1
|
CIB-Raj-W-68
|
Const. of 96m long PSC Girder Bridge over Baral river on Chalk krishnopur-Jahangirabad road at Ch. 230m under Charghat Upazila District: Rajshahi.
|
CIBRR
|
charghat
|
181254059
|
|
96.00
|
100
|
531.18
|
JE & S JV Md.Sohel,
|
590.94
|
27/02/2018
|
11/03/2018
|
10/01/2022
|
100
|
585.00
|
100
|
05/02/2025
|
|
2
|
CRMIDP/RAJ/W-109
|
Monigram Hat
|
CRMIDP
|
bagha
|
|
|
|
75
|
300.00
|
M/S Jaeda Construction &Shila Enterprise JV Laxmipur Vatapara, Rajpara, Rajshahi
|
252.41
|
21/11/2019
|
|
30/03/2021
|
90
|
189.15
|
75
|
25/07/2022
|
|
3
|
CRMIDP/RAJ/W-111
|
Nandongachhi Hat
|
CRMIDP
|
charghat
|
|
|
|
9
|
310.00
|
MIM Development Engineering Ltd House # 25/B, Vill-Bonpara, P.o-Haroa, P.S.-Boraigram, Natore
|
267.91
|
06/07/2022
|
|
10/03/2021
|
22
|
23.00
|
9
|
25/07/2022
|
|
4
|
CRMIDP/RAJ/W-113
|
Rajabari Hat
|
CRMIDP
|
godagari
|
|
|
|
45
|
225.00
|
Md. Abdul Mannan Bangabari, Ajgora Gomostapur Chapai Nawabganj.
|
218.02
|
27/06/2022
|
20/08/2020
|
28/06/2022
|
99
|
99.00
|
45
|
25/07/2022
|
|
5
|
CRMIDP/RAJ/W-115
|
Bashontokedra Hat (Bidirpur)
|
CRMIDP
|
mohanpur
|
|
|
|
25
|
275.00
|
Md.Wasimul Haque
|
225.64
|
24/11/2020
|
|
03/07/2022
|
60
|
56.00
|
25
|
25/07/2022
|
|
6
|
CRMIDP/RAJ/W-117
|
Kartikpara Hat
|
CRMIDP
|
puthia
|
|
|
|
30
|
250.00
|
Md.Abdul Bangabari
|
249.52
|
27/05/2020
|
06/04/2021
|
21/12/2022
|
42
|
75.85
|
30
|
25/07/2022
|
|
7
|
CRMIDP/RAJ/W-118
|
Billi Hat
|
CRMIDP
|
tanore
|
|
|
|
18
|
282.00
|
M/S Azizul Traders
|
239.67
|
27/05/2020
|
06/10/2021
|
23/01/2022
|
42
|
43.00
|
18
|
25/07/2022
|
|
8
|
EUCPW-32
|
Construction of Upazila Extension Building & Hall Room
|
EUCP-2
|
mohanpur
|
|
|
|
40
|
586.70
|
M/S. Md. Wasimul Haque & Md. Abul Hossain (JV)
|
469.44
|
28/10/2019
|
08/10/2019
|
02/12/2021
|
65
|
190.00
|
40
|
20/12/2021
|
|
9
|
GRDRIDP-Raj-VR-01 /16-17
|
Nowtika H/o Aksed Mohari to Nowtika H/o Abdur Rahman road (Ch. 00-500m)
|
GRDRIDP
|
bagha
|
181105096
|
0.50
|
0.00
|
100
|
22.43
|
Sara International, Rajshahi
|
20.19
|
19/03/2017
|
02/01/2017
|
31/08/2017
|
100
|
19.26
|
100
|
25/07/2019
|
|
10
|
GRDRIDP-Raj-VR-02 /16-17
|
Atghori Azahar Chairmanpara H/O Samad to Atghori house of Gofur member boro mosque Road (Ch. 00-460m)
|
GRDRIDP
|
bagha
|
181105100
|
0.46
|
0.00
|
100
|
24.48
|
MN Traders, Natore
|
22.03
|
19/03/2017
|
02/01/2017
|
31/08/2017
|
100
|
22.03
|
100
|
25/07/2019
|
|
11
|
GRDRIDP-Raj-VR-03 /16-17
|
Panchapara (Aftab Engineer's Pond) -Rustompur hat road (Ch. 00-1000m)
|
GRDRIDP
|
bagha
|
181104020
|
1.00
|
0.00
|
100
|
52.25
|
M/S Umma Ruman Enterprise, Rajshahi
|
52.16
|
14/06/2017
|
01/12/2016
|
30/06/2018
|
100
|
52.16
|
100
|
25/07/2019
|
|
12
|
GRDRIDP-Raj-VR-17 /16-17
|
Kishobpur Durlob pond-Kishorpur Beribandh road (Ch.00-800m)
|
GRDRIDP
|
bagha
|
181105038
|
0.80
|
0.00
|
100
|
41.40
|
Md. Abul Hossain, Shaheb Bazar, Ghoramara, Rajshahi`
|
41.40
|
11/06/2017
|
20/03/2017
|
15/02/2018
|
100
|
41.38
|
100
|
25/07/2019
|
|
13
|
GRDRIDP-Raj-VR-22 /16-17
|
Imp. of Pirgacha Eidgha-Eastpara Jammee Mosque road (Ch. 00-500m) under Bagha upazila, Distrcit Rajshahi.
|
GRDRIDP
|
bagha
|
181105065
|
0.50
|
0.00
|
100
|
27.81
|
M/S Umma Ruman Enterprise, Rajshahi
|
27.58
|
31/05/2017
|
27/03/2017
|
30/04/2018
|
100
|
27.57
|
100
|
25/07/2019
|
|
14
|
GRDRIDP-Raj-VR-28 /17-18
|
Imp. of Monigram hat - Bolihar Govt. primary school road (Ch. 00-1111m). (Salvage: 17,11,303.00)
|
GRDRIDP
|
bagha
|
181104049
|
1.11
|
0.00
|
100
|
79.44
|
Md. Abul Hossain, Shaheb Bazar, Ghoramara, Rajshahi`
|
71.50
|
01/01/1900
|
29/08/2017
|
|
100
|
71.41
|
100
|
25/07/2019
|
|
15
|
GRDRIDP-Raj-UNR-M-02/16-17
|
Maintenance of Satari (R&H)-Pakuria UP Office road at (Ch. 00-1000m) under Bagha Upazila, District Rajshahi.
|
GRDRIDP
|
bagha
|
181103006
|
1.00
|
0.00
|
100
|
18.45
|
Md. Abdul Awal, Rajshahi
|
17.75
|
25/03/2018
|
30/11/2017
|
03/11/2018
|
100
|
17.74
|
100
|
25/07/2019
|
|
16
|
GRDRIDP-Raj-UZR-W-01 /17-18
|
Widening of Bagha Bus Stand-Mirgonj R&H via Harirumpur GC) (Ch.00-6550m) under Bagha Upazila, District Rajshahi. [Salvage: 45,91,168.00]
|
GRDRIDP
|
bagha
|
181102002
|
6.55
|
0.00
|
0
|
215.57
|
Khan & Sons, Dhaka
|
194.01
|
04/06/2018
|
05/03/2018
|
30/04/2019
|
90
|
172.46
|
0
|
25/07/2019
|
|
17
|
GRDRIDP-Raj-UZR-W-02 /17-18
|
Widening of Bagha Bus Stand-Mirgonj R&H via Harirumpur GC) (Ch.6550-10750m) under Bagha Upazila, District Rajshahi.
|
GRDRIDP
|
bagha
|
181102002
|
4.20
|
0.00
|
0
|
198.88
|
M/S Jitendra Nath
|
188.93
|
06/05/2018
|
05/03/2018
|
13/10/2018
|
95
|
173.02
|
0
|
25/07/2019
|
|
18
|
GRDRIDP-Raj-VR-36 /17-18
|
Imp.of Chikabari-Khujipur road (Ch.1000-2000m) under Baghmara Upazila, District Rajshahi.
|
GRDRIDP
|
bagha
|
181124005
|
1.00
|
|
|
58.94
|
M/S. KHAN Construction
|
61.89
|
11/11/2018
|
11/11/2018
|
17/06/2019
|
0
|
|
|
09/04/2019
|
|
19
|
GRDRIDP-Raj-VR-23 /16-17
|
Imp. of Khayerhat Purbopara H/o. Abdur Rahman - Khayerhat Club road (Ch. 00-500m) under Bagha upazila, Distrcit Rajshahi.
|
GRDRIDP
|
bagha
|
|
0.50
|
|
|
22.54
|
Md. Abul Hossain, Shaheb Bazar, Ghoramara, Rajshahi`
|
22.36
|
|
|
30/06/2018
|
100
|
|
|
|
|
20
|
GRDRIDP-Raj-UNR-08 /16-17
|
Taltoli hat-Maria UP Office (Jatragachi) road (Ch. 4500- 5600m) under Baghmara Upazila, District Rajshahi.
|
GRDRIDP
|
bagmara
|
181123008
|
1.10
|
0.00
|
100
|
52.66
|
M/S Ritu Enterprise, Rajshahi
|
50.49
|
17/04/2017
|
04/01/2017
|
31/12/2017
|
100
|
50.48
|
100
|
25/07/2019
|
|
21
|
GRDRIDP-Raj-UNR-09 /16-17
|
Gobindopara UP Office-Hoolikhali Ferryghat via Nardas UP & Banderhat road (Ch.7150 - 7700m) under Baghmara Upazila, District Rajshahi.
|
GRDRIDP
|
bagmara
|
181123010
|
0.55
|
0.00
|
0
|
31.54
|
Sara International, Rajshahi
|
30.93
|
17/04/2017
|
04/01/2017
|
31/12/2017
|
60
|
16.00
|
0
|
25/07/2019
|
|
22
|
GRDRIDP-Raj-VR-07 /16-17
|
Kaligonj bazar-tegachi Senpara Dewan Bayon Uddin house road (Ch. 00-1000m) under Baghmara Upazila, District Rajshahi.
|
GRDRIDP
|
bagmara
|
181125052
|
1.00
|
0.00
|
100
|
56.01
|
M/S Ritu Enterprise, Rajshahi
|
53.53
|
24/04/2017
|
04/01/2017
|
31/12/2017
|
100
|
51.22
|
100
|
25/07/2019
|
|
23
|
GRDRIDP-Raj-VR-37 /17-18
|
Imp. of Hatmadnagar-Kastonangla road (Ch.1500-2012m) under Baghmara Upazila, District Rajshahi.
|
GRDRIDP
|
bagmara
|
181124010
|
0.51
|
0.00
|
100
|
34.12
|
M/S. KHAN Construction
|
35.83
|
11/11/2018
|
30/11/2017
|
17/06/2019
|
100
|
94.65
|
100
|
25/07/2019
|
|
24
|
GRDRIDP-Raj-VR-38 /17-18
|
Imp. of Mirjapur North road-Mirjapur South road (Ch. 270-760m) under Baghmara Upazila, District Rajshahi.
|
GRDRIDP
|
bagmara
|
181124037
|
0.49
|
0.00
|
0
|
33.10
|
Md. Mansur Rahman
|
33.10
|
12/07/2018
|
30/11/2017
|
13/12/2018
|
80
|
25.85
|
0
|
25/07/2019
|
|
25
|
GRDRIDP-Raj-UNR-31 /17-18
|
Imp. of Goalkandi UP office-Madnagar bazar (rail station) road (Ch. 500-1500m) under Baghmara Upazila, District Rajshahi.
|
GRDRIDP
|
bagmara
|
181123004
|
1.00
|
0.00
|
100
|
61.34
|
Md. Mansur Rahman
|
61.34
|
12/07/2018
|
30/11/2017
|
13/12/2018
|
100
|
61.98
|
100
|
25/07/2019
|
|
26
|
GRDRIDP-Raj-UNR-32 /17-18
|
Imp. of Auchpara UP Office (Hatkhujipur)-Kesorhat road (Ch. 3598-3880m) under Baghmara Upazila, District Rajshahi.
|
GRDRIDP
|
bagmara
|
181123011
|
0.28
|
0.00
|
100
|
15.72
|
M/S. Koli Enterprise
|
14.93
|
18/12/2018
|
30/11/2017
|
24/05/2019
|
100
|
14.79
|
100
|
25/07/2019
|
|
27
|
GRDRIDP-Raj-VR-36 /17-18
|
Imp.of Chikabari-Khujipur road (Ch.1000-2000m) under Baghmara Upazila, District Rajshahi.
|
GRDRIDP
|
bagmara
|
181124005
|
1.00
|
0.00
|
0
|
58.94
|
M/S. KHAN Construction
|
61.89
|
11/11/2018
|
30/11/2017
|
17/06/2019
|
0
|
0.00
|
0
|
25/07/2019
|
|
28
|
GRDRIDP- Raj-VR-49/18-19 (LTM)
|
Imp. of Sujan Palsa-Barigram road at ch. 2550-3250m.
|
GRDRIDP
|
bagmara
|
181724026
|
0.70
|
0.00
|
0
|
66.66
|
|
0.00
|
01/01/1900
|
|
|
0
|
0.00
|
0
|
25/07/2019
|
|
29
|
GRDRIDP-Raj-VR-08 /16-17
|
Gopalpur-Achirgat road at (Ch. 3750-4250m) under Baghmara Upazila, District Rajshahi.
|
GRDRIDP
|
bagmara
|
|
0.50
|
|
|
26.15
|
Sara International, Rajshahi
|
25.69
|
|
17/04/2017
|
10/09/2017
|
50
|
|
|
09/04/2019
|
|
30
|
GRDRIDP-Raj-VR-35 /17-18
|
Imp. of Khardokore-Suvadanga UP road (Ch. 2650-3650m) under Baghmara Upazila, District Rajshahi.
|
GRDRIDP
|
bagmara
|
181124082
|
1.00
|
|
|
61.39
|
M/S Ritu Enterprise,
|
61.33
|
30/05/2018
|
30/05/2018
|
15/12/2018
|
0
|
|
|
09/04/2019
|
|
31
|
GRDRIDP-Raj-UZR-M-08/17-18
|
Maintenance of Paherpur bazar-Hoolikhali Ferryghat (Banderhat) via Dwippur UP Office road (Ch.3180-4180m) under Bagmara Upazila, District Rajshahi.
|
GRDRIDP
|
bagmara
|
|
1.00
|
|
|
23.03
|
M/S Khan Construction
|
21.88
|
|
20/05/2018
|
15/07/2018
|
0
|
|
|
|
|
32
|
GRDRIDP-Raj-UZR-M-02/16-17
|
Maintenance of Kakramari (RHD) - Dakra (GC) road. at (Ch. 00-1000m)
|
GRDRIDP
|
charghat
|
181252005
|
1.00
|
0.00
|
100
|
43.72
|
Mohammad Eunus & Brothers
|
39.34
|
13/06/2017
|
|
12/11/2017
|
100
|
39.32
|
100
|
25/07/2019
|
|
33
|
GRDRIDP-Raj-VR-18 /16-17
|
Imp. of Yusufpur Muksed house-Yousufpur Bazar (Karigorpara, Babul, Nazrul) (Babul Mohorir Bari) (Ch. 00-536m) under Charghat upazila, Distrcit Rajshahi.
|
GRDRIDP
|
charghat
|
181255027
|
0.54
|
0.00
|
100
|
28.71
|
Md. Milon Ali, Rajshahi
|
28.40
|
29/05/2017
|
27/03/2017
|
15/11/2017
|
100
|
28.40
|
100
|
25/07/2019
|
|
34
|
GRDRIDP-Raj-VR-19 /16-17
|
Imp. of Shibpur Lalmontala Shafi Driver house-Bablur bari road (Shibpur H/O Aktar- H/O Shahabaj road) (Ch. 00-300m) under Charghat upazila, Distrcit Rajshahi.
|
GRDRIDP
|
charghat
|
181254252
|
0.30
|
0.00
|
100
|
13.01
|
M/S Arif & co. Ramchandrapur, Rajshahi
|
12.95
|
04/07/2017
|
27/03/2017
|
10/12/2017
|
100
|
12.95
|
100
|
25/07/2019
|
|
35
|
GRDRIDP-Raj-VR-20 /16-17
|
Imp. of Via Laxmipur-Bankra via Mohonnagar road (Ch. 1037-2037m) under Charghat upazila, Distrcit Rajshahi.
|
GRDRIDP
|
charghat
|
181254101
|
1.00
|
0.00
|
0
|
63.89
|
M/S Hossain Enterprise, Rajshahi
|
63.75
|
11/06/2017
|
29/03/2017
|
15/02/2018
|
95
|
58.00
|
0
|
25/07/2019
|
|
36
|
GRDRIDP-Raj-VR-21 /16-17
|
Imp. of Kalabipara Bazar-Dakkin Kalabipara Mosque road (Kalabipara School-Kalabipara Sugar Cane Center) (Ch. 00-700m) under Charghat upazila, Distrcit Rajshahi.
|
GRDRIDP
|
charghat
|
181254084
|
0.70
|
0.00
|
100
|
36.93
|
Md. Abul Hossain, Shaheb Bazar, Ghoramara, Rajshahi`
|
33.23
|
04/07/2017
|
29/03/2017
|
15/02/2018
|
100
|
32.23
|
100
|
25/07/2019
|
|
37
|
GRDRIDP-Raj-UZR-07 /17-18
|
Imp. of Balaudiar Azizul more-Baneshor via Maria road (Balaudiar Azizul more(UZR)-Baneshwer via Maria (GPS) road at Ch. 1016-1999m & 3242-3473m. under Charghat Upazila, District Rajshahi.
|
GRDRIDP
|
charghat
|
181252008
|
1.21
|
0.00
|
100
|
70.91
|
M/S A.J Eterprise
Baneswar, Phutia, Rajshahi.
|
68.97
|
26/02/2018
|
19/11/2017
|
15/08/2018
|
100
|
68.97
|
100
|
25/07/2019
|
|
38
|
GRDRIDP-Raj-UNR-27 /17-18
|
Imp. of Anupampur-Bankra road (Anupampur (UZR)-Bamnidoho (H/O Aziz) UNR road) at Ch.620-1620m. under Charghat Upazila, District Rajshahi.
