|
bahubal
|
480
|
782
|
SDIRIIP/Habi/UNR/W-003
|
Improvemet Snanghat UP Office-Bagdair Bazar Road. (Ch.500-4500)
|
|
4.00
|
0.00
|
0.00
|
238.31
|
Md. Rahmat Ali 01711455042
|
226.38
|
01/01/1900
|
02/04/2018
|
09/04/2019
|
100
|
226.37
|
100
|
13/08/2020
|
|
|
6
|
Habiganj
|
63
|
bahubal
|
480
|
782
|
SDIRIIP/Habi/UNR/W-004
|
Improvement of Mirpur UP-Satiajuri Bazar Road.(Ch.2500-3100)
|
|
0.60
|
0.00
|
0.00
|
37.35
|
Md. Mizanur Rahman Samim 01712303414
|
33.62
|
01/01/1900
|
27/03/2018
|
21/10/2018
|
100
|
30.22
|
100
|
13/08/2020
|
|
|
7
|
Habiganj
|
63
|
bahubal
|
480
|
782
|
SDIRIIP/Habi/VR/W-009
|
a) Improvement of Lamatasi-Baturbary-Mirpur oad Ch.00-1170m. & b) Construction of 5Nos. 0.625x0.600m U-Drain Culvert on the Same Road. a) Improvement of Bahubal bazar-Faizabad Via Tilabary (Baogaon) Road Ch.1000-3290m. & b) Construction of 7Nos. 0.625x0.
|
|
3.46
|
0.00
|
0.00
|
76.04
|
Md. Mizanur Rahman Samim 01715397541
|
219.29
|
01/01/1900
|
11/11/2018
|
17/11/2019
|
100
|
217.09
|
100
|
13/08/2020
|
|
|
8
|
Habiganj
|
63
|
bahubal
|
480
|
782
|
SDIRIIP/Habi/VR/W-010
|
Improvement Of a) Hosanpur-Nidanpur road. (Ch.00-1600m) b) Construction of 1No. 1x2.00x2.00m Ch. 923m, 1No. 1x1.00x1.00m Ch. 1250 & 1No. 0.625x0.600m Ch. 100 Drainage Culvert c) Const. of 111m Protection work on the Same Improvement Of a) Kamaichara-Faiza
|
|
4.40
|
0.00
|
0.00
|
112.46
|
Md. Mizanur Rahman Samim 01711966921
|
274.39
|
01/01/1900
|
11/11/2018
|
26/01/2020
|
100
|
253.53
|
0
|
13/08/2020
|
|
|
9
|
Habiganj
|
63
|
bahubal
|
480
|
782
|
SDIRIIP/Habi/VR/W-011
|
Improvement Of a) Baraiury-Nandanpur bazar road. (Ch2500-5300m) b) Construction of 1No. 1x2.00x2.00m Ch. 4270m, 2Nos. 1x1.00x1.00m Ch. 4111m, 4801m & 1No. 1x1.50x1.50m Ch. 5178m & 8Nos. 0.625x0.600m Drainage Culvert c) Const. of 95m Protection work on th
|
|
3.80
|
0.00
|
0.00
|
266.00
|
Md. Golam faruk 01711-446278
|
248.71
|
01/01/1900
|
11/11/2018
|
17/11/2019
|
100
|
248.34
|
100
|
13/08/2020
|
|
|
10
|
Habiganj
|
63
|
baniachong
|
458
|
782
|
SDIRIIP/Habi/S(OTR)/W-006
|
Improvement of a) Habigonj-Sujatpur-Agua road Via North Ikram Eidgah Road by RCC Ch.00-2000m b) Construction of 5Nos 0.60x0.60m U-Draine & c) Const. of 150m. Protection Works on the Same road.
|
|
2.00
|
0.00
|
0.00
|
169.86
|
M/S Sohan Traders 01714-627552
|
161.36
|
01/01/1900
|
23/09/2018
|
28/09/2019
|
100
|
157.35
|
0
|
13/08/2020
|
|
|
11
|
Habiganj
|
63
|
baniachong
|
458
|
782
|
SDIRIIP/Habi/UNR/W-009
|
Improvement of a) Ratna Bazar-Muradpur UP Road.(Ch.1120-3120m) by Earth & b) BC Work Ch. 1120-3120m. C) Const. of 2Nos. 1x2.50x2.50m. Drainage Culvert on the Same Road.
|
|
2.00
|
0.00
|
0.00
|
166.25
|
Md. Tipu Ahmed 01712-075924
|
157.94
|
01/01/1900
|
23/09/2018
|
30/05/2020
|
70
|
67.78
|
0
|
13/08/2020
|
|
|
12
|
Habiganj
|
63
|
baniachong
|
458
|
782
|
SDIRIIP/Habi/VR/W-013
|
Improvement Of a) Chungirvanga-Ratna river Via Vobaranipur road. (Ch00-1742m) by BC b) Construction of 3Nos. 0.600x0.600m Ch. 1150m, 1360m & 1655m U-Drain c) Const. of 65m Protection work on the Same Road. Improvement Of a) Rayer School-Basiapara Madrasa
|
|
|
0.00
|
0.00
|
161.35
|
M/S Bisal Construction 01711-240998
|
153.28
|
01/01/1900
|
13/08/2018
|
30/11/2019
|
100
|
153.23
|
100
|
13/08/2020
|
|
|
13
|
Habiganj
|
63
|
baniachong
|
458
|
782
|
SDIRIIP/Habi/UZR/W-003
|
Improvemet of a) Habigonj-Nabigonj R&H Via Gunai Barueury-Katiarbon Sluice Gate Road. (Ch.8035-11390m) by Earth work b) BC road & c) Construction of 3Nos 1x1.50x1.50 Drainage Culvert on the Same road
|
|
3.36
|
0.00
|
0.00
|
342.05
|
MRS-AKC (JV) 01711240998
|
341.95
|
01/01/1900
|
11/11/2018
|
28/01/2020
|
45
|
55.03
|
0
|
13/08/2020
|
|
|
14
|
Habiganj
|
63
|
chunarughat
|
479
|
782
|
SDIRIIP/Habi/UNR/W-001
|
Deurgach UP (Chunaru ghat Rail Station)-Amrote Bazar (Rail Station) Road.(Ch.1750-3080)
|
|
1.33
|
0.00
|
0.00
|
86.06
|
M/S Bhawal Construction 01711002347
|
77.45
|
01/01/1900
|
19/03/2018
|
28/02/2020
|
72
|
48.44
|
0
|
13/08/2020
|
|
|
15
|
Habiganj
|
63
|
chunarughat
|
479
|
782
|
SDIRIIP/Habi/UNR/W-005
|
Imp. Of Gatabala bazar-Mirashi UP (Nalmuk bazar) Via Bularjum bazar Road.(Ch.3684-4410m) & Const. of a) 3Nos 1x1.00x1.00 m, b) 1 no 1x2.00x2.00m c) 2Nos 0.60x0.60m Drainag Culvert & Const. of 58.00m Protection Work on the Same road.
|
|
0.73
|
0.00
|
0.00
|
60.53
|
M/S Bhawal Construction 01711002347
|
54.47
|
01/01/1900
|
19/03/2018
|
28/02/2020
|
40
|
10.04
|
0
|
13/08/2020
|
|
|
16
|
Habiganj
|
63
|
chunarughat
|
479
|
782
|
SDIRIIP/Habi/UNR/W-010
|
Improvement of a) Gazipur UP Office (Asampara bazar)-Jarulia bazar Via Osmanpur Road. (Ch.500-2060m) by BC & b) Construction of 6Nos 1x1.00x1.00m Drainage Culvert Ch. 360m, 145m, 1550m, 1686m, 1870m, 1925m C) Const. of 100m. Protection work on the Same Ro
|
|
1.56
|
0.00
|
0.00
|
114.10
|
M/S W S Construction 01711-267981
|
108.40
|
01/01/1900
|
16/10/2019
|
16/10/2019
|
100
|
101.55
|
100
|
13/08/2020
|
|
|
17
|
Habiganj
|
63
|
chunarughat
|
479
|
782
|
SDIRIIP/Habi/VR/W-001
|
Improvement of Raki Wapda Embantment-Shahid Chunnu Bazar Via Kakush Link to Kotbar Ferrighat Road.(Ch.1400-2160m)
|
|
0.76
|
0.00
|
0.00
|
59.79
|
M/S Bhawal Construction 01711002347
|
53.81
|
01/01/1900
|
19/03/2018
|
06/01/2020
|
100
|
53.62
|
100
|
13/08/2020
|
|
|
18
|
Habiganj
|
63
|
chunarughat
|
479
|
782
|
SDIRIIP/Habi/VR/W-014
|
Improvement Of a) Khoai Embankment (Parazar)-Muchikandi FWC road. (Ch 00-1000m) by BC b) Construction of 1No. 1x1.00x1.00m Ch. 519m, 1 No. 1x2.00x2.00m Ch. 670mDrainage Culvert c) Const. of 62m Protection work on the Same Road. Improvement Of a)Pakuria G
|
|
2.71
|
0.00
|
0.00
|
72.48
|
M/S Jahid Enterprise 01712716399
|
176.99
|
01/01/1900
|
23/09/2018
|
28/09/2019
|
100
|
176.88
|
100
|
13/08/2020
|
|
|
19
|
Habiganj
|
63
|
habiganj-s
|
478
|
782
|
SDIRIIP/Habi/VR/W-004
|
a) Improvement of Boiragi khal Bridge South Side-Anandapur West Side Road Ch.00-1500m b) Construction of 7Nos 600mm Dia Pipe Culvert. 1No. 1x2.5x2.5 Ch. 215m & 1No.1x2.00x2.00m Ch. 1438m Drainage Culvert on the Same Road.
