Important Rural Infrastructure Development Project: Bhola District (BDIRIDP)

Serial District Name District Code/ID Upazila Name Upazila Code/ID Project ID Package No Scheme Name Road ID Length of Scheme(Km) - Road Length of Scheme(m) - Bridge/Culverts Building Quantity Estimated Amount(LAC) Contractor Name Contract Amount(LAC) Date of Contract (DD/MM/YYYY) Date of commencement (DD/MM/YYYY) Date of Completion (DD/MM/YYYY) Physical Progress(%) Financial Progress (Amount) (LAC) Financial Progress(%) Date of Progress Update (DD/MM/YYYY) Remarks
1 Bhola 4 bhola-s 4 752 llp ff 23.00 0.00 80 06/01/2021
2 Bhola 4 bhola-s 4 752 SA/M-08 A. Maintenance of Alia Madrasha - Kheya ghat (Babul Molla Bridge ) road at Ch.00-680.0mm Road ID- 509184008 (BC Pavement Length 680m) B. Construction of Palisading Work on Alia Madrasha - Kheya ghat (Babul Molla Bridge ) road at Ch. 120-140m L/S (Pound), 360-370m L/S (Pound). Road ID- 509184008 (Length- 210m). C. Construction of (0.75m x 0.75m) RCC Box Culvert on Alia Madrasha - Kheya ghat (Babul Molla Bridge ) road at Ch-57.00m . Road ID- 509184008 509184008 0.68 0.75 2079085.00 Kabir & Brothers, 4 Free School Street, Hatirpool, Dhaka. 2076951.06 05/07/2017 12/07/2017 04/07/2018 100 2075963.00 100 05/03/2019
3 Bhola 4 bhola-s 4 752 SA/M- 293 (A) Maintenance (Site Widening) of RHD (Howlader Hat) - Mukti Camp Road at Ch. 00-1980.0m under Bhola Sadar Upazila. Road ID 509184093 (B) Maintenance (Overly) of Ponditer hat - Wapda (West) Berry Bandth Road. at Ch. 00-1400.0m under Bhola Sadar Upazila. Road ID 509185044 4.00 162.83   0.00 0 31/12/2018  
4 Bhola 4 bhola-s 4 752 SA/M- 292 Maintenance (Site Widening) of Shibpur - Charpata via Ratanpur Satalight School Road. at Ch. 00-3146.0m under Bhola Sadar Upazila. Road ID 509185083 3.00 123.93   0.00 0 31/12/2018  
5 Bhola 4 bhola-s 4 752 SA/M- 291 (A) Maintenance (Overly) of D.C road to Manik Mia Bari via Katalia Howlader Bari Road Under 7 No- Sibpur Union. at Ch. 00-1500.0m under Bhola Sadar Upazila. Road ID 509185101,(B) Maintenance (Re-Seal) of Shibpur Paccar Matha Hossen Sarder Bari Mosque Road. at Ch. 00-1456.0m under Bhola Sadar Upazila. Road ID 509185045,(C) Maintenance (Overly) of Shibpur DC road-Manike mia bari-shibpur chow muhaie at Ch. 00-1800.0m under Bhola Sadar Upazila. Road ID 509185033 5.00 132.55   0.00 0 31/12/2018  
6 Bhola 4 bhola-s 4 752 SA/M/SE-24 Surface Enhancement of Bhola Bhola kheya ghat-Kalinath bazar-Dorgar road-Bypass-Ponditer pool-Gozaria GC road at CH- 00-4030.00m Road ID- 509182010 4.00 133.49   0.00 0 31/12/2018  
7 Bhola 4 bhola-s 4 752 SA/STR-283 Construction of (3.0x4.50x4.50m) (W-5.50m 3 Vent) RCC Box Culvert on RHD (Howladar Hat) –Mukti Camp road at CH- 1120.00m Under Bhola Sadar , Upazila Dist Bhola. Road ID 509184093 61.34   0.00 0 31/12/2018  
8 Bhola 4 bhola-s 4 752 SA/STR-258 Construction of 44m Long RCC Girder Bridge on Bankerhat GC – Lahar hat RHD via Char Chatkimara (Bhola Sadar Portion) at Ch.4750.00m under Sadar Upazila. Dist, Bhola (509182017) 363.75   0.00 0 31/12/2018  
9 Bhola 4 bhola-s 4 752 SA/STR-257 Construction of 44m Long RCC Girder Bridge on Bankerhat GC – Lahar hat RHD via Char Chatkimara (Bhola Sadar Portion) at Ch.4557.00m under Sadar Upazila. Dist, Bhola (509182017) 362.96   0.00 0 31/12/2018  
10 Bhola 4 bhola-s 4 752 SA/STR-256 Construction of 52m Long RCC Girder Bridge on Banker hat GC – Lahar hat RHD via Char Chatkimara ( Bhola Sadar Portion) at Ch.3961.00 m under Sadar Upazila. Dist, Bhola (509182017) 369.99   0.00 0 31/12/2018  
11 Bhola 4 bhola-s 4 752 SA/STR-255 Construction of 34m Long RCC Girder Bridge on Banker hat GC – Lahar hat RHD via Char Chatkimara (Bhola Sadar Portion) at Ch.19.00 m under Sadar Upazila. Dist, Bhola (509182017) 333.32 M/S Samata Enterprise, Bhola Sadar, Bhola . 0.00 0 31/12/2018  
12 Bhola 4 bhola-s 4 752 SA/STR-252 Construction of 44.0m RCC Girder Bridge on Velumia Bazar (UPC) - Sharif Khan Bazar – Bauphal Lunch Ghat Road Under Velumia UP at CH- 4200.0m Road ID 509183008 364.53 M/S Priyonti Construction, Holding No-1409, Gazipur road, Bhola. 356.21 0 31/12/2018  
13 Bhola 4 bhola-s 4 752 SA/R-251 (A) (1) Improvement of Pairkhan road-jonpure Mirsaheb EIDgha-colghat road (Hawladar Bari-Bodi Doctor Bari-Mokhu Kha Bari) at Ch. 00-1065m under Bapta UP. (Effective Length-1065.0m) Road ID 509185080 (2) Construction of Palisading Work on the Same road (Effective Length-281.00m) (3) Construction of 3 no RCC (1.50m x 1.50m) Box Culvert on the Same road at CH- 30m, 102m & 800m (4) Construction of 3 no RCC (0.75x0.75) Box Culvert on the Same road at CH- 30/102/800 (B) Constrcution of (2x4.0x4.0) (W-5.50) on Bhola-Gazaria GC road under Alinagar UP from CH- 00.0m Road ID 509182015 (C) (1) Improvement ( Side Widening) of Kabi Mozzmel Hoque Bari - Tobgi Road. under Bapta UP at CH- 00-2400.0m (Effective Length- 2400.0m) Road ID 509184005 (2) Construction of 4 no RCC (1.50 x 1.50m) Box Culvert on the Same road at CH- 800m, 945m, 1390m &1500m (3) Construction of 4 no RCC (0.750x0.750m) Box Culvert on the Same road at CH- 290m, 510m, 1691m & 1800m (D) (1) Improvement of ( Side Widening) Mazir hat - Taker hat Road. Ch.00m-3130.0m under Veduria UP. Road ID 509184045 (2) Construction of 2 no RCC (1.50x1.50m) Box Culvert on the Same road at CH- 1110/1340.0m 7.00 474.03 M/S Sayem Enterprise,Kalinath Bazar, Bhola Sadar, Bhola 474.00 0 31/12/2018  
14 Bhola 4 bhola-s 4 752 SA/R-250 (A) (1) Improvement of ( Side Widening) Purbo Ilisha UP RHD Tultuli-Sudurchar khal (Bridge) via Kali bayati bari road from ch: 00-1800m. (Effecetive Length - 1800.0m ) Road ID 509185135 (Old) 509185146 (New) (2) Construction of 3 no RCC (1..50 x 1.50m) Box Culvert on the Same road at CH- 440m, 600m & 1224m (B) (1) Improvement ( Side Widening) of Dania Up - Bekego Bari Very Bath Road(Site Widing) at Ch. 00-1500m under Dhani UP (Effective Length- 1500.0m) Road ID 509185154 (2) Construction of 2 no RCC (0.750x0.750m) Box Culvert on the Same road at CH- 433.0m & 1400.0m (C) (1) Improvement of ( Side Widening) Shibpur Salauddin dokan-Abdul Hoque bari road at CH- 00-1100.0m (Effective Length - 1100.0m ) Road ID 509185217 (2) Construction of 2 no RCC (1.50 x 1.50m) Box Culvert on the Same road at CH- 1250m & 1450.0m 4.00 324.29 Md. Zakir Hossain,Masum Khanam Road,Bhola 328.99 0 31/12/2018  
15 Bhola 4 bhola-s 4 752 SA/R-249 (A) (1) Improvement by HBB of Babul Molla Bridge Road - Malkanda – Bhola Kheya ghat Road. at Ch. 1000-1935.0m under Paschim Ilisha UP. ( Effective Length- 935.0m) Road ID 5090184084 (2) Construction of 2 no RCC (1.50 x 1.50m ) Box Culvert on the Same road at CH- 1110.0m & 1340.0m (B) (1) Improvement of Ilisha UP R&H to Shantir hat WAPDA Very bandh road Ilisha UP raod at CH- 850-1850m.( Effective Length-1000.0m) Raod ID 509184031 (2) Construction of Palisading Work on the Same road (Effective Length-290.00m) (3) Construction of 3 no RCC (1.50x1.50) Box Culvert on the Same road at CH- 928m, 1100m, & 1310m (4) Construction of 2 no RCC (0.75x0.75) Box Culvert on the Same road at CH- 1540m & 1605m (C) Improvement ( Side Widening) of Bhola Parangonj – Pangashia FRB road to Talukder Char Bridge via Guptamunshi – Char Algi – Talukder hat Road. Ch.00m-2850.0m under East Ilisha UP.( Effective Length-2850.0m) Raod ID 509185108 5.00 346.74 Nabarun Traders Limited Khaier Hat, Borhanuddin, Bhola 350.05 0 31/12/2018  
16 Bhola 4 bhola-s 4 752 SA/R-248 (A) (1) Improvement by HBB of Banker hat GC – Lahar hat RHD via Char Chatkimara ( Bhola Sadar Portion) Road. Ch 00-480 & .2450-4550.00m under Veduria UP. (HBB Road, Effective Length -2580m) Road ID – 509182017 (2) Construction of 3 no RCC (2.0m x 2.0m) Box Culvert on the Same road at CH- 2850m, 3225m & 3580m (B) (1) Improvement of Ilisha RHD-sonadugi Mosque(Sogirer Dokan South East Ilisha - Mosraf Hossain Rari Bari-Ilih RHD) Ch.00m-1610.00m under East Ilisha UP (Effective Length - 1610.0m) Road ID – 509184046 (2) Construction of Palisading Work on the Same road at CH- 150-1590.0 m (Effective Length-453.00m) (3) Construction of 6 no RCC (1.50m x 1.50m) Box Culvert on the Same road at CH- 270m, 400m, 587m, 722m, 1087m & 1520m(4) Construction of 6 no RCC (0.750 x 0.750) Box Culvert on the Same road at CH- 672m, 762m, 987m, 1144m, 1210m, & 1373m. (5) Construction of RCC (2x4.50x4.50) Box Culvert on the Same road at CH- 985m. 10.00 480.65   480.62 0 31/12/2018  
17 Bhola 4 bhola-s 4 752 SA/M- 282 Maintenance work of Bhola-Charfassion RHD(Mollah bari)-Gazaria GC via Shahid Salam high school Road at CH- 00-2750.0m Road ID 509182016 (Effective Length- 2750.0m) 2.00 120.98   0.00 0 31/12/2018  
18 Bhola 4 bhola-s 4 752 SA/M- 281 Maintenance work of Bhola-Charfassion RHD (Mollah bari)-Gazaria GC via Shahid Salam high school Road at CH- 2750-4880.0m Road ID 509182016 (Effective Length- 2130.0m) 3.00 166.01 M/S Eli Enterprise, Sadar Raod Bhola 0.00 0 31/12/2018  
19 Bhola 4 bhola-s 4 752 SA/M- 270 Maintenance work of Shibpur Santir Hat Madrasha -Alauddin Mazi Bari- Harun Mazi bari(Madua Up Border) Road from Ch.00-1500m under Bhola Sadar Upazila (509185174) Maintenance work of Degir parar Mosque- Mazer Bari- Rokeya Pry. School Road from Ch.00-1400m under Bhola Sadar Upazila (509185170) Maintenance work of Algi Te Maiha-Nasir Majhi Madrasha Road from Ch. 00-1760m under Bhola Sadar Upazila (509185009) 6.00 159.52 Md. Bahlul Karim, RHD Bhola Sadar, Bhola.. 159.50 0 31/12/2018  
20 Bhola 4 bhola-s 4 752 SA/M- 269 Maintenance work of Hazir hat-Porir hat Road from Ch.00-1765m under Bhola Sadar Upazila (509184062) Maintenance work of Agarpole-Muslime para-Abu doctor bari Road from Ch.00-350m under Bhola Sadar Upazila (509185091) Maintenance work of Shibpur (dak bangla)-al-haz jalal ahmed school Road from Ch.00-1310m under Bhola Sadar Upazila (509185221) 3.00 124.22 M/S Prince Enterprise, Collage Road, Poura Kathali, Bhola. 124.18 0 31/12/2018  
21 Bhola 4 bhola-s 4 752 SA/M- 268 Maintenance work of Char Gazi Bazar- Hatem Ali Reg Pry. School - Helal Member Bari Road from Ch. 00-2300m under Bhola Sadar Upazila (509185168) 2.00 142.59 M/S Eli Enterprise, Sadar Raod Bhola.. 142.55 0 31/12/2018  
22 Bhola 4 bhola-s 4 752 SA/M- 267 Maintenance work of Agor pole road-Altazer Rahaman college Road from Ch.00-1770m under Bhola Sadar Upazila (509184050) Maintenance work of Ukil Bari-Chachra school Payer khan Road from Ch. 00-1280m under Bhola Sadar Upazila (509184028) 3.00 147.27 Md. Bahlul Karim, RHD Bhola Sadar, Bhola. 147.23 0 31/12/2018  
23 Bhola 4 bhola-s 4 752 SA/M- 266 Maintenance work of bapta Burir Mosque to Weast Piar khan Road from Ch.00-2110m under Bhola Sadar Upazila (509184024) 2.00 114.77 M/S Shad Jahan Enterprise, South Charnoabadh Bhola Sadar, Bhola. 114.75 0 31/12/2018  
24 Bhola 4 bhola-s 4 752 SA/M- 265 Maintenance work of Kheyaghat bridge-shere Bangla RPS-Nazir Majee khayghat Road from Ch.00-4700m under Bhola Sadar Upazila (509184044) 5.00 189.41 M/S Eli Enterprise, Sadar Raod Bhola 189.39 0 31/12/2018  
25 Bhola 4 bhola-s 4 752 SA/M- 264 Maintenance work of Bhola-Ilisha RHD (Mohajan bari)-Tulatali via porir hat Road from Ch.00m-2500m under Bhola Sadar Upazila (509184069) 3.00 145.83 M/S Ruhul Amin, Amin Villa, Muslim Para Bhola Sadar, Bhola. 145.81 0 31/12/2018  
26 Bhola 4 bhola-s 4 752 SA/M- 263 Maintenance work of Charkali-Majeer hat Road from Ch. 00-3140m under Bhola Sadar Upazila (509184042) 3.00 147.97   147.89 0 31/12/2018  
27 Bhola 4 bhola-s 4 752 SA/M- 262 Maintenance work of Charkali-Luzarhat-natun hat-Nazirmazi kheyaghat Road from Ch. 00m-4600m under Bhola Sadar Upazila (509184049) 5.00 233.19 Salahuddin Lincon, Kalibari Road, Bhola Sadar, Bhola. 0.00 0 31/12/2018  
28 Bhola 4 bhola-s 4 752 SA/M-26 Maintenance of Teli bari (Nabipur)-Giringi bazar. (Site Wading) at Ch. 00-1790.0m (Length- 1790.0m) Road ID- 509184016 Construction of Palisading work on Teli bari (Nabipur)-Giringi bazar. (Site Wading) at Ch. 10-24m LS, 117-132 LS, 195-206 LS, 402-408 RS, 746-774 RS, 1211-1245 LS, 1260-1287 BS, 1503-1515 RS, 1660-1675 RS. (Length- 189.0m) Construction of 2 no Cross Drain on Teli bari (Nabipur)-Giringi bazar. (Site Wading) at Ch. 570m & 1270m 2.00 53.64 Salahuddin Lincon, Kali bari Road, Bhola Sadar, Bhola 52.82 25/10/2017 17/07/2018 100 31/12/2018 Final Bill Payment
29 Bhola 4 bhola-s 4 752 SA/R-96 Improvement of Maler hat Rice Mill - Bokshi Bari – Rastermatha Bridge Connecting Road. Ch.1000m-2000m under East Ilisha UP (Length- 1000m. Road ID- 509185123) Construction of Palisading Work on Maler hat Rice Mill - Bokshi Bari – Rastermatha Bridge Connecting Road. at CH- 1190-1205m R/S, 1920-1970m R/S (Length- 65m) Construction of 2 no (0.75m x 0.75m) RCC Box Culvert on Maler hat Rice Mill - Bokshi Bari – Rastermatha Bridge Connecting Road.at CH- 1600m & 1920m Construction of 2 vent (3m x 3m) RCC Box Culvert on Maler hat Rice Mill - Bokshi Bari – Rastermatha Bridge Connecting Road.at CH- 1390m 1.00 95.72 Nabarun Traders Limited and H.L Corporation JV House#18/7, Basiruddin Road, Kalabagan, Dhaka 95.69 22/01/2018 21/01/2018 100 31/12/2018 Final Bill Payment
30 Bhola 4 bhola-s 4 752 SA/R-100 Improvement of Sadur char gangaliar hat-norona road via Dulamiar bari road at Ch. 00-1850m (Length- 1850m. Road ID- 509184053) Construction of Palisading Work on Sadur char gangaliar hat-norona road via Dulamiar bari road. at CH- 40-60 RS, 270-300 RS, 320-400 RS, 500-530 LS, 550-580 LS, 600-635 LS, 640-670RS, 700-725 RS, 800-825 RS, 1030-1060RS, 1120-1150 LS, 1330-1360 LS, 1410-1480 LS, 1520-1540 RS, 1600-1620 LS (Length- 565.00m) Construction of 3 no (1.50m x1.50m) RCC Box Culvert on Sadur char gangaliar hat-norona road via Dulamiar bari road .at CH- 103m , 900m, 1350mConstruction of 3 no (0.75m x 0.75m) RCC Box Culvert on Sadur char gangaliar hat-norona road via Dulamiar bari road .at CH- 103m , 900m, 1350m Construction of (4.50m x 4.50m) RCC Box Culvert on Sadur char gangaliar hat-norona road via Dulamiar bari road .at CH- 1405m 2.00 214.20 Md. Zakir Hossain, 830, Sadar, Bhola 214.08 17/01/2019 16/01/2019 100 31/12/2018 Carpeting Completed
31 Bhola 4 bhola-s 4 752 SA/R-140 Improvement of Closser Berry Bandth – Annanda bazar (Hazipur School)-Mehendiganj Border road under Rajapur UP Road at Ch. 00-1620.0m (Road ID-509185178) (Length-1620.0m) Construction of Palisading work on Closser Berry Bandth – Annanda bazar (Hazipur School)-Mehendiganj Border road under Rajapur UP Road at Ch. 00-1620.0m (Length-227.0m) Construction of (1.50m x 1.50m) RCC Box Culvert on Closser Berry Bandth – Annanda bazar (Hazipur School)-Mehendiganj Border road under Rajapur UP Road at Ch. 380.0m 2.00 89.44 Md. Zakir Hossain, 830, Sadar, Bhola 89.40 31/01/2018 30/01/2019 100 31/12/2018 Final Bill Payment
32 Bhola 4 bhola-s 4 752 SA/R-124 Improvement of Tunu Chowdarir Bridge - Magedpur cyclone Shelter Road at Ch. at CH- 00-1100.0m (Road ID- 509185164) (Length- 1100.0m) Construction of Tunu Chowdarir Bridge - Magedpur cyclone Shelter Road at CH- (Length- 121.0m) Construction of (3 x 4.50m X 4.50m ) RCC Box Culvert on Tunu Chowdarir Bridge - Magedpur cyclone Shelter Road at CH- 105.0mConstruction of (1.50m X 1.50m) no Tunu Chowdarir Bridge - Magedpur cyclone Shelter Road at CH-645.0m Construction of 4 no (0.75m x 0.75m) no Tunu Chowdarir Bridge - Magedpur cyclone Shelter Road at CH-530m, 580m, 800m 1.00 131.17 Md. Zakir Hossain, 830, Sadar, Bhola 131.17 11/02/2018 10/02/2019 100 31/12/2018 final Bill Payment
33 Bhola 4 bhola-s 4 752 SA/R-121 Improvement of Valumiya Sahajan member bari-Gusso gram road via Ruhul Amin Miar bari road at CH- 00-1000.0m (Road ID- 509185222) (Length- 1000.0m) Construction of Palisading Work on Valumiya Sahajan member bari-Gusso gram road via Ruhul Amin Miar bari road at CH- (Length- 456.0m) Construction of (1.50m X 1.50m) RCC Box Culvert on Valumiya Sahajan member bari-Gusso gram road via Ruhul Amin Miar bari road at CH-440.0m Construction of (2.40m X 2.40m) no Valumiya Sahajan member bari-Gusso gram road via Ruhul Amin Miar bari road at CH-530.0m 1.00 111.12 Md. Zakir Hossain Masum khanam Road Bhola 111.12 31/01/2018 30/01/2019 60 31/12/2018 AS on going
34 Bhola 4 bhola-s 4 752 SA/R-01 A. Improvement of Velumia Bazar - Bisso Road - Hadis Faragir Mosques Road Ch.00m-1000m Road ID: 509185167 (BC Pavement). B. Construction of Palisading Work on Velumia Bazar - Bisso Road - Hadis Faragir Mosques Road at Ch.82-109m R/S, 188-200m R/S, 330-395m R/S, 485-500m L/S, 506-519m L/S, 859-875m L/S, 942-962m L/S. Road ID: 509185167 (Lenght168m). C. Construction of Cross Drain on Velumia Bazar - Bisso Road - Hadis Faragir Mosques Road Ch.596.00m. Road ID: 509185167 1.00 67.19 Md. Ruhul Amin, Amin Vila, Muslimpara, Bhola Sadar, Bhola. 67.13 25/06/2017 17/03/2018 100 31/12/2018 Final Bill Payment
35 Bhola 4 bhola-s 4 752 SA/R-49 Improvement of Char Samaiya Kalimuddin Chairman bari-Munshi bari road at ch- 00-870.00m Road ID 5509185232Construction of Palisading Work on Char Samaiya Kalimuddin Chairman bari-Munshi bari road at ch-7-32m BS, 197-210m BS, 720-746m RS, 839-855m LS (Total Length- 118.0m). Construction of (1.50mx1.50m) RCC Box Culvert on Char Samaiya Kalimuddin Chairman bari-Munshi bari road at ch- 303.0m Construction of 2 no RCC Cross Drain on Char Samaiya Kalimuddin Chairman bari-Munshi bari road at ch- 116& 770m 1.00 57.19 Md. Ruhul Amin, Amin Vila, Muslimpara, Bhola Sadar, Bhola. 57.16 16/10/2017 08/07/2018 100 31/12/2018 Final Bill Payment