|
GRDRIDP
|
charghat
|
181253003
|
1.00
|
0.00
|
0
|
56.77
|
Khan & Sons, Dhaka
|
51.09
|
27/02/2018
|
19/11/2017
|
31/07/2018
|
75
|
37.42
|
0
|
25/07/2019
|
|
39
|
GRDRIDP-Raj-UNR-28 /17-18
|
Imp. of Khudir Battala-Solua via Jafarpur road (Khudir Battala (RHD)-Holidagachi Jagirpara Bottola more via Jafarpur) at Ch. 2050-3050m.
|
GRDRIDP
|
charghat
|
181253006
|
1.00
|
0.00
|
100
|
55.15
|
M/S Ritu Enterprise, Rajshahi
|
52.34
|
25/02/2018
|
19/11/2017
|
25/08/2018
|
100
|
52.34
|
100
|
25/07/2019
|
|
40
|
GRDRIDP-Raj-UNR-29 /17-18
|
Imp. of Laxmipur Kotar more-Puthimari road (Laxmipur Kotar more(UZR) –Puthimari Bazar road) at Ch. 750-1606m.
|
GRDRIDP
|
charghat
|
181253007
|
0.86
|
0.00
|
100
|
46.49
|
M/S Koli Enterprise, Laxmipur, Vatpara, Rajshahi
|
46.36
|
07/03/2018
|
19/11/2017
|
31/12/2018
|
100
|
46.36
|
100
|
25/07/2019
|
|
41
|
GRDRIDP-Raj- VR-32 /17-18
|
Imp. of Bill meramotpur-Dakhin pirozpur road (Ch. 1000-1350m)
|
GRDRIDP
|
charghat
|
181254009
|
0.35
|
0.00
|
100
|
20.56
|
M/S Mamun Traders, Muktapur, Rajshahi
|
19.90
|
14/02/2018
|
19/11/2017
|
25/07/2018
|
100
|
19.89
|
100
|
25/07/2019
|
|
42
|
GRDRIDP-Raj-VR-33 /17-18
|
Imp. of Palli Biddut (UZR) road's culvert-Delip Master Bari-Khuazer more (Charghat Putia road’s (PBS road) Kamar’s Culvert-Khoj’s more via H/O Delip Master road) road (Ch. 00-575m)
|
GRDRIDP
|
charghat
|
181255165
|
0.58
|
0.00
|
100
|
31.60
|
M/S Mamun Traders, Muktapur, Rajshahi
|
30.06
|
14/02/2018
|
19/11/2017
|
25/07/2018
|
100
|
30.60
|
100
|
25/07/2019
|
|
43
|
GRDRIDP-Raj-VR-34 /17-18
|
Imp. of Samsadipur Mosque-Dalapara more road (Samsadipur Mosque-Ansar Pond road) (Ch. 00-500m)
|
GRDRIDP
|
charghat
|
181255160
|
0.50
|
0.00
|
100
|
29.22
|
M/S Mamun Traders, Muktapur, Rajshahi
|
28.29
|
14/02/2018
|
19/11/2017
|
25/07/2018
|
100
|
28.22
|
100
|
25/07/2019
|
|
44
|
GRDRIDP- Raj-Bazar-01/18-19
|
Construction of Chowmohani hat under Charghat Upazila, District Rajshahi.
|
GRDRIDP
|
charghat
|
|
|
0.00
|
0
|
72.20
|
Konamoni Traders
|
68.59
|
10/12/2018
|
02/10/2018
|
20/06/2019
|
0
|
0.00
|
0
|
25/07/2019
|
|
45
|
GRDRIDP-Raj-UNR-01/16-17
|
Yusufpur (BOP) - Naodara (RHD) via Shreekhondi road (Ch. 500-1500m)
|
GRDRIDP
|
charghat
|
|
1.00
|
|
|
51.55
|
Md. Selim Reza, Chapai Nawabgonj
|
46.39
|
|
22/03/2017
|
10/12/2017
|
100
|
|
|
|
|
46
|
GRDRIDP-Raj-UNR-02/16-17
|
Kalurhat-Vatpara via Nimpara road (Ch. 4131-4647m & 4925-5409m)
|
GRDRIDP
|
charghat
|
|
1.00
|
|
|
51.84
|
Md. Selim Reza, Chapai Nawabgonj
|
46.66
|
|
29/03/2017
|
21/12/2017
|
100
|
|
|
|
|
47
|
GRDRIDP-Raj-UNR-03/16-17
|
Sardah R&H-to Nandangachi via Bamondighi road (Ch. 600-1600m)
|
GRDRIDP
|
charghat
|
|
1.00
|
|
|
52.70
|
Md. Selim Reza, Chapai Nawabgonj
|
47.43
|
|
23/03/2017
|
10/12/2017
|
100
|
|
|
|
|
48
|
GRDRIDP-Raj-UNR-21 /16-17
|
Imp. of Kalurhat-Vatpara via Nimpara road (Ch. 5409-7041m)
|
GRDRIDP
|
charghat
|
|
1.63
|
|
|
83.85
|
M/S Hossain Enterprise, Rajshahi
|
75.46
|
|
05/06/2017
|
30/06/2018
|
100
|
|
|
|
|
49
|
GRDRIDP-Raj-UNR-30 /17-18
|
Imp. of Charghat UP-Mongli via Bamnidaha, Faridpur,Mintur more road (Ch. 3500-4085m)
|
GRDRIDP
|
charghat
|
|
0.59
|
|
|
32.84
|
Khan & Sons, Dhaka
|
29.55
|
|
27/02/2018
|
31/07/2018
|
10
|
|
|
|
|
50
|
GRDRIDP-Raj-UZR-M-05/16-17
|
Maintenance of Shingahat GC-Biraldah Mazar NHW via Bahrampur,Hoza (Durgapur part) road at (Ch. 00-1000m)
|
GRDRIDP
|
durgapur
|
181312010
|
1.00
|
0.00
|
100
|
19.26
|
M/S Poddar Construction, Lalbazar, Natore
|
17.33
|
22/08/2017
|
24/04/2017
|
30/05/2018
|
100
|
17.32
|
100
|
25/07/2019
|
|
51
|
GRDRIDP-Raj-UZR-M-06/16-17
|
Maintenance of Shampurhat (Start from RHD)-Mohonganj road at (Ch. 00-1000m)
|
GRDRIDP
|
durgapur
|
181312013
|
1.00
|
0.00
|
100
|
20.15
|
M/S Poddar Construction, Lalbazar, Natore
|
18.14
|
22/08/2017
|
24/04/2017
|
30/05/2018
|
100
|
18.07
|
100
|
25/07/2019
|
|
52
|
GRDRIDP-Raj-VR-31 /17-18
|
Dangapara-Jugishow road (Ch. 2750-3305m)
|
GRDRIDP
|
durgapur
|
181314016
|
0.60
|
0.00
|
15
|
39.27
|
M/S Juthi Enterprise, Rajpara, Rajshahi
|
37.58
|
19/03/2018
|
08/11/2017
|
31/10/2018
|
15
|
0.00
|
15
|
25/07/2019
|
|
53
|
GRDRIDP-Raj-UNR-24 /17-18
|
Deluabari UP-Kishorpur bazar road (Ch. 800-2200m)
|
GRDRIDP
|
durgapur
|
181313008
|
1.40
|
0.00
|
100
|
78.82
|
M/S Koli Enterprise, Laxmipur, Vatpara, Rajshahi
|
74.04
|
27/03/2018
|
08/11/2017
|
28/02/2019
|
100
|
73.77
|
100
|
25/07/2019
|
|
54
|
GRDRIDP-Raj-UZR-M-07/17-18
|
Maintenance of Kanpara Hat GC-Dhopaghata GC via Joynagar UP Road road at (Ch. 00-1500m) under Durgapur Upazila, District Rajshahi.
|
GRDRIDP
|
durgapur
|
181312007
|
1.50
|
0.00
|
100
|
36.35
|
|
55.72
|
20/03/2018
|
05/03/2018
|
30/11/2018
|
100
|
37.41
|
100
|
25/07/2019
|
|
55
|
GRDRIDP- Raj-UZR-M-11/17-18
|
Maintenance of Kanpara Hat GC-Dhopaghata GC via Joynagar UP Road road at (Ch. 00-1500m) under Durgapur Upazila, District Rajshahi.
|
GRDRIDP
|
durgapur
|
181312007
|
1.50
|
0.00
|
0
|
39.39
|
|
37.42
|
14/02/2019
|
15/11/2018
|
24/05/2019
|
0
|
0.00
|
0
|
25/07/2019
|
|
56
|
GRDRIDP-Raj-VR-39 /17-18
|
Imp. of Bordhonpur Pucca Road H/O Abul (Tosirer Moor) - Jaychora Moor. (Chowpukuria Jaichora more-Tosir's More BMDA pucca road via Akhiara Dara.) road (Ch. 00-800m) under Durgapur Upazila, District Rajshahi.
|
GRDRIDP
|
durgapur
|
|
0.80
|
|
|
58.16
|
|
55.72
|
|
20/03/2018
|
30/11/2018
|
10
|
|
|
09/04/2019
|
|
57
|
GRDRIDP-Raj-VR-40 /17-18
|
Imp. of Chowbaria-Kismotmaria (meet at R&H Near Pali). Road (Ch. 00-600m) under Durgapur Upazila, District Rajshahi.
|
GRDRIDP
|
durgapur
|
|
0.60
|
|
|
36.51
|
M/S Koli Enterprise, Laxmipur, Vatpara, Rajshahi
|
35.25
|
|
27/03/2018
|
28/02/2019
|
70
|
|
|
09/04/2019
|
|
58
|
GRDRIDP-Raj-UZR-01 /16-17
|
Shinga GC (Gourkhai)-Goganbaria R&H Road via Amgram road (Ch. 5749-6478m)
|
GRDRIDP
|
durgapur
|
|
0.73
|
|
|
42.21
|
Sara International, Rajshahi
|
42.49
|
|
19/03/2017
|
17/03/2018
|
100
|
|
|
|
|
59
|
GRDRIDP-Raj-VR-04 /16-17
|
Sukandighi-Belghoria Hat road (Ch. 3000-3630m)
|
GRDRIDP
|
durgapur
|
|
0.63
|
|
|
34.80
|
M/S Hossain Enterprise, Rajshahi
|
34.28
|
|
14/03/2017
|
25/12/2017
|
100
|
|
|
|
|
60
|
GRDRIDP-Raj-VR-05 /16-17
|
Alipur Model college-Samad Kazir Bari road (Ch. 00-500m)
|
GRDRIDP
|
durgapur
|
|
0.50
|
|
|
27.22
|
Sara International, Rajshahi
|
24.50
|
|
19/03/2017
|
30/07/2018
|
100
|
|
|
|
|
61
|
GRDRIDP-Raj-UNR-14 /16-17
|
Imp. of Godagari UP-Nabinagar Bazar road (Ch.960-1960m).
|
GRDRIDP
|
godagari
|
181343021
|
1.00
|
0.00
|
100
|
52.00
|
M/S Masud Traders, Rajshahi
|
46.80
|
18/05/2017
|
27/02/2017
|
10/08/2017
|
100
|
46.80
|
100
|
25/07/2019
|
|
62
|
GRDRIDP-Raj-VR-16 /16-17
|
Imp. of Nabinagar-Bhamongram via bongpur road (Ch. 00-500m)
|
GRDRIDP
|
godagari
|
181345022
|
0.50
|
0.00
|
100
|
25.29
|
M/S Modina Construction
|
23.77
|
31/05/2017
|
08/03/2017
|
31/12/2017
|
100
|
23.77
|
100
|
25/07/2019
|
|
63
|
GRDRIDP-Raj-UZR-M-03/16-17
|
Maintenance of Kakonhat GC to Kaliganj GC road (Ch.00-1500m) under Godagari Upazila, Distrct Rajshahi.
|
GRDRIDP
|
godagari
|
181342002
|
1.50
|
0.00
|
100
|
32.34
|
M/S Paradise Traders
|
31.06
|
31/05/2017
|
27/03/2017
|
31/12/2017
|
100
|
31.05
|
100
|
25/07/2019
|
|
64
|
GRDRIDP-Raj-UZR-M-04/16-17
|
Maintenance of Rajabari to Kakonhat road (Kundolia) at (Ch. 00-1500m) under Godagari Upazila, Distrct Rajshahi.
|
GRDRIDP
|
godagari
|
181342003
|
1.50
|
0.00
|
100
|
31.07
|
M/S Masud Traders, Rajshahi
|
32.31
|
01/06/2017
|
27/03/2017
|
10/11/2017
|
100
|
32.31
|
100
|
25/07/2019
|
|
65
|
GRDRIDP-Raj-UNR-M-01/16-17
|
Maintenance of Kakonhat-Chanduria via mandoil (Starting from Dorgapara) road at (Ch. 00-1000m) under Godagari Upazila, Distrct Rajshahi.
|
GRDRIDP
|
godagari
|
181343004
|
1.00
|
0.00
|
100
|
21.87
|
M/S Paradise Traders
|
21.83
|
31/05/2017
|
27/03/2017
|
31/12/2017
|
100
|
21.83
|
100
|
25/07/2019
|
|
66
|
GRDRIDP-Raj-VR-41 /17-18
|
Imp. of Naligram-Ghasirpara road (Ch. 1010m-1510m). under Godagari Upazila, District Rajshahi.
|
GRDRIDP
|
godagari
|
181344021
|
0.50
|
0.00
|
100
|
29.45
|
M/S Umma Roman Enterprise
|
27.98
|
20/05/2018
|
|
15/04/2019
|
100
|
27.90
|
100
|
25/07/2019
|
|
67
|
GRDRIDP- Raj-VR-42 /17-18
|
Khoriapara-Godagari UP (Upto Sangrampara) road Ch.4515-4800m & 5500-6215m), Road ID 181343003
|
GRDRIDP
|
godagari
|
181344215
|
1.00
|
0.00
|
100
|
58.70
|
M/S Umma Roman Enterprise
|
55.76
|
20/05/2018
|
|
15/04/2019
|
100
|
55.71
|
100
|
25/07/2019
|
|
68
|
GRDRIDP- Raj-VR-43 /17-18
|
Imp. of Soguna-Jotgopal road (Ch. 1850-2350m) under Godagari Upazila, District Rajshahi.
|
GRDRIDP
|
godagari
|
181344055
|
0.50
|
0.00
|
0
|
29.45
|
|
0.00
|
01/01/1900
|
|
|
0
|
0.00
|
0
|
25/07/2019
|
|
69
|
GRDRIDP- Raj-VR-46/18-19
|
Imp. of Naligram-Kumarpara road (Ch. 00-800m) under Godagari Upazila, District Rajshahi.
|
GRDRIDP
|
godagari
|
181345002
|
0.80
|
0.00
|
0
|
55.94
|
|
53.14
|
01/01/1900
|
|
|
25
|
0.00
|
0
|
25/07/2019
|
|
70
|
GRDRIDP- Raj-VR-47/18-19
|
(i) Imp. of Patharghata-Chak Kuharan road (Ch. 00-2000m) (ii) Imp. of Patharghata-Dhamila road (Ch. 00-1000m) (iii) Imp. of Iswaripur-Chapal road (Ch. 00-350m) under Godagari Upazila, District Rajshahi.
|
GRDRIDP
|
godagari
|
|
3.35
|
0.00
|
0
|
224.43
|
M/S Paradise Traders & M/S Umma Roman Enterprise (JV)
|
196.75
|
29/04/2019
|
|
05/04/2020
|
10
|
0.00
|
0
|
25/07/2019
|
|
71
|
GRDRIDP-Raj-VR-13 /16-17
|
Ghobbiisnagar Eidgah-Amtolipara-Anarul's Deep Tube-weel road (Ch. 617-1117m), GRDRIDP-Raj-VR-13 /16-17
|
GRDRIDP
|
godagari
|
181344010
|
0.50
|
0.00
|
100
|
25.74
|
M/S A. Taher Construction, Rajshahi
|
23.16
|
18/05/2017
|
31/01/2017
|
10/11/2017
|
100
|
23.17
|
100
|
25/07/2019
|
|
72
|
GRDRIDP- Raj-VR-50/19-20 (LTM)
|
Imp. of Sagram Mazhir more Bottoli via Nalitri road (Ch. 1000-2000m) under Godagari Upazila,Dist: Rajshahi.
|
GRDRIDP
|
godagari
|
181344068
|
1.00
|
0.00
|
0
|
65.13
|
|
0.00
|
01/01/1900
|
15/07/2019
|
|
0
|
0.00
|
0
|
25/07/2019
|
|
73
|
GRDRIDP- Raj-VR-51/19-20 (LTM)
|
Imp. of Bissawnathpur-Pacca road (1 No. word Bissawnathpur More-Digha Marketpara) road (Ch. 500-1500m) under Godagari Upazila,Dist: Rajshahi.
|
GRDRIDP
|
godagari
|
181344017
|
1.00
|
0.00
|
0
|
65.83
|
|
0.00
|
01/01/1900
|
15/07/2019
|
|
0
|
0.00
|
0
|
25/07/2019
|
|
74
|
GRDRIDP-Raj-VR-39 /17-18
|
Imp. of Bordhonpur Pucca Road H/O Abul (Tosirer Moor) - Jaychora Moor. (Chowpukuria Jaichora more-Tosir's More BMDA pucca road via Akhiara Dara.) road (Ch. 00-800m) under Durgapur Upazila, District Rajshahi.
|
GRDRIDP
|
godagari
|
181314027
|
0.80
|
0.00
|
0
|
58.16
|
|
55.72
|
20/03/2018
|
08/01/2018
|
30/11/2018
|
25
|
0.00
|
0
|
25/07/2019
|
|
75
|
GRDRIDP-Raj-VR-40 /17-18
|
Imp. of Chowbaria-Kismotmaria (meet at R&H Near Pali). Road (Ch. 00-600m) under Durgapur Upazila, District Rajshahi.