|
|
1.50
|
0.00
|
0.00
|
107.12
|
Md. Abdur Rouf 01711-147969
|
101.76
|
01/01/1900
|
01/07/2018
|
08/07/2019
|
100
|
101.35
|
100
|
13/08/2020
|
|
|
20
|
Habiganj
|
63
|
habiganj-s
|
478
|
782
|
SDIRIIP/Habi/VR/W-005
|
Improvement of Poddarbary (DR)-Gopalgonj Bazar Via Dighalbag Road at Ch. 3540-4660m
|
|
1.12
|
0.00
|
0.00
|
68.43
|
Md. Rokibul Islam 01712-100182
|
65.00
|
01/01/1900
|
01/07/2018
|
08/07/2019
|
100
|
65.00
|
100
|
13/08/2020
|
|
|
21
|
Habiganj
|
63
|
habiganj-s
|
478
|
782
|
SDIRIIP/Habi/VR/W-006
|
a) Improvement of Bissa Road-Ladia Via Morra Kazirgaon Road Ch.1575-2870m b) Construction of 3Nos .900x1.00m Ch. 1680, 1770, 2855m U-Drain Culvert & C) Construction of 146m Protection work on the Same Road.
|
|
1.30
|
0.00
|
0.00
|
91.70
|
Md. Mostafa Ali 01714-913205
|
87.12
|
01/01/1900
|
01/07/2018
|
08/07/2019
|
100
|
86.71
|
100
|
13/08/2020
|
|
|
22
|
Habiganj
|
63
|
habiganj-s
|
478
|
782
|
SDIRIIP/Habi/UNR/W-008
|
Improvement of a) Shajibazar Sadurbazar-Nurpur UP-Kasabpur Bazar Road.(Ch.1050-2030m) & b) Const. of 167m Protection Work on the Same Road.
|
|
0.98
|
0.00
|
0.00
|
71.12
|
Sayed Rokonuzzaman 01711-267981
|
67.57
|
01/01/1900
|
01/07/2018
|
08/07/2019
|
100
|
66.21
|
100
|
13/08/2020
|
|
|
23
|
Habiganj
|
63
|
habiganj-s
|
478
|
782
|
SDIRIIP/Habi/UZR/W-004
|
Improvemet of a) Lakhai R&H-Rajiura Via Huigaon Road. Ch.4000-6000m by BC b) Construction of 3Nos 600mm Dia Pipe Culvert, 2Nos 1x2.00x2.00, 1 no. 1x3.00x3.00 Drinage Culvert & c) Construction of 40m Protection work on the Same road
|
|
2.00
|
0.00
|
0.00
|
181.24
|
M/S Chowdhury Enterprise 01711125674
|
172.17
|
01/01/1900
|
21/10/2018
|
26/10/2019
|
100
|
172.16
|
100
|
13/08/2020
|
|
|
24
|
Habiganj
|
63
|
lakhai
|
477
|
782
|
SDIRIIP/Habi/S(OTR)/W-003
|
Improvement of Lakhai Bazar-Shibpur bazar Road by RCC Ch.00-1054m & 4005-4700m b) Construction of 2Nos 1x1.00x1.00m Drainage Culvert on the Same road.
|
|
1.05
|
0.00
|
0.00
|
131.03
|
M/S M L Plaza 01742288111
|
124.91
|
01/01/1900
|
23/09/2018
|
28/09/2019
|
100
|
124.89
|
100
|
13/08/2020
|
|
|
25
|
Habiganj
|
63
|
lakhai
|
477
|
782
|
SDIRIIP/Habi/S(OTR)/W-004
|
Improvement of a) Katihara-Kasimpur Road by RCC Ch.00-2500m b) Construction of 3Nos 0.625x0.600m U-Draine Culvert & c) Const. of 70m. Protection Works on the Same road.
|
|
2.50
|
0.00
|
0.00
|
197.05
|
M/S M R Traders 01712-453232
|
187.20
|
01/01/1900
|
23/09/2018
|
28/09/2019
|
100
|
196.39
|
0
|
13/08/2020
|
|
|
26
|
Habiganj
|
63
|
lakhai
|
477
|
782
|
SDIRIIP/Habi/S(OTR)/W-005
|
Improvement of a) Fulbaria RHD (Fulbaria Madrasa)-Fulbaria RHD Fulbaria GPS Road by RCC Ch.00-1800m b) Construction of 1No 1x2.50x2.50m Drainage Culvert & c) Const. of 162m. Protection Works on the Same road.
|
|
1.80
|
0.00
|
0.00
|
149.95
|
Md. Imdadur Rahman Mukul 01715-045171
|
142.45
|
01/01/1900
|
23/09/2018
|
28/09/2019
|
100
|
119.98
|
100
|
13/08/2020
|
|
|
27
|
Habiganj
|
63
|
lakhai
|
477
|
782
|
SDIRIIP/Habi/S(UZR)/W-001
|
Improvemet Serpur Highway Polish Fari-Parkul Somit Bibiana Power Com. -Inathgonj Road. (Ch.3000-4400 & 4600-6000m)
|
|
4.00
|
0.00
|
0.00
|
175.97
|
Md. Shafiulla 01712-100182
|
167.17
|
01/01/1900
|
06/05/2018
|
28/01/2020
|
65
|
154.13
|
0
|
13/08/2020
|
|
|
28
|
Habiganj
|
63
|
madhabpur
|
476
|
782
|
SDIRIIP/Habi/VR/W-002
|
Improvement of Montola-Karim Shah ® Mazar Road.(Ch.00-1000m)
|
|
1.00
|
0.00
|
0.00
|
65.03
|
M/S Bhawal Construction 01711002347
|
58.53
|
01/01/1900
|
19/03/2018
|
26/03/2019
|
70
|
38.91
|
0
|
13/08/2020
|
|
|
29
|
Habiganj
|
63
|
madhabpur
|
476
|
782
|
SDIRIIP/Habi/VR/W-007
|
a) Improvement of Kasimnagar-Kali Bazar Road Ch.300-2300m b) Construction of 9Nos .0.625x0.600m Drainage Culvert & C) Construction of 100m Protection work on the Same Road.
