Development of Important Rural Infrastructure Project .

Serial District Name District Code/ID Upazila Name Upazila Code/ID Project ID Package No Scheme Name Road ID Length of Scheme(Km) - Road Length of Scheme(m) - Bridge/Culverts Building Quantity Estimated Amount(LAC) Contractor Name Contract Amount(LAC) Date of Contract (DD/MM/YYYY) Date of commencement (DD/MM/YYYY) Date of Completion (DD/MM/YYYY) Physical Progress(%) Financial Progress (Amount) (LAC) Financial Progress(%) Date of Progress Update (DD/MM/YYYY) Remarks
1 B.baria 14 b.baria-s 104 240 Upazila : Sadar DIRIP/BBR/Sad/ UZR/SL-04(01)/12-13/W-29 Improvement of Panchabati R&H road-Akhaura bazar road (Heliday) road (ID: 412132006) Part A: Pucca Road Works. Nil Part B:Rehabilitation Works= 4.225 km (Ch. 0+00km to 4+225km) Part C: Structure Works=Nil. (Total Length=4.225 km) 4.23 382.78 M/s. MRC & MMK (JV) Kawtali B.Baria 382.71 11/02/2013 01/07/2013 100 20/12/2018  
2 B.baria 14 BijoyNagar 487 240 Upazila : Bijoynagar DIRIP/BBR/Bijoy /UZR/SL-5(01)/12-13/W-19 Improvement of Nurpur GC-Kalibari R&H (Simna-B.Baria road) (Bijoynagar part) (ID: 412152009) Part A: Pucca Road Works. Nil Part B:Rehabilitation Works= 0.67 km (Ch. 0+00 to 0+670km) Part C: Structure Works=Nil. (Total Length=0.670 km) 0.67 59.41 M/s. Mostafa Kamal 59.41 25/07/2013 18/12/2013 100 20/12/2018  
3 B.baria 14 sarail 98 240 Upazila : Sarail DIRIP/BBR/Sarl /UZR/SL-3(01)/15-16/W-174 Rehabilitation of Shahbajpur-Shahajadpur Road(Ch. 0+000km-4+850km). ID. 412942002 Part A: BC Road Works. Nil Part B:Rehabilitation Works= 4.407 km (Ch. 0+328km - 2+360km & 2+475km-4+850km)Part C: Structure Works=Nil. Parte D: RCC Work=0.375km(Ch. 0+068km - 0+328km & 2+360km-2+475km). (Total Length=4.782 km) 4.78 361.76 M/S. Mahabub Alam,Vairob, Khishorgonj 293.92 30/08/2016 06/05/2017 100 20/12/2018  
4 Barguna 2 amtali 16 240 Upazila: AmtaliDIRIP/BRG/Amt/UZR/SL-15(02)/15-16/W-138 Part A: Imp. of Gulishakhali Bazar UP-Mahishkata Road & R&H-Shahjahan Mansur road-Hazar Taker Bendth-Shahid Sarwarthe School (Remaning Portion) Road (Amtali-Mahishkata R&H-Kalagacia-Kaserhat GC via Gulishakhali Bazar) ch. 2+000 km to 2+750 km. ID. 504092010 0.75 538.89 Md. Abul Kalam Azad. Natun Bazar, Patuakhali 452.67 17/12/2015 03/12/2017 94 13/05/2019  
5 Barguna 2 amtali 16 240 Upazila: AmtaliDIRIP/BRG/Amt/VR/SL-14(04)/15-16/W-153 Const. of 40.00 m long RCC Girder Bridge on Gulishakhali UP-Yunus Ali Khan College-Mahishkata R&H road to Khagdon School Road (Mahiskata RHD-Gulishakhali UP via Yunus Khan College) at ch. 1+500 km. ID. 504094052 (Total (HBB)Length=0.097 km) 40.00 255.30 M/S.AAC & PC (JV),BB Road,Barguna 215.77 20/12/2015 11/03/2016 100 08/04/2019  
6 Barguna 2 amtali 16 240 Upazila: AmtaliDIRIP/BRG/Amt/VR/SL-14(05)/16-17/W-215 Const. of 30.00 m long RCC Girder Bridge on Gulishakhali UP-Yunus Ali Khan College-Mahishkata R&H road to Khagdon School Road at ch. 9.00m, ID. 504094052 (Total (HBB)Length=0.033 km) 30.00 202.47 M M Builders & Engineers Ltd - M/S Tanvir Ahmed (JV), Gulshan, Dhaka 182.23 07/02/2018 30/06/2018 90 11/04/2019  
7 Barguna 2 amtali 16 240 Upazila:Amtali DIRIP/BRG/Amt/UNR/SL-15(04)/15-16/W-152 Const. of 18.00 m long RCC Girder Bridge on Gulishakhali Bazar UP-Mahishkata Road & R&H-Shahjahan Mansur road-Hazar Taker Bendth-Shahid Sarwarthe School (Remaning Portion) Road (Gulishakhali UP-Kukua hat via Chunakhali bazar & Hazar Takar bandh) at ch 4+480 km. ID. 504093006 18.00 132.51 M/s. Lutful Kabir, Dilbag, Bagura, Alekanda road, Barisal. 108.64 20/12/2015 30/05/2017 100 20/12/2018  
