Coastal Climate Resilient Infrastructure Project (2nd Revised)

Serial District Name District Code/ID Upazila Name Upazila Code/ID Project ID Package No Scheme Name Road ID Length of Scheme(Km) - Road Length of Scheme(m) - Bridge/Culverts Building Quantity Estimated Amount(LAC) Contractor Name Contract Amount(LAC) Date of Contract (DD/MM/YYYY) Date of commencement (DD/MM/YYYY) Date of Completion (DD/MM/YYYY) Physical Progress(%) Financial Progress (Amount) (LAC) Financial Progress(%) Date of Progress Update (DD/MM/YYYY) Remarks
1 Barishal 5 agailjhara 21 277 CCRIP/Bari/UZR/2014/W-13 Improvement of Goila RHD-Dhamura GC via Mistripara Hat & Shaheber Hat GC 3.24 430.99 MMA-MST JV, Gouranadi, Barisal. ; Mr. Alauddin-01712209586 492.95 05/02/2015 26/06/2018 70 19/01/2019 Revised
2 Barishal 5 babuganj 26 277 CCRIP/ADB/Bari/UZR/2015/W-29 Improvement of Mohongonj Hat - Babugonj Girls School Road 4.11 1357.09 M/S Noona Traders, 54, Motijheel C/A, 2nd Floor, Dhaka. ; Mr. Azad-01718121748 1125.29 12/05/2016 30/11/2018 77 19/01/2019 Work on going
3 Barishal 5 babuganj 26 277 CCRIP/GOB/BARI/Maint/2018/W-92 Improvement of - Rakudia Polli Biddut subcentre (RHD) - Baherchar bazer 5.86 27.72   27.72 0 19/01/2019  
4 Barishal 5 babuganj 26 277 CCRIP/GOB/BARI/BRDG/2017/W-64 Improvement of Construction of 28.00 m Long Bridge on Amirgonj Hat- Mirgonj via MaidanerHar Road Near Anwar Uddin Senior Madrasha over Bailakhali Khal. 265.00 Islam Brothers ; Amir Hossain-01748991151 257.67 15/01/2018 15/09/2018 80 19/01/2019 Work on going
5 Barishal 5 babuganj 26 277 CCRIP/GOB/BARI/Maint/2018/W-87 Improvement of Periodic Mainteneace of Amordonj - Maisaner Hat - Mirgonj Road 4.37 56.90   56.90 0 19/01/2019  
6 Barishal 5 babuganj 26 277 CCRIP/GOB/BARI/Maint/2018/W-88 Improvement of Periodic Maintenance of Baherchar Hat - Baherchar Hospital Road 3.35 45.38   45.38 0 19/01/2019  
7 Barishal 5 babuganj 26 277 CCRIP/GOB/BARI/UNR/2017/W-63 Improvement of Rahamatpur Bazar - Madhabpasha UP 1.50 165.22 Suhana Trade Link International, Pro: Md. Akteruzzaman Manik, Parer Hat, Perojpur. (Manik) ; Mehedi-01711943099 132.05 03/12/2017 03/12/2018 40 19/01/2019 Work on going
8 Barishal 5 babuganj 26 277 CCRIP/BARI/VR/ 2014/W-22 Improvement of LGED road to Steamer Ghat Bazar 0.50 58.86 M/S S.H Enterprise, Mehendigonj, Barisal. ; Mr. Azad-01718121748 51.49 04/06/2015 31/05/2018 100 19/01/2019 Final Bill
9 Barishal 5 babuganj 26 277 CCRIP/BARI/UNR/ 2014/W-05 Improvement of Rakudia Polli Biddut subcentre (RHD) - Baherchar bazer 5.86 161.92 M/S Poly Engg. Corporation, 10, Para Road, Barisal ; Md. Babul Hossain-01714969207 128.25 0 19/01/2019 Final Bill
10 Barishal 5 babuganj 26 277 CCRIP/BARI/UNR/ 2014/W-03 Improvement of Baherchar Hat - Baherchar Hospital 2.60 187.89 MT-SE(JV), Brown Compound, Barisal ; Momin Sikder-01745465040 148.57 02/10/2014 21/12/2015 100 19/01/2019 Final Bill
11 Barishal 5 babuganj 26 277 CCRIP/BARI/VR/ 2014/W-04 Improvement of Improvement work of Amirgar Hat-Mirzagonj via Maidaner Hat Road at Ch.00-3000m. 3.00 242.82 M/S Talukder Enterprise, Talukder Bari, Nabogram Road, Barisal ; Mr. Monir Hossain-01712395366 239.72 21/09/2014 30/03/2016 100 19/01/2019 Final Bill
12 Barishal 5 babuganj 26 277 CCRIP/BARI/UNR/2014/W-21 Improvement of Improvement work of Rahmatpur Bazar to Madhabpasha Up at Ch. 00m-2100m (ID No. 506033004) 2.10 174.33 M/S S.H Enterprise, Mehendigonj, Barisal. ; Mr. Azad-01718121748 160.86 04/06/2015 10/06/2016 100 19/01/2019 Final Bill
13 Barishal 5 bakerganj 27 277 CCRIP/ADB/Bari/UZR/2017/W-43 Improvement of Talukdarer Hat (RHD) to Kamarkhali GC via Katadia Kheyaghat and Darial Mia Bari High School 2.97 397.31 MST & MDE (JV), Banglabazar, Barisal. ; Mr. Kalu-01711010507 436.83 17/10/2017 13/10/2018 70 19/01/2019 Work on going
14 Barishal 5 bakerganj 27 277 CCRIP/Bari/UZR/2014/W-14 Improvement of Kamarkhali GC - Baherchar GC via Sarsi Police Farry 4.30 443.34 M/S Poly Engineering Corporation, Parara Road, Barisal. ; Amir Hossain-01748991151 513.00 21/01/2015 27/07/2016 100 19/01/2019 Final Bill
15 Barishal 5 banaripara 20 277 CCRIP/IFAD/BARI/VR/2017/W-60 Improvement of Khalishakota Mujahar Member Hose to Doctor hat Via Motiur rahaman Roypasia Road., Banaripara, Barisal Improvement of Caker Doga Sharif - Senar Bari Via H/O Farid Mohuri, Banaripara, Barisal 1.81 150.61 M/S Mother Engineering ; Mr. Bakshi Monir-01712866188 141.42 21/11/2017 18/10/2018 43 19/01/2019 Work on going
16 Barishal 5 banaripara 20 277   Improvement of Chowaripara ( Starting from Guachitra - Banaripara RHD) to Saliabakpur via H/O Abdul Latif & Mr Mohabad 1.00 172.07 M/S Jabana Enterprise ; Jelal Commissioner 01711342615 0.00 23/06/2018 25/05/2019 20 19/01/2019  
17 Barishal 5 banaripara 20 277 CCRIP/GOB/BARI/VR/2018/W-80 Improvement of kalir Bazar to Chakhar UP , 1.32 0.00 ; 163.47 0 19/01/2019  
18 Barishal 5 banaripara 20 277 CCRIP/GOB/BARI/Maint/2018/W-91 Improvement of Khalishakota Bazar -Khalishakota High School. 0.41 14.43   14.43 0 19/01/2019  
19 Barishal 5 banaripara 20 277 CCRIP/GOB/BARI/Maint/2018/W-90 Improvement of Chowlkathi Primary School to Jangalia School (Azad Market to Naya Bazar ) 1.80 16.84   16.84 0 19/01/2019  
20 Barishal 5 banaripara 20 277 CCRIP/IFAD/BARI/VR-BRDG/2016/W-40 Improvement of Constrction of 22.00 m Long Bridge on Chowlakati Pravatia to Zangalia Primary School (Azad Market to Naya Bazar) 102.55 M/S Talukder Enterprise & Meem & Co. ; Rezaul 01717044834 76.64 10/11/2016 09/11/2017 100 19/01/2019 Final Bill
21 Barishal 5 banaripara 20 277 CCRIP/GoB/BARI/BRG/2017/W-72 Improvement of Construction of 21.00 m Long Bridge on Baladia Moluhar High School - Utter Moluhar GPS Padmabunia Bazar Poschim Mluhar GPS 238.34 RC & PE JV, Razapur, Jhalokathi ; Pintu-01765009547 181.86 24/12/2017 12/10/2018 40 19/01/2019 Work on going
22 Barishal 5 banaripara 20 277 CCRIP/GOB/BARI/VR/2018/W-79 Improvement of Chakhar Darber Sarif to Manik Mira Hat H/Q Mollah Kazi Nurul Haque Sarder Bridge-Laskarpur road 2.50 239.79 M/S Rupali Construction, Barisal ; Farid 01711351360 225.04 03/06/2018 12/05/2019 40 19/01/2019 Work on going
23 Barishal 5 banaripara 20 277 W55 Double Entry have #10,11Row Improvement of Saliabakpur UPC via House of Shafdar Khan- Senerhat Improvement of Khalishakota Bazar to Bakpur H/O Rajjak Khan Road 1.34 0.00   116.07 0 19/01/2019  
24 Barishal 5 banaripara 20 277 CCRIP/GOB/BARI/VR/2017/W-49 Improvement of Baldia Maluher High school-Uttar Moluher GPS ( Padmabunia Bazar - Parchim Moluhar GPS), Banaripara, Barisal 1.10 172.78 Susanko Ranjon Samadder ; Rafiq-01715613319 131.10 22/10/2017 29/11/2018 75 19/01/2019 Work on going
25 Barishal 5 banaripara 20 277 CCRIP/IFAD/BARI/VR/2017/W-48 Improvement of Khalishakota to Haque Saheber Hat Via Sonahar Dasher Bari Road 2.21 182.91 M/S Mother Engineering ; Mr. Bakshi Monir-01712866188 151.79 26/10/2017 03/09/2018 45 19/01/2019 Work on going
26 Barishal 5 banaripara 20 277 CCRIP/BARI/VR/ 2014/W-17 Improvement of Digihar Hat to Auhar Hat 1.40 232.29 MIB & MME (JV), Amirkutir, Barisal ; Faruk Sorder-01718214356 215.30 04/06/2015 10/03/2017 100 19/01/2019 Final Bill
27 Barishal 5 banaripara 20 277 CCRIP/BARI/VR/ 2014/W-06 Improvement of Chowlakati Pravatia to Zangalia Primary School (Azad Market to Naya Bazar) Improvement of Nayabazar to west side of Chalitabari GPS (Naya Bazar to Mirere Hat) 2.10 245.35 M/S Bakshi Enterprise, Thana Road, Charfassion, Bhola ; Moniruzzaman-01712866188 188.63 17/09/2014 11/12/2016 100 19/01/2019 Final Bill
28 Barishal 5 banaripara 20 277 CCRIP/BARI/VR/ 2014/W-18 Improvement of Alta Faizul Haque Bridge to Sunil Sarkar 1.95 218.82 M/S NE & M/S SC (JV), Barisal ; Md. Shahazahan-01716483394 235.47 04/06/2015 31/08/2017 100 19/01/2019 Final Bill
29 Barishal 5 banaripara 20 277 CCRIP/IFAD/BARI/VR/2015/W-30 Improvement of Simultala to Khalishakota Bazar via Khalishakota High School Starting from Madarkati GPS 2.23 278.52 Md. Matiar Rahman ; Shaha Alom-01711237640/Mol Babu-01715161492 225.40 01/03/2016 30/12/2018 75 19/01/2019 Work on going
30 Barishal 5 banaripara 20 277 CCRIP/IFAD/BARI/VR/2017/W-55 Improvement of 506103009-Saliabakpur UPC via House of Shafdar Khan- Senerhat , 506105073-Khalishakota Bazar to Bakpur H/O Rajjak Khan Road 0.00   116.07 0 19/01/2019  
31 Barishal 5 banaripara 20 277 CCRIP/GOB/BARI/UNR/2018/W-83 Improvement of Part A: Baisari RHD Bridge to Harta via Tetla Shere Bangla hat Udaykati UP Road ( Reallignment) Improvement of Part B: Conastruction of 2 nos Single Vent 1.0 m x 1.00 m RCC box Culvrt on Baisari RHD Bridge to Harta via Tetla Shere Bangla h 0.10 18.00 M/S Jahanara Traders ; Heron Councilor-01712258583 6.66 07/09/2018 07/01/2019 15 19/01/2019 Work on going
32 Barishal 5 banaripara 20 277 CCRIP/BARI/UNR/ 2014/W-16 Improvement of Baisari RHD Bridge to Harta via Tetla Shere Bangla hat Udaykati UP Road 2.00 207.90 M/S S.H Enterprise, Mehendigonj, Barisal. ; Mr. Azad-01718121748 214.01 27/08/2015 11/02/2017 100 19/01/2019 Final Bill
33 Barishal 5 banaripara 20 277 CCRIP/GOB/BARI/UNR/2017/W-47 Improvement of 506103003-South Illuhar Boro Bridge to Chander hat via Illuhar High School, Banaripara, Barisal 2.10 157.89 M/S Mother Engineering ; Heron Councilor-01712258583 136.52 26/10/2017 31/12/2018 30 19/01/2019 Work on going
34 Barishal 5 gouranadi 22 277 CCRIP/ADB/Bari/BRDG/2017/W-66 Improvement of Constrction of 23.00 m Long Bridge on Sarikal GC-Mahilara Bazer at RHD Road via Kalibazer Road 178.38 M/S Rupali Construction ; MR,. Faruk Hossain-01710702111 180.06 15/01/2018 15/12/2018 50 19/01/2019 Work on going
35 Barishal 5 gouranadi 22 277 CCRIP/Bari/UZR/2014/W-12 Improvement of Sarikal GC-Mahilara Bazer at RHD Road via Kalibazer Road 2.53 433.65 M/S Mudasser Ali Mollik, Barisal. ; MR,. Faruk Hossain-01710702111 396.74 04/02/2015 30/12/2018 75 19/01/2019 Work on going
36 Barishal 5 hizla 23 277 W-29 Improvement of Kawria Bazer - Memania Takerhat 4.65 0.00   0.00 0 19/01/2019  
37 Barishal 5 mehendiganj 24 277 CCRIP/Bari/UZR/2014/W-11 Improvement of Langutia GC - Bankerhat GC via Sreepur Bazer Ad Bazer - Charboji 2.60 618.01 M/S Poly Engineering Corporation, Parara Road, Barisal. ; Amir Hossain-01748991151 378.73 25/01/2015 02/08/2016 100 19/01/2019 Final Bill
38 Barishal 5 muladi 25 277 CCRIP/ADB/Bari/UZR/2017/W-41 Improvement of Mirdar hat GC-Nazirpur GCCR via Madrashar hat,Bangla Bazar 0.76 86.50 M/S Dhara Enterprise ; Mr. Kalu-01711010506 95.11 17/10/2017 20/09/2018 90 19/01/2019 Work on going
39 Barishal 5 uzirpur 29 277 CCRIP/IFAD/BARI / VR-BRG/2015/W-36 Improvement of Constrction of 22.00 m Long Bridge on North Dehergati Govt. Pry.School-Darogar hat Rd. ( Gutia Bazar Adjacent Road) 171.16 M/S Talukder Enterprise ; Mr.Monir Hossain-01727669209 133.31 06/06/2016 15/04/2018 100 19/01/2019 Final Bill
