1
|
CRMIDP/BOG/W-63
|
Taluch Hat
|
CRMIDP
|
dhupchancia
|
|
|
0.00
|
67
|
338.00
|
M/S Rahman Traders Bogura.
|
294.60
|
20/08/2019
|
|
28/02/2022
|
75
|
196.03
|
67
|
20/07/2022
|
|
2
|
CRMIDP/BOG/W-64
|
Mohisaban Hat
|
CRMIDP
|
gabtali
|
|
|
|
28
|
258.00
|
M.S MI Trading & Co
|
204.58
|
01/11/2020
|
|
29/03/2022
|
35
|
57.57
|
28
|
20/07/2022
|
|
3
|
CRMIDP/BOG/W-66
|
Hatkaroy Hat
|
CRMIDP
|
nandigram
|
|
|
|
26
|
352.00
|
M/S Mahamuda enterprise &M/s Doiel Enterprise
|
354.29
|
03/08/2021
|
|
15/09/2022
|
40
|
91.00
|
26
|
20/07/2022
|
|
4
|
CRMIDP/BOG/W-67
|
Sariakandi Hat
|
CRMIDP
|
sariakandi
|
|
|
|
85
|
306.00
|
M/S Basundhara House Builders
|
269.56
|
01/09/2019
|
|
30/06/2022
|
90
|
229.59
|
85
|
20/07/2022
|
|
5
|
GPBRIDP/Rd-393
|
Improvement of Nashratpur-Durgapur via Kundogram Road from Ch.5460-6820m & 9030-9764m
|
GPBRIDP
|
adamdighi
|
110062001
|
2.09
|
0.00
|
100
|
151.07
|
M/S. Sukra Enterprise
|
118.79
|
01/01/1900
|
24/03/2016
|
19/01/2017
|
100
|
115.04
|
100
|
30/06/2020
|
|
6
|
GPBRIDP/Rd-394
|
Improvement of Chapapur-Bashilipukur via Palonkuri Rd. (Champapur UP Office Chowmuhani-hat via Palonkuri Road) (Adamdighi portion) from Ch. 00m-740m, 1263m-1572m
|
GPBRIDP
|
adamdighi
|
|
1.05
|
0.00
|
100
|
62.44
|
M/S. Sukra Enterprise
|
50.37
|
01/01/1900
|
22/03/2016
|
24/02/2017
|
100
|
47.12
|
100
|
30/06/2020
|
|
7
|
GPBRIDP/Rd-395
|
Improvement of Nashratpur-Bhandergram hat via Borboria ghat Road from Ch.1430-2430m
|
GPBRIDP
|
adamdighi
|
|
1.00
|
0.00
|
100
|
57.35
|
M/S. Sukra Enterprise
|
46.38
|
01/01/1900
|
24/03/2016
|
31/01/2017
|
100
|
41.67
|
100
|
30/06/2020
|
|
8
|
GPBRIDP/Rd-396
|
Improvement of Chhatiangram-Tilokpur via Laxmikola Road from Ch.00-100m, 1100-2000m
|
GPBRIDP
|
adamdighi
|
|
1.00
|
0.00
|
100
|
56.99
|
M/S. Sukra Enterprise
|
46.15
|
01/01/1900
|
24/03/2016
|
30/04/2017
|
100
|
45.54
|
100
|
30/06/2020
|
|
9
|
GPBRIDP/Rd-397
|
Improvemnt of Boalia-Chatkhoir Village Road from 450-950m
|
GPBRIDP
|
adamdighi
|
110064005
|
0.50
|
0.00
|
100
|
29.84
|
Mst. Morium Begum
|
28.22
|
01/01/1900
|
03/05/2016
|
10/11/2016
|
100
|
25.22
|
100
|
30/06/2020
|
|
10
|
GPBRIDP/Rd-398
|
Improvement of Chattiangram-Bagbari via Auntahar Road from Ch.1482-1982m
|
GPBRIDP
|
adamdighi
|
110064007
|
0.50
|
0.00
|
100
|
28.95
|
M/S Islam Enterprise
|
26.05
|
01/01/1900
|
07/06/2017
|
15/06/2018
|
100
|
25.54
|
100
|
30/06/2020
|
|
11
|
GPBRIDP/Rd-399
|
Improvement of Ranirdighi-Dhulator via Kallagari Road from Ch.1544-2044m
|
GPBRIDP
|
adamdighi
|
110064026
|
0.50
|
0.00
|
100
|
32.35
|
M/S Islam Enterprise
|
29.11
|
01/01/1900
|
04/06/2017
|
30/05/2018
|
100
|
28.70
|
100
|
30/06/2020
|
|
12
|
GPBRIDP/Rd-400
|
Improvement of Indoil-Santahar via Tiorpara Road from Ch.1680-2180m
|
GPBRIDP
|
adamdighi
|
110064033
|
0.50
|
0.00
|
0
|
27.69
|
M/S Islam Enterprise
|
24.92
|
01/01/1900
|
08/06/2017
|
21/11/2017
|
100
|
24.91
|
0
|
30/06/2020
|
|
13
|
GPBRIDP/Rd-401
|
Improvement of Chapapur-Billpara Kazibari via Natun Hat Road from Ch. 00-163m & 203-370m & Const.of 1 No U-drain at Ch.269m
|
GPBRIDP
|
adamdighi
|
110065061
|
0.33
|
0.45
|
100
|
18.04
|
M/S. Arco Engineer's
|
16.24
|
01/01/1900
|
24/05/2016
|
10/08/2017
|
100
|
16.04
|
100
|
30/06/2020
|
|
14
|
GPBRIDP/Rd-402
|
Improvement of Khanchapur High School Jame Mosque-Goladoriya via Hori Mondir Road from Ch. 00-472m & Const.of 1 No U-drain at Ch. 264m.
|
GPBRIDP
|
adamdighi
|
|
0.47
|
0.45
|
0
|
25.87
|
M/S. Arco Engineer's
|
24.52
|
01/01/1900
|
24/05/2016
|
10/08/2017
|
100
|
24.46
|
0
|
30/06/2020
|
|
15
|
GPBRIDP/Rd-403
|
Improvement of Harbhanga village Road from Ch. 00-490m
|
GPBRIDP
|
adamdighi
|
110065007
|
0.49
|
0.00
|
100
|
26.30
|
M/S Alaya Construction
|
25.52
|
01/01/1900
|
05/06/2016
|
25/12/2017
|
100
|
24.79
|
100
|
30/06/2020
|
|
16
|
GPBRIDP/Rd-524
|
Improvement of Kodbopur-Nasratpur via Dumurigram Road from Ch.00-1180m
|
GPBRIDP
|
adamdighi
|
1100622012
|
1.18
|
0.00
|
100
|
90.53
|
M/S Sukra Enterprise
|
81.48
|
01/01/1900
|
08/04/2018
|
06/05/2019
|
100
|
80.64
|
100
|
30/06/2020
|
|
17
|
GPBRIDP/Rd-539
|
Improvement of Boldakuri-Chapapur Housepur Road from Ch.00-1270m
|
GPBRIDP
|
adamdighi
|
110064030
|
1.27
|
0.00
|
100
|
90.43
|
A.K.M Fazlur Rahim
|
84.16
|
01/01/1900
|
29/10/2018
|
30/05/2019
|
100
|
84.16
|
100
|
30/06/2020
|
|
18
|
GPBRIDP/WR-10
|
Widening of Abadpukur Road from Ch.00-4830m
|
GPBRIDP
|
adamdighi
|
110062002
|
4.83
|
0.00
|
0
|
202.34
|
M.M Builders & Engineers Ltd.
