1
|
Jamalpur
|
27
|
bakshiganj
|
219
|
947
|
JETIP/ BAK/19/07
|
Improvement of Bitumen Carpeting Road from Kagmari para Kader Master house towards Sablo Mia House under Bakshigonj PourshavaCh.(00-600)
|
|
0.60
|
0.00
|
0.00
|
53.73
|
M/S Durga Enterprise
|
51.04
|
15/01/2020
|
|
13/06/2020
|
100
|
6.52
|
12
|
15/08/2020
|
|
|
2
|
Jamalpur
|
27
|
bakshiganj
|
219
|
947
|
JETIP/ BAK/19/06
|
Development of BC road from Masher Char Hamidur member house towards Baruitary BC road under Bakshigonj Pourashava(Ch.00-1.080)
|
|
1.08
|
0.00
|
0.00
|
92.27
|
Asha Enterprise
|
87.66
|
15/01/2020
|
|
13/06/2020
|
75
|
8.63
|
9
|
15/08/2020
|
|
|
3
|
Jamalpur
|
27
|
bakshiganj
|
219
|
947
|
JETIP/ BAK/19/05
|
Development of BC road from Tikorkandi Bridge towards community Clinic via Moslem uddin house under Bakshigonj Pourashava (ch.00-0.700)
|
|
0.70
|
0.00
|
0.00
|
65.03
|
M/S Mohasif Enterprise
|
61.77
|
15/01/2019
|
|
13/06/2020
|
70
|
3.12
|
5
|
15/08/2020
|
|
|
4
|
Jamalpur
|
27
|
bakshiganj
|
219
|
947
|
JETIP/ BAK/19/04
|
Development of BC road from Rezaul Master house near Upazila road towards T&T road Grameen phone Tower via Mhatab house under Bakshigonj Pourashava (Ch.00-0.400)km
|
|
0.40
|
0.00
|
0.00
|
29.76
|
M/S Maraya Enterprise
|
28.27
|
15/01/2020
|
|
13/06/2020
|
75
|
3.50
|
12
|
15/08/2020
|
|
|
5
|
Jamalpur
|
27
|
bakshiganj
|
219
|
947
|
JETIP/ BAK/19/03
|
Development of BC road from Namapara Robiul House towards Malir char Nowapara more via Abul Kalam Azad Medicine House under Bakshigonj Pourashava(CH.00-0.700)km
|
|
0.70
|
0.00
|
0.00
|
54.23
|
M/S Bhai Bhai Bostra Bitan
|
51.52
|
15/01/2020
|
|
13/06/2020
|
75
|
21.68
|
40
|
15/08/2020
|
|
|
6
|
Jamalpur
|
27
|
bakshiganj
|
219
|
947
|
JETIP/ BAK/19/02
|
Development of BC road from Gowalgow Middlepara Mosque more near (Jail Khana) towards North Majpara Faraque House under Bakshigonj Pourashava(Ch.00-1.020)km
|
|
1.02
|
0.00
|
0.00
|
87.74
|
M/S Biksh Store
|
83.35
|
15/01/2020
|
|
13/06/2020
|
75
|
6.53
|
7
|
15/08/2020
|
|
|
7
|
Jamalpur
|
27
|
bakshiganj
|
219
|
947
|
JETIP/ BAK/19/01
|
Development of BC Road from Pakimara Eid Gha Field Near Nurul Islam Shop towards Doripora Zinna's House Under Bakshigonj Pourashava(Ch.00-1.330)km
|
|
1.33
|
0.00
|
0.00
|
107.79
|
M/S S.R Construction
|
102.40
|
15/01/2020
|
|
13/06/2020
|
75
|
0.00
|
0
|
15/08/2020
|
|
|
8
|
Jamalpur
|
27
|
dewanganj
|
202
|
947
|
JETIP/DWN/19/05
|
a) Improvement Road by RCC from North kalikapur Dhudhu member House moar towards Gobinda nagar Farid Hossain house, Ch.00- 200m b) Construction of Protection Wall in char Kalikapur near H/O Liton, Ch00-90m c)Improvement of RCC Road from Chikajani Hoque House Gorosthan toward rongmohol Ch.00-525m
|
|
0.82
|
0.00
|
0.00
|
100.42
|
M/S Munjurul Haque
|
99.42
|
15/08/2019
|
|
14/08/2020
|
70
|
15.50
|
15
|
15/08/2020
|
|
|
9
|
Jamalpur
|
27
|
dewanganj
|
202
|
947
|
JETIP/DWN/19/04
|
Contruction of BC Road from Char kalikapur (from Dewanganj Thana) towards shasan Ghat, Ch.00-880m
|
|
0.88
|
0.00
|
0.00
|
74.38
|
M/S Munjurul Haque
|
73.64
|
15/08/2019
|
|
14/08/2020
|
67
|
33.50
|
45
|
15/08/2020
|
|
|
10
|
Jamalpur
|
27
|
dewanganj
|
202
|
947
|
JETIP/DWN/19/03
|
a) Construction of Site protection at Thana Ghat East site 2x150m b)Improvement of RCC Road from Dakrapara BC Road (Near Dhola house) towards char Vabosur West para Khoka house,Ch.00-295m c) Rehabilitation of Road by BC from Jambil Bazar towards Choniapara chowrasta from Ch.00-510 m
|
|
0.81
|
0.30
|
0.00
|
101.73
|
M/S Munjurul Haque
|
100.71
|
15/08/2019
|
|
14/08/2020
|
55
|
0.00
|
0
|
15/08/2020
|
|
|
11
|
Jamalpur
|
27
|
dewanganj
|
202
|
947
|
JETIP/DWN/19/02
|
a)Contruction of RCC road from Dewanganj thana towards shasanghat (north side) from Ch.00-1075m b)Construction of one vent 3.00x3.00m Box culvert on Thana Ghat to Shasan ghat at Char Kalikapur, Ch.875m
|
|
1.08
|
0.03
|
0.00
|
167.47
|
M/S Lokman Hossain
|
167.20
|
18/09/2019
|
|
16/09/2019
|
40
|
40.00
|
23
|
15/08/2020
|
|
|
12
|
Jamalpur
|
27
|
dewanganj
|
202
|
947
|
JETIP/DWN/19/01
|
a)Contruction of RCC road from thana Ghat to Dilip Bari Ghat at Ch 0-1330 km b))Construction of single vent 3.00mX3.00 Box culvert on thana Ghat to Dilip Bari Ghat Road at Char Kalikapur, Ch.1075m
|
|
1.33
|
0.03
|
0.00
|
196.27
|
M/S Lokman Hossain
|
196.00
|
18/09/2019
|
|
16/09/2019
|
40
|
0.00
|
0
|
15/08/2020
|
|
|
13
|
Jamalpur
|
27
|
islampur
|
203
|
947
|
JETIP/ ISL/19/23
|
Protection work of Islampur Central Eidgah field
|
|
|
0.17
|
0.00
|
54.69
|
MD. Khalilur Rahman
|
51.95
|
01/01/1900
|
|
|
0
|
0.00
|
0
|
15/08/2020
|
|
|
14
|
Jamalpur
|
27
|
islampur
|
203
|
947
|
JETIP/ ISL/19/22
|
a)Construction of RCC road at ward no 09 Tongerla Mollah Shop to Shoel house 00-180m b)Construction of RCC road at ward no 08 to Honourable Ex Minister Md. Rashed Mosarof house to poultry firmch.00-180m c)Construction of RCC road at ward no 03 Patna para Rohim house babul house ch.00-220
|
|
0.56
|
0.00
|
0.00
|
69.17
|
M/s Labonno labib
|
65.71
|
27/05/2020
|
|
27/11/2020
|
100
|
0.00
|
0
|
15/08/2020
|
|
|
15
|
Jamalpur
|
27
|
islampur
|
203
|
947
|
JETIP/ ISL/19/21
|
a)Construction of RCC road at ward no 05 paschim vangura Manik Bsc house to Momotaj house Ch.0+000-110m b)Construction of RCC road at ward no 07 Palobandha lakhlo khandaker house to BC roads via duio councillor house ch00-.220m and link road palobandha kamrul house 00-60m c) Construction of RCC road at ward no 07 Dharmukhura bazer roads to sadek sarker houseCh.00-130m
|
|
0.52
|
0.00
|
0.00
|
74.48
|
M/S Mim Enterprise
|
66.96
|
02/06/2020
|
|
06/08/2020
|
40
|
0.00
|
0
|
15/08/2020
|
|
|
16
|
Jamalpur
|
27
|
islampur
|
203
|
947
|
JETIP/ ISL/19/20
|
Construction of RCC road at ward no-02 Islampur Thana moar to upazilaEid gha math road at Ch.0+000-580
|
|
0.58
|
0.00
|
0.00
|
91.61
|
M/s Shyamol
|
87.03
|
02/06/2020
|
|
06/08/2020
|
0
|
0.00
|
0
|
15/08/2020
|
|
|
17
|
Jamalpur
|
27
|
islampur
|
203
|
947
|
JETIP/ ISL/19/19
|
a)Construction of RCC drain at Islampur Ashraful Madrasha to Pathor Ghata Khalvia Patna Para rail Gate ch.00-700m b)Construction of RCC road at ward no-01at ward no 02 Starting from Anawer Major Houseto Magothakur House ch.00-450m c)Construction of BC road at Anawer house to Uttar Doriabat LalMiah House ch.00-1150m and Improvement of BC road from chan house to Shebu Thakur house ch.00-410m d)Improvement of BC road at ward no08 from Bowalmari Roton house to Mosaroufgonj rail station ch.00-2250m
|
|
3.81
|
1.15
|
0.00
|
260.46
|
Mohammad Younus and brothers
|
217.99
|
02/06/2020
|
|
06/08/2020
|
0
|
0.00
|
0
|
15/08/2020
|
|
|
18
|
Jamalpur
|
27
|
islampur
|
203
|
947
|
JETIP/ ISL/19/18
|
a))Construction of RCC drain at bward no 04 starting from Islampur High school side Abdur Rahim House to LSD Godown via Nazrul house ch.00-230m b)Construction of RCC drain at ward no 06 from Neru motore to pute Khal Sujan house via Hamidur house ch.00-280m
|
|
|
0.51
|
0.00
|
52.40
|
M/S Shemol Traders
|
49.78
|
29/01/2020
|
|
29/07/2020
|
0
|
0.00
|
0
|
15/08/2020
|
|
|
19
|
Jamalpur
|
27
|
islampur
|
203
|
947
|
JETIP/ ISL/19/17
|
a))Construction of RCC drain at ward no 06 Guakura Muhammed Ali house to Islampur Land office Ch.00-650m b) Construction of BC road at ward no 04 from Abul Latif house to Netrakandha Mosque Ch.00-330
|
|
0.33
|
0.65
|
0.00
|
86.83
|
M/S Tonoy Enterprise
|
81.99
|
29/01/2020
|
|
29/07/2020
|
40
|
0.00
|
0
|
15/08/2020
|
|
|
20
|
Jamalpur
|
27
|
islampur
|
203
|
947
|
JETIP/ ISL/19/16
|
a)Construction of RCC drain from at ward no 03 Patne Para Khadamul Hpuse to Babul House ch.00-220 b)Construction of RCC drain at ward no 07 polobandha Dr.Abdul Salam Sarder house to Zakirul Mondol house ch.00-170m
|
|
|
0.39
|
0.00
|
34.67
|
MD. Chonno Mia
|
32.93
|
29/01/2020
|
|
29/07/2020
|
100
|
10.00
|
31
|
15/08/2020
|
|
|
21
|
Jamalpur
|
27
|
islampur
|
203
|
947
|
JETIP/ ISL/19/15
|
a)Construction of RCC road at ward no 02 Islampur Thana mour to Upazila Eidgha Math road at Ch.0.000-580m b)
|
|
0.58
|
0.00
|
0.00
|
80.08
|
M/S Sopna Enterprise
|
76.07
|
29/01/2020
|
|
29/07/2020
|
60
|
5.00
|
6
|
15/08/2020
|
|
|
22
|
Jamalpur
|
27
|
islampur
|
203
|
947
|
JETIP/ ISL/19/14
|
