1
|
Chattogram
|
11
|
mirsharai
|
68
|
291
|
ChCC2-15
|
New construction of Rabindra Nazrul high school cum cyclone center.
|
|
1.00
|
|
|
1094.39
|
Consonence Engineers and Builders & Abul Bashar (JV)
|
905.86
|
|
16/08/2017
|
09/11/2018
|
0
|
|
|
07/02/2019
|
|
|
2
|
Chattogram
|
11
|
mirsharai
|
68
|
291
|
ChCC2-14
|
New construction of Patantully boys high school cum cyclone center.
|
|
1.00
|
|
|
632.85
|
M/S Monir Ahmed-Hossan & Brothers(JV)
|
529.75
|
|
17/08/2017
|
09/11/2018
|
0
|
|
|
07/02/2019
|
|
|
3
|
Chattogram
|
11
|
mirsharai
|
68
|
291
|
ChCC2-13
|
Re-construction of West Madarbari girls high school cum cyclone center
|
|
1.00
|
|
|
616.12
|
M/S Quashem Construction
|
542.19
|
|
02/05/2017
|
26/07/2018
|
0
|
|
|
07/02/2019
|
|
|
4
|
Chattogram
|
11
|
mirsharai
|
68
|
291
|
ChCC2-12
|
Re-construction of East Madarbari girls high school cum cyclone center
|
|
1.00
|
|
|
451.02
|
M/S Tohid & Brothers
|
371.09
|
|
02/05/2017
|
26/07/2018
|
0
|
|
|
07/02/2019
|
|
|
5
|
Chattogram
|
11
|
mirsharai
|
68
|
291
|
ChCC2-11
|
Re- construction of Laldighi Community Centre Cum Cyclone Shelter.
|
|
1.00
|
|
|
1515.64
|
M/S Hasan & Brothers, Anantan BikashTripura Jv
|
1295.92
|
|
30/11/2017
|
23/02/2019
|
0
|
|
|
07/02/2019
|
|
|
6
|
Chattogram
|
11
|
mirsharai
|
68
|
291
|
ChCC2-10
|
New construction of Ahmed Mia City Corp. Girls School Cum Cyclone Shelter
|
|
1.00
|
|
|
790.07
|
M/S Tohid & Brothers
|
685.36
|
|
19/05/2017
|
06/09/2018
|
0
|
|
|
07/02/2019
|
|
|
7
|
Chattogram
|
11
|
mirsharai
|
68
|
291
|
ChCC2-9
|
New construction of Mohabbat Ali Girls High School Cum Cyclone Shelter.
|
|
1.00
|
|
|
736.34
|
M/S Quashem Construction
|
642.38
|
|
30/11/2017
|
23/02/2019
|
0
|
|
|
07/02/2019
|
|
|
8
|
Chattogram
|
11
|
mirsharai
|
68
|
291
|
ChCC2-08
|
New construction of Six Storied Building at Patanga Girls High School and Colledge Cum Cyclone Shelter.
|
|
1.00
|
|
|
2085.57
|
Dhaly Construction Ltd.
|
2064.72
|
|
02/09/2018
|
25/11/2019
|
0
|
|
|
07/02/2019
|
|
|
9
|
Chattogram
|
11
|
mirsharai
|
68
|
291
|
ChCC2-17
|
Reconstruction of road by RCC from Sotsong Asrom Nibash to Soroni Road (Ch-0+00 to Ch-1+503)
|
|
3.10
|
|
|
679.49
|
M/S Quashem Construction
|
639.01
|
|
05/07/2017
|
25/12/2018
|
0
|
|
|
07/02/2019
|
|
|
10
|
Chattogram
|
11
|
mirsharai
|
68
|
291
|
ChCC2-16
|
Contruction of 65m Bridge on Marinars Road
|
|
|
|
|
970.32
|
S Ananta & Abdus Salam JV
|
867.00
|
|
|
|
0
|
|
|
07/02/2019
|
|
|
11
|
Chattogram
|
11
|
mirsharai
|
68
|
291
|
ChCC2-04
|
Improvement of Agrabad access road by overlay and widening with BC (Ch-0+00 to Ch-2+378)
|
|
7.13
|
|
|
5103.31
|
MBEL-ROYAL Jv BGMEA
|
4896.67
|
|
04/12/2017
|
13/05/2019
|
0
|
|
|
07/02/2019
|
|
|
12
|
Chattogram
|
11
|
mirsharai
|
68
|
291
|
ChCC2-03
|
Improvement of port connecting road by BC from Alaker to Nimtola Ch-4+289 to Ch.6+371.
|
|
6.25
|
|
|
5391.48
|
Rana -Saleh Jv
|
5084.70
|
|
05/12/2017
|
13/05/2019
|
0
|
|
|
07/02/2019
|
|
|
13
|
Chattogram
|
11
|
mirsharai
|
68
|
291
|
ChCC2-02
|
Improvement of port connecting road from Alaker to Nimtola (Ch-2`+400 to Ch-4+289) by Bituminous Carpeting.
|
|
5.67
|
|
|
5354.45
|
Rana Builders
|
5063.00
|
|
05/12/2017
|
13/05/2019
|
0
|
|
|
07/02/2019
|
|
|
14
|
Chattogram
|
11
|
mirsharai
|
68
|
291
|
ChCC2-01
|
Improvement of Port Connecting Road from Alanker to Nimtola By BC. Ch. 1+450 to Ch.2+400km
|
|
2.85
|
|
|
4323.36
|
|
0.00
|
|
|
|
0
|
|
|
07/02/2019
|
|
|
15
|
Cumilla
|
10
|
cumilla-s
|
95
|
291
|
CoCC2-07
|
Installation of street lighting system in different areas of CoCC (2550 Nos. GI Pole with 2550 Nos. LED Street light Including all accessories)
|
|
|
|
|
2068.61
|
PDL-IEL-MDHV(JV)
|
1949.60
|
|
22/01/2018
|
21/01/2019
|
0
|
|
|
07/02/2019
|
|
|
16
|
Cumilla
|
10
|
cumilla-s
|
95
|
291
|
CoCC2-06
|
Installation of 9 nos production Tube-wells including pump house with all other accessories in ward no 01 to 27
|
|
|
|
|
568.09
|
MSST-MCS JV
|
584.56
|
|
27/11/2018
|
26/11/2019
|
0
|
|
|
07/02/2019
|
|
|
17
|
Cumilla
|
10
|
cumilla-s
|
95
|
291
|
CoCC2-08
|
b) Construction of Drain, Footpath & Road at Fazlul Hoque Road (From Kandirpar to Rajgonj) (Ch. 0+00 to 0+729) and Construction of Drain & Footpath from Post Office or Circuit House to Rajgonj (Ch. 0+000 to 0+626).