36 Bhola 4 bhola-s 4 752 SA/M-10 A.Maintenance of Ponditer pole-Hassain member bari Berry Bandh Ekata Brick field road at CH-00-1660.0m Road ID- 509185031 (BC Pavement Length 1660m B. Construction of Palisading Work on Ponditer pole-Hassain member bari Berry Bandh Ekata Brick field road at CH- 82-92m R/S, 156-170 m L/S, 354-360 m R/S, 375-390 m R/S, 438-466 m R/S, 530-555 m R/S, 700-725 m L/S, 719-754 m R/S, 760-786 m L/S, 764-786 m R/S, 998-1009 m R/S, 1023-1087 m L/S, 1093-1115 m R/S, 1131-1145 m L/S, 1306-1316 m R/S, 1368-1378 m L/S, 1425-1470 m R/S, 1555-1571 m L/S. Road ID- 509185031 (Length- 398m). C. Construction of 3 no cross Drain on Ponditer Ponditer pole-Hassain member bari Berry Bandh Ekata Brick field road at CH- 750m, 768m & 1172m Road ID- 509185031 2.00 60.65 Md. Ruhul Amin, Amin Vila Muslimpara, Bhola Sadar Bhola. 60.45 12/07/2017 04/04/2018 100 31/12/2018 Final Bill Payment
37 Bhola 4 bhola-s 4 752 SA/R-41 Improvement of Shibpur - Montaz Bapari Bari – Dulal Bari Pusti Bari Road at CH- 00-750.00m (BC Pavement Length - 750m). Road ID- 509185219 Construction of Palisading Work on Shibpur - Montaz Bapari Bari – Dulal Bari Pusti Bari Road. at Ch. 8-40m LS, 96-107m LS, 372-387m LS, 402-412m RS, 447-462m LS, 558-573m LS. (Length- 98m). Construction of 6 no RCC Cross Drain on Shibpur - Montaz Bapari Bari – Dulal Bari Pusti Bari Road. at Ch.- 35m, 119m, 160m, 452m, 477m, 558m. 1.00 48.60 Md. Ruhul Amin, 8300, Sadar, Bhola 48.02 20/11/2017 12/05/2018 70 31/12/2018 WBM Completed
38 Bhola 4 bhola-s 4 752 SA/R-122 Improvement of Valumiya Sahajan member bari-Gusso gram road via Ruhul Amin Miar bari road at CH- 1000-2000.0m (Road ID- 509185222) (Length- 1000.0m) Construction of Palisading Work on Valumiya Sahajan member bari-Gusso gram road via Ruhul Amin Miar bari road at CH- (Length- 170.0m) Construction of (3 x 4.50m X 4.50m ) RCC Box Culvert on Valumiya Sahajan member bari-Gusso gram road via Ruhul Amin Miar bari road at CH-1102.0m Construction of (1.50m X 1.50m) no Valumiya Sahajan member bari-Gusso gram road via Ruhul Amin Miar bari road at CH-1500.0m 1.00 127.21 Md. Rubel Enterprise, Vaduria, Bhola Sadar, Bhola 127.17 26/04/2018 17/04/2019 0 31/12/2018  
39 Bhola 4 bhola-s 4 752 SA/R-158 Improvement of Charsamaya UP Office – Bapta Union Border via by pass Road. at Ch. 00-1900.00m (Length – 1900.0m) Road ID- 509184032Construction of Palisading Work on Charsamaya UP Office – Bapta Union Border via by pass Road. at Ch. 00-1900.00m (Effective Length – 806.0m) Construction of 2 no (1.50m x1.50m) RCC Box Culvert on Charsamaya UP Office – Bapta Union Border via by pass Road. at Ch. 905.0m & 1800.0m Construction of 3 no (0.750m x0.750m) RCC Box Culvert on Charsamaya UP Office – Bapta Union Border via by pass Road. at Ch. 1030.0m, 1620.0m & 1725.0m 2.00 168.72 Md. Nazrul Islam Chunnu, Ali nagar, Bhola Sadar, Bhola 168.60 17/04/2018 08/04/2019 80 31/12/2018 WBM on going
40 Bhola 4 bhola-s 4 752 SA/R-157 Improvement of Maler Hat Bridge to Rustom Ali Mia Brick Field Road at Ch. 00-1020.0m (Length – 1020.0m) Road ID -509185109Construction of Palisading Work on Maler Hat Bridge to Rustom Ali Mia Brick Field Road at Ch. 00-1020.0m (Effective Length – 508.00m) Construction of 2 no (0.750m x0.750m) RCC Box Culvert on Maler Hat Bridge to Rustom Ali Mia Brick Field Road at Ch. 206m & 766m 1.00 89.59 Md. Mohshin Nagar, 1 No. Woard, Bhola Sadar, Bhola 89.55 17/04/2018 08/04/2019 40 31/12/2018 AS on going
41 Bhola 4 bhola-s 4 752 SA/R-101 Improvement of Pangashia GC -Char Illisha Talukder GPS Road at Ch. 00-1400m (Length- 1400m. Road ID- 509185159) Construction of Palisading Work on Pangashia GC -Char Illisha Talukder GPS Road at Ch.- 5-30m BS,140-165M RS, 190-215M RS, 240-260M LS, 270-320M LS, 550-590M RS, 600-740M LS, 1000-1040M LS, 1070-1100M LS, 1230-1300M LS (Length- 465m) Construction of 3 no (1.50m X1.50m) RCC Box Culvert on Pangashia GC -Char Illisha Talukder GPS Road at Ch – 560m, 810m, & 980m Construction of 2 no (0.750m x0.750m) RCC Box Culvert on Barister Kachari-Purbo Berry Bandh road at CH- 134m & 920m 1.00 128.26 Md. Jamal Uddin Golder, 8300 Bhola Sadar, Bhola 127.99 31/01/2018 30/01/2019 100 31/12/2018 final Bill Payment
42 Bhola 4 bhola-s 4 752 SA/M-28 Maintenance of Dania Munaf Talukder Bari(Madrasha)- Bodi Ker Bari at Ch. 00-850.0m (Length-850.0m) Road ID- 509185155 Construction of Palisading work on Dania Munaf Talukder Bari(Madrasha)- Bodi Ker Bari at Ch. 100-125m L/S, 525-552m L/S, 580-603m L/S, 655-678m L/S, 770-805m L/S. & RS. (Length- 195.0m) 1.00 25.53 Md. Emdad Hossain, Office Para Bhola Sadar, Bhola. 25.48 18/10/2017 10/04/2018 100 31/12/2018 Final Bill Payment
43 Bhola 4 bhola-s 4 752 SA/M-165 Maintenance of Charsamaiya Shintar hat road-Notun hat-Nazimuddin Matobbor bari Road at Ch.00-1000m (Side Widing) & 1000-2270m (Effective Length – 2270.00m) Road ID - 509185213 Construction of 3 no’s (1.50m x1.50m) RCC Box Culvert at Ch.- 490m, 745m, 1700m & 1 no (0.750m x 0.750m) RCC Box Culvert at Ch.- 1966.0m on the same road. 2.00 84.94 Md. Bahalul Karim, 8300, Sadar Road Bhola. 84.90 10/04/2018 02/10/2018 100 31/12/2018 Final Bill Payment
44 Bhola 4 bhola-s 4 752 SA/M-25 Maintenance of Ilisha RHD ( Pulesher Dokan )- Chowdagor Road at CH- 00-1170m (Length – 1170.0m) road ID - 509185143 Construction of Palisading work on Ilisha RHD ( Pulesher Dokan )- Chowdagor Road at CH-44-64m RS, 250-281 RS, 472-479 RS, 686-700 RS, 852-862 RS, 972-979 LS, 1035-1048 RS, 1077-1106 RS, 1132-1142 RS. (Length – 141.0m) 1.00 45.28 M/s. Maa Enterprise, Bangla Bazar,Fatema Khanam College Gate, Bhola 45.28 18/10/2017 10/04/2018 100 31/12/2018 Final Bill Payment
45 Bhola 4 bhola-s 4 752 SA/R-97 Improvement of Bheduria Mesturi Bari pole - Fajlu Gharani Bari via Madday Bheduria RNGPs Road Ch.00m-2000m (Length- 2000m. Road ID- 509185149) Palisading Work (Effective Length – 695.0m) on the same road. Construction of 5 no (1.50m x 1.50m ) RCC Box Culvert on the same road at CH- 617.0m, 1126.0m, 1532.0m 1785.0m & 1950.0m Construction of 4 no (0.625m x 0.625m) RCC U Drain on the same road at CH- 617.0m, 1126.0m, 1532.0m 1785.0m & 1950.0m312.0m, 518.0m 980.0m & 1650.0m 2.00 206.33 M/S Zakir Hossain, 830 Bhola Sadar, Bhola. 206.12 31/01/2019 0 31/12/2018  
46 Bhola 4 bhola-s 4 752 SA/R-28 Improvement of Barisal RHD- Ilisha RNGPS-kalu Boati Road. at Ch.00-1500.0m (BC Pavement Length -1500m). Road ID-509185116 Construction of Palisading Work on Barisal RHD- Ilisha RNGPS-kalu Boati Road.. at Ch. 14-44m B/S, 184-227m L/S, 368-423m L/S, 440-460m R/S, 690-720m B/S, 760-785m L/S, 1020-1050m L/S, 1050-1075m, L/S, 1170-1190m L/S, 1420-1470m, L/S. (Length- 348.0m). Road ID-509185116 Construction of 2 nos (1.50m x 1.50m) (With-5.50m) RCC Box Culvert on Barisal RHD- Ilisha RNGPS-kalu Boati Road. at CH- 890m, & 1220m. Construction of 3 nos (.750m x .750m) RCC Box Culvert on Barisal RHD- Ilisha RNGPS-kalu Boati Road. at CH- 960m, 1125m, & 1375m. 2.00 105.11 M/S Tublu Enterprise, Barishal Sadar, Barishal 105.10 05/10/2017 27/09/2018 100 31/12/2018 final Bill Payment
47 Bhola 4 bhola-s 4 752 SA/STR-106 Constrcution of 2 vent 3.00m x 3.00m RCC box culvert on Bapta Mushkandi Peyar khan road near East side of Manik Dr. bari road ID No- 509184024 (Length- 6m) 21.78 M/S Tahura Enterprise 21.22 0 31/12/2018  
48 Bhola 4 bhola-s 4 752 SA/R-212 Improvement of Santir hat Bazar - Sattar Mal Bari - Alamgir Mal Bari Road. Ch.00m- 1360.00m Road ID – 509185185 Palisading work at CH- 90-1275m (Effective Length – 620.0m) on the same road. Construction of 6 no (1.50 x 1.50m) RCC Box Culvert on the same road at CH- 108.0m, 220.0m, 310.0m, 465.0m, 842.0m & 1263.0m Construction of 5 no ( 0.75m x 0.75m) RCC U Drain on the same road at CH- 70.0m, 160.0m, 251.0m, 350.0m, 610.0m 1.00 116.21 M/S Supti Enterprise, Notun Bazar, Bhola Sadar, Bhola 110.40 0 31/12/2018  
49 Bhola 4 bhola-s 4 752 SA/M-164 Maintenance of Rajapur UP - (New Proposed) Janata bazar – Roder hat – RHD Junction Road. at Ch. 00-2300.00m Road ID – 509184064 (Effective Length – 2300.00m) Construction of Palisading work on Rajapur UP - (New Proposed) Janata bazar – Roder hat – RHD Junction Road. at Ch. 00-2300.00m (Effective Length – 54.00m) 2.00 55.50 M/S Supti Enterprise, Notun Bazar, Bhola Sadar, Bhola 55.39 17/04/2018 08/10/2018 100 31/12/2018 Final Bill Payment
50 Bhola 4 bhola-s 4 752 SA/M-163 Maintenance of Agar pole Road-charshifly by pass road at CH- 00-2700.00m Road ID-509184047 (Effective Length – 2700.00m) 3.00 58.50 M/S Shanto Entrprise, Holding No- 309 Ukilpara, Bhola. 58.43 17/04/2018 08/10/2018 100 31/12/2018 Final Bill Payment
51 Bhola 4 bhola-s 4 752 SA/M-166 Maintenance of Abohowa office road-Chodhoghor road via Siraj Maker Bari (Site Widing) at Ch-00-1000m & 1000-1220.0m (Effective Length – 1190.00m) Road ID- 509185081 Palisading Work at CH- 167m-1120m (Effective Length – 277.00m) on the same Road. 1.00 41.09 M/S Shanto Enterprise, Holding No.309, Ukilpara, Bhola 41.07 15/04/2018 04/10/2018 100 31/12/2018 Carpeting Completed
52 Bhola 4 bhola-s 4 752 SA/R-125 Improvement of Sadur char camunity school- Colghat Bazar Road at CH- 00-1100.0m (Road ID- 509185158) (Length- 1100.0m) Construction of Palisading work on Sadur char camunity school- Colghat Bazar Road at CH - (Length- 282.0m) Construction of (3.0m x 3.0m ) RCC Box Culvert on Sadur char camunity school- Colghat Bazar Road at CH-557.0mConstruction of (1.50m X 1.50m) no Sadur char camunity school- Colghat Bazar Road at CH-756.0m Construction of 3 no (0.75m x 0.75m) RCC U Drain no Sadur char camunity school- Colghat Bazar Road at CH- 338.0m, 806.0m, & 964.0m 1.00 98.74 M/S Shanto Enterprise, Holding No.309, Ukilpara, Bhola 98.69 11/02/2018 10/11/2018 100 31/12/2018 final Bill Payment
53 Bhola 4 bhola-s 4 752 SA/R-123 Improvement of Charfession RHD-Purbo Ruhita RNGPS at CH- 00-1550.0m (Road ID- 509184079) (Length- 1550.0m) Construction of Charfession RHD-Purbo Ruhita RNGPS at CH- (Length- 301.0m) Construction of (1.50m x 1.50m ) RCC Box Culvert on Charfession RHD-Purbo Ruhita RNGPS at CH-315.0m & 1100.0m Construction of 4 no (0.75m x 0.75m) RCC U Drain no Charfession RHD-Purbo Ruhita RNGPS at CH-520m, 900, 1020m, 1240m 2.00 124.23 M/S Shaki Enterprise, Koralia, Ward No.09, Bhola 124.17 11/02/2018 10/02/2019 100 31/12/2018 final Bill Payment
54 Bhola 4 bhola-s 4 752 SA/M-162 Maintenance of Bhola-Ilisha RHD-Purba Ilisha up (NEW) Connection road at CH- 00-2000.00m Road ID- 509184065 (Effective Length – 2000.00m) 2.00 41.37 M/S Shaha Alam, Muslim para, Bhola Sadar, Bhola 41.35 17/04/2018 08/10/2018 100 31/12/2018 BC Completed
55 Bhola 4 bhola-s 4 752 SA/M-160 Maintenance of Maintenance of Madrasha hat - East Ilisha UP (East Berry Bandth) Road from Ch. 00-1475m (Length- 1475m) Road ID- 509183002 Under Sadar Upazila. Construction of Palisading Work on Madrasha hat - East Ilisha UP (East Berry Bandth) Road from Ch. (Effective Length – 388.00m) 1.00 57.14 M/S Sayem Enterprise, Kalinath Rayer Bazar, Sadar, Bhola 56.99 10/04/2018 02/11/2018 60 31/12/2018 BC preperation on going
56 Bhola 4 bhola-s 4 752 SA/R-139 Improvement of Majer Hat Bazer - Farid Member Bari at Ch. 00-1550.0m (Road ID-509185157) (Length-1550.0m) Construction of Palisading work on Majer Hat Bazer - Farid Member Bari at Ch. 00-1550.0m (Length-180.0m) Construction of 5 no (0.750 x 0.750 m) RCC U Drain on Majer Hat Bazer - Farid Member Bari at Ch.-110m, 230m, 320m, 390m, 506mConstruction of 2 no (1.50m x 1.50m) RCC Box Culvert on Majer Hat Bazer - Farid Member Bari at Ch.- 600m & 790m Construction of (3.00m x 3.00m) RCC Box Culvert on Majer Hat Bazer - Farid Member Bari at Ch.- 1400m 2.00 135.48 M/S Sayem Enterprise, Kalinath Rayer Bazar, Bhola Sadar, Bhola. 135.47 31/01/2018 30/01/2019 100 31/12/2018 final Bill Payment
57 Bhola 4 bhola-s 4 752 SA/R-48 Improvement of Sadur char Tematha-BholaKhaya ghat-Babul molla bridge at Ch 00-1830.00m Road ID 509184052 Construction of Palisading Work on Sadur char Tematha-BholaKhaya ghat-Babul molla bridge at Ch 162-178m (Total Length- 16.0m). 2.00 74.67 M/S Sayem Enterprise, Kalinath Rayer Bazar, Bhola Sadar, Bhola. 74.66 16/10/2017 08/07/2018 100 31/12/2018 Final Bill Payment
58 Bhola 4 bhola-s 4 752 SA/R-03 A. Improvement of Babul Molla Bridge-B.C k nogar Ch.00m-1250m. Road ID: 509184027 (BC Pavement). Construction of Palisading Work on Babul Molla Bridge-B.C k nogar at Ch.00m-20m B/S, 80-100m L/S, 130-150m R/S, 920-940m L/S, 1000-1015m Pond, 1060-1090m R/S, 1150-1170m L/S, 1210-1230m L/S . Road ID: 509184027 (Length- 165m). Construction of 3nos (0.75m x 0.75m) RCC Box Culvert on Babul Molla Bridge-B.C k nogar Ch.165.00m, 454.00m & 1000.00m. Road ID: 509184027 1.00 82.80 M/S Sayem Enterprise, Kalinath Rayer Bazar, Bhola Sadar, Bhola 82.79 29/06/2017 21/03/2018 100 31/12/2018 Final Bill Payment
59 Bhola 4 bhola-s 4 752 SA/M-159 Maintenance of Charnayabad Boddo Bari - Parem Road - chowkider Bari Mosques at Ch. 00-1440.0m (Length- 1440.0m) Road ID – 509185172 Under Sadar Upazila. Construction of Palisading Work on Charnayabad Boddo Bari - Parem Road - chowkider Bari Mosques at Ch. 00-1440.0m (Effective Length – 282.00m) Construction of (0.750m x0.750m) RCC Box Culvert on Charnayabad Boddo Bari - Parem Road - chowkider Bari Mosques at Ch. 1260.0m 1.00 56.75 M/S Sayem Enterprise, Bhola Sadar Bhola. 56.73 10/04/2018 02/11/2018 100 31/12/2018 Final Bill Payment
60 Bhola 4 bhola-s 4 752 SA/R-95 Improvement of Hetner Hat - Atol Howlader Bari Road at CH- 00-1240.0m (Length- 1240m. Road ID- 509185150) Construction of Palisading Work on Hetner Hat - Atol Howlader Bari Road at CH- 30-48m R/S, 91-105m R/S, 145-156 L/S, 290-298m L/S, 363-368 L/S, 1230-1240 L/S & R/S (Length- 94m) Construction of 2 no (0.75m x 0.75m) RCC Box Culvert on Hetner Hat - Atol Howlader Bari Road at CH- 43m & 458m Construction of 3 no (1.50m x 1.50m) RCC Box Culvert on Hetner Hat - Atol Howlader Bari Road at CH- 423m & 886m & 1024m 1.00 90.04 M/S Sayem Enterprise, Bhola Sadar Bhola. 90.04 31/01/2018 30/01/2019 100 31/12/2018 Final Bill Payment
61 Bhola 4 bhola-s 4 752 SA/M-24/1 1. Maintenance of Bhola kheya ghat-Kalinath bazar-Dorgar road-Bypass-Ponditer pool-Gozaria GC road at CH- 00-2000.00m Road (Length- 2000m) Road ID No- ID- 509182010 A. Pavment & Surfasing Work (Length- 2000m & Width -5.5m) B. Earth Work C. Protrective work (Length- 120.0m) D. RCC Pipe-Drain (Length- 800.0m 2.00 269.41 M/S Santo Enterprise, Holding No-309, Ukilpara, Bhola. 291.08 25/01/2018 24/01/2019 90 31/12/2018 BC Completed
62 Bhola 4 bhola-s 4 752 SA/M-168 Maintenance of Berry Bandh - Ponditer pole road at Ch- 00-1450.0m (Effective Length – 1450.00m) Road ID - 509185038 Palisading work at CH- 00-1442.0m (Effective Length – 319.00m) on the same Road. Construction of (1.50m x1.50m) RCC Box Culvert at Ch- 1087.0m & 1 no (0.750m x0.750m) RCC Box Culvert at Ch.- 90.0m & 1415.0m on the same Road. 1.00 66.00 M/S Saleah Enterprise, Word No-06, Enayetullah Sarak Kasai Bari Pool, Borishal 65.62 17/04/2018 08/10/2018 60 31/12/2018 Hard bed preperation on going
63 Bhola 4 bhola-s 4 752 SA/M-27 Maintenance of Puran Gogirghol – by pass road – Puran kathali – Nazi Bepari shop Road under Alinagar UP at CH- 00-2600.00m (Length- 2600.00m) Road ID- 509184025 Construction of Palisading work on Puran Gogirghol – by pass road – Puran kathali – Nazi Bepari shop Road under Alinagar UP at CH- 445-489 RS, 550-572M RS, 735-750 RS, 837-854 RS, 949-968 LS, 2050-2050-2085 LS. (177.0M) Construction of 3 no RCC Cross Drain on Puran Gogirghol – by pass road – Puran kathali – Nazi Bepari shop Road under Alinagar UP at CH- 700m, 1000m, & 1208m Construction of 2 vent 3.0x3.0m RCC Box Culvert on Puran Gogirghol – by pass road – Puran kathali – Nazi Bepari shop Road under Alinagar UP at CH- 00m. 3.00 99.74 M/S Ruhul Amin, Amin Villa, Muslim Para, Bhola Sadar Bhola 98.89 01/11/2017 24/07/2018 100 31/12/2018 Final Bill Payment
64 Bhola 4 bhola-s 4 752 SA/R-43 Improvement of Uttar Beduria High school Jungiala khayghat Road at Ch- 00-600.00m (BC Pavement Length - 600m). Road ID- 509185016Construction of Palisading Work on Uttar Beduria High school Jungiala khayghat Road at Ch-124-132m, LS, 182-210m RS, 224-248m RS, 290-315m RS, 333-340m RS, 432-442m LS (Length- 102m). Construction of (0.75x0.75m) RCC Cross Drain on Uttar Beduria High school Jungiala khayghat Road at Ch- 124m 1.00 45.54 M/S Rubel Enterprise, Vaduria, Bhola Sadar. 45.52 05/10/2017 27/03/2018 100 31/12/2018 Final Bill Payment
65 Bhola 4 bhola-s 4 752 SA/R-46 Improvement of PIlot Sadek Howlader Bari Mill - Sunder khali Pacca Road. at Ch.-00-1100.00m (BC Pavement Length - 1615m). Road ID- 509185161 Construction of Palisading Work on PIlot Sadek Howlader Bari Mill - Sunder khali Pacca Road. at Ch.- 00-25m RS, 65-107m LS, 160-190m RS, 262-305m LS, 328-393m LS, 530-550m LS, 600-620m RS, 640-660m RS, 668-712m LS, 718-758m RS, 760-770m RS, 930-963m RS, 987-1030m LS (Total Length- 445.0m). Construction of 2 no (1.50mx1.50m) RCC Box Culvert on PIlot Sadek Howlader Bari Mill - Sunder khali Pacca Road. at Ch.- 116.0m & 440.0m Construction of 2 no (0.75mx0.75) RCC Box Culvert on PIlot Sadek Howlader Bari Mill - Sunder khali Pacca Road. at Ch.- 700.0m & 895.0m 2.00 88.51 M/S Rubel Enterprise, Vaduria, Bhola Sadar. 88.45 16/10/2017 08/07/2018 70 31/12/2018 WBM On completed
66 Bhola 4 bhola-s 4 752 SA/M-02 A. Maintenance of Wapda (BIP-2)-Ratanpur Bazar-Charpata UP –RHD Ch- 2000m-3610m. B. Construction of Palisading Work on Wapda (BIP-2)-Ratanpur Bazar-Charpata UP –RHD at Ch- 3000-3045m R/S, 3400-3440m R/S, 3540-3590m R/S. (Length 135m). Road ID 509183005 2.00 80.19 M/S Priyonti Construction, Holding No-1409, Gazipur road, Bhola. 80.17 15/06/2017 07/03/2018 100 31/12/2018 Final Bill Payment
67 Bhola 4 bhola-s 4 752 SA/M-24/2 1. Maintenance of Bhola kheya ghat-Kalinath bazar-Dorgar road-Bypass-Ponditer pool-Gozaria GC road at CH- 2000-4030.00m Road (Length- 2030m) Road ID No- ID- 509182010 A. Pavment & Surfasing Work (Length- 2030m & Width -5.5m) B. Earth Work C. Protrective work (Length- 63.0m) D. RCC Pipe-Drain (Length- 1125.0m) 2.00 310.77 M/S Priyonti Construction 346.75 25/01/2018 24/01/2019 90 31/12/2018 BC Completed