a)Construction of RCC drain at ward no-6 near Councillor Md Abdul Alim house to koti kal, Ch.00-375m b)Construction of R C C drain at ward no 4 Jhil BANGLAfertilizer godown to shorojshak house. Ch.00-255m
|
|
|
0.63
|
0.00
|
72.99
|
M/S Jony Enterprise
|
69.34
|
08/08/2019
|
|
28/02/2020
|
85
|
41.57
|
59
|
15/08/2020
|
|
|
23
|
Jamalpur
|
27
|
islampur
|
203
|
947
|
JETIP/ ISL/19/13
|
a)Construction of RCC drain at ward no-7 polobanda poura market to Badshamondol house,Ch.00-700m b)Construction of RCC road at ward no-5 at vangura soudi Rice mill to Asraf Ali, Ch.00-100m
|
|
0.10
|
0.70
|
0.00
|
90.00
|
M/s Daulot Enterprise
|
85.50
|
08/08/2019
|
|
28/02/2020
|
75
|
48.74
|
56
|
15/08/2020
|
|
|
24
|
Jamalpur
|
27
|
islampur
|
203
|
947
|
JETIP/ ISL/19/12
|
a)Construction of RCC road at ward no-06 Milk Vita office to karim monshi bari, Ch.00-430m b)Construction of RCC drain at ward no-01 near hospital more to Md. Shajahan house, Ch.00-510m
|
|
430.00
|
0.51
|
0.00
|
101.31
|
M/s Arabi Trades
|
96.24
|
08/08/2019
|
|
28/02/2020
|
75
|
13.00
|
13
|
15/08/2020
|
|
|
25
|
Jamalpur
|
27
|
islampur
|
203
|
947
|
JETIP/ ISL/19/11
|
a)Construction of RCC drain from Bito kamar house to Md. Korshed house via Lalmia house Ch.00-700m b)Construction of RCC road at ward no-01 at kasari para Anil kasari house to Rustam house, ch.00-220m
|
|
0.22
|
0.70
|
0.00
|
96.86
|
M/s Salam and Sons
|
92.02
|
08/08/2019
|
|
28/02/2020
|
85
|
37.00
|
42
|
15/08/2020
|
|
|
26
|
Jamalpur
|
27
|
islampur
|
203
|
947
|
JETIP/ ISL/19/10
|
Construction of RCC road at ward no-01Dokkin Dhriabad Anowar hourse to markas mosque Balal mistry house . Ch.00m-950.00m
|
|
0.85
|
0.00
|
0.00
|
95.69
|
M/S Ratul Traders
|
90.91
|
08/08/2019
|
|
28/02/2020
|
100
|
27.00
|
30
|
15/08/2020
|
|
|
27
|
Jamalpur
|
27
|
islampur
|
203
|
947
|
JETIP/ ISL/19/09
|
a)Construction of RCC drain at ward no-6 (Gaukora Dorjipra abbus doiji house to REB sub station, Ch.00-610m b) Construction of RCC road at ward no-01 north doria bad to Hazrat sha kamal Eidga madth Ch.00-250m
|
|
0.25
|
0.61
|
0.00
|
94.93
|
M./s Arabi Traders
|
901.80
|
08/08/2019
|
|
28/02/2020
|
75
|
60.00
|
66
|
15/08/2020
|
|
|
28
|
Jamalpur
|
27
|
islampur
|
203
|
947
|
JETIP/ ISL/19/08
|
a) Construction of R C C drain at ward no-03 hakim chairman house to shotikul house Ch.00-600m b)Construction of RCC road at ward no-01 at Brack office to soroj shekh house Ch.00-260m
|
|
0.26
|
0.60
|
0.00
|
91.98
|
M/s Salam and Sons
|
87.38
|
08/08/2019
|
|
28/02/2020
|
100
|
24.00
|
27
|
15/08/2020
|
|
|
29
|
Jamalpur
|
27
|
islampur
|
203
|
947
|
JETIP/ ISL/19/07
|
a))Construction of R C C drain at ward no-4 nator kunda Bulbul councilor house to-Yusuf member House, ch.00-520m b)Construction of RCC drain ward no 5,6 vangura Lalmia house to Hazi shahajada house Ch00-220m
|
|
|
0.74
|
0.00
|
76.85
|
M/S Sabbir Cloth store
|
73.01
|
08/08/2019
|
|
28/02/2020
|
100
|
43.00
|
58
|
15/08/2020
|
|
|
30
|
Jamalpur
|
27
|
islampur
|
203
|
947
|
JETIP/ ISL/19/06
|
a)Construction of R C C drain at ward No-07 pouro Gorostan to RIsipara Ch.00-450m b)Improvement of B C road at ward no-2 Fokir para jama Mosque to sirajabad road, Ch.00m-1000m
|
|
1.00
|
0.45
|
0.00
|
100.83
|
M/S Sopna Enterprise
|
95.78
|
08/08/2019
|
|
28/02/2020
|
100
|
21.00
|
22
|
15/08/2020
|
|
|
31
|
Jamalpur
|
27
|
islampur
|
203
|
947
|
JETIP/ ISL/19/05
|
a)Construction of R C C Drain at ward no-5 Moddo vangura Md Tahar Member house to Md.Delwar house, Ch.00-750m b)Construction of R C C drain at ward no-4 Amena Momin shoping mall to shornokoti jewellars, Ch00-160m
|
|
|
0.91
|
0.00
|
96.57
|
M/S Kotha Traders
|
91.74
|
08/08/2019
|
|
28/02/2020
|
85
|
43.68
|
47
|
15/08/2020
|
|
|
32
|
Jamalpur
|
27
|
islampur
|
203
|
947
|
JETIP/ ISL/19/04
|
a)Construction of R C C Drain at ward no-1,2 Islampur BRDB office to Doriabad Asa oftic, Ch00-320m b)Construction of R C C Drain at ward no-2 Islampur TNT more samsul house to Thana more, Ch.00-347m
|
|
|
0.66
|
0.00
|
77.42
|
M/s Hasib Enterprise
|
73.54
|
08/08/2019
|
|
28/02/2020
|
95
|
40.09
|
54
|
15/08/2020
|
|
|
33
|
Jamalpur
|
27
|
islampur
|
203
|
947
|
JETIP/ ISL/19/03
|
a)Construction of R C C Drain at ward no 2 king jalla Ex vice chairman Jahanara poti house to Asraful ullum Madrasha, Ch.00-260m b)Improvement of B C road at Dormokora Bazer internal mad starting form pouro Gorostan to s b store Ch.00-1600m
|
|
1.60
|
0.26
|
0.00
|
96.10
|
M/S Sinthi Enterprise
|
91.30
|
08/08/2019
|
|
28/02/2020
|
100
|
39.00
|
42
|
15/08/2020
|
|
|
34
|
Jamalpur
|
27
|
islampur
|
203
|
947
|
JETIP/ ISL/18902
|
a)Improvement of BC road at. ward no -7 polobanda pultola Azad mia house to sardar ban rail gate, Ch.00-780m b) Construction of R C C Road at ward no-5 porchim bangura Monisha narchary to manik B S C house, ch.00-480m
|
|
1.26
|
0.00
|
0.00
|
79.20
|
M/S Tony Enterprise
|
75.24
|
08/08/2019
|
|
28/02/2020
|
85
|
50.00
|
66
|
15/08/2020
|
|
|
35
|
Jamalpur
|
27
|
islampur
|
203
|
947
|
JETIP/ ISL/19/01
|
a)Construction of R C C road at ward no-7 porchim poloband gov.primary school to Thaki ban via Mohon mia house. Ch.00-570m b))construction of R C C Drain at ward no-2,3 patni para hakim chairman house to Bipul chairman house, ch 00-360m
|
|
0.57
|
0.36
|
0.00
|
104.59
|
M/S Rafique Traders
|
99.36
|
08/08/2019
|
|
28/02/2020
|
90
|
44.31
|
44
|
15/08/2020
|
|
|
36
|
Jamalpur
|
27
|
islampur
|
203
|
947
|
JETIP/ ISL/18/05
|
a)Construction of RCC Road at Uttar Dariabad MD.Biranro Das house to Shalo Shak house.ch.00.00m-310.00m.b)Improvedment of BC Road at Ward no-01 Hospital more to Shoroje Naib house.Ch.00m-500.00 c)Construction of RCC Drain at Ward no -03 Mojajalla MD.Rashid Member house to Mohoshin Driver house. Ch.00m-260.00m.d)Construction of RCC Road at Ward no-09 Kazim uddin house to Chonno Councilor house.ch.00m-170.00m.e)Improvement of B C Road at Polobanda Hafiz master house to Salam Bapari house. Ch.00m-1000.00f)Construction of RCC Road at Rard no-07 Md.Amirul Shak to Poura Eid ga mat . Ch.00 m-220.00m
|
|
2.06
|
0.00
|
0.00
|
217.84
|
M/S Islam Brothers Ltd.
|
184.41
|
08/08/2019
|
|
28/02/2020
|
55
|
29.32
|
15
|
15/08/2020
|
|
|
37
|
Jamalpur
|
27
|
islampur
|
203
|
947
|
JETIP/ ISL/18/04
|
a) Construction of RCC Road at Maji bari Ward no -02 Staring form Maji bari to Md Hasam Doctor house . Ch.00-.350 b)Construction of RCC Drain at Nakjahan Mosque to Dormokora bazer SB store. Ch.00.00 m- 620.00m c)Construction of RCC Road at South Vanguera Md Salam house to MD . Halal Shak house .Ch.00m -380.00m .d)Construction of Drain at Ward no- 8, 9 Stating form Hazi Bahaj uddin Madrasha more to Mosaraf Gong jama Mosqua Ch.00m -250.00m.e)Construction of RCC Road at Ward no-04 Mondol para Babo Market to Mando Rice mile .Ch00.00m-510.00
|
|
1.81
|
0.66
|
0.00
|
240.92
|
M/S Islam Brothers Ltd.
|
203.94
|
08/08/2019
|
|
28/02/2020
|
50
|
35.00
|
17
|
15/08/2020
|
|
|
38
|
Jamalpur
|
27
|
islampur
|
203
|
947
|
JETIP/ ISL/18/03
|
Construction of RCC Road with Embankment and Drain at Tagria Ward no- 7,8 Starting form Ex. Honourable Minister Md. Rashid Mosaraf Poltry farm to Nangti kaly Bridge. Ch.00.00m- 620.00m.
|
|
1.60
|
0.26
|
0.00
|
275.87
|
CE-ME JV
|
233.80
|
08/08/2019
|
|
28/02/2020
|
50
|
10.00
|
4
|
15/08/2020
|
|
|
39
|
Jamalpur
|
27
|
islampur
|
203
|
947
|
JETIP/ ISL/18/02
|
a)Construction of RCC Road at Islampur Bazer Internal road Ward no -02..CH.00.00m-1200.00m. b)Construction of R C C Road at Vangura Ward no -05 Staring Rokaya house to Porchim Vangura MD Akbor House . Ch.00-490.00m.
|
|
1.69
|
0.00
|
0.00
|
257.61
|
CE-ME JV
|
211.37
|
08/08/2019
|
|
28/02/2020
|
85
|
66.00
|
31
|
01/01/1900
|
|
|
40
|
Jamalpur
|
27
|
islampur
|
203
|
947
|
JETIP/ ISL/18/01
|
a) Construction RCC Road at Tagoria ward no -8 Strating form Ex Honourable Minister Md Rashid Mosaraf polty farm to Boailmary Md .Haider ali house. Via Police supper Md.Manik mia house. Ch.00m-780.00m b) b) Construction of Tagoria mire para Asad Master house to Idrish Ali house at Ward no- 08. Ch.00-550.00. c)) Construction of Drain at ward no 09 Dorna Para Rail x to Poscho mia house. Ch. 00-.00m-400.00.d)Improvement of B C road at ward no -06 Rishe Para more to S B store via Kachari Bridge . Ch.00m- 600.00m.
|
|
2.37
|
0.00
|
0.00
|
230.45
|
M/S Islam Brothers Ltd.