c) Re-construction of Drain Judge Court-Eidgah-Stadium Market-New Market-Kandirpar to Circit House road side Khal at Hotel Salauddin (Ch. 0+000 to 1+900).
|
|
5.02
|
|
|
1506.45
|
Rana builders
|
1565.77
|
|
22/01/2018
|
21/01/2019
|
0
|
|
|
07/02/2019
|
|
|
18
|
Cumilla
|
10
|
cumilla-s
|
95
|
291
|
CoCC2-05
|
(a) Excavation of Khal from Medical Hospital to EPZ road with beautification. ( Ch. 00 + 00 to 00 + 800 m.)
(b) Excavation of Airport khal (EPZ poket gate to Gopenathpur khal/Canal) . ( Ch. 00 + 00 to 05 + 000 m.)
(c) Excavation of Unaishar khal (South- Westen side of EPZ wall to Gopenathpur khal/Canal via Kazipara-Hirapur) with beautification ( Ch. 00 + 00 to 7 + 000 m.)
(d) Excavation of Kuchaitoly khal (Kuchaitoly to Gopenathpur khal/Canal via Donessor-Rajapara-Tarapaia) . ( Ch. 00 + 00 to 15 + 000 m.)
(e) Excavation of Sonaichori khal/Canal (from Pathankot to Gopenathpur khal/Canal via Chowara Bazar Matiara) . ( Ch. 00 + 00 to 06 + 000 m.)
|
|
28.47
|
|
|
1665.06
|
HASAN TECHNO BUILDERS,TAHER BROTHERS LTD (JV)
|
1663.91
|
|
09/07/2018
|
03/09/2019
|
0
|
|
|
07/02/2019
|
|
|
19
|
Cumilla
|
10
|
cumilla-s
|
95
|
291
|
ICGP B2 CoCC09
|
b) (i) Reconstruction of drain from Akther Hamid Khan road to Morden Hospital and Nowgaon chowmohoni (Laksam road) via RAB office, Ch.0+000-1+063.
b) (ii) Reconstruction of drain from Akther Hamid Khan road to Morden Hospital and Nowgaon chowmohoni (Laksam road) via RAB office, Link, Ch.0+000-0+341.
c) (i) Reconstruction of Rampur road from Kourt bari road (Cantonment gate and opposite side of land office) to Kourt bari road (Moynamoty Housing) via Rampur area, Ch.0+000-1+690. 1 x 1 m x 1 m Size Box Culvert at Ch.0+603, 0+825, 0+928, 1+207, 1+351, 1+385. & 1 x 3 m x 1.5 m Size Box Culvert at Ch.1+325,& 1x1.5mx1.5m box culvert at Ch.1+588.
c) (ii) Reconstruction of Rampur road from Kourt bari road (Cantonment gate and opposite side of land office) to Kourt bari road (Moynamoty Housing) via Rampur area, Link, Ch.0+000-0+593. 1 x 1.5 m x 1.5 m Size Box Culvert at Ch.0+476.
f) (ii) Reconstruction of drain from Laksam road to Easin market via Mirpukurpar, Ch.0+000-0+402.
g) Reconstruction of drain from Thomson bridge - EPZ (North side) - Housing Estate - Medical College near Bakhrabad Gas office.Ch.0+000-2+450. & Link drain At Ch.1+755(R/S), Ch.0+000-0+250.
|
|
6.79
|
|
|
1466.38
|
Hasan builders
|
1466.22
|
|
17/12/2017
|
16/12/2018
|
0
|
|
|
07/02/2019
|
|
|
20
|
Cumilla
|
10
|
cumilla-s
|
95
|
291
|
ICGP B2 CoCC04
|
(c) Re-construction of 8m span R.C.C. Bridge at Kazipara.
(d) Re-construction of 8m span R.C.C. Bridge at Near Noagah Chowmohony over katakhali khal.
(h) Construction of 3X5.0mX4.0m RCC Box Culvert at Rececourse Khalpar
|
|
0.04
|
|
|
528.05
|
HASAN BUILDERS
|
528.05
|
|
17/12/2017
|
16/12/2018
|
0
|
|
|
07/02/2019
|
|
|
21
|
Cumilla
|
10
|
cumilla-s
|
95
|
291
|
ICGP B2 CoCC-03
|
Part: 1, Road Improvement
a) Reconstruction of Road Start From Old Dhaka-Chittagong Highway Road to Airport Road (Laxmipur Chownohony) Via Gram Chowara And Laxmipur By B.C From I.SG.( Ch. 0+000 to 02+ 855 m). b) Reconstruction of Road Start From Old Dhaka-Chittagong Highway road (Near City Corporation Office) Via Raypur, Dayapur. Link From Doyapur Madrasa to Dhaka-Chittagong Highway Road By B.C From I.SG. (Ch. 0+000 to 02+ 772 m). c) Contraction of Road Start From Dhaka-Chittagong Highway Road to Airport Road, Domoria Road & Tarapaia Road Via Laxminagar, Laxmipur Katcha Road By B.C (Ch. 00+00 to 02+ 284 m) Link -1(Ch. 0+ 000 To 0+ 278) Link -2(Ch. 0+000 To 0+ 625) d) Reconstruction of Road Start From Old Dhaka-Chittagong Highway Road (Old Chowara) to Rajapara (Near Post Office) Via Domoria, Tarapaia & Noapara By B.C From I.S.G (Ch. 0+000 to 03+302m) e) Reconstruction of Dhaneshor Road (From Old Dhaka - Chittagong Highway Road to Airport Road) By B.C From I.S.G. (Ch.0+000 to 02+368m). f) Reconstruction of Road Start From Old Dhaka-Chittagong Highway Road to Airport Road Via Goalmothon & Rajapara By B.C From I.S.G (Ch.0+000 to 02+812m). Link -1 (Ch.0+000 to 0+700) g) Reconstruction of Road Start From Old Dhaka-Chittagong Highway Road (Chowara Madrasha & Chira Mill) to Dhaka-Chittagong Highway Road (Matiara & Chashapara) By B.C From I.S.G.(Ch.0+000 to 1+148m). Link -1 (Ch.0+000 to 0+657) Link-2 (Ch.0+000 to 0+539)
Part: 2, Drainage
a) Contruction of Drain (RCC) From Laxmipur Khal to Dhaka- Chittagong Highway Besides Airport Road & From Doyapur Madrasa (Ch. 0+000-0+712)Link -1 (Ch.0+000-1+372) b) Contruction of Drain (RCC) From Sonaichori Khal to Funka Industries Besides Old Dhaka-Chittagong Highway Road.(Ch.0+000-2+449)
|
|
24.87
|
|
|
4260.58
|
HASAN TECHNO BUILDERS,TAHER BROTHERS LTD (JV)
|
4259.42
|
|
20/06/2018
|
26/10/2019
|
0
|
|
|
07/02/2019
|
|
|
22
|
Cumilla
|
10
|
cumilla-s
|
95
|
291
|
CoCC2-02
|
(a) Reconstruction of road Start from Dhaka-Chittogong Highway road (Joypur) to Kotbari road (Singapur Market) area by B.C. from I.S.G.