|
|
2.00
|
0.00
|
0.00
|
142.62
|
Bulbul Ahmed 01717533059
|
135.48
|
01/01/1900
|
31/07/2018
|
30/01/2020
|
100
|
89.00
|
0
|
13/08/2020
|
|
|
30
|
Habiganj
|
63
|
madhabpur
|
476
|
782
|
SDIRIIP/Habi/UZR/W-005
|
Improvemet of a) Maulana Asad Ali (Andiura R&H-Bulla Satian bazar) Road. Ch.5800-7800m by Earth work b) BC work & c) Construction of 40m Protection work on the Same road
|
|
2.00
|
0.00
|
0.00
|
193.58
|
M/S Badal Enterprise 01717940410
|
183.90
|
01/01/1900
|
12/11/2018
|
05/01/2020
|
100
|
179.03
|
100
|
13/08/2020
|
|
|
31
|
Habiganj
|
63
|
madhabpur
|
476
|
782
|
SDIRIIP/Habi/UNR/W-002
|
Improvement of Chowmohoni-Kamalnagar-Anandabazar Barajala BOP Road.(Ch.2800-4415m)
|
|
1.62
|
0.00
|
0.00
|
109.17
|
M/S Bhawal Construction 01711002347
|
98.26
|
01/01/1900
|
06/05/2018
|
15/04/2020
|
35
|
44.38
|
100
|
13/08/2020
|
|
|
32
|
Habiganj
|
63
|
nabiganj
|
475
|
782
|
SDIRIIP/Habi/UZR/W-001
|
Improvemet Serpur Highway Polish Fari-Parkul Somit Bibiana Power Com. -Inathgonj Road. (Ch.3000-4400 & 4600-6000m)
|
|
4.00
|
0.00
|
0.00
|
175.97
|
Md. Shafiulla 01712-100182
|
167.17
|
01/01/1900
|
06/05/2018
|
12/05/2019
|
100
|
167.13
|
100
|
13/08/2020
|
|
|
33
|
Habiganj
|
63
|
nabiganj
|
475
|
782
|
SDIRIIP/Habi/UZR/W-002
|
Improvemet of Sayedpur-Gorari Bazar Road. (Ch.1600-2210m) & 2Nos 0.625x0.600m U-Drain Culvert on the Same road
|
|
0.61
|
0.00
|
0.00
|
50.36
|
Md. Jamal Miah 01711-233420
|
47.84
|
01/01/1900
|
06/05/2018
|
12/05/2019
|
100
|
47.83
|
100
|
13/08/2020
|
|
|
34
|
Habiganj
|
63
|
nabiganj
|
475
|
782
|
SDIRIIP/Habi/UNR/W-006
|
Improvement of Model Bazar-Katari Road. (Ch.1000-2500m)
|
|
1.50
|
0.00
|
0.00
|
95.98
|
M/S Fazal & Brothers 01711966921
|
91.18
|
01/01/1900
|
06/05/2018
|
12/05/2019
|
100
|
91.18
|
100
|
13/08/2020
|
|
|
35
|
Habiganj
|
63
|
nabiganj
|
475
|
782
|
SDIRIIP/Habi/UNR/W-007
|
Improvement of Sayedpur Inathgonj-Kamargaon Bazar Via Durgapur bazar Road.(Ch.2700-4350m)
|
|
1.65
|
0.00
|
0.00
|
103.14
|
M/S S A Soykat 01729650814
|
97.98
|
01/01/1900
|
06/05/2018
|
23/07/2019
|
100
|
97.95
|
100
|
13/08/2020
|
|
|
36
|
Habiganj
|
63
|
nabiganj
|
475
|
782
|
SDIRIIP/Habi/VR/W-003
|
Imp. Of Inathgonj-Kasba Lanch ghat Lipigonj Bazar Road.(Ch.750-1850m)
|
|
1.10
|
0.00
|
0.00
|
71.46
|
Mostak Ahmed Milu 01711588021
|
67.69
|
01/01/1900
|
06/05/2018
|
23/07/2019
|
100
|
66.64
|
100
|
13/08/2020
|
|
|
37
|
Habiganj
|
63
|
nabiganj
|
475
|
782
|
SDIRIIP/Habi/VR/W-008
|
a) Improvement of Boiragi khal Bridge South Side-Anandapur West Side Road Ch.00-1500m b) Construction of 7Nos 600mm Dia Pipe Culvert. 1No. 1x2.5x2.5 Ch. 215m & 1No.1x2.00x2.00m Ch. 1438m Drainage Culvert on the Same Road.
|
|
1.50
|
0.00
|
0.00
|
107.12
|
Md. Abdur Rouf 01711-147969
|
101.76
|
01/01/1900
|
01/07/2018
|
25/08/2019
|
100
|
184.00
|
100
|
13/08/2020
|
|
|
38
|
Moulvibazar
|
62
|
barlekha
|
482
|
782
|
SDIRIIP/Moul/UNR/W-015
|
Improvement of Barni Up office to Edgah Bazar (Goalta Bazar) via Amedpur-Mododpur Road from Ch. 9200m - 11200m).
|
|
2.00
|
0.00
|
0.00
|
0.00
|
Saleh Ahmed Brahman Gram Barlekha, Moulvibazar.
|
125.88
|
01/01/1900
|
20/08/2018
|
30/12/2019
|
100
|
122.34
|
0
|
13/08/2020
|
|
|
39
|
Moulvibazar
|
62
|
barlekha
|
482
|
782
|
SDIRIIP/Moul/VR/W-004
|
(a)Improvement of RHD Eidgha bazar- Nijbahadurpur UP office road to Adampur road via Roshagram Road Ch.1700m-2480m and Protection work at chainage 55.00m on the same road (b) 658144004- Improvement of Kathaltoli Madhabkunda Road -Gandhai bazar via BOC Dem
|
|
0.78
|
0.00
|
0.00
|
0.00
|
Saleh Ahmed Brahman Gram Barlekha, Moulvibazar.
|
164.09
|
01/01/1900
|
20/08/2018
|
05/11/2019
|
100
|
162.97
|
100
|
13/08/2020
|
|
|
40
|
Moulvibazar
|
62
|
juri
|
481
|
782
|
SDIRIIP/Moul/UNR/W-016
|
Improvement of Bhabaniganj Bazar - Purbojuri UPC - Durgapur Bazar Road (Ch. 6250-8600m) and construction of palisading work on the same road from Ch. 60.00m.
|
|
2.35
|
0.00
|
0.00
|
0.00
|
Al Amin Traders Roghunandanpur Court Road Moulvibazar. 01717533006
|
144.92
|
01/01/1900
|
18/07/2018
|
08/08/2019
|
100
|
135.88
|
0
|
13/08/2020
|
|
|
41
|
Moulvibazar
|
62
|
juri
|
481
|
782
|
SDIRIIP/Moul/UNR/W-017
|
Improvemento of Ratna Bazar-Joychandi UPC (Kulaura) Road (Ch. 00-2500m).
|
|
2.50
|
0.00
|
0.00
|
0.00
|
Md. Mustafijur Rahman Laskarpur Kulaura, Moulvibazar. 01711303460
|
150.97
|
01/01/1900
|
28/06/2018
|
03/07/2019
|
100
|
150.80
|
0
|
13/08/2020
|
|
|
42
|
Moulvibazar
|
62
|
juri
|
481
|
782
|
SDIRIIP/Moul/UNR/W-018
|
Improvement of Maniksingh Bazar - Jaifarnagar UPC Road (Ch. 950-2880m) construction of palisading work on the same road from Ch. 50.00m.
|
|
1.93
|
0.00
|
0.00
|
0.00
|
Al Amin Traders Roghunandanpur Court Road Moulvibazar. 01717533006
|
115.44
|
01/01/1900
|
10/07/2018
|
30/12/2019
|
100
|
71.00
|
0
|
13/08/2020
|
|
|
43
|
Moulvibazar
|
62
|
juri
|
481
|
782
|
SDIRIIP/Moul/UNR/W-019
|
Improvement of Fultola UPC - Razkee Bazar Road (Ch. 4000 - 6000m).
|
|
2.00
|
0.00
|
0.00
|
0.00
|
M/S Rushmoth Alam, Bhababigonj Bazar, Juri Moulvibazar. 01713817687
|
122.03
|
01/01/1900
|
24/06/2018
|
22/11/2019
|
100
|
121.94
|
0
|
13/08/2020
|
|
|
44
|
Moulvibazar
|
62
|
juri
|
481
|
782
|
SDIRIIP/Moul/VR/W-005
|
Improvement of Ratna Bazar -Shomai Bazar via Jalalpur Road (Ch. 2310-4000m).
|
|
1.69
|
0.00
|
0.00
|
0.00
|
Md. Mustafijur Rahman Laskarpur Kulaura, Moulvibazar. 01711303460
|
100.20
|
01/01/1900
|
28/06/2018
|
03/07/2019
|
100
|
99.27
|
100
|
13/08/2020
|
|
|
45
|
Moulvibazar
|
62
|
juri
|
481
|
782
|
SDIRIIP/Moul/VR/W-006
|
(a) Improvement of Fultala RHD-Champaklata Road (Ch. 1000-1500m) (b) - Improvement of Fultala Basti-Lalmati Road (Ch.1670-2170m) (C) Improvement of Juri latitila Road to Kuchai T. E. shilua Road (Ch. 00-1000m).
|
|
2.00
|
0.00
|
0.00
|
126.74
|
Al Amin Traders Roghunandanpur Court Road Moulvibazar. 01717533006
|
120.41
|
01/01/1900
|
10/07/2018
|
30/12/2019
|
100
|
120.21
|
100
|
13/08/2020
|
|
|
46
|
Moulvibazar
|
62
|
kamalganj
|
449
|
782
|
SDIRIIP/Moul/UZR/W-005
|
(a) Improvement of Shamshernagar -Badesunapur Road from (Ch. 3200m-3390m) 658562009 (b) Improvemento of Munshibazar GC--Shamshernagar RHD-via Rameswarpur Road from (Ch. 4510m-5135m).
|
|
0.19
|
0.00
|
0.00
|
0.00
|
M/S Ismam Builders, Prop : Imtiaz Ahmed, Siddesworpur, Munshibazar, Kamalgonj. 01711910406
|
61.16
|
01/01/1900
|
18/06/2018
|
14/05/2019
|
100
|
61.12
|
0
|
13/08/2020
|
|
|
47
|
Moulvibazar
|
62
|
kamalganj
|
449
|
782
|
SDIRIIP/Moul/UZR/W-006
|
Improvement of Madhabpur-Paddmachara Road from (Ch. 2200m-4113m) including Construction of 02 No. 1x2.50mx2.50m Drainage Culvert at Ch. 3052m and 3717m & 60m Protection works on the same Road.