68 Bhola 4 bhola-s 4 752 SA/R-45 Improvement of Humawan Mia Brick Field – Hossen Ali khan Bari – Harun member Bari Road. at Ch. 00-1500m under Bapta UP at CH- 00-1615.00m (BC Pavement Length - 1615m). Road ID- 509185160 Construction of Palisading Work on Humawan Mia Brick Field – Hossen Ali khan Bari – Harun member Bari Road. at Ch.-. 12-55m RS, 110-125m RS, 145-163m RS, 163-197m LS, 213-227m LS, 275-300m LS, 426-503m LS, 521-662m RS, 778-816m RS, 850-860m RS, 880-930m LS, 1090-1105m LS, 1220-1240m LS, 1250-1280m RS, 1420-1460m LS, 570-1600m RS (Length- 600m). Construction of (1.50mx1.50m) RCC Box Culvert on Humawan Mia Brick Field – Hossen Ali khan Bari – Harun member Bari Road. at Ch.- 822.00mConstruction of 2 vent (4.0mx4.0m) RCC Box Culvert on Humawan Mia Brick Field – Hossen Ali khan Bari – Harun member Bari Road. at Ch.- 195.00m Construction of 2 no (0.75mx0.75m) RCC Box Culvert on Humawan Mia Brick Field – Hossen Ali khan Bari – Harun member Bari Road. at Ch.- 1122.0m & 1338.0m 2.00 156.87 M/S Prins Enterprsie, Bhola Sadar, Bhola 157.04 16/10/2017 08/10/2018 100 31/12/2018 Final Bill Payment
69 Bhola 4 bhola-s 4 752 SA/R-30 Improvement of Rajapur Closer Berry Badh- (New UP Porished)--Roder hat Connecting Road at Ch. 526-2300m (BC Pavement Length -1774m). Road ID-509184077 Construction of Palisading Work on Rajapur Closer Berry Badh- (New UP Porished)--Roder hat Connecting Road at Ch. 550-570m L/S, 580-600m L/S, 605-625m R/S, 634-644m Rs, 692-720m Rs, 750-762m RS, 920-928m RS, 934-990m LS (Length- 174.0m). Construction of nos (0.750m x 0.750) RCC Cross Drain on of Rajapur Closer Berry Badh- (New UP Porished)--Roder hat Connecting Road. at CH- 788m, 2050m, 1855m, 2245m. 2.00 113.86 M/S Orni Enterprise, Bhola Sadar, Bhola 113.80 10/07/2017 01/07/2018 100 31/12/2018 Carpeting Completed
70 Bhola 4 bhola-s 4 752 SA/M-161 Maintenance of Bhola Barisal RHD Fajapur Tutatali bazar road at Ch. 00-1000.00m Road ID – 509185073 Under Sadar Upazila. Construction of Palisading Work on Bhola Barisal RHD Fajapur Tutatali bazar road at Ch. 00-1000.00m (Effective Length – 45.00m) Construction of 2 no (0.750m x0.750m) RCC Box Culvert on Bhola Barisal RHD Fajapur Tutatali bazar road at Ch. 35.0m & 890.0m 1.00 33.35 M/S Orni Enterprise, Bhola sada, Bhola. 33.33 15/04/2018 04/10/2018 100 31/12/2018 Carpeting Completed
71 Bhola 4 bhola-s 4 752 SA/R-02 A. Improvement of RHD -Taltoli Bazar- Ponditer Pool Road. at Ch.1625m-3615m .& 2765m-3615m Road ID: 509184011 (BC Pavement). B. Construction of Palisading Work on RHD -Taltoli Bazar- Ponditer Pool Road. at Ch.1670-1719m R/S, 1740-1755m L/S, 2200-2230m L/S, 2390-2420m L/S. Road ID: 509184011 (Length -124m). 2.00 88.86 House No. 187/7, Lake Circus, Bashir Uddin road, Kalabagan, Dhaka-1205, Bangladesh. 88.85 28/06/2017 20/03/2018 100 31/12/2018 Final Bill Payment
72 Bhola 4 bhola-s 4 752 SA/M-04 A. Maintenance of Bhola -charfession RHD Bangla Bazer-Dakshin Dighaldi UP via Santir Ch-2280m-2586m & 2720m-5870m. Road. B. Construction of Palisading Work on Bhola -charfession RHD Bangla Bazer-Dakshin Dighaldi UP via Santir at Ch-2375-2390m R/S, 2760-2780m R/S, 2808-2828m L/S, 2847-2872m L/S, 2908-2960m L/S, 3157-3187m L/S, 3250-3270m L/S, 3550-3570m L/S, 3630-3675m B/S, 3960-3990m L/S, 4060-4080m R/S, 4140-4155m R/S, 4515-4535m R/S, 4490-4420m R/S, 4550-5180m L/S, 5640-5655m R/S, 5710-5725m R/S, 5730-5745m R/S. (Length 427m). C. Construction of 2 no’s (0.750m x 0.750m) RCC Box Culvert at CH- 3430.00m, 5210.00m & 1 no’s (1.50m x 1.50m) ) (With-5.50m) RCC Box Culvert at CH- 4270.00m on Bhola -charfession RHD Bangla Bazer-Dakshin Dighaldi UP via Santir hat &. Road ID 509183015. 3.00 132.30 M/S Nabarun Traders 132.29 15/06/2017 07/06/2018 100 31/12/2018 Final Bill Payment
73 Bhola 4 bhola-s 4 752 SA/M-01 A. Maintenance of Dakshin Dighaldi UP (Joynogor high school)-Natun hat Berir hat-Gazaria GC Ch.00m-3300m. B. Construction of Palisading Work on Dakshin Dighaldi UP (Joynogor high school)-Natun hat Berir hat-Gazaria GC at Ch.350m-380m R/S Pond, 860-890m L/S Pond, 1530-1550m L/S Pond, 1586-1645m L/S Pond, 1930-1970m B/S Pond, 2840-2860m L/S Pond. C. Construction of 2 no’s (0.750m x 0.750m) RCC Box Culvert on Dakshin Dighaldi UP (Joynogor high school)-Natun hat Berir hat-Gazaria GC Road at Ch.1344.00m & 2200.00m . Road ID 509183014. 3.00 107.50 M/S Md. Jakir Hossain, Masuma Khanom Rod, Bhola 107.39 25/06/2017 17/06/2018 100 31/12/2018 Final Bill Payment
74 Bhola 4 bhola-s 4 752 SA/R-99 Improvement of Barister Kachari-Purbo Berry Bandh road at CH- 00-1330m (Length- 1330m. Road ID- 509185177) Construction of Palisading Work on Barister Kachari-Purbo Berry Bandh road. at CH- 40-100m R/S, 250-270m R/S, 310-410m R/S, 840-920m R/S, 1100-1190m R/S, 1250-1300 R/S (Length- 400m) Construction of 5 no (0.75m x 0.75m) RCC Box Culvert on Barister Kachari-Purbo Berry Bandh road .at CH- 104m, 335m, 660m, 1030m & 1210m Construction of (2x4.00x4.00) RCC Box Culvert on Barister Kachari-Purbo Berry Bandh road at CH- 812m 1.00 126.72 M/S Mahir & Munem Business International, Ukilpara, Bhola Sadar Bhola. 126.71 15/02/2018 14/02/2019 50 31/12/2018 structure and palasiding on going
75 Bhola 4 bhola-s 4 752 SA/R-29 Improvement of Dokkhin digoldy bagmara road-Harun Bepari bari road at Ch.00-600.0m (BC Pavement Length -600m). Road ID-509185210 Construction of Palisading Work on Dokkhin digoldy bagmara road-Harun Bepari bari road at Ch. 9-39m B/S, 99-116m L/S, 160-185m L/S, 215-246m R/S, 438-538m R/S (Length- 203.0m). Road ID-509185210 Construction of 3 nos (0.750m x 0.750m) RCC Box Culvert on of Dokkhin digoldy bagmara road-Harun Bepari bari road. at CH- 250m, 306m & 438m Construction of (1.50m x 1.50m) RCC Box Culvert on of Dokkhin digoldy bagmara road-Harun Bepari bari road at CH- 510m. . 1.00 48.85 M/S Maa Enterprise, Bhola Sadar, Bhola. 48.83 05/10/2017 27/03/2018 100 31/12/2018 Final Bill Payment
76 Bhola 4 bhola-s 4 752 SA/R-207 Improvement of CC Road at Charsaymia Charcifoly Ibrahim Charashi Bari at CH- 870-1000.0m Road ID - 509185232 5.77 M/S Julfikar Ahmed, Muslimpara, Bhola 5.48 19/07/2019 0 31/12/2018  
77 Bhola 4 bhola-s 4 752 SA/R-206 Improvement of Agar pole-Muslime para Aukande Bari (Site Wading) Ch. 00-400m under Bapta UP Road ID 509185092 33.34 M/S Julfikar Ahmed, Muslimpara, Bhola 31.67 19/07/2019 0 31/12/2018  
78 Bhola 4 bhola-s 4 752 SA/M-03 A. Maintenance of Wapda (BIP-2)-Ratanpur Bazar-Charpata UP–RHD CH - 00m-2000m. B. Construction of Palisading Work on Wapda (BIP-2)-Ratanpur Bazar-Charpata UP–RHD at CH - 1100m-1116m L/S, 1300-1360m L/S, 1900-1936m L/S. (Length 112m). Road ID 509183005. 2.00 91.63 M/S Jahanara Trading Corp. Word No. 9 Poura Char Jangal, Vocational road Bhola 91.50 15/06/2017 07/03/2018 100 31/12/2018 Final Bill Payment
79 Bhola 4 bhola-s 4 752 SA/M-167 Maintenance of Dhania Chaklader Bari – Ali Hossen Minister Bari – Cyclone shelter road via Moazem house Road. at Ch- 00-1400.00m (Effective Length – 1440.00m) Road ID - 509185072 Palisading Work at CH- 55m-738.0m (Effective Length – 142.00m) on the same road. Construction of (0.750m x0.750m) RCC Box Culvert at Ch.- 930.0m on the same Road. 1.00 49.61 M/S Jahanara Trading Corp, Word No-9 Poura Jangla Vocational Road Bhola 49.52 17/04/2018 08/10/2018 100 31/12/2018 Final Bill Payment
80 Bhola 4 bhola-s 4 752 SA/STR-126 Construction of (2.0m x 4.0m x 4.0m) RCC Box Culvert on on Ismail Forazi bari road under Bapta UP Road at CH- 5.00m ( Road ID – 509184143) 24.79 M/S Jahanara Trading Corp, Word no.9 Poura Char Jangla, Vocational Road, Bhola 24.61 11/02/2018 10/08/2018 100 31/12/2018 Final Bill Payment
81 Bhola 4 bhola-s 4 752 SA/M-07 A. Maintenance of Bangla Bazer – Bagmara - Baroni kachare-Shainter hat road at Ch.00m-1930.00m Road ID 509185087 (BC Pavement Length 1930m) B. Construction of Palisading Work on Bangla Bazer – Bagmara - Baroni kachare-Shainter hat road at Ch.-25-75m R/S (Pond), 150-180m R/S (Pond), 320-345m L/S (Pond), 370-380m R/S (Pond), 730-780m L/S (Pond), 1100-1115m R/S (Pond), 1170-1200m R/S (Pond). Road ID 509185087 (Length- 210m). 2.00 68.35 M/S Hayder Builders, Bhola Sadar, Bhola 68.34 12/07/2017 04/04/2018 100 31/12/2018 Final Bill Payment
82 Bhola 4 bhola-s 4 752 SA/R-47 Improvement of Alinagar Madrashsa Bazar Mazi Bari - Gazaria GC Road. at Ch- 00-1380.00m Road ID 509185141Construction of Palisading Work on Alinagar Madrashsa Bazar Mazi Bari - Gazaria GC Road. Ch- 66-90m LS, 355-394m LS, 432-455m RS, 584-617m RS, 650-670m RS, 690-713m LS, 855-870m LS, 931-965m RS, 1014-1025m LS, 1188-1208m RS, 1340-1375m LS. (Total Length- 312.0m). Construction of 3 no (1.50mx1.50m) RCC Box Culvert on Alinagar Madrashsa Bazar Mazi Bari - Gazaria GC Road. at Ch- 80m , 870m, & 1222m 1.00 110.26 M/S Hawladar Construction, Borhanuddin, Bhola 109.75 16/10/2017 08/10/2018 100 31/12/2018 final Bill Payment
83 Bhola 4 bhola-s 4 752 SA/R-42 Improvement of Bhola Coast Guard office - Nazim Chowkider Bari Road. at CH- 00-950.00m (BC Pavement Length - 950m). Road ID- 509185165 Construction of Palisading Work on Bhola Coast Guard office - Nazim Chowkider Bari Road. at CH- 25-58m RS, 107-125m LS, 225-238m LS, 250-273m LS, 410-416m LS, 770-795m LS (Length- 118m). 1.00 65.70 M/S Hawladar Construction, Borhanuddin, Bhola 67.68 05/10/2017 27/06/2018 100 31/12/2018 Final Bill Payment
84 Bhola 4 bhola-s 4 752 SA/R-120 Improvement of Hatner hat-Arujan ali khayghat road at CH- 00-2060.0m (Road ID- 509184036) (Length- 2060.0m) Construction of Palisading Work on Hatner hat-Arujan ali khayghat road at CH- (Length- 359.0m) Construction of 4 no (0.75m X 0.75m) RCC Box Culvert on Hatner hat-Arujan ali khayghat road at CH- 516m, 660m, 990m, & 1080m Construction of (1.50m X 1.50m) no Hatner hat-Arujan ali khayghat road at CH- 480.0m Construction of (3.0m X 3.0m) no Hatner hat-Arujan ali khayghat road at CH- 1262.0m 2.00 159.53 M/S Eli Enterprise, Sadar Road, Bhola 159.45 23/02/2018 14/10/2019 40 31/12/2018 structure and palasiding on going
85 Bhola 4 bhola-s 4 752 SA/M-09 A. Maintenance of Velumia Bazar (UPC) - Sharif Khan Bazar – Bauphal Lunch Ghat Road. Ch. 4170-5620.0m. Road ID- 509183008. (BC Pavement Length 1450m) .B. Construction of Palisading Work on Velumia Bazar (UPC) - Sharif Khan Bazar – Bauphal Lunch Ghat Road. Ch- 4308-4324m L/S, 4347-4360m L/S, 4470-4495m L/S,4526-4540m L/S, 4550-4563m L/S, 4573-4594m L/S, 4776-4837m R/S, 4853-4922m L/S, 4991-5005m R/S, 5065-5087m L/S, 5355-5363m L/S, 5572-5608m R/S. Road ID- 509183008. (Length- 312m). 1.00 97.38 M/S Alif Enterprise 97.36 10/07/2017 02/04/2018 100 31/12/2018 Final Bill Payment
86 Bhola 4 bhola-s 4 752 SA/R-04 A. Improvement of RHD - Bagmara – Madhe Bari-Sorif bari - Balia high school Khorshed Alom Master Bari. Ch.00m- 1030m Road ID-509185104 (BC Pavement). B. Construction of Palisading Work on RHD - Bagmara – Madhe Bari-Sorif bari - Balia high school Khorshed Alom Master Bari. at Ch.10m- 60m R/S, 100-120m L/S, 400-420m R/S, 500-540m L/S, 600-640m B/S Road ID-509185104 (Length- 170m). C. Construction of 2 nos (1.50m x 1.50m) (With-5.50m) RCC Box Culvert on RHD - Bagmara – Madhe Bari-Sorif bari - Balia high school Khorshed Alom Master Bari.Ch. 800.00m & 998.00m. Road ID-509185104 1.00 77.72 M/S Akter Hossain, Bhola Sadar, Bhola. 77.71 26/06/2017 13/03/2018 100 31/12/2018 Final Bill Payment
87 Bhola 4 borhanuddin 39 752 BOR/R-236 Improvement of Tobgi Fakir Bari to Nafu Mia Bari RHD raod at CH- 00-1398.0m Road ID 509214070 Construction of 5 no (0.625x0.625m) RCC Box Culvert on the same Road at CH- 472m/647m/1094m/1284m/1336m 1.40 96.14 Md. Ruhul Amin, Amin Villa, Muslimpara, Bhola Sadar, Bhola 96.12 0 31/12/2018  
88 Bhola 4 borhanuddin 39 752 BOR/R-235 Improvement of Kali Mondir road to East side Piyari Mohan Hawladerbari clinic East side to Sagla road at CH- 00-1039.0m Road ID 509215180 Palisading Work (Effective Length- 303.0m)on the same Road Construction of 3 no (0.750x0.750m) RCC Box Culvert on the same Road at CH- 49m/467m/567m Construction of (3.0mx2.0m) RCC Box Culvert on the same Road at 397.0m 1.03 93.45 M/S Md. Javed, Pawro Khatli, Bhola 93.40 0 31/12/2018  
89 Bhola 4 borhanuddin 39 752 BOR/R-234 Improvement of Kutuba UP Office-Baklaibari RHD road at CH- 1300-1910.0m Road ID 509213009 Palisading Work (Effective Length- 160.0m)on the same Road Construction of 2 no (0.625x0.625m) RCC Box Culvert on the same Road at CH- 1825m/1889m 0.61 48.04 M/S. Shaki Enterprise, Koralia, Ward No-09, Bhola Sadar, Bhola 48.04 0 31/12/2018  
90 Bhola 4 borhanuddin 39 752 BOR/R-233 Improvement of Entukaribari-Shantir hat road at CH- 00-238m Road ID 509215168 Palisading Work (Effective Length- 78.0m)on the same Road Repair of RCC Box Culvert on the same Road 0.24 18.85 M/S Md. Jamal Uddin Golder, Sadar Road, Bhola 18.85 0 31/12/2018  
91 Bhola 4 borhanuddin 39 752 BOR/R-232 Improvement of GeduGazibari-Gosso gram bridge road at CH- 00-782.0m Road ID 509215167 Palisading Work (Effective Length- 348.0m)on the same Road Construction of 3 no (0.750x0.750m) RCC Box Culvert on the same Road at CH- 496m/543m/634m Construction of (2.0mx2.0m) RCC Box Culvert on the same Road at CH- 732.0m 0.79 78.48 M/S Apu Enterprise, Narkathi, Barisal Sadar, Barisal 74.55 0 31/12/2018  
92 Bhola 4 borhanuddin 39 752 BOR/R-231 Improvement of South Jaya road to Khayer hat Borhanuddin RHD road at CH- 00-1000.0m Road ID 509215035 Palisading Work (Effective Length- 186.0m)on the same Road Construction of 7 no (0.750x0.750m) RCC Box Culvert on the same Road at CH- 12m/96m/145m/227m/403m/527m/707m Construction of (2.0mx2.0m) RCC Box Culvert on the same Road at CH- 919.0m 1.00 113.51 Golam Mowla Liton, S/O Sultan Ahmed, Kalibari Road, Bhola Sadar, Bhola 113.45 0 31/12/2018  
93 Bhola 4 borhanuddin 39 752 BOR/R-230 Improvement of Helipad to Gongapur road via AfajuddinSarkerbari to Kutuba UP road at CH- 00-520.0m, Road ID 509215181 Palisading Work (Effective Length- 186.0m)on the same Road Construction of 2 no (0.625x0.625m) RCC Box Culvert on the same Road at CH- 127m/281m 0.52 43.65 Golam Mowla Liton, S/O Sultan Ahmed, Kalibari Road, Bhola Sadar, Bhola 43.62 0 31/12/2018  
94 Bhola 4 borhanuddin 39 752 BOR/R-229 Improvement of Munshir Hat- Lion Cottage RHD road at CH- 00-1250.0m Raod ID - 509214043 Palisading Work (Effective Length- 347.0m)on the same Road Construction of (1.0x1.0m) RCC Box Culvert on the same Road at CH- 948.0m 1.25 97.83 M/S Priyonti Construction, Holding No-1409, Gazipur Road, Bhola 97.83 0 31/12/2018  
95 Bhola 4 borhanuddin 39 752 BOR/R-216 Improvement of Baisagobari-NasuMattabbar house road at CH – 00-1460.0m (Effective Length- 1460.0m)509215170 Palisading Work (Effective Length- 378.0m)on the same Road Construction of 5 no (0.625x0.625m) RCC Box Culvert on the same Road at CH- 375m/649m/905m/810m/12310m 1.46 135.53 M/S Sayem Enterprise,Kalinath Rayer Bazar, Bhola Sadar, Bhola 135.53 0 31/12/2018  
96 Bhola 4 borhanuddin 39 752 BOR/R-215 Improvement of MohilaMadrasha-East side to Katakhali Bridge road at CH- 00-1142.0m (Effective Length- 1142.0m) Road ID- 509215166 Palisading Work (Effective Length- 367.0m)on the same Road Construction of 3 no (0.625x0.625m) RCC Box Culvert on the same Road at CH- 333.0m, 426.0m & 947.0m 1.15 92.74 M/S Sayem Enterprise,Kalinath Rayer Bazar, Bhola Sadar, Bhola 92.74 0 31/12/2018  
97 Bhola 4 borhanuddin 39 752 BOR/R-214 Improvement of RHD East Kachia GPS to Red rose GPS Road at CH- 670-1935m (Effective Length- 1935.0m) Road ID- 509215047 Palisading Work (Effective Length- 242.0m) on the same Road Construction of 2 no (1.0x1.0m) RCC Box Culvert on the same Road at CH- 735.0m & 1811.0m 1.94 97.48 M/S Priyonti Construction, Holding No-1409, Gazipur Road, Bhola 97.48 0 31/12/2018  
98 Bhola 4 borhanuddin 39 752 BOR/R-202 Improvement of Borhanuddin Mridha bari North side pacca-South side khal road at CH- 00-1790.0m (Effective Length- 1790.0m) Road ID: 509215054 Palisading Work (Effective Length- 250.0m) on the same Road Construction of 4 no (1.0x1.0m) RCC Box Culvert on the same Road at CH- 397m, 496m, 1112m & 1667m 1.79 140.91 M/S Howladar Construction Borhanuddin, Bhola 140.85 03/07/2018 26/06/2019 30 31/12/2018 STR on going
99 Bhola 4 borhanuddin 39 752 BOR/R-198 Improvement of RHD Boyajuddin Howlader Bari to Arob ali Hawlader Bari at CH- 00-623.0m (Effective Length- 623.0m) Road ID-509215107 0.62 34.91 M/S Shahabuddin Bhola Sadar, Bhola 33.17 05/07/2018 25/06/2019 0 31/12/2018  
100 Bhola 4 borhanuddin 39 752 BOR/R-197 Improvement of Manikar hat-Kahayer hat GC road at CH- 00-2877.0m (Effective Length- 2877.0m) Road ID- 509214061 2.88 57.47 M/S Roni Construction Borhanuddin, Powrashava Bhola 57.43 05/07/2018 27/06/2019 0 31/12/2018  
101 Bhola 4 borhanuddin 39 752 BOR/R-196 Improvement of Khayer hat south side to fish ghat road at CH- 00-832.0m (Effective Length- 832.0m) Road ID- 509215164 Palisading work (Effective Length- 333.0m) on the same road. 0.83 63.93 H.L Corporation H/N 1156Vill Western Para, post Bhola Powrashava Bhola 63.93 05/07/2018 27/06/2019 0 31/12/2018  
102 Bhola 4 borhanuddin 39 752 BOR/R-195 Improvement of Boromanika Farazi bari-Kowmi Madrasha vai Moulla Bari road at CH- 00-1566.0m (Effective Length- 1566.0m) Road ID- 509215119 1.00 49.99 M/S Kaikobad,2 no Powroword, Kutba, Borhanuddin, Bhola 49.98 05/07/2018 27/06/2019 0 31/12/2018  
103 Bhola 4 borhanuddin 39 752 BOR/R-194 Improvement of Karamotgonj RHD to Ranigonj road at CH- 00-1000.00m (Effective Length- 1000.0m) Road ID- 509214057 1.00 56.18 M/S Sharmin Enterprise Pokhia Borhanuddin Bhola 56.14 05/07/2018 27/06/2019 0 31/12/2018  