|
182.11
|
01/01/1900
|
08/04/2018
|
31/12/2018
|
100
|
181.99
|
0
|
30/06/2020
|
|
19
|
GPBRIDP/SP-17
|
Protective work of Bichahori Mondir Rashidpara Road from Ch.3-32m, 35-68m, 81-133m, 137-152m, & 189-229m
|
GPBRIDP
|
adamdighi
|
110065059
|
|
0.16
|
100
|
8.46
|
M/S Alef Lam Mim Construction
|
8.04
|
01/01/1900
|
20/01/2019
|
20/04/2019
|
100
|
7.90
|
100
|
30/06/2020
|
|
20
|
GPBRIDP/Rd-297
|
Improvement of Matidali NHW-Naruamala GCM (Start from 2nd By Pass Fonirmore-Chandur Bazar) Road from Ch. 4445-4800m & 6500-7145m
|
GPBRIDP
|
bogura-s
|
110202005
|
1.00
|
0.00
|
100
|
65.77
|
M/S Masuma Begum
|
68.86
|
01/01/1900
|
05/10/2016
|
15/06/2017
|
100
|
63.31
|
100
|
30/06/2020
|
|
21
|
GPBRIDP/Rd-298
|
Improvement of Chandihara NHW-Pirgacha via Raimajira Road from Ch. 1250-1365m & 4365-5410m
|
GPBRIDP
|
bogura-s
|
110202012
|
1.16
|
0.00
|
100
|
66.97
|
M/S Islam Enterprise
|
66.74
|
01/01/1900
|
29/09/2016
|
30/05/2017
|
100
|
66.74
|
100
|
30/06/2020
|
|
22
|
GPBRIDP/Rd-299
|
Improvement of Bogra-Gabtoli RHD-Naruamala GCM Road from Ch.2248-3248m
|
GPBRIDP
|
bogura-s
|
110202014
|
1.00
|
0.00
|
0
|
46.25
|
Md. Emdadul Haque
|
45.38
|
01/01/1900
|
18/08/2016
|
07/05/2017
|
100
|
45.18
|
0
|
30/06/2020
|
|
23
|
GPBRIDP/Rd-300
|
Improvement of Bisic Bazar-Rajapur UP Road from Ch.530-750m & 1350-1950m
|
GPBRIDP
|
bogura-s
|
110203022
|
0.82
|
0.00
|
100
|
44.27
|
Md. Azizul Islam
|
48.57
|
01/01/1900
|
01/09/2016
|
30/03/2018
|
100
|
48.57
|
100
|
30/06/2020
|
|
24
|
GPBRIDP/Rd-301
|
Improvement of Nishindara UP-Gholagarihat Road from Ch.3150-4150m
|
GPBRIDP
|
bogura-s
|
110203006
|
1.00
|
0.00
|
0
|
60.76
|
M/S Liza Enterprise
|
60.67
|
01/01/1900
|
28/08/2016
|
30/05/2017
|
100
|
60.48
|
0
|
30/06/2020
|
|
25
|
GPBRIDP/Rd-302
|
Improvement of Shakharia UP-Mohisbathan Hat Road from Ch.1000-1610m
|
GPBRIDP
|
bogura-s
|
110203023
|
0.61
|
0.00
|
100
|
38.95
|
Dhaly Construction Ltd.
|
35.06
|
01/01/1900
|
02/04/2018
|
30/10/2018
|
100
|
34.54
|
100
|
30/06/2020
|
|
26
|
GPBRIDP/Rd-304
|
Improvement of Noongola UP (Polikukrul)-Dighirhat Road from Ch.2900-3595m
|
GPBRIDP
|
bogura-s
|
110203013
|
0.70
|
0.00
|
100
|
34.07
|
M/S Sukra Enterprise
|
30.66
|
01/01/1900
|
08/04/2018
|
15/09/2018
|
100
|
29.53
|
100
|
30/06/2020
|
|
27
|
GPBRIDP/Rd-305
|
Improvement of Noongola (Old) UP-Baghopara Road from Ch.1000-1445m
|
GPBRIDP
|
bogura-s
|
110203024
|
0.45
|
0.00
|
0
|
27.48
|
Dhaly Construction Ltd.
|
24.73
|
01/01/1900
|
02/04/2018
|
29/10/2018
|
100
|
24.73
|
0
|
30/06/2020
|
|
28
|
GPBRIDP/BRG-28
|
Construction of 20.00m Long RCC Girder Bridge over Subeel Khal on Joypurpara-Atapara Road at Ch.230m
|
GPBRIDP
|
bogura-s
|
110204028
|
|
20.00
|
100
|
148.66
|
M/S S. Enterprise
|
137.53
|
01/01/1900
|
24/11/2016
|
11/11/2017
|
100
|
128.16
|
100
|
30/06/2020
|
|
29
|
GPBRIDP/BRG-29
|
Construction of 63.00m Long RCC Girder Bridge over Karotoa River on Barunighat Near Dakhin Fulbari Road at Ch.1500m
|
GPBRIDP
|
bogura-s
|
110204040
|
|
63.00
|
100
|
276.36
|
MZH & MSE Joint Venture
|
264.22
|
01/01/1900
|
20/11/2016
|
25/12/2018
|
100
|
264.22
|
100
|
30/06/2020
|
|
30
|
GPBRIDP/Rd-307
|
Improvement of Rajakpur Purbapara Jame Mosque-Darial Dakil Madrasha Road from Ch.1050-1710m
|
GPBRIDP
|
bogura-s
|
110204099
|
0.66
|
0.00
|
100
|
40.43
|
Dhaly Construction Ltd.
|
37.16
|
01/01/1900
|
02/04/2018
|
30/10/2018
|
100
|
37.16
|
100
|
30/06/2020
|
|
31
|
GPBRIDP/WR-4
|
Maintenance of Bogra-Tarnihat Road from Ch.2600-6100m
|
GPBRIDP
|
bogura-s
|
110202003
|
3.50
|
0.00
|
0
|
109.79
|
M/S Mollah Traders
|
104.30
|
01/01/1900
|
11/06/2018
|
20/06/2018
|
100
|
104.30
|
0
|
30/06/2020
|
|
32
|
GPBRIDP/Rd-326
|
Improvement of Nimgachi UP-Jorshimul hat via Majabri Road from Ch.4114-5084m
|
GPBRIDP
|
dhunot
|
110273008
|
0.97
|
0.00
|
0
|
53.09
|
M/S. Islam Enterprise
|
40.88
|
01/01/1900
|
27/04/2016
|
30/04/2017
|
100
|
40.88
|
0
|
30/06/2020
|
|
33
|
GPBRIDP/Rd-327
|
Improvement of Elangi UP-Ala hamida hat Road from Ch. 500-1000m & Const.of 2-Nos U-drain at Ch.650m & 750m.
|
GPBRIDP
|
dhunot
|
110273003
|
0.50
|
1.25
|
0
|
27.56
|
M/S Sukra Enterprise
|
25.45
|
01/01/1900
|
20/06/2016
|
10/10/2016
|
100
|
25.44
|
0
|
30/06/2020
|
|
34
|
GPBRIDP/Rd-328
|
Improvement of Nimgachi UP-Boroitoli hat Road from Ch.900-1380m
|
GPBRIDP
|
dhunot
|
110273007
|
0.48
|
0.00
|
0
|
27.86
|
M/S. Islam Enterprise
|
21.71
|
01/01/1900
|
08/05/2016
|
07/10/2016
|
100
|
21.69
|
0
|
30/06/2020
|
|
35
|
GPBRIDP/Rd-329
|
Improvement of Dhunat UP-Kadai hat Road from Ch.2450-3420m & 2-Nos U-drain at Ch.2452m & 2700m.
|
GPBRIDP
|
dhunot
|
110273005
|
0.97
|
1.25
|
0
|
54.33
|
M/S Sukra Enterprise
|
48.14
|
01/01/1900
|
11/07/2016
|
28/10/2016
|
100
|
48.12
|
0
|
30/06/2020
|
|
36
|
GPBRIDP/Rd-330
|
Improvement of Kalerpara UP-Sonamoha hat Road from Ch. 900-1900m.
|
GPBRIDP
|
dhunot
|
110273006
|
1.00
|
0.00
|
0
|
61.19
|
M/S. Asmaul Husna
|
49.39
|
01/01/1900
|
25/10/2016
|
30/04/2017
|
100
|
49.28
|
0
|
30/06/2020
|
|
37
|
GPBRIDP/Rd-331
|
Improvement of Borobila hat-Bhanderbari Road from Ch. 3360-3900m.
|
GPBRIDP
|
dhunot
|
110273017
|
0.54
|
0.00
|
100
|
29.64
|
M/S. Khan Traders
|
25.03
|
01/01/1900
|
01/11/2016
|
30/03/2017
|
100
|
24.63
|
100
|
30/06/2020
|
|
38
|
GPBRIDP/Rd-332
|
Improvement of Chowkibari UP(Panchthupi)-Shagatia hat Road from Ch. 3180-4180m.
|
GPBRIDP
|
dhunot
|
110273012
|
1.00
|
0.00
|
0
|
56.64
|
M/S. Shahin Construction
|
52.31
|
01/01/1900
|
02/11/2016
|
05/03/2018
|
100
|
52.16
|
0
|
30/06/2020
|
|
39
|
GPBRIDP/Rd-333
|
Improvement of Bilchaprighat-Bererbari UZR Road (via Burribita School Road from Ch. 6900-7400m
|
GPBRIDP
|
dhunot
|
110274062
|
0.50
|
0.00
|
0
|
30.39
|
M/S Masuma Begum
|
27.35
|
01/01/1900
|
31/10/2017
|
15/08/2018
|
100
|
27.32
|
0
|
30/06/2020
|
|
40
|
GPBRIDP/Rd-334
|
Improvement of Panchkhupi hat-Kaigathi via Neammatia School Road from Ch. 1000-1500m & Const.of 1 No U-drain at Ch.1498
|
GPBRIDP
|
dhunot
|
110274048
|
0.50
|
0.62
|
100
|
28.18
|
M/S Diba Enterprise
|
24.00
|
01/01/1900
|
25/05/2016
|
20/05/2017
|
100
|
23.84
|
100
|
30/06/2020
|
|
41
|
GPBRIDP/Rd-335
|
Improvement of Kantonagar-Bererbari ghat via Ishwarghat Road from Ch. 1750-2250m.