(b) Reconstruction of road Start from Kotbari road (Beltoly school gate) to Batabaria moszid by B.C. from I.S.G.
(c) Development of Monipur road (from Batabaria to City Boundary) by B.C. from I.S.G.
(d) Reconstruction of road Start from Kotbari road (Gondmoty moszid) to Museum road (Shalbon High school & opposite side of BARD Boundary) & Gabtoly Beby Stand via Bagmara & Lalmai area. Link : Morapara road & Mannan Darbesh house road by B.C. from I.S.G.
(e) Repairing of Museum road (Kotbari road to University) by Base Course and B.C.
|
|
21.82
|
|
|
3816.06
|
RAB-RC(PVT)LTD,M/S HOQUE ENTERPRISE (JV)
|
3815.70
|
|
20/06/2018
|
26/10/2019
|
0
|
|
|
07/02/2019
|
|
|
23
|
Cumilla
|
10
|
cumilla-s
|
95
|
291
|
CoCC2-01
|
(a) Reconstruction of road Start from Kazipara road (Pry. School) to Kazipara road (Graveyard) via Kazipara area by B.C. from I.S.G. (b) Development of road from Old Ctg road (Chowara cattle market) to Dhaka – Chittagong Highway(matiara) via hindu para+ 1 bridge (30m)
(c) Reconstruction of road from Lacsam road to Airport road, and Kazipara road via herapur ,Mostapur, Laxminagar, Disabond and Kazipara
(d) Construction of Drain (RCC/Briek/ Pipe) from EPZ khal to Laxminagar Chowmohony, Asrayon, Airport road.by RCC
|
|
3.20
|
|
|
1041.12
|
MAMCL-PC-SAS(JV)
|
1040.87
|
|
17/12/2017
|
16/12/2018
|
0
|
|
|
07/02/2019
|
|
|
24
|
Gazipur
|
21
|
gazipur-s
|
174
|
291
|
GCC2-14
|
Installation of 3 Nos Production Tube wells,Pump house,Necessary electrical work with 10.00km distribution pipe line at Zone-2,4 5 respectively
|
|
|
|
|
1900.21
|
RFL Plastics Limited
|
1595.35
|
|
|
|
0
|
|
|
07/02/2019
|
|
|
25
|
Gazipur
|
21
|
gazipur-s
|
174
|
291
|
GCC2-13
|
Construction of drain along the side of Nowzour to Zirani Bazar (starting from Zitermour to west direction up to 6.75 Km). (Ch. 00+000 to 6+750)
|
|
6.75
|
|
|
1664.38
|
Wahid Construction ltd
|
1572.38
|
|
26/02/2017
|
14/09/2018
|
0
|
|
|
07/02/2019
|
|
|
26
|
Gazipur
|
21
|
gazipur-s
|
174
|
291
|
GCC2-11
|
Construction of RCC Drain along side of Khapara road lasr part (up to Tilargati road ) Ch. 1+375 to Ch-3+810
|
|
3.19
|
|
|
643.76
|
MRC-MKH(JV)
|
575.00
|
|
26/02/2017
|
21/04/2018
|
0
|
|
|
07/02/2019
|
|
|
27
|
Gazipur
|
21
|
gazipur-s
|
174
|
291
|
GCC2-07
|
Cosntruction of drain from Dhaka-Mymensingh highway to Dhaka bypass road via Gorib & Gorib factory & vogra bazar. (Ch. 00+00 to 1+400) b) Construction of drain from Mogorkhal to Kadda-Turag Khal along Dhaka By pass road Ch.0+0 to 3+950
|
|
5.18
|
|
|
1500.77
|
MDJ Associates
|
1373.73
|
|
19/05/2017
|
25/06/2018
|
19
|
|
|
07/02/2019
|
|
|
28
|
Gazipur
|
21
|
gazipur-s
|
174
|
291
|
GCC2-04
|
Construction of RCC Drain along side of Tongi Vadam road at Ch. 0+00 to Ch-4+125
|
|
5.22
|
|
|
854.54
|
MRC-MKH(JV)
|
740.58
|
|
26/02/2017
|
21/04/2018
|
0
|
|
|
07/02/2019
|
|
|
29
|
Gazipur
|
21
|
gazipur-s
|
174
|
291
|
GCC2-12
|
Repairing & Widening of BC road from Nowzour to Zirani Bazar (starting from Zitermour to west direction up to 6.75. Km). (Ch. 0+00 to 6+750)
|
|
6.75
|
|
|
1210.07
|
NT-RA(JV)
|
1062.33
|
|
14/05/2017
|
30/11/2018
|
0
|
|
|
07/02/2019
|
|
|
30
|
Gazipur
|
21
|
gazipur-s
|
174
|
291
|
GCC2-10
|
Repairing & widening of Khapara road (starting from Dhaka -Mymenshinhg road to Vadam road via Tilargati) (Ch-0+00 to Ch-3+810 ) By RCC Work
|
|
4.36
|
|
|
1237.65
|
Wahid Construction ltd
|
1167.30
|
|
17/04/2017
|
22/12/2018
|
0
|
|
|
07/02/2019
|
|
|
31
|
Gazipur
|
21
|
gazipur-s
|
174
|
291
|
GCC2-09
|
Repairing & Widening of BC road from Dhaka-Pubail road at Markun K2 factory to Harbaid Bazar via Maruka. (Ch. 0+00 to Ch-5+950)
|
|
5.95
|
|
|
921.26
|
MAQ Engineering ltd.