40 Barishal 5 uzirpur 29 277 CCRIP/GOB/BARI/VR/2017/W-62 Improvement of Shakral Rab Market- Dr. Mahabub's House- Goria Natun Hat Road. 1.06 49.76 Serajul Islam Hanif ; Ani-01731936215 38.53 05/11/2017 30/06/2018 15 19/01/2019 Work on going
41 Barishal 5 uzirpur 29 277 CCRIP/GoB/BARI/Cul/2017/W-74 Improvement of Construction of 3v (3x5+5x5+3x5) RCC box culvert on Guria Natun Hat to Daberkool Chomohoni Road 64.68 RC & PE JV, Razapur, Jhalokathi ; Pintu-01765009548 49.38 24/12/2017 24/06/2018 20 19/01/2019 Work on going
42 Barishal 5 uzirpur 29 277 CCRIP/GOB/BARI/VR/2018/W-85 Improvement of Construction of 2.50m x 3.00m RCC Box culvert on Catalbari-Chowmohoni Road 22.29 M/S Jahanara Traders ; Harun 01715635648 22.30 04/09/2018 04/01/2019 85 19/01/2019 Work on going
43 Barishal 5 uzirpur 29 277 CCRIP/GOB/BARI/BRG/2017/W-51 Improvement of Construction of 22.00 m Long Bridge on Jugirkanda to DC road 130.14 Kalai Mollah Construction ; Mr. Aminul-01736182501 104.54 29/10/2017 06/11/2018 65 19/01/2019 Work on going
44 Barishal 5 uzirpur 29 277 CCRIP/GoB/BARI/Cul/2017/W-86 Improvement of Construction of 1 nos 1-Vent 2.60m x 2.60 m RCC box culvert on Otra UP ( Habibpur) - Munshir Taluk - Kuralia Road , and Protective work Ch. 10.00-50.00 14.28   14.28 0 19/01/2019 Work on going
45 Barishal 5 uzirpur 29 277 CCRIP/GOB/BARI/BRG/2017/W-50 Improvement of Constrction of 15.00 m Long Bridge on Gazirpar Sarwar Shikder Bari- Uttar Barokota Kader Bepari Bari via Jabbar Master Bari & Tetultala. 109.08 Susanko Ranjon Samadder ; Mr. Faruk 83.21 12/10/2017 19/11/2018 98 19/01/2019 Work on going
46 Barishal 5 uzirpur 29 277 CCRIP/IFAD/BARI / VR-BRG/2015/W-37 Improvement of Constrction of 15.00 m Long Bridge on Jugirkanda to DC road 108.32 MSI & MSC JV ; Mr. Jointo-01712188784 80.17 23/06/2016 30/12/2017 100 19/01/2019 Final Bill
47 Barishal 5 uzirpur 29 277 CCRIP/IFAD/BARI/VR/-BRG/2015/W-35 Improvement of Constrction of 16.00 m Long Bridge on Fakir Hat (H/O Halim Khalifa) to Gazirpar (Surater Bari) 125.30 M/S Nahid-Fazal (JV) ; Mr.Monir Hossain-01727669209 99.13 19/04/2016 30/04/2018 100 19/01/2019 Final Bill
48 Barishal 5 uzirpur 29 277 CCRIP/GOB/BARI/Maint/2018/W-93 Improvement of Jugirkanda Gala Bazar - Uzirpur Satla Road 2.83 19.76   19.76 0 19/01/2019  
49 Barishal 5 uzirpur 29 277 CCRIP/GOB/BARI/Maint/2018/W-89 Improvement of Kamalapur - Gutia Bridge - Panchagram ( Gutia Bazar -Kamalapur Hat) road 2.00 16.25   16.25 0 19/01/2019  
50 Barishal 5 uzirpur 29 277 CCRIP/ADB/Bari/UZR/2017/W-44 Improvement of Harta - Rajapur - Satla Market - Chowmohani 3.70 414.63 M/S Meem & Hazi (JV) ; Mr. Rezaul-01717044834 443.61 03/10/2017 30/11/2018 100 19/01/2019 Work on going
51 Barishal 5 uzirpur 29 277 CCRIP/GOB/BARI/VR/2018/W-82 Improvement of Vorshakathi BC to Babugonj Border Bridge via Sekander Ali House 0.85 59.64 M/S Confidence International ; Liton 01715635263 56.65 11/09/2018 11/01/2019 10 19/01/2019 Work on going
52 Barishal 5 uzirpur 29 277 CCRIP/IFADBARI/UNR/2017/W-45 Improvement of Fakir Hat - Gajirpar Road 0.96 64.04 M/S Khan Engineering ; Mr. Babul-01714969207 53.14 08/11/2017 31/12/2018 55 19/01/2019 Work on going
53 Barishal 5 uzirpur 29 277 CCRIP/IFAD/BARI / VR/215/W-23 (LCS) Improvement of Fakir Hat (H/O Halim Khalifa) to Gazirpar (Surater Bari) (Fakir Hat - Gajirpar Road) 7.74 Saleha Begum, Chairman & Secretary Sahinur Begum ; 9.98 29/11/2015 30/06/2016 100 19/01/2019 Final bill
54 Barishal 5 uzirpur 29 277 CCRIP/IFAD/BARI/VR/2017/W-73 Improvement of Chowdhurihat-Malikanda Awal Sikder Digher Par Daberkool Road 1.50 151.49 MSE & MTE JV, Amanotgonj, Barisal. ; Mr. Sumon-01719972206 153.27 27/12/2017 27/10/2018 51 19/01/2019 Work on going
55 Barishal 5 uzirpur 29 277 CCRIP/GOB/BARI/UNR/2017/W-67 Improvement of Barakota UP-Daberkul College- Chowmohoni Bazar Road., 2.30 480.42 M/S Amir Engineering Corporation ; Amir Hossain-01748991151 399.73 26/11/2017 01/10/2018 65 19/01/2019 Work on going
56 Barishal 5 uzirpur 29 277 CCRIP/GOB/BARI/UNR/2017/W-65 Improvement of West Side of Jugirkanda Gala hat Kheyaghat- Wabda Road (Jugirkanda Gala Bazar west side Kheyaghat-west side Pucca Road) Including Ghat 0.30 59.63 M/S Talukder Enterprise (Monir) ; Mr. Monir Hossain-01712395366 0.00 09/11/2017 30/12/2018 78 19/01/2019 Work on going
57 Barishal 5 uzirpur 29 277 CCRIP/GOB/BARI/VR/2017/W-59 Improvement of Dasher hat-Chakher College Rd 1.70 119.00 M/S Sabrina- Meem JV ; Mr. Liton 107.82 15/11/2017 07/12/2018 68 19/01/2019 Work on going
58 Barishal 5 uzirpur 29 277 CCRIP/GOB/BARI/VR/2017/W-57 Improvement of Kangsi Hazi Adam Ali Bridge to Dhamura-Daberkool Sharak via Hazi Keramat Ali Mosjid [Muktijudda milon kendrah connecting road(harasia), 0.83 50.85 M/S Mother Engineering ; Mr. Oahed 01781864401 42.15 12/11/2017 31/12/2018 50 19/01/2019 Work on going
59 Barishal 5 uzirpur 29 277 CCRIP/IFAD/BARI/VR/2017/W-54 Improvement of Guria Nutun Hat- Daberkul Choumohoni Road, 1.00 77.19 M/S Khan Engineering ; Mr. Babul-01714969207 63.28 09/11/2017 31/12/2018 30 19/01/2019 Work on going
60 Barishal 5 uzirpur 29 277 CCRIP/IFAD/BARI/VR/2017/W-53 Improvement of Gazirpar Sarwar Shikder Bari- Uttar Barokota Kader Bepari Bari via Jabbar Master Bari & Tetultala. 2.13 142.34 M/S Mother Engineering ; Mr. Oahed 01781864401 114.48 26/10/2017 31/12/2018 35 19/01/2019 Work on going
61 Barishal 5 uzirpur 29 277 CCRIP/IFAD/BARI/VR/2017/W-52 Improvement of Chatalbari- Chowmohani road 2.63 271.28 Mahbub-Nahid (JV) ; Mr. Zakir-01872861193 218.41 25/10/2017 30/11/2018 35 19/01/2019 Work on going
62 Barishal 5 uzirpur 29 277 CCRIP/IFAD/BARI / VR/215/W-31 Improvement of Nayakandi Bazar to Natherkandi Sluice Gate 2.39 176.41 M/S S.H Enterprise, Mehendigonj, Barisal. ; Mr. Azad-01718121748 140.75 01/03/2016 07/08/2017 100 19/01/2019 Final Bill
63 Barishal 5 uzirpur 29 277 CCRIP/IFAD/BARI/VR/2015/W-25 Improvement of Barakota UP - Serebangla - Muktizoddha Milonkendro - Kalibari GPS - Chokiderbari - Tosilderbari - Adam Ali Madrasha - Kangsi GPS - Baborkhana H/O Mobarak - Sanerhat Road (Baborkhana - Kangshi Al-Haj Adam Ali Madrasha & Ext. up to Uzipur Dh 1.40 405.15 M/S Amir Poly (JV) ; Amir Hossain-01748991151 356.24 22/11/2015 30/01/2018 100 19/01/2019 Final Bill
64 Barishal 5 uzirpur 29 277 CCRIP/IFAD/BARI/VR/2015/W-27 Improvement of Solok Hat to North Solok Hazi MA Rashid High School via Solok hat 1.63 138.09 M/S Kohinur Enterprise ; Mr. Fuad-01748729327 109.99 15/11/2015 31/05/2017 30 19/01/2019 Work on going
65 Barishal 5 uzirpur 29 277 CCRIP/IFAD/BARI / VR/2016/W-38 Improvement of Dhamura-Babarkhana- Sholok Hat road 1.51 97.67 M/S Meem & Co. ; Mr.Jhangir-01730169660 77.40 06/06/2016 21/06/2017 100 19/01/2019 Final Bill
66 Barishal 5 uzirpur 29 277 CCRIP/IFAD/BARI/VR/2015/W-24 Improvement of Jugirkanda Madrasha to Mohila College GCCR Raod 1.86 228.88 M/S Talukder Enterprise ; Mr. Monir Hossain-01712395366 192.85 17/11/2015 25/05/2018 74 19/01/2019 Revised
67 Barishal 5 uzirpur 29 277 CCRIP/BARI/IFAD/VR/2015/W-26 Improvement of Jugirkanda to DC road 2.83 166.83 Meem & Co. M/S Talukder Enterprise (JV) ; Mr Rezaul-01717044834 133.02 12/11/2015 18/11/2016 100 19/01/2019 Final Bill
68 Barishal 5 uzirpur 29 277 CCRIP/BARI/VR/ 2014/W-15 Improvement of Gutia Degree College to Masimkhan Dighi westside mosque starting from Milbari of Dohorpara Village 4450 to 5056 0.62 35.23 M/S Rupali Construction, Barisal ; Mr. Samsul Alom-01712154981 25.94 04/06/2015 30/03/2017 100 19/01/2019 Final Bill
69 Barishal 5 uzirpur 29 277 CCRIP/BARI/VR/ 2014/W-01 Improvement of Gutia Degree College to Masimkhan Dighi westside mosque starting from Milbari of Dohorpara Village 0-226m and 3150 to 4150 166.58 M/S Hazi Enterprise, Bakerganj, Barisal ; Mr.Jamil Hossain-01919329832 132.30 30/09/2014 28/03/2016 100 19/01/2019 Final Bill
70 Barishal 5 uzirpur 29 277 CCRIP/BARI/VR/ 2014/W-02 Improvement of Gutia Bazar to Kamlapur Hat 2.00 134.00 M/S Hazi Enterprise, Bakerganj, Barisal ; Mr.Chopol-01677524134 104.18 30/09/2014 30/03/2016 100 19/01/2019 Final Bill
71 Barishal 5 uzirpur 29 277 CCRIP/BARI/VR/ 2014/W-20 Improvement of West Keshabkati to Bapary Bari RNGPS 1.20 129.29 M/S S.H Enterprise, Mehendigonj, Barisal. ; Mr. Anwar Hossain-01712817924 97.43 04/06/2015 20/02/2017 100 19/01/2019 Final Bill
72 Barishal 5 uzirpur 29 277 CCRIP/GOB/BARI/VR/2017/W-46 Improvement of Bamrail UP (R&H) - Ghandeshor Bazar Road, Improvement of Goria Natunhat - Sikerpur UP - Gondeshar Bazar Road, Uzirpur, Barisal 2.08 169.13 M/S Amir Engineering Corp. ; Amir Hossain-01748991151 147.85 19/10/2017 10/06/2018 75 19/01/2019 Work on going
73 Bhola 4 bhola-s 4 277 CCRIP/ADB/ Bhola/UZR/2016/W-40 Improvement of Banglabazar-Bagmara-Sharif K.-Banker Hat 5.23 319.38 M/S Priyonti Construction, & Manir Traders (J.V) 308.83 28/09/2016 27/12/2017 100 19/01/2019 Final Bill
74 Bhola 4 bhola-s 4 277 CCRIP/ Bhola/GOB/Maint/2017/W-56 Improvement of Banglabazar-Bagmara RHD-Bankerhat Via Sharifkhan Hat road 1.57 106.55 M/S ma Entrprizge Banla Bazar Fatma Khanam College Road Bhola 105.60 04/03/2018 03/03/2019 100 19/01/2019  
75 Bhola 4 bhola-s 4 277 CCRIP/ADB/Bhola/UZR/2015/W-27 Improvement of Constrction of 12.00 m Long Bridge on Banglabazar-Bagmara-Sharif K.-Banker Hat Improvement of Constrction of 20.00 m Long Bridge on Banglabazar-Bagmara-Sharif K.-Banker Hat Improvement of Constrction of 4.00 m Box Culvert on Banglabazar-B 0.23 236.38 M/S Monir Traders Ukilpara, Bhola. 247.87 17/12/2015 16/06/2018 100 19/01/2019 Final Bill Box Culvert
76 Bhola 4 borhanuddin 39 277 CCRIP/ADB/Bhola/UZR/2015/W-34 Improvement of Borhangong GC-Moazzem Hat GC via Talukderhat Road 4.80 846.65 M/S S.R. (JV), Kawran Bazar Dhaka 914.31 01/03/2016 30/12/2018 60 19/01/2019 Work on Going
77 Bhola 4 borhanuddin 39 277 CCRIP/ADB/ Bhola/UZR-Brg/2015/W-36 Improvement of Construction of 90.00m Bridge on Borhangonj GC - Moazzem Hat GC via Talukdar hat road 0.10 702.92 M/S S.R. (JV), Kawran Bazar Dhaka 767.21 01/03/2016 31/12/2018 60 19/01/2019  
78 Bhola 4 borhanuddin 39 277 CCRIP/IFAD/Bhola/VR/2014/W-02 Improvement of DC road to wapda via vheri bad via Darga Mosque 1.08 60.96 M/S Kayed Enterprise Ukialpara, Bhola. 62.05 01/10/2014 28/02/2016 100 19/01/2019 Final Bill
79 Bhola 4 borhanuddin 39 277 CCRIP/IFAD/VR/2016/W-44 Improvement of Kachia-Shikdar Hat-Kachia Road 2.10 147.06 JC &EE(JV) 157.84 16/12/2017 05/12/2018 100 19/01/2019 Work on going
80 Bhola 4 borhanuddin 39 277 CCRIP/IFAD/Bhola/VR/W-32 Improvement of DC road ( Miar Dokan) to Talukdar hat 2.57 169.53 M/S Priyonti Construction, Gazipur Road, Bhola. 179.87 14/01/2016 30/07/2018 100 19/01/2019 Final Bill
81 Bhola 4 borhanuddin 39 277 CCRIP/IFAD/Bhola/VR/2014/W-22 Improvement of Joya Hat-Sikder Char Road 1.73 132.55 M/S Priyonti Construction, Gazipur Road, Bhola. 138.08 23/09/2015 22/09/2016 100 19/01/2019 Final Bill
82 Bhola 4 borhanuddin 39 277 CCRIP/IFAD/Bhola/VR/2014/W-23 Improvement of Joya Hat-Tatulia river Joya Bazar Road 0.60 104.67 M/S Sayem Enterprise Kalinath Bazar, Bhola 103.37 23/09/2015 22/09/2016 100 19/01/2019 Final Bill