|
189.23
|
08/08/2019
|
|
28/02/2020
|
90
|
52.00
|
27
|
15/08/2020
|
|
|
41
|
Jamalpur
|
27
|
jamalpur-s
|
204
|
947
|
JETIP/JAM/19/51
|
Construction of Retaing wall ,FOOTpath and beautification work of Matri sadan adjacent pond road at Jamalpur Pourashava ( Retaing wall-116m Fottpath -116m)
|
|
|
0.00
|
0.00
|
91.10
|
H Mtraders
|
86.55
|
10/09/2020
|
|
10/09/2021
|
0
|
0.00
|
0
|
15/08/2020
|
|
|
42
|
Jamalpur
|
27
|
jamalpur-s
|
204
|
947
|
JETIP/JAM/19/50
|
Construction of retaining wall, foot path and beautification work of basak para road at Jamalpur Pourashava( Retaing wall-124m,Drain-40m and Footpath-134m)
|
|
0.04
|
0.00
|
0.00
|
132.80
|
M/S Molla Traders
|
126.16
|
06/09/2020
|
|
06/09/2021
|
0
|
0.00
|
0
|
15/08/2020
|
|
|
43
|
Jamalpur
|
27
|
jamalpur-s
|
204
|
947
|
JETIP/JAM/19/49
|
Improvement of Bhrammoputro ferry ghat Bridge bus stand to Foujdary Moar road with footpath and beautification ch.00-3439m
|
|
3.34
|
0.00
|
0.00
|
366.84
|
M/s. Alam Construction
|
308.91
|
29/07/2020
|
|
29/07/2021
|
0
|
0.00
|
0
|
15/08/2020
|
|
|
44
|
Jamalpur
|
27
|
jamalpur-s
|
204
|
947
|
JETIP/JAM/19/48
|
Improvement of road by RCC and construction of RCC drain starting from Chamra gudam mour to Nirala Cinema Hall ch,00-708 m and Link road starting from R&H road to Porichorja Clinic (Shaid Harun Sarak) ch. 00-246m
|
|
0.95
|
0.95
|
0.00
|
429.42
|
SRS and Uzzal Enterpise
|
425.30
|
01/01/1900
|
|
|
0
|
0.00
|
0
|
15/08/2020
|
|
|
45
|
Jamalpur
|
27
|
jamalpur-s
|
204
|
947
|
JETIP/JAM/19/47
|
Construction of RCC road and Both sides RCC drain with cover slab starting from vocational mour to Malgudam road ch. 00-582m
|
|
0.58
|
0.58
|
0.00
|
377.75
|
Jamlgomj JV
|
295.39
|
01/01/1900
|
|
|
0
|
0.00
|
0
|
15/08/2020
|
|
|
46
|
Jamalpur
|
27
|
jamalpur-s
|
204
|
947
|
JETIP/JAM/19/46
|
Improvement of road by DBC starting from Jahurul fishery mour bypass to sattopir Bazer via Bamonpara mour ch. 00-2000m
|
|
2.00
|
0.00
|
0.00
|
254.46
|
M/S Alam construction
|
193.16
|
01/01/1900
|
|
|
0
|
0.00
|
0
|
15/08/2020
|
|
|
47
|
Jamalpur
|
27
|
jamalpur-s
|
204
|
947
|
JETIP/JAM/19/45
|
Improvement of road by RCC starting from Bagerhata Bottola Mour to R&H bypass road via Monirajpur ch. 00-1140
|
|
1.14
|
0.00
|
0.00
|
293.29
|
SRS and Uzzal Enterpise
|
227.42
|
01/01/1900
|
|
|
0
|
0.00
|
0
|
15/08/2020
|
|
|
48
|
Jamalpur
|
27
|
jamalpur-s
|
204
|
947
|
JETIP/JAM/19/44
|
Improvement of road by RCC starting from R&H road Nakibuddin hospital to old Pourashava gate Mosque R&H raod via Mridha Para mour ch 00-864m and link road starting from uttaran to Law college road ch.00-210m
|
|
1.07
|
0.00
|
0.00
|
516.33
|
Alam Tanvir JV
|
404.00
|
01/01/1900
|
|
|
0
|
0.00
|
0
|
15/08/2020
|
|
|
49
|
Jamalpur
|
27
|
jamalpur-s
|
204
|
947
|
JETIP/JAM/19/43
|
Rehabilitation of Brick masonary Drain with cover slab and construction of RCC road starting from Dewan para mour to Foujdari mour ch.00 -530m
|
|
|
0.53
|
0.00
|
207.77
|
M/S Drobo trade Agency
|
161.06
|
01/01/1900
|
|
|
0
|
0.00
|
0
|
15/08/2020
|
|
|
50
|
Jamalpur
|
27
|
jamalpur-s
|
204
|
947
|
JETIP/JAM/19/42
|
Construction of RCC road and Drain starting from college road to kafil Mukter House road ch.00-260
|
|
0.26
|
0.26
|
0.00
|
129.14
|
M/s Jugul Enterprise
|
122.69
|
05/07/2020
|
|
07/05/2021
|
40
|
10.00
|
0
|
15/08/2020
|
|
|
51
|
Jamalpur
|
27
|
jamalpur-s
|
204
|
947
|
JETIP/JAM/19/41
|
Construction of RCC road starting from college road to Mr. Md Abul Kalam Azed House ch.00-240
|
|
0.24
|
0.00
|
0.00
|
105.41
|
M/s Bhyuan Bricks Manufacturing
|
100.14
|
07/07/2020
|
|
07/07/2021
|
40
|
8.00
|
0
|
15/08/2020
|
|
|
52
|
Jamalpur
|
27
|
jamalpur-s
|
204
|
947
|
JETIP/JAM/19/40
|
Improvement of road by DBC starting from Shepur bypass to Nasirpur school via langoljura rail gate ch.00-2400m
|
|
2.40
|
0.00
|
0.00
|
287.00
|
M/S Alam construction
|
218.03
|
01/01/1900
|
|
|
0
|
0.00
|
0
|
15/08/2020
|
|
|
53
|
Jamalpur
|
27
|
jamalpur-s
|
204
|
947
|
JETIP/JAM/19/39
|
Improvement of road by RCC starting from BSIC Amtola Mour to Mondol House ch.00-510m
|
|
0.51
|
0.00
|
0.00
|
90.87
|
The engineering and Construction
|
86.33
|
01/01/1900
|
|
|
40
|
0.00
|
0
|
15/08/2020
|
|
|
54
|
Jamalpur
|
27
|
jamalpur-s
|
204
|
947
|
JETIP/JAM/19/38
|
Construction of RCC Drain with cover slab Starting from sader mosque to bonder bari Road Ch).0+000-480m
|
|
|
0.48
|
0.00
|
84.28
|
M/S Ahnaf Enterprise
|
80.06
|
14/01/2020
|
|
14/06/2020
|
40
|
0.00
|
0
|
15/08/2020
|
|
|
55
|
Jamalpur
|
27
|
jamalpur-s
|
204
|
947
|
JETIP/JAM/19/37
|
Improvememnt of road by RCC Starting from Sader Mosque to Bonder bari Road Ch.000-480m
|
|
0.48
|
0.00
|
0.00
|
98.25
|
M/S Mohammad Ali
|
93.33
|
14/01/2020
|
|
14/06/2020
|
20
|
0.00
|
0
|
15/08/2020
|
|
|
56
|
Jamalpur
|
27
|
jamalpur-s
|
204
|
947
|
JETIP/JAM/19/36
|
Construction of RCC Drain with cover slabat Iqbalpur mosque road Ch.0+000 to 335m( 00- R/s)
|
|
|
0.33
|
0.00
|
42.34
|
M/S Shadman Construction
|
40.23
|
14/01/2020
|
|
14/06/2020
|
0
|
0.00
|
0
|
15/08/2020
|
|
|
57
|
Jamalpur
|
27
|
jamalpur-s
|
204
|
947
|
JETIP/JAM/19/35
|
Improvement of road by RCC of Iqbalpur mosque road at Ch.0+000+335km
|
|
0.34
|
0.00
|
0.00
|
101.07
|
M/S Nurjahan Enterprise
|
96.02
|
14/01/2020
|
|
14/06/2020
|
0
|
0.00
|
0
|
15/08/2020
|
|
|
58
|
Jamalpur
|
27
|
jamalpur-s
|
204
|
947
|
JETIP/JAM/19/34
|
Construction of RCC Drain with cover slab starting from R&H bypass to Ghoba khali khal (Out fall) Via Monirajpur Road Ch.0+000km to 340km (Both sides) of the road
|
|
|
0.68
|
0.00
|
85.32
|
M/S Masum and three Brothers
|
81.06
|
14/01/2020
|
|
14/01/2020
|
80
|
20.00
|
0
|
15/08/2020
|
|
|
59
|
Jamalpur
|
27
|
jamalpur-s
|
204
|
947
|
JETIP/JAM/19/33
|
Construction of RCC Drain with cover slab starting from Bagerhata Bottlola to Ghoba khali khal (Out fall) via Monirajpur road Ch.0+000km t+740km (Both sides of raod)
|
|
|
1.48
|
0.00
|
183.36
|
M/S Nasir Enterprise
|
174.19
|
15/01/2020
|
|
15/06/2020
|
100
|
0.00
|
0
|
15/08/2020
|
|
|
60
|
Jamalpur
|
27
|
jamalpur-s
|
204
|
947
|
JETIP/JAM/19/32
|
Construction of RCC Drain with cover slab starting from Khashru house to Jillar Mour at Mridhapara Ch.180-360m(New Right side) and 0+000 to 380(Old L/S)
|
|
|
0.56
|
0.00
|
36.10
|
M/S Faiza Cnnstruction
|
42.77
|
14/01/2020
|
|
14/06/2020
|
10
|
0.00
|
0
|
15/08/2020
|
|
|
61
|
Jamalpur
|
27
|
jamalpur-s
|
204
|
947
|
JETIP/JAM/19/31
|
Improve ment of road by RCC starting from Kashru House to Jillar Mour at Mridhapara at Ch.0+000 to 380m
|
|
0.38
|
0.00
|
0.00
|
107.32
|
MD. Rahad Khan
|
101.96
|
14/01/2020
|
|
14/06/2020
|
15
|
0.00
|
0
|
15/08/2020
|
|
|
62
|
Jamalpur
|
27
|
jamalpur-s
|
204
|
947
|
JETIP/JAM/19/30
|
Improvement of road by RCC starting from Ashek Mahmud College moar to R&H roadvia poura Graveyard Ch.0+000km to 0+750km
|
|
0.75
|
0.00
|
0.00
|
218.23
|
A. Traders And D.Enterprise [JV]
|
176.68
|
01/01/1900
|
|
|
50
|
0.00
|
0
|
15/08/2020
|
|
|
63
|
Jamalpur
|
27
|
jamalpur-s
|
204
|
947
|
JETIP/JAM/19/29
|
Improvement of road by RCC starting from Ashek Mahmud College moar to R&H roadvia poura Graveyard Ch.0+750km to 1+050km
|
|
0.30
|
0.00
|
0.00
|
81.99
|
M/S Talukder Enterprise
|
77.89
|
14/01/2020
|
|
14/06/2020
|
50
|
0.00
|
0
|
15/08/2020
|
|
|
64
|
Jamalpur
|
27
|
jamalpur-s
|
204
|
947
|
JETIP/JAM/19/28
|
Improvement of road by RCC starting from Ashek Mahmud College moar to R&H roadvia poura Graveyard Ch.1+050km to 1+602km
|
|
0.55
|
0.00
|
0.00
|
152.65
|
Md. Abdus Satter
|
143.07
|
14/01/2020
|
|
14/06/2020
|
50
|
0.00
|
0
|
15/08/2020
|
|
|
65
|
Jamalpur
|
27
|
jamalpur-s
|
204
|
947
|
JETIP/JAM/19/27
|
Construction of RCC drain with cover slab starting from Khopibari Rail Gate to Police line Bridge Ghobakhali Khal(out fall) Both sides of raod 1+520km to 0+920=600m (backward)
|
|
1.20
|
0.00
|
0.00
|
148.52
|
M/S Raifah Construction
|
141.09
|
14/01/2020
|
|
14/06/2020
|
50
|
0.00
|
0
|
15/08/2020
|
|
|
66
|
Jamalpur
|
27
|
jamalpur-s
|
204
|
947
|
JETIP/JAM/19/26
|
Construction of RCC drain with cover slab starting from Beltia BazerR&H BC road to Police line bridge Gobakhali Khal (out fall)Ch. 0+000km to 0+920km ( Both sides)
|
|
1.84
|
0.00
|
0.00
|
227.75
|
Mam Construction-Shams Engineering (JV)
|
169.70
|
19/03/2020
|
|
19/03/2021
|
10
|
0.00
|
0
|
15/08/2020
|
|
|
67
|
Jamalpur
|
27
|
jamalpur-s
|
204
|
947
|
JETIP/JAM/19/25
|
Improvement of Road by RCC starting from Beltia Bazer R&H BC road to Police lime BridgeCh.0+000 km to 0+920km
|
|
0.92
|
0.00
|
0.00
|
355.91
|
Mam Construction-Shams Engineering (JV)
|
272.27
|
19/03/2019
|
|
19/03/2021
|
10
|
0.00
|
0
|
15/08/2020
|
|
|
68
|
Jamalpur
|
27
|
jamalpur-s
|
204
|
947
|
JETIP/JAM/19/24
|
Improvement of Road by RCC starting from Khopibari Rail gate to Bamon para Moar Ch.1+520km to 2+150
|
|
0.63
|
0.00
|
0.00
|
173.87
|
M/S Shabuz Enterprise
|
165.18
|
15/01/2020
|
|
15/06/2020
|
70
|
0.00
|
0
|
15/08/2020
|
|
|
69
|
Jamalpur
|
27
|
jamalpur-s
|
204
|
947
|
JETIP/JAM/19/23
|
Improvement of Road by RCC starting from Police line Bridge to Khopibari Rail Gate Ch.0+920 km to 1+520km
|
|
0.50
|
0.00
|
0.00
|
232.64
|
Rana Builders (Pvt.) Ltd.