|
GRDRIDP
|
godagari
|
181314011
|
0.60
|
0.00
|
100
|
36.51
|
M/S Koli Enterprise, Laxmipur, Vatpara, Rajshahi
|
35.25
|
27/03/2018
|
08/01/2018
|
28/02/2019
|
100
|
35.24
|
100
|
25/07/2019
|
|
76
|
GRDRIDP-Raj-UNR-15 /16-17
|
Imp. of Pakri UP-Jotgopal (Starting From Mosra ZAM E Mosque) (Ch.00-1000m).
|
GRDRIDP
|
godagari
|
|
1.00
|
|
100
|
53.03
|
M/S Masud Traders, Rajshahi
|
47.73
|
|
31/05/2017
|
10/12/2018
|
100
|
47.73
|
100
|
09/04/2019
|
|
77
|
GRDRIDP-Raj-UNR-23 /16-17
|
Digram-Basudebpur Sluice Gate road (Ch. 5260-6260m)
|
GRDRIDP
|
godagari
|
|
1.00
|
|
100
|
52.01
|
M/S A. Taher Construction, Rajshahi
|
51.99
|
|
08/06/2017
|
31/05/2018
|
100
|
51.99
|
100
|
09/04/2019
|
|
78
|
GRDRIDP-Raj-UNR-12 /16-17
|
Rayghti UP-Kochua hat road (Ch. 00-1000m)
|
GRDRIDP
|
mohanpur
|
181533012
|
1.00
|
0.00
|
20
|
58.22
|
M?S Ritu Enterprise, Rajshahi
|
57.32
|
26/04/2017
|
09/01/2017
|
31/12/2017
|
25
|
11.97
|
20
|
25/07/2019
|
|
79
|
GRDRIDP-Raj-VR-09 /16-17
|
Khaira Moure – Chandpur road (Ch. 00-1000m)
|
GRDRIDP
|
mohanpur
|
181534012
|
1.00
|
0.00
|
100
|
58.57
|
NR MAH (JV), Rajshahi
|
52.71
|
27/04/2017
|
09/01/2017
|
06/01/2018
|
100
|
52.67
|
100
|
25/07/2019
|
|
80
|
GRDRIDP-Raj-VR-10 /16-17
|
Kharoil-Dhopaghata road upto Porijonpara Bridge road (Ch. 2500-3000m)
|
GRDRIDP
|
mohanpur
|
181534025
|
0.50
|
0.00
|
100
|
26.15
|
M/S Sara International, Rajshahi
|
25.74
|
17/04/2017
|
09/01/2017
|
31/12/2017
|
100
|
24.54
|
100
|
25/07/2019
|
|
81
|
GRDRIDP-Raj-VR-12 /16-17
|
Shampur Hat-Vorpalsa via Bashilpur road (Ch. 00-1000m)
|
GRDRIDP
|
mohanpur
|
181534037
|
1.00
|
0.00
|
100
|
60.63
|
M/S Hossain Enterprise, Rajshahi
|
60.62
|
23/04/2017
|
09/01/2017
|
31/12/2017
|
100
|
60.59
|
100
|
25/07/2019
|
|
82
|
GRDRIDP-Raj-VR-27 /16-17
|
Imp. of Motiher-Taherpur road (Ch. 1000-2000m) under Mohonpur Upazila, District Rajshahi.
|
GRDRIDP
|
mohanpur
|
181534004
|
1.00
|
0.00
|
0
|
52.02
|
M/S Kamal Co., Paba, Rajshahi
|
52.10
|
05/07/2017
|
19/04/2017
|
05/01/2018
|
80
|
34.34
|
0
|
25/07/2019
|
|
83
|
GRDRIDP-Raj-UNR-25 /17-18
|
Imp. of Mougachi U.P-Moupara Hat road (Ch. 6355-7710m) under Mohanpur Upazila, District Rajshahi.
|
GRDRIDP
|
mohanpur
|
181533010
|
1.36
|
0.00
|
0
|
85.90
|
Holyhope Enterprise
|
77.31
|
21/03/2018
|
15/11/2017
|
15/11/2018
|
45
|
12.58
|
0
|
25/07/2019
|
|
84
|
GRDRIDP-Raj-UNR-26 /17-18
|
Imp. of Mougachi U.P- Kashimala ghat road (Ch. 3998-4998m) under Mohanpur Upazila, District Rajshahi.
|
GRDRIDP
|
mohanpur
|
181533013
|
1.00
|
0.00
|
0
|
63.24
|
Holyhope Enterprise
|
56.92
|
21/03/2018
|
15/11/2017
|
15/11/2018
|
10
|
0.00
|
0
|
25/07/2019
|
|
85
|
GRDRIDP-Raj-UNR-33 /17-18
|
Imp. of Rayghti UP-Kochua hat road (Ch. 1000-1281m.)
|
GRDRIDP
|
mohanpur
|
181533012
|
0.28
|
0.00
|
100
|
16.45
|
M/S Shila Enterprise, Rajshahi
|
15.26
|
13/05/2018
|
04/02/2018
|
31/12/2018
|
100
|
15.26
|
100
|
25/07/2019
|
|
86
|
GRDRIDP- Raj-UNR-34 /17-18
|
Imp. of Dhuroil U.P-Shampur hat road (Ch. 1190-2550m).
|
GRDRIDP
|
mohanpur
|
181533007
|
1.36
|
0.00
|
0
|
100.78
|
Md. Milon Ali, Rajshahi
|
95.74
|
24/07/2018
|
30/04/2018
|
10/06/2019
|
15
|
9.21
|
0
|
25/07/2019
|
|
87
|
GRDRIDP- Raj-Bazar-02/18-19
|
Construction of Polli Market at Ullapara hat under Jhanabadh UP. Upazila, Mohanpur District Rajshahi.
|
GRDRIDP
|
mohanpur
|
|
|
0.00
|
0
|
74.33
|
|
0.00
|
01/01/1900
|
24/02/2019
|
|
0
|
0.00
|
0
|
25/07/2019
|
|
88
|
GRDRIDP-Raj-UNR-11 /16-17
|
Dhurial UP-Kaligonj GCM road (Ch. 00-1000m)
|
GRDRIDP
|
mohanpur
|
|
1.00
|
|
|
64.91
|
NR MAH (JV), Rajshahi
|
58.42
|
|
27/04/2017
|
06/01/2018
|
70
|
31.95
|
|
09/04/2019
|
|
89
|
GRDRIDP-Raj-UNR-22 /16-17
|
Imp. of Ghachigram U.P. –Kamarpara Hat road (Ch. 5150-6150m)
|
GRDRIDP
|
mohanpur
|
|
1.00
|
|
|
56.56
|
New Relation, Rajshahi
|
50.90
|
|
29/05/2017
|
31/01/2018
|
30
|
|
|
09/04/2019
|
|
90
|
GRDRIDP-Raj-UNR-04 /16-17
|
Shaipara R&H to Gollapara hat (up to Tulshi Khettro) road (Ch. 6335-7185m)
|
GRDRIDP
|
mohanpur
|
|
0.85
|
|
|
64.97
|
M?S Jayeda Construction, Rajshahi
|
58.48
|
|
04/05/2017
|
30/05/2018
|
100
|
|
|
|
|
91
|
GRDRIDP-Raj-VR-11 /16-17
|
Krishnopur UZR-Krishnopur East para via Balal Sarkar house road (Ch. 00-350m)
|
GRDRIDP
|
mohanpur
|
|
0.35
|
|
|
24.21
|
M/S Mamun Enterprise
|
23.72
|
|
23/04/2017
|
10/06/2018
|
100
|
|
|
|
|
92
|
GRDRIDP-Raj-UNR-05 /16-17
|
Hozuripara.UP-Kumrapukur Adarsho gram via Kornher road (Ch.388-636m & 4946-6360m) under Paba Upazila, District Rajshahi.
|
GRDRIDP
|
paba
|
181723003
|
1.66
|
0.00
|
100
|
71.16
|
M/S Masud Traders, Rajshahi
|
64.04
|
20/01/2017
|
04/01/2017
|
31/10/2017
|
100
|
64.04
|
100
|
25/07/2019
|
|
93
|
GRDRIDP-Raj-VR-06 /16-17
|
Mormoria-Domdoma road (Ch.350-850m) under Paba Upazila, District Rajshahi.
|
GRDRIDP
|
paba
|
181724002
|
0.50
|
0.00
|
100
|
26.43
|
M/S Sara International, Rajshahi
|
23.79
|
17/04/2017
|
04/01/2017
|
31/12/2017
|
100
|
23.76
|
100
|
25/07/2019
|
|
94
|
GRDRIDP-Raj-VR-30 /17-18
|
Tetulia-Beelnapalpara road (Ch. 00-500m)
|
GRDRIDP
|
paba
|
181724008
|
0.50
|
0.00
|
100
|
28.42
|
M/S Juthi Enterprise, Rajpara, Rajshahi
|
27.38
|
01/01/1900
|
08/11/2017
|
31/07/2018
|
100
|
27.38
|
100
|
25/07/2019
|
|
95
|
GRDRIDP-Raj-VR-29 /17-18
|
Baroghachi mondal para chairman house-Madhabpure Raj cold store road (Ch.00-500m)
|
GRDRIDP
|
paba
|
181724118
|
0.50
|
0.00
|
90
|
33.83
|
Holyhope Enterprise
|
30.45
|
07/03/2018
|
08/11/2017
|
09/08/2018
|
93
|
28.00
|
90
|
25/07/2019
|
|
96
|
GRDRIDP- Raj-UZR-M-12/18-19
|
Maintenance of Nowhata GC- Ramchandrapur GC at ch. 0.0-3000m.
|
GRDRIDP
|
paba
|
181722006
|
3.00
|
0.00
|
100
|
76.26
|
Shibnath Chowdhwry, Patnitola, Naogaon
|
72.45
|
13/03/2019
|
23/12/2018
|
20/05/2019
|
100
|
72.45
|
100
|
25/07/2019
|
|
97
|
GRDRIDP-Raj-UZR-03 /16-17
|
Nowhata R&H-Kanpara via Dadpr Gopalhat road (Ch.6995-8100m)under Paba Upazila, District Rajshahi
|
GRDRIDP
|
paba
|
|
1.10
|
|
|
62.19
|
Holyhope Enterprise
|
55.97
|
|
09/05/2017
|
30/09/2017
|
100
|
51.00
|
|
09/04/2019
|
|
98
|
GRDRIDP-Raj-UNR-06 /16-17
|
Vogrul R&H to Haragram UP via Kulpara road (Ch.1100-2100m) under Paba Upazila, District Rajshahi
|
GRDRIDP
|
paba
|
|
1.00
|
|
|
54.58
|
Md. Washimul Haque
|
49.12
|
|
26/04/2017
|
10/06/2018
|
70
|
33.24
|
|
09/04/2019
|
|
99
|
GRDRIDP-Raj-UNR-07 /16-17
|
Kapashia Hat-Horian UP via Shamshadipur R&H road (Ch.1219-1860m).
|
GRDRIDP
|
paba
|
|
0.64
|
|
|
33.24
|
M/S Mamun Enterprise
|
32.41
|
|
24/04/2017
|
30/05/2018
|
100
|
|
|
|
|
100
|
GRDRIDP-Raj-UZR-02 /16-17
|
Mypara BazarR&H-Mollapara G.C via Gotia, Domdoma, Mohipara, Dhokrakul road (Ch. 11216-11451m, 13296-14386m. Road ID. 181822016
|
GRDRIDP
|
puthia
|
181822016
|
1.33
|
0.00
|
100
|
97.48
|
M/S Rudro Enterprise, Bulonpur, Rajshahi
|
87.74
|
07/02/2017
|
11/12/2016
|
31/10/2017
|
100
|
78.46
|
100
|
25/07/2019
|
|
101
|
GRDRIDP- Raj-VR-44/18-19
|
Imp. of RHD near Al-Ehshania Academy-Fulbari to Gondogohali road (Ch. 1310-2710m) under Puthia Upazila, District Rajshahi.
|
GRDRIDP
|
puthia
|
181824032
|
1.40
|
0.00
|
0
|
99.17
|
M/S Josna Enterprise
|
94.21
|
19/09/2018
|
04/07/2018
|
30/05/2019
|
75
|
67.00
|
0
|
25/07/2019
|
|
102
|
GRDRIDP- Raj-Bazar-03/18-19
|
Construction of Polli Market at Shadanpur hat in Shilmariya UP. under Puthia Upazila, District Rajshahi.
|
GRDRIDP
|
puthia
|
|
|
0.00
|
0
|
73.99
|
|
70.29
|
09/06/2019
|
24/02/2019
|
15/12/2019
|
0
|
0.00
|
0
|
25/07/2019
|
|
103
|
GRDRIDP-Raj-UNR-04 /16-17
|
Vallukgachi U.P. Office-Fullbaria Hat road (Ch. 00-1342m)
|
GRDRIDP
|
puthia
|
|
1.34
|
|
|
85.26
|
M/S Hossain Enterprise, Rajshahi
|
85.14
|
|
14/03/2017
|
10/06/2018
|
100
|
|
|
|
|
104
|
GRDRIDP-Raj-UZR-M-01/16-17
|
Maintenance of Jholmolia G.C-Mollahpara G.C road at (Ch.00-1500m) under Puthia Upazila, District: Rajshahi.
|
GRDRIDP
|
puthia
|
|
1.50
|
|
|
25.34
|
Md. Abul Hossain, Shaheb Bazar, Ghoramara, Rajshahi`
|
22.81
|
|
01/06/2017
|
25/11/2017
|
100
|
|
|
|
|
105
|
GRDRIDP-Raj-VR-15 /16-17
|
Imp. of Mundumala GC-Mohammad pur Hat. Via Moyenpur Road (Ch.3000-4000m) & 3 nos.U-drain at Ch. 3200,3500m, 3800m
|
GRDRIDP
|
tanore
|
181944023
|
1.00
|
0.00
|
100
|
57.24
|
M/S M.S Molla Traders
|
51.51
|
11/06/2017
|
27/02/2017
|
19/11/2017
|
100
|
51.51
|
100
|
25/07/2019
|
|
106
|
GRDRIDP-Raj-VR-25 /16-17
|
Imp.of Palashi Sharker para (Haripara)-Saranjai UP Road (Ch. 560-1000m) under Tanore Upazila, District Rajshahi.
|
GRDRIDP
|
tanore
|
181944051
|
0.44
|
0.00
|
100
|
27.55
|
M/S Masud Traders, Rajshahi
|
24.80
|
05/07/2017
|
30/03/2017
|
30/11/2017
|
100
|
23.80
|
100
|
25/07/2019
|
|
107
|
GRDRIDP- Raj-UZR-M-09/17-18
|
Maintenance of Chowbaria GC (Gratakanchan more)-Hat bakoil GC Via Choirkhor, Billi Hat road at (Ch. 4600-5600m) under Tanore Upazila, District Rajshahi.
|
GRDRIDP
|
tanore
|
181942010
|
1.00
|
0.00
|
100
|
22.18
|
M/S Afsheen Construction
|
21.07
|
08/08/2018
|
30/04/2018
|
15/10/2018
|
100
|
20.10
|
100
|
25/07/2019
|
|
108
|
GRDRIDP- Raj-UZR-M-10/17-18
|
Maintenance of Kashim Bazzar-Baya road at (Ch.3245-4245m) under Tanore Upazila, Dist.Rajshahi.
|
GRDRIDP
|
tanore
|
181942001
|
1.00
|
0.00
|
100
|
37.63
|
M/S Khan Construction
|
35.75
|
28/08/2015
|
22/05/2018
|
31/01/2019
|
100
|
35.75
|
100
|
25/07/2019
|
|
109
|
GRDRIDP- Raj-VR-45/18-19
|
Imp. of Malbandha Chowmohoni to Fultola Village road at ch. 1300-2300m. under Tanore Upazila, District Rajshahi.
|
GRDRIDP
|
tanore
|
181944078
|
1.00
|
0.00
|
0
|
72.26
|
M/s. Jaeda Construction
Luxmepur, Rajpara, Rajshahi
|
68.64
|
01/04/2019
|
|
06/10/2019
|
30
|
16.52
|
0
|
25/07/2019
|
|
110
|
GRDRIDP- Raj-UZR-M-13/18-19 (LTM)
|
Maintenance of Mundumalahat to Kakonhat (Tanore portion) at Ch. 6300-7300m.
|
GRDRIDP
|
tanore
|
181942008
|
1.00
|
0.00
|
72
|
62.60
|
|
49.90
|
01/01/1900
|
06/03/2019
|
|
75
|
36.00
|
72
|
25/07/2019
|
|
111
|
GRDRIDP-Raj-UZR-05 /16-17
|
Imp. of Gollapara GC to Shaipara (R&H) via Shampur hat (Tanore Part) road at Ch. 00-1612m. under Tanore Upazila, District Rajshahi.
|
GRDRIDP
|
tanore
|
|
1.61
|
|
|
93.49
|
M/S. Kamal & Co. H-509 Raninagar, Rajshahi
|
90.67
|
|
22/08/2017
|
10/08/2018
|
50
|
31.70
|
|
09/04/2019
|
|
112
|
GRDRIDP- Raj-UZR-M-13/18-19
|
Maintenance of Mundumalahat to Kakonhat (Tanore portion) at Ch. 6300-7300m.
|
GRDRIDP
|
tanore
|
181942008
|
1.00
|
|
|
62.60
|
|
0.00
|
|
|
|
0
|
|
|
09/04/2019
|
|
113
|
GRDRIDP-Raj-UNR-16 /16-17
|
Imp. of Kamarga UP Office to Chowbaria Hat via Bataspur Ghat road (Ch. 8610-9150m) & 1nos. U-drain at Ch. 8900m.
|
GRDRIDP
|
tanore
|
|
0.54
|
|
|
31.01
|
M/S A. Taher Construction, Rajshahi
|
27.91
|
|
06/06/2017
|
31/05/2018
|
100
|
|
|
|
|
114
|
GRDRIDP-Raj-UNR-17 /16-17
|
Imp. of Elamdohi hat to Kalma hat via Valukandor Hat road (Ch. 00-1000m & 5 nos. U-drain at Ch. 533,563, 617,663,854m.