83 Bhola 4 borhanuddin 39 277 CCRIP/IFAD/Bhola/VR/2014/W-21 Improvement of Mainker hat kikobad road-lakkipur GPS (Manikahat Kaykobad Road to Laxmipur GPS Via Mostafij bari) 0.49 34.57 M/S Priyonti Construction, Gazipur Road, Bhola. 35.89 23/09/2015 22/09/2016 100 19/01/2019 Final Bill
84 Bhola 4 borhanuddin 39 277 CCRIP/IFAD/Bhola/UNR/2014/W-09 Improvement of Dorgha (Hakimuddin Bazar) to Tobgi UP office via Dalal Bazar road 2.06 246.32 Md. Eunus Al Mamun Charfassion, Bhola. 257.83 09/07/2015 28/02/2018 85 19/01/2019  
85 Bhola 4 borhanuddin 39 277 CCRIP/IFAD/Bhola/VR/2014/ W-01 Improvement of Improvement of Kachia Gass Field to kazir hat via abul bazar road. 1.19 98.12 Md. Hamidullah Mollah, Kalinath Bazar, Bhola. 103.21 01/10/2014 13/12/2015 100 19/01/2019 Final Bill
86 Bhola 4 charfassion 5 277 CCRIP/IFAD/Bhola/UNR-Bridge/2015/ W-26 Improvement of Construction of 30.00 m Long Bridge on RHD-Kaliakandi GPS to Jalil road Dinar Khea ghat via Bhuyar hat 241.73 Md. Eunus Al Mamun Charfassion, Bhola. 272.00 30/12/2015 30/12/2017 100 19/01/2019 Final Bill
87 Bhola 4 charfassion 5 277 CCRIP/Bho/GOB/BR/2017/W-50 Improvement of Construction of 30.00 m Long Bridge on Kukri Mukri Bazar - Aminpur Bazar Road 0.10 275.09 Nabarun Traders 187/7 Lack Sarker Roas ,Kalibari ,Dhaka 287.80 15/02/2018 14/02/2019 35 19/01/2019 Work on going
88 Bhola 4 charfassion 5 277 CCRIP/IFAD/Bhola/VR/2014/W-25 Improvement of Chairman Hat Road to Madraz Shamraj Via Daser Hat 3.37 232.37 Md. Eunus Al Mamun Charfassion, Bhola. 242.74 18/10/2015 17/04/2017 90 19/01/2019 Work on Going
89 Bhola 4 charfassion 5 277 CCRIP/IFAD/Bhola/VR/ 2014/W-18 Improvement of Manika Embankment-Sumir Char Road 4.59 272.86 M/S Babul Traders Thana Road, Charfassion, Bhola. 260.15 22/07/2015 25/02/2018 100 19/01/2019 Final Bill
90 Bhola 4 charfassion 5 277 CCRIP/IFAD/Bhola/VR/ 2014/W-07 Improvement of Manika Embankment (Bundth) to Sumir (Subid) Char 2.20 177.32 M/S Mollik Enterprise Mathbaria, Pirojpur 167.39 28/01/2015 20/05/2016 100 19/01/2019 Final Bill
91 Bhola 4 charfassion 5 277 CCRIP/IFAD/Bhola/VR/ 2014/W-08 Improvement of North manika Red crisent Cyclone shelter to Kachhopia 1.72 152.13 M/S Sayem Enterprise Kalinath Bazar, Bhola 135.75 07/01/2015 19/03/2016 100 19/01/2019 Final Bill
92 Bhola 4 charfassion 5 277 CCRIP/BHOL/ IFAD/UNR/2017/W-52 Improvement of Char Kukri -Mukri UP Office-Kochhopia Bazar Embank. Road via Forest 3.03 469.44 Md. Eunus Al Mamun Charfassion, Bhola. 480.14 25/01/2018 24/01/2019 35 19/01/2019 Work on going
93 Bhola 4 charfassion 5 277 CCRIP/Bhola/IFAD/UNR/2017/W-47 Improvement of College Road Nurabad UP Office-Pangashia Bazar 1.50 130.41 M/S Khan Traders 129.39 30/11/2017 29/11/2018 65 19/01/2019 Work on going
94 Bhola 4 charfassion 5 277 CCRIP/IFAD/Bhola/UNR/2017/W-45 Improvement of East side of Kukri Mukri Bazar to H/O Elahi Bokshi Kukri Mukri Bazar (Char Kukri Mukri UP Office) - Aminpur Bazar road 2.66 324.65 Md. Eunus Al Mamun Charfassion, Bhola. 324.56 20/06/2017 19/12/2018 85 19/01/2019 Work on going
95 Bhola 4 charfassion 5 277 CCRIP/Bhola/GOB/VR/2017/W-49 Improvement of Bangla Bazar to Ghoserhat via Paschim Char Nurul Amin GPS 2.00 168.09 M/S Bakshi Enterprise Thana Road;Charfassion Bhola 167.97 30/11/2017 29/11/2018 60 19/01/2019 Work on going
96 Bhola 4 charfassion 5 277 CCRIP/IFAD/Bhola/UNR/W-33 Improvement of Muzibnagar Janatar Bazar Launchghat to South side of WAPDA embankment road 2.00 234.67 M/S Bakshi Enterprise, Thana Road, Charfassion, Bhola 230.02 29/06/2016 28/06/2017 100 19/01/2019 Final Bill
97 Bhola 4 charfassion 5 277 CCRIP/Bhola/UNR/2014/W-24 Improvement of Usmangonj UP to Kasemmiar Hat via Pangasia bazar 1.50 147.94 M/S Jasim Construction, Thana Road, Charfassion 155.50 18/10/2015 23/04/2017 100 19/01/2019 Work on going
98 Bhola 4 charfassion 5 277 LCS-03 Improvement of East Kukri Bazar from house of Elahi Box (Kocchopia Bazar) Sarok -Mohiskhola Road 0.86 7.70 Asa Begum Chairman & Fatema Begum Secretary 7.77 01/12/2014 30/05/2015 100 19/01/2019 Final Bill
99 Bhola 4 charfassion 5 277 LCS-02 Improvement of East Kukri Bazar from house of Elahi Box (Kocchopia Bazar) Sarok -Mohiskhola Road 1.00 6.77 Azufa Bibi Chairman &Sunifi Rani Secretary 6.77 01/12/2014 30/05/2015 100 19/01/2019 Final Bill
100 Bhola 4 charfassion 5 277 LCS-01 Improvement of Earth work for Improvement of East Kukri Bazar from house of Elahi Box (Kocchopia Bazar) Sarok -Mohiskhola Road 0.80 7.46 Morsheda Begum Chairman & Amania Begum Secretary 7.46 01/12/2014 30/05/2015 100 19/01/2019 Final Bill
101 Bhola 4 charfassion 5 277 CCRIP/IFAD/Bhola/UNR/2014/ W-10 Improvement of RHD-Kaliakandi GPS to Jalil road Dinar Khea ghat via Bhuyar hat 1.27 141.57 Sanguine Enineering Co. Ltd Pallabi, Dhaka 131.35 22/07/2015 23/11/2017 100 19/01/2019 Revised
102 Bhola 4 lalmohan 6 277 CCRIP/IFAD/Bhola/UNR/2014/W-20 Improvement of Mongol Shikder RHD- Chatla Bazar Road 2.73 172.88 Md. Raseduzzaman, Kowranbazar Road, Dhaka. 170.95 08/06/2015 15/03/2017 100 19/01/2019 Final Bill
103 Bhola 4 lalmohan 6 277 CCRIP/ADB/Bhola/UZR/2016/ W-39 Improvement of Lalmohan K. B.-Karter Hat (West Side) 3.99 762.37 M/S S.R. (JV), Kawran Bazar Dhaka 819.11 09/10/2016 30/12/2018 75 19/01/2019 Work on going
104 Bhola 4 lalmohan 6 277 CCRIP/Bhola/GOB/VR/2018/W-57 Improvement of Muslimbazar RHD to Janata Bazar-Bhola Charfession RHD (JewelL Brick Field) 1.19 129.27 M/S Serajia Enterprise ,Western para, Lalmohan, Bhola 129.27 11/11/2018 10/11/2019 10 19/01/2019  
105 Bhola 4 lalmohan 6 277 CCRIP/IFAD/Bhol/VR-BRG/2015/W-38 Improvement of Construction of 15.00 m Long Bridge on RHD (Muslim Bazar) to Lalmohon-Bhola R&H via Janata Bazar 0.06 124.23 Md, Zakir hossain 131.48 25/05/2016 24/05/2017 95 19/01/2019 Work on going
106 Bhola 4 lalmohan 6 277 CCRIP/IFAD/Bhola/VR-Brg/W-35 Improvement of Construction of 16.00 m Long Bridge on Mongol Sikder RHD-Chatla Bazar 0.00 130.93 M/S Orni Enterprise 125.92 20/01/2016 19/01/2017 100 19/01/2019 Final Bill
107 Bhola 4 lalmohan 6 277 CCRIP/IFAD/Bhola/VR-Brg/W-30 Improvement of Construction of 16.00 m Long Bridge on Mongol Sikder RHD-Chatla Bazar 0.03 107.81 M/S Monir Traders Ukilpara, Bhola. 104.11 28/01/2016 27/07/2017 100 19/01/2019 Final Bill
108 Bhola 4 lalmohan 6 277 CCRIP/IFAD/Bhola/VR/W-31 Improvement of Muslimbazar RHD to Janata Bazar-Bhola Charfession RHD (JewelL Brick Field) 3.00 213.32 M/S Rubel Enterprice 216.67 07/01/2016 20/12/2017 100 19/01/2019 Final Bill
109 Bhola 4 lalmohan 6 277 CCRIP/IFAD/Bhola/VR/ 2014/W-19 Improvement of Deghir Para Sada Pole-Patoary Hat road 1.10 77.46 Md. Raseduzzaman, Kowranbazar Road, Dhaka. 76.37 08/06/2015 15/03/2017 100 19/01/2019 Final Bill
110 Bhola 4 lalmohan 6 277 CCRIP/IFAD/Bhola/VR/ 2014/W-06 Improvement of Farashganj UP road-house of Unus Fakir 1.50 1058.87 M/S Eli Enterprise Sadar Road, Bhola. 118.54 08/10/2014 21/02/2016 100 19/01/2019 Final Bill
111 Bhola 4 lalmohan 6 277 CCRIP/IFAD/Bhola/VR /2014/W-05 Improvement of Nazirpur Bazar-Paschim Char Umed via Farashgonj UP 2.00 158.90 Md. Raseduzzaman, Kowranbazar Road, Dhaka. 170.86 23/10/2014 22/04/2016 90 19/01/2019  
112 Bhola 4 lalmohan 6 277 CCRIP/IFAD/Bhola/VR/2014/W-04 Improvement of Horigonj Road-H/Q Alomgir Chairman-Dipshika School 1.73 135.74 Md. Akter Hossain Kalibari Road, Bhola. 147.74 12/10/2014 29/02/2016 100 19/01/2019 Final Bill
113 Bhola 4 lalmohan 6 277 CCRIP/IFAD/Bhola/VR/2014/W-03 Improvement of Improvement of Char vuta UP-Chatla Bazar 2.50 245.17 M/S Eli Enterprise Sadar Road, Bhola. 249.75 08/10/2014 07/04/2016 100 19/01/2019 Final Bill
114 Chuadanga 42 damurhuda 290 277 CCRIP/SARI/UZR/2014/W-03 Improvement of Damuddaya GC to Dasherjungle GC 4.43 736.82 hariatpur Md.Ziaur Rahman: 01718699882 823.56 100 19/01/2019 Final Bill
115 Gopalganj 28 gopalganj-s 241 277 CCRIP/ADB/GOPAL/UZR/2015/W-17 Improvement of Kathi-Teligati-Raghunathpur Road (GC-FRB) 3.81 405.82 M/S ST & SE (JV) Chandmari road,Gopalgonj 323.33 07/02/2016 27/06/2017 100 19/01/2019  
116 Gopalganj 28 kotwalipara 230 277 CCRIP/ADB/GOPAL/UZR/2014/W-05 Improvement of Radhagonj UPC-Doglas High School-Bhangergat GC Rd 3.00 759.11 M/S ASCL & RRPL JV. Panthapath,Dhaka-1207 793.32 08/01/2015 28/07/2016 95 19/01/2019 Work on going
117 Gopalganj 28 kotwalipara 230 277 CCRIP/IFAD/GOPAL/BR/2015/W-20 Improvement of Construction of 16.00 m Long Bridge on Suagram UPC-Kandi bazar road. 111.92 Nihar,Cell # 01774965666 89.16 24/02/2016 10/01/2017 95 19/01/2019  
118 Gopalganj 28 kotwalipara 230 277 CCRIP/ADB/GOPAL/UZR/2015/W-19 Improvement of Constrction of 39.00 m Long Bridge on Radhagonj UPC-Doglas High School-Bhangergat GC Rd Improvement of Constrction of 90.00 m Long Bridge on Majbari R & H-Radhagonj Bazar Road 854.38 M/s Rizvi Construction &M/s.Anamica Traders(JV)107/A,DB Road Mymensingh. 798.48 21/12/2016 20/06/2018 60 19/01/2019 Work on going
119 Gopalganj 28 kotwalipara 230 277 CCRIP/IFAD/GOPAL/VR/2014/W-09 Improvement of WAPDA hat R&H - Bandabari Bazar Road _Palasiding 15.39 Champa Begum,Chairman and Kohinur Begum,Secretary. 15.39 29/11/2014 31/12/2016 100 19/01/2019  
120 Gopalganj 28 kotwalipara 230 277 CCRIP/IFAD/GOPAL/VR/2014/W-13 Improvement of Bujurgikona Bazar-Baro Dakhinpar via Wapda hat Road 2.00 292.18 Asik,Cell # 01713571133 157.25 21/06/2015 28/06/2015 95 19/01/2019 Revised
121 Gopalganj 28 kotwalipara 230 277 CCRIP/IFAD/GOPAL/VR/2014/W-12 Improvement of Suagram UPC-Kandi bazar road. 0.22 9.66 Bithika Roy,Chairman and Kusum Halder,Secretary. 9.67 29/11/2014 30/06/2016 100 19/01/2019  
122 Gopalganj 28 kotwalipara 230 277 CCRIP/IFAD/GOPAL/VR/2014/W-11 Improvement of Suagram UPC-Kandi bazar road. 0.38 8.89 Konoklata Mozumdar,Chairman and Rina Bala,Secretary. 8.90 29/11/2014 30/06/2016 100 19/01/2019  
123 Gopalganj 28 kotwalipara 230 277 CCRIP/IFAD/GOPAL/VR/2014/W-10 Improvement of Suagram UPC-Kandi bazar road. 0.40 10.02 Suity Baroi,Chairman and Tunu Rani Baroi,Secretary. 10.02 29/11/2014 30/06/2016 100 19/01/2019  
124 Gopalganj 28 kotwalipara 230 277 CCRIP/IFAD/GOPAL/VR/2016/W-23 Improvement of Pirarbari hat-Nabagram UP Road 3.00 292.18 M/S Safa Bricks,213,Udayon Road, Gopalgonj. 267.63 09/05/2016 11/11/2017 70 19/01/2019  
125 Gopalganj 28 kotwalipara 230 277 CCRIP/IFAD/GOPAL/VR/2017/W-27 Improvement of WAPDA hat R & H - Bandhabari Bazar Road 2.00 128.54 MME & HJAS (JV), Sheikh Abdus Samad, Gagor Bazar, Kotalipara. 114.00 29/08/2017 08/04/2018 95 19/01/2019 Work on going
126 Gopalganj 28 kotwalipara 230 277 CCRIP/IFAD/GOPAL/UNR/2016/W-26 Improvement of Suagram UPC-Kandi bazar road. 2.00 185.18 M/S Lutful Kabir,Dillbag,Bagura,Alekanda Road, Barisal. 164.16 12/01/2017 07/12/2017 45 19/01/2019  
127 Gopalganj 28 kotwalipara 230 277 CCRIP//GOPAL/UNR/2014/W-02 Improvement of Pubra WAPDA hat-Suagram UPC Road 2.50 221.09 ASCL & RCC (JV) Panthopath, Dhaka. 185.23 14/01/2015 20/01/2016 100 19/01/2019 Final Bill