|
|
1.91
|
0.00
|
0.00
|
0.00
|
M/S Adil Enterprise, Kamalgonj, Moulvibazar. Mobile No. 01712353183 ( Sundar Member)
|
158.44
|
01/01/1900
|
09/09/2018
|
14/09/2019
|
100
|
143.45
|
0
|
13/08/2020
|
|
|
48
|
Moulvibazar
|
62
|
kamalganj
|
449
|
782
|
SDIRIIP/Moul/VR/W-007
|
Improvement of Adhkani-Purba Jalalpur Road (Ch. 00-1500m) Including construction of 01 No. 1x2.50x2.50m Drainage culvert at Ch. 1310m on the same road. Salvage Cost Tk. 5,92,704.00
|
|
1.50
|
0.00
|
0.00
|
0.00
|
Sky Enterprise, Kamalgonj, Moulvibazar.
|
98.09
|
01/01/1900
|
15/07/2018
|
30/06/2019
|
100
|
98.05
|
0
|
13/08/2020
|
|
|
49
|
Moulvibazar
|
62
|
kulaura
|
448
|
782
|
SDIRIIP/Moul/UZR/W-003
|
Improvement of Fulartol GC -Munshibazar GC Road from Ch. 600m-3225m including construction of 3 Nos 1x1.50mx1.95m RCC Drainage Culvert at Ch. 650m 700m 1550m & 4 Nos 0.600mx1.35m RCC Drainage Culvert at Ch. 1225m 1700m 2450m 2850m and 1no. 1x4.50mx4.50m R
|
|
2.63
|
0.00
|
0.00
|
0.00
|
Khandakar Lutfur Rahman, Sadekpur, Kulaura, Moulvibazar. 01715095078
|
265.92
|
01/01/1900
|
15/04/2018
|
29/06/2019
|
100
|
214.71
|
0
|
13/08/2020
|
|
|
50
|
Moulvibazar
|
62
|
kulaura
|
448
|
782
|
SDIRIIP/Moul/UZR/W-004
|
Improvement of Fulartol GC -Munshibazar GC Road from Ch. 3225m-5850m including construction of 2 Nos 1x4.50mx4.50m RCC Drainage Culvert at Ch. 3520 4100m & 2Nos 1x4.00mx4.00m RCC Drainage Culvert at Ch. 4270 4350m 1no. 1x4.50mx3.50m at Ch. 4850m 2nos 1.50
|
|
2.63
|
0.00
|
0.00
|
0.00
|
M/S Ismam Builders, Prop : Imtiaz Ahmed, Siddesworpur, Munshibazar, Kamalgonj. 01711910406
|
61.16
|
01/01/1900
|
18/06/2018
|
12/03/2019
|
100
|
245.26
|
0
|
13/08/2020
|
|
|
51
|
Moulvibazar
|
62
|
kulaura
|
448
|
782
|
SDIRIIP/Moul/UNR/W-004
|
Improvement of Kulaura-Marinabazar-Noabagicha-Joychandi UP Office via Pachpir Jalai Road from Ch. 4060m-6060m
|
|
2.00
|
0.00
|
0.00
|
0.00
|
Md. Jamal Uddin Noagaon, Kajaldhara, Kulaura, Moulvibazar. 01717896044
|
124.23
|
01/01/1900
|
06/06/2018
|
27/05/2020
|
100
|
124.21
|
100
|
13/08/2020
|
|
|
52
|
Moulvibazar
|
62
|
kulaura
|
448
|
782
|
SDIRIIP/Moul/UNR/W-005
|
Improvement of Muracherra -Gazipur road via Karamodha UP office Road from Ch. 8247m-10035m including construction of 2nos 1x1.50mx1.50m Drainage Culvert at Ch. 8552m & 8617m 03 nos 0.600mx1.20m Drainage Culvert at Ch. 9127m 9197m 9247m 1no.1x 3.50m x3.50m
|
|
1.79
|
0.00
|
0.00
|
0.00
|
M/S S.H Enterprise Station Road Boromchal, Kulaura, Moulvibazar. 01717-468050
|
126.06
|
01/01/1900
|
03/06/2018
|
30/01/2020
|
100
|
126.05
|
0
|
13/08/2020
|
|
|
53
|
Moulvibazar
|
62
|
moulvibazar-s
|
453
|
782
|
SDIRIIP/Moul/UNR/W-011
|
Improvement of Sarkarbazar-Monumukh UP Office Road from Ch. 00m-545m and 725m - 1928m & Including construction 06 nos 0.625x0.600m Drain Culvert at Chainage 12m, 95m, 516m, 1440m, 1691m and 1862m and Protective work at Chainage 130m.
|
|
0.55
|
0.00
|
0.00
|
0.00
|
M/S M. Alam Sreemangal Road Moulvibazar 01720183346
|
113.26
|
01/01/1900
|
30/05/2018
|
30/06/2019
|
100
|
113.25
|
100
|
13/08/2020
|
|
|
54
|
Moulvibazar
|
62
|
moulvibazar-s
|
453
|
782
|
SDIRIIP/Moul/UNR/W-013
|
Improvement of Nazirabad UP office-Naraynpasha Bazar Road from Ch. 00m-2000m & Including Construction 05 nos 0.625x0.600m Drainage Culvert at Chainage 165m, 450m, 754m, 1252m and 1900m and 3nos 1.00mx0.900m Drainage Culvert at Chainage 112m, 535m , 700m a
|
|
2.00
|
0.00
|
0.00
|
140.49
|
M/S M. Alam Sreemangal Road Moulvibazar. 01720-183346 01718114792
|
133.46
|
01/01/1900
|
30/05/2018
|
04/06/2019
|
100
|
133.45
|
0
|
13/08/2020
|
|
|
55
|
Moulvibazar
|
62
|
moulvibazar-s
|
453
|
782
|
SDIRIIP/Moul/UNR/W-014
|
Improvement of Satbak-Shamshergonj Road from Ch. 1000m-3031m & Including Construction 04 nos 1.00x0.900m Drainage Culvert at Chainage 1445m, 1877m, 2360m, 2770m and 04nos 0.625mx0.600m RCC Drainage Culvert at Chainage 183m, 1577m, 1655m & 2395m on the sam
|
|
2.03
|
0.00
|
0.00
|
136.93
|
M/S M. Alam Sreemangal Road Moulvibazar. 01720-183346 01718114792
|
130.09
|
01/01/1900
|
30/05/2018
|
02/03/2019
|
100
|
130.08
|
0
|
13/08/2020
|
|
|
56
|
Moulvibazar
|
62
|
moulvibazar-s
|
453
|
782
|
SDIRIIP/Moul/UNR/W-025
|
(a) Improvement of Nazirabad UP office- arayanpasha Bazar Road by BC from Ch. 2000m-4126m & 4156m-4350m including construction of 11nos 0.625m x 0.600m U-drain Culvert in Different chainage and 1no. 1x3.00mx2.50m Drainage Culvert at Ch. 3077m on the same
|
|
2.13
|
0.00
|
0.00
|
0.00
|
Khandakar Kamal Hossain Sadekpur, Kulaura, Moulvibazar. 01715095078
|
177.13
|
01/01/1900
|
24/10/2018
|
09/12/2019
|
100
|
170.21
|
0
|
13/08/2020
|
|
|
57
|
Moulvibazar
|
62
|
moulvibazar-s
|
453
|
782
|
SDIRIIP/Moul/VR/W-003
|
Improvement of RHD-Daudpur Via Fatehpur-Mobarakpur-Nadampur Road from Ch.2308m-4565m.
|
|
2.26
|
0.00
|
0.00
|
0.00
|
M/S Mujib Enterprise Hasanpur Kadamhata Rajnagar, Moulvibazar 01711276532
|
146.12
|
01/01/1900
|
29/05/2018
|
01/03/2019
|
100
|
146.11
|
0
|
13/08/2020
|
|
|
58
|
Moulvibazar
|
62
|
moulvibazar-s
|
453
|
782
|
SDIRIIP/Moul/VR/W-009
|
(a) Improvement of Kamalpur-Maizbaranti Eidgah via Radhanagar Road by BC from Ch. 1440m-2650m including construction of 3nos 0.90mx1.00m U-Drain Culvert at Ch. 2005m 2182m & 2375m and 2 Nos 1x3.00x2.50m Drainage Culvert at Ch 1555m & 2357 with 118m Pro
|
|
1.21
|
0.00
|
0.00
|
0.00
|
M/S Popular Enterprise Purbasha R/A, Sreemangal, Moulvibazar.
|
156.00
|
01/01/1900
|
07/10/2018
|
31/12/2019
|
88
|
123.15
|
0
|
13/08/2020
|
|
|
59
|
Moulvibazar
|
62
|
moulvibazar-s
|
453
|
782
|
SDIRIIP/Moul/VR/W-010
|
(a) Improvement of Giashnagar bazar-Anilceli Road by BC from Ch. 975m-2475m including 364m Protection works on the same road Road Code 658744109 (b) Improvement of Ekatuna-Uluail-Shompasi Road by BC from Ch. 3700m-4200m including construction of 1no.