|
GRDRIDP
|
tanore
|
|
1.00
|
|
|
54.57
|
M/S M.S Molla Traders
|
49.11
|
|
11/06/2017
|
22/05/2018
|
100
|
|
|
|
|
115
|
GRDRIDP-Raj-UNR-18 /16-17
|
Imp. of Billi hat to Khoribari hat road via Choirkhoir road (Ch.2276-3460m) & 2 nos. U-drain at Ch. 400,600m.
|
GRDRIDP
|
tanore
|
|
1.18
|
|
|
64.64
|
M/S A Taher Construction
|
58.18
|
|
06/06/2017
|
01/03/2018
|
100
|
|
|
|
|
116
|
GRDRIDP-Raj-UNR-19 /16-17
|
Imp. of Shadhur Hat to Darga Danga hat via Choirkhoir road (Ch.570-2570m) & 2 nos. U-drain at Ch. 704,1563m.
|
GRDRIDP
|
tanore
|
|
2.00
|
|
|
153.86
|
M/S Masud Traders, Rajshahi
|
138.47
|
|
08/06/2017
|
20/08/2018
|
100
|
|
|
|
|
117
|
GRDRIDP-Raj-VR-24 /16-17
|
Imp. of Dargadanga hat-Natipara hat. Road (Ch. 00-1000m) under Tanore Upazila, District Rajshahi.
|
GRDRIDP
|
tanore
|
|
1.00
|
|
|
56.99
|
M/S Masud Traders, Rajshahi
|
51.29
|
|
05/07/2017
|
04/04/2018
|
100
|
|
|
|
|
118
|
GRDRIDP-Raj-VR-26 /16-17
|
Imp. of Madaripur more – Madaripur Medical Road (Ch 450-1040m) under Tanore Upazila, District Rajshahi.
|
GRDRIDP
|
tanore
|
|
0.59
|
|
|
37.99
|
M/S A Taher Construction
|
34.14
|
|
08/06/2017
|
31/05/2018
|
100
|
|
|
|
|
119
|
GSIDP/RJS/DW-14
|
Improvement of Bagha Graveyard, Union: Bagha Pourasava, Upazila: Bagha, District : Rajshahi. Latitude: 24.1974, Longitude: 88.8428.
|
GSIDP
|
bagha
|
|
|
|
|
5.08
|
M/S. Appal Construction
|
4.82
|
|
|
|
0
|
|
|
|
|
120
|
GSIDP/RJS/DW-15
|
Improvement of Crematory for Arani Khepababar Ashram Union: Arani, Upazila: Bagha, District : Rajshahi. Latitude: 24.2904, Longitude: 88.8593.
|
GSIDP
|
bagha
|
|
|
|
|
10.02
|
Md. Mazadul Islam
|
9.52
|
|
24/05/2018
|
24/10/2018
|
100
|
|
|
|
|
121
|
GSIDP/RJS/DW-5
|
Improvement of Boilsing Bazar Jam-E- Mosjid.Union : Mariya, Upazila: Bagmara, District : Rajshahi. Latitude: 24.59815, Longitude: 88.84597.
|
GSIDP
|
bagmara
|
|
|
|
|
5.00
|
Md. Aslam Pervez
|
4.75
|
|
07/05/2018
|
10/09/2018
|
100
|
|
|
|
|
122
|
GSIDP/RJS/DW-6
|
Improvement of Mochmoil Crematory, Union : Suvodanga.Upazila: Bagmara, District : Rajshahi. Latitude: 24.5826, Longitude: 88.74246.
|
GSIDP
|
bagmara
|
|
|
|
|
5.00
|
Md. Aslam Pervez
|
4.75
|
|
10/05/2018
|
10/09/2018
|
0
|
|
|
|
|
123
|
GSIDP/RJS/DW-7
|
Improvement of Pannapara Bazar Jame Mosque. Union : Bhaya-Luxmipur, Upazila: Charghat, District : Rajshahi. Latitude: 24.2577, Longitude: 88.8299.
|
GSIDP
|
charghat
|
|
|
|
|
5.00
|
M/S. S.M Corporation
|
4.75
|
|
27/05/2018
|
01/10/2018
|
0
|
|
|
|
|
124
|
GSIDP/RJS/DW-8
|
Improvement of Beltoly Jame Mosque. Union : Charghat, Upazila: Charghat, District : Rajshahi. Latitude: 24.2425, Longitude: 88.7901.
|
GSIDP
|
charghat
|
|
|
|
|
5.00
|
Md. Abdul Awal
|
4.75
|
|
13/05/2018
|
10/09/2018
|
100
|
|
|
|
|
125
|
GSIDP/RJS/DW-9
|
Improvement of Nandangachi Bazar Jame Mosque.Union : Nimpara Upazila: Charghat, District : Rajshahi. Latitude: 24.3169, Longitude: 88.8028.
|
GSIDP
|
charghat
|
|
|
|
|
5.00
|
M/S. S.M Corporation
|
4.75
|
|
27/05/2018
|
01/10/2018
|
100
|
|
|
|
|
126
|
GSIDP/RJS/DW-10
|
Improvement of kaminigangarampur Eidgah.Union : Nimpara, Upazila: Charghat, District : Rajshahi. Latitude: 24.3226, Longitude: 88.8008.
|
GSIDP
|
charghat
|
|
|
|
|
5.00
|
M/S. Kamal & CO
|
4.75
|
|
27/05/2018
|
30/10/2018
|
100
|
|
|
|
|
127
|
GSIDP/RJS/DW-11
|
Improvement of Belghoria Purbapara Graveyard.Union : Yusufpur, Upazila: Charghat, District : Rajshahi. Latitude: 24.3542, Longitude: 88.6743.
|
GSIDP
|
charghat
|
|
|
|
|
5.00
|
M/S. Arif & Co.
|
4.75
|
|
27/05/2018
|
30/10/2018
|
100
|
|
|
|
|
128
|
GSIDP/RJS/DW-12
|
Improvement of Khordogobindapur Mosque & Eidgha ground.Union : Sardah, Upazila: Charghat, District : Rajshahi. Latitude: 24.2883, Longitude: 88.7836.
|
GSIDP
|
charghat
|
|
|
|
|
5.00
|
M/S.Monir Enterprise
|
4.75
|
|
07/05/2018
|
10/09/2018
|
100
|
|
|
|
|
129
|
GSIDP/RJS/DW-1
|
Improvement of Palsha Uttorpara Uporpara Jame Mosjid.Union : Dhuroil, Upazila: Mohanpur, District : Rajshahi. Latitude: 24.5618, Longitude: 88.6086.
|
GSIDP
|
mohanpur
|
|
|
|
|
5.05
|
M/S Nirjon Enterprise
|
4.80
|
|
15/07/2018
|
20/12/2018
|
0
|
|
|
|
|
130
|
GSIDP/RJS/DW-2
|
Improvement of Buksoyal Namo para Jame Mosjid.Union : Raighati, Upazila: Mohanpur, District : Rajshahi. Latitude: 24.5849, Longitude: 88.6582.
|
GSIDP
|
mohanpur
|
|
|
|
|
5.00
|
Kazi Ashekul Haque
|
4.75
|
|
07/05/2018
|
10/09/2018
|
100
|
|
|
|
|
131
|
GSIDP/RJS/DW-3
|
Improvement of Belna Graveyard.Union : Ghashigram, Upazila: Mohanpur, District : Rajshahi. Latitude: 24.6104, Longitude: 88.6099.
|
GSIDP
|
mohanpur
|
|
|
|
|
5.00
|
M/S. Kamal & CO
|
4.75
|
|
27/05/2018
|
30/10/2018
|
0
|
|
|
|
|
132
|
GSIDP/RJS/DW-4
|
Improvement of Mohiskundi Eidgah. Union : Ghashigram, Upazila:Mohanpur, District : Rajshahi. Latitude: 24.5750, Longitude: 88.6193.
|
GSIDP
|
mohanpur
|
|
|
|
|
5.00
|
M/S. Arif & Co.
|
4.75
|
|
|
|
0
|
|
|
|
|
133
|
GSIDP/RJS/DW-13
|
Improvement of Kolar Tikor Jame Mosque, Union: Damkura, Upazila: Paba, District : Rajshahi. Latitude: 24.4213873, Longitude: 88.5520153.
|
GSIDP
|
paba
|
|
|
|
|
5.00
|
M/S. Jaima Traders
|
4.75
|
|
29/05/2018
|
31/10/2018
|
100
|
|
|
|
|
134
|
IRIDP-2/RJS/DW-1
|
Improvement of Gopalpur NHW - Machmara road road (Ch. 500m -1000m).
|
IRIDP-2
|
godagari
|
|
0.50
|
|
|
25.83
|
M/S. Jayada Construction
|
20.80
|
|
25/02/2016
|
06/09/2016
|
100
|
|
|
|
|
135
|
IRIDP-2/RJS/DW-2
|
Improvement of Godari UP - Narayanpur road - Shaharapara via Goma High School (Start from Hsazir Pukur) road (ch. 00m -500m).
|
IRIDP-2
|
godagari
|
|
0.50
|
|
|
26.28
|
M/S. Jayada Construction
|
21.16
|
|
25/02/2016
|
09/05/2017
|
100
|
|
|
|
|
136
|
IRIDP-2/RJS/DW-3
|
Improvement of Jotabottola - Shaharapara Mondir road (Ch. 00m -500m).
|
IRIDP-2
|
godagari
|
|
0.50
|
|
|
25.96
|
M/S. Jayada Construction
|
208.86
|
|
25/02/2016
|
25/05/2017
|
100
|
|
|
|
|
137
|
IRIDP-2/RJS/DW-4
|
Improvement of Paramanndapur - Kapasia via Ghanoshampur (Ch.00m- 500m).
|
IRIDP-2
|
godagari
|
|
0.50
|
|
|
25.92
|
M/S. Koli Enterprise
|
27.36
|
|
25/02/2016
|
06/11/2017
|
100
|
|
|
|
|
138
|
IRIDP-2/RJS/DW-5
|
Improvement of Zina Fulbari -Bibidying via Khatandor road ( Ch. 500m -1000m)
|
IRIDP-2
|
godagari
|
|
0.50
|
|
|
25.83
|
Masud Traders
|
20.73
|
|
09/10/2016
|
15/05/2017
|
100
|
|
|
|
|
139
|
IRIDP-2/RJS/DW-6
|
Improvement of Kosia- Andharan (Road st.froKosia) road (Ch. 00m -1000m).
|
IRIDP-2
|
godagari
|
|
1.00
|
|
|
52.12
|
Masud Traders
|
42.36
|
|
17/02/2016
|
30/04/2017
|
100
|
|
|
|
|
140
|
IRIDP-2/RJS/DW-7
|
Improvement of Chabbisnagor Madrasha - Chabbisnagor eidgha via Chaighatpara road (Ch. 00m -400m).
|
IRIDP-2
|
godagari
|
|
0.40
|
|
|
21.07
|
M/S. Juthi Enterprise
|
16.40
|
|
17/02/2016
|
31/12/2016
|
100
|
|
|
|
|
141
|
IRIDP-2/RJS/DW-8
|
Improvement of Huzrapur- Lakradighi Pry. School road (Ch. 500m -1006m).
|
IRIDP-2
|
godagari
|
|
0.51
|
|
|
25.83
|
M/S. Rudro Enterprise
|
20.57
|
|
17/02/2016
|
07/02/2017
|
100
|
|
|
|
|
142
|
IRIDP-2/RJS/DW-9
|
Improvement of Faradpur R&H - Chapra road (Ch. 500m -1280m).
|
IRIDP-2
|
godagari
|
|
0.78
|
|
|
40.30
|
M/S. Rudro Enterprise
|
32.03
|
|
17/02/2016
|
08/09/2016
|
100
|
|
|
|
|
143
|
IRIDP-2/RJS/DW-10
|
Improvement of Vubanpara Eidgha - H/o abdus Samad (st. from H/o Abdul Khalek ending Khash Mahal Farighat) road ( Ch. 00m -500m).
|
IRIDP-2
|
godagari
|
|
0.50
|
|
|
26.39
|
M/S. Rudro Enterprise
|
20.57
|
|
17/02/2016
|
30/05/2017
|
100
|
|
|
|
|
144
|
IRIDP-2/RJS/DW-11
|
a)Improvement of Kuchimara - Bongshidharpur road (Ch. 1559m -2175m).. b) Const.of 2-Nos culvert 0.625x0.600m at Ch.1983 m & 2137 m.
|
IRIDP-2
|
tanore
|
|
0.62
|
|
|
36.78
|
Masud Traders
|
30.69
|
|
17/02/2016
|
13/04/2017
|
100
|
|
|
|
|
145
|
IRIDP-2/RJS/DW-12
|
a)Improvement of Gollapara (R&H) - Krishnopur Hat via Mohor hat road (ch. 3420m -3941m). b) Const.of 3-Nos culvert 0.625x0.600m at Ch.3478, 3550 & 3778 m.
|
IRIDP-2
|
tanore
|
|
0.52
|
|
|
29.01
|
Masud Traders
|
24.23
|
|
17/02/2016
|
07/11/2016
|
100
|
|
|
|
|
146
|
IRIDP-2/RJS/DW-13
|
a)Improvement of Chakbadhair - Boddopur hat road (Ch. 517m -1084m). b) Const.of 3-Nos culvert 0.625x0.600m at Ch.750, 822 & 950m.
|
IRIDP-2
|
tanore
|
|
0.57
|
|
|
32.44
|
Masud Traders
|
27.09
|
|
17/02/2016
|
07/11/2016
|
100
|
|
|
|
|
147
|
IRIDP-2/RJS/DW-14
|
a)Improvement of Pachandor Thantola more - Krishnopur road (Ch.1435m- 2035m). b) Const.of 4-Nos culvert 0.625x0.600m at Ch.1497, 1543, 1797 & 2085 m.
|
IRIDP-2
|
tanore
|
|
0.60
|
|
|
34.70
|
M/S. Rudro Enterprise
|
28.54
|
|
17/02/2016
|
07/11/2016
|
100
|
|
|
|
|
148
|
IRIDP-2/RJS/DW-15
|
a)Improvement of Kamargaon UP offic - Tangra ghat via Dhamdama road (Ch. 549m -1090m). b) Const.of 1-Nos culvert 1.00x0.1.00m at Ch.642 m. c) Const.of 1-No culvert 0.625x0.600m at Ch. 927m.
|
IRIDP-2
|
tanore
|
|
0.54
|
|
|
29.05
|
M/S. Rudro Enterprise
|
24.31
|
|
17/02/2016
|
05/03/2017
|
100
|
|
|
|
|
149
|
e-Tender/NBIDGPS/RAJ/BAG/2017-2018/W1-554
|
MARKUTI KISHOR PUR
|
NBIDGPS-1
|
bagha
|
|
|
|
|
55.24
|
M/S Jim Enterprise
|
52.48
|
|
08/01/2019
|
|
0
|
|
|
|
|
150
|
e-Tender/NBIDGPS/RAJ/BAG/2017-2018/W1-386
|
SANKOA
|
NBIDGPS-1
|
bagmara
|
|
|
|
|
69.65
|
Md. Wasimul Haque
|
68.26
|
|
25/03/2018
|
02/12/2018
|
60
|
|
|
|
|
151
|
e-Tender/NBIDGPS/RAJ/BAG/2017-2018/W1-387
|
DEOPARA BIL MALALI
|
NBIDGPS-1
|
bagmara
|
|
|
|
|
67.30
|
M/s Hossain Enterprise
|
61.03
|
|
15/03/2018
|
22/12/2018
|
70
|
|
|
|
|
152
|
e-Tender/NBIDGPS/RAJ/CHA/2017-2018/W1-1457
|
BELGHORIA
|
NBIDGPS-1
|
charghat
|
|
|
|
|
69.64
|
M/S M.N Trade
|
66.16
|
|
26/06/2018
|
26/06/2019
|
35
|
|
|
|
|
153
|
e-Tender/NBIDGPS/RAJ/CHA/2017-2018/W1-389
|
TANGON
|
NBIDGPS-1
|
charghat
|
|
|
|
|
66.97
|
Md. Abdul Gaffar
|
63.62
|
|
07/05/2018
|
13/02/2019
|
80
|
|
|
|
|
154
|
e-Tender/NBIDGPS/RAJ/CHA/2017-2018/W1-555
|
MOKTAR PUR
|
NBIDGPS-1
|
charghat
|
|
|
|
|
54.17
|
M/S Liton Traders
|
48.75
|
|
04/03/2018
|
23/12/2018
|
95
|
|
|
|
|
155
|
e-Tender/NBIDGPS/RAJ/GOD/2017-2018/W1-1769
|
KHARIJAGANTI GOVT. PRIMARY SCHOOL
|
NBIDGPS-1
|
godagari
|
|
|
|
|
38.54
|
M/S. RAJU ENTERPRISE
|
36.61
|
|
13/09/2018
|
12/06/2019
|
50
|
|
|
|
|
156
|
e-Tender/NBIDGPS/RAJ/PAB/2017-2018/W1-1071
|
SHIALBER GOVT. PRIMARY SCHOOL
|
NBIDGPS-1
|
paba
|
|
|
|
|
31.06
|
M/S. SHILA ENTERPRISE
|
29.51
|
|
20/05/2018
|
24/02/2019
|
85
|
|
|
|
|
157
|
e-Tender/NBIDGPS/RAJ/TAN/2017-2018/W1-388
|
SATPUKURIA GPS
|
NBIDGPS-1
|
tanore
|
|
|
|
|
52.67
|
Forida Construction
|
65.00
|
|
15/06/2018
|
10/02/2019
|
60
|
|
|
|
|
158
|
CW-31.c/RCIP/RJS
|
1. Imp. of Bolihar Eidgah (R&H) – Digha GC via Tetulia Hat road [181102010] 2. Impr. of Chandipur – Arani Rly Station via Station via Bausa UP Office road [181103001]
|
RCIP
|
bagha
|
181102010
|
19.49
|
0.00
|
0
|
1390.02
|
Rithin Enterprise , Dorikharbona, Boalia, Rajshahi
|
1606.00
|
16/01/2022
|
01/02/2022
|
30/05/2023
|
10
|
0.00
|
0
|
05/01/2023
|
|
159
|
CW-47.b/RCIP/RJS
|
Improvement of Bhawanigonj-Ahsangonj (Road ID181122001, Upazila: Bagmara, District: Rajshahi) Improvement of Bhabanigong-Kesorhat (Road ID181122003, Upazila: Bagmara, District: Rajshahi) Improvement of Bhobanigong-Hatgangopara (from Mathabhanga) (Road ID181122004, Upazila: Bagmara, District: Rajshahi)
|
RCIP
|
bagmara
|
|
22.50
|
0.00
|
88
|
2682.17
|
Mim Development Engineering LTD& M/s. ShahidBrothers (JV),
|
2674.79
|
23/08/2020
|
01/09/2020
|
12/12/2022
|
100
|
2321.38
|
88
|
05/01/2023
|
|
160
|
CW-31.b/RCIP/RJS
|
1. Imp. of Holidagachi National high way – Rajshahi University via Belghoria road [181252010] 2 . Imp. of Charghat (Upazila HQ) – Arani GC (Rustompur) via Paglapara more road [181252003] 3 . Imp. of Puthia – Baeswar GC road [181822007]
|
RCIP
|
charghat
|
181252010
|
29.55
|
0.00
|
95
|
2834.13
|
Kamal Associats Engineers Ltd & M/s. Hossain Enterprise (JV)
|
3235.44
|
28/01/2020
|
28/01/2020
|
30/10/2022
|
100
|
3067.72
|
95
|
05/01/2023
|
|
161
|
CW-31.a/RCIP/RJS
|
1. Imp. of Amgachi GC – Katakhali R&H via Kuhar road [181312006] 2. Imp. of Durgapur – Belghoria road [181312001] 3. Imp. of Shingahat GC–Amgachi Hat GC road [181312003]
|
RCIP
|
durgapur
|
181312001
|
18.03
|
0.00
|
0
|
2011.98
|
Muhammad Aminul Haque(Pvt.) Ltd.- Stadium Para, Par Naogaon, Naogaon
|
2874.00
|
28/08/2022
|
07/09/2022
|
06/02/2024
|
0
|
0.00
|
0
|
05/01/2023
|
|
162
|
CW-03.c/RCIP/RJS
|
1. Improvement of Godagari to Kakonhat (Starting from Sadurmore) (Road ID181342001, Upazila: Godagari, District: Rajshahi) 2. Improvement of Pakri UP-Jotgopal (Road ID181343018, Upazila: Godagari, District: Rajshahi) 3. Improvement of Godagari UP-Nabinagar Bazar Road (Road ID181343021, Upazila: Godagari, District: Rajshahi)
|
RCIP
|
godagari
|
181342001
|
23.12
|
0.00
|
46
|
2143.74
|
ShamimEnterprise (Pvt.)Ltd.