|
189.00
|
01/01/1900
|
|
|
0
|
0.00
|
0
|
15/08/2020
|
|
|
70
|
Jamalpur
|
27
|
jamalpur-s
|
204
|
947
|
JETIP/JAM/19/22
|
Improvement Road by RCC & Construction of RCC drain starting fromMadergong road to new college road Sahjmal hospital via Kushumbag Mosque Ch.00-460m
|
|
0.46
|
0.46
|
0.00
|
81.20
|
M/S Adi Enterprise
|
77.14
|
07/09/2019
|
|
09/01/2020
|
100
|
45.00
|
58
|
15/08/2020
|
|
|
71
|
Jamalpur
|
27
|
jamalpur-s
|
204
|
947
|
JETIP/JAM/19/21
|
Construction of RCC drain starting from Zigatola to Railway Outfall Ch.00-500m
|
|
|
0.50
|
0.00
|
84.38
|
M/S Abtahi ENTERPRISE
|
80.16
|
27/06/2019
|
|
24/12/2019
|
60
|
30.00
|
37
|
15/08/2020
|
|
|
72
|
Jamalpur
|
27
|
jamalpur-s
|
204
|
947
|
JETIP/JAM/19/20
|
Improvement Road by RCC & Construction of RCC drain both side starting from R & H Road Zahada Safir Mohila College to Munshipara Mosque Ch. 00-204m
|
|
0.20
|
0.00
|
0.00
|
127.08
|
SRS Construction and Uzzal Enterpise
|
126.22
|
22/08/2019
|
|
22/06/2020
|
92
|
82.63
|
65
|
15/08/2020
|
|
|
73
|
Jamalpur
|
27
|
jamalpur-s
|
204
|
947
|
JETIP/JAM/19/19
|
Improvement Road by RCC starting from Nayapara Char Rasta Mour to West Nayapara Rail Line via West Nayapara Char Rasta Mour ch 00-720m
|
|
0.72
|
0.00
|
0.00
|
131.88
|
SRS Construction and Uzzal Enterpise
|
131.60
|
22/08/2019
|
|
22/06/2020
|
60
|
0.00
|
0
|
15/08/2020
|
|
|
74
|
Jamalpur
|
27
|
jamalpur-s
|
204
|
947
|
JETIP/JAM/19/18
|
a)Improvement Road by RCC starting from Bogabaid BC Road near at Primary School to Mr. Samsul Alam House ch 00-150m b)Improvement Road by RCC starting from East Fulbariya Road to Asmani house ch 00-300m
|
|
0.45
|
0.00
|
0.00
|
49.85
|
M/S Akanda Enterprise
|
47.36
|
07/09/2019
|
|
09/01/2020
|
75
|
20.36
|
43
|
15/08/2020
|
|
|
75
|
Jamalpur
|
27
|
jamalpur-s
|
204
|
947
|
JETIP/JAM/19/17
|
Improvement Road by DBC Starting R & H Raod to Morabari Mour ch 00-500m
|
|
0.50
|
0.00
|
0.00
|
38.25
|
Alhaz Nazrul Islam
|
36.33
|
27/06/2019
|
|
27/12/2019
|
100
|
36.33
|
100
|
15/08/2020
|
|
|
76
|
Jamalpur
|
27
|
jamalpur-s
|
204
|
947
|
JETIP/JAM/19/16
|
Improvement Road by RCC starting from Pachrasta Moar to R & H Road via A. M. College & LGED Office ch 240-1035m
|
|
0.80
|
0.00
|
0.00
|
168.95
|
M/S Sohel Enterprise
|
160.50
|
29/09/2019
|
|
05/05/2020
|
75
|
30.00
|
19
|
15/08/2020
|
|
|
77
|
Jamalpur
|
27
|
jamalpur-s
|
204
|
947
|
JETIP/JAM/19/15
|
Improvement Road by RCC starting from Pachrasta Moar to R & H Road via AM. College & LGED Office ch 00-240.00m (03 Nos X-Drain)
|
|
0.24
|
0.00
|
0.00
|
139.35
|
SRS Construction and Uzzal Enterpise
|
139.12
|
22/08/2019
|
|
22/06/2020
|
100
|
115.15
|
83
|
15/08/2020
|
|
|
78
|
Jamalpur
|
27
|
jamalpur-s
|
204
|
947
|
JETIP/JAM/19/14
|
Improvement Road by RCC starting from Burir Shop to Bagerhata Bottola via Khalek Shop ch 00-800m
|
|
0.80
|
0.00
|
0.00
|
337.65
|
SRS Construction and Uzzal Enterpise
|
272.73
|
26/09/2019
|
|
26/06/2020
|
96
|
150.39
|
55
|
15/08/2020
|
|
|
79
|
Jamalpur
|
27
|
jamalpur-s
|
204
|
947
|
JETIP/JAM/19/13
|
Construction of RCC Drain Both Side Starting from Nayapara Charasta Mour to West Nayapara Rail Line via West Nayapara Char Rasta Mour ch 00-720m
|
|
|
0.72
|
0.00
|
221.22
|
M/S Nazrul Engineering
|
210.16
|
29/09/2020
|
|
05/05/2020
|
80
|
95.00
|
45
|
15/08/2020
|
|
|
80
|
Jamalpur
|
27
|
jamalpur-s
|
204
|
947
|
JETIP/JAM/19/12
|
a) Improvement of Road by RCC starting from Boshepara Mour Aslam Shop to Safimia Bazar via Jogobondhu High School ch 00-661m b ) Construction of RCC Drain starting from Boshepara Mour Aslam Shop to Safimia Bazar via Jogobondhu High School ch 00-350m
|
|
0.66
|
0.35
|
0.00
|
116.84
|
M/S Arif enterprise
|
111.00
|
24/06/2019
|
|
24/01/2020
|
90
|
40.00
|
36
|
15/08/2020
|
|
|
81
|
Jamalpur
|
27
|
jamalpur-s
|
204
|
947
|
JETIP/JAM/19/11
|
Construction of RCC Drain starting from Bonderbari Road to Dakpara Main Drain ch 00-500m
|
|
0.50
|
0.00
|
0.00
|
79.03
|
M/S Kahan Traders
|
75.08
|
14/07/2019
|
|
14/01/2020
|
80
|
35.00
|
47
|
15/08/2020
|
|
|
82
|
Jamalpur
|
27
|
jamalpur-s
|
204
|
947
|
JETIP/JAM/19/10
|
Improvement Road by RCC starting from Sakal Bazar to Matrisodon Road ch 00-444m
|
|
0.44
|
0.00
|
0.00
|
92.72
|
M/S Titash Construction
|
88.08
|
27/06/2019
|
|
14/01/2020
|
100
|
20.00
|
23
|
15/08/2020
|
|
|
83
|
Jamalpur
|
27
|
jamalpur-s
|
204
|
947
|
JETIP/JAM/19/09
|
Construction of RCC Drain & cover slab both side starting from Sakal Bazar to Matrisodon Road ch 00-444m & Construction of 01 No. X-Drain ch 444m
|
|
|
0.44
|
0.00
|
137.50
|
SRS Construction and Uzzal Enterpise
|
137.00
|
22/08/2019
|
|
22/06/2020
|
100
|
99.57
|
73
|
15/08/2020
|
|
|
84
|
Jamalpur
|
27
|
jamalpur-s
|
204
|
947
|
JETIP/JAM/19/08
|
Improvement Road by RCC starting from Dewanpara Mour to College Road via Lichutola Moar ch 00-400m
|
|
0.40
|
0.00
|
0.00
|
50.47
|
M/S B J Enterprise ,
|
47.94
|
24/06/2019
|
|
24/12/2019
|
100
|
47.94
|
100
|
15/08/2020
|
|
|
85
|
Jamalpur
|
27
|
jamalpur-s
|
204
|
947
|
JETIP/JAM/19/07
|
Improvement Road by DBC Starting from Daponiya Could stroge to Diyabari BC Road ch 00-1200m
|
|
1.20
|
0.00
|
0.00
|
55.12
|
M/S Kabir Enterprise
|
52.36
|
27/06/2019
|
|
27/12/2019
|
100
|
35.16
|
67
|
15/08/2020
|
|
|
86
|
Jamalpur
|
27
|
jamalpur-s
|
204
|
947
|
JETIP/JAM/19/06
|
a) Improvement Road by HBB starting from Gatepar to West Fulbariya Level Crossing beside Jamalpur-Sarishabari Rail Line ch 00-1080m & Construction of 01 Nos. X-Drain (1000x1000) b)Improvement Road by HBB Starting Polashghar BC Road to Eid Gha Field ch 00-450m
|
|
1.53
|
0.00
|
0.00
|
87.41
|
M/S Nasir Enterprise
|
83.04
|
27/06/2019
|
|
27/12/2019
|
100
|
59.57
|
72
|
15/08/2020
|
|
|
87
|
Jamalpur
|
27
|
jamalpur-s
|
204
|
947
|
JETIP/JAM/19/05
|
a) Improvement Road by RCC starting from R & H BC Road to Morad house ch 00-228m b)Improvement Road by HBB Starting Horipur nutun Bazar to Masimpur Tara house ch 00-850m
|
|
1.78
|
0.00
|
0.00
|
74.63
|
M/S Akhter Sahin Associates
|
70.90
|
30/06/2019
|
|
30/06/2019
|
65
|
19.00
|
27
|
15/08/2020
|
|
|
88
|
Jamalpur
|
27
|
jamalpur-s
|
204
|
947
|
JETIP/JAM/19/04
|
Improvement Road by HBB Starting Aleya Azam Road ch 00-500m
|
|
0.55
|
0.00
|
0.00
|
70.29
|
M/S Ma Baba Enterprise
|
66.77
|
06/07/2019
|
|
07/12/2019
|
100
|
37.00
|
55
|
15/08/2020
|
|
|
89
|
Jamalpur
|
27
|
jamalpur-s
|
204
|
947
|
JETIP/JAM/19/03
|
Improvement Road by RCC Starting from Beltiya Sahjahan House (Subhan Ukil) to Beltiya BC Road ch 00-555m
|
|
0.56
|
0.00
|
0.00
|
81.76
|
M/S Raifah Construction
|
77.67
|
30/06/2019
|
|
30/12/2019
|
95
|
30.00
|
39
|
15/08/2020
|
|
|
90
|
Jamalpur
|
27
|
jamalpur-s
|
204
|
947
|
JETIP/JAM/19/02
|
mprovement of road by DBC & RCC Starting from Zahurul Fishary moar to Tirutha Bottola Bazar via Bamonpara moar ch 00-600m
|
|
|
0.60
|
0.00
|
61.16
|
M/S M M Enterprise
|
58.10
|
23/06/2019
|
|
30/12/2019
|
100
|
58.93
|
100
|
15/08/2020
|
|
|
91
|
Jamalpur
|
27
|
jamalpur-s
|
204
|
947
|
JETIP/JAM/19/01
|
a) Improvement of road by RCC Starting from NSI Office to Dakpara moar via Rashida Biri Factory moar from ch 00-1254m b) Construction of RCC Drain & Cover Slab Starting from NSI Office to Dakpara moar via Rashida Biri Factory moar ch 00-1200.00m & Construction of 01 No (700x1050mm) X-Drain at ch 900m
|
|
1.25
|
1.20
|
0.00
|
345.77
|
M/S A S Construction
|
326.76
|
26/09/2019
|
|
26/06/2020
|
85
|
146.89
|
45
|
15/08/2020
|
|
|
92
|
Jamalpur
|
27
|
jamalpur-s
|
204
|
947
|
JETIP/JAM/18/08
|
a)Construction of RCC Drain Starting From Guabaria Baitul Aman Mosque to Sluich Gate ch 00-950.00m under Jamalpur Pourashava, Dist: Jamalpur b)Improvement Road by DBC Starting from Pathaliya chatar mour to Kompopur ch 00-2100.00m & ( X-Drain 3-nos) Under Jamalpur Pourashava, Dist: Jamalpur
|
|
|
0.00
|
0.00
|
343.83
|
|
276.89
|
28/04/2019
|
|
28/04/2020
|
100
|
216.80
|
78
|
15/08/2020
|
|
|
93
|
Jamalpur
|
27
|
jamalpur-s
|
204
|
947
|
JETIP/JAM/18/07
|
Improvement Road by DBC Starting from NSI Office to Dakpara Mour via Rashida Biri Factory Mour ch 00-1200.00m. Under Jamalpur Pourashava, Dist: Jamalpur
|
|
|
0.00
|
0.00
|
0.00
|
|
0.00
|
01/01/1900
|
|
|
0
|
0.00
|
0
|
15/08/2020
|
|
|
94
|
Jamalpur
|
27
|
jamalpur-s
|
204
|
947
|
JETIP/JAM/18/06
|
Construction of RCC Drain Starting from Chandra Ghunti to Rashidpur Bottola ch 00-1500.00m under Jamalpur Pourashava, Dist: Jamalpur
|
|
1.50
|
0.00
|
0.00
|
256.57
|
M/S Dhorob Trade Agency h.
