|
1
|
Cox's bazar
|
13
|
teknaf
|
135
|
822
|
EAP/LGED/OCB/W9
|
Construction of 03 Nos Multipurpose Cyclone Shelter. (Nhilla Barmes GPS, Ulachamary GPS and Dakkhin Bara Dail GPS) at Teknaf, District: Cox’s Bazar
|
|
|
|
3.00
|
1264.30
|
Ahmed Kabir Chowdhury, M/S Thohid & Brothers-QC (JV), Sattar Mansion(1st Floor),52,Katalgonj,Panchlaish,Chittagong.
|
734.63
|
20/02/2019
|
|
12/04/2020
|
78
|
685.63
|
93
|
18/01/2021
|
|
|
2
|
Cox's bazar
|
13
|
ukhiya
|
130
|
822
|
EAP/LGED/OCB-N/W10
|
Construction of Hill Slope Protection at Ukhiya i) Camp-20 Nutrition Center to IOM site Management Center 335.00m, ii)Camp-20 FDC to DAM School Learning Center 433.00m, iii) Camp-20 FDC to TDS Center 450.00m, Total 1.218 Km Salvage cost Tk. 1,99,473.00 under Ukhiya upazila Dist: Cox's Bazar.
|
|
1.22
|
|
|
625.00
|
CSI Constructions Ltd.
|
674.21
|
18/06/2020
|
|
28/05/2021
|
10
|
67.42
|
10
|
18/01/2021
|
|
|
3
|
Cox's bazar
|
13
|
ukhiya
|
130
|
822
|
EAP/LGED/OCB-N/W1A
|
Construction of Internal Road & Stair with Drainage facilities Inside the Camp in Ukhiya, i) Camp-20 Ext. CIC Office to Camp-19 Road 1790.00m, ii) TV Tower to Army Road Near Non-Food Distribution Centre 2350.00m, iii) TV Tower Road Camp-6 Road 400.00m, iv) Camp-12 CIC Office to Camp-20 Road Up to Bazar 1150.00 m, v) Camp-20 Football Field to Camp-20 Ext. Road Nutrition Center 600.00m, Total 6.29 km. Salvage cost Tk. 16,77,505.00 under Ukhiya upazila Dist: Cox's Bazar.
|
|
6.29
|
|
|
2330.00
|
CSI Constructions Ltd.
|
2514.07
|
04/06/2020
|
|
10/04/2021
|
35
|
871.73
|
34
|
18/01/2021
|
|
|
4
|
Cox's bazar
|
13
|
ukhiya
|
130
|
822
|
EAP/LGED/OCB-N/W6A
|
Construction of Boundary wall of 7 Nos. Multipurpose Cyclone Shelters Gonarpara Shafi GPS Goriayer Dip GPS Dakkhin Holodia GPS Paglir Bill GPS Faliapara GPS Nurul Islam Ch. GPS and Tutur Bill GPS at Ukhiya Upazila and03 Nos. Multipurpose Cyclone Shelter. Nhilla Barmes GPS Ulachamary GPS and Dakkhin Bara Dail GPS at Teknaf Upazila and Dist Coxs Bazar
|
|
|
54.00
|
|
305.00
|
M/S. Thohid & Brothers
|
310.00
|
02/06/2020
|
|
10/03/2021
|
50
|
100.00
|
32
|
18/01/2021
|
|
|
5
|
Cox's bazar
|
13
|
ukhiya
|
130
|
822
|
EAP/LGED/OCB-N/4C
|