|
GPBRIDP
|
dhunot
|
110274039
|
0.50
|
0.00
|
100
|
29.40
|
M/S. Khan Traders
|
24.43
|
01/01/1900
|
10/11/2016
|
30/03/2017
|
100
|
24.24
|
100
|
30/06/2020
|
|
42
|
GPBRIDP/Rd-336
|
Improvement of Marichtalahat-Marichtala Dakhin-para via Marichtala Pachinpara Rd. from Ch. 00-500m & Const.3-Nos U-drain at Ch.60, 655 & 732m
|
GPBRIDP
|
dhunot
|
110274131
|
0.50
|
1.87
|
0
|
31.48
|
M/S. Islam Enterprise
|
26.02
|
01/01/1900
|
28/04/2016
|
30/04/2017
|
100
|
26.02
|
0
|
30/06/2020
|
|
43
|
GPBRIDP/BRG-35
|
Construction of 81m Long PSC Girder Bridge on Arkatia UZR-Mohanpur Ghat Road at Ch.750m
|
GPBRIDP
|
dhunot
|
110274045
|
|
81.00
|
0
|
0.00
|
M/S Masuma Begum & Md. Moyen Uddin (Bashi)-JV
|
534.00
|
01/01/1900
|
05/04/2018
|
30/04/2020
|
55
|
196.29
|
0
|
30/06/2020
|
|
44
|
GPBRIDP/WR-5
|
Widening of Dhunat-Gossaibari-Bhanderbari-Dhekuria GC Road from Ch.00-4000m
|
GPBRIDP
|
dhunot
|
110272011
|
4.00
|
0.00
|
0
|
0.00
|
M/S Sarkar Corporation
|
81.96
|
01/01/1900
|
01/08/2018
|
09/04/2019
|
100
|
81.75
|
0
|
30/06/2020
|
|
45
|
GPBRIDP/Rd-552
|
Improvement of Batikabari-Zalsuka Road Road from Ch.00-500m
|
GPBRIDP
|
dhunot
|
110274108
|
0.50
|
0.00
|
0
|
30.97
|
M/S Islam Enterprise
|
29.27
|
01/01/1900
|
03/06/2019
|
30/04/2020
|
100
|
29.26
|
0
|
30/06/2020
|
|
46
|
GPBRIDP/Rd-355
|
Improvement of Talora(Goyabanda) Saharpukur via Altafnagar Road from Ch.10475-11645m
|
GPBRIDP
|
dhupchancia
|
110332006
|
1.17
|
0.00
|
0
|
76.14
|
M/S Sumon Enterprise
|
75.96
|
01/01/1900
|
23/08/2016
|
25/10/2017
|
100
|
75.96
|
0
|
30/06/2020
|
|
47
|
GPBRIDP/Rd-356
|
Improvement of Chowmohoni-Zianagor via Taluch, Kamaru & Barahi Road from Ch.9037-9231m & 9637-10523m.
|
GPBRIDP
|
dhupchancia
|
110332008
|
1.08
|
0.00
|
0
|
73.34
|
M/S. Sumon Enteroprise
|
68.83
|
01/01/1900
|
29/05/2016
|
29/06/2018
|
100
|
68.80
|
0
|
30/06/2020
|
|
48
|
GPBRIDP/Rd-357
|
Improvement of Gunahar-Bazardighi hat via Palalpara Road from Ch.1070-1750m.
|
GPBRIDP
|
dhupchancia
|
110333001
|
0.68
|
0.00
|
0
|
36.00
|
M/S Alaya Construction
|
35.94
|
01/01/1900
|
04/09/2016
|
11/03/2018
|
100
|
35.83
|
0
|
30/06/2020
|
|
49
|
GPBRIDP/Rd-358
|
Improvement of Pothatti-Zianagor Road from 2515-3545m
|
GPBRIDP
|
dhupchancia
|
110333007
|
1.03
|
0.00
|
100
|
69.44
|
M/S. Sumon Enteroprise
|
60.18
|
01/01/1900
|
29/05/2016
|
16/04/2018
|
100
|
58.96
|
100
|
30/06/2020
|
|
50
|
GPBRIDP/Rd-359
|
Improvement of Islampur-Gunahar Road from Ch.3117-3568m
|
GPBRIDP
|
dhupchancia
|
110333004
|
0.45
|
0.00
|
0
|
23.61
|
M/S. Sumon Enteroprise
|
22.21
|
01/01/1900
|
29/05/2016
|
25/10/2017
|
100
|
22.21
|
0
|
30/06/2020
|
|
51
|
GPBRIDP/Rd-364
|
Improvement of More Gram (R&H)-(Gashia) Abashon Road from Ch.495-1000m & Const. of 3-Nos U-drain at Ch.575m, 662m & 861m
|
GPBRIDP
|
dhupchancia
|
110335079
|
0.51
|
1.12
|
0
|
38.45
|
M/S. Alaya Construction
|
34.40
|
01/01/1900
|
12/05/2016
|
28/03/2018
|
100
|
34.39
|
0
|
30/06/2020
|
|
52
|
GPBRIDP/Mw-97
|
Maintenance of Shaharpukur-Gupinathpur Road from Ch.00-1684m
|
GPBRIDP
|
dhupchancia
|
110332003
|
1.68
|
0.00
|
0
|
39.23
|
M/S. Sumon Enterprise
|
29.33
|
01/01/1900
|
17/04/2016
|
02/12/2017
|
100
|
29.33
|
0
|
30/06/2020
|
|
53
|
GPBRIDP/Mw-98
|
Maintenance of Talora(Goyabanda) Shaharpukur via Altafnagar Road from Ch.7933-8975m
|
GPBRIDP
|
dhupchancia
|
110332006
|
1.04
|
0.00
|
0
|
21.83
|
M/S Runa Enterprise
|
16.81
|
01/01/1900
|
05/05/2016
|
10/11/2016
|
100
|
16.76
|
0
|
30/06/2020
|
|
54
|
GPBRIDP/Rd-360
|
Improvement of Dupchanchia Union (Dhap Hat)-Kalitolahat Road from Ch.1990-2990m
|
GPBRIDP
|
dhupchancia
|
110333010
|
1.00
|
0.00
|
100
|
61.02
|
M/S Sukra Enterprise
|
54.92
|
01/01/1900
|
08/04/2018
|
06/09/2018
|
100
|
54.26
|
100
|
30/06/2020
|
|
55
|
GPBRIDP/Rd-362
|
Improvement of Dhap Sultangong Hat-Gunahar via Paikpara Vhathanda Road from Ch3120-4650m
|
GPBRIDP
|
dhupchancia
|
110333005
|
1.53
|
0.00
|
0
|
90.66
|
M.M Builders & Engineers Ltd.
|
81.60
|
01/01/1900
|
08/04/2018
|
31/12/2018
|
100
|
81.59
|
0
|
30/06/2020
|
|
56
|
GPBRIDP/Rd-365
|
Improvement of Karamjee-Jhanjira Road from Ch700-1755m
|
GPBRIDP
|
dhupchancia
|
110335057
|
1.06
|
0.00
|
100
|
63.84
|
M/S Sukra Enterprise
|
57.35
|
01/01/1900
|
08/04/2018
|
31/12/2018
|
100
|
57.35
|
100
|
30/06/2020
|
|
57
|
GPBRIDP/Mw-99
|
Maintenance of Chamrul-Taluch hat Road from Ch.4228-5900m .
|
GPBRIDP
|
dhupchancia
|
110333006
|
1.67
|
0.00
|
100
|
27.43
|
Dhaly Construction Ltd.
|
24.68
|
01/01/1900
|
04/04/2018
|
28/06/2018
|
100
|
24.46
|
100
|
30/06/2020
|
|
58
|
GPBRIDP/Mw-100
|
Maintenance of Zianagor-Banaich hat Road from Ch.2470-3080m .
|
GPBRIDP
|
dhupchancia
|
110333014
|
0.61
|
0.00
|
100
|
17.66
|
Dhaly Construction Ltd.