|
882.83
|
|
30/03/2017
|
04/06/2018
|
0
|
|
|
07/02/2019
|
|
|
32
|
Gazipur
|
21
|
gazipur-s
|
174
|
291
|
GCC2-08
|
Repairing & Widening of BC Road from Shibbari Moor to Zoorpukur & Repairing and Widening of Road from Zoorpukur Moor to Titarkul. (Ch.0+045 to 3+625) & Repairing and widening of BC road from Surabari Rice mill to Kashimpur-Sreepur Road Kazi Market Mr.Malek House via Shaildubi Member Market. Ward No (04 & 05).
|
|
6.75
|
|
|
1105.02
|
NT-MMB(JV)
|
994.51
|
|
31/01/2018
|
26/01/2019
|
0
|
|
|
07/02/2019
|
|
|
33
|
Gazipur
|
21
|
gazipur-s
|
174
|
291
|
GCC2-06
|
Repairing & Widening of Joybangla road by RCC/BC (Barobari to Maghdubi bypass via Akkas marker) including a Link Road L=8280m
|
|
10.03
|
|
|
1434.04
|
Wahid Construction ltd
|
1349.78
|
|
18/05/2017
|
23/01/2019
|
0
|
|
|
07/02/2019
|
|
|
34
|
Gazipur
|
21
|
gazipur-s
|
174
|
291
|
GCC2-05
|
a) Repairing & Widening of BC Road from Kashimpur to Sreepur connecting road (UP to Mother Textile). (RCC Road Ch. 0+000-4+500)(Link-1 BC Road Ch.0+380-1+277.7) and 530m link-2 RCC road with side drain (Engineer bari road starting from Gacha polasona main road) b) Construction of RCC drain at Kashimpur to Sreepur connecting road (Zitermoor to Mother textile) (Ch.0+000 to 4+500) & Link (Ch.0+000-
|
|
11.82
|
|
|
2337.09
|
MKE-CDC-NPIL Jv
|
2123.94
|
|
29/11/2017
|
23/11/2018
|
0
|
|
|
07/02/2019
|
|
|
35
|
Gazipur
|
21
|
gazipur-s
|
174
|
291
|
GCC2-03
|
Repairing & widening of Tongi Vadam road by RCC work (Ch-1+651 to Ch-4+150 & Link-1 road by BC ch-0+100 to Ch-0+950 & Link-2 road by RCC Ch-0+625)
|
|
3.97
|
|
|
993.78
|
MRC-MKH (JV )
|
953.86
|
|
17/04/2017
|
11/04/2018
|
0
|
|
|
07/02/2019
|
|
|
36
|
Gazipur
|
21
|
gazipur-s
|
174
|
291
|
GCC2-02
|
a. Repairing & Widening of BC road from Maleker bari (Dhaka-Mymanshingh Highway) to Bashan sarak via Ojerpara & Haque Market. (Ch. 00+000 to 6+650 & a link Ch-0.0 to 0+763).
b. Construction of RCC drain along the side of Maleker bari raod (Dhaka-Mymanshingh Highway) to Bashan sarak via Ojerpara & Haque Market. (Ch.0.0 to -1+950),
|
|
12.72
|
|
|
1972.08
|
CDC-NPL(JV)
|
1744.78
|
|
22/06/2017
|
28/08/2018
|
0
|
|
|
07/02/2019
|
|
|
37
|
Gazipur
|
21
|
gazipur-s
|
174
|
291
|
GCC2-01
|
Repairing & Widening of Road by BC from Vanuya to Banomala rail crossing via Joydebpur-Dhirasram, Haydarabad. (Ch-0+00 to Ch-15+259)
|
|
15.26
|
|
|
3335.92
|
RAB-RC(pvt) Ltd & Dawn Corporation(JV)
|
3283.43
|
|
16/11/2017
|
10/11/2018
|
0
|
|
|
07/02/2019
|
|
|
38
|
Narayanganj
|
20
|
narayanganj-s
|
198
|
291
|
NCC2-09
|
a) Construction of RCC Drain Starting from Godnail Lal Building to Anayetnagar Lacky Bazzar Ch.0+000-2+505.