|
|
1.50
|
0.00
|
0.00
|
0.00
|
M/S M. Alam Sreemangal Road, Moulvibazar
|
136.44
|
01/01/1900
|
07/10/2018
|
23/12/2019
|
100
|
111.70
|
0
|
13/08/2020
|
|
|
60
|
Moulvibazar
|
62
|
rajnagar
|
456
|
782
|
SDIRIIP/Moul/VR/W-002
|
Improvement of WDB Embankment-Prem Nagar Pry.School conecting Road from Ch. 1000m-3000m.
|
|
2.00
|
0.00
|
0.00
|
0.00
|
Sahajan Enterprise T.B Hospital Rd. Moulvibazar. 01711168561
|
135.96
|
01/01/1900
|
15/04/2018
|
15/03/2019
|
100
|
135.93
|
0
|
13/08/2020
|
|
|
61
|
Moulvibazar
|
62
|
rajnagar
|
456
|
782
|
SDIRIIP/Moul/VR/W-011
|
Improvement of Mukambazar-Pashimberkuri Road by BC from Ch. 00m-1500m including cnstruction of 2nos 0.90m x 1.00m U-drain Culvert at ch. 297m & 1203m on the same road Upazila Rajnagar
|
|
1.50
|
0.00
|
0.00
|
0.00
|
Khandakar Kamal Hossain Sadekpur, Kulaura, Moulvibazar. 01715095078
|
95.15
|
01/01/1900
|
18/10/2018
|
23/10/2019
|
100
|
94.03
|
0
|
13/08/2020
|
|
|
62
|
Moulvibazar
|
62
|
rajnagar
|
456
|
782
|
SDIRIIP/Moul/VR/W-012
|
Improvement of Rajnagar Balagonj Bishair dukan- Masunadi Road by BC from Ch. 1000m-3500m including construction of 4nos 0.90m x 1.00m U-drain Culvert at ch. 1305m 1480m 1598m & 1978m on with 100m Protection Road the same road Upazila Rajnagar
|
|
2.50
|
0.00
|
0.00
|
0.00
|
M/S Jumki Enterprise, Goyghar, Rajnagar Moulvibazar.
|
157.67
|
01/01/1900
|
25/10/2018
|
15/12/2019
|
100
|
124.00
|
0
|
13/08/2020
|
|
|
63
|
Moulvibazar
|
62
|
rajnagar
|
456
|
782
|
SDIRIIP/Moul/UZR/W-001
|
Improvement of Lwayuni-Munshibazar Road from Ch. 4500m-6000m including Construction of 6nos 0.900mx1.00m Drainage Culvert at Ch. 4840m 4993m 5198m 5238m 5375m 5980m on the same Road
|
|
1.50
|
0.00
|
0.00
|
0.00
|
Md. Fazlur Rahman, Paschim Barhat Moulvibazar. 01712-636446 01712636446
|
121.83
|
01/01/1900
|
30/05/2018
|
30/06/2019
|
100
|
108.00
|
0
|
13/08/2020
|
|
|
64
|
Moulvibazar
|
62
|
rajnagar
|
456
|
782
|
SDIRIIP/Moul/UZR/W-002
|
Improvement of Munshibazar-Fulartol Road from Ch. 1000m-3000m.
|
|
2.00
|
0.00
|
0.00
|
0.00
|
M/S Hassan Enterprise, Station Road, Shamshernagar Kamalgonj, Moulvibazar. 01712964414
|
159.49
|
01/01/1900
|
02/04/2018
|
27/02/2019
|
100
|
159.27
|
100
|
13/08/2020
|
|
|
65
|
Moulvibazar
|
62
|
sreemangal
|
474
|
782
|
SDIRIIP/Moul/M/W-004
|
Rehabilitation of Layarkul RHD to Satgaon GC via Madhabpasha GPS Road at (Ch. 00-1530m).
|
658832010
|
1.53
|
|
|
55.25
|
M/S S. K. Enterprise,
|
52.49
|
21/01/2019
|
|
10/06/2019
|
100
|
52.46
|
100
|
13/08/2020
|
|
|
66
|
Moulvibazar
|
62
|
sreemangal
|
474
|
782
|
SDIRIIP/Moul/UNR/W-008
|
Improvement of Kalapur UP RHD office to Baruna Bazar Via Monargaon GPS Road from Ch. 4000m-4550m Salvage Cost Tk. 344131.00
|
|
0.50
|
0.00
|
0.00
|
0.00
|
M/S. S. M Construction Purbasha R/A Sreemangal, Moulvibazar. 01711342196
|
31.09
|
01/01/1900
|
10/04/2018
|
14/10/2018
|
100
|
31.08
|
100
|
13/08/2020
|
|
|
67
|
Moulvibazar
|
62
|
sreemangal
|
474
|
782
|
SDIRIIP/Moul/UNR/W-009
|
Improvement of Sreemangal GC Radanagar to Mohazerabad Bazar Via Vishamani Bazar Road from Ch. 4857m-6500m.
|
|
1.64
|
0.00
|
0.00
|
0.00
|
M/S. S. M Construction Purbasha R/A Sreemangal, Moulvibazar. 01711342196
|
88.61
|
01/01/1900
|
10/04/2018
|
14/10/2018
|
100
|
59.18
|
0
|
13/08/2020
|
|
|
68
|
Moulvibazar
|
62
|
sreemangal
|
474
|
782
|
SDIRIIP/Moul/UNR/W-010
|
Improvement of Uttarsur Shahgibazar to Fatki-Laharpur Via Ashidron UP office Road from Ch. 3000m-3840m Salvage Cost Tk. 17297.00
|
|
0.84
|
0.00
|
0.00
|
0.00
|
M/S. S. M Construction Purbasha R/A Sreemangal, Moulvibazar. 01711342196
|
48.29
|
01/01/1900
|
10/04/2018
|
14/10/2018
|
100
|
52.46
|
100
|
13/08/2020
|
|
|
69
|
Moulvibazar
|
62
|
sreemangal
|
474
|
782
|
SDIRIIP/Moul/UNR/W-012
|
Improvement of RHD-Ashidroune UP office-Kalighat Bazar Road from Ch. 00m-1950m & Including construction 05 nos 0.900x0.900m Drain Culvert at Chainage 55m, 587m, 723m, 914m and 1028m.
|
|
1.95
|
0.00
|
0.00
|
0.00
|
M/S Priti Enterprise Niloy-61, Natunpara Sunamgonj. 01711467691
|
139.55
|
01/01/1900
|
26/06/2018
|
29/03/2019
|
100
|
122.00
|
0
|
13/08/2020
|
|
|
70
|
Moulvibazar
|
62
|
sreemangal
|
474
|
782
|
SDIRIIP/Moul/UNR/W-020
|
Improvement of Khejuri Charra GC - Nerala Punji Via Horincharra Road (Ch. 4000-6000m) Including construction of 03 Nos 1x2.00x2.00m Drainage culvert at Ch. 4516m, 2034m, 5685m and 07Nos 1x1.00x1.00m Drain culvert at Ch. 4154m, 4276m, 4315m, 5791m, 5858m,
|
|
2.00
|
0.00
|
0.00
|
0.00
|
M/S Rashed Enterprise, Sreemongal, Moulvibazar. 01712718535
|
147.74
|
01/01/1900
|
19/07/2018
|
24/07/2019
|
100
|
147.66
|
100
|
13/08/2020
|
|
|
71
|
Moulvibazar
|
62
|
sreemangal
|
474
|
782
|
SDIRIIP/Moul/UNR/W-021
|
Improvement of Satgaon bazar (Bhunabir UP office) -Huglia Bazar (Gazipur) Road (Ch. 3350-5925m) Including construction of 02 Nos 1x3.00x2.50m Drainage culvert at Ch. 4569m & 4891m on the same road.
|
|
2.58
|
0.00
|
0.00
|
0.00
|
M/S Rashed Enterprise, Sreemongal, Moulvibazar. 01712718535
|
170.27
|
01/01/1900
|
19/07/2018
|
24/07/2019
|
100
|
170.23
|
100
|
13/08/2020
|
|
|
72
|
Moulvibazar
|
62
|
sreemangal
|
474
|
782
|
SDIRIIP/Moul/UNR/W-022
|
Improvement of Satgaon UP (Lachna)- Mirzapur UP Via Makricharra Bazar Road (Ch. 4500-6500m) Including construction of 05 Nos 1x1.00x1.00m Drainage culvert at Ch. 4915m, 4986m, 5208m, 5703m & 5900m on the same road.
|
|
2.00
|
0.00
|
0.00
|
0.00
|
M/S Rashed Enterprise, Sreemongal, Moulvibazar. 01712718535
|
127.75
|
01/01/1900
|
19/07/2018
|
24/07/2019
|
100
|
127.73
|
100
|
13/08/2020
|
|
|
73
|
Moulvibazar
|
62
|
sreemangal
|
474
|
782
|
SDIRIIP/Moul/UNR/W-023
|
Improvement of Rajghat UP office - Biddabil Bazar Road (Ch. 1000-3000m) Including construction of 02 Nos 1x2.00x2.00m Drainage culvert at Ch. 388m & 889m and Including construction of 01no. 1x1.00x1.00m Drainage culvert at Ch. 1618m on the same road.