Improvement of Hajirpaa Mukter Swdagor Bari-Dakhin Faliapara Sajahan bari Road By BC at Ch00- 2400m Road ID-422945114 Malercul LGED Road - Dakhin Faliapara Road By BC at Ch 00-814m Road ID-422945112 & Ali Mohammed Pingir Road By BC at Ch 00-2327m Road ID-422944037 & Tuturbill Gonarpara Rd. by BC at Ch. 00-1830m Road ID 422945065 under Ukhiya upazila Dist Coxs Bazar. Salvage value-Tk. 3551173.00
|
422945114, 422945112, 422944037, 422945065
|
7.37
|
54.00
|
|
1780.00
|
Nabarun Traders Limited
|
1921.48
|
15/04/2020
|
|
23/04/2021
|
55
|
1049.42
|
54
|
18/01/2021
|
|
|
6
|
Cox's bazar
|
13
|
ukhiya
|
130
|
822
|
EAP/LGED/OCB-N/4D
|
Improvement of Rotnapalong UP Office Coat Bazar -Valukhiya bazar Road Valukhiya Sea Beach Rd by BC at Ch 00-4300 m ID 422943001 & Rotnpalong UP Office-Chakbaita Bazar via Goyalmara Rd Yousuf Ali Rotnapalong Karaibunia Roadby BC at Cy-00-4435m ID422943004 Under Ukhiya Upazila.Dist Coxs Bazar. Salvage value Tk. 1415528.00
|
422943001,422943004,
|
8.74
|
10.00
|
|
1115.00
|
Nabarun Traders Limited
|
1199.48
|
02/04/2020
|
|
10/04/2021
|
80
|
862.28
|
71
|
18/01/2021
|
|
|
7
|
Cox's bazar
|
13
|
ukhiya
|
130
|
822
|
EAP/LGED/OCB-N/W21
|
Construction and Re-Construction of Storm Water Drainage Network on Primary Canal -02 from Camp 20 Extension (Chainage 5+800m) to Naf River (Outlet 0+00m), Under Ukhiya Upazila Dist: Cox`sBazar.
|
|
|
|
|
1131.62
|
Nabarun Traders Limited
|
1163.19
|
22/12/2019
|
|
21/12/2020
|
80
|
862.28
|
71
|
18/01/2021
|
|
|
8
|
Cox's bazar
|
13
|
ukhiya
|
130
|
822
|
EAP/LGED/OCB-N/W20
|
Construction and Re-Construction of Storm Water Drainage Network on Primary Canal -01 from Modhuchara (Chainage 5+100m) to Naf River (Outlet 0+00m), Under Ukhiya Upazila , Dist: Cox`sBazar.
|
|
|
|
|
1340.50
|
Nabarun Traders Limited
|
1525.11
|
22/12/2019
|
|
21/12/2020
|
80
|
1152.38
|
75
|
18/01/2021
|
|
|
9
|
Cox's bazar
|
13
|
ukhiya
|
130
|
822
|
EAP/LGED/OCB-N/W1B
|
Construction of 7.5 km (Effective length 6.51 km.) Internal Roads and Stairs with Drainage Facilities at Ukhiya of i Balukhali Highway to Camp-09 Hilly Road by HBB at ch.00- 271.0m. ii D5 to Kutupalong Link Road.at ch 00-744m iii Jamtoli field learning Centre Baggona road at ch. 00-835m. iv DS Mosque Road at ch. 00-265m. v DS 8W Mosque Road via Nauka Bazar at ch.00-855m. vi Camp 12 to Talkhola road at ch. 00-730m. vii. Talkhola to Mochrakhola Road 0.00-2810.0m. under Ukhiya Upazila Dist Coxs Bazar. Salvage value BDT 879928
|
|
6.51
|
|
|
940.00
|
Mohammed Eunus & Brothers (Pvt.) Ltd.