104 Bhola 4 borhanuddin 39 752 BOR/R-193 Improvement of Moulavir hat-East side to Abdul Hasem Farazi house road at CH- 00-600.0m (Effective Length- 600.0m) Road ID- 509215165 Palisading Work (Effective Length- 600.0m) on the same Road Construction of (1.0x1.0m) RCC Box Culvert on the same Road at CH- 377.0m Construction of 4 no (0.6250m x 0.625m) RCC Box Culvert on the same Road at CH- 377.0m 0.60 54.19 M/S Roni Construction Borhanuddin, Powrashava Bhola 54.13 03/07/2018 25/06/2019 70 31/12/2018 WBM on going
105 Bhola 4 borhanuddin 39 752 BOR/R-183 Improvement of Bhola to Charfassion CMB road Chowdhury para Via Betua Khal at CH-00-1436.00 m (Effective Length 1436.00 m) ID No. 509215189 Palisading Work (Effective Length 354.00 m) on the same road. Construction of 2 no RCC Box Culvert at Ch 206.00 m, 765.00m on the same road.. 1.44 111.10 M/S Bikrompur Enterprise Muslimpara Bhola 111.08 03/07/2018 25/06/2019 0 31/12/2018  
106 Bhola 4 borhanuddin 39 752 BOR/R-182 Improvement of RHD Lal Dighi-CO road at CH-00-1694.00 m (Effective Length 1694.00 m) ID No. 509214027. Palisading Work (Effective Length 142.00 m) on the same road. Construction of 6 no RCC Box Culvert at Ch 85.00 m, 113.00m, 594.00m,761.00m, 885.00m, 986.00m on the same road. 1.69 84.29 M/S Khan & sons Thana road Borhanuddin, Bhola 84.42 26/07/2018 18/07/2019 40 31/12/2018 sub base on going
107 Bhola 4 borhanuddin 39 752 BOR/R-181 Improvement of Char Titia to Talpater Hat via Komoruddin Houlader road at CH-00-1135.00 m (Effective Length 1135.00 m) ID No. 509214041. Palisading Work (Effective Length 243.00 m) on the same road. Construction of 3 no RCC Box Culvert at Ch 185.00 m, 409.00m, 965.00m on the same road. 1.14 84.86 Md. Rafiqul Islam Borhanuddin, Bhola 84.81 05/07/2018 27/06/2019 0 31/12/2018  
108 Bhola 4 borhanuddin 39 752 BOR/R-180 Improvement of Choto Manika GPS to South side to Gongapur border at CH-00-1180.00 m (Length 1180.00 m) ID No. 509215178. Palisading Work (Effective Effective Length 142.00 m) on the same road. Construction of 5 no RCC Box Culvert at Ch 338.00 m, 513.00m, 712.00m, 739.00m, 1146.00m on the same road. 1.18 86.12 M/S Bikrompur Enterprise Muslimpara Bhola 86.10 26/07/2018 18/07/2019 0 31/12/2018  
109 Bhola 4 borhanuddin 39 752 BOR/R-179 Improvement of Kunjerhat GCR road Akbor lat shop- Abdul karim Munshir bari to Nur Alam hawlader dokan via North side Kalu Hawlader Bari to Musalman pukur Cyclone shelter at CH-00-1127.00 m (Effective Length 1127.00 m) ID No. 509215184. Palisading Work (Effective Length 88.00 m) on the same road. Construction of 3 no RCC Box Culvert at Ch 451.00 m, 939.00m, 1115.00m on the same road. 1.13 77.12 M/S Shazi Traders Chack Dosh Kunjerhat Borhanuddin Bhola 77.10 01/07/2018 23/06/2019 0 31/12/2018  
110 Bhola 4 borhanuddin 39 752 BOR/R-178 Improvement of Bhola to Charfassion CMB road Kunjerhat North side of west side Kazi Bari road Via west side Bazlu Hawlader Bari at CH-00-1000.00 m (Effective Length 1000.00 m) ID No. 509215185. Palisading Work (Effective Length 222.00 m) on the same road. Construction of RCC Box Culvert at Ch 828.00 m on the same road. 1.00 77.85 M/S Bhuya Enterprise 77.85 04/09/2018 26/08/2019 0 31/12/2018  
111 Bhola 4 borhanuddin 39 752 BOR/R-177 Improvement of CO road ful kachia Majunder bari Kunjer hat to Mozzam GCR Abbas Munshi Bari Road at CH-00-1340.00 m (Effective Length 1340.00 m) ID No. 509215187. Palisading Work (Effective Length 182.00 m) on the same road. Construction of 2 no RCC Box Culvert at Ch 700.00 m, 1178.00m on the same road. 1.34 94.28 M/S Sharmin Enterprise Pokhia Borhanuddin Bhola. 94.22 26/07/2018 18/07/2019 0 31/12/2018  
112 Bhola 4 borhanuddin 39 752 BOR/R-176 Improvement of RHD Khayer Moulovi Mosque-Dakkhin side road at CH-00-687.00 m (Effective Length 687.00 m) ID No. 509215160 Palisading Work (Effective Length 55.46 m) on the same road. Construction of 5 no RCC Box Culvert at Ch 160.00m, 343.00m, 385.00m, 412.00m, and 485.00m on the same road.. 0.69 58.93 M/S Khan & sons Thana road Borhanuddin Powrashava, Bhola 58.90 02/07/2018 29/06/2019 0 31/12/2018  
113 Bhola 4 borhanuddin 39 752 BOR/R-175 Improvement of RHD to Woaziullah Biswas bari road at CH-00-240.00 m (Effective Length 240.00 m) ID No. 509215194. Palisading Work at (Effective Length 65.00 m) on the same road. 2.40 18.41 M/S Md. Kalikobad 18.36 04/09/2018 26/02/2019 0 31/12/2018  
114 Bhola 4 borhanuddin 39 752 BOR/R-243 (A) Improvement of CO road Chowmohani-North Kachia RPS Road at CH- 00-3679.00m Road ID 509214030 (B) Palisading Work (Effective Length- 568.0m) on the same Road(C) Construction of 8 no (1.0x1.0m) & 2 no (0.625x0.625m) RCC Box Culvert on the same Road at CH -808/985/1194/152/2007/2482/2798/3463m (D) Improvement of Imam uddin Mirdha Bari-Gov. Dighi road at CH- 00-1665.0m Road ID 509215172(E) Palisading Work (Effective Length- 618.0m) on the same Road(F) Construction of 6 no (0.75x0.75m) & 1 no (2x4.50x2.50m) & 1 no (2.00x2.00m) RCC Box Culvert on the same Road at CH -30/345/439/572/1155/1537/995/559m (Salvage Cost 91,186.00) 5.00 466.74 M/S Priyonti Construction, Holding No-1409, Gazipur Road, Bhola 466.47 0 31/12/2018  
115 Bhola 4 borhanuddin 39 752 BOR/STR-203 Construction of 12m RCC bridge on Borhanuddin RHD-Sayed Bepari bari to Choto Manika Baro bari road. at CH- 15.00m Road ID 502914080 84.87 M/S Khan & Sons, Thana Road, Borhanuddin Powrashava, Bhola. 80.63 26/07/2018 18/07/2019 0 31/12/2018  
116 Bhola 4 borhanuddin 39 752 BOR/R-59 Improvement of ofRHD Krisnachura Tree-(Shohid Zia road to BorhangonjRanigonj road at Ch- 00-1340.0m (Length – 1340.0m) Road ID- 509214037 Construction of Palisading Work onRHD Krisnachura Tree-(Shohid Zia road to BorhangonjRanigonj road at Ch- 286-306m R/S, 297-606 LS, 335-345 LS, 362-390 RS, 490-517 LS 555-568 RS, 568-591 LS, 591-620 LS, 620-640 BS, 753-773 LS, 792-828 RS, 852-888 RS, 919-930 RS. (Length = 302.0m) 1.34 48.44 M/S Hawlader Construction, Borhanuddin, Bhola 48.42 19/10/2017 11/04/2018 100 31/12/2018 Final Bill Payment
117 Bhola 4 borhanuddin 39 752 BOR/R-52 Improvement of Char GazipurHawladerbari to west Gazi Bari road at Ch- 00-1000.00m Length ( 1000m) Road ID- 509214080 Construction of Palisading Work onChar gazipurHawladerbari to west Gazi Bari road at Ch- 19-30, RS, 40-58, LS, 64-74, LS, 450-465 RS, 610-619 RS, 633-642 RS, 652-664-LS, 831-842 RS, 945-966 RS (Total Length = 116.5m) Construction of 2 no (0.625 x 0.600) (5.5m) RCC “U” Drain onGazipurHawladerbari to west Gazi Bari road at Ch- 114m & 468m 1.00 65.18 M/S Hawlader Construction, Borhanuddin, Bhola 65.15 18/10/2017 10/07/2018 100 31/12/2018 BC Completed
118 Bhola 4 borhanuddin 39 752 BOR/R-51 Improvement of South Mirzakalu bazar-Katakhali bridge road at CH- 00-1000.00m Length ( 1000m) Construction of Palisading Work onSouth Mirzakalu bazar-Katakhali bridge road at CH- 23-35m, LS, 359-374 LS, 475-500 LS, 694-713 RS, 846-876 RS, 952-900 RS Road ID 509214074 1.00 68.60 M/S Madina Enterprise, North Degoldi, Joynagar, Bhola 68.50 18/10/2017 10/07/2018 0 31/12/2018 Contruct Reject
119 Bhola 4 borhanuddin 39 752 BOR/R-200 Improvement of Boromanika Bashir Miar Dhighe to santerhat via Dargha hat at CH- 00-2392.0m (Effective Length- 2392.0m) Road ID: 509215108 2.30 140.71 H.L Corporation H/N 1156Vill Western Para, post Bhola Powrashava Bhola 140.71 05/07/2018 25/06/2019 30 31/12/2018 STR on going
120 Bhola 4 borhanuddin 39 752 BOR/R-199 Improvement of Manika Hat-Noor Miar Hat Road at CH- 00-4670.0m (Effective Length- 4670.0m) Road ID: 509214060 4.60 191.46 M/S Hauladar Construction 191.37 26/08/2019 0 31/12/2018  
121 Bhola 4 borhanuddin 39 752 BOR/R-156 Improvement of Sachra Pacca road to Rare bari road at CH- 00m-2050m (Effective Length- 2050.0m) Road ID: 509214083Construction of Palisading work on Sachra Pacca road to Rare bari road at CH- 00m-2050m (Effective Length – 456.0m) Construction of (0.625x0.625m) RCC U Drain on Sachra Pacca road to Rare bari road at CH- 1358.0mConstruction of (1.50m x 1.50m ) RCC Box Culvert on Sachra Pacca road to Rare bari road at CH- 1794.0m Construction of (1.00m x 1.00m ) RCC Box Culvert on Sachra Pacca road to Rare bari road at CH- 1662.0m 2.05 139.79 M/S Mohammad Hanif, Bhola Sadar, Bhola 139.00 01/05/2018 22/04/2019 50 31/12/2018 WBM on going
122 Bhola 4 borhanuddin 39 752 BOR/R-107 Improvement of Gafurgong Bazar-Mollarhat Mosonerhat road at CH- 00m-875m (Length- 875.00m. Road ID- 509214075) Construction of Palisading work on Gafurgong Bazar-Mollarhat Mosonerhat road at CH – 433-458m, RS, 541-548M RS, 556-576M RS, 595-600M RS, 631-635M LS, 784-795M RS, 813-833M RS, 863-870M LS (Length – 99m) Construction of (0.625x0.625m) RCC U Drain on Gafurgong Bazar-Mollarhat Mosonerhat road at CH – 712.00m 0.88 60.80 M/S Zakir Hossain, Bhola Sadar Bhola 60.80 100 31/12/2018 Final Bill Payment
123 Bhola 4 borhanuddin 39 752 BOR/M-201 Maintenance of RHD at Azad Nagar (Motiar mar pukur)-Alimuddin Via Bara Manika Up & Mollar Hat road at CH- 00-7120.0m (Effective Length- 7120.0m) Road ID: 509213008 7.12 201.35 Md. Rafiqul Islam Borhanuddin, Bhola 199.85 28/06/2018 27/06/2019 0 31/12/2018  
124 Bhola 4 borhanuddin 39 752 BOR/M-15 Maintenance of Maintenance of Borhanuddin Upzila H/Q (Kutuba High School) Borhangonj GC south Kutuba Natun Bazar road at CH-00-6660.0m Road ID-509212012Construction of Palisading Work on Borhanuddin Upzila H/Q (Kutuba High School) Borhangonj GC south Kutuba Natun Bazar road at CH- 1100-1116m L/S 1157-1173m L/S, 1745-1766m L/S, 2255-2286m R/S, 2301-2330m L/S, 2598-2620m L/S, 2812-2833m L/S, 2860-2870m R/S, 3712-3725m L/S, 6101-6125m R/S, 6148-6160-R/S, 6164-6175m R/S, 6385-6423m R/S, 6572-6596m R/S. (Total Length – 288m ). Road ID- 509212012Construction of (2x3.0x3.0) (5.50m) RCC Box Culvert on Borhanuddin Upzila H/Q (Kutuba High School) Borhangonj GC south Kutuba Natun Bazar road at CH- 1246m. Road ID- 509212012Construction of U Drain (0.625x0.600) (5.50m) on Borhanuddin Upzila H/Q (Kutuba High School) Borhangonj GC south Kutuba Natun Bazar road at CH- 56896m. Road ID- 509212012 6.66 158.29 Md. Rafiqul Islam, Khaier Hat Borhanuddin Bhola. 158.05 12/07/2017 06/09/2018 100 31/12/2018 BC Completed
125 Bhola 4 borhanuddin 39 752 BOR/M-14 Maintenance of Moazzem Hat-Dowri GC (Borhanuddin Part) at CH- 00-2723m (BC Pavement, Length 00– 2723m). Road ID- 509212013Construction of Palisading Work on Moazzem Hat-Dowri GC (Borhanuddin Part) at CH- 1035-1065m R/S (Total Length – 27m ). Road ID- 509212013Construction of (1m x 1m) (7.30m) RCC Box Culvert on Moazzem Hat-Dowri GC (Borhanuddin Part) at CH- 756.0m Road ID- 509212013Construction of 2 no U Drain (0.625x0.600) (7.30m) on Moazzem Hat-Dowri GC (Borhanuddin Part) at CH- 107m & 1995m. Road ID- 509212013 2.72 110.43 M/S Shah Alam, Muslim Para Bhola Sadar Bhola. 110.33 12/07/2017 04/04/2018 60 31/12/2018 WBM Completed
126 Bhola 4 borhanuddin 39 752 BOR/M-13 A. Maintenance of Sikderhat-Kunjer Hat GC up to Boyder Bridge road at CH- 00-3405m (BC Pavement, Length – 3405 m ). Road ID- 509212011 B. Construction of Palisading Work on Sikderhat-Kunjer Hat GC up to Boyder Bridge road at CH- 3364-3374m L/S ( Total Length – 10m ). Road ID- 509212011 C. Construction of 3 no (1m x 1m) (4.66m) RCC Box Culvert on Sikderhat-Kunjer Hat GC up to Boyder Bridge road at CH- 70m , 3318m, 3400m. Road ID- 509212011 D. Construction of 6 no (0.625m x 0.600m ) (7.30m) RCC Box Culvert on Sikderhat-Kunjer Hat GC up to Boyder Bridge road at CH- 680m, 880m, 1670m, 2172m. Road ID- 509212011 3.41 89.27 M/S S & N JV, 8200, Barishal Sadar Upazila Borishal. 87.63 07/12/2017 04/04/2018 100 31/12/2018 Final Bill Payment
127 Bhola 4 borhanuddin 39 752 BOR/M-12 Maintenance of Mirzakalu GC (Near Chowdhury Bari)- Fakir hat Dalal Bazar R & D Road at CH- 00-2111m & 6000-9755m (BC Pavement, Length – 5866m ). Road ID- 509212004 Construction of Palisading Work on Mirzakalu GC (Near Chowdhury Bari)- Fakir hat Dalal Bazar R & D Road at CH- 842-847m L/S, 854-859m R/S, 1172-1178m L/S1302-1318m R/S, 1500-1519m R/S, 1743-1753m L/S, 1772-1800m L/S. ( Total Length – 98m ). Road ID- 509212004 Construction of 5 no (1m x 1m) RCC Box Culvert on Mirzakalu GC (Near Chowdhury Bari)- Fakir hat Dalal Bazar R & D Road at CH- 790m , 1790m, 6458m, 6725m, 8470m. Road ID- 509212004 Construction of 6 no (0.625mx 0.600m) U Drain on Mirzakalu GC (Near Chowdhury Bari)- Fakir hat Dalal Bazar R & D Road at CH- 815m, 6275m, 6553m, 6624m, 7860m. Road ID- 509212004 5.87 213.67 M/S Hawlader Construction.Borhanuddin,Bhola,Bhola 213.56 30/07/2018 30/07/2018 100 31/12/2018 BC Completed
128 Bhola 4 borhanuddin 39 752 BOR/R-50 Improvement of Sikderhar- Maniram RD Borhanuddin Lalmohan RHD Road at CH- 1230-2392.00m. Length ( 1162m) Road ID- 509214016hanudding Lalmohan RHD Road at CH- 1475m 1.16 162.64 M/S Jarin & Co, Word No. 07 Ukilpara, Bhola. 162.62 0 31/12/2018  
129 Bhola 4 borhanuddin 39 752 BOR/M-238 Maintenance of Moazzam Hat (Deula Up)- Kacharir hat road from CH- 2000-3300m Road ID 509213011. Maintenance of Chargazipur-Chartitiya via Talukder hat road at CH- 2300-3130.0m Road ID 509214034 2.13 85.21 M/S Hawladar Construction, Borhanuddin, Bhola. 85.20 0 31/12/2018  
130 Bhola 4 borhanuddin 39 752 BOR/R-141 Improvement of Deula Moulavi Bari to Hazi Md. Shahalam Chowkider Bari Via south Battala road at CH- 00-3257.0m Road ID 509214088 3.26 211.36   0.00 0 31/12/2018  
131 Bhola 4 borhanuddin 39 752 BOR/R-240 (A) Improvement of Maniram-Munshir hat RHD- Azahar Chowdhury Bari Road at CH- 1000-2057.0m Including 6 no (0.75x0.75m) RCC Box Culvert, 1 no (2.0x2.0m) RCC Box Culvert & 154m RCC Palisading works on the same Road. Road ID 509214020 (B) Improvement of Deula Mongolar Dokan South Deula RPS road at CH- 00-1307.0m Including 83.0m RCC Palisading works on the same Road ID 50925123 2.36 113.72   0.00 0 31/12/2018  
132 Bhola 4 borhanuddin 39 752 BOR/R-277 Improvement of Choto Manika Senior Madrasha road to South Mostafiz bari via South side of Jantu Kazi bari road at CH - 00-2392.00m Road ID 509215179 2.39 129.46   0.00 0 31/12/2018  
133 Bhola 4 borhanuddin 39 752 BOR/R-276 Improvement of CO road Aziz Miar Bari-Uttor Kachia RPS Road at CH- 00-2008m Road ID 509215050 2.01 140.60   0.00 0 31/12/2018  
134 Bhola 4 borhanuddin 39 752 BOR/R-275 (A) Improvement of Munshir-Lamukata road at CH- 00-2471.0m Including 259.0m RCC Palisading works on the same Road. Road ID - 509214008 (B) Improvement of Dargh-Maniram -Munshirhat Road at CH- 00-2143.0m Road ID 509214005 Salvage Cost =58,800.00 (C) I mprovement of - Serajul Patwary bari-Uttor side to Bazir hat Raod at CH- 00-957m Road ID 509215177 Salvage Cost =8,199.0 5.57 197.93   0.00 0 31/12/2018  
135 Bhola 4 borhanuddin 39 752 BOR/R-280 (D) Improvement of Deula Up Moazzem Bazar-East Side to hazir Hat road at CH-00-2771.0m Road ID 509214087(E) Palisading Work (Effective Length- 195.0m) on the same Road(F) Construction of 3 no (1.00x1.00m) & 5 no (0.625x0.625m) RCC Box Culvert on the same Road at CH -788/2273/2393/956/1043/1641/2083/2663 2.77 207.04   0.00 0 31/12/2018  
136 Bhola 4 borhanuddin 39 752 BOR/R-279 (A) Improvement of Sikderhat RHD-Kunjer Hat RHD raod at CH- 00-2000.00m Road ID 509214025(B) Palisading Work (Effective Length- 278.0m) on the same Road(C) Construction of 3 no (1.00x1.00m) & 4 no (0.625x0.625m) RCC Box Culvert on the same Road at CH -1346, 526,798,1791, . 2.00 157.54   0.00 0 31/12/2018  
137 Bhola 4 borhanuddin 39 752 BOR/R-278 (G) Improvement of Fulkacia Kalir Hat south side of CO road via Mira bari field road at CH- 00-2140.0m Road ID 509215183 (H) Palisading Work (Effective Length- 173.0m) on the same Road(I) Construction of 3 no (0.625x0.625m) RCC Box Culvert on the same Road at CH -767/1676/1784 2.14 144.65   0.00 0 31/12/2018  
138 Bhola 4 borhanuddin 39 752 BOR/R-244 (A) Improvement of Kachia Gas Field RD Tobgi Jamal Kandi road at CH- 00-1523.0m Road ID 509214017 (B) Palisading Work (Effective Length- 269.0m) on the same Road(C) Construction of 3 no (1.0x1.0m) & 2 no (0.625x0.625m) RCC Box Culvert on the same Road at CH -275/435/773/1022/1444m 1.52 117.44   0.00 0 31/12/2018  
139 Bhola 4 borhanuddin 39 752 BOR/R-242 (A) Improvement of Bhola to Charfasshion CMB road Dalal Bazar North side to patawary bari Via Mohajon Bari Gas Field road at CH- 00-2342.0m Road ID 509215186(B) Palisading Work (Effective Length- 233.0m) on the same Road(C) Construction of 1 no (1.00x1.00m) & 3 no (0.625x0.625m) RCC Box Culvert on the same Road at CH -1346, 526,798,1791 2.34 165.31   0.00 0 31/12/2018  
140 Bhola 4 charfassion 5 752 CHA/R-290 A. Improvement of Ahammadpur Union Akota Bazar - Ali Ahammad Munshir Bari via Abdur Rab Bapari Bari. Road From Ch. 00-650m under Charfassion Upazila, (509255087) B. Improvement of Nurabad Dc Road - Maya River (Ghat) via Rari Bari Mosjid Road From Ch. 1200-2200m under Charfassion Upazila, (509255034) C. Improvement of Uttar Char Manika Dakkin Beri Badh (Rahim Munshir Bari) -North way of Nasir Master Bazar.Road From Ch. 00-500m under Charfassion Upazila, (509254199) 2.15 206.90   0.00 0 31/12/2018  
141 Bhola 4 charfassion 5 752 CHA/R-289 A. Improvement of Abdullahpur Sibarhat Bazar - South way of Surandip Khal. Road From Ch. 00-1000m under Charfassion Upazila, (509254198) B. Improvement of North Side of Janota Bazar (RHD) - East way of Kalapania Khal via Dafader Bari. Road From Ch. 00-500m under Charfassion Upazila, (509254195) C. Improvement of North Side of Nayeber Bridge (RHD) - East way of F. Rahaman Road From Ch. 00-500m under Charfassion Upazila, (509254194) 2.00 214.99   0.00 0 31/12/2018  
142 Bhola 4 charfassion 5 752 CHA/R-288 A. Improvement of Abdullahpur UP Abdul Hasem Khan Jame Moszid - Mina Bazar.Road From Ch. 00-500m under Charfassion Upazila, (509254197) B. Improvement of Shashibhussion-Anjurhat road(Iqbal Patwary Dokan) to Bazlur Bazar Road From Ch. 800-2000m under Charfession Upazila, (509254183) C. Improvement of Ahammadpur Union South Side of Akota Bazar - Mahafujul HoqeMowlana Bari Road From Ch. 600-1280m under Charfassion Upazila, (509255088) 2.98 222.46   0.00 0 31/12/2018  