|
|
2.00
|
0.00
|
0.00
|
0.00
|
M/S Rakib Enterprise, Sreemongal, Moulvibazar.
|
128.47
|
01/01/1900
|
19/07/2018
|
16/06/2019
|
100
|
128.27
|
100
|
13/08/2020
|
|
|
74
|
Sunamganj
|
64
|
biswamvarpur
|
464
|
782
|
SDIRIIP/Sun/S(OTR)/W-023
|
Improvement of Palash UP-Baccurbari Mujib bazar-Kapna Kashipur Bazarroad by RCC at Ch.5450-6200m.
|
|
0.75
|
0.00
|
0.00
|
54.46
|
Atiqur Rahman 01712521355
|
48.93
|
01/01/1900
|
30/08/2018
|
31/08/2019
|
100
|
40.74
|
100
|
13/08/2020
|
|
|
75
|
Sunamganj
|
64
|
chatak
|
473
|
782
|
SDIRIIP/Sun/S(OTR)/W-006
|
Improvement of Buraya RHD bazar-pirpur bazar road by RCC ch.2800-3991m under Chhatak Sunamganj
|
|
1.19
|
0.00
|
0.00
|
84.44
|
Akbor Ali 01716122058
|
92.02
|
01/01/1900
|
27/08/2018
|
31/08/2019
|
100
|
91.94
|
100
|
13/08/2020
|
|
|
76
|
Sunamganj
|
64
|
chatak
|
473
|
782
|
SDIRIIP/Sun/S(OTR)/W-007
|
Improvement of Dharon bazar-Amertal via Rukka bazar road by RCC at ch.2680-3680m
|
|
1.00
|
0.00
|
0.00
|
72.68
|
Lucky Enterprise 01712148142
|
78.85
|
01/01/1900
|
19/08/2018
|
31/08/2019
|
100
|
78.52
|
100
|
13/08/2020
|
|
|
77
|
Sunamganj
|
64
|
chatak
|
473
|
782
|
SDIRIIP/Sun/S(OTR)/W-013
|
Improvement of Jalia-Gonipur road by RCC at ch.00-1000m
|
|
1.00
|
0.00
|
0.00
|
72.42
|
Bismillah Snaks & Con. 01712231884
|
68.80
|
01/01/1900
|
19/07/2018
|
31/07/2019
|
5
|
0.00
|
0
|
13/08/2020
|
|
|
78
|
Sunamganj
|
64
|
chatak
|
473
|
782
|
SDIRIIP/Sun/S(OTR)/W-014
|
Improvement of Kalipur UZR-Binondopur road by RCC at ch.2500-3500m
|
|
1.00
|
0.00
|
0.00
|
71.21
|
Bismillah Snaks & Con. 01712231884
|
67.65
|
01/01/1900
|
19/07/2018
|
31/07/2019
|
10
|
0.00
|
0
|
13/08/2020
|
|
|
79
|
Sunamganj
|
64
|
chatak
|
473
|
782
|
SDIRIIP/Sun/S(OTR)/W-015
|
Improvement of Tatiachar bazar-Charbaruka road by RCC at ch.00-1400m
|
|
1.40
|
0.00
|
0.00
|
101.36
|
Shakil Enterprise 01714486427
|
96.30
|
01/01/1900
|
12/07/2018
|
31/07/2018
|
100
|
96.05
|
100
|
13/08/2020
|
|
|
80
|
Sunamganj
|
64
|
chatak
|
473
|
782
|
SDIRIIP/Sun/S(OTR)/W-017
|
a) Improvement of Jamura-Islampur Road at ch.0-1200m b) Construction of 01 no 1x4.50mx4.50m drainage culvert at ch.140m on the same road c) Protective work length 150m on the same road a) Improvement of Madrasa bazar-Rahmatpur Road at ch.0-855m b) Constr
|
|
2.06
|
0.00
|
0.00
|
206.36
|
Israth Builders 01747908891
|
193.96
|
01/01/1900
|
09/09/2018
|
31/01/2019
|
45
|
30.37
|
0
|
13/08/2020
|
|
|
81
|
Sunamganj
|
64
|
chatak
|
473
|
782
|
SDIRIIP/Sun/S(OTR)/W-018
|
Improvement of Gonespur-Madrasa bazar-Moulivigoan Rahmatpur-Jamura Gonespur-Niamotpur at ch.00-1450m
|
|
1.45
|
0.00
|
0.00
|
108.04
|
Milon Kanti Dey 01712020736
|
102.64
|
01/01/1900
|
20/08/2018
|
31/08/2019
|
100
|
102.42
|
100
|
13/08/2020
|
|
|
82
|
Sunamganj
|
64
|
chatak
|
473
|
782
|
SDIRIIP/Sun/UNR/W-005
|
Improvement of Kalaruka UP-Tazpur RHD road at ch.6600-7880m
|
|
1.28
|
0.00
|
0.00
|
80.14
|
Shipa Enterprise 01718173249
|
76.13
|
01/01/1900
|
02/08/2018
|
31/07/2019
|
65
|
33.89
|
0
|
13/08/2020
|
|
|
83
|
Sunamganj
|
64
|
derai
|
483
|
782
|
SDIRIIP/Sun/S(OTR)/W-020
|
Improvement of Razanagar-Banglabazar road at ch.3130-6720m Constuction of 05 no U-Drain culvert on the same road
|
|
3.59
|
0.00
|
0.00
|
295.51
|
Nurul Islam 01713812992
|
323.58
|
01/01/1900
|
20/10/2018
|
30/09/2019
|
100
|
210.51
|
0
|
13/08/2020
|
|
|
84
|
Sunamganj
|
64
|
derai
|
483
|
782
|
SDIRIIP/Sun/S(OTR)/W-026
|
(a) Improvement of Parua - Alongjuri-Kanpur road at ch.500-1500m (b) Construction of 02 nos .625x.600 m drainage Culvert at ch.880m1150m on the same road
|
|
1.00
|
0.00
|
0.00
|
84.41
|
Atiqur Rahman 01712521355
|
90.27
|
01/01/1900
|
30/09/2018
|
31/08/2019
|
28
|
13.00
|
0
|
13/08/2020
|
|
|
85
|
Sunamganj
|
64
|
derai
|
483
|
782
|
SDIRIIP/Sun/S(OTR)/W-027
|
(a) Improvement of Nagodi bazar-Hossainpur road at ch.500-1550m under Derai Sunamganj (b) Construction of 02 nos .625x.600 m drainage Culvert at ch.850m1170m on the same road
|
|
1.05
|
0.00
|
0.00
|
88.49
|
Atiqur Rahman 01712521355
|
94.64
|
01/01/1900
|
30/09/2018
|
31/08/2019
|
20
|
19.00
|
0
|
13/08/2020
|
|
|
86
|
Sunamganj
|
64
|
doarabazar
|
470
|
782
|
SDIRIIP/Sun/VR/W-005
|
Improvement of Badarpur-Basontopur road at ch.2000-3300m
|
|
1.30
|
0.00
|
0.00
|
78.30
|
Milon Kanti Dey 01712020736
|
80.04
|
01/01/1900
|
17/05/2018
|
30/03/2019
|
100
|
80.04
|
100
|
13/08/2020
|
|
|
87
|
Sunamganj
|
64
|
doarabazar
|
470
|
782
|
SDIRIIP/Sun/S(UZR)/W-002
|
Improvement of Dowarabazar GCM-R&HAmbaribazar via Boglabazar-Horinapati Adarbazar roadDowarabazar part by RCC from ch.22600-24500m
|
|
1.90
|
0.00
|
0.00
|
173.75
|
S.D Enterprise 01714753580
|
165.07
|
01/01/1900
|
05/07/2018
|
31/05/2019
|
100
|
165.07
|
100
|
13/08/2020
|
|
|
88
|
Sunamganj
|
64
|
doarabazar
|
470
|
782
|
SDIRIIP/Sun/S(OTR)/W-010
|
Improvement of Dhulposhi-Kamargaon road by RCC from ch.500-770m &1280-2010m
|
|
0.73
|
0.00
|
0.00
|
73.24
|
Poli Enterprise 01748988668
|
69.58
|
01/01/1900
|
10/07/2018
|
31/07/2019
|
100
|
69.57
|
100
|
13/08/2020
|
|
|
89
|
Sunamganj
|
64
|
doarabazar
|
470
|
782
|
SDIRIIP/Sun/S(OTR)/W-024
|
Improvement of Manda-Dopakhai GPS road by RCC at Ch.500-800m & 2000-25000m.