|
2064.47
|
03/11/2020
|
10/11/2020
|
16/02/2023
|
57
|
945.60
|
46
|
30/04/2023
|
|
163
|
CW-03.a/RCIP/RJS
|
1. Improvement of Railbazar - Amnura road via Mowlanar gate, Dhuly shanko, Ratahary (Godagari part end at Khaira) (Road ID181342009, Upazila: Godagari, District: Rajshahi
|
RCIP
|
godagari
|
181342009
|
17.41
|
0.00
|
90
|
2067.61
|
Don Enterprise &Md. WashimulHaque (JV)
|
2189.04
|
22/10/2020
|
29/10/2020
|
27/11/2022
|
97
|
1973.53
|
90
|
05/01/2023
|
|
164
|
CW-03.b/RCIP/RJS
|
1. Improvement of Baliaghata Bazar RHD more to Mundumala GC via Jota Bottola, Hatgobindapur (258m over lapping with RHD) (Road ID181342008, Upazila: Godagari, District: Rajshahi) 2. Improvement of Basudebpur Sluice Gate-Dariapur ending at Nawabgonj Border (Road ID181343006, Upazila: Godagari, District: Rajshahi)
|
RCIP
|
godagari
|
181342008
|
27.26
|
0.00
|
70
|
1998.23
|
ShamimEnterprise (Pvt.)Ltd.
|
2150.66
|
20/05/2020
|
01/06/2020
|
31/01/2023
|
98
|
1490.56
|
70
|
05/01/2023
|
|
165
|
CW-46.a/RCIP/RJS
|
1. Improvement of Tanore-Amnura via Mundumala Hat (Road ID181942003, Upazila: Tanore, District: Rajshahi) 2. Improvement of Mollikpur Bipass (Kukhundipur Bazar) - Parila UP Road (Road ID181723024, Upazila: Paba , District: Rajshahi)
|
RCIP
|
tanore
|
|
21.39
|
0.00
|
95
|
2152.79
|
Don Enterprise &Md. WashimulHaque (JV)
|
2078.16
|
20/07/2020
|
03/08/2020
|
20/09/2022
|
100
|
1962.68
|
95
|
01/10/2023
|
|
166
|
CW-47.a/RCIP/RJS
|
1. Imp. of Elamdhi Hat - Kalma Hat via Valuka Kandor road 181943005 2.Imp. of Mundumala Hat (Start from Ayra more) - Hat Baloil (GCM) via Uchadanga Narayenpur (Tanore Part) road [181942005] 3. Imp. of Bazorpur Trimohoni - Dhupaghata Hat road [181532001]
|
RCIP
|
tanore
|
|
20.65
|
0.00
|
96
|
2233.19
|
Md. MoyenUddin (Bashi) Ltd.Jessore
|
2219.00
|
23/08/2020
|
30/08/2020
|
15/11/2022
|
100
|
2129.24
|
96
|
05/01/2023
|
|
167
|
CW-46.b/RCIP/RJS
|
1. Improvement of Talanda FRB to Nizampur via Dargadanga Hat,Billi Hat Road (Road ID181942007, Upazila: Tanore, District: Rajshahi) 2. Improvement of Talanda to Keshor Hat (from Hatishail)Tanore Part (Road ID181942011, Upazila: Tanore, District: Rajshahi)
|
RCIP
|
tanore
|
|
22.44
|
0.00
|
96
|
2204.30
|
Don Enterprise &Md. WashimulHaque (JV)
|
2138.00
|
19/09/2020
|
23/09/2020
|
07/07/2022
|
100
|
2042.35
|
96
|
05/01/2023
|
|
168
|
CW-46.c/RCIP/RJS
|
1. Improvement of Tanore-Chowbaria road (Road ID181942002, Upazila: Tanore, District: Rajshahi) 2. Improvement of Saranjai Pacca Road More - Mundumala Hat Via DebipurMore,Elamdohi hat and Prokash Nagar Hat. (Road ID181942014, Upazila: Tanore, District: Rajshahi)
|
RCIP
|
tanore
|
|
27.36
|
0.00
|
96
|
2414.17
|
Md. Moyen Uddin (Bashi) Ltd. Jessore
|
2399.00
|
23/08/2020
|
30/08/2020
|
16/06/2022
|
100
|
2293.02
|
96
|
05/01/2023
|
|
169
|
RDRIDP/Raj/Bagha/Maintenance-02/17-18
|
Periodic Maintenance work of Monigram hat--- Bolihar Govt. Primary School Road at ch1100--2364m. Road ID 181104049. UpazilaBagha.2Periodic Maintenance work of Jotraghob hat--Durduria hat road at ch.00--875m. Road ID 181104017.UpazilaBagha.3Periodic Maintenance work of Bagsahesta H/Q Emran member--Jottraghob hat road at ch.125 --1640m Road ID 181104038UpazilaBagha. Dist Rajshahi.
|
RDRIDP
|
bagha
|
|
3.27
|
|
|
131.86
|
M.A. NABI & SONS
|
125.27
|
|
|
31/12/2018
|
5
|
|
|
|
|
170
|
RDRIDP/Raj/Bagha-01/17-18
|
Improvement of Sultanpur H/O Idris Melitary H/O Khalil road at Ch.- 00-550m ID. No. 181104140 Upazila Bagha.bImprovement of Sultanpur Mosque Sultanpur hat road at Ch.- 00-958m ID. No. 181104141 Salvage cost 1845116 Upazila.Bagha.cImprovement of Sultanpur Gorstan Pucca road Bholar more at Ch.- 00-1412m ID. No. 181104178 Salvage Cost765044Upazila Bagha.dImprovement of Ashrafpur Embankment Ashrafpur village via Chandpur GPS road at Ch.- 00-929m ID. No. 181105010 Upazila Bagha.
|
RDRIDP
|
bagha
|
|
4.78
|
|
|
252.42
|
Md. Selim Reza
|
248.03
|
|
10/07/2018
|
30/12/2019
|
40
|
|
|
|
|
171
|
RDRIDP/Raj/Bagmara/Maintenance-13/17-18
|
Maintenance Work of Mochmoil - Mohongong road at Ch.2200-5670.00m Road ID 181122008 Upazila Rajshahi (Salvage Cost-2227557.00 )
|
RDRIDP
|
bagmara
|
|
3.47
|
|
|
177.16
|
M/S. Azizul Traders
|
168.31
|
|
09/08/2018
|
10/06/2019
|
0
|
|
|
|
|
172
|
RDRIDP/Raj/Bagmara-05/17-18
|
a) Improvement of Mondial- Birkaya road at Ch. 00-1160.00m, ID.No. 181124004 [Upazila: Bagmara]. b) Improvement of Sikdary-Jugipara road at Ch. 500-1500.00m, ID.No. 181124016 [Upazila: Bagmara].
|
RDRIDP
|
bagmara
|
|
2.16
|
|
|
141.15
|
M/S. KHAN CONSTRUCTION
|
148.21
|
|
15/09/2018
|
31/01/2019
|
0
|
|
|
|
|
173
|
RDRIDP/Raj/Bagmara-07/17-18
|
Improvement of Mozopara-Tokipur via Sarandi road at Ch. 00-1500.00m, ID.No. 181124081 [Upazila: Bagmara].
|
RDRIDP
|
bagmara
|
|
1.50
|
|
|
140.56
|
M/S. KHAN CONSTRUCTION
|
147.59
|
|
15/09/2018
|
31/01/2019
|
0
|
|
|
|
|
174
|
RDRIDP/Raj/Bagmara-01/17-18
|
a)Improvement of Fousderpara- Ronshibari Hat road Ch. 1845-202.00m, ID.No. 181124088 [Upazila: Bagmara]. b)Improvement of Gopalpur - Achinghat road at Ch. 9900-10900.00m, ID.No. 181124066 [Upazila: Bagmara].
|
RDRIDP
|
bagmara
|
|
1.82
|
|
|
68.77
|
M/S. KHAN CONSTRUCTION
|
72.21
|
|
01/09/2018
|
01/05/2019
|
0
|
|
|
|
|
175
|
RDRIDP/Raj/Bagmara-02/17-18
|
Improvement of Bhawanigonj GC- Pirgonj Hat via Kachari Kolipara UP road at Ch. 3850-5250.00m, ID.No. 181123020 [Upazila: Bagmara].
|
RDRIDP
|
bagmara
|
|
1.73
|
|
|
97.89
|
MD. ZAHANGIR ALAM
|
99.85
|
|
01/09/2018
|
01/05/2019
|
0
|
|
|
|
|
176
|
RDRIDP/Raj/Bagmara-03/17-18
|
Improvement of Baro Bihanali UP office- Paikarhat road at Ch. 518-2445.00m, ID.No. 181123013 [Upazila: Bagmara].
|
RDRIDP
|
bagmara
|
|
1.30
|
|
|
119.04
|
MD. ZAHANGIR ALAM
|
122.62
|
|
01/09/2018
|
01/05/2019
|
0
|
|
|
|
|
177
|
RDRIDP/Raj/Bagmara-04/17-18
|
Improvement of Konopara hat- Goalkandi UP office road at Ch. 00-1920.00m, ID.No. 181123015 [Upazila: Bagmara].
|
RDRIDP
|
bagmara
|
|
1.50
|
|
|
119.52
|
M/S. KHAN CONSTRUCTION
|
125.50
|
|
01/09/2018
|
01/05/2019
|
0
|
|
|
|
|
178
|
RDRIDP/Raj/Bagmara-06/17-18
|
a) Improvement of Kamnagar (UZR)-Porakaya hat road via Basupara UP H/Q Road at Ch. 770-1770.00m, ID.No. 181123016 [Upazila: Bagmara]. b)Improvement of Gohindapara UP- Damnas hat Road at Ch. 00-1000.00m, ID.No. 181123017 [Upazila: Bagmara].
|
RDRIDP
|
bagmara
|
|
2.00
|
|
|
135.94
|
M/S. Taohid Enterprise
|
142.73
|
|
01/10/2018
|
30/07/2019
|
0
|
|
|
|
|
179
|
RDRIDP/Raj/Charghat/Maintenance-06/17-18
|
Maintenance work of Charghat (RHD) Cinema Hall - Charghat UP (Paranpur) road at (Ch.- 00-3732m), ID. No. 181253017, [Upazila: Charghat].
|
RDRIDP
|
charghat
|
|
3.73
|
|
|
59.42
|
M/S. North Star Enterprise
|
56.45
|
|
01/06/2018
|
30/10/2018
|
100
|
|
|
|
|
180
|
RDRIDP/Raj/Charghat/Maintenance-08/17-18
|
Maintenance work of Yousuf Purbazar Sluicegate- Kapasia Palpara Dhalan NHW via Chowmohoni road at Ch.- 00- 2930m ID. No. 181254263 Upazila Charghat.
|
RDRIDP
|
charghat
|
|
2.93
|
|
|
59.14
|
Md. Abdul Awal
|
56.19
|
|
01/06/2018
|
31/10/2018
|
100
|
|
|
|
|
181
|
RDRIDP/Raj/Charghat/Maintenance-09/17-18
|
a)Maintenance work of Patiakandi Bazar- Khardo Gobindapur (H/Q Gujroth) Chakopara road at (Ch.- 00-1388m), ID. No. 181254265, [Upazila: Charghat]. b)Maintenance work of Laxmipur Kotarmore (UZR)- Bonkishor (UZR) road at (Ch.- 00-880m), ID. No. 181254274, [Upazila: Charghat].
|
RDRIDP
|
charghat
|
|
2.27
|
|
|
43.93
|
M/S. A. J. Enterprise
|
41.73
|
|
01/06/2018
|
31/10/2018
|
50
|
|
|
|
|
182
|
RDRIDP/Raj/Charghat-02/17-18
|
A Improvement work of Routha Hazir Dhalan - Panchbaria Madrasa road. At Ch. 00.0- 800.0m ID. No. 181254010 B Improvement work of Mungli Jame Mosque- Jalal pond via Kodomtola road. At Ch. 00.0- 1034.0m ID. No. 181254043C Improvement work of Talbaria - Binodpur pucca road. At Ch. 00.00 - 745.0m ID. No. 181254228 .D Improvement work of Routha R&H Nururs Bottola - Hazir Dhalroad via H/O Principal Rowshan Ch. 00.0 - 360 & Link road Ch. 00-210m 360210570.00 ID. No. 181254159 (Salvage Cost=192957) E Improvement work of Mungli Bottola - Patiakandi Bazar at Ch. 450.0m -1153.0m ID. No. 181254114 20.Improvement work of Talbarla Poranpur H/O Soen BC road - Talbaria Motir mour BC road at Ch. 00.0 - 645.0m ID. No. 181255190 .F Improvement work of Talbariya H/O Sarman BC road Westiside Poura Mosque Ch. 00.0 - 800.0m ID. No. 181255238G Improvement work of Rautha RHO - Charghat UP Paranpur Via Talbaria road at Ch. 00.0- 137m 1779 -1800m & 2450 - 3125.0m 13721675 833.0m ID. No. 181253016 Upazila Charghat
|
RDRIDP
|
charghat
|
|
6.13
|
|
|
365.21
|
DON ENTERPRISE
|
359.73
|
|
|
|
0
|
|
|
|
|
183
|
RDRIDP/Raj/Durgapur-01/17-18
|
A) Improvement of Dhopapara, Kashipur more-Namodarkhali Edgah Road at Ch. 400-820.00m, ID.No. 181315189 B) Improvement of Ujankhalshi U.P Office- Laxmipur Road at Ch. 00-640.00m, ID.No. 181315005 C) Improvement of Saiber Naodapara Bridge-jhalika Guchogram Road (ID Name : Panthapara Jhaluka Maddhapara Zame Mosjid via Jhaluka Guchagram) Road at Ch. 500-1830.00m, ID.No. 181315001 D) Improvement of Pananagor- Gabranali Road at Ch. 00-300.00m, ID.No. 181314013 E) Improvement of Pananagor- Dangirpara Road at Ch. 700-1070.00m, ID.No. 181315070 F) Improvement of Near House Nabir Dr. of Tebila- Narayanpur Pucca Road at Ch. 500-1250.00m, ID.No. 181314017
|
RDRIDP
|
durgapur
|
|
3.81
|
|
|
237.28
|
Md. Selim Reza
|
224.88
|
|
01/10/2018
|
30/01/2020
|
0
|
|
|
|
|
184
|
RDRIDP/Raj/Durgapur/Maintenance-15/17-18
|
A) Maintenance work of Nowpara School Gopalpur hat via Isodpur more road form Ch. 00-3510.00m Road ID 181313015 [Upazila: Durgapur] B)Maintenance work of Deluabari UP-Jugishow Bazar road form Ch. 00-2280.00m Road ID 181313004 [Upazila: Durgapur] C)Maintenance work of Jhaluka UP Office- Hatgodagari via Hariapara( Dugapur Part) road form Ch. 00-2570.00m Road ID 181313007[Upazila: Durgapur]
|
RDRIDP
|
durgapur
|
|
8.36
|
|
|
191.51
|
M/S. Mamun Traders
|
166.62
|
|
|
|
0
|
|
|
|
|
185
|
RDRIDP/Raj/Godagari/Maintenance-01/17-18
|
Periodic Maintenance work of Kakonhat GC-- Kaliganj GC Road at Ch.00-10110m.Road ID 181342002 Upazila Godagari. Dist Rajshahi.