128 Gopalganj 28 muksudpur 220 277 CCRIP/ADB/GOPAL/UZR/2015/W-16 Improvement of Muksudpur R&H to Kalinagar GC via Kishnadia Bahirbag Road 2.79 423.00 ASCL & RCC (JV) 17/C Panthopath, Dhaka. 378.19 07/02/2016 22/11/2017 100 19/01/2019 Final Bill
129 Gopalganj 28 muksudpur 220 277 CCRIP/IFAD/GOPAL/VR/2014/W-08 Improvement of WAPDA hat R&H - Bandabari Bazar Road (1600-2000m) 15.05 Kulsum Begum,Chairman and Morjina Begum,Secretary. 15.05 29/11/2014 31/12/2016 100 19/01/2019  
130 Gopalganj 28 muksudpur 220 277 CCRIP/IFAD/GOPAL/VR/2014/W-07 Improvement of WAPDA hat R&H - Bandabari Bazar Road (1000-1600m) 15.04 Shirin Kazi,Chairman and Rahima Begum,Secretary. 15.04 29/11/2014 31/12/2016 100 19/01/2019  
131 Gopalganj 28 muksudpur 220 277 CCRIP/IFAD/GOPAL/VR/2014/W-06 Improvement of WAPDA hat R&H - Bandabari Bazar Road (0-1000m) 15.52 Mina Vokto,Chairman and Nasima Begum, Secretary. 15.52 29/11/2014 31/12/2016 100 19/01/2019  
132 Gopalganj 28 tungipara 232 277 CCRIP//GOPAL/UNR/2014/W-01 Improvement of Gopalpur UP-Borauhati Road 1.54 170.96 Md. Babul Sheik, Tungipara, Gopalgonj. 157.31 14/01/2015 20/01/2016 100 19/01/2019 Final Bill
133 Gopalganj 28 tungipara 232 277 CCRIP/IFAD/GOPAL/BR/2015/W-21 Improvement of Construction of 26.00 m Long Bridge on Pakurtia Bazar-Karfa Bazar Road 250.86 Narayon chandro dham-01740948994 & Sanjoy-01973545488 224.24 06/03/2016 12/09/2017 85 19/01/2019 Revised
134 Khulna 35 batiaghata 264 277 CCRIP/KHUL/VR/2014/W-01 Improvement of Nijgram -Baintala Hat 1.99 109.27 M/s.Ezaz Traders Pro:Amir Ezaz Khan, Khulna 98.22 10/11/2014 30/01/2017 100 19/01/2019 Final Bill Paid
135 Khulna 35 batiaghata 264 277 CCRIP/KHUL/VR/2014/W-02 Improvement of Baintala Hat - Narayanpur School 1.59 91.87 M/s. Kamrul Ent. Pro: Md. Kamrul Ahasan, Khulna 80.88 06/11/2014 20/01/2017 100 19/01/2019 Final Bill Paid
136 Khulna 35 batiaghata 264 277 CCRIP/GOB/KHUL/VR/2017/W-21 Improvement of Sukdara Hat-Gangarampur Hat Road, Batiaghata, Khulna 1.50 92.84 M/S Ziaul Traders, Pro: Md. Ziaul Ahsan, 37 South Tootpara, Khulna 101.10 09/01/2018 15/11/2018 45 19/01/2019 Work on going
137 Khulna 35 batiaghata 264 277 CCRIP/KHUL/UNR/2014/W-09 Improvement of Baliadanga UP office (West) - Taliamara Hat 1.46 117.67 M/s Faisal Traders Pro: Khan Hafizur Rahman, Jugihati, Rupsa, Khulna 96.99 09/09/2015 04/07/2018 100 19/01/2019 Final Bill Paid
138 Khulna 35 dacope 263 277 CCRIP/IFAD/KHUL/VR/2015/W-16 Improvement of Khatail CARE Pucca Road to Khatail near Kali Mondir 1.28 101.74 M/S Amirun Enterprise & M/S Akhi Enterprise (JV), Khulna 89.40 17/12/2015 30/08/2018 85 19/01/2019 Work on going
139 Khulna 35 dacope 263 277 CCRIP/IFAD/KHUL/VR/2015/W-14 Improvement of Yasin School near Hoglabunia Khal road 1.50 104.27 Prosanta Kumar Saha, Chalna Bazar, Dacope, Khulna 89.96 21/01/2016 26/01/2017 100 19/01/2019 Final Bill Paid
140 Khulna 35 dacope 263 277 CCRIP/IFAD/KHUL/VR/2015/W-13 Improvement of Pankhali Ferry Ghat to Laxmikhola Bazar road 1.40 93.14 Md. Asgar Ali Khan, Milki Deara Jugihati, Rupsha, Khulna 77.89 21/01/2016 25/01/2018 100 19/01/2019 Final Bill Paid
141 Khulna 35 dacope 263 277 CCRIP/IFAD/KHUL/VR/2015/W-15 Improvement of Khajuria WDB Gora N/H/O Krishnapada to Dhangmari Biswashnath P/School via Binapani GPS 2.34 159.95 AT & NE JV, Chalna Bazar, Khulna 144.11 21/01/2016 29/05/2018 90 19/01/2019 Work on going
142 Khulna 35 dacope 263 277 CCRIP/IFAD/KHUL/UNR/2016/W-17 Improvement of Dacope UP Office to Badua UP office road 2.50 202.46 AT & NE JV, Chalna Bazar, Dacope, Khulna 202.36 26/07/2016 24/11/2018 100 19/01/2019 Final Bill Processing
143 Khulna 35 dacope 263 277 CCRIP/KHUL/UNR/2014/W-03 Improvement of Banisanta UP office to Banisanta Bazar road 2.50 196.43 M/s.Kamrul Ent. Pro: Md. Kamrul Ahasan, Khulna 180.13 08/03/2015 18/01/2018 100 19/01/2019 Final Bill Paid
144 Khulna 35 dighalia 270 277 CCRIP/ADB/KHUL/UZR/2015/W-12 Improvement of Majhirgati-Bamondanga - Katenga GC 6.46 265.26 M/S Rafique Enterprise, Md. Rafiquzzaman, 252, Tootpara Main Road, Khulna 283.87 03/03/2016 30/06/2018 95 19/01/2019 Work on going
145 Khulna 35 koira 275 277 CCRIP/KHUL/VR/2014/W-08 Improvement of Hatiardanga Culvert - Patnikhali Foot Bridge 2.08 133.99 M/s Rupa Enterprise Pro: Sk. Ebadad Hossain, Shiromoni, Khulna 116.23 09/09/2015 25/04/2018 100 19/01/2019 Final Bill Paid
146 Khulna 35 koira 275 277 CCRIP/IFAD/KHUL/VR/2015/W-11 Improvement of Malikhali UZR - Khorolkati Bazar 0.81 74.26 Howlader Basharat Ali. 18 K.D. Ghosh Road, Khulna 61.24 02/11/2015 20/01/2017 100 19/01/2019 Final Bill Paid
147 Khulna 35 paikgacha 276 277 CCRIP/ADB/KHUL/UZR/2016/W-18 Improvement of Paikghacha R&H (Bowalia More) - Baka GC 2.47 231.78 M/S. Kamrul Enterprise, Tootpara, Khulna 250.21 31/01/2017 30/12/2018 100 19/01/2019 Final Bill Processing
148 Khulna 35 terokhada 278 277 CCRIP/KHU/UZR/2014/W-07 Improvement of Abduler more R&H - Majhirgati GC via Kola Bazar 6.18 612.51 M/S JI & ZT (JV) , 37 South Tootpara, Khulna 740.10 15/01/2015 15/06/2017 100 19/01/2019 Final Bill Paid
149 Madaripur 30 rajoir 228 277 CCRIP/MADA/GoB/BRG/2017/W-57 Improvement of Construction of 22.00 m Long Bridge on Kabirajpur GC to Sree Nadi GC 170.18 M/S Progoti Enterprise, Goshairhat, Shariatpur 128.91 21/12/2017 50 19/01/2019 Work on going
150 Madaripur 30 rajoir 228 277 CCRIP/MADA/GoB/BRG/2017/W-22 Improvement of Construction of 51.00 m Long Bridge on Boiragir Bazar to Damerchat Bazar at CH 4500.00 365.17 M/S Showrove Traders, Madaripur. Lovelu: 01712294436 261.06 90 19/01/2019 Work on going
151 Madaripur 30 rajoir 228 277 CCRIP/IFAD/MADA/BR/2015/W-21 Improvement of Construction of 17.00 m Long Bridge on Kodalia bazar to Chourashi bridge road 135.34 M/S Hamim International, Madaripur. Habib: 01712-178665 143.44 21/03/2016 90 19/01/2019 Work on going
152 Madaripur 30 rajoir 228 277 CCRIP/IFAD/MADA/BR/2015/W-23 Improvement of Construction of 15.00 m Long Bridge on Kodalia bazar to Chourashi bridge road Improvement of Construction of 17.00 m Long Bridge on 235.40 M/S Hamim International, Madaripur. Habib: 01712-178665 255.30 20/03/2016 95 19/01/2019 Work on going
153 Madaripur 30 rajoir 228 277 CCRIP/IFAD/MADA/BR/2015/W-20 Improvement of Construction of 18.00 m Long Bridge on Nayanagar to Malek Memorial H/School via Krisnopur Road 128.43 Safal Enterprise, Madaripur. Shajahan: 01733-109759 & 01712-290328 135.82 95 19/01/2019 Work on going
154 Madaripur 30 rajoir 228 277 CCRIP/IFAD/MADA/BR/2015/W-19 Improvement of Construction of 20.00 m Long Bridge on Purbo Lundi Mosque-Pochim Lundi GPS road & Lundi more-Mia bari road 121.18 Bhuiya Construction, Madaripur. Sabbir Bhuiya: 01715-398839 & 01848-077555 126.55 20/03/2016 100 19/01/2019 work complete
155 Madaripur 30 rajoir 228 277 CCRIP/IFAD/MADA/BR/2015/W-18 Improvement of Construction of 16.00 m Long Bridge on Mostofapur pacca road-Charu Boser Dighirpar road 107.28 Kajol Krishinu Day, Madaripur. Kajol Krishinu : 01711-830143 & 01716-522864 106.73 16/03/2016 100 19/01/2019 Final Bill
156 Madaripur 30 rajoir 228 277 CCRIP/MADARI/ADB/UZR/2017/W-46 Improvement of Takerhat GC-Sreenodi GC-Charmuguria-Khagdi R&H road 0.50 157.88 M/S Ha-mim International, Kulpoddi, Madaripur 125.80 60 19/01/2019 Work on going
157 Madaripur 30 rajoir 228 277 CCRIP/MADA/IFAD/2014/LCS/W-13 Improvement of Kodalia bazar to Chourashi bridge road (1800-2543m) 0.74 17.23 LCS 17.23 100 19/01/2019 Final Bill
158 Madaripur 30 rajoir 228 277 CCRIP/MADA/IFAD/2014/LCS/W-12 Improvement of Kodalia bazar to Chourashi bridge road (1200 m-1800m) 0.60 14.45 LCS 14.46 100 19/01/2019 Final Bill
159 Madaripur 30 rajoir 228 277 CCRIP/MADA/IFAD/2014/LCS/W-11 Improvement of Kodalia bazar to Chourashi bridge road (1200 m) 1.20 13.29 LCS 13.29 100 19/01/2019 Final Bill
160 Madaripur 30 rajoir 228 277 CCRIP/Madari/IFAD/VR/2015/W-14 Improvement of Bharot R&H-Kodalia bazar road 1.45 102.50 M/S Sarder Enterprise Madaripur 86.01 24/01/2016 100 19/01/2019 Final Bill
161 Madaripur 30 rajoir 228 277 CCRIP/MADA/GoB/VR/2017/W-59 Improvement of Boiragir Bazar to Damerchat Bazar 1.02 71.00 M/S Subrin Maeccano Madaripur 69.59 17/04/2018 55 19/01/2019 Work on going
162 Madaripur 30 rajoir 228 277 CCRIP/MADA/GOB/VR/2017/W-52 Improvement of Kabirajpur GC to Sreenodi GC road, 4.20 264.65 M/S Sonali Store, Puran Bazar Madaripur 242.07 13/02/2018 55 19/01/2019 Work on going
163 Madaripur 30 rajoir 228 277 CCRIP/MADA/GOB/VR/2017/W-51 Improvement of Fultala Hat-Sreerampur Road, Rajoir, Madaripur 1.50 192.74 M/S Safol Enterprise, Kulpoddi, Madaripur 169.68 26/12/2017 85 19/01/2019 Work on going
164 Madaripur 30 rajoir 228 277 CCRIP/MADA/GOB/VR/2017/W-45 Improvement of Kodalia Bazar - Choweashi Bridge 2.54 149.69 M/S Bhuya Construction, Madaripur. Bhuya: 01715398839 121.15 75 19/01/2019 Work on going
165 Madaripur 30 rajoir 228 277 CCRIP/IFAD/MADA/VR/2016/W-28 Improvement of Kabirajpur GC to Sreenodi GC road 0.73 16.85 LCS 18.85 100 19/01/2019 Final Bill
166 Madaripur 30 rajoir 228 277 CCRIP/IFAD/MADA/VR/2016/W-27 Improvement of Kabirajpur GC to Sreenodi GC road 0.40 16.31 LCS 16.31 100 19/01/2019 Final Bill
167 Madaripur 30 rajoir 228 277 CCRIP/IFAD/MADA/VR/2016/W-26 Improvement of Kabirajpur GC to Sreenodi GC road 1.10 14.25 LCS 14.25 100 19/01/2019 Final Bill
168 Madaripur 30 rajoir 228 277 CCRIP/IFAD/MADA/VR/2016/W-25 Improvement of Kabirajpur GC to Sreenodi GC road 0.58 10.70 LCS 10.70 100 19/01/2019 Final Bill
169 Madaripur 30 rajoir 228 277 CCRIP/IFAD/MADA/VR/2016/W-24 Improvement of Kabirajpur GC to Sreenodi GC road 0.80 11.52 LCS 11.52 100 19/01/2019 Final Bill
170 Madaripur 30 rajoir 228 277 CCRIP/Madari/IFAD/VR/2014/W-06 Improvement of Nayanagar to Malek Memorial H/School via Krisnopur Road 2.00 168.97 M/S Sarbik International, New Town, Madaripur. Aku Sikdar: 01712-846773 188.47 23/01/2015 100 19/01/2019 Final Bill
171 Madaripur 30 rajoir 228 277 CCRIP/Madari/IFAD/VR/2014/W-07 Improvement of Purbo Lundi Mosque-Pochim Lundi GPS road & Lundi more-Mia bari road 1.45 117.15 M/S Nurjahan Resours International , Kukrail,Madaripur. Yeaid Ali (Mayor): 01713-008840 & Zakir : 01712-488487 121.78 23/01/2015 100 19/01/2019 Final Bill
172 Madaripur 30 rajoir 228 277 CCRIP/Madari/VR/2014/W-1 Improvement of Mostofapur pacca road-Charu Boser Dighirpar road 1.27 90.57 M/S Hridoy Construction,Akur-Takurpara,Tangail. Babu: 01712-518290 71.75 25/08/2014 100 19/01/2019 Final Bill
173 Madaripur 30 rajoir 228 277 CCRIP/IFAD/MADA/VR/2015/W-13 Improvement of Bairagir bazar-Ragdi bazar road 2.50 154.51 M/S Khokon Bapary Kalkini. Iqbal: 01726-837869 120.54 20/07/2017 100 19/01/2019 Final Bill
174 Madaripur 30 rajoir 228 277 CCRIP/IFAD/MADA/UNR/2016/W-31 Improvement of Hossenpur UP-Kabirajpur UP road 0.91 15.66 LCS 15.66 100 19/01/2019 Final Bill