|
15.90
|
01/01/1900
|
02/04/2018
|
30/04/2018
|
100
|
15.80
|
100
|
30/06/2020
|
|
59
|
GPBRIDP/Rd-547
|
Improvement of Talora(Goyabanda)-Chowmuhoni Road via Debkhanda Road from Ch.440-1000m
|
GPBRIDP
|
dhupchancia
|
110333013
|
0.56
|
0.00
|
0
|
41.23
|
M/S Applo Traders
|
39.16
|
01/01/1900
|
22/05/2019
|
30/10/2019
|
100
|
31.00
|
0
|
30/06/2020
|
|
60
|
GPBRIDP/Rd-547.b
|
Improvement of Gunahar(Sharsha)-Beholtti Road from Ch.1553-2515m
|
GPBRIDP
|
dhupchancia
|
110333008
|
0.96
|
0.00
|
0
|
78.19
|
M/S Mondal Traders
|
74.28
|
01/01/1900
|
05/04/2020
|
15/12/2020
|
0
|
0.00
|
0
|
30/06/2020
|
|
61
|
GPBRIDP/Rd-337
|
Improvement of Naruamala UP-Golabari Road from Ch.2300-3300m
|
GPBRIDP
|
gabtali
|
110403004
|
1.00
|
0.00
|
0
|
58.22
|
M/S.Islam Enterprise
|
45.55
|
01/01/1900
|
22/05/2016
|
15/02/2018
|
100
|
45.37
|
0
|
30/06/2020
|
|
62
|
GPBRIDP/Rd-338
|
Improvement of Uzgram hat-Mohasthan UP Office via Doripara Road from Ch. 1000-1990m
|
GPBRIDP
|
gabtali
|
110403022
|
0.99
|
0.00
|
0
|
65.09
|
M/S. Sukra Enterprise
|
47.72
|
01/01/1900
|
13/04/2016
|
09/02/2017
|
100
|
47.72
|
0
|
30/06/2020
|
|
63
|
GPBRIDP/Rd-339
|
Improvement of Nepaltoli UP-Kadamtali hat Road from Ch.3150-3470m
|
GPBRIDP
|
gabtali
|
110403008
|
0.32
|
0.00
|
0
|
18.48
|
M/S. Fatta Ali Construction
|
14.37
|
01/01/1900
|
17/04/2016
|
26/01/2017
|
100
|
13.34
|
0
|
30/06/2020
|
|
64
|
GPBRIDP/Rd-340
|
Improvement of Noshipur UP-Tornihat via Horardighi Road from Ch.2600-3090m
|
GPBRIDP
|
gabtali
|
110403020
|
0.49
|
0.00
|
0
|
27.84
|
M/S. Islam Enterprise
|
22.03
|
01/01/1900
|
22/10/2017
|
22/10/2017
|
100
|
22.03
|
0
|
30/06/2020
|
|
65
|
GPBRIDP/Rd-341
|
Improvement of Kagoil UP Office (Sultanpur)-Dakhinpara UP Office Road from Ch.4850-5350m
|
GPBRIDP
|
gabtali
|
110403014
|
0.50
|
0.00
|
100
|
33.27
|
M/S. Rang Brothers
|
24.92
|
01/01/1900
|
10/11/2016
|
26/05/2017
|
100
|
24.92
|
100
|
30/06/2020
|
|
66
|
GPBRIDP/Rd-344
|
Improvement of Sordonkuti Pucca Road-Teorpara Mosque Road from Ch. 812-1420m
|
GPBRIDP
|
gabtali
|
110404099
|
0.61
|
0.00
|
0
|
39.90
|
M/S Islam Enterprise
|
35.91
|
01/01/1900
|
08/06/2017
|
28/05/2018
|
100
|
35.90
|
0
|
30/06/2020
|
|
67
|
GPBRIDP/Rd-345
|
Improvement of Jaiguli-Vurajan via Jaiguli Eidgamath-Pirgacha Road from Ch.1000-1500m
|
GPBRIDP
|
gabtali
|
110404101
|
0.50
|
0.00
|
100
|
30.85
|
M/S Islam Enterprise
|
27.76
|
01/01/1900
|
08/06/2017
|
30/04/2018
|
100
|
27.61
|
100
|
30/06/2020
|
|
68
|
GPBRIDP/Mw-89
|
Maintenance of Sukhanpukur Rail Sation-Nepaltoli UP Office via Shabazpur Road from Ch.3085-5670m
|
GPBRIDP
|
gabtali
|
110403021
|
2.59
|
0.00
|
0
|
34.39
|
PTSL-Maitree (Pvt.) Ltd
|
30.95
|
01/01/1900
|
06/11/2017
|
30/11/2017
|
100
|
30.85
|
0
|
30/06/2020
|
|
69
|
GPBRIDP/Mw-90
|
Maintenance of Ramesherpur UP Office-Sabgram GC via Satiantola Road from Ch.00-2075m
|
GPBRIDP
|
gabtali
|
110403024
|
2.08
|
0.00
|
0
|
43.23
|
PTSL-Maitree (Pvt.) Ltd
|
38.91
|
01/01/1900
|
06/11/2017
|
30/12/2017
|
100
|
38.86
|
0
|
30/06/2020
|
|
70
|
GPBRIDP/Mw-88
|
Maintenance of Rameswarpur UP-Jaigoli hat Road from Ch.2625-3725m
|
GPBRIDP
|
gabtali
|
110403013
|
1.10
|
0.00
|
0
|
19.68
|
Dhaly Construction Ltd.
|
17.71
|
01/01/1900
|
08/04/2018
|
30/08/2018
|
100
|
17.71
|
0
|
30/06/2020
|
|
71
|
GPBRIDP/Mw-130
|
Maintenance of Sukhanpukur-Nayabari-Rail Station Road from Ch.00-899m
|
GPBRIDP
|
gabtali
|
110405022
|
0.90
|
0.00
|
0
|
28.83
|
M/S Tooner & Co.
|
16.83
|
01/01/1900
|
30/05/2019
|
10/08/2019
|
100
|
16.74
|
0
|
30/06/2020
|
|
72
|
GPBRIDP/BRG-39
|
Construction of 51m RCC Girder Bridge over Ishamoti-Gojaria River on Durgahata Bazar-Baithavanga Road (H/O Harez Mistry) via H/O Bahar Master Road at Ch.450m
|
GPBRIDP
|
gabtali
|
110404043
|
|
51.00
|
0
|
338.81
|
M/S Sukra Enterprise
|
278.67
|
01/01/1900
|
10/07/2019
|
30/05/2020
|
100
|
153.76
|
0
|
30/06/2020
|
|
73
|
GPBRIDP/Rd-413
|
Improvement of Sukhanpukur-Nyabari Rail Station Raod from Ch.910-1300m
|
GPBRIDP
|
gabtali
|
110405022
|
0.39
|
0.00
|
0
|
30.81
|
M/S Islam Enterprise
|
25.28
|
01/01/1900
|
|
|
0
|
0.00
|
0
|
30/06/2020
|
|
74
|
GPBRIDP/Rd-370.
|
Improvement of Panchipir RHD (Rail Station) –Talora GC Road from Ch.3000-3417m
|
GPBRIDP
|
kahaloo
|
110542014
|
0.42
|
|
100
|
22.12
|
Md. Abdul Jalil
|
17.42
|
17/04/2016
|
25/04/2016
|
28/05/2017
|
100
|
17.41
|
100
|
30/07/2020
|
|
75
|
GPBRIDP/Rd-366.
|
Remaining Work of Kahaloo-Bibirpukur Road from Ch.2300-3450m
|
GPBRIDP
|
kahaloo
|
110542007
|
1.15
|
|
100
|
62.80
|
Md. Monjurul Alam Mohon
|
56.52
|
14/02/2018
|
21/02/2018
|
30/11/2018
|
100
|
56.50
|
100
|
30/07/2020
|
|
76
|
GPBRIDP/Rd-367.
|
Improvement of Murail R&H-Gohail GC (via Eruil Bazar) Road from Ch.7250-8250m, Const. of 1-No U-drain at Ch.7537m & 1 No RCC Box culert at Ch.8237m.
|
GPBRIDP
|
kahaloo
|
11052010
|
1.00
|
|
100
|
67.47
|
Md. Azizul Islam
|
67.36
|
04/09/2016
|
11/09/2016
|
14/12/2017
|
100
|
67.36
|
100
|
30/07/2020
|
|
77
|
GPBRIDP/Rd-366
|
Remaining Work of Kahaloo-Bibirpukur Road from Ch.2300-3450m
|
GPBRIDP
|
kahaloo
|
110542007
|
1.15
|
0.00
|
0
|
62.80
|
Md. Monjurul Alam Mohon
|
56.52
|
01/01/1900
|
14/02/2018
|
30/11/2018
|
100
|
56.50
|
0
|
30/06/2020
|
|
78
|
GPBRIDP/Rd-367
|
Improvement of Murail R&H-Gohail GC (via Eruil Bazar) Road from Ch.10913-12093M & 2-Nos U-drain at Ch.11019m & 11863m
|
GPBRIDP
|
kahaloo
|
110542010
|
1.18
|
1.00
|
0
|
78.87
|
Md. Azizul Islam
|
63.10
|
01/01/1900
|
18/04/2016
|
05/12/2017
|
100
|
63.09
|
0
|
30/06/2020
|
|
79
|
GPBRIDP/Rd-368
|
Improvemnt of Tindighi GC via Ghoradaphat GC Road from 00-1000m..