143 Bhola 4 charfassion 5 752 CHA/R-287 A. Improvement of Rasulpur Dawan Bari Mosjid - West side More of Uttar Aicha Bazar (RHD Road). From Ch. 00-1000m under Charfession Upazila, (509254132) B. Improvement of RHD ( Miazir Khamar) - Baitul Gani Jame Moszid ( BC Road) via Ali Akbor Mazi Bari Moszid.Road From Ch. 1050-1550m under Charfession Upazila, (509254188) C. Improvement of North Aicha Bazar Embk. Via Golkhali khal From Ch. 1300-2755m under Charfession Upazila, (509254043) 2.96 240.40   0.00 0 31/12/2018  
144 Bhola 4 charfassion 5 752 CHA/R-286 A. Improvement of Uttar Aicha RHD Road- Shashibussion Atkapat road via Zahira Madrasha Cum Cyclone Shelter.Road From Ch. 1000-1850m under Charfession Upazila, (509254125) B. Improvement of Anjur hat Maya Bridge ( Adu Mirdah Bari) - Langlapata 1No. Word Hafej howlader Bari via Bokshi Berry Bazar Jame Moszid.Road From Ch. 00-500m under Charfession Upazila, (509254193) 1.35 125.32   0.00 0 31/12/2018  
145 Bhola 4 charfassion 5 752 CHA/R-285 Improvement of Kasemgonj Jalil Bapari Road (Kanchon Patowary Bari) - East way of Basir Bone Bazar (Embk)Road From Ch. 00-1735m under Charfession Upazila, (509255093) 1.74 209.22   0.00 0 31/12/2018  
146 Bhola 4 charfassion 5 752 CHA/R-284 Improvement of Nurabad Madrasha-Katchia Khali Bazar Road From Ch. 2500-4700m under Charfession Upazila, (509254006) 2.20 182.64   0.00 0 31/12/2018  
147 Bhola 4 charfassion 5 752 CHA/R-171 Improvement of Road From Betua RHD (Lounch Ghat) - Char Aicha GC Via Chairman Bazar Road at Ch- 8000-9300.0m (length-1300m) (Road ID- 509252007) 1.30 76.08 Md. Jasim Construction, Thana Road, Charfassion, Bhola. 76.08 26/06/2018 25/06/2019 0 31/12/2018  
148 Bhola 4 charfassion 5 752 CHA/R-15 Improvement of Road From RHD Road (Hali pad) - West way of Kuchiamora Dr. Bari Bridge Road at Ch.00m-2432.0m Road ID: 509254018 (BC Pavement Length – 2432.0m). Construction of Palisading Work on RHD Road (Hali pad) - West way of Kuchiamora Dr. Bari Bridge Road at Ch. 00-100m L/S, 280-336m L/S, 460-535m L/S, 590-620m L/S, 631-676m L/S, 721-731m L/S, 941-970m L/S, 1092-1149m L/S, 1260-1286m L/S . Road ID: 509254018 (Length -428m). Construction of 1 no (2m X 4.50m X 3.50m) (w-4.260m) RCC Box Culvert on RHD Road (Hali pad) - West way of Kuchiamora Dr. Bari Bridge Road. at CH- 815.0m. Road ID: 509254018 Construction of 4 no (1.50m X 1.50m) (w-5.50m) RCC Box Culvert on RHD Road (Hali pad) - West way of Kuchiamora Dr. Bari Bridge Road. at CH- 21.0m, 333.0m, 1928.0m, & 2075.0m. Road ID: 509254018 Construction of 10 no (0.75m X 0.75m) (w-5.50m) RCC Box Culvert on RHD Road (Hali pad) - West way of Kuchiamora Dr. Bari Bridge Road. at CH- 167.0m, 515.0m, 655.0m, 1040.0m, 1156.0m, 1260.0m, 1482.0m, 2024.0m, 2220.0m, 2342.0m, & 2386.0m. Road ID: 509254018 2.43 204.06 M/S Jasim Construction, Thana Road Charfashion, Bhola. 204.04 12/07/2017 07/04/2018 70 31/12/2018 WBM completed
149 Bhola 4 charfassion 5 752 CHA/R-144 Improvement of Samraj Done - West way of Madraj Done ( Zaman Road). Road at Ch- 00-1000.0m (length- 1000.0m) (Road ID – 509254202) Construction of (2 x 4.50m x 3.50m ) RCC Box Culvert on Samraj Done - West way of Madraj Done ( Zaman Road). Road at Ch- 600.00m 1.00 78.99 M/S Khan Traders, Charfassion, Bhola 78.95 19/02/2018 10/11/2019 0 31/12/2018  
150 Bhola 4 charfassion 5 752 CHA/R-143 Improvement of Nurabad DC Road to Maya River Via Abdul Ali Chairman Bari Road at Ch- 00-1000.0m (length- 1000.0m) (Road ID – 509255035) Construction of Palisading Work on Nurabad DC Road to Maya River Via Abdul Ali Chairman Bari Road at Ch- 00-1000.0m (Length –222.0m) Construction of 5 no (1.50m x 1.50m ) RCC Box Culvert on Nurabad DC Road to Maya River Via Abdul Ali Chairman Bari Road at Ch- 250.0m, 348m, 460m, 708m, & 847.0m 1.00 95.84 M/S Khan Traders Charfassion, Bhola 95.79 19/02/2018 10/11/2018 50 31/12/2018 WBM on going
151 Bhola 4 charfassion 5 752 CHA/R-142 Improvement of Anjur hat Road (Zor- Moszid) - Maya River Road. at Ch- 00-1000.0m (length- 1000.0m) (Road ID – 509255026) Construction of Palisading Work on Anjur hat Road (Zor- Moszid) - Maya River Road. at Ch- 00-1000.0m (Length –128.0m) Construction of 2 no (1.50m x 1.50m ) RCC Box Culvert on Anjur hat Road (Zor- Moszid) - Maya River Road. at Ch- 424.0m & 802.0m Construction of (0.75m x0.75m ) RCC U Drain on Anjur hat Road (Zor- Moszid) - Maya River Road. at Ch-115.0m 1.00 79.19 Nabarun Traders Limited, House#187/7, Basiruddin Road, Kalabagan, Dhaka 79.19 19/02/2018 10/11/2018 70 31/12/2018 WBM completed
152 Bhola 4 charfassion 5 752 CHA/R-141 Improvement of Betua RHD Roadat Ch- 00-695.0m (length- 695.0m) (Road ID – 509254147) Construction of Palisading Work on Betua RHD Roadat Ch- 00-695.0m (Length – 60.0m) Construction of (3.0m x 3.0m ) RCC Box Culvert on Betua RHD Roadat Ch- 618.0m Construction of (1.50m x 1.50m ) RCC Box Culvert on Betua RHD Roadat Ch- 112.0m 0.70 81.30 Nabarun Traders Limited, House#187/7, Basiruddin Road, Kalabagan, Dhaka 81.29 19/02/2018 10/11/2018 100 31/12/2018 BC Complete
153 Bhola 4 charfassion 5 752 CHA/R-14 Improvement of Charfession GC Betua road to Jinnagar U.HQ.via Chakbazar Road (Ch. 4000-4900m). ID: 509253052 (BC Pavement).Construction of Palisading Work on Charfession GC Betua road to Jinnagar U.HQ.via Chakbazar Road (Ch. 4670-4685m R/S). ID: 509253052 (Length 15m). Construction of 1no (1.5m x 1.5m) (w-5.5m) RCC Box Culvert on Charfession GC Betua road to Jinnagar U.HQ. via Chakbazar Road at Ch. 4630m. Road ID: 509253052. Construction of 3nos (0.75m x 0.75m) (w-5.5m) RCC Box Culvert on Charfession GC Betua road to Jinnagar U.HQ. via Chakbazar Road at Ch. 4157m, 4384m & 4475m. Road ID: 509253052. 0.90 68.42 M/S Fakrul Islam, Ward No-01, Charfashion, Pourashava, Bhola. 68.39 04/07/2017 19/03/2018 100 31/12/2018 BC Complete
154 Bhola 4 charfassion 5 752 CHA/R-137 Improvement of Ahammedpur Union Hazirhat Bazar - North way of Akota Bazar Pucca Road (Nilkamol UP Border). at Ch- 00-1000.0m (length- 1000.0m) (Road ID – 509255086) Construction of Palisading Work on Ahammedpur Union Hazirhat Bazar - North way of Akota Bazar Pucca Road (Nilkamol UP Border). at Ch- 00-1000.0m (Length – 59.0m) Construction of 4 no (0.75m x 0.75m ) RCC U Drain on Ahammedpur Union Hazirhat Bazar - North way of Akota Bazar Pucca Road (Nilkamol UP Border). at Ch- 315, 500m, 590m & 850m 1.00 74.48 M/S Khan Traders, Charfassion, Bhola 74.40 09/02/2018 11/10/2018 50 31/12/2018 WBM on going
155 Bhola 4 charfassion 5 752 CHA/R-136 Improvement of Char Manika Union Naya Miar Bari to Kalar Dhokan via Faruk Mamber Bari Road. at Ch- 00-845.0m (length- 845.0m) (Road ID – 509254217) Construction of Palisading Work on Char Manika Union Naya Miar Bari to Kalar Dhokan via Faruk Mamber Bari Road.at Ch-00-1000m (Length – 160.0m) Construction of 2 no (0.75m x 0.75m ) RCC U Drain on Char Manika Union Naya Miar Bari to Kalar Dhokan via Faruk Mamber Bari Road.at Ch- 585.0m & 669.0m 0.85 64.24 M/S Khan Traders, Charfassion, Bhola 64.19 25/02/2018 19/02/2018 50 31/12/2018 WBM on going
156 Bhola 4 charfassion 5 752 CHA/R-135 Improvement of Bhuiyarhat Abugonj BC Road Gulam Maulana Sikder Bari - Sundari Khal Road at Ch- 00-1000.0m (length-1000.0m) (Road ID – 509255079) Construction of Palisading Work on Bhuiyarhat Abugonj BC Road Gulam Maulana Sikder Bari - Sundari Khal Road at Ch- 00-845m (Length – 22.0m) Construction of 2 no (0.75m x 0.75m ) RCC U Drain on Bhuiyarhat Abugonj BC Road Gulam Maulana Sikder Bari - Sundari Khal Road at Ch- 360m, 983m 1.00 69.37 Md. Eunus Al Mamun, Thana Road, Charfassion, Bhola 69.33 11/02/2018 10/11/2018 50 31/12/2018 WBM on going
157 Bhola 4 charfassion 5 752 CHA/R-134 Improvement of Road From Charfassion Dularhat Road (Bat tala) -Surudip Khal Road. at Ch- 1000-2000m (length-1000.0m) (Road ID – 509254203) Construction of Palisading Work on Road From Charfassion Dularhat Road (Bat tala) -Surudip Khal Road. at Ch- Ch- 1000-2000m (Length – 182.0m) Construction of 5 no (0.75m x 0.75m ) RCC U Drain on Road From Charfassion Dularhat Road (Bat tala) -Surudip Khal Road. at Ch- 1235m 1400m, 1569m, 1807m, 1973m 1.00 81.88 Nabarun Traders Limited, House#187/7, Basiruddin Road, Kalabagan, Dhaka 81.87 11/02/2018 10/11/2018 100 31/12/2018 Final bill payment
158 Bhola 4 charfassion 5 752 CHA/R-119 Improvement of Road From Golderhat - WDB Embk. (UZR Road) at Ch- 1000-2000.0m (length-1000.0m) (Road ID – 509254182) Construction of Palisading Work on Golderhat - WDB Embk. (UZR Road) at Ch- 1182 1196 RS, 1290-1321 LS, 1509-1521 RS, 1847-1867 RS (Length – 77.0m) Construction of (0.75m x 0.75m ) RCC U Drain on Golderhat - WDB Embk. (UZR Road) at Ch- 1595.00m Construction of (2.0m X 4.50m X 3.50m) RCC box Culvert on Golderhat - WDB Embk. (UZR Road) at Ch- 1994.00m 1.00 85.60 M/S Eunus Al Mamun, Thana Road Charfashion, Bhola. 85.57 11/02/2018 10/11/2018 30 31/12/2018 ISG
159 Bhola 4 charfassion 5 752 CHA/R-118 Improvement of Road From Vhuter Khal - Mukharbanda Khal Near Farazi Bari (Mazahar Ali Road) at Ch- 00-1125.00m (length-1125m) (Road ID- 509254029) Construction of Palisading Work on Vhuter Khal - Mukharbanda Khal Near Farazi Bari (Mazahar Ali Road) at Ch- 233-271LS, 978-993 LS, 1094-1101 RS (length-60.0m) Construction of 7 no (0.75m x 0.75m ) RCC U Drain on Vhuter Khal - Mukharbanda Khal Near Farazi Bari (Mazahar Ali Road) at Ch- 58m, 114m, 235m, 549m, 755m, 875m & 1058m 1.13 88.90 M/S Nabarun Traders Ltd, House No. 187/7, Lake Circus, Bashir Uddin road, Kalabagan, Dhaka-1205, Bangladesh 88.90 11/02/2018 10/11/2018 70 31/12/2018 WBM completed
160 Bhola 4 charfassion 5 752 CHA/R-117 Improvement of Road From Gazaria Shashibussion Road (Keramot Ali Moszid) - East way of Kuchiamora Madrasha Road Via College Road 02 No. Bridge Road at Ch- 00-2075.0m (length-2075m) (Road ID- 509254190) Construction of Palisading Work on Gazaria Shashibussion Road (Keramot Ali Moszid) - East way of Kuchiamora Madrasha Road Via College Road 02 No. Bridge Road at Ch- 811-835 RS, 825-834LS, 2050-2070 RS (length-53.0m) Construction of 5 no (0.75m x 0.75m ) RCC U Drain on Gazaria Shashibussion Road (Keramot Ali Moszid) - East way of Kuchiamora Madrasha Road Via College Road 02 No. Bridge Road at Ch- 294m, 1210m, 1323m, 1453m & 1982m Construction of (3.00m x 3.00m) RCC box Culvert on Gazaria Shashibussion Road (Keramot Ali Moszid) - East way of Kuchiamora Madrasha Road Via College Road 02 No. Bridge Road at Ch- 824.00m 2.08 151.78 M/S Nabarun Traders Ltd, House No. 187/7, Lake Circus, Bashir Uddin road, Kalabagan, Dhaka-1205, Bangladesh 151.77 11/02/2018 10/02/2019 100 31/12/2018 BC Completed
161 Bhola 4 charfassion 5 752 CHA/R-116 Improvement of Road From West Side of RHD Road - Vhanchar Abason Project Via Moulobi Road at Ch- 1200-2200.0m (length-1000.0m) (Road ID- 509255062) Construction of (0.75m x 0.75m ) RCC U Drain on West Side of RHD Road - Vhanchar Abason Project Via Moulobi Road at Ch- 1900.0mConstruction of (3.00m x 3.00m) RCC box Culvert on West Side of RHD Road - Vhanchar Abason Project Via Moulobi Road at Ch- 1377.0m Construction of (2.0m x 4.50m x 3.50m) RCC box Culvert on West Side of RHD Road - Vhanchar Abason Project Via Moulobi Road at Ch- 1770.0m 1.00 98.08 Md. Eunus Al Mamun, Thana Road Charfashion, Bhoal 98.05 20/03/2018 19/12/2018 0 31/12/2018 RE-Tender
162 Bhola 4 charfassion 5 752 CHA/R-115 IImprovement of Road From Kalmi bridge bazar-South Char Aicha bazar via Rasulpur UP Office Road at Ch- 7300-9800.0m (length-2500.0m) (Road ID- 509253041) Construction of Palisading Work on Kalmi bridge bazar-South Char Aicha bazar via Rasulpur UP Office Road at Ch- 8847-8868m LS (length- 21.0m) Construction of 2 no (1.50m x 1.50m) RCC box Culvert on Kalmi bridge bazar-South Char Aicha bazar via Rasulpur UP Office Road at Ch- 7836m & 8500m Construction of (3.00m x 3.00m) RCC box Culvert on Kalmi bridge bazar-South Char Aicha bazar via Rasulpur UP Office Road at Ch- 9690.0m Construction of (2.0m x 4.50m x 3.50m) RCC box Culvert on Kalmi bridge bazar-South Char Aicha bazar via Rasulpur UP Office Road at Ch- 9785.0m 2.50 195.20 M/S Eunus al Mamun, Thana road Charfashion Bhola. 195.16 11/02/2018 10/02/2019 70 31/12/2018 WBM completed
163 Bhola 4 charfassion 5 752 CHA/R-114 Improvement of Road From Mukharbandha Khal (Bridge) - North way of Oli Mia Chowkider Bari (Principal Nazrul Islam Road). at Ch- 500-2000.0m (length-1500.0m) (Road ID- 509255156) Construction of Palisading Work on Mukharbandha Khal (Bridge) - North way of Oli Mia Chowkider Bari (Principal Nazrul Islam Road). at Ch- 955-960 RS, 1295-1310 LS, 1356-1368 RS, 1477-1500 LS, 1487-1513 RS, 1667-1684 RS (Length- 89.00) Construction of 8 no (1.50m x 1.50m) RCC box Culvert on Mukharbandha Khal (Bridge) - North way of Oli Mia Chowkider Bari (Principal Nazrul Islam Road). at Ch- 950m, 1044m, 1152m, 1237m, 1331m, 1629m, 1700m, & 1860m Construction of 4 no (0.75m x 0.75m) RCC box Culvert on Mukharbandha Khal (Bridge) - North way of Oli Mia Chowkider Bari (Principal Nazrul Islam Road). at Ch- 636.0m, 870m, 1823m & 1984m. 1.50 139.08 M/S Jasim Construction, Bhola Sadar Bhola 139.03 11/02/2018 10/02/2019 70 31/12/2018 WBM completed
164 Bhola 4 charfassion 5 752 CHA/R-113 Improvement of Road From Kasemgonj Jalil Bapari Road (06 No Ward) - West way of Mollah Bari road. at Ch- 00-1200.0m (length-1200.0m) (Road ID- 509255092) Construction of Palisading Work on Kasemgonj Jalil Bapari Road (06 No Ward) - West way of Mollah Bari road. at Ch- 5-42m RS, 46-76M RS, 78-112M, BS, 112-141 RS, 412-427 RS, 438-451 RS, 473-495 RS, 618-630 RS, 696-717 RS, 803-853 RS, 914-939RS, 943-955 RS (Length- 334.0m) Construction of 6 no (0.75m x 0.75m) RCC U Drain on Kasemgonj Jalil Bapari Road (06 No Ward) - West way of Mollah Bari road. at Ch- 242m, 412m, 473m, 717m, 824m & 1122m Construction of (1.50m x 1.50m) RCC RCC box on Kasemgonj Jalil Bapari Road (06 No Ward) - West way of Mollah Bari road. at Ch- 100.0m 1.20 109.10 M/S Nabarun Traders Ltd, House No. 187/7, Lake Circus, Bashir Uddin road, Kalabagan, Dhaka-1205, Bangladesh 109.08 11/02/2018 10/02/2019 100 31/12/2018 final bill payment
165 Bhola 4 charfassion 5 752 CHA/R-112 Improvement of Road From Boktirhat Baburhat Pucca Road (Kasem Akhon Bridge) - Sharek Khali Bridge Road. at Ch- 00-1500.0m (length-1500m) (Road ID- 509254191) Construction of 7 no (0.75m x 0.75m) RCC RCC box on Boktirhat Baburhat Pucca Road (Kasem Akhon Bridge) - Sharek Khali Bridge Road. at Ch- 165m, 244m, 500m, 722m, 810m, 1021m & 1142.0m 1.50 117.74 M/S Eunus al Mamun, Thana Road Charfashion 117.69 11/02/2018 10/02/2019 50 31/12/2018 SUB on going
166 Bhola 4 charfassion 5 752 CHA/R-111 Improvement of Road From Charfassion Dularhat Road -Surudip Khal Road Via Hazirhat Road. at Ch- 1800-3750.0m (length-1950m) (Road ID- 509254051) Construction of Palisading Work on Charfassion Dularhat Road -Surudip Khal Road Via Hazirhat Road. at Ch- 1807-1823m RS, 1850-1865M RS, 1890-1917M LS, 1929-1948M RS, 1973-1990 LS, 2104-2113M RS (Length- 103.0m) Construction of 7 no (0.75m x 0.75m) RCC RCC box on Charfassion Dularhat Road -Surudip Khal Road Via Hazirhat Road. at Ch- 1994m, 2100m, 2250m, 2610m, 3191m, 3556m & 3570m. Construction of (3.0m x 3.0m) RCC box Culvert on Charfassion Dularhat Road -Surudip Khal Road Via Hazirhat Road. at Ch-.2890.0m 1.95 161.36 M/S Khan Traders , 8340, Charfashion, Bhola 161.27 11/02/2018 10/02/2019 70 31/12/2018 WBM completed
167 Bhola 4 charfassion 5 752 CHA/R-110 Improvement of Road From RHD Road (Salam Patowary House) - West way of Buragaurango River Via Shashibussion Gazaria GC Road & West Awaspur 49 No.GPS Road at Ch- 1000-4000.0m (length-3000m) (Road ID- 509254085) 3.00 238.20 Md. Eunus Al Mamun, Thana Road, Charfassion, Bhola 238.16 22/02/2018 14/02/2019 70 31/12/2018 WBM completed
168 Bhola 4 charfassion 5 752 CHA/R-109 Improvement of Road From Betua RHD (Lounch Ghat) - Char Aicha GC Via Chairman Bazar Road at Ch- 4000-8000.0m (length-4000m) (Road ID- 509252007) 4.00 234.04 Nabarun Traders Limited, House#187/7, Basiruddin Road, Kalabagan, Dhaka 234.01 11/02/2018 10/02/2019 30 31/12/2018 ISG
169 Bhola 4 charfassion 5 752 CHA/R-108 Improvement of Road From Betua RHD (Lounch Ghat) - Char Aicha GC Via Chairman Bazar Road at Ch- 00-4000.0m (length-4000m) (Road ID- 509252007) 4.00 234.04 Nabarun Traders Limited, House#187/7, Basiruddin Road, Kalabagan, Dhaka 234.03 11/02/2018 10/02/2019 70 31/12/2018 WBM completed
170 Bhola 4 charfassion 5 752 CHA/R-09 A. Improvement of Goni Chairman C.S-WDB Embk. via Omrabaz Cyclone Shelter Road at CH- 00-1000.00m. B. Construction of Palisading Work on Goni Chairman C.S-WDB Embk. via Omrabaz Cyclone Shelter Road at CH- 498.00-514.00m B/S, 622.00-630.00m L/S. ( Length 24m). C. Construction of 2 no’s (3.00mx4.50mx3.50m) (W-4.26m) Three Vent RCC Box Culvert on Goni Chairman C.S-WDB Embk. via Omrabaj Syclone Shelter Road . at CH- 230.00m & 445.00m. Road ID:509255007. 1.00 110.90 M/S Fakrul Islam, Ward-01, Charfashion Pourashava, Bhola 110.87 22/06/2017 06/07/2018 100 31/12/2018 BC Complete
171 Bhola 4 charfassion 5 752 CHA/R-08 A. Improvement of Charfassion GC Dularhat GC (Kabir Shop) - North Way of Siddque Howladar Bazar Ghosher hat Road via Madrasha & Dularhat Adarsha Collage Road Ch.1200m-2990m, B) Construction of Palisading Work on Charfassion GC Dularhat GC (Kabir Shop) - North Way of Siddque Howladar Bazar Ghosher hat Road via Madrasha & Dularhat Adarsha Collage Road at Ch.1496m-1508m R/S, 1877m-1892m R/S, 1922m-1944m R/S, 2011m-2028m L/S, 2561m-2570m R/S, 2675m-2685m R/S, 2801m-2813m R/S. C) Construction of 1no (3.00m x 3.00m) (w-4.26m) RCC Box Culvert on Charfassion GC Dularhat GC (Kabir Shop) - North Way of Siddque Howladar Bazar Ghosher hat Road via Madrasha & Dularhat Adarsha Collage. at CH- 2410.00m. D) Construction of 5nos (0.75m x 0.75m) (w-5.5m) RCC Box Culvert on Charfassion GC Dularhat GC (Kabir Shop) - North Way of Siddque Howladar Bazar Ghosher hat Road via Madrasha & Dularhat Adarsha Collage. at CH- 1510m, 1940m, 2113m, 2712m, 2940m). Road ID: 509254119 1.79 133.17 M/S Khan Traders, 8340, Charfassion, Bhola 133.09 22/06/2017 06/07/2018 100 31/12/2018 Final bill payment