175 Madaripur 30 rajoir 228 277 CCRIP/IFAD/MADA/UNR/2016/W-30 Improvement of Hossenpur UP-Kabirajpur UP road 0.60 15.03 LCS 15.03 100 19/01/2019 Final Bill
176 Madaripur 30 rajoir 228 277 CCRIP/IFAD/MADA/UNR/2016/W-29 Improvement of Hossenpur UP-Kabirajpur UP road 1.08 17.10 LCS 17.10 100 19/01/2019 Final Bill
177 Madaripur 30 rajoir 228 277 CCRIP/MADA/GOB/UNR/2017/W-50 Improvement of Hossenpur UP-Kabirajpur UP road 2.59 223.55 M/S Sonali Store, Puran Bazar Madaripur 196.67 21/12/2017 60 19/01/2019 Work on going
178 Madaripur 30 shibchar 231 277 CCRIP/MADA/GoB/BRG/2017/W-56 Improvement of Construction of 35.00 m Long Bridge on Kolatola Hat - Lal Cander More Golam Jahangir (RNGPS) Road 272.25 M/S Munir Chowdhury, Shibchar, Madaripur. 299.92 80 19/01/2019 Work on going
179 Madaripur 30 shibchar 231 277 CCRIP/IFAD/MADA/BR/2016/W-37 Improvement of Construction of 22.00 m Long Bridge on Boheratola UP office-Baburhat via Vennatola bazar (0-1000m) 190.17 M/S MK Bilders, Madaripur. Tofajel Hossain: 01737-668857 195.80 13/10/2016 100 19/01/2019 work complete
180 Madaripur 30 shibchar 231 277 CCRIP/Madari/IFAD/BR/2015/W-15 Improvement of Construction of 59.00 m Long Bridge on Shariatpur R&H road near the H/O Sarwar Bepari to Mithu Hazirkandi road 433.78 M/S Hamim International, Madaripur. Habib: 01712-178665 477.00 95 19/01/2019 Work on going
181 Madaripur 30 shibchar 231 277 CCRIP/MADARI/ADB/UZR/2017/W-42 Improvement of Chanderchar Growth Center-Shekhpur R&H road via Satvagia and Baburhat 2.62 305.31 M/S Hamim & Munir (JV) 319.76 20/08/2017 100 19/01/2019 Final Bill
182 Madaripur 30 shibchar 231 277 CCRIP/MADA/UZR/2014/W-05 Improvement of R&H, Bypass road to Kahtalbari Ferryghat road via Kutubpur Growth Centre & Bangla Bazar 3.97 433.83 M/S Hamim International, Madaripur. Habib: 01712-178665 500.80 15/04/2015 100 19/01/2019 work complete
183 Madaripur 30 shibchar 231 277 CCRIP/Madari/IFAD/VR/2015/W-16 Improvement of Shariatpur R&H road near the H/O Sarwar Bepari to Mithu Hazirkandi road 1.00 104.95 M/S Sepai Enterprise, Shibchar, Madaripur. Lukman: 01716-778879 108.05 100 19/01/2019 Final Bill
184 Madaripur 30 shibchar 231 277 CCRIP/MADA/IFAD/VR/2014/W-10 Improvement of Bangla bazarhat-Mollarhat via J.K GPS & Purankandi GPS road (1500m-2000m) 0.50 9.94 LCS 9.94 13/01/2015 13/09/2015 100 19/01/2019 Final Bill
185 Madaripur 30 shibchar 231 277 CCRIP/MADA/IFAD/VR/2014/W-09 Improvement of Bangla bazarhat-Mollarhat via J.K GPS & Purankandi GPS road (800m-1500m) 0.70 12.28 LCS 12.28 13/01/2015 13/09/2015 100 19/01/2019 Final Bill
186 Madaripur 30 shibchar 231 277 CCRIP/MADA/IFAD/VR/2014/W-08 Improvement of Bangla bazarhat-Mollarhat via J.K GPS & Purankandi GPS road (800m) 0.80 11.03 LCS 11.03 13/01/2015 13/09/2015 100 19/01/2019 Final Bill
187 Madaripur 30 shibchar 231 277 CCRIP/IFAD/MADA/VR/2016/W-32 Improvement of Kawerhat to Kabirazpur GC via Gosaidia 2.20 212.41 M/S Atahar Enterprise, Madaripur. Atahar: 01712-291595 219.28 13/10/2016 100 19/01/2019 Final Bill
188 Madaripur 30 shibchar 231 277 CCRIP/IFAD/MADA/VR/2016/W-34 Improvement of Korokchar natun bazar-Joynagor bazar road 1.00 94.13 M/S Pavel Enterprise, Madaripur. Abul Hossain: 01713-569586 97.51 13/10/2016 100 19/01/2019 Final Bill
189 Madaripur 30 shibchar 231 277 CCRIP/IFAD/MADA/VR/2016/W-40 Improvement of Bangla bazarhat-Mollarhat via J.K GPS & Purankandi GPS road 2.00 48.17 Faruk & Eleas (JV) , Shibchar, Madaripur. 270.22 100 19/01/2019 work complete
190 Madaripur 30 shibchar 231 277 CCRIP/MADA/IFAD/VR/2018/W-60 Improvement of Bangla bazarhat-Mollarhat via J.K GPS & Purankandi GPS road, 0.53 56.94 M/S Mathbor Traders, Shibchar, Madaripur 59.76 18/07/2018 100 19/01/2019 work complete
191 Madaripur 30 shibchar 231 277 CCRIP/MADA/GOB/VR/2017/W-54 Improvement of Bangla bazarhat-Mollarhat via J.K GPS & Purankandi GPS road, Shibchar, Madaripur 2.00 348.43 M/S Ha-Mim International, Kulpoddi, Madaripur 383.00 60 19/01/2019 Work on going
192 Madaripur 30 shibchar 231 277 CCRIP/MADA/GOB/VR/2017/W-53 Improvement of Kolatolahat-Lal Chander more via Golam Jahangir RNGPS Road 2.00 245.52 M/S Munir Chowdhury, Shibchar, Madaripur. 269.89 75 19/01/2019 Work on going
193 Madaripur 30 shibchar 231 277 CCRIP/MADA/GOB/VR/2017/W-49 Improvement of UZR-6, Dakhin Korokchar Hat to Jaynagar via Eskan Bapari House, Shibchar, Madaripur 1.15 110.33 M/S Omar Faruque, Shibchar, Madaripur 121.31 28/05/2018 55 19/01/2019 Work on going
194 Madaripur 30 shibchar 231 277 CCRIP/Madari/IFAD/UNR/2015/W-17 Improvement of Bashkandi UP Office - Chowdhurir hat road via Garir Hat 2.65 287.86 M/S Hamim International. Habib: 01712-178665 304.45 29/02/2016 100 19/01/2019 work complete
195 Madaripur 30 shibchar 231 277 CCRIP/MADA/UNR/2016/W-36 Improvement of UZR-1,Bhadrason UP office-Korokchar natun bazar road via minakandi GPS,Uttar Korokchar hat & Beshai Dhonirkandi GPS 2.23 404.50 M/S Hamim & Munir (JV) 397.53 100 19/01/2019 work complete
196 Madaripur 30 shibchar 231 277 CCRIP/IFAD/MADA/UNR/2016/W-41 Improvement of Boheratola UP office-Baburhat via Vennatola bazar 2.00 187.28 Faruk & Jaman (JV) , Shibchar, Madaripur. 204.28 95 19/01/2019 Work on going
197 Madaripur 30 shibchar 231 277 CCRIP/MADA/IFAD/NR/2014/LCS/W-15 Improvement of Boheratola UP office-Baburhat via Vennatola bazar (1000-2000m) 1.00 16.59 LCS 11.30 14/05/2015 14/11/2015 100 19/01/2019 work complete
198 Madaripur 30 shibchar 231 277 CCRIP/MADA/IFAD/NR/2014/LCS/W-14 Improvement of Boheratola UP office-Baburhat via Vennatola bazar (0-1000m) 1.00 11.30 LCS 16.59 14/05/2015 14/11/2015 100 19/01/2019 work complete
199 Madaripur 30 shibchar 231 277 CCRIP/MADA/GOB/UNR/2017/W-48 Improvement of Umedpur U.P.Office to Dakhin Korokchar Hat road via Bhandarikandi High School, Bhandarikandi U.P.Office & F.W.C., Shibchar, Madaripur 1.05 118.10 M/S Mizan Enterprise, New Town, Madaripur. Siraj: 01726-604606 & Alamgir : 01712-476168 129.84 70 19/01/2019 Work on going
200 Madaripur 30 shibchar 231 277 CCRIP/MADA/GOB/UNR/2017/W-47 Improvement of Bashkandi UP Office-Chowdhurir Hat Road via Garir Hat Road 2.10 1877.09 M/S Ha-Mim International, Kulpoddi, Madaripur 206.38 90 19/01/2019 Work on going
201 Patuakhali 1 dashmina 10 277 CCRIP/ADB/Patua/UZR/2015/W-17 Improvement of Gachani GC-Hazirhat GC 4.50 845.42 MA-KH-SMT (JV)Azad bhaban,Patuakhali 966.86 10/03/2016 09/09/2017 100 19/01/2019 Final Bill
202 Patuakhali 1 dumki 15 277 CCRIP/ADB/Patua/UZR/2014/W-9 Improvement of Moukoron GC-khataltali GC Via Hazirhat Rd. 2.61 760.39 M/S.Polli store,Kalikapur,Patuakhali 651.32 16/02/2015 15/08/2016 98 19/01/2019 Work on going
203 Patuakhali 1 galachipa 1 277 CCRIP/Patua/IFAD/VR/2015/W-28 Improvement of Chottosiba FRB to Barosiba Launchghat . 2.35 195.77 M/S.Safiqur Rahaman,Natun bazar Patuakhali 171.16 16/05/2016 13/05/2017 95 19/01/2019 Work on going
204 Patuakhali 1 galachipa 1 277 CCRIP/IFAD/Patua/UNR/BRDG/2015/W-31 Improvement of Construction of 91.00 m Long Bridge on Naluabagi Bazar-R&H road via UP Office 701.73 Amel-PS(JV) M/S Polli store,Kalikapur,Patuakhali 557.05 13/11/2017 05/01/2018 85 19/01/2019 Work on going
205 Patuakhali 1 galachipa 1 277 CCRIP/IFAD/Patua/VR/2014/W-16 Improvement of Gazalia hat-Kalaraja Hat. 3.00 216.69 M/S.Rupali Construction,Barisal 174.16 19/07/2015 17/01/2017 60 19/01/2019 Work on going
206 Patuakhali 1 galachipa 1 277 CCRIP/IFAD/Patua/VR/2014/W-4 Improvement of Amkhola U.P.office-Musarikati Sluice 2.00 160.33 M/S. Halim mondal,Pro.Md. Abdul Halim,Gorostan road,Gaibandha 141.30 02/08/2014 09/08/2015 100 19/01/2019 Final Bill
207 Patuakhali 1 galachipa 1 277 CCRIP/PATUA/GoB/UNR/2017/W-43 Improvement of Panpatty UP-Katakhali Puca Road 185.36 M/S.Polli store,Kalikapur,Patuakhali 168.17 25/01/2018 24/10/2018 65 19/01/2019 Work on going
208 Patuakhali 1 galachipa 1 277 CCRIP/Patua/UNR/2014/W-15 Improvement of Chiknikandi UP-Amkhola UP 2.21 209.40 M/S.Kohinur Enterprise,Barisal 171.45 19/12/2017 25/01/2017 85 19/01/2019 Revised
209 Patuakhali 1 galachipa 1 277 CCRIP/Patua/UNR/2014/W-03 Improvement of Naluabagi Bazar-R&H road via UP Office 2.00 197.99 M/S. Halim mondal,Pro.Md. Abdul Halim,Gorostan road,Gaibandha 164.51 16/08/2015 06/12/2016 100 19/01/2019 Final Bill
210 Patuakhali 1 kalapara 12 277 CCRIP/Patua/UNR/2014/W-5 Improvement of Lalua UP-Nilgonj UP Via Mithagong UP. 2.00 176.26 MD.Gias uddin 165.40 07/12/2014 29/05/2016 100 19/01/2019 Final Bill
211 Patuakhali 1 kalapara 12 277 CCRIP/ADB/Patua/UZR/2017/W-36 Improvement of Kalapara HQ Dhankhali GC Road via Landa Khaya Ghat, Dhankhali College 1.96 200.13 M/S.Polli store,Kalikapur,Patuakhali 217.97 05/10/2017 04/10/2018 73 19/01/2019 Work on going
212 Patuakhali 1 kalapara 12 277 CCRIP/IFAD/Patua/VR/2014/W-6 Improvement of Utter charpara Abdul Bari khan house-Lamupara wapda (Chapakhali bazar to Tegachia bazar) 215.44 Abul Kalam Azad 242.14 07/05/2014 29/05/2016 100 19/01/2019 Final Bill
213 Patuakhali 1 kalapara 12 277 CCRIP/Patua/IFAD/UNR/2015/W-27 Improvement of Khapravanga UP to Dalbugonj Hat 2.08 195.25 M/S.K.K Enterprise,Sabugbag Patuakhali 150.85 04/01/2016 04/01/2017 100 19/01/2019 Final Bill
214 Patuakhali 1 kalapara 12 277 CCRIP/Patua/GoB/UNR/2017/W-39 Improvement of Mithagonj UPC-Majar kheya ghat via aligonj GPS,Joybangla Road , Kalapara, Patuakhali 3.05 281.35 M/S.Poly construction.Collage road ,Barguna 245.29 07/12/2017 06/12/2018 40 19/01/2019 Work on going
215 Patuakhali 1 mirjaganj 13 277 CCRIP/IFAD/Patua/VR/2015/W-22 Improvement of Buittarhat-Santespur Reg. P.S-East Rampur Lunchghat Rd. 1.69 195.24 BU-EH-JV.Baitul Aman Lane,Patuakhali 161.66 21/02/2017 26/03/2018 100 19/01/2019 Final Bill
216 Patuakhali 1 mirjaganj 13 277 CCRIP/IFAD/Patua/VR/2014/W-14 Improvement of Kalagachia Bazar to Kalikapur GPS via H/O Habib Sikder 1.23 130.23 M/S.Polli store,Kalikapur,Patuakhali 100.03 19/07/2015 25/07/2016 100 19/01/2019 Final Bill
217 Patuakhali 1 mirjaganj 13 277 CCRIP/IFAD/Patua/VR/2014/W-13 Improvement of Bazita High School-Shishurhat-Dargabarihat. 2.23 189.87 M/S.Khan Enterprise,Pro. Khalilur rahaman,Betagi,Barguna 177.29 22/11/2015 13/06/2017 90 19/01/2019 Revised
218 Patuakhali 1 mirjaganj 13 277 CCRIP/IFAD/Patua/VR/2014/W-23 Improvement of RHD at Gabua Bazer Near the H/O. Pr.A.Rob Howladar to Karam Ali Bridge. 0.62 65.40 M/S.K.K Enterprise,Sabugbag Patuakhali 53.64 05/01/2016 04/01/2017 100 19/01/2019 Final Bill
219 Patuakhali 1 mirjaganj 13 277 CCRIP/IFAD/Patua/UNR/2015/W-25 Improvement of Chaita Bazar-Chaita Madrasha-Bazita Madrasha at Shishurhat. 2.00 170.42 M/S.Safiqur Rahaman,Natun bazar Patuakhali 141.65 10/01/2016 10/01/2017 100 19/01/2019 Final Bill
220 Patuakhali 1 mirjaganj 13 277 CCRIP/IFAD/Patua/UZR/2015/W-21 Improvement of Mazidbaria UP office-Khalishakhali bazar Rd. 2.30 195.26 BU-EH.Baitul Aman Lane,Patuakhali 165.36 07/01/2016 05/01/2017 100 19/01/2019 Final Bill