|
GPBRIDP
|
kahaloo
|
110542011
|
1.00
|
0.00
|
0
|
59.72
|
Md. Abdul Jalil
|
59.63
|
01/01/1900
|
21/08/2016
|
20/12/2017
|
100
|
59.63
|
0
|
30/06/2020
|
|
80
|
GPBRIDP/Rd-369
|
Improvement of Kazipara R&H-Shehali GC (Via Kurnipara Noldobi) Road from Ch.1000-3087m, Const.of 1 No U-drain at Ch.2407m & Const.of 1.30mx1.30m RCC Box culvert at Ch.1812m.
|
GPBRIDP
|
kahaloo
|
110542012
|
2.09
|
1.92
|
100
|
117.02
|
Md. Azizul Islam
|
89.89
|
01/01/1900
|
18/04/2016
|
14/12/2017
|
100
|
89.03
|
100
|
30/06/2020
|
|
81
|
GPBRIDP/Rd-375
|
Improvemnt of Narhatta UP Office-Kalitola hat (Via Kallanpur, Panchgram) Road from 3645-4645m & Const.of 3-Nos U-drain at Ch.3645m, 46457m, 3958m.
|
GPBRIDP
|
kahaloo
|
110543004
|
1.00
|
1.87
|
0
|
54.98
|
M/S. Rang Brothers
|
42.75
|
01/01/1900
|
17/04/2016
|
31/12/2017
|
100
|
42.74
|
0
|
30/06/2020
|
|
82
|
GPBRIDP/Rd-370
|
Improvement of Panchipir RHD (Rail Station) –Talora GC Road from Ch.1416-2076m
|
GPBRIDP
|
kahaloo
|
110542014
|
0.66
|
0.00
|
0
|
36.45
|
M/S Masuma Begum
|
32.80
|
01/01/1900
|
24/07/2017
|
28/09/2018
|
100
|
32.79
|
0
|
30/06/2020
|
|
83
|
GPBRIDP/Rd-371
|
Improvement of Murail UP-Dighirhat Road from Ch.514-1514m
|
GPBRIDP
|
kahaloo
|
11053005
|
1.00
|
0.00
|
0
|
53.61
|
S.Ananta Bikash Treipura
|
48.25
|
01/01/1900
|
24/07/2017
|
30/11/2018
|
100
|
48.12
|
0
|
30/06/2020
|
|
84
|
GPBRIDP/Rd-374
|
Improvement of Durgapur GC-Jamgram UP (via Karamjupara) Road from Ch.1589-2499m
|
GPBRIDP
|
kahaloo
|
11053007
|
0.91
|
0.00
|
0
|
58.26
|
M/S Masuma Begum
|
52.44
|
01/01/1900
|
18/07/2017
|
23/09/2018
|
100
|
52.42
|
0
|
30/06/2020
|
|
85
|
GPBRIDP/Rd-378
|
Improvement of Jorgarpara-Chandpur Road from Ch.6200-6700m
|
GPBRIDP
|
kahaloo
|
11054044
|
0.50
|
0.00
|
0
|
27.57
|
M/S Masuma Begum
|
24.82
|
01/01/1900
|
24/07/2017
|
30/12/2018
|
100
|
24.80
|
0
|
30/06/2020
|
|
86
|
GPBRIDP/Mw-102
|
Maintenance of Narhatta UP Office-Kalitola hat via Kollanpur, Panchgram Road from Ch.00-570m
|
GPBRIDP
|
kahaloo
|
110543004
|
0.57
|
0.00
|
0
|
9.13
|
M/S Masuma Begum
|
8.21
|
01/01/1900
|
31/10/2017
|
09/01/2018
|
100
|
8.20
|
0
|
30/06/2020
|
|
87
|
GPBRIDP/Mw-103
|
Maintenance of Samantaher-Doguchia Road from Ch.00-589m
|
GPBRIDP
|
kahaloo
|
110544005
|
0.59
|
0.00
|
0
|
15.93
|
M/S Masuma Begum
|
14.33
|
01/01/1900
|
31/10/2017
|
14/01/2018
|
100
|
14.29
|
0
|
30/06/2020
|
|
88
|
GPBRIDP/Rd-372
|
Improvement of Sarai Bazar-Murail UP (Via Katnahar) Road from Ch.312-2404m
|
GPBRIDP
|
kahaloo
|
110543003
|
2.09
|
0.00
|
0
|
128.02
|
S.Ananta Bikash Treipura
|
115.22
|
01/01/1900
|
05/11/1971
|
30/08/2018
|
100
|
114.73
|
0
|
30/06/2020
|
|
89
|
GPBRIDP/Rd-373
|
Improvement of Birkeder UP-Kurnipara hat (Via Shibtola hat) Road from Ch.1035-1585m & 1650-2100m & const.of 5-Nos U-drain at Ch.1226m, 1305m, 1381m, 1451m & 2040m.
|
GPBRIDP
|
kahaloo
|
110543009
|
1.00
|
2.12
|
0
|
54.97
|
PTSL-Maitree (Pvt.) Ltd
|
51.89
|
01/01/1900
|
12/11/2017
|
30/06/2018
|
50
|
29.00
|
0
|
30/06/2020
|
|
90
|
GPBRIDP/Rd-376
|
Improvement of Laxmipur (Poltry Firm)-Gurbisha Road from Ch.3500-4065m
|
GPBRIDP
|
kahaloo
|
110544012
|
0.57
|
1.25
|
0
|
40.50
|
PTSL-Maitree (Pvt.) Ltd
|
37.68
|
01/01/1900
|
08/11/2017
|
30/05/2018
|
100
|
37.66
|
0
|
30/06/2020
|
|
91
|
GPBRIDP/Rd-377
|
Improvement of Laxmipur-Shabanpur via Khajlal Road from Ch.1500-2000m & Const.of 3-Nos U-drain at Ch.1853m, 1874m, 1905m & from Ch.1833-1863m Surface U-drain.
|
GPBRIDP
|
kahaloo
|
110544009
|
0.50
|
1.12
|
100
|
32.61
|
PTSL-Maitree (Pvt.) Ltd
|
31.11
|
01/01/1900
|
12/11/2017
|
30/11/2018
|
100
|
30.19
|
100
|
30/06/2020
|
|
92
|
GPBRIDP/Rd-379
|
Improvement of Samantaher-Dogachi Road from Ch.1350-1850m & & Const.of 3-Nos U-drain at Ch.1780m, 1432m, 1580m & Ch.1360-1423m. Surface U-drain.
|
GPBRIDP
|
kahaloo
|
|
0.50
|
1.37
|
0
|
29.09
|
PTSL-Maitree (Pvt.) Ltd
|
28.52
|
01/01/1900
|
12/11/2017
|
30/04/2018
|
40
|
0.00
|
0
|
30/06/2020
|
|
93
|
GPBRIDP/Mw-101
|
Maintenance of Kahaloo GC-Durgapur GC via Paik para Road from Ch.3400-3940m .
|
GPBRIDP
|
kahaloo
|
110542013
|
0.54
|
0.00
|
0
|
6.44
|
M/S Masuma Begum
|
5.79
|
01/01/1900
|
02/04/2018
|
15/06/2018
|
100
|
5.78
|
0
|
30/06/2020
|
|
94
|
GPBRIDP/Rd-519
|
Improvement of Kahaloo Aghorshal Road-Murail Eruil Road via Dhawapara Road from Ch.00-1516m .
|
GPBRIDP
|
kahaloo
|
110544055
|
1.52
|
0.00
|
100
|
116.64
|
M.M Builders & Engineers Ltd.
|
104.98
|
01/01/1900
|
08/04/2018
|
15/05/2019
|
100
|
102.75
|
100
|
30/06/2020
|
|
95
|
GPBRIDP/Rd-533
|
Improvement of Digharhat-Khair Bhogoil via Moheshamura Road from Ch.1300-2670m .
|
GPBRIDP
|
kahaloo
|
|
1.37
|
0.00
|
0
|
101.90
|
M/S Alef Enterprise
|
96.80
|
01/01/1900
|
01/08/2018
|
30/03/2019
|
100
|
63.48
|
0
|
30/06/2020
|
|
96
|
GPBRIDP/Rd-536
|
Improvement of Tindighi GC-Ghoradhap GC Road from Ch.4009m-5580m
|
GPBRIDP
|
kahaloo
|
|
1.57
|
0.00
|
0
|
111.88
|
Md. Abdul Jalil
|
106.28
|
01/01/1900
|
01/08/2018
|
28/02/2019
|
100
|
106.16
|
0
|
30/06/2020
|
|
97
|
GPBRIDP/Rd-537
|
Improvement of Kahaloo GC-Durgapur GC via Paik para Road from Ch.7000m-8220m
|
GPBRIDP
|
kahaloo
|
|
1.22
|
0.00
|
0
|
81.48
|
M/S Islam Enterprise
|
77.41
|
01/01/1900
|
23/07/2018
|
31/01/2020
|
100
|
77.39
|
0
|
30/06/2020
|
|
98
|
GPBRIDP/Rd-538
|
Improvement of Shekaher-Durgapur Road-Bamuza Dokhinpara Mosque Road from Ch.00m-460m
|
GPBRIDP
|
kahaloo
|
|
0.46
|
0.00
|
100
|
35.15
|
M/S Liton Construction
|
33.39
|
01/01/1900
|
01/08/2018
|
30/12/2018
|
100
|
32.73
|
100
|
30/06/2020
|
|
99
|
GPBRIDP/Rd-552
|
Improvement of Abilomba-Kazipara Road (Pucca road-Kazipara School) from Ch.700-1400m & Improvement of Digharhat-Khair Bhogoil via Moheshamura Road from Ch.00-1300m .