(b) Construction of Drain (RCC/Brick/Pipe) Starting from Tatkhana more upto WAPDA Canal via Sayedpara wooden bridge, sayedpara kafil uddin Garments & the H/O mr. shamim at ward no.-08. Ch.0+000-0+670. (Total Length with 7 link drain=1616.0m) (c) Construction of RCC Drain(RCC/Brick/Pipe) Starting from Tatkhana Government Primary school to Chowdhuri bari road via Dr. Kuddus house at word no.-8. Ch.0+000-0+292 & Link Ch.0+000-0+100. (d) Construction of RCC Drain(RCC/Brick/Pipe) Starting from Starting from Dhanakunda Saudbari to rail line & Barepara Aklim Mia House at ward No.-08. Ch.0+000-0+170. (e) Construction of drain (RCC/Brick/Pipe) starting from Modhugar connecting upto WAPDA canal at ward no-08.Ch.0+000-0+356. Total Length (including 8 nos. Link Drain)=1840m. (f) Construction of Drain (RCC/Brick/Pipe) at Jhalkuri Starting from amtala mor to wapda canal via east side & Jhalkuri khola market at word no.-9. Ch.0+000-0+735, Ch.0+000-0+493(Link-1), Ch.0+000-0+288(Link-2). (g) Construction of Drain (RCC/Brick/Pipe) at Jhalkuri Starting from Jalkuri Naintarpar to Karoitala via Firoz Master House at ward no.-09. Ch.0+000-0+650, Ch.0+000-0+599(Link-1), Ch.0+000-0+100(Link-2), Ch.0+000-0+118(Link-3). (h) Construction of drain (RCC/Brick/Pipe) at Jalkuri starting from Jalkuri Wapda canal Culvert to end of NCC & Goramara Mosque-E-Noor via Rajmahal Chinema Hall at ward no-9. Ch.0+000-0+225, Total Length (including Link drain)=837m. (i) Construction of Drain (RCC/Brick/Pipe) at Jhalkuri Starting from Jalkuri Transmeter to Sheikderbari pool via Taher Ali House & Jalkuri Graveyard at ward no.-9. Ch.0+000-0+580. Ch.0+000-0+580(Link-1), Ch.0+000-0+190(Link-2) (j) Construction of Drain (RCC/Brick/Pipe) at Jhalkuri Starting from Modhugar Mojibor Poulty firm to Wapda canal near Ali Hossain House via Dewan Jame Mosque at ward no-9. Ch.0+000-0+400, Ch.0+000-0+370(Link-1), Ch.0+000-0+580(Link-2)
|
|
12.87
|
|
|
2144.52
|
Mir Habibul Alam-Udayan Builders(JV)
|
1917.36
|
|
10/08/2017
|
13/12/2018
|
0
|
|
|
07/02/2019
|
|
|
39
|
Narayanganj
|
20
|
narayanganj-s
|
198
|
291
|
NCC2-07
|
Re-excavation of main canal from bhangar poll to Shimrail galakata bridge along with Protective Works by CC Block lining at west side of the main canal in Siddhirganj (Ch.0+000km to 5+538Km) at both sides.
|
|
5.20
|
|
|
5834.50
|
|
0.00
|
|
|
|
0
|
|
|
07/02/2019
|
|
|
40
|
Narayanganj
|
20
|
narayanganj-s
|
198
|
291
|
NCC2-12
|
a) Re-construction of Road and Drain by RCC starting from AEPZ Road to Sumilpara Road in ward No-06 at Ch.000 to 0646.
b) Re-construction of Char Sumilpara road by RCC with RCC drain in ward No06 Length350m & 6 nos link road length 1099m total effective length1449m.
c) Re-construction of RCC road with RCC drain from Kaiums house to Noardapara moszid in ward no-24 Length86m & 1 Nos Link Road Length134m Total Effective length220m.
d) Construction of Road by RCC with side drain in Shitolankha housing under Ward no.11including 4 Nos Link Road Effective length674m.
e) Re-construction of drain & road by RCC from 100-0 road to Baitul Mamur Madrasha via Roman house beside Kadamrasul College in ward no-23Length400m & 1 Nos Link Road Length117m Total Effective length517m.
f) Re-construction of RCC road with RCC drain from Bugbari Bus road to Bhandary bari in ward no-23 (Ch.000 to 0480).
|
|
8.61
|
|
|
1180.24
|
Starline Services Limited
|
1068.11
|
|
08/10/2017
|
13/12/2018
|
0
|
|
|
07/02/2019
|
|
|
41
|
Narayanganj
|
20
|
narayanganj-s
|
198
|
291
|
NCC2-11
|
Re-construction of road by RCC with Road Side RCC Drain, from Nobiganj Bazar to Dakesshay Mill. Ch(00-4432m) including some Links
|
|
3.91
|
|
|
791.31
|
M/S Munia Traders
|
749.43
|
|
23/05/2017
|
17/10/2018
|
0
|
|
|
07/02/2019
|
|
|
42
|
Narayanganj
|
20
|
narayanganj-s
|
198
|
291
|
NCC2-10
|
(i) Construction of 40.00m long RCC foot over bridge over WAPDA main canal at Ch.0+280km (ii) Construction of 33.00m long RCC bridge over WAPDA main canal at Ch.1+200km (iii) Construction of 38.00m long RCC bridge over WAPDA main canal at Ch.2+130km (iv) Construction of 46.25m long RCC foot over bridge over WAPDA main canal at Ch.2+630km (v) Construction of 34.00m long RCC bridge over WAPDA main canal at Ch. 3+550km (vi) Construction of 37.00m long RCC foot over bridege over WAPDA main canal at Ch.5+150km.
|
|
0.23
|
|
|
3813.80
|
Mir Habibul Alam-Udayan Builders(JV)
|
3584.87
|
|
25/11/2018
|
19/03/2020
|
0
|
|
|
07/02/2019
|
|
|
43
|
Narayanganj
|
20
|
narayanganj-s
|
198
|
291
|
NCC2-06
|
Construction of 20m span RCC Luhia Bridge over Nabiganj Khal on Nobiganj Bazar to Dakesshay Mill Road at Chainage 0+350m and 22m span RCC Lakankhola Brige over Lakhankhola Khal on Nobiganj Bazar to Dakesshay Mill Road at Chainage 2+750.
|
|
0.04
|
|
|
556.34
|
Prominent -Quashem (JV)
|
482.36
|
|
05/03/2017
|
31/10/2018
|
0
|
|
|
07/02/2019
|
|
|
44
|
Narayanganj
|
20
|
narayanganj-s
|
198
|
291
|
NCC2-05
|
a) Construction of 15m long RCC bridge over WAPDA canal near Lithigarments at ward no-3,; 14m long RCC bridge (Abdul Ali pool) at ward no-2, 10m long RCC culvert near Rahim market at ward-02, b) Reconstruction of 60m long RCC birdge over Shitalakkhya Khal at Shaheed Nagar in ward no-18
c) Reconstruction of 60m long RCC bridge over Shitalakkhya khal at Sayedpur in ward no-18,
d) Construction of 12m long RCC bridge over Nolkhali Khal near Knit conern at ward no-10.