8 Barguna 2 amtali 16 240 Upazila: Amtali DIRIP/BRG/Amt/UZR/SL-15(03)/15-16/W-151 Const. of 50.00 m long RCC Girder Bridge on Gulishakhali Bazar UP-Mahishkata Road & R&H-Shahjahan Mansur road-Hazar Taker Bandh-Shahid Sarwarthe School (Remaning Portion) Road (Amtali-Mahishkata R&H-Kalagacia-Kaserhat GC via Gulishakhali Bazar) at ch. 2+924 km. ID. 504092010 50.00 386.65 M/s. Lutful Kabir, Dilbag, Bagura, Alekanda road, Barisal. 321.68 10/12/2015 31/05/2017 100 20/12/2018  
9 Barguna 2 amtali 16 240   Part C: Rehab. work of Gulishakhali Bazar UP-Mahishkata Road & R&H-Shahjahan Mansur road-Hazar Taker Bendth-Shahid Sarwarthe School (Remaning Portion) Road (Gulishakhali UP-Kukua hat via Chunakhali bazar & Hazar Takar bandh). ch. 3+100 km to 4+100 km, 4+100km - 6+000km & 6+000km - 6+500km. ID. 504093006 Salvaged Tk. 2,65,309.00 (Total Length=7.561 km) 3.40 0.00   0.00 100 20/12/2018  
10 Barguna 2 amtali 16 240 Upazila: Amtali DIRIP/BRG/Amt/UZR/SL-15(01)/12-13/W-45 Imp. of Gulishakhali Bazar UP-Mahishkata Road & R&H-Shahjahan Mansur road-Hazar Taker Bendth-Shahid Sarwarthe School (Remaning Portion) Road at ch. 00-2000m. ID. 504092010 (Total Length=2.000 km) 2.00 181.74 Md. Abul Kalam Azad. Azad Bhaban, Patuakhali 196.21 03/06/2013 31/03/2016 100 20/12/2018  
11 Barguna 2 amtali 16 240 Upazila: Amtali DIRIP/BRG/Amt/VR/SL-14(03)/15-16/W-139 Part A: Gulishakhali UP-Yunus Ali Khan College-Mahishkata R&H road to Khagdon School Road (Khakdon Chawrasta to Kakua UP via Purba Chunakhali GPS) ch.0+000 km to 0+700 km & 3+700km - 6+190km. ID. 504094070 Salvaged Tk. 9,63,702.00 3.52 247.02 Md. Shahidul Islam, Amtali, Barguna 209.02 17/12/2015 31/05/2018 100 20/12/2018  
12 Barguna 2 amtali 16 240 Upazila: Amtali DIRIP/BRG/Amt/VR/SL-14(02)/12-13/W-46 Imp. of Gulishakhali UP-Yunus Ali Khan College-Mahishkata R&H road to Khagdon School Road at ch.1700-3700m. ID. 504094052 & ID. 504094070 (Total Length=2.000 km) 2.00 134.74 Md. Golamkibria 154.75 20/06/2013 30/06/2015 100 20/12/2018  
13 Barguna 2 amtali 16 240 Upazila: Amtali DIRIP/BRG/AMT /VR/SL-14(01)/12-13/W-16 Imp.of Gulishakhali UP-Yunus Ali Khan College-Mahishkata RHD to Khakdon School road ID: 504094052 & 504094070 [(Khakdon Chowrasta to Kukua UP via Purba Chunakhali GPS road (Purba Kewabunia RHD-Roy bala Chowrasta via Akbaria Dakhil Madrasha) road by BC (ID No-504094070)] Part A:Pucca (BC) Road Works= 1.00km (Ch. 0+700 to 1+700 km) Part B:Rehabilitation Works= Nil Part C:Structure Works = 04- Nos, 3.475m (Total Length=1.000 km) 1.00 68.31 M/S GM IKFA Ent Amtoly Borguna 77.68 15/01/2013 15/03/2015 100 20/12/2018  
14 Bhola 4 charfassion 5 240 DIRIP/Bhl/ Chrf/VR/SL-55(05)/13-14/ W-92 Construction of 60.00m Long RCC girder Bridge on the road of Kashemgonj to east side of Madraj Beribadh road at Ch: 14+640km over Thalakhali Khal (ID No. 509254076) Structure Works = 01 No. (60.00m) (at Ch: 14640m.) charfession 60.00 337.76 Unas Al mamun 386.55 20/01/2014 20/01/2014 19/01/2015 100 338.79 88 11/04/2019 On going
15 Bhola 4 charfassion 5 240 DIRIP/Bhl/ Chrf/ UNR/SL-49(04)/13-14/W-60 Imp. of Madraj Beribadh-West side Tetulia river road. (ID: 509253056). BC Road Works = 0.980km, (Ch.: 12+250km - 13+230km) Structure Works = 05 Nos (11.00m) under Charfession. 509253056 0.98 11.00 830.44 M/s Rubal Enterprise 646.79 29/01/2014 29/01/2014 28/07/2014 100 644.06 100 28/07/2014 FBP
16 Bhola 4 charfassion 5 240 DIRIP/Bhl/Chrf/VR/SL-51(04)/13-14/W-90 C40 BC Road Works = 1.910km, (Ch.: 5+440km - 74+350km) Structure Works = 08 Nos (14.25m) under Charfession. 1.91 14.25 142.68 Mohiuddin Ahamed 116.92 29/01/2014 29/01/2014 20/10/2015 100 116.90 100 27/06/2019