|
211.12
|
28/04/2019
|
|
26/01/2020
|
82
|
58.00
|
27
|
15/08/2020
|
|
|
95
|
Jamalpur
|
27
|
jamalpur-s
|
204
|
947
|
JETIP/JAM/18/05
|
Construction of RCC Drain Starting from Cold Storage Road Mour to Nadir Par Via Dighir Par ch 00-1200.00m under Jamalpur Pourashava, Dist: Jamalpur
|
|
1.20
|
0.00
|
0.00
|
453.95
|
M/S Dhorob Trade Agency
|
374.46
|
28/04/2019
|
|
26/01/2020
|
90
|
220.50
|
59
|
15/08/2020
|
|
|
96
|
Jamalpur
|
27
|
jamalpur-s
|
204
|
947
|
JETIP/JAM/18/04
|
Construction of RCC Drain Starting from Gatepar to Goba Khali Khal on the Railway lowland ch 1400-2000.00m under Jamalpur Pourashava, Dist: Jamalpur
|
|
0.60
|
0.00
|
0.00
|
226.43
|
M/s Chowdury Enterprise
|
182.24
|
28/04/2019
|
|
26/01/2020
|
70
|
87.26
|
48
|
15/08/2020
|
|
|
97
|
Jamalpur
|
27
|
jamalpur-s
|
204
|
947
|
JETIP/JAM/18/03
|
Construction of RCC Drain Starting from Fishary Office to Goba Khali Khal via Homeo College Mour ch 00-1700.00m under Jamalpur Pourashava, Dist: Jamalpur
|
|
1.70
|
0.00
|
0.00
|
325.32
|
M/S Dhorob Trade Agency
|
263.12
|
28/04/2019
|
|
26/01/2020
|
80
|
135.72
|
52
|
15/08/2020
|
|
|
98
|
Jamalpur
|
27
|
jamalpur-s
|
204
|
947
|
JETIP/JAM/18/02
|
Construction of RCC Drain & Road Starting from Banakura Mour to Bottola via Sardar para 246.00m under Jamalpur Pourashava, Dist: Jamalpur
|
|
0.25
|
0.00
|
0.00
|
94.03
|
M/s Aksa Enterprise
|
89.33
|
12/03/2019
|
|
11/09/2020
|
100
|
65.63
|
74
|
15/08/2020
|
|
|
99
|
Jamalpur
|
27
|
jamalpur-s
|
204
|
947
|
JETIP/JAM/18/01
|
a) RCC Drain Starting from College Moure to Dewanpara via Jagoroni Club ch 00-530.00.00m. Under Jamalpur Pourashava, Dist: Jamalpur b) Cleaning of Bangsha Khal Ch.00-1500m under Jamalpur Pourashava, Dist: Jamalpur
|
|
2.03
|
0.00
|
0.00
|
98.32
|
M/s Alhaj Enterprise .
|
92.99
|
07/03/2019
|
|
16/10/2019
|
95
|
59.49
|
64
|
15/08/2020
|
|
|
100
|
Jamalpur
|
27
|
madarganj
|
205
|
947
|
JETIP/ MAD/19/16
|
Construction of RCC drain with footpath starting from the Moktizodda Complex Bhababon to the Main darin at Upazila road (Pondid Para Mosjid) Ch.00-400m
|
|
|
0.40
|
0.00
|
58.77
|
M/S Urmi Enterprise
|
61.68
|
15/01/2020
|
|
14/09/2020
|
95
|
0.00
|
0
|
15/08/2020
|
|
|
101
|
Jamalpur
|
27
|
madarganj
|
205
|
947
|
JETIP/ MAD/19/15
|
Construction of RCC drain with footpath starting from the house of Mr.Hafiz to the main drain (Near Shofi Haler) Upazila road Ch.00-500m)
|
|
|
0.50
|
0.00
|
75.95
|
M/S Neha Enterprise
|
79.71
|
16/01/2020
|
|
15/09/2020
|
95
|
0.00
|
0
|
15/08/2020
|
|
|
102
|
Jamalpur
|
27
|
madarganj
|
205
|
947
|
JETIP/ MAD/19/14
|
Construction of carpeting road starting from Zoina Chitroj more towards Mridha Bari Mosjid at Khudra Zoinal ch.00-620m
|
|
0.62
|
0.00
|
0.00
|
108.20
|
M/S Laboni Enterprise
|
113.58
|
18/01/2020
|
|
17/09/2020
|
55
|
0.00
|
0
|
15/08/2020
|
|
|
103
|
Jamalpur
|
27
|
madarganj
|
205
|
947
|
JETIP/ MAD/19/13
|
Construction of carpeting road starting from the house of Mr. Jahangir at Chandpur paka road to the house of Mr.Salayman at badth Ch.00-1000m
|
|
1.00
|
0.00
|
0.00
|
117.10
|
M/S Laboni Enterprise
|
122.92
|
14/01/2020
|
|
13/09/2020
|
60
|
0.00
|
0
|
15/08/2020
|
|
|
104
|
Jamalpur
|
27
|
madarganj
|
205
|
947
|
JETIP/ MAD/19/12
|
Construction of carpeting road starting from the house of Mr. Mirza Rabbi towards the Zoinal Raisha Madrasha Gate at Kudra zoinal ch.00-600m
|
|
0.60
|
0.00
|
0.00
|
105.80
|
M/S Laboni Enterprise
|
110.98
|
19/01/2020
|
|
18/09/2020
|
50
|
0.00
|
0
|
15/08/2020
|
|
|
105
|
Jamalpur
|
27
|
madarganj
|
205
|
947
|
JETIP/ MAD/19/11
|
Construction of carpeting road starting from RHD road (Near Sohraber more) to the House of Mr.Abul Zolil at Khudra Zonail (Ch.00-630)m
|
|
0.63
|
0.00
|
0.00
|
109.77
|
M/S Annesha Enterprise
|
115.20
|
15/01/2020
|
|
14/09/2020
|
70
|
0.00
|
0
|
15/08/2020
|
|
|
106
|
Jamalpur
|
27
|
madarganj
|
205
|
947
|
JETIP/ MAD/19/10
|
a.) Construction of RCC Drain with Footpath starting from the House of Mr. Shofikur Rahman to the main drain at Upazila road Ch.00-500m b). Construction of RCC. Drain with Footpath starting from the House of Mr. Monohor to the main drain at Upazila road (Near girls School moar) Ch.00-400m
|
|
|
0.90
|
0.00
|
123.51
|
|
0.00
|
01/01/1900
|
|
|
0
|
0.00
|
0
|
15/08/2020
|
|
|
107
|
Jamalpur
|
27
|
madarganj
|
205
|
947
|
JETIP/ MAD/19/09
|
a) Construction of RCC road starting from the House of Mr Hanu at Chandpur paka road to the House of Mr. Roshid at Badth Ch.00-1000m b) Construction of RCC. Drain starting from Zonail bazar Morich hati to the Bottola Box culvert at Zonail bazar.Ch.00-500m
|
|
1.50
|
0.00
|
0.00
|
193.06
|
|
0.00
|
01/01/1900
|
|
|
100
|
0.00
|
0
|
15/08/2020
|
|
|
108
|
Jamalpur
|
27
|
madarganj
|
205
|
947
|
JETIP/ MAD/19/03
|
Construction of carpeting road starting from the House of Mr. Azhar towards Gabergram Bazar Ch. 00-820m
|
|
0.82
|
0.00
|
0.00
|
105.53
|
|
0.00
|
01/01/1900
|
|
|
0
|
0.00
|
0
|
15/08/2020
|
|
|
109
|
Jamalpur
|
27
|
madarganj
|
205
|
947
|
JETIP/ MAD/19/01
|
Construction of carpeting road starting from Zonail Chitroraz more towards Zonail Pokhimari RHD road from Ch.00-1950m
|
|
1.95
|
0.00
|
0.00
|
339.29
|
|
0.00
|
01/01/1900
|
|
|
0
|
0.00
|
0
|
15/08/2020
|
|
|
110
|
Jamalpur
|
27
|
melendah
|
206
|
947
|
JETIP/HAZ/19/24
|
(a) Estimate for the Construction of RCC Road Start from Neelakothi Daatvanga main road via Bashuria to Old Daatvanga Moar with 457m Palasiding . Ch.0.00-430.00m. (b) Construction of 02(Two) Nos 600mmX625mm U-drain on the same road at Chs.00-110 & 356m
|
|
0.43
|
0.00
|
0.00
|
91.85
|
|
0.00
|
01/01/1900
|
|
|
0
|
0.00
|
0
|
15/08/2020
|
|
|
111
|
Jamalpur
|
27
|
melendah
|
206
|
947
|
JETIP/HAZ/19/23
|
a) Estimate for the Construction of RCC Road Start from Samshul Haque house to Ray Bari Moar with 50m Palasiding under Hazrabari Pourashava, District: Jamalpur. Ch.0.00-310.00m. b) Construction of 01(One) nos 600mmX625mm U-drain on the same road at Ch.0.00-56m
|
|
0.31
|
0.00
|
0.00
|
48.68
|
|
0.00
|
01/01/1900
|
|
|
0
|
0.00
|
0
|
15/08/2020
|
|
|
112
|
Jamalpur
|
27
|
melendah
|
206
|
947
|
JETIP/HAZ/19/22
|
(a) Estimate for the Construction of RCC Road Start from Dilaler Para Bazar to Muchi House Moar with 288m Palasiding . Ch.0.00-680.00m. b) Construction of 02(Two) Nos 600mmX625mm U-drain on the same road at Chs.00-112 & 288m
|
|
0.68
|
0.00
|
0.00
|
100.59
|
|
0.00
|
01/01/1900
|
|
|
0
|
0.00
|
0
|
15/08/2020
|
|
|
113
|
Jamalpur
|
27
|
melendah
|
206
|
947
|
JETIP/HAZ/19/21
|
Improvement of R.C.C road starting from Jamalpur-Madargonj RHD main road to Mr. Aminul Islam House Ch.00m-235m
|
|
0.24
|
0.00
|
0.00
|
31.60
|
|
0.00
|
01/01/1900
|
|
|
0
|
0.00
|
0
|
15/08/2020
|
|
|
114
|
Jamalpur
|
27
|
melendah
|
206
|
947
|
JETIP/HAZ/19/20
|
a)Estimate for the Construction of RCC Road Start from West Hazrabari Bridge to Beltoil BC main road with Palasiding . Ch.0.00-830.00m. b) Construction of 01(One) nos 600mmX625mm U-drain the same road at Ch.0.00-268m
|
|
0.83
|
0.00
|
0.00
|
132.88
|
|
0.00
|
01/01/1900
|
|
|
0
|
0.00
|
0
|
15/08/2020
|
|
|
115
|
Jamalpur
|
27
|
melendah
|
206
|
947
|
JETIP/HAZ/19/19
|
(a) Estimate for the Construction of RCC Road Start from Dilaler Para Eidgah BC Road to End of BC Road Moar with 301m Palasiding under Hazrabari Pourashava, District: Jamalpur. Ch.0.00-610.00m b) Construction of 01(One) nos 600mmX625mm U-drain the same road at Ch.0.00-268m
|
|
0.88
|
0.00
|
0.00
|
101.87
|
|
0.00
|
01/01/1900
|
|
|
0
|
0.00
|
0
|
15/08/2020
|
|
|
116
|
Jamalpur
|
27
|
melendah
|
206
|
947
|
JETIP/HAZ/19/18
|
(a) Estimate for the Construction of RCC Road Start from East Guza Manika(Mr. Vuttro House) to B.C Main Road with 186mPalasiding Ch.0.00-590.00m. (b) Construction of 02(Two) Nos 600mmX625mm U-drain on the same road at Chs.00-304 & 363m
|
|
0.59
|
0.00
|
0.00
|
94.14
|
|
0.00
|
01/01/1900
|
|
|
0
|
0.00
|
0
|
15/08/2020
|
|
|
117
|
Jamalpur
|
27
|
melendah
|
206
|
947
|
JETIP/HAZ/19/17
|
a) Estimate for the Construction of RCC Road Start from Brahmman Para Mr. Hasan House to west Brahmman Para Bottola Moar under Hazrabari Pourashava, District: Jamalpur. Ch.0.00-390.00m. (b) Construction of 02(Two) Nos 600mmX 625mm U-drain on the same road at Chs.00-151 & 310m
|
|
0.39
|
0.00
|
0.00
|
58.58
|
|
0.00
|
01/01/1900
|
|
|
0
|
0.00
|
0
|
15/08/2020
|
|
|
118
|
Jamalpur
|
27
|
melendah
|
206
|
947
|
JETIP/HAZ/19/16
|
(a) Estimate for the Construction of RCC Road Start from Pahari Potol Mr. Afal House to Mr. Shagor Ali Pond with 435m Palasiding . Ch.0.00-435.00m. (b) Construction of 02(Two) Nos 600mmX625mm U-drain on the same road at Chs.00-69 & 198m