|
|
0.13
|
|
|
2098.27
|
Prominent -Quashem (JV)
|
1845.95
|
|
05/03/2017
|
31/12/2018
|
0
|
|
|
07/02/2019
|
|
|
45
|
Narayanganj
|
20
|
narayanganj-s
|
198
|
291
|
NCC2-04
|
a) Construction of 18m etre span RCC Tribini Bridge over Tribini Khal on Madanganj power grid to Nabigonj bus stand Road at Chainage 1+735 m. Ward-21 b)Construction of 20m metre span RCC Baparipara Bridge over Baparipara Khal on Madanganj power grid to Nabigonj bus stand Road at Chainage 0+370 m.
|
|
0.04
|
|
|
892.12
|
Prominent -Quashem (JV)
|
779.16
|
|
05/03/2017
|
31/12/2018
|
0
|
|
|
07/02/2019
|
|
|
46
|
Narayanganj
|
20
|
narayanganj-s
|
198
|
291
|
NCC2-03
|
Re-construction of road by RCC with Road Side RCC Drain, from Nobiganj Bazar to Dakesshay Mill. Ch(00-4432m) including some Links
|
|
16.05
|
|
|
2841.86
|
Rana Builders & Hasan Builders (JV)
|
2700.33
|
|
23/05/2017
|
31/12/2018
|
0
|
|
|
07/02/2019
|
|
|
47
|
Narayanganj
|
20
|
narayanganj-s
|
198
|
291
|
NCC2-02
|
a) Re-habilitation of road & drain with link from lithi garmentsd to dhaka-Chittagong highway road vai london market & Nemai kaisari bazer by RCC in ward-03 Length 1582 & 8 nos.
Link road length:2796.0m Total Effective length4378.0m
|
|
11.39
|
|
|
1931.42
|
M/S Ratna Enterprise
|
1693.74
|
|
08/10/2017
|
08/11/2018
|
0
|
|
|
07/02/2019
|
|
|
48
|
Narayanganj
|
20
|
narayanganj-s
|
198
|
291
|
NCC2-01
|
a) Improvement of Bhasha Sainik Sarak by RCC with Footpath cum RCC drains in ward no-13 (Ch 0+00 to 0+400.00m),
b) Construction of CC road with RCC drain beside Paikpara Big Graveyard in ward no-17 & 18 (Ch 0+00 to 0+700.00m),
c)Construction of RCC road & Drain starting from Shantibag Stadium road near EURO Garments upto north line of Islam Nagar WAPDA canal in ward No:08 (Ch 0+00 to 0+ 615m ) .
|
|
4.13
|
|
|
711.25
|
MAM Construction Ltd
|
674.79
|
|
12/07/2017
|
30/11/2018
|
0
|
|
|
07/02/2019
|
|
|
49
|
Pabna
|
49
|
ishwardi
|
374
|
291
|
RpCC2-11
|
Construction of Bus Terminal at Bodorganj road Rangpur.
|
|
|
|
|
2868.64
|
PMPL-KSA JV
|
2581.77
|
|
06/09/2018
|
19/09/2018
|
0
|
|
|
07/02/2019
|
|
|
50
|
Pabna
|
49
|
ishwardi
|
374
|
291
|
RpCC2-04
|
Construction of 4 nos production tube-well (PTW), 3 nos overhead tank including pump and 50km distribution line in different places of Rangpur City Corporation
|
|
50.00
|
|
|
1882.66
|
M/S MT & SS Construction
|
1876.92
|
|
03/09/2018
|
13/09/2019
|
0
|
|
|
07/02/2019
|
|
|
51
|
Pabna
|
49
|
ishwardi
|
374
|
291
|
RpCC2-02
|
Replacement of 12.50km Old Asbestos/ MS Water Supply Pipe line from Medical Moure to Mahigonj and Construction of 6 nos production tube-well (PTW) including pump house, pump and 32.0 km distribution line at different places of Rangpur City Corporations.
|
|
44.50
|
|
|
1506.22
|
FSL-TCEL JV
|
1414.69
|
|
06/09/2018
|
19/09/2019
|
0
|
|
|
07/02/2019
|
|
|
52
|
Pabna
|
49
|
ishwardi
|
374
|
291
|
RpCC2-25
|
a)Contruction of drain beside Nilkantha road.(Ch 0- 2.1 km.)
b)Contruction of drain starting from behind of Kotwali thana to Mulatol Madrasha. (Ch 0- 0.7 km.)
c)Contruction of drain beside Babukha Shantipara (Hindupara) road side drain.(Ch 0- 1.0 km.)
d)Contruction of drain beside Dhopapotty road & Beltola road.(Ch 0- 0.8 km)
|
|
2.50
|
|
|
590.90
|
Rafiq constructionco(pvt)Ltd-Ujjal Kumar Dey
|
584.02
|
|
21/03/2018
|
31/03/2019
|
0
|
|
|
07/02/2019
|
|
|
53
|
Pabna
|
49
|
ishwardi
|
374
|
291
|
RpCC2-24
|
a)Contruction of drain from Satgara Mistrypara road. (Ch 0- 2.1 km.)
b)Contruction of drain beside Nisbetgonj road.(Ch 0- 2.2 km.)
c)Contruction of drain Beside Salema Khatun road. Ch 0- 1.2 km.)
|
|
5.07
|
|
|
954.40
|
Rafiq constructionco(pvt)Ltd-Ujjal Kumar Dey
|
909.76
|
|
21/03/2018
|
31/03/2019
|
0
|
|
|
07/02/2019
|
|
|
54
|
Pabna
|
49
|
ishwardi
|
374
|
291
|
RpCC2-23
|
a)Contruction of drain from Satgara H/O Shaheen to Satgara Madrasa. (Ch 0- 2100 m.)
b)Contruction of drain from Purba Vogi H/O Shahider to Nengrar more. (Ch 0- 3.61m.)
|
|
4.32
|
|
|
756.45
|
Shamsurjaman& Shajahan Ali( JV)
|
680.79
|
|
20/06/2017
|
23/08/2018
|
0
|
|
|
07/02/2019
|
|
|
55
|
Pabna
|
49
|
ishwardi
|
374
|
291
|
RpCC2-22
|
a) Contruction of drain (RCC/Brick/Pipe) besideIslambug internal road. (Ch 0- 2693mm.)