17 Bhola 4 charfassion 5 240 DIRIP/Bhl/Chrf/VR/SL-52(04)/13-14/W-91 Imp. of Charfokira Beribadh to Osmangornj Uniion border road. (ID: 589254874) BC Road Works = 4.360km, (Ch.: 7+500km - 8+100km, 28+670km-31+230km & 31+830km-33+030km) Structure Works = 09 Nos (6.75m)under Charfession 589254874 4.36 6.75 285.95 Unas Al mamun 324.45 20/01/2014 20/01/2014 20/10/2015 100 323.84 100 27/06/2019 FBP
18 Bhola 4 charfassion 5 240 Upazila: CharfashionDIRIP/BHL/Chrf/VR/SL-55(06)/16-17/W-212 Const. of 63.00 m long RCC Girder bridge on Kashemgonj to East side of Madraj beri bandh road. At Ch. 13410 m ID. 509254076. (Total(Approach) Length=0.100 km) 63.00 352.93 M/s. Unus-al-Mamun, Charfashion, Bhola 352.79 25/01/2018 24/01/2019 65 13/05/2019  
19 Bhola 4 charfassion 5 240 DIRIP/BHL/Chrf/UNR/SL-49(08)/16-17/W-211 Construction of 25.00 m long PC Girder Bridge on Madraj Beribadh-west side of Tetulia river road at Ch. 16285 m ID. 509253056. (Total(Approach) Length=0.100 km) 0.10 191.03 M/S Friends Corpo.Ukil Para roadBhola 190.95 25/01/2018 21/01/2019 70 13/05/2019  
20 Bhola 4 charfassion 5 240 DIRIP/BHL/Char/VR/SL-53/15-16W-171 Improvement of Nurabad to east Border of Madraj Union Road from Ch: 20+600km to 21+275 km (Rd. ID: 509254075) 509254075 0.68 40.42 Md. Unas Al Mamun 40.40 25/05/2016 30/05/2016 24/11/2016 75 25.46 100 11/04/2019
21 Bhola 4 charfassion 5 240 DIRIP/BHL/Chrf/VR/SL-50(05)/15-16/W-142 (RW) Improvement of Aslampur UP border to Osmangonj Beribadh road (Ch. 21+650km - 24+000km & 24+660km - 25+310km). ID. 509254072 (Total Length=3.00km) 3.00 194.65 M/S Poly Engineering, Corporation,10,Parara road,Barisal 188.82 07/12/2016 08/05/2018 100 08/04/2019  
22 Bhola 4 charfassion 5 240 DIRIP/BHL/Chrf/VR/SL-56(05)/16-17/W-213 Const. of 30.00 m long PC Girder bridge on Aminabad Boyati Khal Bridge to east side of Madraj Beri badh Road.At ch. 16050 m. (ID:509254028). (Total(Approach) Length=0.100 km) 30.00 253.46 M/s. Unus-al-Mamun, Charfashion, Bhola 253.36 25/01/2018 24/01/2019 80 08/04/2019  
23 Bhola 4 charfassion 5 240 DIRIP/BHL/Chrf/UNR/SL-49(06)/16-17/W-193 Improvement of Madraj Beribadh-west side Tetulia river road (Ch.15+490km - 17+330km & 18+150km - 20+070 km). ID. 509253056. (Total Length=3.705km) 3.71 302.17 M/S Jashim Const.ChorfashonBhola 302.16 29/05/2017 28/05/2018 70 10/03/2019  
24 Bhola 4 charfassion 5 240 DIRIP/Bhl/Chrf/VR/SL-55(01)/12-13/ W-34 Imp. of Kashemgonj to East side of Madraj beri badh road. (ID: 509254076): Part A: BC Road Works = 3.390km. (Ch.: 0+00km to 3+390km). Part B: Rehabilitation Woks = Nil. Part C: Structure Works = 12 Nos (17.25m). under Charfession upazila. 509254076 3.39 11.75 259.75 M/s. Bokshi Enterprise 258.67 28/03/2013 28/03/2013 27/09/2014 100 254.39 100 28/02/2019 FBP
25 Bhola 4 charfassion 5 240 Upazila: CharfashionDIRIP/BHL/Chrf/VR/SL-56(04)/16-17/W-198 Imp.Of Aminabad Boyati Khal Bridge to east side of Madraj Beri bandh Road (ID:509254028). Part A:Pucca (BC) road Works=2.335km (Ch.14+550 km to 16+885 km ) Part B:Rehabilitation Works = Nil Part C Structure Works =6 nos (10.50m) (Total Length=2.199 km) 2.34 168.79 M/s. Bokshi Ent. Charfashon, Bhola 168.76 29/05/2017 28/05/2018 100 10/03/2019  
26 Bhola 4 charfassion 5 240 Upazila: Charfashion DIRIP/BHL/Chrf/ VR/SL-52(05)/16-17/W-197 Imp. of Chorfakira Beribadh to Osmangonj Union borde road. ID. 509254074. at ch. 33+030km-34+251km, (Total Length=1.221km) 1.22 94.23 M/S. Saimum Traders, Charfashion, Bhola 94.21 29/05/2017 28/05/2018 100 20/12/2018  
27 Bhola 4 charfassion 5 240 Upazila: Charfashion DIRIP/BHL/Chrf/ VR/SL-51(06)/16-17/W-196 Imp. of Samraj to Char Kalmi west border road at ch. 4+190km-5+440km (ID:509254073). (Total Length=1.250 km) 1.25 94.12 M/S Khan Traders,Charfashion, Bhola Bhola 94.10 29/05/2017 28/05/2018 100 20/12/2018  