172 Bhola 4 daulatkhan 30 752 DA/R-67 Improvement of Faruk miar hat-Noor miar hat to Eddgha road at CH- 00-480.00m (Length-480.0m) Road ID- 509295018 0.48 33.21 Md. Ruhul Amin, Amin Villa, Muslimpara Bhola Sadar Bhola. 33.19 20/11/2017 12/08/2018 60 31/12/2018 WBM ON GOING
173 Bhola 4 daulatkhan 30 752 DA/R-154 Improvement of Improvement of Charpata Komaruddin to Angali rani Members house at CH- 1000-2427.0m (Effective Length- 1440.0m) Road ID: 509295051 Construction of 4 no (0.625m x0.625m) U Drain on Charpata Komaruddin to Angali rani Members house at CH- 1441.0m 1.43 98.79 Md. Zakir Hossain, Md. Zakir Hossain, Masuma Khanam Road, Bhola 98.76 26/04/2018 17/04/2019 50 31/12/2018 Sub Base on going
174 Bhola 4 daulatkhan 30 752 DA/R-153 Improvement of Improvement of Chiltatali bazar UZR to Azim Rari Howla Madrasha road at Ch- 00-1455.0m (Effective Length- 1440.0m) Road ID: 509294020 Construction of (2.50m x 2.50m x 5.50m) RCC box Culvert on Chiltatali bazar UZR to Azim Rari Howla Madrasha road at Ch- 630.0m Construction of 4 no (0.625m x0.625m) U Drain on Chiltatali bazar UZR to Azim Rari Howla Madrasha road at Ch- 61m, 250m, 370m & 548.0m 1.44 107.84 M/S Eli Enterprise, Sadar Road, Bhola 106.99 26/04/2018 17/04/2019 50 31/12/2018 WBM ON GOING
175 Bhola 4 daulatkhan 30 752 DA/R-152 Improvement of Charpata old kazir hat to Gharami bariat CH- 405-1405.0m (Effective Length- 1000.0m) Road ID: 509294024 Construction of 2 no (0.625m x0.625m) U Drain on Charpata old kazir hat to Gharami bariat CH- 792m & 1235m 1.00 65.15 M/S Shanto Enterprise, Holding No-309, Ukilpara, Bhola 65.15 01/05/2018 22/09/2019 0 31/12/2018  
176 Bhola 4 daulatkhan 30 752 DA/R-151 Improvement of Improvement of North Jaynagar UP Office – Chalitatali Bazar Road at CH- 00-1386.0m (Effective Length- 1386.0m) Road ID: 509294030 Construction of 4 no (0.625m x0.625m) U Drain on North Jaynagar UP Office – Chalitatali Bazar Road at CH- 465m, 822m, 929m & 1301m 1.39 95.80 M/S Sayem Enterprise, Kalinath Rayer Bazar, Sadar, Bhola 95.90 30/09/2018 21/09/2019 70 31/12/2018 WBM Completed
177 Bhola 4 daulatkhan 30 752 DA/R-07 A) Improvement of Kalakopa- Sanibari road at CH- 700-1700m. B) Improvement of Kalakopa- Sanibari road at CH- 719-811 R/S, 841-870 R/S, 1068-1086 L/S, 1377-1391 L/S, 1359-1389 R/S. ID: 509294031 (Including 3 nos Box Culvert) 1.00 72.92 Md. Nazrul Islam Chunnu. Alinagor, Sadar, Bhola 72.92 22/06/2017 07/03/2018 70 31/12/2018 WBM Completed
178 Bhola 4 daulatkhan 30 752 DA/M-29 Earth Work on Khayer hat GC to Bhola-Charfession R&H Road at CH- 00-4880m (3144.36m3) Maintenance of Pavment & Surfacing Eorks on Khayer hat GC to Bhola-Charfession R&H Road at CH- 00-4880m (Length-4880.m) Road ID- 509294028 Construction of 4 no 1.0x1.0x5.50m RCC Box Culvert on Khayer hat GC to Bhola-Charfession R&H Road at CH- 240n, 626m, 1466m, 2913m Construction of Palisading work on Khayer hat GC to Bhola-Charfession R&H Road at CH- 690-721m L/S, 1898-1961m L/S, 3065-3107m L/S (Length-136.0m. 4.88 99.11 Md. Farid Uddin, Daulotkhan Bazar, Daulotkhan, Bhola 99.06 20/11/2017 12/08/2018 100 31/12/2018 Final Bill Payment
179 Bhola 4 daulatkhan 30 752 DA/M-28 Earth Work on Noor miar hat to Chailtatali hat to Chailtatali hat UZR Road at CH- 00-4910m (2621m3) Maintenance of Pavment & Surfacing Eorks on Noor miar hat to Chailtatali hat to Chailtatali hat UZR Road at CH- 00-5315.0m (Length-5315.0m) Road ID- 509294013 Construction of 1.0x1.0x5.50m RCC Box Culvert on Noor miar hat to Chailtatali hat to Chailtatali hat UZR Road at CH- 1498.0m Construction of Palisading work on Noor miar hat to Chailtatali hat to Chailtatali hat UZR Road at CH- 178-184m L/S, 362-388m R/S, 465-480m L/S, 752-780m L/S, 667-684m R/S, 721-752m L/S, 844-862m L/S, 915-928m L/S, 968-985m L/S, 1002-1023m L/S, 1120-1129m L/S, 1175-1198m R/S, 1721-1729m R/S, 2201-2238m R/S, 2352-2364m R/S, 3150-3166m R/S, 3269-3306m R/S3426-3458m R/S, 4090-4102m R/S (Length-351.0m) 5.32 134.56 M/S Sayem Enterprise, Kalinath Rayerbazar, Bhola Sadar, Bhola 134.56 18/10/2017 10/10/2018 100 31/12/2018 Final Bill Payment
180 Bhola 4 daulatkhan 30 752 DA/M-27 Earth Work on South charshuvi Faruk miar hat to Noormiarhat Raod at CH- 00-3407.0m (2143.0m3) Maintenance of Pavment & Surfacing Eorks on South charshuvi Faruk miar hat to Noormiarhat Raod at CH- 00-3470.0m (Road ID- 509294015) Construction of 5no 1.0mx1.0mx5.50m RCC Box Culvert on South charshuvi Faruk miar hat to Noormiarhat Raod at CH- 72.0m, 137m, 530m, 660m Construction of Palisading work on South charshuvi Faruk miar hat to Noormiarhat Raod at CH- 688-703 R/S, 728-745m L/S, 761-777 m L/S, 952-968 m L/S, 1057-1070 m L/S, 1074-1105 m L/S, 1250-1288 m R/S,, 1536-1558 m R/S, 1876-1955 m L/S, 2666-2685 m R/S,, 2968-2983m R/S, 2990-3020 m R/S,3030-3040 m R/S,3077-3086 m R/S,3170-3183 m R/S.3327-3339 m R/S, (Length-381.0m) 3.47 100.20 M/S Farid Uddin, Daulatkhan Bazar, Bhola 100.17 25/10/2017 17/10/2018 100 31/12/2018 Final Bill Payment
181 Bhola 4 daulatkhan 30 752 DA/M-23 Maintenance of Banglabazaar-Daulatkhan R&H to (Kalim Patwary bari) to Helipad road at CH- 00-900.00m (Length- 900.0m) road ID- 509295058 Construction of Palisading work on Banglabazaar-Daulatkhan R&H to (Kalim Patwary bari) to Helipad road at CH- 30-52 LS, 245-281 LS, 315-335 RS, 393-424 RS. (Length- 109.0m) Construction of (1.0mx1.0mx5.50m) RCC Box Culvert on Banglabazaar-Daulatkhan R&H to (Kalim Patwary bari) to Helipad road at CH- 50.0m 0.90 25.42 M/S Farid Uddin, Daulatkhan Bazar, Bhola 25.40 25/10/2017 17/04/2018 100 31/12/2018 Final Bill Payment
182 Bhola 4 daulatkhan 30 752 DA/M-22 Maintenance of Chailtatali-Noormiarhat road to Howlader para NGPS via mohon propesar bari at CH- 00-607.0m (Length – 607m) Road ID 509295069 Construction of Palisading work on Chailtatali-Noormiarhat road to Howlader para NGPS via mohon propesar bari at CH- 67-110 LS, 297-314 LS, 430-453 LS, 560-580 RS, 579-589 LS. (Length- 113.0m) 0.61 17.81 M/S Rahima Construction, West Joynagar, Daulotkhan 17.79 18/10/2017 10/04/2018 100 31/12/2018 Final Bill Payment
183 Bhola 4 daulatkhan 30 752 DA/M-21 Maintenance of Daulatkhan GC to (Daulatkhan Live Stock office) Guinger hat-Daulatkhan UZR via Radhaballov GC road at CH- 00-720.0m (length-720.0m) road ID- 509293007 Construction of Palisading work on Maintenance of Daulatkhan GC to (Daulatkhan Live Stock office) Guinger hat-Daulatkhan UZR via Radhaballov GC road at CH- 239-260 RS, 355-367 RS, 432-459 RS, 465-484 RS, 503-517 RS, 565-591 RS, 604-615 RS, 654-705 RS. (Length- 181.0m) 0.72 25.59 M/S Farid Uddin, Daulatkhan Bazar, Bhola 25.58 25/10/2017 17/07/2018 100 31/12/2018 Final Bill Payment
184 Bhola 4 daulatkhan 30 752 DA/M-20 Maintenance of Orni Brick field to Azimuddin Noor miar hat Road at CH- 00-909.0m (length-909m) road ID- 509295057 Construction of Palisading work on Orni Brick field to Azimuddin Noor miar hat Road at Ch-332-387m LS, 332-363 RS, 387-409 RS, 437-459 RS, 487-500 LS, 847-867 LS. (Length- 163.0m) 0.91 23.96 M/S Rahima Construction,West Joynagar, Bhola 23.95 25/10/2017 10/04/2018 100 31/12/2018 Final Bill Payment
185 Bhola 4 daulatkhan 30 752 DA/M-06 0.61 13.20 M/S Farid Uddin, Daulatkhan Bazar, Daulatkhan, Bhola. 13.18 14/06/2017 30/11/2017 100 31/12/2018 Final Bill Payment
186 Bhola 4 daulatkhan 30 752 DA/M-05 A. Maintenance of Moulovi Shanko to Bhola Charfassion RHD Road. from ch- 712m-1810m Road ID 509294029 1.10 24.86 M/S Farid Uddin, Daulatkhan Bazar, Daulatkhan. 24.85 14/06/2017 30/11/2017 100 31/12/2018 Final Bill Payment
187 Bhola 4 daulatkhan 30 752 DAU/M-271 Periodic Maintenance of Banglabazar-Doulatkhan UZR (Hasmat Bepari Baro) to WAPDA Embankment at Ch. 00 -1082 m under DaulatkhanUpazila. (509295103) Periodic Maintenance of Noor Miar Hat-Chailtatali Raad-Palowan Bari Road at Ch. 00-585m under DaulatkhanUpazila. (509295097) Periodic Maintenance of Middle Kalakopa GPS road-Chowkider Bari road at Ch. 00 -.1063m under Daulatkhan Upazila. (509295049) 2.73 99.91   0.00 0 31/12/2018  
188 Bhola 4 daulatkhan 30 752 DAU/R-237 Improvement of KalacopaHazibari Mosque to Box Ali road via St. Munshir hat road at CH -3340-3710.0m Road ID 509294001 Palisading Work at CH- 3530-3710.0m (Effective Length – 32.0m) on the same Road. Construction of (0.625m x 0.600m) RCC Box Culvert at CH- 3442.0m 0.37 25.15 M/S Z.R Traders, Boro Manika, Manika, Borhanuddin, Bhola 25.14 0 31/12/2018  
189 Bhola 4 daulatkhan 30 752 DAU/R-236 Improvement of Charpata Nagar Member bari to North joynagarMadrash.road at CH- 00-852.0m Road ID - 509295013 0.86 48.05 M/S Farid Uddin, Daulatkhan Bazar , Daulatkhan, Bhola 48.02 0 31/12/2018  
190 Bhola 4 daulatkhan 30 752 DAU/R-174 Improvement of Charpata UP office to Dhania bari road at CH- 00-792.00m (Effective Length – 792.00m) Road ID - 509294023 Palisading Work at CH- 00-792.0m (Effective Length – 104.0m) on the same Road. Construction of (0.625m x 0.600m) RCC Box Culvert at CH- 185.0m 0.79 41.46 Md. Kamal Hossain, Kalakopa, Daulatkhan, Bhola 41.45 03/07/2018 25/06/2019 0 31/12/2018  
191 Bhola 4 daulatkhan 30 752 DAU/R-173 Improvement of Bangla bazar-Daulatkhan RHD to Miar hat hawlader road at CH- 00-766.0m (Bechu Maler bari to Ali Miar dighi) (Effective Length – 766.00m) Road ID - 509295066 Palisading Work at CH- 00-766.0m (Effective Length – 167.0m) on the same Road. Construction of 2 no (0.625m x 0.600m) RCC Box Culvert at CH- 372.0m & 623.0m 0.77 55.39 Md. Farid Uddin, Daulatkhan Bazar, Daulatkhan, Bhola. 55.38 30/07/2018 29/06/2019 70 31/12/2018 WBM ON GOING
192 Bhola 4 daulatkhan 30 752 DAU/R-172 Improvement of Helipad road to Doska bridge at CH- 00-792.00 (Effective Length – 792.00m) Road ID - 509295011 Palisading Work at CH- 00-792.0m (Effective Length – 498.00m) on the same Road. 0.79 72.30 Md. Kamal Hossain, Kalakopa, Daulatkhan, Bhola 72.28 30/07/2018 25/06/2019 0 31/12/2018  
193 Bhola 4 lalmohan 6 752 LAL/STR-274 Consruction of 25.00m Long RCC Gurder bridge on Lalmohan Chowmohoni-Karterhat (East) Road (Miar Hat Near Mawlana Nazrul Islam Bari at Ch.10m) at Ch.2+500Km Under Lalmohan, Bhola.(509543002) 254.23   0.00 0 31/12/2018  
194 Bhola 4 lalmohan 6 752 LAL/R-273 Improvement of Mongol Shikder Bazar-Fatemabad Road-Lordhardings Chatla Bazer (South side of Chatla Mohammadia GPS) Road From Ch.00-1004m Lalmohan ID No-509545134 Improvement of Lalmohan Chawmohini- Balurchar Bazar Road From Ch.1925-2450m Lalmohan ID No-509543004 1.57 156.62 Md. Akter Hossain, Pourakathali, Bhola Sadar, Bhola. 156.62 0 31/12/2018  
195 Bhola 4 lalmohan 6 752 LAL/R-272 Improvement of Madrasha Bazar Road- Chan Miar Hat via Sayadabad GPS From Ch.1000-2006m Lalmohan ID No-509545022 Improvement of Taragonj Alamiah Madrasha Bazer-Miar Hat Road Via H/O Waziullah Sharder From Ch.00-925m Lalmohan ID No-509545176 2.06 188.33 Md. Akter Hossain, Pourakathali, Bhola Sadar, Bhola. 188.33 0 31/12/2018  
196 Bhola 4 lalmohan 6 752 LAL/R-260 Improvement of Char Bhuta UP- Chatla Bazar via Lengutia GPS Road From Ch.4200-5923m Lalmohan ID No-509543010 1.70 154.49 M/S Howlader Construction, Shams Grehaion, Holding No – 734, Ward No-05, Lalmohon Bhola. 154.49 0 31/12/2018  
197 Bhola 4 lalmohan 6 752 LAL/R-259 Improvement of Char Bhuta UP- Chatla Bazar via Lengutia GPS Road From Ch.2500-4200m Lalmohan ID No-509543010 1.70 151.88   0.00 0 31/12/2018  
198 Bhola 4 lalmohan 6 752 LAL/M-261 Maintenance of New ID & Name: Pachim Char Umed UPC-Gazaria Sluice Bazar Via Keramottoa Madrasha Road at CH- 00-1076.0m Old Name: Gazaria Senior Madrasha -Gazaria Sluice Bazer. Road ID 09544026 Maintenance of New ID & Name: Purba Char Ummed jalal Master Bari Bridge-Mugria Bazar from CH- 00-1415.0m ID 509545216. Old Name & ID: Old Muguria Bazar -New Muguria Bazar UNR 3001 ID 509544009. 2.49 123.41 Md. Asadullah, Bhola Sadar, Bhola. 117.24 0 31/12/2018  
199 Bhola 4 lalmohan 6 752 LAL/STR-254 (A) Construction of 40.0m long PC Gurder bridge on Lord Harding Up- Fatimabad Sluice Gate Bazar Road at CH- 2+100km Road ID 509543016 (B) Construction of 34.0m long RCC Gurder bridge on RHD North side of College to Hazir hat road at CH- 2+500km Road ID 509543008 592.36   0.00 0 31/12/2018  
200 Bhola 4 lalmohan 6 752 LAL/GCM-245 (A) Development of Chairman Hat under Lalmohan UP(B) Development of Chatla Dalal Bazar under Lalmohan Upazila(C) Development of Lordharding Bazar under Lalmohan Upazila(D) Development of GM Bazar uunder Lalmohan Upazila(E) Development of Charbhuta Janata Bazar under Lalmohan Upazila(F) Development of Ramagonj Chawmohoni Bazar under Lalmohan Upazila(G) Development of South Khasher hat Bazar under Shambopur union under Tazimuddin Upazila(H) Development of Chatta Dowari Baza, under Chandpur union under Tazimuddin Tazimuddin Upazila 198.53 M/S Tahura Enterprise, 05 No Ward, Kalinath roy Bazar Bhola 188.60 0 31/12/2018  
201 Bhola 4 lalmohan 6 752 LAL/R-246 Improvement of Lalmohan RHD-West very banth (Bedorkari road) Bhola Charfashion RHD( Ananda Bazar) Gaimara Sluice gate Bazar (Tofayel miah sarak) at CH- 00-1000.00m Road ID 50945063Construction of Palisading work at CH- 15m-832.0m (Effective Length- 74.0m) on the same roadConstruction of 2 no (0.75m x0.75m) RCC Box Culvert at CH- 28m & 660.0m on the same road. Construction of 2 no (1.50m x1.50m) RCC Box Culvert at CH- 28m & 660.0m on the same road Construction of (3.00x3.00m) RCC Box Culvert at CH- 581.0m on the same road 1.00 95.48 Md. Nazrul Islam Cunnu, Alinagar, Bhola Sadar, Bhola 90.70 0 31/12/2018  
202 Bhola 4 lalmohan 6 752 LAL/STR-209 Construction of RCC Box Culvert size (2x 4.50 x 4.50m) (W.5.50m) on Lordharding Up- Madrasha Bazar Embankment Road at CH- 1050.00m Road ID- 509543015 & Construction of of RCC Box Culvert size (2x 4.50 x 4.50m) (W.5.50m) on R&H (Shada Pol)-Kalirtak Bazer via Balam Char Kandi road at CH- 1010.00m Road ID-509544035 76.69 M/S Bhuya Enterprsie 72.86 26/08/2019 0 31/12/2018  
203 Bhola 4 lalmohan 6 752 LAL/STR-130 Consruction of 20.0m RCC Gurder bridge on Ramagonj UP - Miar Hat Road at CH- 3200.0m (ID No- 509543011) Earth Work on Ramagonj UP - Miar Hat Road at CH- 3200.0m 145.78 Md. Rashaduzzaman Peter, Md. Rashaduzzaman Peter, Ward No.04, Lalmohan, Bhola 145.77 70 31/12/2018 Abultment work on going
204 Bhola 4 lalmohan 6 752 LAL/R-57 Improvement of Raychad Road- Katatara Khal road at CH- 00-2000.0m (Length- 2000m) Raod ID- 509544001Construction of Palisading Work on Raychad Road- Katatara Khal road at CH- 1040m R/S, 15-50m L/S, 1385-1405m R/S, 1880-1900m R/S. (Length- 105.0m) Construction of 3 no (1.50mx1.50m) RCC box Culvert on Raychad Road- Katatara Khal road at CH- 420m, 1385m & 1900m Construction of 3 no (0.75x0.75m) RCC box Culvert on Raychad Road- Katatara Khal road at CH- 250m, 900m & 1700m 2.00 146.11 Md. Iqbal Hossain, Rahim Villa, Poura Kathali, Bhola Sadar, Bhola. 146.11 20/06/2017 12/03/2018 60 31/12/2018 Sub Base on going
205 Bhola 4 lalmohan 6 752 LAL/R-55 Improvement of Hazigonj Junior High School-Betua river (H/o Bazlu Mia road) Banghabandhu Sarak road at Ch- 2700-3450.0m (length-750m ) Road ID- 50945167 Construction of Palisading Work on Hazigonj Junior High School-Betua river (H/o Bazlu Mia road) Banghabandhu Sarak road at Ch- 2740-2769m R/S, 2881-2900m R/S, 2940-2950m L/S, 3010-3035m L/S. (Length – 83.0m) Construction of 3 no RCC (0.75x0.75m) box Culvert on Hazigonj Junior High School-Betua river (H/o Bazlu Mia road) Banghabandhu Sarak road at Ch- 2710m, 3073m & 3370m 0.75 54.93 M/S Ma Moni Enterprise, 8 no Word Pourashava, Lalmohon Bhola. 54.90 25/10/2017 17/07/2018 50 31/12/2018 WBM on going
206 Bhola 4 lalmohan 6 752 LAL/R-54 Improvement of Natun Bazar (Lordharding) - Char Udaykhali Wapda Road at CH- 00-1050m (Length – 1050m ) Road ID- 509545004Construction of Palisading Work on Natun Bazar (Lordharding) - Char Udaykhali Wapda Road at CH- 14-20m BS, 24-32m BS, 300-312m LS, 514-532m RS. (length- 58.0) Construction of RCC (3.0mx3.0m) box Culvert on Natun Bazar (Lordharding) - Char Udaykhali Wapda Road at CH- 20m Construction of 5 no RCC (0.75x0.75m) box Culvert on Natun Bazar (Lordharding) - Char Udaykhali Wapda Road at CH- 20m 1.05 89.14 M/S Bhuya Enterprise, Charfashion Bhola 89.10 25/10/2017 17/07/2018 50 31/12/2018 WBM on going
207 Bhola 4 lalmohan 6 752 LAL/R-53 Improvement of Fatemabad barri-H/o Jashim member towards west road at CH- 00-500m (Total Length = 500m) Road ID- 50945112Construction of Palisading Work on Fatemabad barri-H/o Jashim member towards west road at CH- 125-146.0m (Total Length – 21m ) Construction of 2 no RCC (0.75x0.75m) box Culvert on Fatemabad barri-H/o Jashim member towards west road at CH- 105m & 470mTalukder Bari(Madrasha)- Bodi Ker Bari at Ch. 100-125m L/S, 525-552m L/S, 580-603m L/S, 655-678m L/S, 770-805m L/S. & RS. (Length- 195.0m) 0.50 35.11 M/S Bhuya Enterprise, Charfashion Bhola 35.09 25/10/2017 17/07/2018 60 31/12/2018 WBM on going
208 Bhola 4 lalmohan 6 752 LAL/R-51 Improvement of Chatla Bazar C/C Clinic - Shambhupur Border via Saji Chawmohoni Road at Ch- 00-1000.00m (BC Pavement Length 822m) Road ID 509544015 Construction of Palisading Work on Chatla Bazar C/C Clinic - Shambhupur Border via Saji Chawmohoni Road at Ch- 61-134m LS, 158-181m LS, 231-240m LS, 697-704m LS, 963-977m LS, 440-460m RS. (Total Length- 315m). Construction of 3 no ( 0.75x0.75) ( W5.5) RCC BOX Culvert on Chatla Bazar C/C Clinic - Shambhupur Border via Saji Chawmohoni Road at Ch- 65.0m, 431.0m, & 771.0m. 0.82 76.46 M/S Bhuya Enterprise, Charfashion, Bhola, Bhola. 77.22 05/10/2017 27/06/2018 100 31/12/2018 Final Bill Payment