|
|
0.44
|
0.00
|
0.00
|
85.92
|
|
0.00
|
01/01/1900
|
|
|
0
|
0.00
|
0
|
15/08/2020
|
|
|
119
|
Jamalpur
|
27
|
melendah
|
206
|
947
|
JETIP/HAZ/19/15
|
(a) Estimate for the Construction of RCC Road Start from Dhaluya Bari Kosir Bari Moar to 35 No. Dhaluya Bari Govt. Primary School with 48m Palasiding Ch.0.00-250.00m. (b) Construction of 01(One) nos 600mmX625mm U-drain the same road at Ch.0.00-87m
|
|
0.25
|
0.00
|
0.00
|
38.62
|
|
0.00
|
01/01/1900
|
|
|
0
|
0.00
|
0
|
15/08/2020
|
|
|
120
|
Jamalpur
|
27
|
melendah
|
206
|
947
|
JETIP/HAZ/19/14
|
a) Estimate for the Construction of RCC Road Start From Baromashi Khaler Bridge via Mr. Hobi House to Mr. Solayman House with Palasiding under Ch.0.00-650.00m. b) Construction of 02(Two) Nos 600mmX625mm U-drain on the same road at Chs.00-180 & 243m
|
|
0.65
|
0.00
|
0.00
|
106.60
|
|
0.00
|
01/01/1900
|
|
|
0
|
0.00
|
0
|
15/08/2020
|
|
|
121
|
Jamalpur
|
27
|
melendah
|
206
|
947
|
JETIP/HAZ/19/13
|
(a)Estimate for the Construction of RCC Road Start From Hazrabari Beiltoil Bakkar Bari Moar to Gomra Para Sahjahan House with Palasiding . Ch.0.00-640.00m. (b)Construction of 01(One) nos 600mmX625mm U-drain the same road at Ch.0.00-405m
|
|
0.64
|
0.00
|
0.00
|
109.10
|
|
0.00
|
01/01/1900
|
|
|
0
|
0.00
|
0
|
15/08/2020
|
|
|
122
|
Jamalpur
|
27
|
melendah
|
206
|
947
|
JETIP/HAZ/19/12
|
Estimate for the Construction of RCC Road Start From Neelakothi Daat Vanga Moar to Bania Bazar with Palasiding . Ch.0.00-730.00m
|
|
0.73
|
0.00
|
0.00
|
97.78
|
|
0.00
|
01/01/1900
|
|
|
0
|
0.00
|
0
|
15/08/2020
|
|
|
123
|
Jamalpur
|
27
|
melendah
|
206
|
947
|
JETIP/HAZ/19/11
|
Estimate for the Construction of RCC Road Start From Moddho Dilaler Para Bridge to Bania Bazar with Palasiding under Hazrabari Pourashava, District: Jamalpur. Ch.0.00-560.00m
|
|
0.55
|
0.00
|
0.00
|
99.85
|
|
0.00
|
01/01/1900
|
|
|
0
|
0.00
|
0
|
15/08/2020
|
|
|
124
|
Jamalpur
|
27
|
melendah
|
206
|
947
|
JETIP/HAZ/19/10
|
Estimate for the Construction of RCC Road Start from Fulkocha BC Road (Shop of Nurnobi) to Chini Sukar Paar Bridge with Palasiding under Hazrabari Pourashava, District: Jamalpur. Ch.0.00-490.00km
|
|
0.49
|
0.00
|
0.00
|
84.66
|
|
0.00
|
01/01/1900
|
|
|
0
|
0.00
|
0
|
15/08/2020
|
|
|
125
|
Jamalpur
|
27
|
melendah
|
206
|
947
|
JETIP/HAZ/19/09
|
Improvement of Road from H/O Dhaluya Bela Mondal Moar - H/O Mannan Moar from Ch.00 -330m Under Hazrabari Pouashava
|
|
0.33
|
0.00
|
0.00
|
46.65
|
M/S Noushin Enterprise
|
48.87
|
21/11/2019
|
|
20/11/2020
|
100
|
38.90
|
81
|
15/08/2020
|
|
|
126
|
Jamalpur
|
27
|
melendah
|
206
|
947
|
JETIP/HAZ/19/08
|
a) Improvement of Zogot Pattra Masrasha Moar-H/O.Bogor Bari Main Road from Ch.00-521m b) Construction of 600mx625mm U-Drain on the same Road at Ch.76 m Under Hazrabari Pouashava
|
|
0.52
|
0.00
|
0.00
|
75.70
|
M/S Arzu Enterprise
|
79.41
|
21/11/2019
|
|
20/11/2020
|
100
|
34.50
|
43
|
15/08/2020
|
|
|
127
|
Jamalpur
|
27
|
melendah
|
206
|
947
|
JETIP/HAZ/19/07
|
a) Improvement of Koroichora H/O Ahammod Moar Powra Cinema Gate Road from Ch.00-910m b )Construction of 6 Nos. 600mx625mm U-Drain on the same Road at Chs. 40m, 85m, 263m, 450m, 583m & 700m Under HazrabariPouashava
|
|
0.91
|
0.00
|
0.00
|
127.01
|
/S Maharush Enterprise
|
133.23
|
21/11/2019
|
|
20/11/2020
|
95
|
40.50
|
30
|
15/08/2020
|
|
|
128
|
Jamalpur
|
27
|
melendah
|
206
|
947
|
JETIP/HAZ/19/06
|
a) Improvement of Bramman Para Amtala to Eidgah Field Road from Ch.00-660m under Hazrabari Pouashava b) Construction of 600mx625mm U-Drain on the same Road at Ch.242m Under Hazrabari Pouashava
|
|
0.66
|
0.00
|
0.00
|
90.25
|
M/S Ma Traders
|
94.49
|
21/11/2019
|
|
20/11/2020
|
100
|
43.00
|
45
|
15/08/2020
|
|
|
129
|
Jamalpur
|
27
|
melendah
|
206
|
947
|
JETIP/HAZ/19/05
|
Improvement of Adiar Para H/O. Masum-Dilalarpara H/O. Balor Bari Moar Road from Ch.00-750m Under Hazrabari Pouashava
|
|
0.75
|
0.00
|
0.00
|
103.54
|
M/S Himu Enterprise
|
108.46
|
21/11/2019
|
|
20/11/2020
|
95
|
26.00
|
25
|
15/08/2020
|
|
|
130
|
Jamalpur
|
27
|
melendah
|
206
|
947
|
JETIP/HAZ/19/04
|
a) Improvement of Pahari Potal Khalil Master House Road (Near LGED road) - Pahari Potal Bridge Road from Ch.00-945m under Hazrabari Pouashava b) Construction of 600mx625mm U-Drain on the same Road at Ch.370m Under Hazrabari Pouashava
|
|
0.95
|
0.00
|
0.00
|
152.95
|
M/S Taranon Enterprise
|
160.45
|
21/11/2019
|
|
20/11/2020
|
100
|
33.00
|
20
|
15/08/2020
|
|
|
131
|
Jamalpur
|
27
|
melendah
|
206
|
947
|
JETIP/HAZ/19/03
|
a) Improvement of Bramman Para Baro Masi Khaler Bridge - Guja Manika Amtola Road from Ch.00-697m under Hazrabari Pouashava b) Construction of 600mm x 625mm U-Drain on the same road at Ch.575m under Hazrabari Pouashava
|
|
0.70
|
0.00
|
0.00
|
94.33
|
M/S Faraque Traders
|
98.95
|
21/11/2019
|
|
20/11/2020
|
100
|
35.00
|
35
|
15/08/2020
|
|
|
132
|
Jamalpur
|
27
|
melendah
|
206
|
947
|
JETIP/HAZ/19/02
|
a) Improvement of Road by RCC from Jahangir Shop -Adiar Para Bridge from Ch.00-1100m under Hazrabari Pouashav b) Construction of 2 Nos. 600mx625mm U-Drain on the same road at Chs.70m & 930m under Hazrabari Pouashava
|
|
1.10
|
0.00
|
0.00
|
180.49
|
M/S Zaman Construction
|
188.97
|
21/11/2019
|
|
20/11/2020
|
95
|
35.00
|
18
|
15/08/2020
|
|
|
133
|
Jamalpur
|
27
|
melendah
|
206
|
947
|
JETIP/HAZ/19/01
|
a) Improvement of Hazrabari Goru Hati-H/O Gias Modha Bramman Para Moar Road by RCC from Ch.99-1113m under Hazrabari Pouashava b) Construction of 2Nos. 600mx625mm U-Drain on the same road at Chs.180m & 376m under Hazrabari Pouashava
|
|
1.01
|
0.00
|
0.00
|
151.69
|
M/S Riad Enterprise
|
159.19
|
21/11/2019
|
|
20/11/2020
|
100
|
30.00
|
18
|
15/08/2020
|
|
|
134
|
Jamalpur
|
27
|
melendah
|
206
|
947
|
JETIP/MEL/20/13
|
Improvement of RCC road from Nagerpara Krishnochura more to women technical college via master bari road from Ch.00-760m and 1 croos drain at ch.130m(w-3m) link 1 bari master jame mosque more sajedul commisssioner house ch.00-90m(w-3m)
|
|
0.85
|
0.00
|
0.00
|
108.26
|
|
0.00
|
01/01/1900
|
|
|
0
|
0.00
|
0
|
15/08/2020
|
|
|
135
|
Jamalpur
|
27
|
melendah
|
206
|
947
|
JETIP/MEL/20/12
|
Estimate for improvement of RCC road from mlandah bazr nutu Saha more to central Shahid Minar road via Govt. Girls school road from ch.00-405m (w-4.5m and 3.5m)
|
|
0.41
|
0.00
|
0.00
|
83.26
|
|
0.00
|
01/01/1900
|
|
|
0
|
0.00
|
0
|
15/08/2020
|
|
|
136
|
Jamalpur
|
27
|
melendah
|
206
|
947
|
JETIP/MEL/20/11
|
Improvement of RCC road from Adipot T&T more shahid shamor road to satter bakery factory road from Ch.00710m(w-3.5m)
|
|
0.71
|
0.00
|
0.00
|
87.49
|
|
0.00
|
01/01/1900
|
|
|
0
|
0.00
|
0
|
15/08/2020
|
|
|
137
|
Jamalpur
|
27
|
melendah
|
206
|
947
|
JETIP/MEL/20/10
|
Improvement of RCC road from Monowar Hawlader shop to harun member house road from ch.00-410m with 3 nos link road (35m+30m+75m)
|
|
0.55
|
0.00
|
0.00
|
66.06
|
|
0.00
|
01/01/1900
|
|
|
0
|
0.00
|
0
|
15/08/2020
|
|
|
138
|
Jamalpur
|
27
|
melendah
|
206
|
947
|
JETIP/MEL/20/09
|
a) Estimate for improvement of Melandah Bazar Goru hati ditch earth filling and construction of Market shade.b) Estimate for improvement of RCC road Melandah Upazila Sahid Minar to Melandah police station road from Ch.00-295m( w-3.50m) and maintenance of Brick Drain c)Estimaate for improvement of RCC road from Melndah Bazer shapla market to shahid minar road from ch.00-385m
|
|
0.68
|
0.00
|
0.00
|
177.56
|
|
0.00
|
01/01/1900
|
|
|
0
|
0.00
|
0
|
15/08/2020
|
|
|
139
|
Jamalpur
|
27
|
melendah
|
206
|
947
|
JETIP/MEL/20/08
|
a) Estimate for Improvement of RCC road from Melandah Upazila Shahid Minar to TTDC Jame Mosque Road from ch.00-86m(w-3.7m) b)Improvement of RCC road from Chakdah Helal house to Nayanagar BC road via dula house road from ch.532-607m(w-2.5m) c) Estimate for construction of RCC cover slab drain from pachsim Nayanagar kashem house more to Shirajul Islam house (Mosque) from ch.00-150m d) Estimate for construction of RCC cover slab drain from Nayanagar Khaja house to Saheb Ali Hawlader house (600*850m) from ch. 414-536m)
|
|
0.51
|
0.00
|
0.00
|
58.02
|
|
0.00
|
01/01/1900
|
|
|
0
|
0.00
|
0
|
15/08/2020
|
|
|
140
|
Jamalpur
|
27
|
melendah
|
206
|
947
|
JETIP/MEL/20/07
|
a)Improvement of RCC road from Melandah -Mahamudpur road Pachurpara to KP School via Mukul Commissioner house Road from Ch. 280-573m (w-2.5m amd 1 box culvert (2*2.5) at ch.570m b) Improvement of RCC road from melandah Hazrabari road at Janota Bank to Mali Bari Road from ch.00-160m