221 Patuakhali 1 mirjaganj 13 277 CCRIP/IFAD/Patua/UNR/2015/W-24 Improvement of Kakrabunia UP office-kumrakhali-H/O Rashid Judge-Gazipurhat Rd. 1.30 119.25 M/S.Balaram Banik,Pro.Tapon kumar,Patuakhali 107.33 18/01/2016 16/01/2017 75 19/01/2019 Work on going
222 Patuakhali 1 patuakhali-s 14 277 CCRIP/IFAD/Patua/VR/2014/W-12 Improvement of Sathgar bazer to janata H/S 1.66 117.87 MD.Aktaruzzaman,Patuakhali 98.70 06/07/2015 25/07/2016 100 19/01/2019 Final Bill
223 Patuakhali 1 patuakhali-s 14 277 CCRIP/PATUA/GoB/Bridge/2017/W-45 Improvement of Construction of 24.00 m Long Bridge on Utter Purbo Baruanbaria Padhabari Mosque -Tafalbaria Abual Member Bari - Hazikhali Bazer Road. 151.10 M/S.Polli store,Kalikapur,Patuakhali 133.65 06/06/2018 28/01/2019 50 19/01/2019 Work on going
224 Patuakhali 1 patuakhali-s 14 277 CCRIP/IFAD/Patua/VR/2015/W-19 Improvement of Utter Purbo Baruanbaria Padhabari Mosque -Tafalbaria Abual Member Bari - Hazikhali Bazer Road. 3.69 244.31 M/S.Balaram Banik,Pro.Tapon kumar,Patuakhali 141.88 18/01/2016 16/07/2017 100 19/01/2019 Final Bill
225 Patuakhali 1 patuakhali-s 14 277 CCRIP/PATUA/GoB/VR/2017/W-38 Improvement of R & H Fultalah Bazar - Alipur UPC via Ashamir Hat 3.22 241.01 M/S.Balaram Banik,Pro.Tapon kumar,Patuakhali 196.32 17/12/2017 16/10/2018 30 19/01/2019 Work on going
226 Patuakhali 1 patuakhali-s 14 277 CCRIP/Patua/IFAD/UNR/2015/W-29 Improvement of Jainkati UP-Dholkhali (Sluice Launchghat)Bazer-Via Chandanbaria Bhuriar Khayaghat-Katakhali launchghat Road. 2.00 160.09 M/S.Balaram Banik,Pro.Tapon kumar,Patuakhali 133.82 18/05/2016 17/05/2017 70 19/01/2019 Work on going
227 Patuakhali 1 patuakhali-s 14 277 CCRIP/Patua/UNR/2014/W-02 Improvement of Bara Bighai Up-Patukhali GPS-Shechasebak Bazer-Marichbunia UP. 2.05 206.48 M/S.Balaram Banik,Pro.Tapon kumar,Patuakhali 164.54 10/01/2016 10/01/2017 100 19/01/2019 Final Bill
228 Patuakhali 1 patuakhali-s 14 277 CCRIP/IFAD/Patua/UNR/2015/W-18 Improvement of Lohalia Up-Patuakhali H/Q. 0.96 92.49 M/S Tanvir Ahammed Natun bazar,Patuakhali 68.71 10/01/2016 10/01/2017 100 19/01/2019 Final Bill
229 Patuakhali 1 patuakhali-s 14 277 CCRIP/Patua/UNR/2016/W-32, Improvement of Lohalia Up-Patuakhali H/Q. 2.00 12.64 Kalma Rani,Charman,Razia khatun,secretary (LCS Group) 12.64 21/03/2016 20/04/2017 100 19/01/2019 Final Bill
230 Patuakhali 1 patuakhali-s 14 277 CCRIP/Patua/UNR/2014/W-1, Improvement of Lohalia Up-Patuakhali H/Q. 2.00 175.37 M/S Salim stotes,Pro.Salim mia, Salim Plaza.Collage road 183.73 02/08/2014 09/08/2015 100 19/01/2019 Final Bill
231 Patuakhali 1 Rangabali 484 277 CCRIP/Patua/VR/2016/W-10 Improvement of Gohin khali C. Shelter-Horidrakhali 3.00 289.86 M/S.Polli store,Kalikapur,Patuakhali 222.16 19/07/2015 25/01/2017 100 19/01/2019 Final Bill
232 Patuakhali 1 Rangabali 484 277 CCRIP/IFAD/Patua/UNR/BRDG/2015/W-30 Improvement of Construction of 24.00 m Long Bridge on Chailtabunia UP-Borrobaisda UP-Moudube Mukharbandha Shelter. 191.49 M/S.K.K Enterprise,Sabugbag Patuakhali 159.49 23/06/2016 22/06/2017 80 19/01/2019 Work on going
233 Patuakhali 1 Rangabali 484 277 CCRIP/Patua/VR/2014/W-35 Improvement of Char Montaz Sluice Bazar - Charbestin Bazar 3.43 331.91 M/S.Polli store,Kalikapur,Patuakhali 242.74 26/09/2016 25/03/2018 0 19/01/2019 work to be cancle
234 Patuakhali 1 Rangabali 484 277 CCRIP/IFAD/Patua/UNR/2015/W-26 Improvement of Barobaisdia U.P. to Rangabali U.P. 11.51 285.65 M/S.Rupali Construction,Barisal 220.83 15/02/2016 15/07/2017 55 19/01/2019 Work on going
235 Patuakhali 1 Rangabali 484 277 CCRIP/Patua/UNR/2014/W-11 Improvement of Chailtabunia UP-Borrobaisda UP-Moudube Mukharbandha Shelter. 2.00 366.52 M/S Salim stotes,Pro.Salim mia, Salim Plaza.Collage road 207.43 06/07/2015 25/01/2017 100 19/01/2019 Final Bill
236 Pirojpur 3 bhandaria 35 277 CCRIP/ADB/PIROJ/UZR/2015/W-15 Improvement of Telikhali GC-Safa Bazar RHD Road. 5.21 371.40 suhana Trade Link International, Pro: Md. Akteruzzaman Manik, Parer Hat, Perojpur. (Manik) Fulu 01711368019 Mob:01726808092 (Komal Manager) 366.13 11/04/2016 30/01/2019 70 19/01/2019 WBM work complete
237 Pirojpur 3 indurkani 3 277 CCRIP/IFAD/PIROJ/UNR/2017/W-27 Improvement of LGED Road Near the H/O Bacchu Kapali-Talukdergat Bridge , Zia Nagar, Perojpur 1.11 85.37 M/S.Abir & Brothers, Prop. Salma Rahman, Amlapara, Parerhat road, Pirojpur Mr. Shuv, Pirojpur, Mobile: 01717503538 69.32 13/09/2017 23/09/2018 35 19/01/2019 Work on going
238 Pirojpur 3 indurkani 3 277 CCRIP/IFAD/PIROJ/ VR-BRIG/2016/W-23 Improvement of Construction of 10.00 m Long Bridge on Chowkidar Hat Road 93.25 Md. Shahjahan Ali, Barendra Plaza(1st Floor), Greater Road, Luxmipur, Rajpara, Rajshahi-6000. Suman / Liton, Pirojpur, 01718504085 81.73 23/04/2017 03/05/2018 100 19/01/2019 Final Bill
239 Pirojpur 3 indurkani 3 277 CCRIP/IFAD/PIROJ/ VR/2015/W-19 Improvement of Balipara GC-Chowkider hat Embankment. 2.11 273.55 M/S Jiaul & Brothers, Prop: Khandakar Jiaul Hossain, Bhandaria, Pirojpur Ziaul Islam, Mob: 01711359029 272.31 26/09/2016 30/10/2018 80 19/01/2019 All str. Complete, WBM complete
240 Pirojpur 3 indurkani 3 277 CCRIP/PIROJ/ UNR/2014/W-11 Improvement of Gosherhat bazar -Khajurtola bazar road. 3.06 182.88 Suhana Trade Link International, Pro: Md. Akteruzzaman Manik, Parer Hat, Perojpur. (Manik) Fulu 01711368019 Mob:01726808092 (Komal Manager) 200.80 19/10/2015 30/10/2018 85 19/01/2019 Work on going
241 Pirojpur 3 indurkani 3 277 CCRIP/IFAD/PIROJ/UNR/2017/W-26 Improvement of Balipara UP-Jamaddarhat RHD via Uttar Chandipur GPS, Uttar Kolaron GPS & Talukderhat Road , Indurkani (Zianagar), Perojpur 1.20 87.07 M/S.Abir & Brothers, Prop. Salma Rahman, PirojpurMr. Shuv, Pirojpur, Mobile: 01717503538 70.96 13/09/2017 23/09/2018 45 19/01/2019 AS on going
242 Pirojpur 3 indurkani 3 277 CCRIP/PIROJ/ UNR/2014/W-10 Improvement of Balipara UP-Battala hat via Uttar Kalaron Dhakil madrasha & Nuria Dhakil Madrasha road. 2.00 173.94 M/s Efte Enterprise Manik-01711368019 190.58 19/10/2015 30/06/2018 70 19/01/2019 Work on going
243 Pirojpur 3 indurkani 3 277 CCRIP/PIROJ/ UNR/2014/W-02 Improvement of Parerhat GC (Chalna)- Goperhat via parerhat UP & Luhuri hat road. 2.01 228.04 Suhana Trade Link International, Pro: Md. Akteruzzaman Manik, Parer Hat, Perojpur. (Manik) Fulu 01711368019 Mob:01726808092 (Komal Manager) 184.30 30/10/2014 07/05/2016 100 19/01/2019 Final Bill
244 Pirojpur 3 kawkhali 36 277 CCRIP/ADB/PIROJ/UZR/2016/W-21 Improvement of Amrajuri-Keundia-Shahapura Connecting road 1.47 472.57 Mr.Melu 01715132555 472.10 28/09/2016 30/12/2018 70 19/01/2019 Work on going
245 Pirojpur 3 mothbaria 37 277 CCRIP/IFAD/PIROJ/ VR/2015/W-08 Improvement of Tushkhali - Boro Masua Road - Mothbaria-Boro Masua RHD (Starting from LGED bridge, Dhondoa Khal at North Mithakhali via H/O Hazi Yasin Howlader and Hazi Abdul Hamid Akond) 3.26 216.96 M/S Raj & Brothers, Parerhat Road, Pirojpur Sohel/Mithu, 01727467232 226.73 19/10/2016 25/10/2017 100 19/01/2019 Final Bill
246 Pirojpur 3 mothbaria 37 277 CCRIP/GOB/PIROJ/BOX/2017/W-37 Improvement of Construction of 2 vent 4.0m x 4.0m RCC Box culvert on Gulishakhali UP to Baish Kura Bazar via tearkhali Bazar ( H/O Hashem Howlader ) Road at Ch 1943.00m ( ID No: 579583016) 24.80 M/S Saifuddin Traders, Prop: M.M.A.. Wahab, Nesrabad, Pirojpur 24.88 04/03/2018 12/09/2018 100 19/01/2019 Final bill
247 Pirojpur 3 mothbaria 37 277 CCRIP/GOB/PIROJ/BRG/2017/W-33 Improvement of Construction of 30.00 m Long Bridge on Mirukhali UP-Jawtala bazar via Vagirathpur bazar 223.69 RC-KMC-JV, East Rasti, Puran Bazar, Madaripur Mr. Amman, Leader, Mob:01717409797 173.68 01/11/2017 07/11/2018 70 19/01/2019 PC Girder Casting ongoing
248 Pirojpur 3 mothbaria 37 277 CCRIP/IFAD/PIROJ/ UNR-Brg/2016/W-20 Improvement of Construction of 26.00 m Long Bridge on Gulishakhali UP to 22 Kura Bazar via H/O Hasem Howlader 173.82 EE-OC(JV), New Market, Mathbaria, Pirojpur Selim Matubbar, Mathbaria, Pirojpur, Mob:01712075095, 194.01 18/01/2017 30/06/2018 100 19/01/2019 Final Bill
249 Pirojpur 3 mothbaria 37 277 CCRIP/PIROJ/ UNR-Bridge/2015/W-12 Improvement of Construction of 39.00 m Long Bridge on Amrgachia UP- Amtoli hat at ch. 700-1750m & 2750-5250m 307.04 RB-AB (JV) 173/1 Pirojpur,Mr.Melu 01715132555 305.76 17/11/2015 24/04/2017 100 19/01/2019 Final Bill
250 Pirojpur 3 mothbaria 37 277 CCRIP/Piroj/UZR/2014/W-05 Improvement of Gulsakhali GC to Dauatala GC via Tearkhali bazar 2.67 309.65 M/s Efte Enterprise Selim Matbubbar 01712075095 357.79 15/02/2015 22/08/2016 100 19/01/2019 Final Bill
251 Pirojpur 3 mothbaria 37 277 CCRIP/GOB/PIROJ/UNR/2017/W-31 Improvement of Saplaza Nali BC UZR Nurul Hoque House - Tafalbaria badba via Farazeer Hat Road , 1.72 14.94 ASI-TBK (JV) ,Faysal 01765009798 150.72 29/08/2017 20/09/2018 100 19/01/2019 Final
252 Pirojpur 3 mothbaria 37 277 CCRIP/PIROJ/ VR/2014/W-09 Improvement of Nizamia Bazar - Masua Kheyaghat WAPDA via H/O Late Dr. Karim Howlader . 2.60 233.66 M/S Efte Enterprise, Pro: Md. Merazul Islam, Bhandaria, Pirojpur Ripon, Mob: 01716489245 241.04 19/10/2015 26/11/2017 100 19/01/2019 Final Bill
253 Pirojpur 3 mothbaria 37 277 CCRIP/PIROJ/ VR/2014/W-07 Improvement of Tearkhali bazar-Bandoppara R&H road. 3.02 226.41 M/S Efte Enterprise, Pro: Md. Merazul Islam, Bhandaria, Pirojpur. (Selim Matubbar) Selim Matubbar,Mob:01712075095, Nasir:01765029365 246.03 19/10/2015 30/03/2017 100 19/01/2019 Final Bill
254 Pirojpur 3 mothbaria 37 277 CCRIP/IFAD/PIROJ/ VR/2015/W-18 Improvement of Amtoli bazar-WAPDA 1.85 135.34 M/s Oishi Construction Nasir-01765029365 139.76 07/09/2016 03/10/2017 100 19/01/2019 Final Bill
255 Pirojpur 3 mothbaria 37 277 CCRIP/GOB/PIROJ/UNR/2017/W-30 Improvement of Betmore Up-Amtali Hat via kulur Hat (Khunner Hat) 0.81 97.31 M/S Oshi Construction, Prop: Sabina Yeasmin, Mathbaria, Pirojpur Selim Matubbar, Mob:01712075095, Nasir:01765029365 97.31 13/09/2017 30/11/2018 80 19/01/2019 Work on going
256 Pirojpur 3 mothbaria 37 277 CCRIP/GOB/PIROJ/UNR/2017/W-29 Improvement of Betmore Up-Amtali Hat via kulur Hat (Khunner Hat) 2.45 196.56 M/S Oshi Construction, Prop: Sabina Yeasmin, Mathbaria, Pirojpur Selim Matubbar, Mob:01712075095, Nasir:01765029365 196.56 13/09/2017 30/11/2018 80 19/01/2019 Work on going
257 Pirojpur 3 mothbaria 37 277 CCRIP/GOB/PIROJ/ UNR/2017/W-24 Improvement of Amragachia UP-Amtali Hat 1.40 158.19 M/S Oshi Construction, Prop: Sabina Yeasmin, Mathbaria, Pirojpur Selim Mob:01712075095, Nasir:01765029365 131.40 13/09/2017 30/11/2018 80 19/01/2019 Carpeting will be started
258 Pirojpur 3 mothbaria 37 277 CCRIP/PIROJ/ UNR/2014/W-01 Improvement of Amrgachia UP- Amtoli hat at ch. 780 - 1740 & 3119-4168 206.40 M/S Efte Enterprise, Pro: Md. Merazul Islam, Bhandaria, Pirojpur.Md. Meraz, Bhandaria, Pirojpur Mob:01944996677, 218.77 30/10/2014 07/05/2016 100 19/01/2019 Final
259 Pirojpur 3 mothbaria 37 277 CCRIP/PIROJ/ UNR/2016/W-22 Improvement of Gulishakhali UP to 22 Kura Bazar via H/O Hasem Howlader 1.86 164.59 M/S Oshi Construction, Prop: Sabina Yeasmin, Mathbaria, Selim Matubbar, Mathbaria, Pirojpur, Mob:01712075095, Nasir:01765029365 148.13 03/04/2017 30/11/2018 50 19/01/2019 WBM on going