209 Bhola 4 lalmohan 6 752 LAL/R-50 Improvement of Dhaligournagar Janata Mongol Sikder Hospital-Chatla Bazar road at CH- 00-822.00m. (BC Pavement Length 822m) Road ID 50945130 0.82 74.16 M/S Elias Enterprise, Bhola Sadar, Bhola. 74.16 17/01/2018 16/10/2018 100 31/12/2018 BC Completed
210 Bhola 4 lalmohan 6 752 LAL/R-40 Improvement of Ramagonj UP- Miar Hat Road at CH- 00-2400.00m Road ID 509543011 (BC Pavement Length 2400m) Construction of Palisading Work on Ramagonj UP- Miar Hat Road at CH- 4-26m LS, 45-55m LS, 1252-1269m LS, 1676-1701m LS, 99-108m RS, 556-568m RS, 1140-1171m RS, 1188-1211m RS. (Length- 149m). Construction of 7 no ( 0.75x0.75) ( W5.5) RCC BOX Culvert on Ramagonj UP- Miar Hat Road at CH- 67m, 157m, 657m, 752m, 975m, 1150m, 2154m. 2.40 168.79 M/S Nazimuddin Traders Ward No-06, Mahajon Patti , Sadar Road Bhola 185.25 13/11/2017 05/11/2018 75 31/12/2018 WBM completed
211 Bhola 4 lalmohan 6 752 LAL/R-39 Improvement of Road from RHD (Asholi Minar Mosque) HQ Kader Master Master Road at CH- 00-980m Road ID 509545149 (BC Pavement Effective Length 813m) Construction of Palisading Work on RHD (Asholi Minar Mosque) HQ Kader Master Master Road at CH- 07-18m LS, 31-42m LS, 463-470m LS, 754-786m LS, 127-135m RS. (Length- 69m). Construction of 5 no ( 0.75x0.75) ( W5.5) RCC BOX Culvert on RHD (Asholi Minar Mosque) HQ Kader Master Master Road at CH- 77m, 176m, 283m, 819m, 933m. 0.81 63.09 M/S Moni Enterprise, 8 no Ward, Pourashava, Lalmohon, Bhola. 63.09 25/09/2017 27/06/2018 100 31/12/2018 BC Completed
212 Bhola 4 lalmohan 6 752 LAL/R-38 Improvement of UNR 3012 (Asrafia C/C - Chandrima Abason Kheyaghat via Anisol Miar Hat & Dider Mosque road at CH- 00-1000m. Road ID 509544045 (BC Pavement Length 752m) Construction of Palisading Work on UNR 3012 (Asrafia C/C - Chandrima Abason Kheyaghat via Anisol Miar Hat & Dider Mosque road at CH- 2136-2154m LS,2183-2199m LS, 2355-2375m LS, 2149-2162m RS, 2755-2771m RS. (Length- 83m). Construction of 4 no ( 0.75x0.75) ( W5.5) RCC BOX Culvert on UNR 3012 (Asrafia C/C - Chandrima Abason Kheyaghat via Anisol Miar Hat & Dider Mosque road at CH- 2245m,2397m, 2627m, 2837m. 0.75 57.27 Md. Raseduzzaman Petar, 8330, Lalmohon , Bhola . 57.24 05/10/2017 27/06/2018 40 31/12/2018 Sub base on going
213 Bhola 4 lalmohan 6 752 LAL/R-37 Improvement of Chatla Dalal bazar UZR (Bawaria RNGPS) Dafadar bari road at CH- 00-1000m. Road ID 50945126 (BC Pavement Length 1000m) Construction of 2 no ( 0.75x0.75) ( W5.5) RCC BOX Culvert on Chatla Dalal bazar UZR (Bawaria RNGPS) Dafadar bari road at CH- 42m &810m. 1.00 65.59 Md. Mokanmel Enterprise, Lalmohon, Bhola 65.55 05/10/2017 27/06/2018 100 31/12/2018 Final Bill Payment
214 Bhola 4 lalmohan 6 752 LAL/R-226 Improvement of Anndaprosad Rakhit road (Betua river-UNR 3007) (New Name UZR 2009 (HQ) Safiul Sarder – Diner Baper Kheyaghat via GM Bazar) from at CH – 00-1000.00m Road ID- 50945115 Construction of (2x4.0x3.50m) RCC Box Culvert at CH- 924.0m on the same road. Construction of (0.75m x0.75m) RCC Box Culvert at CH- 385.0m.0m on the same road. 1.00 84.38 M/S Santo Enterprise, Holding No-309, Ukilpara, Bhola 84.36 0 31/12/2018  
215 Bhola 4 lalmohan 6 752 LAL/R-225 Improvement of Lalmohan 2 No. GPS-Fulbagicha road at CH – 00-1550.0m Road ID 50945082 Palisading work at CH- 12-1362.0m (Effective Length- 121.0m) on the same road Construction of 6 no (0.75m x0.75m) RCC Box Culvert at CH- 44,220,497,671,982, & 1272.0m.0m on the same road. Construction of (1.50m x 1.50m) RCC Box Culvert at CH- 1453.0m on the same road. 1.55 119.38 M/S Santo Enterprise, Bhola Sadar, Bhola 119.38 0 31/12/2018  
216 Bhola 4 lalmohan 6 752 LAL/R-224 Improvement of Munshir Hawla (H/o Dulu Miah)-Patowary Bari-Dewan bari Via Hazi Solayman Reg. NGPS road at CH- 00-750.0m Road ID 509545081 Palisading work at CH- 30-613.0m (Effective Length- 121.0m) on the same road Construction of 5 no (0.75m x0.75m) RCC Box Culvert at CH- 117,318,422,575, & 706m on the same road. 0.75 62.45 M/S Apu Enterprise, Narkathi, Barishal Sadar, Bhola 59.33 0 31/12/2018  
217 Bhola 4 lalmohan 6 752 LAL/R-223 Improvement of Rahimpur Bridge - Yasin Gonj UNR road at CH- 00-1000.0m Road ID 509545068 Palisading work at CH- 35-1000.0m (Effective Length- 121.0m) on the same road Construction of 2 no (1.50m x 1.50m) RCC Box Culvert at CH- 280.0m & 500.0m on the same road. Construction of 2 no (0.75m x0.75m) RCC Box Culvert at 1.00 82.68 M/S Howlader Traders & Construction, Bhola Sadar, Bhola. 82.66 0 31/12/2018  
218 Bhola 4 lalmohan 6 752 LAL/R-222 Improvement of Monglakikder Road (East side of Dalal Bazer)-Tozummuddin LALder road at CH- 00-970.0m Raod ID 509545031. Palisading work at CH- 2-390.0m (Effective Length- 75.0m) on the same road Construction of 2 no (1.50m x 1.50m) RCC Box Culvert at CH- 280.0m & 500.0m on the same road. Construction of 3 no (0.75m x0.75m) RCC Box Culvert at CH- 98.0m, 661.0m & 910.0m on the same road. 0.97 81.75 M/S Santo Enterprise, Holding No-309, Ukilpara, Bhola 81.74 0 31/12/2018  
219 Bhola 4 lalmohan 6 752 LAL/R-221 Improvement of Rahimpur GPS - Abdul Motaleb Dakhil Madrasha road at CH- 00-500.0m Road ID 509544057 Construction of Palisading work at CH- 30m-75.0m (Effective Length- 45.0m) on the same road Construction of (0.75m x0.75m) RCC Box Culvert at CH- 261.0m, 318.0m, & 456.0m on the same road. 0.50 40.75 M/S Shawdagor Traders , Post-Khasher hat, Tazumuddin, Bhola. 40.69 0 31/12/2018  
220 Bhola 4 lalmohan 6 752 LAL/R-220 Improvement of UZR 2003 (H/O) Moslem Uddin - Sambhupur LALder via Master Bazar raod at CH – 00-500.0m Road ID 509544053 Construction of (1.50m x 1.50m) RCC Box Culvert at CH- 230.0m on the same road. Construction of (0.75m x0.75m) RCC Box Culvert at CH- 477.0m on the same road. 0.50 39.08   0.00 0 31/12/2018  
221 Bhola 4 lalmohan 6 752 LAL/R-219 Improvement of Gazaria-Shashibhushan road (H/o Abu Musa commender)-Pangashia bazer road at CH- 00-500.0m Road ID 509544046 Construction of Palisading work at CH- 110m-123.0m (Effective Length- 22.0m) on the same road Construction of (0.75m x0.75m) RCC Box Culvert at CH- 287.0m on the same road. 0.50 35.49 M/S Md. Shahabuddin Ward No-09, Paurachar Jangal, Bhola Pourasava, Bhola Sadar, Bhola 34.61 0 31/12/2018  
222 Bhola 4 lalmohan 6 752 LAL/R-213 Improvement of Nazirpur RHD (GP Tower) - Habi Howladar bari vote Kendra – Nabinagar Bazar road at CH- 3660-4700.0m Road ID 50945195 Construction of Palisading work at CH- 3675-4696.00m (Effective Length- 201.0m) on the same road. Construction of (1.50m x 1.50m) RCC Box Culvert at CH- 3660.0m on the same road Construction of 2 no (0.75m x0.75m) RCC Box Culvert at CH- 4077m, 4288.0m on the same road.. 1.04 82.38 M/S Tahura Enterprise, 05 No Ward, Kalinath roy Bazar Bhola 82.21 0 31/12/2018  
223 Bhola 4 lalmohan 6 752 LAL/R-19 Improvement of Torabagonj Pas pagar more-UNR road at CH- 00-1000m. Road ID 50945226 (BC Pavement Length 1000m) Construction of Palisading Work on Torabagonj Pas pagar more-UNR road at CH- 26-40m L/S, 110-115 L/S, 480-490m L/S, 990-1000m L/S. Road ID 50945226 (Length- 39m). 1.00 60.30 Md. Akter Hossain, Pourakathali Bhola Sadar Bhola. 60.27 07/12/2017 04/05/2018 70 31/12/2018 WBM Completed
224 Bhola 4 lalmohan 6 752 LAL/R-18 A. Improvement of Road from Lalmohan UP office-Baklali bari road at CH- 00-1000m. Road ID 50945087 (BC Pavement Length 1000m) B. Construction of Palisading Work on Lalmohan UP office-Baklali bari road at CH-225-238 m L/S, 532-548 m L/S, 550-562 m L/S, 640-661 m L/S, 765-785 m L/S, 893-907 m R/S, 973-983 m R/S. Road ID 50945087 (Length- 106m). 1.00 63.15 Md. Asadullah Bhola Sadar Bhola 63.10 07/02/2017 17/03/2018 100 31/12/2018 final Bill Payment
225 Bhola 4 lalmohan 6 752 LAL/R-170 Improvement of Mongol Sikder bazar Fadebad Sluice gate bazar via Lord Harding UP road at CH- 3950-5300m (Effictive Length- 1350.0m) Road ID- 509543007 (old) 509542009 (new Construction of 3x4.50x4.50 (W-5.5) RCC Box Culvert on the Same Road at CH- 7420.0m) 1.35 80.08 M/S Md. Javed, Pawro Khatli, Bhola 76.08 25/06/2018 24/06/2019 0 31/12/2018  
226 Bhola 4 lalmohan 6 752 LAL/R-17 A. Improvement of road from RHD-Boddhi bari Char Road at CH- 00-1000m. Road ID 509545069 (BC Pavement Length 1000m). B. Construction of Palisading Work on RHD-Boddhi bari Char Road Road at CH- 520-540m R/S, 568-587m L/S. Road ID 509545069 (Length- 39m). 1.00 60.38 Md. Iqbal Hossain, Bhola Sadar 60.37 20/06/2017 12/03/2018 50 31/12/2018 WBM on going
227 Bhola 4 lalmohan 6 752 LAL/R-16 Improvement of Muguria Bazar-UZR-2002 (Fazal Munsir Bari Mosque) via Janata Bazar via Bangla Bazar road at CH- 2000-3000m. Road ID 509544004 (BC Pavement Length 1000m) Construction of Palisading Work on Muguria Bazar-UZR-2002 (Fazal Munsir Bari Mosque) via Janata Bazar via Bangla Bazar road at CH- 2125-2135m L/S & 2213-2253m L/S. Road ID 509544004 (Length- 50m). 1.00 57.08 Md. Asadullah, 8300, Bhola Sadar Bhola 57.04 07/12/2017 04/04/2018 100 31/12/2018 Final Bill Payment
228 Bhola 4 lalmohan 6 752 LAL/R-155 Improvement of -UNR 3008 (Gudir Pole) - Nazirpur via Tarullah Bridge Road at CH- 2500-4010.0m (Length- 1510.0m) Road ID -509544011 Construction of Palisading Work on UNR 3008 (Gudir Pole) - Nazirpur via Tarullah Bridge Road at CH- 2584-2632m L/S, 2696-2738m L/S, 3920-3966m L/S, 2564-2594m R/S. ( Length- 166.0m) Construction of 6 no (0.75m x 0.75m) RCC Box Culvert on UNR 3008 (Gudir Pole) - Nazirpur via Tarullah Bridge Road at CH- 2613m, 3197m, 3287m, 3376m, 3695m, & 3895m. 1.51 116.16 Md. Akter Hossain, Pourakathali, Bhola Sadar, Bhola 107.50 30/04/2018 21/04/2018 40 31/12/2018 sub base on going
229 Bhola 4 lalmohan 6 752 LAL/R-105 Improvement of Paschim Char Umed Samsul Haque road at CH- 00m-1304m (Length- 1304.00m. Road ID- 509545105) Construction of Palisading work on Paschim Char Umed Samsul Haque road at CH - 730-736m, LS, 736-756 RS, 777-800M LS, 796-816M, RS, 821-836M LS, 868-878M RS, 904-914M RS (Length – 104m) Construction of 2 no (1.50mx1.50m) RCC Box Culvert on Paschim Char Umed Samsul Haque road at CH -32.0m & 980.0m Construction of 2 no (0.75x0.75m) RCC Box Culvert on Paschim Char Umed Samsul Haque road at CH – 586.0m & 644.0m 1.30 106.24 M/S Santo Enterprise, Holding no- 309, Ukilpara, Bhola. 105.18 12/02/2018 10/02/2019 40 31/12/2018 str completed
230 Bhola 4 lalmohan 6 752 LAL/R-104 Improvement of UNR 3013 to Azam Road via Purba Kachuakhali GPS (Awlad Hossain Road) at CH- 00m-590m (Length- 590.00m. Road ID- 509544044) Construction of 1 no (1.50mx1.50m) RCC Box Culvert on UNR 3013 to Azam Road via Purba Kachuakhali GPS (Awlad Hossain Road) at CH- 295.00m Construction of 1 no (0.75x0.75m) RCC Box Culvert on UNR 3013 to Azam Road via Purba Kachuakhali GPS (Awlad Hossain Road) at CH- 22.00m 0.59 45.36 M/S Santo Enterprise, Holding no- 309, Ukilpara, Bhola 44.91 11/02/2018 10/07/2018 60 31/12/2018 WBM on going
231 Bhola 4 lalmohan 6 752 LAL/R-06 A. Improvement of Paschim Char Umed UPC (RHD)-Amin Miar hat via Soinik bazar road (Lalmohan Part)(Ch.3480m-4440m ). B. Improvement of Road From Paschim Char Umed UP (RHD)-Amin Miar bazar via Soinik bazar road (Lalmohan Part) (Ch.3900m-3928m L/S, 4111-4123m L/S). (Palisading Work Length 40m). C. Construction of 1 no’s (1.5m x 1.5m) (w-5.5m) Size Box Culvert on Paschim Char Umed UP (RHD)-Amin Miar bazar via Soinik bazar road (Lalmohan Part) (Ch.3988m ). D. Construction of 2nos (0.75m x 0.75m) (w-5.5m) RCC Box Culvert on Paschim Char Umed UP (RHD)-Amin Miar bazar via Soinik bazar road (Lalmohan Part) (Ch.3775m & 4240m ). Road ID: 509543019 0.96 67.99 M/S Bhuya Enterprise, Charfassion, Bhola. 67.93 06/07/2017 31/03/2018 100 31/12/2018 final Bill Payment
232 Bhola 4 lalmohan 6 752 LAL/R-05 A) Improvement of Lordharding UPC- Fatemabad Sluice Gate Bazar Road from Ch.4300m-5710m B) Construction of 3 no’s (1.5m x 1.5m) (w-5.50m) Size Box Culvert on Lordharding UPC- Fatemabad Sluice gate Bazar Road at Ch.4460.00m, 4820.00m & 5460.00m. C) Construction of 3 no’s (0.75m x 0.75m) RCC Culvert on Lordharding UPC- Fatemabad Sluice gate Bazar Road at Ch. 2157m, 2225m 2419m, 2780m, 3008m & 3216m). Road ID: 509543016 1.41 99.71 Md. Iqbal Hossain, Rahima Villa, Poura Kathali, Bhola Sadar. Bhola 99.48 06/11/2017 04/02/2018 75 31/12/2018 WBM on going
233 Bhola 4 lalmohan 6 752 LAL/M-210 Maintenance of Banglabazar (North Side) Kobkhali Bazar Embankment via Nayabhanguni GPS UNR 3001 Azhar Road - Patoary Bazar via Kazir Bazar at CH- 990-1839.0m & 2842-4017.0m (Effective Length- 2014.0m) Road ID- 509544010 Construction of 4 no RCC (0.75x 0.75m) Box Culvert on the same road at CH- 1082m, 2982m, 3044m, & 3103.0m 2.01 105.49 M/S Bhuya Enterprise, Charfassion, Bhola 105.49 24/06/2019 0 31/12/2018  
234 Bhola 4 lalmohan 6 752 LAL/M-208 Maintenance of RHD- Maddha Gazaria RNGPS - Kalir Take Bazar via Motaher Master Bari & Dewal Kandi GPS at CH-00-1000.0m (Effective Length -1000.0m) Road ID 509544061(old) 509543017 (New) Palisading Work at ch- 55-946.00m 0m (Effective Length -372.00.0m) on the same road. Construction of (1.50 x 1.50m ) & (3.0x3.0m) RCC Box Culvert on the same road at CH- 532m & 945.0m 1.00 63.58 M/S Santo Enterprise, Bhola Sadar, Bhola 60.40 0 31/12/2018  
235 Bhola 4 lalmohan 6 752 LAL/M-205 Maintenance of RHD (Balur tak) - Hazir hat Road at CH- 00-1955.0m (Effective Length -1955.0m) Road ID 509544052 1.95 53.58 M/S Happy Enterprise, Lalmohon Powrashava, Bhola 53.56 18/01/2019 0 31/12/2018  
236 Bhola 4 lalmohan 6 752 LAL/M-204 Maintenance of Madrasha Bazar- Chan Miar Hat via Sayadabad GPS at CH- 00-1275.0m (Effective Length -1275.0m) Road ID 509545022 Construction of 4 no (0.75m x 0.75m) RCC Box Culvert at CH- 210m, 360m, 670m & 860m on the same Road. 1.27 42.57 M/S Bhuya Enterprise, Charfashion, Bhola 42.57 18/01/2019 0 31/12/2018  
237 Bhola 4 lalmohan 6 752 LAL/M-203 Maintenance of Road from RHD (Nurunnabi Chowdhury Collage)-Moazzem Bazar Debir Char Bazar-Mojam Bazar road at CH- 550-1225.0m (Effective Length -675.0m) Road ID 509544012 0.68 11.69 M/S Happy Enterprise, Lalmohon Pourashava, Bhola 11.68 18/01/2019 0 31/12/2018  
238 Bhola 4 lalmohan 6 752 LAL/M-190 Maintenance of Muguria Bazar 2002 (Fazle Rahman Munshi Bari Mosque) via Bangla Bazar Ch. 00m - 2000m (509544004). (Effective Length 2000.00 m) Palisading Work (Effective Length 254.00 m) on the same Road. Construction of 6 no (0.75m x 0.75m) RCC Box Culvert at CH- 238m, 554m, 804m, 953m, 1844m, & 1900.0m on the same Road. 2.00 77.54 M/S Diganto Construction, Lalmohan, Bhola 77.54 24/06/2018 24/06/2019 20 31/12/2018 STR on going
239 Bhola 4 lalmohan 6 752 LAL/M-189 Maintenance of Lordharding UP- Fatemabad Sluice Gate Bazar Road Ch. 00m - 1000m (509543016). (Effective Length 1000.00 m) Construction of 2 no (0.75m x 0.75m) RCC Box Culvert at CH- 97m & 780.0m on the same Road. 1.00 35.12 M/S Mokammal Enterprise, Prop: Md Zulfqar Ali, 7/404, Modhuchanda to college road, Lalmohan, Bhola 35.10 28/06/2018 27/12/2018 0 31/12/2018  
240 Bhola 4 lalmohan 6 752 LAL/M-188 Maintenance of Farargong UP to - Miar Hat Road Ch. 4400m - 5677m (509543011). (Effective Length 1277.00 m) Construction of (0.75m x 0.75m) & 3 no (1.50m X 1.50m) RCC Box Culvert at CH- 5492m, 4415m, 4554m, & 4682.0m on the same Road. 1.28 46.04 M/S Shawdagor Traders, Kasherhat, Tazumuddin, Bhola 46.02 28/06/2018 27/12/2018 0 31/12/2018  
241 Bhola 4 lalmohan 6 752 LAL/M-187 Maintenance of RHD at Kassopia Jame Moshjid- Gazaria GC via Farargonj UP Road (New name) Ch. 1317m - 2317m (509542010). Nazirpur Bazar-Paschim Char Umed Via Farazganj UP Road (old name & ID No 509543012) from Ch. 3800m - 4800m (Effective Length 1000.00 m) Palisading Work (Effective Length 78.00 m) on the same Road. Construction of (0.75m x 0.75m) RCC Box Culvert at CH- 1437 on the same Road. 1.00 35.12 M/S Mokammal Enterprise, Prop: Md Zulfqar Ali, 7/404, Modhuchanda to college road, Lalmohan, Bhola 35.10 28/06/2018 27/12/2018 0 31/12/2018  
242 Bhola 4 lalmohan 6 752 LAL/M-186 Maintenance of Abu gong Bazar RHD - Fulbagisa Bazar (UZR)- Kharakandi & mizipara GPS- Talpta Bazar UZR (New name) Border (UNR). Fulbagisa Bazar(UZR)- Mofix tori Sikder Bari (old name & ID No 509545094) from Ch. 1277m -2500m (509545078) (Effective Length 1223.00 m) 1.22 33.47 M/S Promee Enterprise, 5 No ward, Lalmohan, Bhola 33.47 0 31/12/2018 NOA Issure
243 Bhola 4 lalmohan 6 752 LAL/M-185 Maintenance of Farazganj UPC-Gaimara Slauice gate bazaar via Gaimara GPS Road (New name). Farazganj UP-Gaimara GPS Road (old name & ID No 509544027) from Ch. 00-1000.0m (509543020) (Effective Length 1000.00 m) Construction of 3 no (0.75m x 0.75m) RCC Box Culvert at CH- 156.0m, 331.0m, & 463.0m on the same Road. 1.00 35.88 M/S Shanto Enterprise, Holding No.309, Ukil Para, Bhola 35.87 27/06/2019 27/12/2018 0 31/12/2018  
244 Bhola 4 lalmohan 6 752 LAL/M-184 Maintenance of Abu gong Bazar RHD - Fulbagisa Bazar(UZR)- Kharakandi & mizipara GPS- Talpta Bazar UZR (New name) Border (UNR). Fulbagisa Bazar(UZR)- Kharakandi Border (UNR) (old name & ID No 509545089) from Ch. 2510m - 3830m (509545078) (Effective Length 1320.00 m) Palisading Work (Effective Length 53.00 m) on the same Road. Construction of (0.75m x 0.75m) RCC Box Culvert at CH- 2626m on the same Road. 1.32 45.89 M/S Julfikar Ahmed, Pawro Khatli, Muslim Para, Bhola 44.51 25/06/2018 24/12/2018 0 31/12/2018  
245 Bhola 4 lalmohan 6 752 LAL/M-15 Maintenance of H/O Khan Shahed - H/O Mamun Nadda towards South Direction at CH- 00-1730.0m (BC Pavement Length 1730m) Road ID - 509544016 1.73 58.83 M/S Bhuya Enterprise, Charfashion, Bhola 58.80 25/10/2017 17/07/2018 100 31/12/2018 Final Bill Payment