|
RDRIDP
|
godagari
|
|
10.11
|
|
|
541.89
|
M/S HOSSAIN ENTERPRISE
|
499.79
|
|
15/07/2018
|
30/11/2018
|
30
|
|
|
|
|
186
|
RDRIDP/Raj/Mohanpur/Maintenance-14/17-18
|
A)Maintenance work of Dhuroil UP- Shampur Hat road form Ch. 00-1190.00m Road ID 181533007 [Upazila: Mohanpur] B)Maintenance work of Jahanabad UP-Mugaipara road form Ch. 1885-4400.00m Road ID 181533002 [Upazila: Mohanpur] C)Maintenance work of Mougachi UP-Moupara Hat road form Ch. 00-6350.00m Road ID 181533010 [Upazila: Mohanpur]
|
RDRIDP
|
mohanpur
|
|
10.06
|
|
|
193.84
|
M/S. MD. WASIMUL HAQUE & NEW RELATION JV
|
167.15
|
|
01/11/2018
|
30/03/2019
|
0
|
|
|
|
|
187
|
RDRIDP/Raj/Paba/Maintenance-05/17-18
|
a)Maintenance work of Darusha UP kaikuri More-Kakon GC (Paba part) road at (Ch.- 00-2500m), ID. No. 181722011, [Upazila: Paba]. b)Maintenance work of Darusha UP kaikuri More-Kakon GC (Paba part) road at (Ch.- 2500- 4710m), ID. No. 181722011, [Upazila: Paba].
|
RDRIDP
|
paba
|
|
4.71
|
|
|
112.74
|
S. K. Enterprise
|
107.10
|
|
01/06/2018
|
31/10/2018
|
100
|
|
|
|
|
188
|
RDRIDP/Raj/Paba/Maintenance-07/17-18
|
a)Maintenance work of Darshanpara UP- Bagdhani hat road at (Ch.- 00-4300m), ID. No. 181723001, [Upazila: Paba]. b)Maintenance work of Darshanpara UP- Bagdhani hat road at (Ch.- 4300-8600m), ID. No. 181723001, [Upazila: Paba].
|
RDRIDP
|
paba
|
|
4.30
|
|
|
170.34
|
M/S. Modina Construction
|
161.82
|
|
10/06/2018
|
30/10/2018
|
100
|
|
|
|
|
189
|
RDRIDP/Raj/Puthia/Maintenance-10/17-18
|
Maintenance work of RHD Kapasia- Amgachi GC to via Mahandra hat road at (Ch.- 00-5350m), ID. No. 181822011, [Upazila: Puthia].
|
RDRIDP
|
puthia
|
|
5.35
|
|
|
79.17
|
M/s.Rudro Enterprise
|
75.22
|
|
01/07/2018
|
28/02/2019
|
100
|
|
|
|
|
190
|
RDRIDP/Raj/Puthia/Maintenance-11/17-18
|
Maintenance work of Baneswar GC- Holidagachi RHD via namajgram road at Ch.- 00-4842m ID. No. 181822014 Upazila Puhia.
|
RDRIDP
|
puthia
|
|
5.35
|
|
|
100.55
|
M/S Kakoli Enterprise
|
95.52
|
|
15/07/2018
|
30/11/2018
|
100
|
|
|
|
|
191
|
RDRIDP/Raj/Puthia/Maintenance-12/17-18
|
Maintenance work of Jholmolia GC- RHD Puthia Arani road (Putia Part) at (Ch.- 00- 2160m), ID. No. 181822021, [Upazila: Puthia].
|
RDRIDP
|
puthia
|
|
4.84
|
|
|
58.04
|
M/S Wooden Furniture House
|
55.14
|
|
15/07/2018
|
30/05/2019
|
10
|
|
|
|
|
192
|
RDRIDP/Raj/Puthia-01/17-18
|
A) Improvement of Road from RHD Belpukuria H/O jalal-Belpukuria Central Grave Yarde via Bismillah Dal Mill Road Ch. 00-500.00m, ID.No. 181825019 [Upazila: Puthia]. B) Improvement of Road from UZR Kazirpara Polaner More-UZR Somajer More via H/O Saidur Road at ch. 00-500.00m, ID.No. 181825144 [Upazila: Puthia].
|
RDRIDP
|
puthia
|
|
1.00
|
|
|
60.96
|
M/S. Shahin & Sons
|
57.91
|
|
09/08/2018
|
30/06/2019
|
0
|
|
|
|
|
193
|
RDRIDP/Raj/Puthia-02/17-18
|
A) Improvement of Road from UNR Sorisabari Bazar-Maspara Mondir at ch. 1000-1670m, ID.No. 181824104 [Upazila: Puthia]. B) Improvement of Road from RHD Lalmontola-Jamira via Bogartak Road at ch. 3110.00-4110.00m, ID.No. 181824046 [Upazila: Puthia].
|
RDRIDP
|
puthia
|
|
1.00
|
|
|
99.32
|
M/S. MOMO TRADERS
|
94.35
|
|
10/08/2018
|
30/12/2018
|
70
|
|
|
|
|
194
|
RDRIDP/Raj/Puthia-03/17-18
|
A) Improvement of Road from Soto Kandra Rahedulâ??s shop pucca Road- Boro Kandra Kayemâ??s house Road at ch. 00-1000.00m, ID.No. 181825057 [Upazila: Puthia]. B) Improvement of Road from UZR Sahabajpur Bazar-UZR Bot tala H/O Mojahar Ali Road at ch. 500.00-1350.00m, ID.No. 181824168 [Upazila: Puthia].
|
RDRIDP
|
puthia
|
|
1.85
|
|
|
109.91
|
MD. FEROZ KABIR
|
104.41
|
|
19/08/2018
|
18/08/2019
|
10
|
|
|
|
|
195
|
RDRIDP/Raj/Puthia-04/17-18
|
A) Improvement of Road from Sonatoner More- Munto�¢??s house Road at ch. 00-565.00m, ID.No. 181825067 [Upazila: Puthia]. B) Improvement of Road from RHD Shibpur near Vetenary Office- RHD Baneswar Bannana Hat via Jagirpara Road at ch. 00-850.00m, ID.No. 181824175 [Upazila: Puthia].
|
RDRIDP
|
puthia
|
|
1.42
|
|
|
91.22
|
M/S. A. J. Enterprise
|
86.66
|
|
09/08/2018
|
30/12/2018
|
10
|
|
|
|
|
196
|
RDRIDP/Raj/Puthia-05/17-18
|
A) Improvement of Road from Bharora Munsipara pucca Road More-Najimâ??s Garden Road at ch. 00-500.00m, ID.No. 181825065 [Upazila: Puthia]. B) Improvement of Road from UZR jamira Nimnomadhomic School to UZR Digholkandi at ch. 1170-1690.00m, ID.No. 181824132 [Upazila: Puthia].
|
RDRIDP
|
puthia
|
|
1.02
|
|
|
57.22
|
MD. FEROZ KABIR
|
54.36
|
|
09/08/2018
|
18/06/2019
|
0
|
|
|
|
|
197
|
RDRIDP/Raj/Puthia-06/17-18
|
Improvement of Road from RHD Satbari H/O Surendranath-H/O A. Latif via High School at Satbaria Road ch. 00-1000.00m, ID.No. 181824085 [Upazila: Puthia].
|
RDRIDP
|
puthia
|
|
1.00
|
|
|
58.63
|
M/S. A. J. Enterprise
|
55.69
|
|
09/08/2018
|
30/12/2018
|
0
|
|
|
|
|
198
|
RDRIDP/Raj/tanor/Maintenance-03/17-18
|
Maintenance work of Tanore- Chowbaria road at Ch. 4600-7865m. B Maintenance work of Tanore- Chowbaria road at Ch. 10400-12750m. ID No. 181942002 Upazila Tanore.
|
RDRIDP
|
tanore
|
|
5.62
|
|
|
121.60
|
M/S. Masud Traders
|
115.52
|
|
01/06/2018
|
10/11/2018
|
100
|
|
|
|
|
199
|
RDRIDP/Raj/tanor/Maintenance-04/17-18
|
Maintenance work of Tanore-Chowbaria road at Ch.- 2500-4600m ID. No. 181942002 Upazila Tanore.
|
RDRIDP
|
tanore
|
|
2.10
|
|
|
59.81
|
M/S BANOFUL INVESTMENTS
|
56.82
|
|
15/07/2018
|
30/11/2018
|
100
|
|
|
|
|
200
|
RDRIDP/Raj/Tanor-01/17-18
|
Alitola Pucca Road more to jotgorib via Hasnapura, chorkhor, gobtola more road at Ch. 3800-4800.0m & Const. of 4 nos U-Type Culvert Size 600x625 mm at Ch. 3900m ,4085m, 4353m, & 4600m. Road ID 181944070 Upazila Tanore.
|
RDRIDP
|
tanore
|
|
1.00
|
|
|
70.93
|
M/S. Shahin & Sons
|
67.38
|
|
01/07/2018
|
30/05/2019
|
15
|
|
|
|
|
201
|
RDRIDP/Raj/Tanore-06/17-18.
|
Shadhur Hat- Darga Danga hat road via Horipur Ghat at Ch. 2400-6300m & Const. of 5nos. U-Type Culvert size 625x600mm at Ch 4100m 4175m 5625m 5729m & 6085m. ID.No. 181943008 Upazila Tanore.Dist Rajshahi.
|
RDRIDP
|
tanore
|
|
3.90
|
|
|
257.45
|
M/S. A. Taher Construction
|
242.00
|
|
03/09/2018
|
20/05/2019
|
10
|
|
|
|
|
202
|
RDRIDP/Raj/Tanore-05/17-18
|
Hasnapur Maria road at Ch. 00-1000m ID.No. 181844001 Upazila Tanore.Narayanpur Uchadanga- Ekkanapur from Horipur road at Ch. 00-500m ID.No. 181844018 Upazila Tanore.Narayanpur School Narayanpur village pucca road at Ch. 00-500m ID.No. 181844056 Upazila Tanore.
|
RDRIDP
|
tanore
|
|
2.00
|
|
|
135.78
|
M/S. AFSHEEN CONSTRUCTION
|
128.99
|
|
01/07/2018
|
30/11/2018
|
10
|
|
|
|
|
203
|
RDRIDP/Raj/Tanore-04/17-18
|
Tanore Mundumala UZR Jumarpara more - Jhinakhor via Ramdebpur Abason at Ch. 600 1100m ID.No. 181944068 Upazila Tanore.Chandpur Pacca road- Banial Bazar Road via Chandpur GPS at Ch. 00 500m ID.No. 181944090 Upazila Tanore.Zujishar Zospur Pucca road- Duboil Purbapara road at Ch. 00 500m ID.No. 181944091 Upazila Tanore.
|
RDRIDP
|
tanore
|
|
1.50
|
|
|
103.27
|
M/S Arif & Co.
|
98.11
|
|
15/07/2018
|
30/11/2018
|
15
|
|
|
|
|
204
|
RDRIDP/Raj/Tanore-03/17-18
|
Jumarpara more Shibrampur road at Ch. 2000 2350m ID.No. 181944009 Upazila Tanore.Choirkhoir Pagol Dewani Ghat road at Ch. 1400 2000m ID.No. 181944016 Upazila Tanore.Sidhara- Jumarpara Ganirmora road at Ch. 2200-2700m0 ID.No. 181944020Upazila Tanore.
|
RDRIDP
|
tanore
|
|
1.45
|
|
|
103.24
|
M/s. Rudro Enterprise
|
98.08
|
|
03/09/2018
|
25/04/2019
|
50
|
|
|
|
|
205
|
RDRIDP/Raj/Tanore-02/17-18
|
Baya UZR- Gagrands Start from Kumrapukur Chanduria UP via Saranjai UP at Ch. 00 -2800m ID. No. 181943009 Upazila Tanore.
|
RDRIDP
|
tanore
|
|
2.80
|
|
|
180.02
|
M/S. PANOROMIC CONSTRUCTION
|
171.02
|
|
01/07/2018
|
30/05/2019
|
10
|
|
|
|
|
206
|
RERMP-3/RA JSHA/W-13
|
Maintenance of Rural
Roads Rajshahi()
|
RERMP-3
|
bagha
|
N/A
|
|
|
31
|
2628.00
|
N/A
|
2628.00
|
|
|
|
40
|
855.00
|
31
|
26/12/2021
|
|
207
|
SHOU III/ Raj/W-32
|
Periodic Maintenance of Rajabari GC-DamKura GC ( Starting from Chaingati) Road
|
SHOUHARDO-3
|
godagari
|
181342005
|
4.45
|
|
|
82.85
|
|
78.71
|
11/04/2019
|
|
30/06/2019
|
100
|
|
|
22/05/2019
|
|
208
|
SHOU III/ Raj/W-22
|
Periodic Maintenance of Rajabari GC-DamKura GC ( Starting from Chaingati) Road
|
SHOUHARDO-3
|
godagari
|
181342005
|
5.00
|
|
|
100.96
|
M/s Salim Enterprise, Duspukor/3 , GPO-6000, Rajpara, Rajshahi
|
99.91
|
|
12/11/2018
|
17/01/2019
|
100
|
|
|
22/03/2019
|
|
209
|
SHOU III/ Raj/W-28
|
Maintenance of Ishoripur-Pulpur (Bottala) Road.
|
SHOUHARDO-3
|
godagari
|
181344103
|
1.42
|
|
|
51.01
|
Don Enterprise, Baharpur, Rajpara, Rajshahi
|
47.39
|
|
04/01/2018
|
25/06/2018
|
100
|
|
|
05/03/2019
|
|
210
|
SP14143/Barkatpur Baladiar DR Subproject
|
Borkotpur-Baladia khal re-excavation(ch.1000-2300m) Referenced line section(2 Nos.) Bamboo bridge(2 Nos.)
|
SSSWRDP
|
charghat
|
|
|
1.30
|
92
|
23.94
|
LCS-7
|
23.94
|
10/03/2019
|
08/04/2019
|
30/04/2019
|
100
|
22.17
|
92
|
30/11/2022
|
|
211
|
SP12037/Dudhai-Bhanpur Khal WCS Subproject
|
Dudhai - Bhanpur Khal Re-excavation (ch0.00-2500m) Reference Line Section (4nos) (ch 100m, 1200m, 1800m, 2400m), SP Identification signboard (2Nos.)
|
SSSWRDP
|
godagari
|
|
|
2.50
|
100
|
31.92
|
LCS
|
31.92
|
09/09/2020
|
28/01/2021
|
10/04/2021
|
100
|
31.86
|
100
|
30/11/2022
|
|
212
|
SP25235/Kashimpur CAD Sub-project
|
Re-Construction of 1-500mm dia UPVC Buried Pipe C-D-E-F Line From (Ch: 0.00m-1236.00m.) Construction of RCC Open Branch Canal BR-5 from (Ch: 0.00m-450.00m.) Project Identification Signboard. Const. of Laying 1-450mm dia Upvc Buried Pipe Branch Canal-1, line C-C4-1 from RCC Sump to Header Tank Near Asmail Land). Length= 1350m - 2023-24 Const. of Laying 1-250mm dia Upvc Buried Pipe Branch Line C4-C5 (Asmail Land to South side). Length= 300m - 2023-24 Const. of RCC Open Irrigation Canal Line C-D (0.50m X 0.50m) (South side of Existing RCC Sump). Length= 280m. & Sump Extension - 2023-24
|
SSSWRDP
|
godagari
|
|
|
0.00
|
53
|
243.25
|
OTM
|
218.93
|
28/10/2020
|
25/04/2024
|
28/06/2022
|
50
|
117.99
|
53
|
30/11/2022
|
|
213
|
SP25236/Baliaghata Subproejct
|
Construction of RCC Pumping Platform near Mohananda River (1no), Small Size Pumping Platfrom (2nos.) Construction of RCC Over Head Tank near Ajram Pond. Re-Construction of 1-500mm dia UPVC Buried Pipe Lines, FF1 Line From Ch.(1343m to1483 m) Construction of 1-315mm UPVC Buried Pipe Line,NO line From Ch.(0.0 to 1550 m) Construction of 1-250mm dia UPVC Buried Pipe Branch Lines OP From Ch.(1550 m+1920 m) Construction of 1-250mm dia UPVC Buried Pipes Branch Lines PP2 From Ch.(1920 m+2720 m) Construction of 1-250mm dia UPVC Buried Pipes Branch Lines OQ From Ch.(1550 m+1870 m) Construction of 1-250mm dia UPVC Buried Pipes Branch Lines QQ2 From Ch.(1870 m+2670 m) Non-Tender Items: 125mm Brick Work, Supplying, Fitting, Fixing MS grills
|
SSSWRDP
|
godagari
|
|
|
0.00
|
100
|
201.51
|
Borsa enter prize & Rithin Enter Prize
|
185.65
|
05/02/2020
|
14/12/2020
|
10/10/2021
|
100
|
185.65
|
100
|
30/11/2022
|
|
214
|
SP25227/Hatnabad Subproject
|
Construction of RCC Irrigation Open Canal Line: B-B1 From Ch.0+000 km to 0+150 km Construction of RCC Irrigation Open Canal Line: C1-C2 From Ch.0+000 km to 0+110 km. Plastering & Bottom Patent Stone of Brick Main and Plastering & Bottom Patent Stone & Vertical Extension Brick Branch Canal Line: E-F from Ch.0+500 km to 685 km Construction of RCC Irrigation Open Canal Line: F-F1 From Ch.0+000 km to 0+150 km. Laying of 1-250mm Dia Upvc Buried Pipe Line: G-G1 from Ch. 0+000 km to 0+700 km Laying of 1-250mm Dia Upvc Buried Pipe Line: G-G2 from Ch. 0+000 km to 0+150 km Laying of 2-280mm Dia Upvc Buried Pipe Line: G-H from Ch. 0+000 km to 1+650 km Laying of 1-250mm Dia Upvc Buried Pipe Line: H-H1 from Ch. 0+000 km to 0+500 km Laying of 1-250mm Dia Upvc Buried Pipe Line: H-H2 from Ch. 0+000 km to 0+650 km Laying of 1-250mm Dia Upvc Buried Pipe Line: H-H3 from Ch. 0+000 km to 0+380 km Laying of 1-250mm Dia Upvc Buried Pipe Line: H-H4 from Ch. 0+000 km to 0+300 km Construction of Brick Header Tank ( 3.60m x 3.60 m x 2.10m ) near Mirdha Pond Construction of Rcc Pump Operating Platform (2-3.0m x 2.0m ) at Existing Header Tank & Mirdha Pond & (1-6.0m x 2.0m) at River Bank, 28 Nos Brick Name Plate, 2 Nos. SPISP & 2 Nos. SPIP. Laying of 1-280mm Dia uPVC Buried Pressure Pipe Line G-H from Ch. 0+000km to 1+650km - 2023-24
|
SSSWRDP
|
godagari
|
|
|
0.00
|
75
|
221.09
|
OTM
|
198.99
|
17/04/2023
|
30/04/2024
|
16/01/2024
|
92
|
149.25
|
75
|
30/11/2022
|
|
215
|
SP45198/Shutki Beel Subproject
|
Const of Rem. works of (2v-1.50mx1.80m) Regulator at ch. 3600m of Khal, SP Identf. S.Board Construction of Remaining works of WMCA office -
|
SSSWRDP
|
mohanpur
|
|
|
0.00
|
100
|
30.73
|
M/S Rudro Enterprise
|
31.91
|
13/04/2022
|
01/09/2022
|
02/03/2023
|
100
|
31.80
|
100
|
30/11/2022
|
|
216
|
SP22024/Hatisal Ghritakanchan Subproject
|
Re-excavation of Hatishail Ghritakanchan Khal (Ch-0+00km to 3+500km) Ref. Lined Section 5 Nos. On 1 Khals, And SP Identf. Signboard (2 nos.)