b) Contruction of drain (RCC/Brick/Pipe) from Satgara Kamil Madrasa to MP Checkpost.(Ch 0- 2027m)
|
|
2.90
|
|
|
817.94
|
Md.Khairul Kabir Rana
|
874.53
|
|
10/10/2017
|
09/10/2018
|
0
|
|
|
07/02/2019
|
|
|
56
|
Pabna
|
49
|
ishwardi
|
374
|
291
|
RpCC2-21
|
a)Contructiont of drain (RCC/Brick/Pipe) from Modern more Dimond Hotel to R.K road Shutki Godown.(Ch 0- 1230 m.)
b)Contruction of drain (RCC/Brick/Pipe) from Dhap 4 storied Mosque to Lakuthi more to Checkpost to Lalkuthi School.(Ch 0- 1133m.)
c)Contruction of drain (RCC/Brick/Pipe) from Dhap Police Fari to Sena auditorium & link Ridom clinic & H/O Ratan.(Ch 0- 995 m.)
|
|
3.26
|
|
|
516.21
|
SA & ME (JV)
|
452.35
|
|
20/07/2017
|
19/07/2018
|
0
|
|
|
07/02/2019
|
|
|
57
|
Pabna
|
49
|
ishwardi
|
374
|
291
|
RpCC2-20
|
a)Contruction of drain from Lalbag to Darshan more & Link Ch 0- 3.00 km. b)Contruction of drain (RCC/Brick/Pipe) from central Bus stand to Barobari hat road.( Ch 0- 4.0 km)
|
|
9.10
|
|
|
1234.85
|
Kobir Hossain
|
1100.65
|
|
11/04/2017
|
15/06/2018
|
0
|
|
|
07/02/2019
|
|
|
58
|
Pabna
|
49
|
ishwardi
|
374
|
291
|
RpCC2-19
|
a) Contruction of drain (RCC/Brick/Pipe) beside Keranipara Kakina Kuthi road.(Ch 0- 815 m.)
b) Contruction of drain (RCC/Brick/Pipe) from Burirhat road Pakar matha to East side of Shakati Bridge.(Ch 0- 589 m.)
c) Contruction of drain (RCC/Brick/Pipe) from old Desh Clinic to Gonganath road.(Ch 0- 583 m.)
|
|
4.29
|
|
|
533.89
|
Khan &Sons and M/S enterprise Ltd Jv
|
485.02
|
|
11/03/2017
|
15/06/2018
|
0
|
|
|
07/02/2019
|
|
|
59
|
Pabna
|
49
|
ishwardi
|
374
|
291
|
RpCC2-18
|
a) Contruction of drain (RCC/Brick/Pipe) from Textile more to Nisbetgonj Mosque Ghaghot River.( Ch 0-2800 m.)
b) Contruction of drain (RCC/Brick/Pipe) from 2 no MP Checkpost to Misbetgonj road via H/O sujit.(Ch 0- 1200 m.)
c) Contruction of drain (RCC/Brick/Pipe) beside Dewanbari road.(Ch 0- 2622 m.)
|
|
6.62
|
|
|
1282.85
|
Kobir Hossain
|
1163.64
|
|
11/03/2017
|
15/06/2018
|
0
|
|
|
07/02/2019
|
|
|
60
|
Pabna
|
49
|
ishwardi
|
374
|
291
|
RpCC2-17
|
Contruction of drain (RCC/Brick/Pipe) from Central Bus Terminal to Ghaghot River.( Ch 0- 3170m)
|
|
3.17
|
|
|
869.70
|
Alamgir Jahan
|
790.06
|
|
30/03/2017
|
11/08/2018
|
0
|
|
|
07/02/2019
|
|
|
61
|
Pabna
|
49
|
ishwardi
|
374
|
291
|
RpCC2-16
|
a) Contruction of drain (RCC/Brick/Pipe) from Kellabond Mosque to Uttam School via Juenalist Mounul Islam & link Shop of Azam. (Ch 0- 1633 m.)
b) Contruction of drain (RCC/Brick/Pipe) from Hazipara more to BDR drain via ex Councillor Nur mohammad House & link Aftab School.( Ch 0- 1260m.)
|
|
4.17
|
|
|
542.02
|
Abul Hossain
|
503.28
|
|
30/03/2017
|
23/08/2018
|
0
|
|
|
07/02/2019
|
|
|
62
|
Pabna
|
49
|
ishwardi
|
374
|
291
|
RpCC2-15
|
a) Contruction of drain (RCC/Brick/Pipe) from H/O Moti to Chowrapara Fuel Station to Kellabond Sluice Gate via CO bazar & Connecting Drain back side of Upazilla Office(Ch 0- 2160 m.)
b) Contruction of drain (RCC/Brick/Pipe) from H/O ex Councillor Nurul Haque to BCIC road & beside BCIC road & Link.( Ch 0- 809 m.)
|
|
4.61
|
|
|
768.51
|
Khairul-Ujjal-Rej(JV)
|
701.35
|
|
03/04/2017
|
30/08/2018
|
0
|
|
|
07/02/2019
|
|
|
63
|
Pabna
|
49
|
ishwardi
|
374
|
291
|
RpCC2-14
|
Construction of 25 m span Bridge over K.D canal at Angur Mia.
|
|
|
|
|
294.11
|
Alamgir Jahan
|
232.57
|
|
30/03/2017
|
09/08/2018
|
0
|
|
|
07/02/2019
|
|
|
64
|
Pabna
|
49
|
ishwardi
|
374
|
291
|
RpCC2-12
|
a) Improvement of Charcit house road bylane Ch 0-647m.
b) Improvement of road from Betpotty to kamarpara to Abohway office & Link. ch0.0-2900m
c) Rehabilitation and widenning of Dhap old Desh Clinic to Gonganath road by BC. Ch 0-576m.
d) Rehabilitation and widenning of Jummapara Fokir Mohammad road by BC. Ch 0-946m.
e) Rehabilitation and widenning of Jummapara Mosque to Jummapara Pakar Matha road by BC. Ch 0-1080m.