28 Bhola 4 charfassion 5 240 DIRIP/BHL/Chrf/ VR/SL-50(06)/16-17/W-195 Improvement of Aslampur UP border to Osmangonj Beribadh road (Ch. 23+310km - 26+000km. ID. 509254072 (Total Length=0.690km) 0.69 39.99 M/s. Saimun Traders, Charfashion, Bhola 39.96 29/05/2017 06/06/2018 100 20/12/2018  
29 Bhola 4 charfassion 5 240 DIRIP/BHL/Chrf/ VR/SL-50(04)/13-14/W-87 Imp.of Aslampur UP border to Osmangonj Beribandh road at ch.5+220km-7+770km, 7+920km-8+630km &17+750km-18+150km . (ID:509254072). (Total Length=3.660km) 3.66 281.43 M/s. Jasim Const. Thanaroad, Charfashion, Bhola 309.49 09/03/2014 29/11/2015 100 20/12/2018  
30 Bhola 4 charfassion 5 240 DIRIP/BHL/Chrf/ VR/SL-50(01)/12-13/W-06 Imp.of Aslampur UP border to Osmangonj Beribadh road ((ID:509254072). Part A:Pucca (BC) Road Works = (Ch. 14+370 to 15+370 km) = 1.00km (Total Length=1.00km) 1.00 63.71 M/S Jashim Const. Thana road Chorfashon Bhola 63.70 19/02/2013 23/10/2014 100 20/12/2018  
31 Bhola 4 charfassion 5 240 DIRIP/BHL/Chrf/ UNR/SL-49(07)/16-17/W-194 Improvement of Madraj Beribadh-west side Tetulia river road (Ch.20+070-22+870 km). ID. 509253056. (Total Length=2.800km) 2.80 160.85 M/s. Bokshi Ent. Chorfashon, Bhola 160.83 29/05/2017 28/05/2018 100 20/12/2018  
32 Bhola 4 charfassion 5 240 DIRIP/BHL/Chrf/ UNR/SL-49(05)/15-16/W-140 Improvement of Madraj Beribadh-west side Tetulia river road (Ch.9+000km - 10+670km & 13+230km - 14+690 km). ID. 509253056. (Total Length=3.130km) 3.13 221.44 M/s. Sayem Enterprise 208.80 27/10/2015 03/05/2016 100 20/12/2018  
33 Bhola 4 charfassion 5 240 Tree Plantation (1) Char Fakira bari Bandh Osmangong Union Barder Road at Ch. 8200-16250m (2) Kashemgong East side of Madraj Bari Bandh road at ch. 00-3390m Cherfessain 8.53 8.53 15/10/2014 15/10/2014 20/10/2014 100 6.99 100 20/10/2014 FBP
34 Bhola 4 charfassion 5 240 DIRIP/BHL/Chrf/VR/SL-53(03)/15-16/W-141 Improvement of Nurabad to east Side of Madraj union road ID.509254075 (Part-A: BC Works=5.009km, Ch: 11+522km to 11+910km & 13+400km to 13+518km, 15+100km to 18+203km and 19+200km to 20+600km) Part-C: Structure Work=1 nos (9.00m). under Charfession upazila. 509254075 5.01 39.75 395.63 Md. Unas Al Mamun 408.23 28/10/2015 28/10/2015 27/10/2016 100 406.91 100 27/10/2016 FBP
35 Bhola 4 charfassion 5 240 DIRIP/BHL/Charf/VR/SL-51(05)/13-14/W-95 Improvement of Samraj to CharKalmi West Border Road From Ch (12+6250-14+465) including 06 m Structures 1.84 6.00 129.43 M/s Jashim Const. 142.48 22/04/2014 22/04/2014 10/09/2014 100 142.43 100 10/09/2014 FBP
36 Bhola 4 charfassion 5 240 DIRIP/Bhl/ Chrf/ VR/SL-50(04)/13-14/ W-87, Imp. of Aslampur UP border to Osmangonj Beribadh road ID: 509254072. BC Road Works = 3.66 km, (Ch.: 5+220km - 7+770km, 7+920km-8+630km & 17+750km- 18+150km). Structure Works = 17 Nos. (15.75m) under Charfession Upazila. 509254072 3.66 15.75 281.43 M/s Jashim Const. 309.49 09/03/2014 29/11/2015 29/11/2015 100 306.46 100 29/11/2015 FBP
37 Bhola 4 charfassion 5 240 DIRIP/Bhl/ Chrf/UNR/SL-54(03)/13-14/W-89 Imp. of Hajarigonj Beribadh to North side of Aslampur road (Ch: 0+000km- 4+120km) ID: 509253057.BC Road Works = 4.120 km, (Ch.: 0+000km - 4+120km). Structure Works = 15 Nos. & 28.50m. under Charfession 509253057 4.12 28.50 328.85 Unas Al mamun 361.67 09/03/2014 09/03/2014 06/03/2015 100 360.15 100 06/03/2015 FBP
38 Bhola 4 charfassion 5 240 DIRIP/Bhl/Chrf/VR/SL-53(02)/13-14/W-78 Imp. of Nurabad to East border to Madraj Union road (ID. 509254075) Part A: BC Road Works = 4+450km., (Ch.: 0+000km – 4+450km) Part B: Rehabilitation Woks = Nil. Part C: Structure Works = 06 Nos (4.50) under Charfession upazila. 509254075 4.45 4.50 287.41 Unas Al mamun 315.90 04/12/2013 04/12/2013 03/08/2014 100 315.28 100 03/08/2014