|
GPBRIDP
|
kahaloo
|
|
2.20
|
0.00
|
0
|
156.37
|
M/S Islam Enterprise
|
147.75
|
01/01/1900
|
03/06/2019
|
30/04/2020
|
100
|
144.79
|
0
|
30/06/2020
|
|
100
|
GPBRIDP/Rd-380
|
Improvement of Panditpukur GC-Abadpukur GC Road from Ch.4160-4460m
|
GPBRIDP
|
nandigram
|
|
0.30
|
0.00
|
0
|
20.25
|
M/S. Diba Enterprise
|
17.21
|
01/01/1900
|
24/05/2016
|
30/04/2017
|
100
|
17.20
|
0
|
30/06/2020
|
|
101
|
GPBRIDP/Rd-381
|
Improvement of Kunder GC-Sherpur NHW Road from Ch. 2619-3619m & Const. 1 No U-drain at Ch.3208m.
|
GPBRIDP
|
nandigram
|
|
1.00
|
0.62
|
0
|
66.09
|
M/S. Sukra Enterprise
|
57.39
|
01/01/1900
|
11/06/2016
|
10/04/2017
|
100
|
57.36
|
0
|
30/06/2020
|
|
102
|
GPBRIDP/Rd-382
|
Improvement of Jamadarpukur GC-Champapur GC via Damrul, Amragohail, Guliahat Road from Ch.15993-16993m
|
GPBRIDP
|
nandigram
|
|
1.00
|
0.00
|
0
|
67.52
|
M/S Alaya Construction
|
56.46
|
01/01/1900
|
12/05/2012
|
30/09/2018
|
100
|
56.45
|
0
|
30/06/2020
|
|
103
|
GPBRIDP/Rd-383
|
Improvement of Ponditpukur GC-Talora GC Road from Ch.2398-3398m
|
GPBRIDP
|
nandigram
|
|
1.00
|
0.00
|
100
|
64.44
|
M/S Surovi Enterprise
|
49.61
|
01/01/1900
|
27/04/2016
|
30/04/2017
|
100
|
49.61
|
100
|
30/06/2020
|
|
104
|
GPBRIDP/Rd-384
|
Improvement of Dugapur GC-Nashratpur GC via Kundagram Road from Ch.1635-2635m.
|
GPBRIDP
|
nandigram
|
|
1.00
|
0.00
|
0
|
65.93
|
M/S Surovi Enterprise
|
50.20
|
01/01/1900
|
27/04/2016
|
28/12/2017
|
100
|
50.16
|
0
|
30/06/2020
|
|
105
|
GPBRIDP/Rd-387
|
Rehabilitation of Omarpur GC-Bodaparahat via Derahar Road from Ch.1496-1775m
|
GPBRIDP
|
nandigram
|
110673008
|
0.28
|
0.00
|
100
|
15.78
|
Mst. Morium Begum
|
15.83
|
01/01/1900
|
03/05/2016
|
30/05/2018
|
100
|
15.83
|
100
|
30/06/2020
|
|
106
|
GPBRIDP/Mw-105
|
Maintenance of Belgoria-Bhartaulla Road from Ch.00-300m & 1100-1430m
|
GPBRIDP
|
nandigram
|
110674013
|
0.63
|
0.00
|
0
|
14.26
|
M/S. Sukra Enterprise
|
9.50
|
01/01/1900
|
04/05/2016
|
30/11/2016
|
100
|
9.50
|
0
|
30/06/2020
|
|
107
|
GPBRIDP/Rd-392
|
Improvement of Koldighi-Takurai Road (Deota-Takurai Koldighi via Choto Kanch Road Pacca Road-Dakhin para Natun Edgha Math) Road from Ch1476-1976m
|
GPBRIDP
|
nandigram
|
|
0.50
|
0.00
|
100
|
30.29
|
M/S Doiel Enterprise
|
30.21
|
01/01/1900
|
01/09/2016
|
30/04/2017
|
100
|
29.76
|
100
|
30/06/2020
|
|
108
|
GPBRIDP/Rd-385
|
Improvement of Kunder GC-Dhunder hat Road from Ch.5529-6774m & Const.of 2-Nos RCC Box culvert at Ch.5679m & 6098m.
|
GPBRIDP
|
nandigram
|
|
1.55
|
4.00
|
100
|
68.12
|
M/S Rakib Construction
|
71.82
|
01/01/1900
|
24/07/2017
|
30/05/2019
|
100
|
71.82
|
100
|
30/06/2020
|
|
109
|
GPBRIDP/Rd-386
|
Improvement of Thaltamajgram UP-Dariapur Road from Ch.00-1275m
|
GPBRIDP
|
nandigram
|
110673005
|
1.28
|
0.00
|
100
|
67.90
|
M/S Rakib Construction
|
61.11
|
01/01/1900
|
23/07/2017
|
30/11/2018
|
100
|
61.11
|
100
|
30/06/2020
|
|
110
|
GPBRIDP/Rd-390
|
Improvement of Khathon Kalogonj RHW-Moninag Road from Ch.00-500m & Const.of 1-No U-drain at Ch.327m
|
GPBRIDP
|
nandigram
|
110674033
|
0.50
|
0.62
|
0
|
28.20
|
M/S Rakib Construction
|
26.23
|
01/01/1900
|
23/07/2017
|
14/11/2018
|
100
|
26.20
|
0
|
30/06/2020
|
|
111
|
GPBRIDP/Rd-518
|
Improvement of Vatgram UP-Atail Bazar via Palahar Road from Ch.1680-3200m
|
GPBRIDP
|
nandigram
|
110673006
|
1.52
|
0.00
|
100
|
98.41
|
M/S Sukra Enterprise
|
88.57
|
01/01/1900
|
08/04/2018
|
25/12/2018
|
100
|
85.57
|
100
|
30/06/2020
|
|
112
|
GPBRIDP/Rd-520
|
Improvement of Fulbari GC-Kutubpur GC Road from Ch.9700-11000 m
|
GPBRIDP
|
sariakandi
|
110812002
|
1.30
|
|
100
|
92.39
|
M/S Sukra Enterprise
|
83.15
|
08/04/2018
|
15/04/2018
|
31/12/2018
|
100
|
83.15
|
100
|
30/07/2020
|
|
113
|
GPBRIDP/Rd-418
|
Improvement of Fulbari GC-Kutubpur GC Road from Ch.11000-12500m
|
GPBRIDP
|
sariakandi
|
|
1.50
|
0.00
|
100
|
98.11
|
M/S. Sukra Enterprise
|
78.50
|
01/01/1900
|
22/05/2016
|
05/08/2017
|
100
|
77.98
|
100
|
30/06/2020
|
|
114
|
GPBRIDP/Rd-419
|
Improvement of Kutubpur GC-Tornihat GC Road from Ch. 2065-2827m & 3777-4540m.
|
GPBRIDP
|
sariakandi
|
|
1.53
|
0.00
|
0
|
85.65
|
M/S. Islam Enterprise
|
80.41
|
01/01/1900
|
11/05/2016
|
12/06/2017
|
100
|
80.39
|
0
|
30/06/2020
|
|
115
|
GPBRIDP/Rd-420
|
Improvement of Kamalpur UP Office-Koritola hat via Sutanara Road from Ch.4236-5300m.
|
GPBRIDP
|
sariakandi
|
|
1.06
|
0.00
|
100
|
57.76
|
M/S. Sukra Enterprise
|
46.50
|
01/01/1900
|
13/04/2016
|
25/03/2017
|
100
|
41.00
|
100
|
30/06/2020
|
|
116
|
GPBRIDP/Rd-422
|
Improvement of Sariakandi-Chandanbaisha UZR (Biman Bandar More)-Bangali River Ghat Road from Ch. 00-1060m
|
GPBRIDP
|
sariakandi
|
|
1.06
|
0.00
|
0
|
56.54
|
M/S Islam Enterprise
|
50.89
|
01/01/1900
|
07/06/2016
|
31/05/2018
|
100
|
50.88
|
0
|
30/06/2020
|
|
117
|
GPBRIDP/Rd-521
|
Improvement of Kamalpur UP Office-Koretola hat via Sutanara Road from Ch.00-1600m.