260 Pirojpur 3 mothbaria 37 277 CCRIP/PIROJ/ UNR/2014/W-06 Improvement of Gulishakhali UP to 22 Kura Bazar via H/O Hasem Howlader 2.55 259.48 M/s R-N (JV) Mohiuddin 01710704506 290.03 07/12/2015 10/12/2017 100 19/01/2019 Final Bill
261 Pirojpur 3 mothbaria 37 277 W-13 Improvement of Betmore UP-Amtoli hat via Khunerhat road at ch. 3600m-5600m. 2.00 0.00   182.49 0 19/01/2019 Final Bill
262 Pirojpur 3 mothbaria 37 277 CCRIP/IFAD/PIROJ/ UNR/2015/W-14 Improvement of Mirukhali UP-Jawtala bazar via Vagirathpur bazar at ch. 5040-7790m. 2.15 372.39 M/S Raj & Brothers, Parerhat Road, Pirojpur Mr. Hanif, Mathbaria, Mob:01716203892 390.28 19/10/2016 30/09/2018 100 19/01/2019 Final Bill Processing
263 Pirojpur 3 mothbaria 37 277 CCRIP/IFAD/PIROJ/ UNR/2015/W-13 Improvement of Betmore UP-Amtoli hat via Khunerhat road 2.00 179.52 RB-ASI (JV), Pirojpur Sadar, Pirojpur,Md.Iqbal Mobile:01771827568 195.26 31/05/2016 31/01/2018 100 19/01/2019 Final Bill
264 Pirojpur 3 nazirpur 11 277 CCRIP/IFAD/PIROJ/UNR/2017/W-25 Improvement of Malikhali UP- Panakhali Bazar road , Nazirpur , Perojpur 1.67 144.68 M/S.Abir & Brothers, Prop. Salma Rahman, PirojpurMr. Shuv, Pirojpur, Mobile: 01717503538 114.36 01/11/2017 10/11/2018 65 19/01/2019 Work on going
265 Pirojpur 3 nazirpur 11 277 CCRIP/GOB/PIRO/ 2017/W-32 Construction of proposed 22.0m Long RCC Girder Bridge on Malikhali UP - Panakhali Bazar Road 166.31 M/S.Abir & Brothers, Holding no: 173/1, Masimpur, Amlapara, Sadar, Pirojpur 131.05 01/11/2017 31/10/2018 80 19/01/2019 Work on going
266 Pirojpur 3 nesarabad 28 277 CCRIP/ADB/PIROJ/BRG/2017/W-40 Improvement of Construction of 16.0M RCC Girder Bridge on Jagannathkathi Bazar - Sreeramkathi via Alkirhat Ganakpara Dhaihari road at ch.4429m 142.79 M/s Arafat Traders Nobin 01710776633 149.67 30/04/2018 07/02/2019 65 19/01/2019 Work on going
267 Pirojpur 3 nesarabad 28 277 CCRIP/ADB/PIROJ/BRG/2017/W-39 Improvement of Construction of 22.0M RCC Girder Bridge on Jagannathkathi Bazar - Sreeramkathi via Alkirhat Ganakpara Dhaihari road at ch.1278m 184.61 M/s SifatEnterprise Nobin 01710776633 193.81 30/04/2018 07/02/2019 65 19/01/2019 Work on going
268 Pirojpur 3 nesarabad 28 277 CCRIP/ADB/PIROJ/BRG/2017/W-38 Improvement of Construction of 22.0M rcc Girder Bridge on Jagannathkathi Bazar - Sreeramkathi via Alkirhat Ganakpara Dhaihari road at ch.913m 187.88 M/s SifatEnterprise Nobin 01710776633 197.21 30/04/2018 07/02/2019 65 19/01/2019 Work on going
269 Pirojpur 3 nesarabad 28 277 CCRIP/ADB/PIROJ/UZR/2017/W-35 Improvement of Kuriana RHD- Banaripara GC 1.88 1817.52 M/s Mahmudul Haque 181.46 08/01/2018 14/01/2019 65 19/01/2019 Work on going
270 Pirojpur 3 nesarabad 28 277 CCRIP/ADB/PIROJ/ UZR/2015/W-17 Improvement of Jagannathkati Bazar-Sreeramkati via Alkirhat Ganakpara Dhaihari road. 5.03 859.07 M/s Mahfuz Khan 01717068153 858.72 17/08/2016 30/12/2018 52 19/01/2019 Work on going
271 Satkhira 39 assasuni 280 277 CCRIP/SATK/VR/ 2014/W-14 Improvement of Improvement of Manikkhali Ferryghat - Kallayanpur Khyaghat road 2.70 59.81 M/S. Akon Trading & Co, Gorachad das road, Barishal. Asad Iqbal Khan, Sub-Contractor Cell: 01711959088 55.37 06/09/2015 15/11/2018 100 19/01/2019 Revised/ Final Bill under process
272 Satkhira 39 assasuni 280 277 CCRIP/ADB/ SATK/UZR/2017/W-35 Improvement of Improvement of Chiledanga RHD - Bangadah GC via Paithali Bazar Road 1.80 223.96 M/S. Bosu Traders & M/S. Rafid Traders (JVC), Tala, Satkhira. Kallan Bosu, Contractor, Cell: 01716703753 & Shakti Bosu, Partner, Cell: 01711349167 241.42 07/02/2018 20/02/2019 100 19/01/2019 Work on going
273 Satkhira 39 assasuni 280 277 CCRIP/SATK/VR/ 2014/W-03 Improvement of Imp.of Shetpur primary school -Gazirhat Road 1.10 93.88 M/S Motiur Rahman (Nannu) Chalk Bazar, Faridpur. Md. Motiur Rahman (Nannu) Contractor, Cell: 01711378443 72.48 22/01/2015 30/05/2016 100 19/01/2019 Revised/ Final
274 Satkhira 39 assasuni 280 277 CCRIP/IFAD/ SATK/VR/2015/W-26 Improvement of Improvement of Mohishkur-Puijala via Boudirghat Road 2.00 130.42 M/S. Rafique Enterprise, 248/2 Tutpara Main Road, Khulna. Md. Alamgir Fakir, Sub-Contractor, Cell: 01718136029, 01711379366 112.29 18/01/2016 30/06/2018 70 19/01/2019 Revised/ Work on going
275 Satkhira 39 assasuni 280 277 CCRIP/IFAD/SATK/UNR/2015/W-28 Improvement of Improvement of Khasbagan-Sreedharpur-Kharihati road (Dargapur UP Office-Harihornagar Bazar via Sreedharpur Pry. School & Hossainpur Bazar) 2.00 169.79 Asaduzzaman Salim, Itagacha, Satkhira. Asaduzzaman Salim, Contractor Cell: 01711299715 156.40 07/01/2016 30/07/2018 70 19/01/2019 Revised/ Work on going
276 Satkhira 39 assasuni 280 277 CCRIP/SATK/VR/ 2014/W-15 Improvement of Improvement of Agordari - Gabtala Bazar road 1.00 76.88 M/S. Star Enterprise & Asaduzzaman Salim JV, Itagacha, Satkhira. M.A.K. Helal Uddin, Contractor Cell: 01711372815 69.01 06/09/2015 17/01/2018 100 19/01/2019 Revised/ Final
277 Satkhira 39 assasuni 280 277 CCRIP/SATK/VR/ 2014/W-01 Improvement of Imp.of Chapra R&H-Maddyam Chapra Khyea Ghat road 1.00 58.23 M/S Motiur Rahman (Nannu) Chalk Bazar, Faridpur. Md. Motiur Rahman (Nannu) Contractor, Cell: 01711378443 59.63 20/01/2015 07/04/2016 100 19/01/2019 Revised/ Final
278 Satkhira 39 assasuni 280 277 CCRIP/IFAD/ SATK/VR/2015/W-27 Improvement of Improvement of Mahsharkati-Baushuli via Maddam Chapra road 4.00 180.55 Asaduzzaman Salim, Itagacha, Satkhira. Asaduzzaman Salim, Contractor, Cell: 01711299715 163.19 07/01/2016 25/10/2018 100 19/01/2019 Revised/ Final Bill under process
279 Satkhira 39 assasuni 280 277 CCRIP/GOB/SATK/VR/2017/W-38 Improvement of Improvement of Bauchas Pry. School - Kamalkati Bazar (Sovnali UP Office) Road 2.40 229.34 MS. Ziaul Traders, 37 Tutpara Cross Road - 2, Khulna 244.18 11/01/2018 25/08/2019 5 19/01/2019 Revised/ Work on going
280 Satkhira 39 assasuni 280 277 CCRIP/IFAD/SATK/UNR/2015/W-25 Improvement of Improvement of Ekshora Bazar-Bichat Bazar (Anulia UP) Road (Ekshora Bazar - Anulia UP Office Road) 1.94 172.12 M/S. Joint Bricks Traders, Itagacha, Bakal, Satkhira. Contractor - Md. Abdus Sobur, Cell: 01711826322 152.93 19/01/2016 30/04/2018 100 19/01/2019 Revised/ Final Bill under process
281 Satkhira 39 assasuni 280 277 CCRIP/SATK/VR/ 2014/W-02 Improvement of Imp.of Kadakati UP-Gabtala hat-Kadakati GC Road 2.13 206.46 M/S Basu Traders Tala, Satkhira. Contractor - Kallan Bosu, Cell: 01716703753 200.23 26/01/2015 31/03/2016 100 19/01/2019 Final
282 Satkhira 39 debhata 286 277 CCRIP/ADB/ SATK/UZR/2015/W-30 Improvement of Imp. of Parulia GC - Subarnobad GC road 6.06 1939.55 ST - ME - DCL (JV) H # 22, R # 12, Nikunjo - 2, Dhaka. Md. Enamul Khaleque Site Engineer. Cell: 01713249132 1735.56 31/01/2016 30/12/2018 84 19/01/2019 Work on going
283 Satkhira 39 kaliganj 285 277 CCRIP/IFAD/ SATK/VR/2015/W-31 Improvement of Improvement of Zhurukhamar H/Q -Sontosh Dr. House Road 0.62 49.84 M/S. Ansar Ali, Islam Market, Abul Kashem Road, Satkhira. Md. Ansar Ali, Contractor, Cell: 01728567647 40.32 28/01/2016 20/03/2017 100 19/01/2019 Revised/ Final
284 Satkhira 39 kaliganj 285 277 CCRIP/ADB/ SATK/UZR/2015/W-30 Improvement of Imp. of Khanpur Baliadanga GCCR - Uzirpur via Gobindokati Hat road 2.78 0.00   0.00 0 19/01/2019 Work on going
285 Satkhira 39 kaliganj 285 277 CCRIP/SATK/VR/2014/W-07 Improvement of Imp.of Bagbati GPS - Suilpur BGB Road 1.66 147.55 M M Abdullah & JV Indranagar, Kaligonj, Satkhira. Md. Abdulla Morol, Contractor Cell: 01711668455 118.49 05/03/2015 10/03/2016 100 19/01/2019 Final
286 Satkhira 39 kaliganj 285 277 CCRIP/SATK/VR/2014/W-06 Improvement of Imp.of Kazla LGED road-Sannashir Chalk Bazar road 2.50 229.70 M/S Motiur Rahman (Nannu) Chalk Bazar, Faridpur. Md. Motiur Rahman (Nannu) Contractor, Cell: 01711378443 192.91 20/01/2015 14/06/2017 100 19/01/2019 Revised/ Final
287 Satkhira 39 kaliganj 285 277 CCRIP/IFAD/ SATK/VR/2015/W-24 Improvement of Improvement of Jafourpur-Tetulia via Nonamath Road 1.00 93.76 S.M.Abul Bashar & Molla Engg. JV. Shyamnagar, Satkhira. M M Nurul Haque Mollah, Contractor Cell: 01712773227 77.03 20/12/2015 10/04/2018 100 19/01/2019 Revised/ Final
288 Satkhira 39 kaliganj 285 277 CCRIP/IFAD/ SATK/VR/2015/W-23 Improvement of Improvement of East Trali UZR-Kashibati GPS Road 2.30 190.57 Md. Iqbal Jamader, Polashpole, Satkhira. Md. Rafiqul Islam,Sub-Contractor, Cell: 01712048724 &Md. Abdulla Morol, Sub-Contractor, Cell: 01711668455 165.51 23/12/2015 30/12/2017 100 19/01/2019 Revised/ Final
289 Satkhira 39 kaliganj 285 277 CCRIP/SATK/VR/2014/W-12 Improvement of Improvement of Jeron Gacha Hat - Chara Bottala - Moutala - Uvakur road 2.90 176.95 M/S. Ansar Ali, Islam Market, Abul Kashem Road, Satkhira. Md. Ansar Ali, Contractor, Cell: 01728567647 150.77 03/09/2015 05/05/2017 100 19/01/2019 Revised/ Final
290 Satkhira 39 kaliganj 285 277 CCRIP/SATK/VR/2014/W-13 Improvement of Improvement of Gorer hat - Probajpur road 1.50 95.14 M/S. Ansar Ali, Islam Market, Abul Kashem Road, Satkhira. Md. Ansar Ali, Contractor, Cell: 01728567647 80.39 03/09/2015 15/04/2017 100 19/01/2019 Revised/ Final
291 Satkhira 39 kaliganj 285 277 CCRIP/IFAD/GOB/SATK/VR/ 2017/W-41 Improvement of Improvement of Charjamuna Khaldhar Dudli Natunhat-Moutala bus stand via Raypur Charjumana Khal Road 1.50 112.46 M/S. Rafiqul Islam (JV.), Sitalpur, Kaligonj, Satkhira. Md. Rafiqul Islam, Contractor, Cell: 01712048724 107.90 19/11/2017 13/02/2019 70 19/01/2019 Work on going
292 Satkhira 39 kaliganj 285 277 CCRIP/GOB/SATK/VR/2017/W-39 Improvement of Improvement of Ratanpur UZR-(Kadamtala Bazar)-Raypur ZR Connecting Road 1.50 140.93 M/S PBL-AE-JV. Gulshan-2, Dhaka-1212. Md. Altaf, Partner, Cell: 01719608136 154.21 10/05/2018 03/02/2019 20 19/01/2019 Work on going
293 Satkhira 39 kaliganj 285 277 CCRIP/IFAD-GOB/SATK/UNR/2017/W-43 Improvement of Improvement of Moutala Up (Moutala Bazar) - Baliadanga GC via Chatra Road 3.40 288.72 SABT-MMSL JV, Milonpur, Khagrachari Sadar, Khagrachari. Partner - Debasis, Cell: 01787650007 305.70 18/06/2018 06/02/2019 25 19/01/2019 Work on going
294 Satkhira 39 satkhira-s 282 277 CCRIP/ADB/ SATK/UZR/2016/W-33 Improvement of Improvement of Satkhira Bailey Bridge to Bangdah GC Road 3.00 301.97 M/S. Joint Bricks Traders, Prop. Abu Nasar Md Abu Sayeed, Itagacha, Bakal, Satkhira. Md. Abdus Sobur, Contractor, Cell: 01711826322, 01711217155 319.59 10/10/2016 15/10/2018 100 19/01/2019 Final Bill under process
295 Satkhira 39 shyamnagar 292 277 CCRIP/SATK/VR/ 2014/W-05 Improvement of Imp.of Mindinagar-Kalindi road 2.50 223.58 M/S Motiur Rahman (Nannu) Chalk Bazar, Faridpur. Md. Motiur Rahman (Nannu) Contractor, Cell: 01711378443 172.00 20/01/2015 30/04/2017 100 19/01/2019 Revised/ Final