39 Bhola 4 charfassion 5 240 DIRIP/Bhl/Chrf/VR/SL-50(03)/13-14/W-77 Imp. of Aslampur UP border road to Osmangonj Beribandh road (ID. 509254072)Part A: BC Road Works = 3+960km., (Ch.: 8+670km - 11+250km, 15+370km- 16+190km & 17+190km – 17+750km) Part B: Rehabilitation Woks = Nil. Part C: Structure Works = 08 Nos (31.50m) under Charfession upazila. 509254072 3.90 31.50 302.44 M/s Jerin & Co. 331.80 23/01/2014 23/01/2014 10/09/2014 100 331.27 100 10/09/2014 FBP
40 Bhola 4 charfassion 5 240 DIRIP/Bhl/Chrf/VR/SL-51(03)/13-14/ W-76 Imp. of Samraj to Char Kalmi west border road (ID. 509254073)Part A: BC Road Works = 0.96 km, (Ch.: 1+000km - 1+366km & 2+366 km- 2+960 km). Part B: Rehabilitation Woks = .charfession 509254073 0.96 611.78 M/s Mawa Construction 581.21 01/12/2013 01/12/2013 05/06/2015 100 581.03 100 05/06/2015 FBP
41 Bhola 4 charfassion 5 240 DIRIP/Bhl/Chrf/VR/SL-55(04)/12-13/W-72 Imp. of Kashemgonj to east side of Madraj Beribadh road (ID. 509254076) Part A: BC Road Works = 3+855km., (Ch.: 11+420km - 15+275km). Part B: Rehabilitation Woks = Nil Part C: Structure Works =05 Nos 509254076 3.86 4.50 259.39 M/s Quired Enterprise 222.24 18/11/2013 18/11/2013 26/10/2015 100 218.22 100 26/10/2015 FBP
42 Bhola 4 charfassion 5 240 DIRIP/Bhl/Chrf/VR/SL-56(03)/12-13/W-66 , Imp. of Aminabad-Boyatir Khal Bridge to East side of Madraj Beribadh road (ID. 509254028) Part A: BC Road Works = 1.820km, (Ch.: 11+130km - 12+330km & 13+930 km- 14+550km). 509254028 1.82 44.30 125.02 Md. Iqbal Hossain 114.09 26/11/2013 26/11/2013 25/12/2015 100 108.69 100 25/12/2015 FBP
43 Bhola 4 charfassion 5 240 DIRIP/Bhl/Chrf/UNR/SL-49(03)/12-13/W-64 "Imp. of Madraj Beribadh-west side Tetulia river road. ID 509253056. Part A: BC Road Works = 0.820km. (Ch.: 17+330km – 18+150km) Part B: Rehabilitation Woks = Nil. Part C: Structure Works = 05Nos. (44.30m) under Charfession " 509253056 0.82 44.30 356.45 M/s Friends Corporation 390.56 19/09/2013 19/09/2013 31/12/2014 100 381.23 100 31/12/2014 FBP
44 Bhola 4 charfassion 5 240 DIRIP/Bhl/Chrf/VR/SL-55(03)/12-13/W-63 Imp. of Kashemgonj-East Side of Madraj Beribadh road (ID: 509254076) Part A: BC Road Works = 3.985km. (Ch.: 3+390km – 5+800km & 9+845km-11+420km) Part B: Rehabilitation Woks = Nil. Part C: Structure Works = 15 Nos. (52.50m).Charfession 509254076 3.99 52.50 355.77 Unas Al mamun 391.29 19/09/2013 19/09/2013 18/03/2015 100 390.23 100 18/03/2015 FBP
45 Bhola 4 charfassion 5 240 DIRIP/Bhl/Chrf/VR/SL-52(03)/12-13/W-62 "Imp. of Charfikira Beribadh to Osmangonj Union Border road (ID. 509254074) Part A: BC Road Works = 6.120km. (Ch.: 1+380km - 7+500km) Part B: Rehabilitation Woks = Nil. Part C: Structure Works = Nil. " 6.12 355.10 Unas Al mamun 390.11 19/09/2013 19/09/2013 18/03/2015 100 390.09 100 18/03/2015
46 Bhola 4 charfassion 5 240 DIRIP/Bhl/Chrf/VR/SL-51(02)/12-13/ W-61 " Imp. of Shamraj to Char Kalmi west Border road (ID. 509254073) Part A: BC Road Works = 4.300km. (Ch.: 8+350km - 12+650km). Part B: Rehabilitation Woks = Nil. Part C: Structure Works = 13 Nos (34.50m) under Charfession upazila. " 509254073 4.30 34.50 358.28 393.96 19/09/2013 19/09/2013 18/03/2015 100 392.93 100 18/03/2015 FBP
47 Bhola 4 charfassion 5 240 DIRIP/Bhl/Chrf/UNR/SL-54(02)/12-13/W-59 Imp. of Hazarigonj Beribadh to north side of Aslampur road (ID. 509253057) Part A: BC Road Works = 5.065km. (Ch.: 10+750km - 11+800km, 12+750km – 15+350km & 16+485-17+ 900km) Part B: Rehabilitation Woks = Nil. Part C: Structure Works = 06 Nos (18m) under Charfession upazila. 509253057 5.07 18.00 354.75 Md. Iqbal Hossain 347.61 08/09/2013 08/09/2013 20/05/2015 100 345.80 100 20/05/2015 FBP