|
GPBRIDP
|
sariakandi
|
|
1.60
|
0.00
|
100
|
106.66
|
Dhaly Construction Ltd.
|
95.99
|
01/01/1900
|
04/04/2018
|
31/12/2018
|
100
|
95.50
|
100
|
30/06/2020
|
|
118
|
GPBRIDP/Rd-346
|
Improvement of Khorna GCM-Dosmile NHW Road from Ch.3327-4457m
|
GPBRIDP
|
shajahanpur
|
110962009
|
1.30
|
0.00
|
100
|
75.79
|
M/S. Sukra Enterprise
|
58.63
|
01/01/1900
|
13/04/2016
|
25/01/2017
|
100
|
57.80
|
100
|
30/06/2020
|
|
119
|
GPBRIDP/Rd-347
|
Improvement of Gohail GCM-Murail R&H via Kalmahat Road from Ch. 3700-4900m Const. of 1 No U-drain at Ch.3915m
|
GPBRIDP
|
shajahanpur
|
110962010
|
1.20
|
0.00
|
0
|
64.70
|
M/S. Shuvo Enterprise
|
51.31
|
01/01/1900
|
17/04/2016
|
25/01/2017
|
100
|
51.31
|
0
|
30/06/2020
|
|
120
|
GPBRIDP/Rd-348
|
Improvement of Damajani Hat-Amrul UP Road from Ch.00-1000m
|
GPBRIDP
|
shajahanpur
|
110963007
|
1.00
|
0.00
|
0
|
55.20
|
Md.Monjurul Alam Mohon
|
42.43
|
01/01/1900
|
18/04/2016
|
30/04/2017
|
100
|
42.41
|
0
|
30/06/2020
|
|
121
|
GPBRIDP/Rd-349
|
Improvement of Madla UP-Dublagari hat Road from Ch.1835-2335m
|
GPBRIDP
|
shajahanpur
|
110963010
|
0.50
|
0.00
|
100
|
27.85
|
M/S. M.H Enterprise
|
21.87
|
01/01/1900
|
13/04/2016
|
30/04/2017
|
100
|
21.27
|
100
|
30/06/2020
|
|
122
|
GPBRIDP/Rd-350
|
Improvement of Subrul hat-Malancha UP Road from Ch.3835-4600m
|
GPBRIDP
|
shajahanpur
|
110963006
|
0.77
|
0.00
|
0
|
41.14
|
M/S. Uttraran Traders
|
35.80
|
01/01/1900
|
24/10/2016
|
30/04/2017
|
100
|
35.76
|
0
|
30/06/2020
|
|
123
|
GPBRIDP/Rd-351
|
Improvement of Gohail UP-Khadas hat Road from Ch.1300-2500m
|
GPBRIDP
|
shajahanpur
|
110963021
|
1.20
|
0.00
|
100
|
77.30
|
M/S. Jarif Corporation
|
66.81
|
01/01/1900
|
03/11/2016
|
29/12/2017
|
100
|
58.57
|
100
|
30/06/2020
|
|
124
|
GPBRIDP/Rd-352
|
Improvement of Gohail UP-Atail hat Road from Ch.1800-2800m
|
GPBRIDP
|
shajahanpur
|
110963001
|
1.00
|
0.00
|
0
|
54.30
|
M/S. Loba Construction
|
48.54
|
01/01/1900
|
26/10/2016
|
30/08/2017
|
100
|
48.49
|
0
|
30/06/2020
|
|
125
|
GPBRIDP/Rd-353
|
Improvement of Brikustia Paschimpara-Dakkhinpara Road from Ch.00-500m
|
GPBRIDP
|
shajahanpur
|
110965098
|
0.50
|
0.00
|
100
|
27.18
|
M/S. Sukra Enterprise
|
21.53
|
01/01/1900
|
12/04/2016
|
30/04/2017
|
100
|
21.00
|
100
|
30/06/2020
|
|
126
|
GPBRIDP/MW-91
|
Maintenance work of Aria UP-Ramnagar hat Road from Ch.2865-3665m
|
GPBRIDP
|
shajahanpur
|
110963002
|
1.00
|
0.00
|
0
|
9.76
|
M/S. Gafurun Nasa Begum
|
5.91
|
01/01/1900
|
17/04/2016
|
25/10/2016
|
100
|
5.90
|
0
|
30/06/2020
|
|
127
|
GPBRIDP/MW-93
|
Maintenance of Chupinagor UP-B Block Bazar Road from Ch.3000-4000m
|
GPBRIDP
|
shajahanpur
|
110963008
|
1.00
|
0.00
|
0
|
27.13
|
Md. Fazlul Haque
|
19.13
|
01/01/1900
|
06/11/2016
|
30/03/2017
|
100
|
19.13
|
0
|
30/06/2020
|
|
128
|
GPBRIDP/MW-94
|
Maintenance work of Kamarpara hat-Bilkeshpathar Road from Ch00-1780m
|
GPBRIDP
|
shajahanpur
|
110964010
|
1.78
|
0.00
|
0
|
34.38
|
M/S. Masuma Begum
|
21.93
|
01/01/1900
|
17/04/2016
|
25/10/2016
|
100
|
21.90
|
0
|
30/06/2020
|
|
129
|
GPBRIDP/MW-95
|
Maintenance work of Bogra-Natore R&H-Partekur Road from Ch.00-1900m
|
GPBRIDP
|
shajahanpur
|
110964025
|
1.90
|
0.00
|
100
|
47.72
|
Md. Monjurul Alam Mohon
|
32.72
|
01/01/1900
|
17/04/2016
|
28/11/2016
|
100
|
30.72
|
100
|
30/06/2020
|
|
130
|
GPBRIDP/RD-539
|
Improvement of Shajapur NHW-Nura Elahi Jame Mosque-Shajapur Proash School Road from Ch.00-177m
|
GPBRIDP
|
shajahanpur
|
110965217
|
0.18
|
0.00
|
0
|
11.45
|
A.K.M Fazlur Rahim
|
10.88
|
01/01/1900
|
29/10/2018
|
30/05/2019
|
100
|
10.87
|
0
|
30/06/2020
|
|
131
|
GPBRIDP/MW-129
|
Maintenance of Omardighi-Khaianjul Road from Ch.00-1500m
|
GPBRIDP
|
shajahanpur
|
110964008
|
1.50
|
0.00
|
100
|
53.82
|
M/S Mehadi Construction
|
51.06
|
01/01/1900
|
12/06/2019
|
29/10/2019
|
100
|
51.06
|
100
|
30/06/2020
|
|
132
|
GPBRIDP/MW-129.d.
|
Improvement of Khorna hat-Fakirpara Nazipur High School Road from Ch.00-1000m
|
GPBRIDP
|
shajahanpur
|
110964096
|
1.00
|
0.00
|
0
|
73.08
|
M/S Sadman Enterprise
|
69.42
|
01/01/1900
|
08/01/2020
|
20/06/2020
|
70
|
48.04
|
0
|
30/06/2020
|
|
133
|
GPBRIDP/WR-3
|
Widening of Sherpur GC-Nimgachi GC via Sherua Bottola NHW & Bhabanipur UP (Sherpur Part) Road from Ch.2500-4935m.
|
GPBRIDP
|
sherpur
|
110882003
|
2.44
|
|
100
|
165.39
|
PTSL-Maitree (Pvt.) Ltd
|
148.85
|
05/11/2017
|
12/11/2017
|
28/04/2018
|
100
|
148.80
|
100
|
30/07/2020
|
|
134
|
GPBRIDP/Rd-316
|
Improvement of Mohipur NHW-Ranirhat GC (Via Pachuilhat & Kochuapara) Road from Ch.5200-6183m, 7000-7525m & Const.of 3-Nos U-drain at Ch.5323m, 6060m & 7005m.
|
GPBRIDP
|
sherpur
|
110882009
|
1.71
|
1.87
|
0
|
100.98
|
M/S Mollah Construction
|
78.82
|
01/01/1900
|
24/05/2016
|
30/05/2018
|
100
|
78.78
|
0
|
30/06/2020
|
|
135
|
GPBRIDP/Rd-317
|
Improvement of Mirzapur GC-Sughat UP Road from Ch. 5985-6985m & Const.of 3-Nos U-drain at Ch.6135m, 6335m & 6679m.