|
SSSWRDP
|
tanore
|
|
|
3.50
|
100
|
46.08
|
LCS
|
46.08
|
20/02/2022
|
20/03/2022
|
24/04/2022
|
100
|
45.64
|
100
|
30/11/2022
|
|
217
|
SP23070/Banial-Elamdahi Khal Subproject
|
Baniyal-Islamdahi Khal Re-excavation - Upstream (Ch0.00-3300m) Reference Line Section (4nos), Subproject Identification signboard (2nos.) and Provisional Sum, Baniyal-Ilamdahi Khal Re-excavation - Downstream (Ch.0+000 Km to 2+000 Km) 2022-23 Reference Line Section (3Nos), SP Identification signboard (2Nos.) and Demarcation Post (6Nos.) 2022-23
|
SSSWRDP
|
tanore
|
|
|
5.30
|
100
|
52.58
|
LCS
|
52.28
|
27/04/2024
|
24/03/2024
|
30/04/2024
|
100
|
52.19
|
100
|
30/11/2022
|
|
218
|
SP62031/Gurail Chalk Kazizia Subproject
|
Gurail Chalk Kazizia Khal Re-excavation. (Ch-0+000km to 4+720km) Ref. Lined Section 05 Nos. On 1 Khal and SP Identf. Signboard (2 nos.) Construction of Gurail Chalk Kazizia Khal WRS-1 (3v-1.50mx2.00m) at Ch. 0+175m of Khal Construction of Gurail Chalk Kazizia Khal WRS-2 (2v-1.50mx1.80m) at Ch. 2+340m of Khal Construction of WMCA office
|
SSSWRDP
|
tanore
|
|
|
4.72
|
97
|
256.16
|
OTM
|
247.23
|
18/09/2022
|
21/12/2022
|
30/04/2023
|
100
|
241.21
|
97
|
30/11/2022
|
|
219
|
SP13095/Malbandha WCS Subproject
|
Construction of WMCA office, Electificatiion works of WMCA office and Supply Office Furniture of WMCA office
|
SSSWRDP
|
tanore
|
|
|
0.00
|
0
|
22.03
|
OTM
|
22.98
|
16/02/2023
|
28/05/2023
|
|
30
|
0.00
|
0
|
30/11/2022
|
|
220
|
SP15243/Bankeshor-Nabutala DR & WCS Subproject
|
Re-Excavation of Bankeshor Nabutala Khal (Ch.0+000 Km to 2+500 Km) Const. of 03 Nos. Reference lined Section on 1 Khal, SP Identf. sign board 2 Nos., Demercation Post 10 Nos. and SP Indication Post 2 Nos.
|
SSSWRDP
|
tanore
|
|
|
2.50
|
96
|
52.69
|
LCS
|
52.69
|
05/03/2023
|
23/03/2023
|
23/05/2023
|
100
|
50.73
|
96
|
30/11/2022
|
|
221
|
SP14179/Dhamdhum-Mohammadpur DR & WCS Subproject
|
Re-excavation of Dhamdum-Mohammadpur Khal (Ch-2+850km to 6+350km) Reference Line Section (4nos) (ch 2900m, 3900m, 4900m, 5900m), SP Identification signboard & post (2Nos.)
|
SSSWRDP
|
tanore
|
|
|
3.50
|
100
|
46.38
|
LCS
|
46.34
|
15/10/2023
|
01/01/2024
|
30/04/2024
|
100
|
45.94
|
100
|
30/11/2022
|
|
222
|
w.041
|
Construction of 4 no borobihanali UP Complex
|
UCCP-2
|
bagmara
|
|
|
|
100
|
91.50
|
|
91.30
|
19/07/2016
|
|
30/11/2017
|
100
|
91.23
|
100
|
27/08/2020
|
|
223
|
w.140
|
Construction of hamirkhusa UP Complex
|
UCCP-2
|
bagmara
|
|
|
|
100
|
86.66
|
|
82.33
|
18/07/2013
|
|
31/01/2015
|
100
|
79.11
|
100
|
26/08/2020
|
|
224
|
w.104
|
Construction of kachari koalipara UP Complex
|
UCCP-2
|
bagmara
|
|
|
|
100
|
91.62
|
|
87.04
|
27/07/2013
|
|
31/12/2014
|
100
|
86.99
|
100
|
26/08/2020
|
|
225
|
w.629
|
Construction of shovodanga UP Complex
|
UCCP-2
|
bagmara
|
|
|
|
|
126.27
|
|
119.95
|
21/01/2019
|
|
26/10/2019
|
80
|
70.00
|
|
26/08/2020
|
|
226
|
036/246
|
Construction of Tushkhali UP Complex
|
UCCP-2
|
bagmara
|
|
|
|
100
|
59.00
|
|
56.05
|
30/08/2010
|
|
24/07/2013
|
100
|
55.93
|
100
|
06/08/2020
|
|
227
|
035/246
|
Construction of maria UP Complex
|
UCCP-2
|
bagmara
|
|
|
|
100
|
59.00
|
|
56.05
|
05/09/2010
|
|
30/04/2014
|
100
|
55.81
|
100
|
06/08/2020
|
|
228
|
w-509
|
Construction of1 no usufpur UP Complex
|
UCCP-2
|
charghat
|
|
|
|
|
108.73
|
|
97.86
|
17/07/2017
|
|
28/02/2019
|
100
|
70.00
|
|
26/08/2020
|
|
229
|
028/176
|
Construction of joynagar UP Complex
|
UCCP-2
|
durgapur
|
|
|
|
100
|
88.21
|
|
73.55
|
22/07/2015
|
|
12/10/2016
|
100
|
73.24
|
100
|
08/09/2020
|
|
230
|
w.128
|
Construction of deopara UP Complex
|
UCCP-2
|
godagari
|
|
|
|
100
|
83.75
|
|
79.56
|
07/03/2013
|
|
28/02/2015
|
100
|
79.28
|
100
|
26/08/2020
|
|
231
|
w.127
|
Construction of maticata UP Complex
|
UCCP-2
|
godagari
|
|
|
|
100
|
83.65
|
|
79.47
|
25/03/2013
|
|
29/01/2015
|
100
|
79.42
|
100
|
26/08/2020
|
|
232
|
w.013
|
Construction of ghasigram UP Complex
|
UCCP-2
|
mohanpur
|
|
|
|
100
|
89.33
|
|
84.86
|
29/04/2013
|
|
30/07/2015
|
100
|
84.86
|
100
|
26/08/2020
|
|
233
|
w.609
|
Construction of royghati UP Complex
|
UCCP-2
|
mohanpur
|
|
|
|
|
127.84
|
|
121.44
|
08/08/2018
|
|
07/05/2019
|
85
|
25.00
|
|
26/08/2020
|
|
234
|
w-566
|
Construction of parila UP Complex
|
UCCP-2
|
paba
|
|
|
|
|
114.77
|
|
103.29
|
22/03/2018
|
|
24/12/2018
|
100
|
90.00
|
|
26/08/2020
|
|
235
|
w.031
|
Construction of talonda UP Complex
|
UCCP-2
|
tanore
|
|
|
|
100
|
89.99
|
|
85.49
|
08/04/2013
|
|
30/06/2015
|
100
|
85.47
|
100
|
26/08/2020
|
|
236
|
w.636
|
Construction of pachando UP Complex
|
UCCP-2
|
tanore
|
|
|
|
|
144.03
|
|
136.83
|
05/02/2019
|
|
04/11/2019
|
80
|
|
|
26/08/2020
|
|
237
|
034/246
|
Construction of kamargaon UP Complex
|
UCCP-2
|
tanore
|
|
|
|
100
|
56.05
|
|
56.05
|
30/10/2010
|
|
30/10/2011
|
100
|
55.93
|
100
|
06/08/2020
|
|
238
|
CBU-100/ Purto-156
|
রাজশাহী জেলার দূর্গাপুর উপজেলাধীন কিসমতহোজা (জুগীপাড়া)- পানানগর সংযোগ হোজা নদীর উপর RCC ব্রিজ নির্মাণ (রোড আইডিঃ১৮১৪৫৫১১২)
|
UHBP
|
durgapur
|
181455112
|
|
64.00
|
0
|
464.54
|
M/S. Boshundhara House Builders & New Relation (JV)
|
416.29
|
29/09/2020
|
08/01/2020
|
08/06/2023
|
90
|
361.21
|
0
|
28/09/2024
|
|
239
|
CBU-100/ Purto-157
|
রাজশাহী জেলার গোদাগাড়ী উপজেলাধীন কদমশহর ভাগাইল রাস্তায় পান্তাপাড়া ঘাটে খাড়ির উপর RCC ব্রিজ নির্মাণ (রোড আইডিঃ ১৮১৩৪৪০৭১)
|
UHBP
|
godagari
|
181344071
|
|
72.00
|
0
|
514.61
|
Md. Sohel
|
445.13
|
04/10/2020
|
06/03/2020
|
28/10/2024
|
95
|
395.14
|
0
|
28/09/2024
|
|
240
|
CBU-100/ Purto-158
|
রাজশাহী জেলার গোদাগাড়ী উপজেলাধীন মাথাভাংগা জামদহ সড়কে জোয়াখালী খাড়ির উপর RCC ব্রিজ নির্মাণ (রোড আইডিঃ ১৮১৩৪৪১১২)
|
UHBP
|
godagari
|
181344112
|
|
33.00
|
0
|
347.97
|
Md. Abdul Mannan
|
319.07
|
25/08/2020
|
08/01/2020
|
17/06/2023
|
100
|
319.03
|
0
|
28/09/2024
|
|
241
|
CBU-100/ Purto-159
|
আলীমগঞ্জ আরএইচডি-গহামাবোনা সড়কে ২০২০ মিঃ চেইনেজে আরসিসি সেতু নির্মাণ। (রোড আইডি: ১৮১৭২৪০২৯) উপজেলাঃ পবা, জেলা: রাজশাহী।
|
UHBP
|
paba
|
181724029
|
|
24.00
|
0
|
184.16
|
Barendra Construction Ltd.
|
165.75
|
21/04/2024
|
30/04/2024
|
23/04/2025
|
0
|
0.00
|
0
|
28/09/2024
|
|
242
|
UIIP-BC/PCO/W-294
|
1 Construction of B/C Road i) In Kusabari from h/o Jillu to Jamnagar Ghat & j/o Nuruzzaman Ch.000-0920. ii )From Kusabari Main Road near Eid Ghah to h/o Yousuf Ch. 000-0250. iii) In Shahpur from Main Road to h/o Rahman Shah Ch.000- 0600 ward no. 01 05 under Arani Pourshava Bagha Rajshahi.
|
UIIP
|
bagha
|
|
1.77
|
0.00
|
71
|
121.63
|
Bashundra House Builder
|
93.94
|
07/03/2022
|
08/03/2022
|
07/03/2023
|
80
|
66.50
|
71
|
29/09/2022
|
|
243
|
UIIP-BC/PCO/W-295
|
Rehabilitation & Widening of station road & In side of arani Bazer ch 000-2750 ward no 04,06 Under Arani Pourashava,Bagha,Rajshahi
|
UIIP
|
bagha
|
|
2.75
|
0.00
|
80
|
187.11
|
Bashundra House Builder
|
137.24
|
07/03/2022
|
08/03/2022
|
07/03/2023
|
90
|
108.86
|
80
|
29/09/2022
|
|
244
|
UIIP-BC/PCO/W-296
|
Construction of Rcc Box Culvert Ward no 01-09 Under Arani Pourashava,Bagha ,Rajshahi
|
UIIP
|
bagha
|
|
|
2.61
|
0
|
85.07
|
Bashundra House Builder
|
63.64
|
07/03/2022
|
08/03/2022
|
07/03/2023
|
30
|
0.00
|
0
|
29/09/2022
|
|
245
|
UIIP-BC/PCO/W-98
|
(A)i Construction of RCC road from Mr. Bikom Master house to Mr. Muku house at Kaligram at ward No.03 under Bagha Pourashava.(Ch 0+075-0+345)m.
(ii) Construction of RCC Palisading work at (Ch 0+285-0+310)m.
(B) Construction of RCC road near at Doctor Sree Mithun house at Ghospara& from Sarakghat-Pakuria BC road to Kalidaskhali High School & Primary School road at Kaligram at ward No.03 under Bagha Pourashava. (Ch 0+000-0+100)m. & (Ch 0+000-0+150)m.
(C) Rehabilitation of BC road from Sree Bhobash Pandey house to Dairitola Jame Mosque at Chalk-Narayanpur at ward no.04 under Bagha Pourashava, Rajshahi. Ch:(0+000-0+555)m.
(D) Construction of RCC drain from Mr. Dulal Professor house to Dairitola Jame Mosque at Chalk-Narayanpur at ward no.04 under Bagha Pourashava, Rajshahi.(Ch 0+000-0+330)m.
|
UIIP
|
bagha
|
|
1.08
|
0.00
|
100
|
101.65
|
Fariva Auto
|
100.63
|
27/09/2020
|
08/10/2020
|
07/10/2021
|
100
|
100.49
|
100
|
29/09/2022
|
|
246
|
UIIP-BC/PCO/W-99
|
(A)iConstruction of RCC drain from Mr.Tozammel Haque Pond via Mr. Abu Hossain house to Mr.Motaleb Ali house at South Gaonpara at ward no.05 under Bagha Pourashava Rajshahi. (Ch 0+000-0+260)m. (ii) Road crossing drain at (Ch 0+060)m & (Ch 0+215)m.(B)i Construction of RCC road from Mr.Bokul house to Mr. Altaf Ali house at Chalk- Ahammedpur at ward No.06 under Bagha Pourashava (Ch 0+000-0+600)m.(ii) Construction of RCC Palisading work at (Ch 0+455-0+520)m.(iii) Construction of road crossing drain at(Ch 0+210)m & (Ch 0+485)m.
|
UIIP
|
bagha
|
|
0.85
|
0.00
|
92
|
105.99
|
Fariva Auto
|
104.93
|
27/09/2020
|
08/10/2020
|
07/10/2021
|
95
|
96.18
|
92
|
29/09/2022
|
|
247
|
UIIP-BC/PCO/W-100
|
(A)iConstruction of RCC road from Sree Sunil house to Mr. Kalim Uddin house at Hat Balihar at ward No.1 under Bagha Pourashava. (Ch 0+000-0+240)m.(ii) Construction of RCC Palisading work at (Ch 0+030-0+100)m, (Ch 0+110-0+170)m, (Ch 0+190-0+220)m.B) Construction of BC road from Mr Akkal Ali House via Mr. Moser Ali house to Malitapara Jame Mosque road & Mr. Mahabub house road Malitapara & Mr. Mozir Uddin house road at Karigorpara at ward No. 02 under Bagha Pourashava.(Ch 0+000-0+544)m.
|
UIIP
|
bagha
|
|
0.78
|
0.00
|
98
|
69.70
|
Fariva Auto
|
69.00
|
27/09/2020
|
08/10/2020
|
07/10/2021
|
100
|
68.06
|
98
|
29/09/2022
|
|
248
|
UIIP-BC/PCO/W-143
|
(A) Construction of BC road from Mr.Shafi house via BaliharJame Mosque & Mr. Hasem Ali house to Mr. Ainal Ali house at Balihar at ward No.01 under BaghaPourashava. Ch:(0+000-0+360)m.
(B) Construction of R.C.C Palisading workat Mr.Tozammel Haque pond side at South Gaonpara at ward no.05 under BaghaPourashava, Bagha,Rajshahi.Ch: (0+000-120)m.
(C) Construction of road with B.C from BaghaUpazila Election office to BaghaUpazila Police station gate at ward no.06 under BaghaPourashava.Bagha,Rajshahi. Ch: (0+000-0+205)m.
(D) Construction of R.C.C coverd drain from Mr.Mominul Islam Mill house via Mr. Hossain Ali house to Mr.Masud shop at UttorMilikbagha at ward no.07 under BaghaPourashava, Bagha,Rajshahi.Ch: (0+000-0+300)m.
|
UIIP
|
bagha
|
|
0.69
|
0.00
|
90
|
82.34
|
Fariva Auto
|
81.51
|
27/09/2020
|
08/10/2020
|
07/10/2021
|
100
|
73.35
|
90
|
29/09/2022
|
|
249
|
UIIP-BC/PCO/W-162
|
(A) Construction of BC Road at Bagha Upazila Healh Complex at Uttor Milikbagha at ward No.07 under Bagha Pourashava, Bagha, Rajshahi. Ch:(0+000-0+210)m.
(B) Construction of RCC Road from Mr.Shahidul Islam house to Mr.Mokbul hossain house,Baniapara Graveyeard, Caigary Pond to Late Kader Master house at Baniapara at ward No.08 under Bagha Pourashava, Bagha, Rajshahi. Ch:(0+000-0+470)m.