48 Bhola 4 charfassion 5 240 DIRIP/Bhl/Chrf/UNR/SL-49(02)/12-13/W-58 Imp. of Madraj Beribadh to west side Tetuli river road (ID. 509253056) Part A: BC Road Works = 4.520km. (Ch.: 3+000km - 5+420km & 6+900-9+000km). Part B: Rehabilitation Woks = Nil. Part C: Structure Works = 18 Nos (32.25m) under Charfession 509253056 4.52 32.25 350.54 "M/s. Jashim Construction Charfession, Bhola" 384.21 19/09/2013 19/09/2013 18/03/2015 100 382.31 100 18/03/2015 FBP
49 Bhola 4 charfassion 5 240 DIRIP/Bhl/Chrf/VR/SL-56(02)/12-13/W-50 Imp. of Aminabad Boyati Khal bridge to east side of Madraj Beribadh road. (ID. 509254028), Part A: BC Road Works = 3.942km., (Ch.: 2+740km to 5+143km & 5+541 km-7+080km)., Part B: Rehabilitation Woks = Nil.Part C: Structure Works = 17.00 Nos (33.75m) under Charfession upazila. 509254028 3.94 33.75 316.90 Unas Al mamun 316.85 05/08/2013 05/08/2013 15/03/2015 100 316.65 100 15/03/2015 FBP
50 Bhola 4 charfassion 5 240 DIRIP/Bhl/Chrf/VR/SL-50(02)/12-13/W-49 Imp. of Aslampur UP border to Osmangonj Beribadh road (ID. 509254072), Part A: BC Road Works = 4.120km., (Ch.: 0+000km to 4+120km)., Part B: Rehabilitation Woks = Nil. Part C: Structure Works = 06 Nos (12.75m) under Charfession upazila. 4.12 12.75 283.76 M/s. Bokshi Enterprise 283.75 05/08/2013 05/08/2013 15/01/2014 100 283.67 100 15/01/2014 FBP
51 Bhola 4 charfassion 5 240 DIRIP/Bhl/Chrf/VR/SL-55(02)/12-13/ W-38 Imp. of Kashemgonj to East side of Madraj beri badh road. (ID: 509254076): Part A: BC Road Works = 1.88 km. (Ch.: 7+970km to 9+845km). Part B: Rehabilitation Woks = Nil. Part C: Structure Works = 6 Nos (11.75m) (at Ch: 8+037km, 8+292km, 8+460km, 8+615km, 9+252km & 9+442km), under Charfession upazila. 509254076 1.88 11.75 147.78 "M/s. Jashim Construction Charfession, Bhola" 147.68 28/03/2013 28/03/2013 15/03/2015 100 146.92 100 15/03/2015 FBP
52 Bhola 4 charfassion 5 240 DIRIP/Bhl/Chrf/VR/SL-52(02)/12-13/W-33 Imp. of Char Fakira beri badh to Osmangonj Union Border road. (ID: 509254074): Part A: BC Road Works = 5.530km. (Ch.: 8+200 to 11+250km, 12+ 240km to 14+720km). Part B: Rehabilitation Woks = Nil. Part C: Structure Works = 19 Nos (15.00m). under Charfession upazila. 509254074 5.53 15.00 40.12 "Md. Eunus-Al Mamun Charfession, Bhola" 39.30 24/03/2013 24/03/2013 16/01/2014 100 43.69 100 16/01/2014 FBP
53 Bhola 4 charfassion 5 240 DIRIP/Bhl/Chrf/VR/SL-56(01)/12-13/ W-15 Imp. of Aminabad Boyati khal bridge to eas side of Madraj Beribadh road. (ID: 509254028), (1) Part A: Pucca (BC) Road Work = 1.530 km. [Ch. 0+00 (Avwgbvev` eqvwZi Lvj eªx‡Ri `wÿY w`K n‡Z) to 1+530 km (Pid¨vkb †`vjvinvU wRwm †ivW ch©šÍ)] (2) Part B: Rehabilitation Woks = Nil. (3) Part C: Structure Works = 06 Nos (17.25m) (At Ch: 0+ 00, 0+345, 0+550, 1+010, 1+077 & 1+434 km). 509254028 1.53 17.25 133.39 "M/s. Al-Amin Traders, Daulatkhan, Bhola" 133.74 24/02/2013 24/02/2013 01/12/2013 100 132.99 100 01/12/2013 FBP
54 Bhola 4 charfassion 5 240 DIRIP/Bhl/Chrf/VR/SL-52(01)/12-13/ W-14 (1) Part A: Pucca (BC) Road Work = 1.250 km. [Ch. 15+000 (wgVz †Pqvig¨v‡bi evoxi wbKU n‡Z) to 16+250 km (eqvwZi Lvj ch©šÍ)] (2) Part B: Rehabilitation Woks = Nil. (3) Part C: Structure Works = 05 Nos (14.25m) (At Ch: 15+780, 16+035 & 16+250 km). 509254074 1.25 14.25 113.12 "M/s. Bokshi Enterprise Charfession, Bhola" 113.09 03/03/2013 03/03/2013 20/04/2013 100 112.19 100 20/04/2013 FBP
55 Bhola 4 charfassion 5 240 DIRIP/Bhl/Chrf/VR/SL-53(01)/12-13/ W-13 Imp. Nurabad to east Border of Madraj union road. (ID: 509254075), (1) Part A: Pucca (BC) Road Work = 1.022 km. [Ch. 7+500 (Iqv`y` wgqvi evoxi wbKU n‡Z) to 8+522 km (Xvwj nv‡Ui cwðg w`K ch©šÍ)], (2) Part B: Rehabilitation Woks = Nil. (3) Part C: Structure Works = 04 Nos (4.50m) (At Ch: 7+794, 7+914, 8+064 & 8+289 km). 509254075 1.02 4.50 6760145.00 M/s. Jashim Const. Thana road, Charfession, Bhola. 6758116.00 11/04/2013 11/04/2013 11/10/2013 100 67.51 100 11/10/2013 FBP