|
|
23.00
|
0.00
|
0.00
|
59.03
|
Akter Hossain 01711026722
|
53.89
|
01/01/1900
|
24/09/2018
|
30/09/2019
|
100
|
53.40
|
0
|
13/08/2020
|
|
|
90
|
Sunamganj
|
64
|
jagannathpur
|
469
|
782
|
SDIRIIP/Sun/S(OTR)/W-011
|
Improvement of Jagannathpur-Swjansree via Chilaura road at ch.7165-8533m and 9293-9950m by RCC Construction of 02 nos 2x3.50mx2.50m drainage culvert at ch.7603m& 7730m on the same road
|
|
2.03
|
0.00
|
0.00
|
169.81
|
Rupon Miah 01711973348
|
161.31
|
01/01/1900
|
01/07/2018
|
30/06/2019
|
100
|
149.25
|
100
|
13/08/2020
|
|
|
91
|
Sunamganj
|
64
|
jagannathpur
|
469
|
782
|
SDIRIIP/Sun/S(OTR)/W-012
|
Improvement of Ismailchak-bari via baudron road by RCC at ch.0-2000m Construction of 01 no 1x4.50mx4.50m drainage culvert at ch.500m on the same road
|
|
2.00
|
0.00
|
0.00
|
170.21
|
S.D Enterprise 01614753580
|
161.70
|
01/01/1900
|
05/07/2018
|
28/02/2019
|
100
|
161.25
|
100
|
13/08/2020
|
|
|
92
|
Sunamganj
|
64
|
jamalganj
|
468
|
782
|
SDIRIIP/Sun/S(OTR)/W-001
|
Improvement of Sachna bazar UP officeFazilpur -Ramnagar bazar by RCC at ch.3150-4150m
|
|
1.00
|
0.00
|
0.00
|
72.81
|
Mahbub Enterprise 1711335076
|
65.53
|
01/01/1900
|
09/04/2018
|
14/04/2019
|
100
|
65.37
|
100
|
13/08/2020
|
|
|
93
|
Sunamganj
|
64
|
jamalganj
|
468
|
782
|
SDIRIIP/Sun/S(UZR)/W-001
|
Improvement of Salimganj GC-Jamalganj HQ Shahpur via Fenerbaz UP road by RCC at ch.2000-4840m
|
|
2.84
|
0.00
|
0.00
|
255.44
|
Belal Enterise & Nurul Haque (JV) 01716387312
|
237.17
|
01/01/1900
|
06/06/2018
|
19/05/2019
|
100
|
202.90
|
0
|
13/08/2020
|
|
|
94
|
Sunamganj
|
64
|
shantiganj
|
462
|
782
|
SDIRIIP/Sun/S(UZR)/W-005
|
Improvement of RHD (Dabar) -Bitgonj GC via Lalpur Cikarkandi Bazar road by RCC at Ch.2540-3300m.
|
|
0.76
|
0.00
|
0.00
|
68.94
|
Eva Builders 01716-122058
|
65.49
|
01/01/1900
|
09/09/2018
|
31/08/2019
|
100
|
57.23
|
0
|
13/08/2020
|
|
|
95
|
Sunamganj
|
64
|
shantiganj
|
462
|
782
|
SDIRIIP/Sun/S(OTR)/W-032
|
a) Improvement of Kandapara-Dawla via Noagoan road by RCC at ch.00-1000m b) Construction of 595m Protective work.
|
|
1.00
|
0.00
|
0.00
|
100.87
|
Hasna Enterprise 01718525384
|
95.82
|
01/01/1900
|
22/10/2018
|
30/09/2019
|
100
|
82.80
|
100
|
13/08/2020
|
|
|
96
|
Sunamganj
|
64
|
shantiganj
|
462
|
782
|
SDIRIIP/Sun/S(OTR)/W-031
|
a) Improvement of Dhamopasha-Singpur road by RCC at ch.1200-3760m b) Constuction of 3 nos drinage culvert at ch.1597m; 3550m & 3630m on the same road.
|
|
2.56
|
0.00
|
0.00
|
194.26
|
Muna Enterprise 01767480290
|
184.55
|
01/01/1900
|
15/10/2018
|
31/10/2019
|
100
|
184.44
|
100
|
13/08/2020
|
|
|
97
|
Sunamganj
|
64
|
sulla
|
467
|
782
|
SDIRIIP/Sun/S(UZR)/W-003
|
a) Improvement of Sulla HQ-Rahutala bazar by RCC at ch.18740-21740m b) Construction of 02 nos 1x1.00mx1.00m drinage Culvert at ch.19500m 20810m on the same road
|
|
3.00
|
0.00
|
0.00
|
297.76
|
RRS Enterprise 01739842734
|
318.43
|
01/01/1900
|
30/09/2018
|
02/09/2019
|
85
|
192.24
|
0
|
13/08/2020
|
|
|
98
|
Sunamganj
|
64
|
sulla
|
467
|
782
|
SDIRIIP/Sun/S(UZR)/W-004
|
a) Improvement of Sulla HQ-Kadirganj GCBaniachong via merkuli bazar road by RCC at ch.0-1077m and 9500-10825m b) Construction of 02 nos 1x1.00mx1.00m drinage Culvert at ch.20m 9550m on the same road C Construction of 100 m Protection work the same road c)
|
|
1.08
|
0.00
|
0.00
|
237.41
|
RRS Enterprise 01739842734
|
253.89
|
01/01/1900
|
30/09/2018
|
01/09/2019
|
100
|
248.00
|
100
|
13/08/2020
|
|
|
99
|
Sunamganj
|
64
|
sulla
|
467
|
782
|
SDIRIIP/Sun/S(OTR)/W-016
|
a) Improvement of Sulla HQ Kandokolla-Sulla UP-Shreehail bazar by RCC Ch.14500-16500m b) Constuction of 01 no 1.00x1.00mx1.00m Drainage culvert at ch.14905m on the same road
|
|
2.00
|
0.00
|
0.00
|
171.38
|
RRS Enterprise 01739842734
|
162.81
|
01/01/1900
|
19/08/2018
|
31/08/2019
|
80
|
118.35
|
0
|
13/08/2020
|
|
|
100
|
Sunamganj
|
64
|
sulla
|
467
|
782
|
SDIRIIP/Sun/S(OTR)/W-021
|
a) Improvement of Habibpur Noagaon-Anandapur bazar Hoar Road by RCC Road from Ch.1500-3500m b) Construction of 2 nos 1x1.00x1.00 m Dainage culvert at ch 1650m& 1890m On the same road a) Improvement of Dattapara Protap pur Bazar Road Agurai -protappur baza
|
|
2.00
|
0.00
|
0.00
|
294.87
|
AKC-ONS-JV 01716562760
|
326.17
|
01/01/1900
|
30/09/2018
|
30/09/2019
|
100
|
324.56
|
100
|
13/08/2020
|
|
|
101
|
Sunamganj
|
64
|
sunamganj-s
|
466
|
782
|
SDIRIIP/Sun/S(OTR)/W-008
|
Improvement of Mullapara UPC (Jogjibonpur) Buristol Road from Ch.00-1250m Construction of 1x4.50x4.00m Culvert at ch. 905m on Same Road
|
|
1.25
|
0.00
|
0.00
|
102.56
|
Parag Enterprise 01712374292
|
97.43
|
01/01/1900
|
10/07/2018
|
14/07/2019
|
100
|
97.03
|
100
|
13/08/2020
|
|
|
102
|
Sunamganj
|
64
|
sunamganj-s
|
466
|
782
|
SDIRIIP/Sun/S(OTR)/W-009
|
Improvement of Surma UPC (Ibrahimpur) Dalura Balat(India) Boader Hat road from Ch.6836-10276 m
|
|
3.44
|
0.00
|
0.00
|
265.83
|
Atiqur Rahman 01712521355
|
240.54
|
01/01/1900
|
27/08/2018
|
14/07/2019
|
100
|
239.82
|
100
|
13/08/2020
|
|
|
103
|
Sylhet
|
61
|
balaganj
|
461
|
782
|
SDIRIIP/Syl/UNR/W-009
|
Improvement of Kalibari bazar-Burunga UP Road Ch.670m-2080m b) Construction of 5Nos U-Drain 1x1.00x1.00m on the Same Road at Ch. 685m, 815m, 860m,1495m & 2070m under Balagonj Upazila.
|
691083019
|
1.41
|
5.00
|
0.00
|
0.00
|
|
0.00
|
01/01/1900
|
|
|
0
|
0.00
|
0
|
13/08/2020
|
|
|
104
|
Sylhet
|
61
|
biswanath
|
459
|
782
|
SDIRIIP/Syl/UNR/W-012
|
a)Improvement of RHD Rampasa-Rajagonj-Uttor Biswanath-Lamakazi UP Road Ch.4600m-5600m, b) 691203009-b)Improvement of Alongkari UP-Ramdhana baza Road Ch.1980m-2810m, C) 691203011-a) Improvement of Doshghar UP-Lohori- Mashukhali Road Ch.2000m-3300m under Bi
|
|
3.13
|
0.00
|
0.00
|
199.81
|
M/s. Premium Trading, Amborkhana, Sylhet.