(C) Construction of Road by BC from Mr.Karim house to Sree Assini Shah house at Pakuria Shahpara at ward no.02 under Bagha Pourashava, Bagha,Rajshahi. Ch: (0+000-0+400)m.
|
UIIP
|
bagha
|
|
1.08
|
0.00
|
93
|
74.51
|
M/S Hossain
|
60.73
|
03/12/2020
|
20/12/2020
|
09/12/2021
|
100
|
56.47
|
93
|
29/09/2022
|
|
250
|
UIIP-BC/PCO/W-163
|
(A)iConstruction of Road with BC from Mr.Mokbul Hossain house to Mr.Kamal Mondal house at Jotsayesta& From Mr. Abul Hossain house to Musidpur Dakkinpara Jame Mosque at Musidpur at Ward no.09 under Bagha Pourashava, Bagha,Rajshahi. Ch: (0+000-0+600)m& Ch: (0+000-0+100)m.
(ii) Construction of RCC Road crossing drain at Ch: (0+350)m.
(B) Construction of RCC drain near at Bottoly old drain forward east along Bagha-Lalpur Highway road at Baniapara at Ch:(0+000-0+120)m at ward No.08 under Bagha Pourashava, Bagha, Rajshahi.
(C) Construction of RCC drain near at Mr.Mahabul house at Kaligram Westpara at Ch:(0+000-0+030)m & near at Mr.Akram Ali house at Kaligram Kazipara at Ch:(0+000-0+030)m at ward No.03 under Bagha Pourashava, Bagha, Rajshahi.
|
UIIP
|
bagha
|
|
0.70
|
0.00
|
78
|
77.15
|
M/S Hossain
|
60.57
|
03/12/2020
|
20/12/2020
|
09/12/2021
|
95
|
46.96
|
78
|
29/09/2022
|
|
251
|
UIIP-BC/PCO/W-164
|
Improvement of Road with BC from Bagha-Arani BC Road to Bolihar more BC Road at Ward No: 06 & 01 Under Bagha Pourashava, Bagha, Rajshahi. Ch: (0+000-1+200)m.
|
UIIP
|
bagha
|
|
1.20
|
0.00
|
100
|
95.65
|
M/S Hossain
|
77.95
|
07/12/2020
|
|
13/12/2021
|
100
|
77.95
|
100
|
29/09/2022
|
|
252
|
UIIP-BC/PCO/W-165
|
Construction of RCC Road from Mr. Anarul Islam house to Mr. Abdul Mannan house at Pakuria at ward no.02 under Bagha Pourashava, Bagha, Rajshahi. Ch:(0+000-0+640)m.
|
UIIP
|
bagha
|
|
0.64
|
0.00
|
100
|
68.30
|
M/S Hossain
|
49.52
|
07/12/2020
|
|
13/12/2021
|
100
|
49.52
|
100
|
29/09/2022
|
|
253
|
UIIP-BC/PCO/W-411
|
Improvement of Road with BC from Bagha Brack office to at Hat Bolihar Government Primary School road at Bolihar ward no-1 Under Bagha Pourashava Bagha Rajshahi.
|
UIIP
|
bagha
|
|
1.32
|
0.00
|
0
|
95.67
|
M/S Shammy Enterprise
|
76.95
|
02/03/2022
|
10/03/2022
|
09/03/2023
|
15
|
0.00
|
0
|
29/09/2022
|
|
254
|
UIIP-BC/PCO/W-412
|
Construction of RCC drain from Mr. Rafique house to Existing Box Culvert and toward Padma River side at South Gaonpara at Ward No-05 Under Bagha Pourashava Bagha Rajshahi Ch: (0+000 - 0+577)m.
|
UIIP
|
bagha
|
|
|
0.00
|
0
|
77.71
|
MM Development Engineering LTD.
|
62.10
|
02/03/2022
|
02/03/2022
|
09/03/2022
|
0
|
0.00
|
0
|
29/09/2022
|
|
255
|
UIIP-BC/PCO/W-413
|
(A)Improvement of Road with RCC from Pakuria BC Road To H/O Shohidul Islam at Pakuria Ward No-02 Under Bagha Pourashava Bagha Rajshah. Ch.( 0+000 - 0+ 460)m.
(B)Rehabilitation of BC road from Sorokghat Pakuria BC road near at Mr.Serajul Islam House to Mr. Mazdar Dofader House at kaligram word no-03 under Bagha pourashava Bagha Rajshahi Ch:(0+090-0+810)m.
(C)Rehabilitation of BC road from Murshidpur Kheya Ghat to Narayonpur Bazar GC road at ward no-04 05 & 09 Under Bagha Pourashava Bagha Rajshahi. Ch.(0+000 - 1+500)m.
(D)Rehabilitation and widening of BC road from Bagha-Arani main road to Nischintapur Jame mosque at word no- 07 Under Bagha Pourashava Bagha Rajshahi Ch:(0+000-0+570)m.
(E)Improvement of road with BC from Bagha lalpur main road near Bottola to land of Mr.Chanda to South Milikbagha at word no-08 Under Bagha PourashavaBagha Rajshahi Ch:(0+000-0+402)m.
(F)Rehabilitation of BC road from Mr.Sakandor Ali House to Mr. Abdur Razzaq house near at Monmohon Primary school at word no-09 Under Bagha Pourashava Bagha Rajshahi Ch:(0+000-0+440)m.
|
UIIP
|
bagha
|
|
4.18
|
0.00
|
0
|
229.09
|
MM Development Engineering LTD.
|
187.23
|
02/03/2022
|
10/03/2022
|
09/03/2023
|
10
|
0.00
|
0
|
29/09/2022
|
|
256
|
UIIP-BC/PCO/W-495
|
A) Construction of Shed for Public Transport Passenger (28.00sqm) at Bagha New Bus Terminal Ward No.01 Under Bagha Pourashava Rajshahi.
B) Construction of One Storied Public Toilet (Type A=56.00sqm) at Bagha Upazilla Health Complex Ward No.07 Under Bagha Pourashava Rajshahi.
C) Construction of One Storied Vegetables & Agricultural Products Market of 5 Storied Foundation (Floor Area=314 sqm) at Bagha Hat Area Ward No.01 Under Bagha Pourashava Rajshahi.
|
UIIP
|
bagha
|
|
|
0.00
|
0
|
150.52
|
Liton Traders & M/S Mamun Traders (JV)
|
141.64
|
26/06/2022
|
01/07/2022
|
30/06/2023
|
20
|
0.00
|
0
|
29/09/2022
|
|
257
|
UIIP-BC/PCO/W-45
|
(A) Construction of Rcc Covered drain from Horitola more to LGED Godown under Taherpur Pourashava, (ch00-220m).
(B) Re-Construction of Dens carpeting road with Retaining wall from Dighipara Babul house to Hejatipara Mojnu house, (ch. 00-1500m).
|
UIIP
|
bagmara
|
|
1.50
|
0.00
|
100
|
142.99
|
M/S Rifath Enterprise
|
151.97
|
16/07/2020
|
|
22/07/2021
|
100
|
151.97
|
100
|
29/09/2022
|
|
258
|
UIIP-BC/PCO/W-46
|
(A) Construction of Rcc Covered drain from LGED Godawn to River via Piaz hata mosque under Taherpur Pourashava, (ch220-440m).(B) Construction of 9 Nos Rcc road from-
(a) Jamgram mosque to Bahar house, (ch. 00-325m)
(b) RosulpurSefatulla house to Akkas house,(ch. 00-270)
(c) Amtoli Mosque to Sohel house, (ch.00-m160)
(d) Front of Munsur house, (ch. 00-50m)
(e) RosulpurRoidul house to Salam house, (ch.00-130)
(f) Side of Jomuna Shoe room, (ch.00-130)
(g) Front of JalaparaMondir(ch.00-145)
(h) JamloiLalu house to Somser house.ch.(00-150)
(i) BisuparaSohidkhondokar main rode ch. (00-180
|
UIIP
|
bagmara
|
|
1.49
|
0.00
|
100
|
163.79
|
Md. Abu Bakkar Mridha Munsur
|
170.63
|
16/07/2020
|
|
22/07/2021
|
100
|
170.63
|
100
|
29/09/2022
|
|
259
|
UIIP-BC/PCO/W-47
|
Construction of Rcc Retaining wall & road Front of Poura Tohsil Office to high school mosque under Taherpur Pourashava, Rajshahi.
|
UIIP
|
bagmara
|
|
0.14
|
0.00
|
100
|
64.76
|
Md. Mamunur Rashid Khan
|
67.60
|
16/07/2020
|
|
22/07/2021
|
100
|
67.55
|
100
|
29/09/2022
|
|
260
|
UIIP-BC/PCO/W-212
|
a)Construction of Rcc Road from Chankhali Bridge to mohongonj main road, under Taherpur Pourashava, (ch00-850m).b)Construction of Rcc road from Poura Auditorium to Mohongonj main road via Mohila collage under Taherpur Pourashava, (ch 00-1000m)
|
UIIP
|
bagmara
|
|
1.85
|
0.00
|
100
|
172.02
|
M/S Mishad International
|
171.62
|
16/08/2020
|
|
23/08/2021
|
100
|
171.62
|
100
|
29/09/2022
|
|
261
|
UIIP-BC/PCO/W-213
|
a) Re-Construction of Rcc road from Koalipara Primary School to Rosulpur Mosque under Taherpur Pourashava (ch.00-600). B)Construction of Rcc road from Nurpur Rhaman more to Patketola more (ch 00-950m) under Taherpur Pourashava, Rajshahi.
|
UIIP
|
bagmara
|
|
0.60
|
0.00
|
100
|
155.13
|
M/S Mishad International
|
154.55
|
16/08/2020
|
|
23/08/2021
|
100
|
154.53
|
100
|
29/09/2022
|
|
262
|
UIIP-BC/PCO/W-338
|
Construction of Rcc road with drain from Poura Auditorium to Main road near Police Fari Ch 00-250m under Taherpur Pourashava, Rajshahi.
|
UIIP
|
bagmara
|
|
0.25
|
0.00
|
100
|
58.33
|
Md. Abu Bakkar Mridha Munsur
|
58.07
|
08/04/2021
|
|
07/04/2022
|
100
|
58.07
|
100
|
29/09/2022
|
|
263
|
UIIP-BC/PCO/W-339
|
Construction of Rcc Covered Drain from Chokirpara Moajjem shek house to Main Drain (ch.00-130m) under Taherpur Pourashava, Rajshahi.
|
UIIP
|
bagmara
|
|
0.13
|
0.00
|
100
|
29.88
|
Md. Abu Bakkar Mridha Munsur
|
29.76
|
08/04/2021
|
|
07/04/2022
|
100
|
29.76
|
100
|
29/09/2022
|
|
264
|
UIIP-BC/PCO/W-340
|
Construction of Rcc Retaining wall & pointing road Front of Poura Tohsil Office Pond to high school mosque(ch140-240m). under Taherpur Pourashava, Rajshahi.
|
UIIP
|
bagmara
|
|
0.10
|
0.00
|
100
|
65.13
|
M/S Rifath Enterprise, Md. Rafiqul Islam Pk
|
64.93
|
31/05/2021
|
07/06/2021
|
30/05/2022
|
100
|
64.92
|
100
|
29/09/2022
|
|
265
|
UIIP-BC/PCO/W-341
|
Construction of Rcc road with Retaining wall front of Basiapara Mosque, Palisading Basiapara Ibrahim Pond (Ch 00-75m) under Taherpur Pourashava, Rajshahi.
|
UIIP
|
bagmara
|
|
0.08
|
0.00
|
100
|
33.46
|
M/S Rifath Enterprise
|
33.29
|
31/05/2021
|
07/06/2021
|
30/05/2022
|
100
|
33.19
|
100
|
29/09/2022
|
|
266
|
UIIP-BC/PCO/W-342
|
Extention & Re Construction of Dense Carpeting road with Retaining wall from Jamgram Korim shop to Gaidoa Mosque (ch.00-2100m) under Taherpur Pourashava, Rajshahi.
|
UIIP
|
bagmara
|
|
2.10
|
0.00
|
100
|
160.21
|
Md. Anwar Hosain,
|
159.57
|
31/05/2021
|
07/06/2021
|
30/05/2022
|
100
|
159.39
|
100
|
29/09/2022
|
|
267
|
UIIP-BC/PCO/W-343
|
Construction of Rcc road from Mothurapur Idris House to Pabnapara Road & front of Hafiz Master house (ch.00-570m) under Taherpur Pourashava, Rajshahi.
|
UIIP
|
bagmara
|
|
0.57
|
0.00
|
100
|
71.98
|
Md. Mamunur Rashid Khan
|
71.62
|
31/05/2021
|
07/06/2021
|
30/05/2022
|
100
|
71.62
|
100
|
29/09/2022
|
|
268
|
UIIP-BC/PCO/W-344
|
Construction Box Culvert on Mothurapur Khal Near Younus house at word no 04 under Taherpur Pourashava, Rajshahi.
|
UIIP
|
bagmara
|
|
|
3.00
|
100
|
31.15
|
Md. Anwar Hosain, Bisupara
|
31.00
|
31/05/2021
|
07/06/2021
|
30/05/2022
|
100
|
30.99
|
100
|
29/09/2022
|
|
269
|
UIIP-BC/PCO/W-43
|
(A) Rehabilitation of BC Road Starting from Dawonpara Eid-Gha to Bakerbaz Uttor Para Culvert via katakhali Bazar (Ch.00m-945.0m) by Bituminous Dense Carpeting (DC) under Katakhali Pourashava, District: Rajshahi. (B)Rehabilitation of BC Road Starting from Maskatadighi Shop of Samsul to Shop of Zillur (ch.00-370.00m) By Bituminous Dense Carpeting (DC) With RCC Reataining Wall under Katakhali Pourashava, District: Rajshahi.
|
UIIP
|
paba
|
|
1.32
|
0.00
|
50
|
101.22
|
MD. Abdul Mannan
|
91.03
|
15/10/2020
|
|
28/02/2022
|
90
|
45.38
|
50
|
29/09/2022
|
|
270
|
UIIP-BC/PCO/W-79
|
(A)Construction of Two Vent Box Culvert (box size4.0mx4.0m) At near Bakrabag Hossin House Cannal Under Katakhali Pourashava, District; Rajshahi. (b) Construction of RCC Box Drain Strting Form West Comer of Maskatadinghi Hi-School to Horian Cannel (Ch. 00-232.00m) Under Katakhali Pourashava, District; Rajshahi. ( c) Rehabilitation of DC Road Starting from Hajrapukur H/O Shafiuddin to Shop of Rejaul (Ch. 00-150.00m) by Bituminous Dense Carpeting (DC) Under Katakhali Pourashava, District; Rajshahi.
|
UIIP
|
paba
|
|
0.15
|
1.00
|
80
|
100.90
|
MD. Abdul Mannan
|
90.72
|
15/10/2020
|
|
28/02/2022
|
90
|
72.70
|
80
|
29/09/2022
|
|
271
|
UIIP-BC/PCOW-243
|
(a) Rehabilitation of BC Road Starting from shympur Sayad more to Box Calvert (Ch. 00m -300.00m) by Bituminous Dense Carpeting (DC) Under Katakhali Pourashava, District: Rajshahi. (b)Improvement of DC Road Starting from Shympur Azizur more to Boain shop (Ch.00m -320.00m) by Bituminous Dense Carpeting (DC) RCC Retaining Wall under Katakhali Pourashava, District Rajshahi
|
UIIP
|
paba
|
|
0.62
|
0.00
|
39
|
54.06
|
M/S Mamun Traders
|
46.97
|
15/01/2021
|
15/02/2021
|
25/06/2022
|
90
|
18.02
|
39
|
29/09/2022
|
|
272
|
UIIP-BC/PCOW-244
|
(a) Improvement of RCC Road Starting from shyampur Boubazar (Ch.00m-470.00m) Under Katakhali Pourashava, District: Rajshahi.
(b) Improvement of RCC Road Starting from shyampur thandar para Mosque to Beribadh Bottula (Ch.00m-200.00m) With Retaining Wall Under Katakhali Pourashava, District: Rajshahi.
(c) Improvement of RCC Road Starting from Samsadipur Islam Road to Grareg Road ( Ch.00m-250.00m) Under Katakhali Pourashava, District: Rajshahi.
(d) Improvement of RCC Road Starting from Hajrapokur Koayl Pond to H/O Shafi uddin (Ch.00m-200.00m) Under Katakhali Pourashava, District: Rajshahi.
|
UIIP
|
paba
|
|
1.12
|
0.00
|
81
|
96.33
|
M/S Mamun Traders
|
82.85
|
25/01/2021
|
15/02/2021
|
25/06/2022
|
90
|
66.65
|
81
|
29/09/2022
|
|
273
|
UIIP-BC/PCOW-245
|
(a) Construction of RCC Drain Starting Form Dawonpara EID-GHA to Bakrabaz UttorPara Culvert (Ch.00m - 680.00m) Under Katakhali Pourashava, District Rajshahi. (b)Improvement of DC Road Starting from Samsadipur H/O Monju member to H/O Arshad (Ch.00m -230.00m) by Bituminous Dense Carpeting (DC) RCC Retaining Wall under Katakhali Pourashava, District Rajshahi.
|
UIIP
|
paba
|
|
0.23
|
0.00
|
80
|
124.53
|
MD. Abdul Mannan
|
108.90
|
25/01/2021
|
15/02/2021
|
15/10/2021
|
90
|
86.40
|
80
|
29/09/2022
|
|
274
|
UTMIDP- MOHON/ RJS/ WR-9
|
1.Improvement of Mohonpur Degree Collage- Soipara Road from Ch. 0.00-1000m.
2.Improvement of Mohanpur Upazila-Eakdiltola Road from Ch. 0.00m- 428m.
|
UTMIDP
|
mohanpur
|
|
1.43
|
|
53
|
75.41
|
M/S. Smita Trading
|
75.41
|
07/05/2019
|
|
13/11/2019
|
100
|
40.00
|
53
|
04/09/2019
|
|