246 Bhola 4 lalmohan 6 752 LAL/M-07 Periodic Maintenance (PM Overlay) of road from Paschim Char Umed UP (RHD)-Amin Miar Hat via Soinik bazar road (Lalmohon Part) from Ch.2370m-3480m) Road ID: 509543019 (BC Pavement Length-1110m). 1.11 26.03 Md. Asadullah Bhola Sadar Bhola. 25.98 25/01/2017 17/12/2017 100 31/12/2018 Final Bill Payment
247 Bhola 4 monpura 7 752 MON/R-192 Improvement of Nutan Bazar Road –Julfikar Ali GPS ( UZR-2) – Haris Rokea GPS Road at CH- 00-1000.0m (Effective Length- 985.0m) Road ID- 509654057 Construction of 4 no (0.75x0.75m) RCC Box Culvert on the Same Road at CH- 7.0m, 475.0m, 650.0m, & 910.0m 0.99 78.39 Md. Jasim Construction, Thana Road, Charfassion, Bhola. 78.39 25/06/2018 24/06/2019 0 31/12/2018  
248 Bhola 4 monpura 7 752 MON/R-191 Improvement of UZR - Pal Bari - Koralia Bazar - West Embankment Road at CH- 890-2090.0m (Effective Length- 1115.0m) Road ID 509654039 Construction of (1x2.50x2.50m) RCC Box Culvert on the Same Road at CH- 1337.0m 1.12 89.63 M/S Bokshi Enterprise, Prop: Md. Arman Bokshi, Charfassion, Bhola. 89.63 24/06/2018 23/06/2019 0 31/12/2018  
249 Bhola 4 monpura 7 752 MON/R-150 Improvement of Kalatoli Abassion Bazar - Monir Bazar - Kabir Bazar Roadat CH- 00-1000.00m. (Effective Length- 1000.0m) Road ID: 509654055 1.00 88.55 M/S Bokshi Enterprise, Md. Arman Bokshi, Charfassaion, Bhola 88.51 30/04/2018 21/04/2019 0 31/12/2018  
250 Bhola 4 monpura 7 752 MON/R-149 Improvement of East EMBK. - UZR - West EMBk. Surazamukhi Bazar Road at CH- 00-1800.00m. (Effective Length- 1789.0m) Road ID: 509654015 Construction of 4 no (0.75m x 0.75m) RCC Box Culvert no East EMBK. - UZR - West EMBk. Surazamukhi Bazar Road at CH- 275.0m, 610.0m, 810.0m &1382.0m. Construction of (2 x 3.50m x 4.00m) RCC Box Culvert no East EMBK. - UZR - West EMBk. Surazamukhi Bazar Road at CH- 1565.0m 1.80 166.44 M/S Jasim Construction, Thana Road, Charfassaion, Bhola 166.39 30/04/2018 21/04/2019 0 31/12/2018  
251 Bhola 4 monpura 7 752 MON/R-148 Improvement of Rahamanpur Delur Dokan – Shakuchia UZR – Nuton Bazar road at CH- 00-1080.00m. (Effective Length- 1080.0m) Road ID: 509654063 Construction of (0.75m x 0.75m) RCC Box Culvert no North Sakuchia UP office - Char Goalia - Batankhali Bazar road at CH- 390.0m 1.08 95.85 M/S Bokshi Enterprise, Md. Arman Bokshi, Charfassaion, Bhola 95.84 30/04/2018 21/04/2019 0 31/12/2018  
252 Bhola 4 monpura 7 752 MON/R-147 Improvement of Alom Bazar –Anondo Bazar (UZR-2) Taltoli Bazar Road at CH- 00-1000.00m. (Effective Length- 1000.0m) Road ID: 509654058 1.00 85.24 M/S Khan Traders Thana road Charfashion 0.00 0 31/12/2018  
253 Bhola 4 monpura 7 752 MON/R-146 Improvement of Rahmanpur Koralia Bazar UZR - Majher Ghat South EMBK. Road at CH- 1220-5100.00m. (Effective Length- 3839.0m) Road ID: 509654013 Construction of 2 no (0.75m x 0.75m) RCC Box Culvert no Rahmanpur Koralia Bazar UZR - Majher Ghat South EMBK. Road at CH- 1620.0m & 2370.0m 3.84 342.71 Md. Eunus Al Mamun, Thana Road, Charfassion, Bhola 342.68 30/04/2018 21/04/2019 0 31/12/2018  
254 Bhola 4 monpura 7 752 MON/R-145 Improvement of Koralia bazar - Kachiakhali - Shikder hat Halot Road at CH- 1300-3120.00m. (Effective Length- 1805.0m) Road ID: 509654032 Construction of 2 no (0.75m x 0.75m) RCC Box Culvert no Koralia bazar - Kachiakhali - Shikder hat Halot Road at CH- 2215.0m, 2590.0m & 2850.0m 1.81 146.75 M/S Jasim Construction, Thana Road, Charfassion, Bhola 146.29 30/04/2018 21/04/2019 0 31/12/2018  
255 Bhola 4 monpura 7 752 MON/R-144 Improvement of Nazir Ahammed Road - Taltola Majher Ghat Bazar Road at CH- 00-1000.00m. (Effective Length- 1000.0m) Road ID: 509654036 Construction of 2 no (0.75m x 0.75m) RCC Box Culvert no Nazir Ahammed Road - Taltola Majher Ghat Bazar Road at CH- 30.0m & 913.0m 1.00 88.11 M/S Bokshi Enterprise, Md.Arman Bokshi, Charfassion, Bhola 88.07 30/04/2018 21/04/2019 0 31/12/2018  
256 Bhola 4 monpura 7 752 MON/R-143 Improvement of Sakuchia UP-Koralia GC Road at CH- 292-5000.00m. (Effective Length- 4523.0m) Road ID: 509653004 Construction of (0.75m x 0.75m) RCC Box Culvert no Sakuchia UP-Koralia GC Road at CH - 392.0m 4.52 345.73 Md. Eunus Al Mamun, Thana Road, Charfassion, Bhola 345.70 30/04/2018 21/04/2019 60 31/12/2018 RCC
257 Bhola 4 monpura 7 752 MON/R-142 Improvement of North Sakuchia UP office - Char Goalia - Batankhali Bazar road at CH- 2300-3383.00m. (Effective Length- 1016.0m) Road ID: 509653007 Construction of (0.75m x 0.75m) RCC Box Culvert no North Sakuchia UP office - Char Goalia - Batankhali Bazar road at CH- 3150.0m 1.02 85.53 M/S Khan Traders, Charfassion, Bhola 85.50 30/04/2018 21/04/2019 30 31/12/2018 RCC
258 Bhola 4 monpura 7 752 MO/R-21 Improvement of Latakhali - Banglabazar GC - Zakir Chairman Bari - East EMBK. Road at CH-1443-3650m Road ID- 509654025 ( 2270 m RCC Road) Construction of Palisading Work on Latakhali - Banglabazar GC - Zakir Chairman Bari - East EMBK. Road at CH-2860-3080m R/S Road ID- 509654025 (Total = 220m).Construction of 2 no (1x1.50x1.50m ) RCC Box Culvert on Latakhali - Banglabazar GC - Zakir Chairman Bari - East EMBK. Road at CH- 2045m & 2275m Road ID- 509654025Construction of (1x2.50x2.50m ) RCC Box Culvert on Latakhali - Banglabazar GC - Zakir Chairman Bari - East EMBK. Road at CH- 2585m Road ID- 509654025Construction of (2x3.50xm ) RCC Box Culvert on Latakhali - Banglabazar GC - Zakir Chairman Bari - East EMBK. Road at CH- 2045m & 2275m Road ID- 509654025 2.27 173.58 M/S Bokshi Enterprise, Charfashion, Bhola. 173.44 12/07/2017 07/04/2018 100 31/12/2018 RCC Complete
259 Bhola 4 monpura 7 752 MO/R-20 Improvement of Hazirhat UP. (Badher Hat) - Bhuiar Hat South Embankment Road at CH- 00-3960.0m Road ID-509653009 ( 3960m RCC Road) Construction of Palisading Work on Hazirhat UP. (Badher Hat) - Bhuiar Hat South Embankment Road at CH-295-304m L/S, 490-503m L/S, 700-730m L/S, 700-715m R/S. Road ID-509653009 (Total = 67.0m).Construction of 6 No (0.75x 0.75m) RCC Box Culvert on Hazirhat UP. (Badher Hat) - Bhuiar Hat South Embankment Road at CH- 700m, 875m, 1107m, 1175m, 1375m, & 1516m Road ID-509653009Construction of (2x3.50x4.00m) RCC Box Culvert on Hazirhat UP. (Badher Hat) - Bhuiar Hat South Embankment Road at CH- 295m Road ID-509653009 3.96 279.72 Md. Unus All Mamun, Thana Road Charfashion, Bhola. 279.71 12/07/2017 07/04/2018 100 31/12/2018 Final bill payment
260 Bhola 4 tazumuddin 8 752 TAZ/STR-129 509912001-Construction of 18.00m Long Girder Bridge on RHD (Muchibari)- khaser hat GC-Mongolsikder GC (Tazumuddin-Part) Road at CH-9100.0m (ID No- 509912001) Earth Work on RHD (Muchibari)- khaser hat GC-Mongolsikder GC (Tazumuddin-Part) Road at CH-9100.0m 136.19 M/S Md. Shaha Alam, Muslim Para, Sadar, Bhola 132.51 25/01/2018 24/01/2019 90 31/12/2018 deck slab completed
261 Bhola 4 tazumuddin 8 752 TAZ/STR-128 Construction of 19.00m Long Girder Bridge on RHD (Muchibari)- Shibpur khaser hat GC-Munsir hat GC (Tazumuddin-Part) Road at CH-475.0m (ID No- 509912002) Earth Work on RHD (Muchibari)- Shibpur khaser hat GC-Munsir hat GC (Tazumuddin-Part) Road at CH-475.0m 102.87 Md. Eunus Al Mamun, Thana Road, Charfassion, Bhola 102.87 11/02/2018 20/02/2019 20 31/12/2018 Pile completed
262 Bhola 4 tazumuddin 8 752 TAZ/STR-127 Construction of 20.00m Long Girder Bridge on Chandpur UP (Shashoing Bazar) Chatta Dawari via Madrasha at CH- 1900.0m (ID No- 509913001) Earth Work on Chandpur UP (Shashoing Bazar) Chatta Dawari via Madrasha at CH- 1900.0m 112.31 Md. Iqbal Hossain, Rahima Villa, Poura Kathali Bhola Sadar Bhola. 112.25 20/03/2018 19/03/2019 20 31/12/2018 Pile completed
263 Bhola 4 tazumuddin 8 752 TAZ/R-66 Improvement of Eashinggonj Bazar to khyaghat Bridge via North koralmara RNGPS ID-509915017 0.50 31.42 A.H Trading Corporation, 1209, Dhanmondi, Dhaka. 31.41 30/01/2018 29/07/2018 50 31/12/2018 WBM on going
264 Bhola 4 tazumuddin 8 752 TAZ/R-65 Improvement of Badlipur-Mirzakalu road at CH- 00-1100.0m (Length-1110m ) Road ID- 09915006Construction of Palisading Work on Badlipur-Mirzakalu road at CH- 145-162 L/S, 600-625 L/S 825-860LS, 875-900 LS, 975-995 LS, 1075-1095 LS, (Length-142.0m) Construction of 4 no (1.00x1.00m) RCC Box Culvert on Badlipur-Mirzakalu road at CH- 458m, 880m, 930m, & 1095m 1.11 92.20 A.H Trading Corporation, 1209, Dhanmondi, Dhaka. 92.19 30/01/2018 29/10/2018 50 31/12/2018 WBM on going
265 Bhola 4 tazumuddin 8 752 TAZ/R-64 Improvement of Dakhin Shambopur-Bangla Bazar Road at CH- 00-1100.0m (Length-1100m) Raod ID-509915002 1.10 88.84 M/S Nazrul Islam Cunnu, 8300, Bhola Sadar, Bhola 88.82 25/01/2018 24/01/2019 70 31/12/2018 WBM completed
266 Bhola 4 tazumuddin 8 752 TAZ/R-63 Improvement of Aralia Thakur Bazar to Kalasa Road at CH- 00-500.0m (Length-500m) Road ID- 509914011 0.50 37.20 M/S Mokammal Enterprise, 8330, Lalmohon, Bhola. 37.17 31/01/2018 30/07/2018 70 31/12/2018 WBM completed
267 Bhola 4 tazumuddin 8 752 TAZ/R-62 Improvement of Chatto Dawri Bridge to Hatkhola bari Bridge road at CH- 00-500.0m (Length-500m) Road ID- 509915018 0.50 47.61 M/S Bhuya Enterprise, Charfashion Bhola 47.58 20/11/2017 12/06/2018 100 31/12/2018 BC Completed
268 Bhola 4 tazumuddin 8 752 TAZ/R-61 Improvement of LGED Road (Kasem house) to Chairman bari via Nasir uddin bridge at Ch-800-1300.0m (Length-500m) Road ID- 509914017 0.50 38.82 Serajia Enterprise, Westernpara, Laomohon , Bhola 38.78 23/11/2017 15/05/2018 100 31/12/2018 BC Completed
269 Bhola 4 tazumuddin 8 752 TAZ/R-60 Improvement of North Chanchra GPS-Ponar kandi Road at CH- 00-1000m (Length-1000m) Road ID-509915012 1.00 68.37 Serajia Enterprise, Westernpara, Laomohon , Bhola 68.33 23/11/2017 15/08/2018 100 31/12/2018 BC Completed
270 Bhola 4 tazumuddin 8 752 TAZ/R-59 Improvement of South Shambopur GPS to Koralmara Adarsha Gram Road at Ch- 00-500.0m (Length-500m) Road ID-509915016 0.50 36.20 M/S Nazimuddin Traders, Ward No-06, Mahajon Patti , Sadar Road Bhola 36.18 22/02/2018 14/08/2018 30 31/12/2018 STR
271 Bhola 4 tazumuddin 8 752 TAZ/R-36 Improvement of Chanchra Enbankment –Ponarkandi Road at CH- 00-1200m (BC Pavement. Length 1250m). Road ID-509915011 Construction of Palisading Work on Chanchra Enbankment –Ponarkandi Road at CH- 110-130m LS, 330-350m RS, 580-590m LS, 990-1010m RS. (Length 70 m). 1.25 76.64 Serajia Enterprise, Westernpara, Laomohon , Bhola. 76.62 05/10/2017 27/06/2018 100 31/12/2018 BC Completed
272 Bhola 4 tazumuddin 8 752 TAZ/R-35 Improvement of Chanchra Enbankmant –Aralia road at CH- 00-1200m (BC Pavement. Length – 1250m). Road ID 509914005 1.25 71.55 M/S Bhuya Enterprise, Charfashion, Bhola. 71.52 05/10/2017 27/06/2018 30 31/12/2018 Sub-Base On Going
273 Bhola 4 tazumuddin 8 752 TAZ/R-34 Improvement of Hazir hat –Lamchi Shambopur Road at CH- 1800-3050m (BC Pavement. Length – 1250m). Road ID 509915001 Construction of Palisading Work on Hazir hat –Lamchi Shambopur Road at CH- 1800-1810m LS, 1845-1850m LS, 1953-1980m LS, 1953-1970m RS, 2060-2067m, 2496-2506m, RS, 2500-2510m LS, 2545-2595m RS, 2968-2978m RS. (Length 1 46 m). Construction of 2no (1mx1m W- 5.500m) RCC Box Culvert on South Kaymullah –North Kaymullah Road at CH- 1805m, 2950m. Road ID 509915001 1.25 94.13 M/S Bhuya Enterprise, Charfashion, Bhola 94.05 25/10/2017 17/07/2018 50 31/12/2018 Sub-Base Completed
274 Bhola 4 tazumuddin 8 752 TAZ/R-33 IImprovement of South Kaymullah –North Kaymullah Road at CH- 00-1200m (BC Pavement. Length – 1200m). Road ID 509915008Construction of Palisading Work on South Kaymullah –North Kaymullah Road at CH- 620-660m RS, 630-650m RS, 950-960m LS. (Length 70 m). Construction of (1mx1m W- 5.500m) RCC Box Culvert on South Kaymullah –North Kaymullah Road at CH- 660m 1.20 80.71 M/S Bhuya Enterprise, Charfashion, Bhola. 80.68 05/10/2017 27/06/2018 70 31/12/2018 WBM Completed
275 Bhola 4 tazumuddin 8 752 TAZ/R-32 Improvement of Shibpur Khaser hat –Anada Bazar road at CH- 00-1200m (BC Pavement. Length – 1200m). Road ID 509914008 Construction of Palisading Work on Shibpur Khaser hat –Anada Bazar road at CH- 60-70m LS, 270-300m RS, 980-990m BS (Length 51 m). Construction of 3no (1mx1m W- 5.500m W-5.5m) RCC Box Culvert on Shibpur Khaser hat –Anada Bazar road at CH- 280m, 570m, & 937m. 1.20 85.25 M/S Bhuya Enterprise, Charfashion, Bhola. 85.21 05/10/2017 27/06/2018 60 31/12/2018 WBM On Going
276 Bhola 4 tazumuddin 8 752 TAZ/R-31 Improvement of Shibpur Khasher hat- Mirzakalu road at CH- 330-1150m (BC Pavement. Length – 820m). Road ID 509914001 Construction of Palisading Work on Shibpur Khasher hat- Mirzakalu road at CH- 330-370m RS, 380-420m RS, 525-535m RS, 700-710m LS, 1075-1090m LS (Length 105 m). Construction of 3no (1mx1m W- 5.500m W-5.5m) RCC Box Culvert on Shibpur Khasher hat- Mirzakalu road at CH- 525m, 730m & 1045m. 0.82 67.93 M/S Bhuya Enterprise, Charfashion, Bhola. 67.88 05/10/2017 21/08/2018 70 31/12/2018 WBM Completed
277 Bhola 4 tazumuddin 8 752 TAZ/R-22 Improvement of Pandith kandi Bridge to Badura bridge road at CH- 00-1000m (BC Pavement. Length – 1000m). Road ID 509914010 Construction of Palisading Work on Pandith kandi Bridge to Badura bridge road at CH- 70-94m 910-930m 930-980m (Length 94 m). Road ID 509914010 Construction of (1mx1m W- 3.70m) RCC Box Culvert on Pandith kandi Bridge to Badura bridge road at CH- 865m Road ID 509914010 1.00 29.22 M/S Serajia Enterprise, Westernpara , Lalmohon, Bhola 29.20 09/07/2017 01/01/2018 100 31/12/2018 Final
278 Bhola 4 tazumuddin 8 752 TAZ/R-218 Improvement of Shibpur Khasher hat- Mirzakalu road at CH- 820-1123.0m Road ID 509914001 Construction of Palisading Work at CH- 13-30m (effective Length – 43.0m) on the same Road. 0.33 21.65 M/S Podder Enterprise, Talluk, Hat Shashigonj, Tazimuddin, Bhola 21.64 0 31/12/2018  
279 Bhola 4 tazumuddin 8 752 TAZ/R-217 Improvement of Katakhali Bridge to Indranarayanpur RNGPS road at CH- 00-500.00m Road ID - 509915019 Construction of Palisading Work at CH- 200-260.0m on the same Road. Construction of (1.00x1.00) RCC Box Culvert at CH- 90.0m on the same road. 0.50 37.99 M/S Shawdagor Traders, Kasherhat, Tazumuddin, Bhola 37.90 0 31/12/2018  
280 Bhola 4 tazumuddin 8 752 TAZ/R-13 A. Improvement of road from Charcha UP- Chachra Addrasho High School – Gosher hat Bazar road at CH- 00-1445.00m Road ID- 509913007 B. Construction of Palisading Work on Charcha UP- Chachra Addrasho High School – Gosher hat Bazar road at CH-60-80m L/S, 65-95m R/S, 910-920m L/S, 1410-1445m L/S (Length- 90m) C. Construction of 3 no’s (1.00x1.00m W-5.50m ) RCC Box Culvert on Charcha UP- Chachra Addrasho High School – Gosher hat Bazar road at CH- 120m, 740m, 1220m. Road ID- 509913007 1.44 113.33 Iqbal Hossain, Bhola Sadar 112.84 27/06/2017 03/12/2018 50 31/12/2018 WBM ON GOING
281 Bhola 4 tazumuddin 8 752 TAZ/R-12 A. Improvement of Improvement of Thakur Bazar (UZR) to Anil Sadur Asram Bangla Bazar (UZR) road at CH- 2000-2500.00m. Road ID – 509914015 0.50 36.16 Md. Mohshin Nagar, 1 No Woard, Bhola Sadar Bhola 36.14 02/07/2017 17/12/2017 100 31/12/2018 Final
282 Bhola 4 tazumuddin 8 752 TAZ/R-11 A. Improvement of Pandith kandi Bridge to Badura bridge at CH- 1000-1515.00m. Road ID – 509914010 B. Construction of Palisading Work on Pandith kandi Bridge to Badura bridge at CH-1018-1028m R/S, 1210-1240m R/S, 1222-1233m L/S, 1260-1273m R/S, 1265-1277m L/S, 1330-1360m R/S, 1383-1425m R/S, 1437-1452m R/S, 1500-1513m L/S, (Length-176m) Road ID – 509914010 C. Construction of 3 no’s (1.00x1.00m W-5.50m ) RCC Box Culvert on Pandith kandi Bridge to Badura bridge at CH- 1005m, 1383m, 1475m. Road ID – 509914010 0.52 51.96 M/S Bhuya Enterprise, Charfashion Bhola 51.95 05/07/2017 20/03/2018 100 31/12/2018 BC Completed
283 Bhola 4 tazumuddin 8 752 TAZ/R-103 Improvement of Improvement of Kaymullah bridge-krishna mazumder Road at CH- 00m-1000m (Length- 1000.00m. Road ID- 509914006) Construction of Palisading Work on Kaymullah bridge-krishna mazumder Road at CH – 450-480 RS, 380-390RS, 250-270 RS, 120-135 RS, 60-80 RS, 600-620 RS, 680-700 LS, 850-875 RS, 880-900 LS (Length- 220m) 1.00 76.95 M/S Nazimuddin Traders, 8300 Bhola Sadar Bhola. 76.93 14/02/2018 06/09/2018 30 31/12/2018 STR
284 Bhola 4 tazumuddin 8 752 TAZ/R-102 Improvement of Improvement of Chandpur UP (Shashigonj Bazar)- Chatta Dowari via madrasha Road at CH- 2200m-3900m (Length- 1700.00m. Road ID- 509913001) Construction of Palisading Work on Chandpur UP (Shashigonj Bazar)- Chatta Dowari via madrasha Road at CH - 2370-2400BS, 2433-2458 BS, 2800-2812 LS, 3550-3675 LS, 3780-3810 RS (Length- 277m) Construction of 3 no (1.50m x 1.50m) RCC Box Culvert on Chandpur UP (Shashigonj Bazar)- Chatta Dowari via madrasha Road at CH – 2350M, 2750M & 2946M 1.70 139.80 M/S Mohshin Nagar, Bhola Sadar Bhola. 139.77 0 31/12/2018  
285 Bhola 4 tazumuddin 8 752 TAZ/R-10 A. Improvement of Uttar Aralia UZR Road to Aralia UZR via Matabbar kandi BC Road at CH- 00-500.00m. Road ID – 509914018 B. Construction of Palisading Work on Uttar Aralia UZR Road to Aralia UZR via Matabbar kandi BC Road at CH- 50-75m R/S, 130-150 L/S, 211-242m R/S, 320-340m R/S, 359-385m R/S, 400-419m R/S, 405-438 L/S, 490-501m L/S. Road ID – 509914018 (Length- 173) C. Construction of 1 no’s (1.00x1.00m W-5.50m) RCC Box Culvert on Uttar Aralia UZR Road to Aralia UZR via Matabbar kandi BC Road at CH- 300.00m Road ID - 509914018 0.50 45.40 M/S Bhuya Enterprise, Charfashion Bhola 45.45 05/07/2017 20/12/2017 100 31/12/2018 BC Completed
286 Bhola 4 tazumuddin 8 752 TAZ/M-11 Maintenance of RHD Fulkuri-Shibpur khasherhat GCCR Road at CH- 00-1400m. Road ID 509914013Construction of Palisading Work on RHD Fulkuri-Shibpur khasherhat GCCR Road at CH- 445-460m L/S, 810-825m L/S, 1293-1308m R/S, 1312-1327m R/S, 1400-1414m L/S. (Length 74 m). Road ID 509914013Construction of 3 no (1mx1m W-5.50m) RCC Box Culvert on RHD Fulkuri-Shibpur khasherhat GCCR Road at CH-18.00m, 970.0m, 1125.0m. Road ID 509914013 1.40 59.27 Md. Khair Hossain, 8200- Barishal Sadar, Barishal 59.24 09/07/2017 01/01/2018 100 31/12/2018 Final