56 Bhola 4 charfassion 5 240 DIRIP/Bhl/Chrf/VR/SL-51(01)/12-13/ W-09 Imp. of Shamraj to Char kalmi west border road. (ID: 509254073) , (1) Part A: Pucca (BC) Road Work = 1.00 km. [Ch. 0+00 (bKwZ evoxi nvjU gmwR‡`i DËi cvk n‡Z) to 1+00 km (Rvnv½xi `yevB evox ch©šÍ)], (2) Part B: Rehabilitation Woks = Nil. (3) Part C: Structure Works = 02 Nos (1.50m) (At Ch: 0+153 & 0+820km). 509254073 1.00 1.50 6485554.00 M/s. Eunus Al-Mamun, Thana road, Bhola. 6484256.00 19/02/2013 19/02/2013 31/03/2015 100 64.84 100 31/03/2015 FBP
57 Bhola 4 charfassion 5 240 DIRIP/Bhl/Chrf/UNR/SL-49(01)/12-13/ W-08 Imp. of Madraj Baribadh to west side Tatulia river road. (ID: 509253056) , (1) Part A: Pucca (BC) Road Work = 1.00 km. [Ch. 0+00 (c~e© wgqvRvbcyi RNGPS `t cvk¦©) to 1+00 km (mvBdzj Bmjvg gywÝi evox ch©šÍ)], (2) Part B: Rehabilitation Woks = Nil. (3) Part C: Structure Works = 02 Nos (1.50m) (At Ch: 0+ 380 & 0+563 km). 509253056 1.00 1.50 6761510.00 Md. Mohashin Nagor, Dhonia, Bhola 6761510.00 10/03/2013 10/03/2013 08/10/2013 100 67.56 100 08/10/2013 FBP
58 Bhola 4 charfassion 5 240 DIRIP/Bhl/Chrf/UNR/SL-54(01)/12-13/ W-07 Imp. of Hajarigonj Beribadh to North side of Aslampur road. (ID: 509253057), (1) Part A: Pucca (BC) Road Work = 1.000 km. [Ch. 4+200 (wgwR evoxi wbKU n‡Z) to 5+200 km (e„nËi ewikvj cÖK‡íi m¤úvw`Z cvKv iv¯Ív ch©šÍ)] (2) Part B: Rehabilitation Woks = Nil. (3) Part C: Structure Works = Nil. 509253057 1.00 6064469.00 "M/s. Bengal Traders Thanaroad, Charfession, Bhola. 6063256.00 16/04/2013 16/04/2013 15/10/2013 100 49.48 100 15/10/2013 FBP
59 Bhola 4 charfassion 5 240 DIRIP/Bhl/Chrf/VR/SL-50(01)/12-13/ W-06 Imp. of Aslampur UP border to Osmangonj Beribadh road. (ID: 509254072) (1) Part A: Pucca (BC) Road Work = 1.00 km. [Ch. 14+370 (ImgvbMÄ BDwcÕi mvg‡b cvKv iv¯Ív n‡Z) to 15+370 km (cv‡Uvqvixi evox ch©šÍ)] (2) Part B: Rehabilitation Woks = Nil. (3) Part C: Structure Works = Nil. 509254072 1.00 6371467.00 M/s. Jashim Const. Thana road, Charfession, Bhola. 6370192.00 19/02/2013 19/02/2013 23/10/2014 100 63.69 100 23/10/2014 FBP
60 Cumilla 10 meghna 108 240 DIRIP/CML/Mgh/ VR/SL-18(01)/12-13/W-22 Imp. of Aralia (Muddarkandi) Ghat to Horipur-Rampur UPZ road. (ID: 419884004) Part A: Pucca Road Works. (Ch. 0+000-1+000km) = 1.00 km Part B:Rehabilitation Works= Nil Part C: Structure Works= 02 Nos. (25.00m)(At Ch. 0+007km & 0+600km) (Total Length=1.000km) 1.00 180.27 M/S. R-Ta Entp. Md. Abul Hossain Bishnapur, Moulobipara, Comilla 201.11 17/02/2013 26/01/2014 100 20/12/2018  
61 Dhaka 24 dhamrai 215 240 DIRIP/DHK/Dham /UZR/SL-08(04)/15-16/W-136 Improvement Kelia-RHD-Vum Dakhin (Joymontap GC) road (ID: 326142010) Part A: BC Road Works = 0.800 km (Ch. 9+500 km to 10+300 km) Part B: Rehabilitation Works= Nil Part C: Structure Works= (01 No.) 9.00m at ch. 7+400km. (Total Length=0.800km) 0.80 133.71 M/s. Dolly Construction, Pro. Md. Nasir Uddin, Senakallyan Bhaban, 195, Matijheel C/A, Dhaka 109.46 29/10/2015 30/06/2016 100 20/12/2018  
62 Dhaka 24 dhamrai 215 240 DIRIP/DHK/Dham /UZR/SL-08(03)/14-15/W-108 Imp. of Kelia RHD - Vum Dakhin (Joymontap GC) Road. (ID:326142010) Part A: BC Road Works = 2.054 km (Ch. 5+816 to 7+870 km) Part B:Rehabilitation Works= Nil Part C:Structure Works=Nil (Total Length=2.000 km) 2.00 168.89 M/s. Nusrat Trade International. 246/2, Basila Raod, Mohammedpur, Dhaka 175.88 13/05/2015 30/04/2016 100 20/12/2018  