|
|
0.46
|
0.00
|
0.00
|
69.44
|
|
0.00
|
01/01/1900
|
|
|
0
|
0.00
|
0
|
15/08/2020
|
|
|
141
|
Jamalpur
|
27
|
melendah
|
206
|
947
|
JETIP/MEL/20/06
|
a)Improvement of RCC road from Baroipara Fazlur Rahman house to Daibari Abdur Rashid house road from ch.00-355m(w-250m) with 1 cross drain at ch.130m b) Estimate for improvement of RCC road from Baroipara Duku Shop to Sahidur Rahman House from Ch.00-110m(w-2.50m)
|
|
0.47
|
0.00
|
0.00
|
68.60
|
|
0.00
|
01/01/1900
|
|
|
0
|
0.00
|
0
|
15/08/2020
|
|
|
142
|
Jamalpur
|
27
|
melendah
|
206
|
947
|
JETIP/MEL/20/05
|
Improvement of RCC road from Melandah Govt. college gate to Nurun Nobi Talukder Boilar via Shosan ghat road from Ch.00-580m(w-2.5m) with 1 link road 40 m and one box culvert
|
|
0.75
|
0.00
|
0.00
|
92.73
|
|
0.00
|
01/01/1900
|
|
|
0
|
0.00
|
0
|
15/08/2020
|
|
|
143
|
Jamalpur
|
27
|
melendah
|
206
|
947
|
JETIP/MEL/20/04
|
a)Improvement of RCC road from Melandah shimul tola UZR(Abdullah Huzur house) to Shafique Kazi house road from Ch.00-245m) b) Improvement of RCC road from fulsenna Jamme Mosque to Aminur House road from Ch.00-120m
|
|
0.37
|
0.00
|
0.00
|
42.70
|
|
0.00
|
01/01/1900
|
|
|
0
|
0.00
|
0
|
15/08/2020
|
|
|
144
|
Jamalpur
|
27
|
melendah
|
206
|
947
|
JETIP/MEL/20/03
|
a) Improvement of RCC road from Purbo Shahjadpur RHD to Khalpar via Ibrahim Mulla House road from ch.00-145m(w-3.17m) b) Improvement of RCC road Shahjadpur Khan para RHD Obaidur Master house to Nazrul Master house road frm ch.00-160m c) Improvement of RCC road from Shajadpur Khan Para to Khaltola to Suruj Mondol House road from Ch.00-90m. d)Improvement of RCC road from Shajadpur Khan para Abul Kasem house to Altafur Rahman house road from ch.00-60m
|
|
0.46
|
0.00
|
0.00
|
58.64
|
|
0.00
|
01/01/1900
|
|
|
0
|
0.00
|
0
|
15/08/2020
|
|
|
145
|
Jamalpur
|
27
|
melendah
|
206
|
947
|
JETIP/MEL/20/02
|
a) Improvement of RCC road from chakdah Aiub Khan house to Muklechur Rahman house road from Ch.00-135(W-2.50m) b) Improvement of RCC road from khosai khana More to Altafur house road from ch.00-50m c) Improvement of RCC Road from chakdah BC road Near Abdul Kader Shop to Chan mia house road fromCh.00-80m (W-2.5M) with 1(one) link road 35m. d) Improvement of RCC road from chakdah Mondol house to Abu Ahmad house road from Ch.75-128 and vandary house to Ashadullah House road from Ch.80-130m(w-2.5m and 3m ) e) Improvement of RCC road from Sader Bari Bilat house to Jalil House road from ch.00-130m(w-2.5m)
|
|
0.56
|
0.00
|
0.00
|
66.97
|
|
0.00
|
01/01/1900
|
|
|
0
|
0.00
|
0
|
15/08/2020
|
|
|
146
|
Jamalpur
|
27
|
melendah
|
206
|
947
|
JETIP/MEL/20/01
|
a) Improvement of RCC road from chakdah mosque to Vhaluka BC road via Kashem Bangali houise road from ch.00-170m with 1(one ) link road b) Improvement of RCC road from chakdah BC road to Haba house Via Hafizur rahman house road from ch.00-94m(w-2.5m) c) Improvement of RCC Road from chakdah sultan house BC road to altafur rahman hosue road ch.00-66m(w-2.5m) d) Improvement of RCC road from chakdah shoder bari syadur raham house to kyum house road from ch.00-98(W-3m) under Melandah Pourashava District Jamalpur.
|
|
0.43
|
0.00
|
0.00
|
57.49
|
|
0.00
|
01/01/1900
|
|
|
0
|
0.00
|
0
|
15/08/2020
|
|
|
147
|
Jamalpur
|
27
|
melendah
|
206
|
947
|
JETIP/MEL/19/15
|
Construction of Melandha Paura Adarsha Shishu Bidda Niketon School Bhana(4-Storied Foundation) Under Melandha Paurashava District Jamalpur A) Ground Floor B)Roof Top C) Sanitary and water supply D) Electrification work E) Furniture supply
|
|
|
0.00
|
0.00
|
105.44
|
|
0.00
|
01/01/1900
|
|
|
0
|
0.00
|
0
|
15/08/2020
|
|
|
148
|
Jamalpur
|
27
|
melendah
|
206
|
947
|
JETIP/MEL/19/14
|
Construction of RCC Cover Slab (600x850mm) over Drain from Nutu Shah Moar to Govt.College Gate from Ch.00-880m & Nutu Sha Moar to Muktizudda Complex from Ch.00-142m
|
|
|
0.99
|
0.00
|
162.39
|
M/S S L Enterprise
|
154.27
|
23/06/2019
|
|
27/06/2020
|
92
|
0.00
|
0
|
15/08/2020
|
|
|
149
|
Jamalpur
|
27
|
melendah
|
206
|
947
|
JETIP/MEL/19/13
|
Improvement of RCC Road from Melandah-Mohishbathan Road Dr.Unush House to Shekbari Moar Road from Ch.00-970m (Width=2.95m) & 2 Nos Link Road (Ch.111m R/S=30m & 210m L/S=50m)
|
|
0.97
|
0.00
|
0.00
|
112.61
|
M/S S L Enterprise
|
112.61
|
23/06/2019
|
|
27/06/2020
|
100
|
0.00
|
0
|
15/08/2020
|
|
|
150
|
Jamalpur
|
27
|
melendah
|
206
|
947
|
JETIP/MEL/19/12
|
a) Construction of 900 mm Dia Under Ground RCC Pipe Drain from Govt.College Gate to Shoshan Ghat Road from ch.00-150m b) Improvement of BC Road from Debpara Shekhbari Moar Kharanu Hazi House via Nannu house Road from Ch.00-437m (Width=2.50m) & 3 Nos Cross Drains (600x750 mm) & Ch.60m, Ch.202m & Ch.380m c) Construction of RCC Cover Slab (600x850mm) over drain from Bagha Market (Trast Battery) to Lazi para Abul & Ujjol House Road from Ch.32-338
|
|
0.89
|
0.00
|
0.00
|
83.55
|
M/s Minan Enterprise
|
83.55
|
23/06/2019
|
|
27/06/2020
|
65
|
0.00
|
0
|
15/08/2020
|
|
|
151
|
Jamalpur
|
27
|
melendah
|
206
|
947
|
JETIP/MEL/19/11
|
a) Construction of RCC Cover Slab (450x600mm) over Drain from Pasha Market to Renu House via Shekandar Shop & Nazrul House from Ch.00-215m b) Construction of RCC Cover Slab (600x750mm) over drain from Nayanagar RHD Sobhan Shop to Nayanagar Khaja House from ch.13-433m c) Construction of RCC Cover slab (600x850mm) Drain from Nayanagar Abdul Wahab House to Brammaputra Khal via Lal Master House from Ch.00-303m
|
|
0.94
|
0.00
|
0.00
|
100.84
|
M/S himu Enterprise
|
103.71
|
23/06/2019
|
|
27/06/2020
|
92
|
0.00
|
0
|
15/08/2020
|
|
|
152
|
Jamalpur
|
27
|
melendah
|
206
|
947
|
JETIP/MEL/19/10
|
a) Improvement of RCC Road from Molika Danga Abdur Rashid House to Karim Member House via Shahjahan House Road from Ch.00-600m (Width=2.50m) 1 No Cross Drain (600mmx600mm) at Ch.196m b) Improvement of RCC Road from Dr. Nurul Islam High School to Labu Mia Shallow Tube-Well Road from ch.00-255m (Width=3.00m) & 2 no Cross Drains (600x600mm) at Ch.203m & Ch.255m
|
|
0.86
|
0.00
|
0.00
|
101.05
|
M/S sahidur Rahman
|
101.05
|
23/06/2019
|
|
24/06/2020
|
98
|
0.00
|
0
|
15/08/2020
|
|
|
153
|
Jamalpur
|
27
|
melendah
|
206
|
947
|
JETIP/MEL/19/09
|
a) Improvement of RCC Road from Shahjadpur RHD to Khal Par via Mohir House Road from Ch.00-144m(Width=2.50m) b) Improvement of RCC Road from Krishna chura Moar (Nagerpara to Melandah Women College Road from Ch.00-314m (Width=3.00m) & 1 No Cross Drain (600mmx600mm) at Ch.96m c) Improvement of RCC Road from Melandah-Mohishbathan Road Hafizur Rahman Boiler –Al-Haz Badiuzzaman Land via Rashid House Road from Ch.00-185m (Width=2.50m) d) Improvement of RCC Road from Shahajadpur RHD Shuruzzaman House to Ajmot Ali House Road from ch.00-120m(Width=3.00m)
|
|
0.76
|
0.00
|
0.00
|
89.68
|
M/S Hiya Enterprise
|
89.68
|
23/06/2019
|
|
19/06/2020
|
98
|
0.00
|
0
|
15/08/2020
|
|
|
154
|
Jamalpur
|
27
|
melendah
|
206
|
947
|
JETIP/MEL/19/08
|
a) Improvement of RCC Road from Uttor Adipoit Main Road to Shamsul House via Hasam Master Madrasha Road from Ch.00-195m (Width=3.00m) b) Improvement of RCC Road from Chakdaha BC Road Near Vandary House to Mitu House Road from Ch.00-80m (Width=3.00m) c) Improvement of RCC Road from Melandah-Khashimara Road Kamdevbari to Muktizudda Abdul Khalek House Road from Ch.00-132m (Width=3.00m) & 2 Nos Cross Drains (600mmx600mm) at Ch.10m & Ch.30m d) Improvement of RCC Road from Melandah-Khashimara Road Bangla Link Tower to Hitlar Mia House Road from Ch.00-266m (Width=2.50m) e)Improvement of RCC Road from Melandah-Khashimara Road Dulal House to Alhaz Abdul Hakim House Road from Ch.00-140m (Width=2.50m)
|
|
0.81
|
0.00
|
0.00
|
94.85
|
M/S E L T Traders
|
94.85
|
23/06/2019
|
|
27/06/2020
|
98
|
0.00
|
0
|
15/08/2020
|
|
|
155
|
Jamalpur
|
27
|
melendah
|
206
|
947
|
JETIP/MEL/19/07
|
a) Improvement of RCC Road from Chakdaha Mondol House to Abdul Malek House & Selim House Road from Ch.00-130m (Width =2.50m) & 1 No Cross Drain (600mmx600mm) at Ch.7m on Salim Road) b) Improvement of RCC Road from Pachim Jalalpur Khoka Member Godown to Abdul Mazid House via Bazari para Road from Ch.00-204m (Width =2.50m) & 1 No Cross Drain (600mmx600mm) at Ch.02m c) Improvement of RCC Road from Chakdah Helal House to Nayon House via Dulal House Road From ch.00-532m (W=2.50m) & 2 no Cross Drains (600mmx600mm) at Ch.295m & Ch.375m
|
|
0.92
|
0.00
|
0.00
|
97.99