|
GPBRIDP
|
sherpur
|
110883001
|
1.00
|
1.87
|
0
|
56.12
|
M/S Masuma Begum
|
45.05
|
01/01/1900
|
28/04/2016
|
09/02/2017
|
100
|
44.95
|
0
|
30/06/2020
|
|
136
|
GPBRIDP/Rd-318
|
Improvement of Sherpur GC-Khanpur UP Road from Ch.2500-3500m
|
GPBRIDP
|
sherpur
|
110883002
|
1.00
|
0.00
|
0
|
53.29
|
M/S Himel Enterprise
|
40.90
|
01/01/1900
|
27/04/2016
|
17/11/2016
|
100
|
40.90
|
0
|
30/06/2020
|
|
137
|
GPBRIDP/Rd-319
|
Improvement of Khamarkandi UP-Parbhanipur Bazar-Rajarampur Bazar Road from Ch.1850-2850m, Const.1 No RCC Box-culvert at Ch.2286m & Const. of 1 No U-drain at Ch.2108m
|
GPBRIDP
|
sherpur
|
110883009
|
1.00
|
1.82
|
100
|
56.43
|
M/S Payel Enterprise
|
46.07
|
01/01/1900
|
18/04/2016
|
31/12/2017
|
100
|
45.58
|
100
|
30/06/2020
|
|
138
|
GPBRIDP/Rd-320
|
Improvement of Khamarkandi UP-Ghondur Hat Parbhanipur -Amul UP Road from Ch.400-1050m.
|
GPBRIDP
|
sherpur
|
110883010
|
0.65
|
0.00
|
0
|
36.82
|
M/S. Hiemel Enterprise
|
33.17
|
01/01/1900
|
01/11/2016
|
30/12/2017
|
100
|
33.16
|
0
|
30/06/2020
|
|
139
|
GPBRIDP/Rd-321
|
Improvement of Sughat UP-Madhyabhag Bazar Road from Ch.1000-2000m.
|
GPBRIDP
|
sherpur
|
110883014
|
1.00
|
0.00
|
0
|
57.25
|
M/S. Uttrarna Traders
|
50.38
|
01/01/1900
|
24/10/2016
|
30/04/2017
|
100
|
50.38
|
0
|
30/06/2020
|
|
140
|
GPBRIDP/Rd-322
|
Improvement of Fulbari Bazar-Garidah UP Road from Ch.1190-2010m.
|
GPBRIDP
|
sherpur
|
110883043
|
0.82
|
0.00
|
0
|
49.76
|
M/S. Doiel Enterprise
|
42.65
|
01/01/1900
|
30/10/2016
|
22/09/2017
|
100
|
42.64
|
0
|
30/06/2020
|
|
141
|
GPBRIDP/Rd-323
|
Improvement of Gosaibari Bazar-Mohipur Bazar-Garidah UP Road from Ch.1200-2200m.
|
GPBRIDP
|
sherpur
|
110883041
|
1.00
|
0.00
|
100
|
54.42
|
M/S. Doiel Enterprise
|
48.98
|
01/01/1900
|
30/10/2016
|
30/05/2017
|
100
|
48.01
|
100
|
30/06/2020
|
|
142
|
GPBRIDP/Rd-324
|
Improvement of Shimabari GC-Shagatia Hat Road (Via Panch Baria) Road from Ch.00-800m.
|
GPBRIDP
|
sherpur
|
110883032
|
0.80
|
0.00
|
0
|
45.33
|
M/S. Doiel Enterprise
|
40.49
|
01/01/1900
|
30/10/2016
|
27/11/2017
|
100
|
40.46
|
0
|
30/06/2020
|
|
143
|
GPBRIDP/Rd-325
|
Improvement of Arangsail-Ghut Battola Road from Ch.1000-1500m & Const.of 3-Nos U-drain at Ch.1005m, 1190m & 1375m.
|
GPBRIDP
|
sherpur
|
110882009
|
0.50
|
1.87
|
0
|
33.32
|
M/S Masuma Begum
|
27.31
|
01/01/1900
|
28/04/2016
|
28/06/2018
|
100
|
27.28
|
0
|
30/06/2020
|
|
144
|
GPBRIDP/Rd-326
|
Improvement of Sherpur GC (Ronbir Bala)-Jazorhat-Elanggi UP Road from Ch.500-1750m
|
GPBRIDP
|
sherpur
|
110883004
|
1.25
|
0.00
|
0
|
76.11
|
Dhaly Construction Ltd.
|
68.50
|
01/01/1900
|
02/04/2018
|
31/12/2018
|
100
|
68.45
|
0
|
30/06/2020
|
|
145
|
GPBRIDP/Rd-522
|
Improvement of Shakdha-Khanpur Road from Ch.500-1500m
|
GPBRIDP
|
sherpur
|
110885090
|
1.00
|
0.00
|
0
|
66.72
|
Dhaly Construction Ltd.
|
60.05
|
01/01/1900
|
02/04/2018
|
27/12/2018
|
100
|
60.04
|
0
|
30/06/2020
|
|
146
|
GPBRIDP/Rd-523
|
Improvement of Shalfa Bazar (RHW)-Jazorhat-Elangi UP Road from Ch.1600-2600m
|
GPBRIDP
|
sherpur
|
110883036
|
1.00
|
0.00
|
0
|
66.64
|
Dhaly Construction Ltd.
|
59.98
|
01/01/1900
|
02/04/2018
|
15/12/2018
|
100
|
40.17
|
0
|
30/06/2020
|
|
147
|
GPBRIDP/Mw-84
|
Maintenance of Sherpur GC-Khanpur UP Road from Ch.500-1500m & 4270-5670m
|
GPBRIDP
|
sherpur
|
110883002
|
2.40
|
0.00
|
0
|
66.73
|
M.M Builders & Engineers Ltd.
|
60.05
|
01/01/1900
|
08/04/2018
|
27/12/2018
|
100
|
60.05
|
0
|
30/06/2020
|
|
148
|
GPBRIDP/Mw-85
|
Maintenance of Garidaha UP-Shibpur Bazar Road from Ch.00-1550m
|
GPBRIDP
|
sherpur
|
110883019
|
1.55
|
0.00
|
0
|
33.42
|
Dhaly Construction Ltd.
|
30.08
|
01/01/1900
|
04/04/2018
|
17/04/2018
|
100
|
30.08
|
0
|
30/06/2020
|
|
149
|
GPBRIDP/Mw-86
|
Maintenance of Ghoga hat (Bottola NHW)-Ashgram-Bhananipur UP Road from Ch.00-3300m
|
GPBRIDP
|
sherpur
|
110883006
|
3.30
|
0.00
|
0
|
44.80
|
Dhaly Construction Ltd.
|
39.94
|
01/01/1900
|
04/04/2018
|
21/05/2018
|
100
|
39.94
|
0
|
30/06/2020
|
|
150
|
GPBRIDP/Rd-327
|
Improvement of Garidaho UP-Amrul UP Road from Ch.1000-3200m
|
GPBRIDP
|
sherpur
|
110883044
|
2.20
|
0.00
|
0
|
138.30
|
Dhaly Construction Ltd.
|
124.47
|
01/01/1900
|
02/04/2018
|
31/12/2018
|
100
|
124.46
|
0
|
30/06/2020
|
|
151
|
GPBRIDP/Rd-534
|
Improvement of Sonka hat(NHW)-Bishalpur UP Road from Ch.1300-4350m
|
GPBRIDP
|
sherpur
|
110883007
|
1.35
|
0.00
|
100
|
102.47
|
Md. Monjurul Alam Mohon
|
97.34
|
01/01/1900
|
23/07/2018
|
30/04/2019
|
100
|
97.34
|
100
|
30/06/2020
|
|
152
|
GPBRIDP/Rd-535
|
Improvement of Baraidaha-Khalshagari Road from Ch.2000m-3000m
|
GPBRIDP
|
sherpur
|
|
1.00
|
0.00
|
100
|
60.73
|
M/S Mohana Construction
|
57.69
|
01/01/1900
|
01/08/2018
|
28/03/2019
|
100
|
57.69
|
100
|
30/06/2020
|
|
153
|
GPBRIDP/Rd-542
|
(a) Improvement of Sherpurhat Mirzapur UP (Kristopur NHW) Road from Ch.2200m-2963m (b) Improvement of Noya Panishra Hindupara ZUR via Tatulia Road from Ch.2650m-4650m
|
GPBRIDP
|
sherpur
|
|
2.76
|
0.00
|
0
|
215.55
|
Monjurul Alam Mohon _Aurk Enterprise JV
|
182.06
|
01/01/1900
|
27/12/2018
|
31/01/2020
|
100
|
159.40
|
0
|
30/06/2020
|
|
154
|
GPBRIDP/Rd-543
|
(a) Improvement of Garidah Bazar (NHW)-Garidah UP (Chandijan) Road from Ch.1445m-2600m (ID-110883030) (b) Improvement of Bishalpur UP-Pechulhat (UZR) via Manikechapor Road from Ch.2510m-4510m (ID-110883021)(c) Improvement of Salfa Bazar (RHD)-Khamarkandi
|
GPBRIDP
|
sherpur
|
|
6.53
|
0.00
|
0
|
481.26
|
M/S Masuma Begum
|
431.56
|
01/01/1900
|
26/02/2019
|
30/01/2020
|
|