296 Satkhira 39 shyamnagar 292 277 CCRIP/ADB/ SATK/UZR/2015/W-30 Improvement of Imp. of Noabenki-Munshigonj- Harinagar-Bhetkhali- Zadahat-Nurnagarhat-Khanpur 7.30 0.00   0.00 0 19/01/2019 Work on going
297 Satkhira 39 shyamnagar 292 277 CCRIP/IFAD/SATK/UNR/2015/W-29 Improvement of Improvement of Nildumur-Porakatla GPS Road 3.66 266.72 Rithin Enterprise, Prop. Tured Ali Masud, House - 542, Dorikhorbona, Boalia, Rajshahi. M M Asek-E-Elahi Munna, Sub-Contractor Cell: 01711481719 259.21 11/04/2016 20/04/2018 100 19/01/2019 Revised/ Final
298 Satkhira 39 shyamnagar 292 277 CCRIP/GOB/SATK/VR/2017/W-44 Improvement of Improvement of Soalia Pry. School - Gouripur Pry. School Road 2.77 219.33 SABT-MMSL JV. House-15/4, Level-5, Mirpur Road, Shyamoly, Dhaka. Partner - Debasis, Cell: 01787650007 240.65 11/11/2018 24/05/2019 0 19/01/2019 WO Issued Dt. On 11.11.18
299 Satkhira 39 shyamnagar 292 277 CCRIP/SATK/VR/ 2014/W-16 Improvement of Improvement of Chaltaghata - Bhurulia road 0.80 52.75 M/S. Ansar Ali, Islam Market, Abul Kashem Road, Satkhira. Md. Ansar Ali, Contractor, Cell: 01728567647 45.13 03/09/2015 10/04/2017 100 19/01/2019 Revised/ Final
300 Satkhira 39 shyamnagar 292 277 CCRIP/SATK/VR/ 2014/W-04 Improvement of Imp.of Munshigonj Bazar-Garrege hat Bridge Road 2.50 203.00 M/S. Joy Enterprise Sonadanga, Khulna. Sk. Sadaqur Rahman, Sub-Contractor Cell: 01710753681 157.93 26/01/2015 25/06/2016 100 19/01/2019 Final
301 Satkhira 39 shyamnagar 292 277 CCRIP/GOB/SATK/VR/2017/W-37 Improvement of Improvement of Soalia Pry. School - Gouripur Pry. School Road 2.00 142.57 AZ - AB (JV) Shyamnagar, Satkhira. Contractor - S. M. Abul Basar, Cell: 01711443150 147.92 02/11/2017 10/09/2018 0 19/01/2019 CANCEL
302 Satkhira 39 shyamnagar 292 277 CCRIP/GOB/SATK/VR/2017/W-36 Improvement of Improvement of Khashkata Jabakhali Bridge-Club-Awjed Masters res. Road 2.51 101.35 M/S. Mollah Engineering Shyamnagar, Satkhira. Contractor - M. M. Nurul Haque Mollah, Cell: 01712773227 104.37 27/09/2017 30/11/2018 65 19/01/2019 Work on going
303 Satkhira 39 shyamnagar 292 277 CCRIP/SAT/IFAD/UNR/2015/W-19(LCS-3) Improvement of Improvement of Gorkuamrpur Bazar-Padmapukur Road 0.42 12.02 Pre: Mst. Nasima Pervin Sec: Mst. Hoshneara Khatun 6.30 26/02/2015 28/02/2016 100 19/01/2019 Final
304 Satkhira 39 shyamnagar 292 277 CCRIP/SAT/IFAD/UNR/2015/W-18(LCS-2) Improvement of Improvement of Gorkuamrpur Bazar-Padmapukur Road 0.65 10.63 Pre: Mst. Rahila Khatun Sec: Mst. Mousumi Akter 9.85 26/02/2015 28/02/2016 100 19/01/2019 Revised/ Final Bill under process
305 Satkhira 39 shyamnagar 292 277 CCRIP/SAT/IFAD/UNR/2015/W-17(LCS-1) Improvement of Improvement of Gorkuamrpur Bazar-Padmapukur Road 0.93 9.60 Pre: Mst. Nurunesa Khatun Sec: Mst. Anjuara Begum 8.69 26/02/2015 28/02/2016 100 19/01/2019 Final
306 Satkhira 39 tala 312 277 CCRIP/SAT/ UZR/2014/W-11 Improvement of Imp. of Tala UZ HQ-Kalaroa road via Dalua GC-Patkhalghata GC Road 3.70 419.88 M/S. Bosu Traders & M/S. Rafid Traders (JVC), Tala, Satkhira. Kallan Bosu, Contractor, Cell: 01716703753 & Shakti Bosu, Partner, Cell: 01711349167 425.04 26/01/2015 28/06/2017 100 19/01/2019 Revised/ Final
307 Shariatpur 32 janjira 238 277 CCRIP/Shariat/IFAD/VR/2014/W-11 Improvement of Taher Madbor hat-UNR 04 road (258m-680m) 0.42 12.61 LCS 12.61 100 19/01/2019 Final Bill
308 Shariatpur 32 janjira 238 277 CCRIP/Shariat/IFAD/VR/2014/W-10 Improvement of Taher Madbor hat-UNR 04 road (0-258m) 0.26 12.51 LCS 12.51 100 19/01/2019 Final Bill
309 Shariatpur 32 janjira 238 277 CCRIP/Shariat/IFAD/VR/2014/W-15 Improvement of Taher Mathbor hat-Shibchar Border via Hazi Abdul Mozid Reg. Pry.school. LCS-4 0.63 7.70 LCS 7.70 100 19/01/2019 Final Bill
310 Shariatpur 32 janjira 238 277 CCRIP/Shariat/IFAD/VR/2014/W-14 Improvement of Taher Mathbor hat-Shibchar Border via Hazi Abdul Mozid Reg. Pry.school. LCS-3 0.60 9.18 LCS 9.18 100 19/01/2019 Final Bill
311 Shariatpur 32 janjira 238 277 CCRIP/Shariat/IFAD/VR/2014/W-13 Improvement of Taher Mathbor hat-Shibchar Border via Hazi Abdul Mozid Reg. Pry.school. LCS-2 0.50 12.49 LCS 12.49 100 19/01/2019 Final Bill
312 Shariatpur 32 janjira 238 277 CCRIP/Shariat/IFAD/VR/2014/W-12 Improvement of Taher Mathbor hat-Shibchar Border via Hazi Abdul Mozid Reg. Pry.school. LCS-1 0.60 13.78 LCS 13.78 100 19/01/2019 Final Bill
313 Shariatpur 32 janjira 238 277 CCRIP/IFAD/SARI/VR/2017/W-39 Improvement of Taher Madbar Hat-UNR -04 (UZR-04) Road 0.68 43.58 M/S Sheik Enterprise 37.91 100 19/01/2019 Final Bill
314 Shariatpur 32 janjira 238 277 CCRIP/IFAD/SARI/VR/2015/W-30 Improvement of Janjira Bilashpur-UZR-Boderhat road 1.51 265.20 M/S Progoti Enterprise. Shariatpur Khokon Mollah: 01718258917 223.09 70 19/01/2019 work stoped
315 Shariatpur 32 janjira 238 277 CCRIP/Shariat/IFAD/UNR/2014/W-04 Improvement of 1.53 654.38 M/S Atiar Rahman Jhiltuly, Faridpur. Md. Atiar Rahman:01711235283 756.46 100 19/01/2019 Final Bill
316 Shariatpur 32 janjira 238 277 CCRIP/Shariat/IFAD/UNR/2014/W-05 Improvement of Bilashpur U.P.-Kaziarchar Bazar Road 0.97 217.98 M/S Oriented International and M/S Amin Builders (JV). Shariatpur Md.Ruhul Amin: 01716432992 248.10 100 19/01/2019 Final Bill
317 Shariatpur 32 naria 236 277 CCRIP/IFAD/SARI/2015/Bridge/W-28 Construction of 15.00 m Long Bridge on Vumkhara to Gulmaiz Road , 640.05 M/S Progoti & RK. Sheik (JV). Sjhariatpur Masud Rana: 01715161398 672.02 82 19/01/2019 Work on going
318 Shariatpur 32 naria 236 277 CCRIP/Shariat/IFAD/UNR/2014/W-08 Construction of 3x 4.5mx4.00m Triple vent RCC Box Culvert at ch.100.00m, 2x 4.5mx4.00m Double vent RCC Box Culvert at ch.504.00m, 2 Nos.1x 4.50mx4.50m Single vent Box Culvert at ch. 800.00m and 1030.00m, on Mohiskhola to Moroler Baour road under Naria, S 0.93 105.68 M/S RK. Construction, Shariatpur Sadar. 120.74 100 19/01/2019 Final Bill
319 Shariatpur 32 naria 236 277 CCRIP/SARI/GoB/Maint/UZR/2017/W-41 Improvement of Naria Battala Road 1.60 115.22 M/s Sheikh Enterprise 103.69 60 19/01/2019 Work on going
320 Shariatpur 32 naria 236 277 CCRIP/ADB/SARI/UZR/2015/W-29 Improvement of Naria to Battalarhat road 2.96 345.59 M/s Surma & Jamuna Enterprise (JV). Shariatpur Melon Boduksi: 01759056444 377.74 100 19/01/2019 Final Bill
321 Shariatpur 32 naria 236 277 CCRIP/SARI/IFAD/VR/W-18 Improvement of Nasashan GPS-Akon Kandi road (1000-1816m) 0.82 12.30 LCS 12.30 100 19/01/2019 Final Bill
322 Shariatpur 32 naria 236 277 CCRIP/SARI/IFAD/VR/W-17 Improvement of Nasashan GPS-Akon Kandi road (500-1000m) 0.50 11.87 LCS 11.87 100 19/01/2019 Final Bill
323 Shariatpur 32 naria 236 277 CCRIP/SARI/IFAD/VR/W-16 Improvement of Nasashan GPS-Akon Kandi road (0-500m) 0.50 11.68 LCS 11.68 100 19/01/2019 Final Bill
324 Shariatpur 32 naria 236 277 LCS-08,Ch.5365-6052.00m. Improvement of Bhojeswar GC-Mohishkhola Bazar road from ch. (3028.00-6052.00) 0.69 6.17 LCS 6.17 100 19/01/2019 Final Bill
325 Shariatpur 32 naria 236 277 LCS-07,Ch.4965-5365.00m. Improvement of Bhojeswar GC-Mohishkhola Bazar road from ch. (3028.00-6052.00) 0.40 8.78 LCS 8.78 100 19/01/2019 Final Bill
326 Shariatpur 32 naria 236 277 LCS-06,Ch.4665-4965.00m Improvement of Bhojeswar GC-Mohishkhola Bazar road from ch. (3028.00-6052.00) 0.30 8.63 LCS 8.63 100 19/01/2019 Final Bill
327 Shariatpur 32 naria 236 277 LCS-05,Ch.4365-4665.00m Improvement of Bhojeswar GC-Mohishkhola Bazar road from ch. (3028.00-6052.00) 0.30 8.21 LCS 8.21 100 19/01/2019 Final Bill
328 Shariatpur 32 naria 236 277 LCS-04,Ch.4180-4365.00m. Improvement of Bhojeswar GC-Mohishkhola Bazar road from ch. (3028.00-6052.00) 0.19 8.16 LCS 8.16 100 19/01/2019 Final Bill
329 Shariatpur 32 naria 236 277 LCS-03,Ch.3865-4180.00m Improvement of Bhojeswar GC-Mohishkhola Bazar road from ch. (3028.00-6052.00) 0.32 8.43 LCS 8.43 100 19/01/2019 Final Bill
330 Shariatpur 32 naria 236 277 LCS-02,Ch.3565-3865.00m Improvement of Bhojeswar GC-Mohishkhola Bazar road from ch. (3028.00-6052.00) 0.30 6.96 LCS 6.96 100 19/01/2019 Final Bill
331 Shariatpur 32 naria 236 277 LCS-01, Ch.3028-65.00.00m. Improvement of Bhojeswar GC-Mohishkhola Bazar road from ch. (3028.00-6052.00) 0.54 7.22 LCS 7.22 100 19/01/2019 Final Bill
332 Shariatpur 32 naria 236 277 CCRIP/SARI/IFAD/VR/W-20 Improvement of Moroler Baor-Mohiskhola road from ch. 0.00m to 1000m.(VR) 1.00 5.81 LCS 5.81 100 19/01/2019 Final Bill
333 Shariatpur 32 naria 236 277 CCRIP/SARI/IFAD/VR/(LCS-03)W-27 Improvement of Manda-Golar Bazar road (2100-3095m) 1.00 12.52 LCS 12.52 100 19/01/2019 work complete
334 Shariatpur 32 naria 236 277 CCRIP/SARI/IFAD/VR/(LCS-02)W-26 Improvement of Manda-Golar Bazar road (1600-2100m) 0.50 11.56 LCS 11.56 100 19/01/2019 work complete
335 Shariatpur 32 naria 236 277 CCRIP/SARI/IFAD/VR/(LCS-01)W-25 Improvement of Manda-Golar Bazar road (1000-1600m) 0.60 12.52 LCS 12.52 100 19/01/2019 work complete
336 Shariatpur 32 naria 236 277 CCRIP/IFAD/SARI/2015/VR/ W-34 Improvement of Moroler Baor-Mohiskhola road 0.10 87.01 M/S Sheik Enterprise. Shariatpur Manik Sheikh: 01745504928 79.37 100 19/01/2019 work complete
337 Shariatpur 32 naria 236 277 CCRIP/SARI/IFAD/VR/W-19 Improvement of Moroler Baor-Mohiskhola road 0.63 5.86 LCS 5.86 100 19/01/2019 Final Bill
338 Shariatpur 32 naria 236 277 CCRIP/Shariat/IFAD/UNR/2014/W-07 Improvement of Mohishkhola Bazar East side-Naria Battala road from ch. 0.00m to 460m.(VR) 0.36 42.33 M/S Prince Trading, Shariatpur Sadar. 45.40 100 19/01/2019 Final Bill
339 Shariatpur 32 naria 236 277 CCRIP/Shariat/IFAD/UNR/2014/W-09 Improvement of Holaishar-Ghorishar UP via Bangla Bazar road 1.94 162.35 M/S Mollah Enterprise, Shariatpur Sadar. 169.65 100 19/01/2019 Final Bill
340 Shariatpur 32 naria 236 277 CCRIP/IFAD/SARI/2015/VR/ W-35 Improvement of Joy Bangla Bazar-Nowpara road 2.00 195.24 M/S S.Ononto Bikash Tripura & Sheikh (JV). Shariatpur Jolil Sarder:01713577765 196.46 80 19/01/2019 Work on going
341 Shariatpur 32 naria 236 277 CCRIP/IFAD/SARI/2015/VR/ W-37 Improvement of Joy Bangla Bazar-Char Atra UP road 2.40 242.82 M/S Sheik Enterprise. Shariatpur Melon Bonduksi: 01759056444 254.92 100 19/01/2019 work complete
342 Shariatpur 32 naria 236 277 CCRIP/SARI/IFAD/UNR/(LCS-3)W-24 Improvement of Bhumkhara-Gulmaize road ( 4985-5685m) 0.70 12.69 LCS 12.70 100 19/01/2019 Final Bill
343 Shariatpur 32 naria 236 277 CCRIP/SARI/IFAD/UNR/(LCS-2)W-23 Improvement of Bhumkhara-Gulmaize road (4385-4985m) 0.60 13.41 LCS 13.41 100 19/01/2019 Final Bill
344 Shariatpur 32 naria 236 277 CCRIP/SARI/IFAD/UNR/(LCS-1)W-22 Improvement of Bhumkhara-Gulmaize road (3585m-4385m) 0.80 12.52 LCS 12.52 100 19/01/2019 Final Bill
345 Shariatpur 32 naria 236 277 CCRIP/Shariat/IFAD/UNR/2014/W-06 Improvement of Bhojeswar-Mohishkhola Bazar road 3.04 36.49 M/S Surma Enterprise, Dohar,Dhaka. Melon Boduksi: 01759056444 399.38 100 19/01/2019 Final Bill
346 Shariatpur 32 naria 236 277 CCRIP/IFAD/SARI/2015/VR/ W-36 Improvement of Charatra UP - Khas Bazar road. 2.00 250.49 M/S S.Ononto Bikash Tripura & Sheikh (JV). Shariatpur Liton :01716204324 247.99 90 19/01/2019 Work on going