|
M/S Burhan Enterprise
|
97.99
|
23/06/2019
|
|
27/06/2020
|
92
|
0.00
|
0
|
15/08/2020
|
|
|
156
|
Jamalpur
|
27
|
melendah
|
206
|
947
|
JETIP/MEL/19/06
|
a) Improvement of RCC Road from Pachim Nayanagar Sirajul House to Eid-Ghah Madth via Piyara Begum House Road from Ch.00-291m(Width=3.00m) b) Improvement of RCC Road from Noyanagor RHD Rohul Amin House to Rail Crossing via Abdul Awal House Road from Ch.80-390m (310+17) (Width =2.50m) & 1 No Cross Drain (600mmx600mm) at Ch.205m L/S, Ring Road) c) Improvement of RCC Road from Shahjadpur Abdul Haque House to Chandu Chowkider House via Alimoddin Boiler Road from Ch.00-258m (Width=2.50m)
|
|
0.88
|
0.00
|
0.00
|
91.09
|
M/s Minan Enterprise
|
91.09
|
23/06/2019
|
|
27/06/2020
|
98
|
0.00
|
0
|
15/08/2020
|
|
|
157
|
Jamalpur
|
27
|
melendah
|
206
|
947
|
JETIP/MEL/19/05
|
a) Improvement of BC Road From Shampur Road Pizush Oil Shop to Margash Mosque & Zinnah Market to Karket to Kobarsthan Road from Ch.00-(220+210+97)=527m (Width=2.70m) b) Improvement of RCC Road from Baroipara Main Road to Gopal Member House Road Ch.110m (Width =3.50m) c) Improvement of RCC Road from Agriculture Office Tetul Tola to Nayanagar Pucca Road via Mostak House Road from ch.00-210m(Width=3.00m) d) Improvement of RCC Road from Shahjadpur BC Road to Mia Shahin House Road from Ch.00-200m (Width=2.50m)
|
|
1.05
|
0.00
|
0.00
|
98.90
|
Nousin Enterprise
|
104.56
|
23/06/2019
|
|
27/06/2020
|
77
|
0.00
|
0
|
15/08/2020
|
|
|
158
|
Jamalpur
|
27
|
melendah
|
206
|
947
|
JETIP/MEL/19/04
|
a) Maintenance of BC Road From Melandah-Mahmmudpur Road Pachurpara to Jobed Ali House via Mukul Commissioner Hosue Road from Ch.00-280m (Width=2.50m) b) Improvement of BC Road From Baroipara BC Road Mosque to Fulsenna Hashem BS House Road via Hira Brick Field Road from Ch.00-590m (Width=3.00m) & 1 No Cross Drain (600mmx600mm) at Ch.290m c) Maintenance of BC Road From Melandah Hospital Goalpara Moar to Shahjadpur Momtaz Rice Mill Road from Ch.00-780m (Width=3.70m)
|
|
1.65
|
0.00
|
0.00
|
103.31
|
M/S M T T Enterprise
|
103.31
|
23/06/2019
|
|
27/06/2020
|
87
|
0.00
|
0
|
15/08/2020
|
|
|
159
|
Jamalpur
|
27
|
melendah
|
206
|
947
|
JETIP/MEL/19/03
|
a) Maintenance of BC Road From Jamalpur Paurashava Boder to Kerani House Moar via Shuruj Ali House Road From Ch.00-360m (Width =3.00m) b) Maintenance of BC Road From Jamalpur Paurashava Boder to Kerani House Moar via Shuruj Ali House Road From Ch.00-360m (Width =3.00m) c) Maintenance of BC Road from Fulsenna Mosque &Hasem House to Jamalpur- Dewangonj RHD Road from Ch.00-355m (Width=3.00m) & 1 No Cross Drain (600mmx600mm) at Ch.150m d) Maintenance of BC Road From Molika Danga Moar BC Road to Purba Baghaduba Ujjal House Road from Ch.00-620m (Width=2.90m)
|
|
1.67
|
0.00
|
0.00
|
98.42
|
M/S Raisha Enterprise
|
98.42
|
23/06/2019
|
|
27/06/2020
|
98
|
0.00
|
0
|
15/08/2020
|
|
|
160
|
Jamalpur
|
27
|
melendah
|
206
|
947
|
JETIP/MEL/19/02
|
a)Maintenance of BC Road from Paurashava Border to Fazor Uddin High School (Station Bazar) via Mozammel Haque House Road from Ch.00-570m (Width 2.40m) & 1 no Cross Drain (600mmx600mm) at Ch.225m b) Maintenance of BC Road From Melandah-Khashimara BC Road KP School Moar to Paurashava Border Road from Ch.00-760m (Width=2.7m) c) Improvement of BC Road from Adipoit Jahangir Mulla House to Dr.Shaju House via Muslim Nagar Jamme Mosque Road from Ch.00-300m(Width=2.50m)@ 1 No Cross Drain (600mmx600mm) at Ch.39m & 1 no Box Culvert (3.0 m x 3.0m) at Ch.128m)
|
|
1.63
|
0.00
|
0.00
|
89.14
|
M/S Sahina Enterprise
|
89.14
|
23/06/2019
|
|
27/06/2020
|
90
|
0.00
|
0
|
15/08/2020
|
|
|
161
|
Jamalpur
|
27
|
melendah
|
206
|
947
|
JETIP/MEL/19/01
|
a)Maintenance of BC Road from Adipoit Bakul Tola Moar to Hazi Ahmed Ali House Moar, Ch.00-810m (Width 3.00m) b) Maintenance of BC Road from Adipoit Bakul Tola Moar to Golam Mostofa House Road from Ch.00-598m(Width 3.00m) c) Improvement of BC Road from Gobindopur Hamid House Moar to melandah-Mohishbathan Road via Shahjahan House Road from Ch. 00-365m (Width=3.00m) d) Maintenance of BC Road from Nayanagar Rail crossing to Digalbari BC Road from Ch.00-216m (Width=2.50m) & 1 no Cross Drain (600mmx600mm) at Ch 50m
|
|
1.99
|
0.00
|
0.00
|
92.37
|
M/S Hira Enterprise
|
92.32
|
23/06/2019
|
|
27/06/2020
|
87
|
0.00
|
0
|
15/08/2020
|
|
|
162
|
Jamalpur
|
27
|
sarishabari
|
207
|
947
|
JETIP/ SRB/19/10
|
a) Construction of R.R.C Drain at Shimla Bazar at Amtolamoar to Agroni Bank mor to Subounokhali river Link RDM moar b) Devolopment of road by Carpeting near A.R.A Jute Mill to Tariapara-Konabari Carpeting road
|
|
0.56
|
0.69
|
0.00
|
136.26
|
M/S Chowdury Enterprise
|
111.72
|
17/07/2019
|
|
17/07/2020
|
0
|
0.00
|
0
|
15/08/2020
|
|
|
163
|
Jamalpur
|
27
|
sarishabari
|
207
|
947
|
JETIP/ SRB/19/09
|
a) Rehabilitation of B.C Road from Chad Shimla N/H/O Samsul Bridge to Shimla Bazzar Muslim Goli Via Shimla Polly East para Zame Moszid b) Construction of Protection wall and C.C Block at the west Bank of Subornokhali Canal from Chalk-Hatbari prymary school to A. R. A Jute mill old Colony
|
|
1.13
|
0.68
|
0.00
|
191.70
|
M/S Chowdury Enterprise
|
151.54
|
17/07/2019
|
|
17/07/2020
|
0
|
0.00
|
0
|
15/08/2020
|
|
|
164
|
Jamalpur
|
27
|
sarishabari
|
207
|
947
|
JETIP/ SRB/19/08
|
Rehabilitation of B.C Road at Boushi-Ponchopir Bazar to North Boushi primary school
|
|
1.63
|
0.00
|
0.00
|
83.80
|
M/S SHAKIL ENTERPRSE
|
83.71
|
01/01/1900
|
|
|
0
|
0.00
|
0
|
15/08/2020
|
|
|
165
|
Jamalpur
|
27
|
sarishabari
|
207
|
947
|
JETIP/ SRB/19/07
|
a) Rehabilitation of B.C Road at PonchopirPadur Moar to Chandonpur End point of Pourashava and Padurmor to BoushiModdhapara Karim Fakir Moar b) Construction of B.C Road at Ezzarapara popular moar to Zharkata bridge c) Construction of R.C.C Road at Nowgola R&H Road to N/H/O Doctor Akbor Ali
|
|
1.65
|
0.00
|
0.00
|
89.81
|
M/S Bondhu Enterprise
|
89.80
|
07/09/2019
|
|
09/01/2020
|
0
|
0.00
|
0
|
15/08/2020
|
|
|
166
|
Jamalpur
|
27
|
sarishabari
|
207
|
947
|
JETIP/ SRB/19/06
|
a) Rehabilitation of B.C Road at Bolardiar near Chandermoar to N/H/O Nurul Islam Councilor b) Devolopment of road by Carpeting from Sarishabai Rail Station to A.R.A jute Mill c) Construction of R.C.C road at Satpoya near Sarkerbarimor to Zinay River via Chaki-bari
|
|
2.24
|
0.00
|
0.00
|
98.48
|
M/S Nayeem Enterprise
|
96.51
|
07/09/2019
|
|
09/01/2020
|
0
|
0.00
|
0
|
15/08/2020
|
|
|
167
|
Jamalpur
|
27
|
sarishabari
|
207
|
947
|
JETIP/ SRB/19/05
|
a) Construction of R.C.C Road from Diairkrisnay T&T office moar to degree college Hostel and college para road b) Construction of R.R.C pucca Drain from R&H Shuborna khali river at Koliline Aramnogor Bazar c) Construction of R.C.C Drain at R&H Aramnogo Bazar othpottri to Shuborna khali river
|
|
0.62
|
0.00
|
0.00
|
100.92
|
M/S Pathan Enterprise
|
100.91
|
07/09/2019
|
|
09/01/2020
|
0
|
0.00
|
0
|
15/08/2020
|
|
|
168
|
Jamalpur
|
27
|
sarishabari
|
207
|
947
|
JETIP/ SRB/19/04
|
a) Rehabilitation of B.C Road at Satpoya Udoayn Moar to Mohila Madrasa Moar b) Construction of R.C.C Road from Satpoya N/H/O Mayor Rukunuzzaman to Moszid c) Rehabilitation of B.C Road from Satpoya N/H/O Poura Mayor Ofc to T&T office via Primary school
|
|
2.09
|
0.00
|
0.00
|
81.04
|
M/S Pathan Enterprise
|
81.04
|
07/09/2019
|
|
09/01/2020
|
0
|
0.00
|
0
|
15/08/2020
|
|
|
169
|
Jamalpur
|
27
|
sarishabari
|
207
|
947
|
JETIP/ SRB/19/03
|
a) Rehabilitation of B.C Road at Upazilla old hall room to Muktizoddha Shongsod moar b) Rehabilitation of B.C Road at Sarishabari Upazilla Gate to near RUT high school
|
|
2.06
|
0.00
|
0.00
|
89.13
|
M/S SHAKIL ENTERPRSE
|
89.04
|
07/09/2019
|
|
09/01/2020
|
0
|
0.00
|
0
|
15/08/2020
|
|
|
170
|
Jamalpur
|
27
|
sarishabari
|
207
|
947
|
JETIP/ SRB/19/02
|
a) Construction of R.C.C Road at Dhanata bridge to Chalk-Hatbari A. R. A Jute mill old Colony b) Construction of Protection wall and C.C Block at the west Bank of Subornokhali River from Dhanata Bridge to Chalk – Hatbari prymary school
|
|
1.40
|
0.78
|
0.00
|
311.22
|
M/S Chowdury Enterprise
|
250.50
|
17/07/2019
|
|
17/07/2020
|
0
|
0.00
|
0
|
15/08/2020
|
|
|
171
|
Jamalpur
|
27
|
sarishabari
|
207
|
947
|
JETIP/ SRB/19/01
|
a) Construction of R.C.C Drain at Satpoya Adalotpara Internal Road b) Construction of R.C.C Cover Slab cum R.C.C Road at Satpoya Adalotpara various internal roads
|
|
3.08
|
0.00
|
0.00
|
255.56
|
M/S Chowdury Enterprise
|
210.78
|
17/07/2019
|
|
17/07/2020
|
0
|
0.00
|
0
|
15/08/2020
|
|