|
189.82
|
09/11/2018
|
11/09/2018
|
16/09/2019
|
35
|
15.50
|
0
|
13/08/2020
|
|
|
105
|
Sylhet
|
61
|
companiganj
|
446
|
782
|
SDIRIIP/Syl/S(OTR)/W-005
|
Improvement of Kalabari-Kalibari-Doyer Bazar Road by RCC (Ch.00-1000 m ) 691274013 - Improvement of RHD Purba Barni-Dakati Bari Goghra Khal Potamara Bazar Road by RCC (Ch.350-1350 m ) 691274010 - Improvement of Islampur B
|
691274002/691274013/691274010
|
3.00
|
0.00
|
0.00
|
325.50
|
SA-SC (JV)
|
342.43
|
10/02/2018
|
02/10/2018
|
07/10/2019
|
80
|
221.63
|
0
|
13/08/2020
|
|
|
106
|
Sylhet
|
61
|
dakshin surma
|
450
|
782
|
SDIRIIP/Syl/UNR/W-014
|
a)Improvement of Moglabazar UP-Ashugonj Bazar Road Ch.2500m-3500m, b) Construction of 1 No. 1x2.00m x 2.00 m Dranage Culvert at Ch.3414 on same Road C) Protective Works at 68m on the Same Road.
|
|
1.00
|
2.00
|
0.00
|
99.75
|
M/s. Premium Trading, Amborkhana, Sylhet.
|
94.77
|
09/11/2018
|
11/09/2018
|
12/06/2019
|
10
|
4.07
|
0
|
13/08/2020
|
|
|
107
|
Sylhet
|
61
|
fenchuganj
|
457
|
782
|
SDIRIIP/Syl/S(OTR)/W-004
|
Sub-Mersible Road of Maijgaon bazar-Shahrullah Mazar via KM Tilla Road.(Ch.1203-2005)
|
|
0.80
|
|
|
60.97
|
M/s. A Ali Enterprise
|
60.97
|
20/06/2018
|
20/06/2018
|
30/11/2019
|
100
|
50.00
|
100
|
13/08/2020
|
|
|
108
|
Sylhet
|
61
|
fenchuganj
|
457
|
782
|
SDIRIIP/Syl/S(OTR)/W-003
|
RCC Road ofKM Tilla Hazrat Sharull Sha Mazar Front-Bajare Tilla Road.(Ch.000-1000)
|
|
1.00
|
|
|
77.32
|
M/s. Ripon Traders
|
72.48
|
20/06/2018
|
20/06/2018
|
22/03/2019
|
100
|
71.96
|
100
|
13/08/2020
|
|
|
109
|
Sylhet
|
61
|
fenchuganj
|
457
|
782
|
SDIRIIP/Syl/S(OTR)/W-001
|
RCC Road of Illashpur-Purba Illashpur Road.(Ch.100-1000)
|
691354015
|
0.90
|
|
|
72.92
|
M/s. Ripon Traders
|
67.69
|
20/06/2018
|
20/06/2018
|
02/07/2019
|
75
|
42.00
|
|
13/08/2020
|
|
|
110
|
Sylhet
|
61
|
golapganj
|
463
|
782
|
SDIRIIP/Syl/VR/W-007
|
Improvement of RHD Road-Fatepur Village Road (Ch.00-1750 m ) b) Construction of Drainage Culvert 2Nos 1x.1.50 x.1.50m at Ch. 315m, 1410m on the Same Road C) Construction of U Drain 6Nos .625 x.0.600m on the Same Road d) Protection Work of 160m on th
|
691384101
|
1.75
|
6.75
|
0.00
|
128.96
|
M/s. Premium Trading, Amborkhana, Sylhet.
|
122.86
|
09/11/2018
|
11/09/2018
|
16/09/2019
|
100
|
120.69
|
100
|
13/08/2020
|
|
|
111
|
Sylhet
|
61
|
gowainghat
|
455
|
782
|
SDIRIIP/Syl/UZR/W-006
|
Improvement of Radanagar Bazar GC-Haderpar Bazar GC Road ( Ch. 2935.00-3435m)
|
691412009
|
0.50
|
|
|
42.91
|
M/s. Sonia Enterprise, Gowainghat, Sylhet
|
46.04
|
24/09/2018
|
24/09/2018
|
26/06/2019
|
100
|
46.00
|
100
|
13/08/2020
|
|
|
112
|
Sylhet
|
61
|
gowainghat
|
455
|
782
|
SDIRIIP/Syl/UNR/W-003
|
Improvement of Pirajpur-Paschim Jaflong UP Office-Sonorhat-Monortal bazar Road by BC (Ch. 9730-10312m )
|
691413002
|
0.58
|
|
|
37.48
|
Bai Bai Traders
|
41.11
|
15/07/2018
|
15/07/2018
|
14/06/2019
|
100
|
41.08
|
100
|
13/08/2020
|
|
|
113
|
Sylhet
|
61
|
gowainghat
|
455
|
782
|
SDIRIIP/Syl/UNR/W-010
|
Improvement of Ramnagar-Dhara bazar Road Ch.906m-2230m under Gowainghat Upazila.
|
691413006
|
1.32
|
|
|
82.65
|
M/s. Khadiza Stone Crusher.
|
78.52
|
20/06/2018
|
20/06/2018
|
15/04/2019
|
100
|
78.26
|
100
|
13/08/2020
|
|
|
114
|
Sylhet
|
61
|
kanaighat
|
447
|
782
|
SDIRIIP/Syl/UNR/W-011
|
a)Improvement of Pashchim Lakshiprashad UP-Badsha bazar Road Ch.1500m-2780m b) Construction of 2Nos U-Drain 0.750x0.750m on the Same Road at Ch.1985m & 2120m, C) Construction of 40m Protection works on the Same Road under Kanaighat Upazila.
|
|
1.28
|
1.50
|
|
88.99
|
M/s. Shimul Enterprise
|
93.00
|
24/06/2018
|
24/06/2018
|
11/04/2019
|
100
|
93.97
|
100
|
13/08/2020
|
|
|
115
|
Sylhet
|
61
|
kanaighat
|
447
|
782
|
SDIRIIP/Syl/VR/W-006
|
Improvement of Mukigonjbazar-Kaptanpur-Jalalpur Road (Ch.1500-2500 m ) b) Construction of U-Drain 1x.750x.750m on the Same Road
|
|
1.00
|
0.75
|
0.00
|
65.26
|
M/s. Premium Trading, Amborkhana, Sylhet.
|
62.00
|
09/11/2018
|
11/09/2018
|
12/06/2019
|
30
|
0.00
|
0
|
13/08/2020
|
|
|
116
|
Sylhet
|
61
|
sylhet-s
|
452
|
782
|
SDIRIIP/Syl/UZR/W-003
|
.a) Improvement of Khadimnagar RHD-Shaheber bazar GC Road (Ch.2000-5300m ), b) U-Drain on the Same Road at Ch. 2054m,2195m,2674m,2780m,5189m, 5254m c) Constraction of 2Nos 1x 3.0x3.0m RCC Box Culvert on the Same Road at Ch. 3044m, 5290m d) Construction o
|
|
3.30
|
27.75
|
|
336.43
|
Dolly Construction Ltd. Dhaka.
|
327.50
|
24/06/2018
|
24/06/2018
|
19/01/2020
|
45
|
98.90
|
|
13/08/2020
|
|
|
117
|
Sylhet
|
61
|
sylhet-s
|
452
|
782
|
SDIRIIP/Syl/UZR/W-004
|
a)Improvement of Khadimnagar RHD-Shaheber bazar GC Road (Ch.5300-8570m ), b) Constraction of 2Nos 1x 2.50mx2.50m RCC Box Culvert on the Same Road at Ch. 5794m, 7870m c) Construction of 2Nos 2x3.00m x3.00 m RCC Box Culvert on the Same Road at Ch. 6454m,77
|
|
3.27
|
33.12
|
|
335.79
|
Dolly Construction Ltd. Dhaka.
|
326.69
|
24/06/2018
|
24/06/2018
|
21/10/2019
|
55
|
104.44
|
|
13/08/2020
|
|
|
118
|
Sylhet
|
61
|
sylhet-s
|
452
|
782
|
SDIRIIP/Syl/UNR/W-008
|
Improvement of Mayna bazar-Gaharpur-Usmanpur UP Road Ch.2500m-3741m under Osmaninagar Upazila.
|
|
1.24
|
0.00
|
0.00
|
77.90
|
M/s. Premium Trading, Amborkhana, Sylhet.
|
74.00
|
09/11/2018
|
11/09/2018
|
10/12/2019
|
100
|
73.78
|
100
|
13/08/2020
|
|
|
119
|
Sylhet
|
61
|
zakiganj
|
451
|
782
|
SDIRIIP/Syl/UZR/W-002
|
a) Improvement RHD Road (Shagoli Bus Stand)- Gucchgram-Laxmi Bazar GC Road (Ch. 1330-2500m.), (b) Const. of 130m Protective Work on the Same Road.
|
691203002
|
1.22
|
|
|
99.45
|
Md. Shamsur Rahman. Zakiganj
|
103.45
|
15/07/2018
|
15/07/2018
|
25/07/2019
|
100
|
92.10
|
|
13/08/2020
|
|