|
1080.71
|
29/12/2019
|
|
03/01/2021
|
65
|
600.93
|
55
|
18/01/2021
|
|
|
10
|
Cox's bazar
|
13
|
ukhiya
|
130
|
822
|
EAP/LGED/OCB-N/ W3
|
A. Development of Faliapara Primary School Road Ch 0-1035m. [Road ID. 4229445067].
B. Development of Ukhiya Merine Drive (N.I Chowdhury) Road Ch 00-2505m [Road ID. 422942003]
Upazila - Ukhiya, District - Cox's Bazar. [Re-Bid][Salvage Amount in BDT. 1,17,47,177.00]
|
4229445067, 422942003
|
3.54
|
31.50
|
7.00
|
1013.51
|
M/S. Nipa Enterprise, R.F Classic Point (1st Floor), 8, Katalgonj Road (Beside Oli Kha Mosque), Chawkbazar, Chittagong
|
1019.26
|
22/07/2019
|
|
05/07/2021
|
70
|
349.96
|
34
|
18/01/2021
|
|
|
11
|
Cox's bazar
|
13
|
ukhiya
|
130
|
822
|
EAP/LGED/OCB-N/W5
|
Upgradation of existing 8.8 km link road connecting Cox’s Bazar-Teknaf and Marine Drive Highways, Ukhiya (Improvement of R&H Palongkhali Bazar- Chapothkhali Bazar Marine Drive Road by BC at ch. 00-9145m under Ukhyia, Cox’sbazar,
|
422944013
|
9.15
|
93.50
|
7.00
|
1569.78
|
Md. Yakub, Yakub- FMC (JV), Charia, Buripukur Par, Hathazari, Chittagong.
|
1693.86
|
23/06/2019
|
|
22/06/2020
|
30
|
406.10
|
23
|
18/01/2021
|
|
|
12
|
Cox's bazar
|
13
|
ukhiya
|
130
|
822
|
EAP/LGED/OCB/W19
|
A. Construction of Semi-Permanent Food Distribution Centers & Loading/ unloading Yard at 1. Balukhali Make Shift-2 2. Hakim Para 3. TV Tower 4.Camp 20 Extension Under Ukhiya upazila. Dist.Coxsbazar.Type-B-1300 sq.m.
B. Constructionof Semi-permanent Food Distyribution Centers & loading /Unloading Yard at 1. Lambashia 2. Modhurchara under Ukhiya Upazila & 3. 1 No. Leda/Jadimura under Teknaf Upazila, Dist.Cox’s bazar. Type-D-1800 & 1500 sq.m.
|
|
|
|
7.00
|
1693.08
|
Ahmed Kabir Chowdhury, M/S Thohid & Brothers-QC (JV), Sattar Mansion(1st Floor),52,Katalgonj,Panchlaish,Chittagong.
|
734.63
|
13/02/2019
|
|
30/06/2019
|
100
|
685.63
|
93
|
18/01/2021
|
|
|
13
|
Cox's bazar
|
13
|
ukhiya
|
130
|
822
|
EAP/LGED/OCB/W6
|
Construction of 04 Nos. Multipurpose Cyclone Shelter (Gonapara Shafi GPS, Goriayer Dip GPS, Dakkhin Holodia GPS and Paglir Bill GPS
|
|
|
|
4.00
|
1693.08
|
Ahmed Kabir Chowdhury, M/S Thohid & Brothers-QC (JV), Sattar Mansion(1st Floor),52,Katalgonj,Panchlaish,Chittagong.
|
1486.02
|
13/02/2019
|
|
05/04/2020
|
78
|
906.45
|
61
|
18/01/2021
|
|
|
14
|
Cox's bazar
|
13
|
ukhiya
|
130
|
822
|
EAP/LGED/OCB/W8
|
Construction of 03 Multipurpose Cyclone Shelter (Faliapara GPS, Nurul Islam Ch.GPS and TuturBill GPS)at upazila, Ukhiya, Dist: COXS,Bazar.
|
|
|
|
3.00
|
1374.81
|
Mohammad Abdur Rashid & Abul Basar, Sattar Chamber (2nd Floor), 52, Katalganj, Panchlaish, Chittagong.
|
1226.10
|
28/11/2018
|
17/12/2018
|
11/03/2020
|
90
|
811.81
|
66
|
18/01/2021
|
|