|
|
8.03
|
|
|
421.23
|
Md. Ayub Hossain
|
334.47
|
|
26/09/2017
|
25/09/2018
|
0
|
|
|
07/02/2019
|
|
|
65
|
Pabna
|
49
|
ishwardi
|
374
|
291
|
RpCC2-10
|
b)Improvement of road by BC from H/O azizer Driver to Shop of Babu. Ch 0- 827m.
c)Improvement of Monoharpur road & bylane by BC. Ch 0- 1342m. d)Improvement of Darshan road bylane from Bothtola to Gofurer Bazzar to H/O Ashraf to H/O Mokhless Ch 0-3745m
e)Rehabitation of Bhurarghat road by BC.Ch 0- 1778m.
|
|
7.69
|
|
|
691.68
|
SMAH-JC-GME(JV)
|
617.67
|
|
26/09/2017
|
25/09/2018
|
0
|
|
|
07/02/2019
|
|
|
66
|
Pabna
|
49
|
ishwardi
|
374
|
291
|
RpCC2-09
|
a) Improvementt of benglar para road from chadcuty halipad up to benglar para.ch0-2.955km.b) Improvement of shahapara road from girls schoolmore up to chilmon H/O Anamul Islam & link Road. ch 0.0-1708m c)Improvement of Bara Bazar road & bylane.Ch 0- 2795.0 m
|
|
7.46
|
|
|
792.25
|
M.Shahjahan Ali
|
724.08
|
|
20/06/2017
|
19/06/2018
|
0
|
|
|
07/02/2019
|
|
|
67
|
Pabna
|
49
|
ishwardi
|
374
|
291
|
RpCC2-08
|
a)Improvementt of road from Vatiatary road Mohabbat Kha Govt. Primary School to Fulamer more..Ch 0- 2174m
b) Improvement of road from Uttamkuthi road Tapodhan UP road to Chilmon Chowrasta Bazar..Ch 0- 1166 m.
c) Improvementtof road from Chandkuthi road to Hazir Bazar via Bodhukamla..Ch 0- 2741 m.
d)Improvementt of road from Mohabbat kha School to Ful Amartol..Ch 0- 1675 m
|
|
7.76
|
|
|
872.03
|
M. Shajahan Ali
|
797.14
|
|
20/06/2017
|
19/06/2018
|
0
|
|
|
07/02/2019
|
|
|
68
|
Pabna
|
49
|
ishwardi
|
374
|
291
|
RpCC2-07
|
a)Improvement of Chandkuthi road from H/O Bidhu master to shop of Lablu ch00.0-1105 & Chandkuthi halipad site Mohabbadkha H/O Advocate ch00.0-1564m b)Improvement of Topadhan UP road by lane Shakpara road Horirammol Boksha GPS ch00.00-2182.Topadhan Mobbatkha school shakpara ch00.0-1721m. Chowrahat shakpara ch00.0-1638m
|
|
8.21
|
|
|
967.90
|
M/S Shohid Brothers.
|
874.69
|
|
20/06/2017
|
29/07/2018
|
0
|
|
|
07/02/2019
|
|
|
69
|
Pabna
|
49
|
ishwardi
|
374
|
291
|
RpCC2-06
|
Improvement of road by RCC from Harail to Burail. Ch 0- 1483m.
|
|
1.49
|
|
|
220.21
|
S.M Shafiqul Alam
|
163.12
|
|
20/07/2017
|
19/07/2018
|
0
|
|
|
07/02/2019
|
|
|
70
|
Pabna
|
49
|
ishwardi
|
374
|
291
|
RpCC2-05
|
Improvement of road by BC from Benughat to 2 no ward Pucca road. Ch 0- 8247 m
|
|
8.25
|
|
|
1303.69
|
M/S Shohid Brothers
|
1163.15
|
|
24/06/2017
|
17/11/2018
|
0
|
|
|
07/02/2019
|
|
|
71
|
Pabna
|
49
|
ishwardi
|
374
|
291
|
RpCC2-03
|
a)Improvement of road by BC from Burirhat road to Monohar road.Ch 0- 2.9 km.
b)Improvementof road by BC from Burirhat road Kellbond Kachari to H/O Azizer.Ch 0- 1.3 km.
c)Improvement of road by BC from Bala Komor Saraker par to Kaiagoli School more. Ch 0- 1.90 km.
d)Improvement of road By Muktizandha H/O Abdul Gofur to Barogharia Dakhil Madrasha. e)Improvement of road By Burirhat Muntu Mill Bazzar to Goalu H/O Kader Chairman . f)Improvement of road Rangpur-Dinajpur road to Uttam East para Baytul Aman Jame Mosque.
g)Improvement of road Madha Oviram H/O Jamal to Oviram Central Jame Mosque.
|
|
11.71
|
|
|
1303.68
|
Rafiq constructionco(pvt)Ltd-Ujjal Kumar Dey
|
1204.58
|
|
28/02/2018
|
10/03/2019
|
0
|
|
|
07/02/2019
|
|
|
72
|
Pabna
|
49
|
ishwardi
|
374
|
291
|
RpCC2-01
|
a) Improvementof road By BC from Ranachandi Sheikhpara to Hazir Hat. Ch 0- 1602m, link-1 ch0.0-956m & link-2 ch0.0-653m
b) Improvementof road by BC from South side of Uttam Boshunia Jame Mosque to H/O Alam to Bashunia para 2nd Jame Mosque to H/O Nurul Hazi to H/O yasin.Ch 0- 939m.
d) Rehabilitation of kutir para road from G.L roy road to Mondal para road.ch.00-905m, link-1 ch00.0-490m. e) Rehabilition of gorapir mazar road to Robertsongong(IRP) choo-1041m, link-1 352m. f)Rehabilitation of Mouvhasa (Mobaser) road. ch0.0-1342 m, link-1 ch.00-674m , link-2 ch.00-297m. g)Improvement of road Moladevpur to robertsongong connection road ch.o-698m
|
|
10.30
|
|
|
837.95
|
Md. Khairul Kabir Rana
|
896.39
|
|
10/10/2017
|
10/09/2018
|
0
|
|
|
07/02/2019
|
|