63 Dhaka 24 dhamrai 215 240 DIRIP/DHK/Dham /UZR/SL-08(02)/12-13/W-27 Imp. of Kelia RHD - Vum Dakhin (Joymontap GC) Road. (ID:326142010) Part A: Pucca Road Works = 3.9660 km (Ch. 1+816 to 5+816 km) Part B:Rehabilitation Works= Nil Part C:Structure Works. 01 No. 12.00 m (At Ch.2+240 km) (Total Length=3.966km) 3.97 389.93 M/S IPUB CYBER NET & Noori Entp (JV) 69, Narinda Road, Sutrapur , Dhaka 428.75 28/03/2013 31/12/2017 100 20/12/2018  
64 Dhaka 24 dhamrai 215 240 DIRIP/DHK/Dham /UZR/SL-08(01)/12-13/W-05 Imp. of Kelia RHD - Vum Dakhin (Joymantap GC) Road. (ID:326142010) Part A: Pucca Road Works. 1.00 km (Ch. 0+816 to 1+816 km) Part B:Rehabilitation Works. 0.816km (Ch. 0+00 to 0+816 km) (Total Length=1.816km) 1.82 116.06 M/s. Mahua Entp. House No.-41, Road No.-01, Sector-05, Uttara, Dhaka 121.91 02/05/2013 30/12/2015 100 20/12/2018  
65 Dhaka 24 dhamrai 215 240 DIRIP/DHK/Dham /UNR/SL-07(04)/15-16/W-137 Improvement of Kushura UP office-Paikpara bazar road (ID: 326143021) Part A: BC Road Works = 1.450 km (Ch.6+600km to 8+050 km) Part B: Rehabilitation Works= Nil Part C: Structure Works= Nil (TotalLength=1.441km) 1.44 111.24 M/s. Dolly Construction, Pro. Md. Nasir Uddin, Senakallyan Bhaban, 195, Matijheel C/A, Dhaka 91.14 29/10/2015 29/06/2016 100 20/12/2018  
66 Dhaka 24 dhamrai 215 240 DIRIP/DHK/Dham /UNR/SL-07(03)/14-15/W-109 Imp. of Kushura UP office-Paikpara Bazar Road. (ID:326143021) Part A: BC Road Works = 2.020km (Ch. 4+580 to 6+600 km) Part B:Rehabilitation Works. Nil. Part C:Structure Works=Nil (Total Length=1.980km) 1.98 151.04 M/s. Anika International, Dhaka. 161.53 21/05/2015 31/01/2017 100 20/12/2018  
67 Dhaka 24 dhamrai 215 240 DIRIP/DHK/Dham /UNR/SL-07(02)/12-13/W-28 Imp. of Kushura UP office-Paikpara Bazar Road. (ID:326143021) Part A: Pucca Road Works = 3.480km (Ch. 1+000 to 4+580 km) Part B:Rehabilitation Works. Nil. Part C:Structure Works. 02 Nos. 5.00m At (Ch.1+100 km & 1+700km). (Total Length=3.480km) 3.48 296.87 M/S IPUB CYBER NET & Noori Entp (JV) 69, Narinda Road, Sutrapur , Dhaka 326.44 28/03/2013 31/12/2018 100 20/12/2018  
68 Dhaka 24 dhamrai 215 240 DIRIP/DHK/Dham /UNR/SL-07(01)/12-13/W-18 Imp. of Kushura UP office-Paikpara Bazar Road. (ID:326143021) Part A: Pucca Road Works= 1.00 km (Ch. 0+00 to 1+00 km) Part B:Rehabilitation Works. Nil. Part C:Structure Works. 03 Nos. 25.50m (At Ch.6+000 km, 6+500km & 7+600km). (Total Length=1.00km) 1.00 118.73 M/S IPUB CYBER NET 69, Narinda Road, Sutrapur , Dhaka 112.79 14/02/2013 10/12/2015 100 20/12/2018  
69 Jashore 41 jashore-s 304 240 Upazila : Sadar DIRIP/JES/SAD/UZR/SL-57(a)(03)/16-17/W-187 Improvement & Widening by two lane of Kumira – Sagordari – Trimohoni –Rajgonj - Pulerhat (Pulerhat – Rajgonj –Trimohoni - Sagordari – Kumira) Road.. (Ch. 1+000km – 4+000km) ID. 241472003. i)1)Improvement & Widening by BC work =2.604km. (Ch. 1+000km-1+920km&2+316km-4+000km) ii) RCC road works = 0.396 km (Ch. 1+920km – 2+316km) iii) Const. & Widening Work of Structure = 2 Nos (1.25 m&Side drain 332.00m) (Total Length=3.000 km) 3.00 372.05 M/S. Chitra Constn. 9- Rail Road Jessore. 387.61 13/04/2017 12/01/2018 100 20/12/2018  
70 Jashore 41 jashore-s 304 240 Upazila : Sadar DIRIP/JES/SAD/UZR/SL-57(a)(02)/15-16/W-180 Const. of 17.00m long RCC Girder bridge over Baliar Khal on Kumira-Sagardari-Trimohoni-Rajgonj-Pulerhat(Pulerhat-Rajgonj- Trimohoni- Sagardari-Kumira) Road at ch.2+708km ID|.241472003 17.00 132.75 M/S. Kumkum Enterprise 138 Noa para Road Jessore. 115.12 14/11/2016 20/06/2018 100 20/12/2018  
71 Jashore 41 jashore-s 304 240 Upazila : Sadar DIRIP/JES/SAD/UZR/SL-57(a)(01)/15-16/W-162 Improvement & Widening by two lane of Kumira – Sagordari – Trimohoni –Rajgonj - Pulerhat (Pulerhat – Rajgonj –Trimohoni - Sagordari - Kumira) Road ID. 241472003 i) Imp. &Widening work by BC = 3.066 km (Ch. 0+450 km – 1+000 km, 4+000km - 4+355 km, 4+697 km – 6+763 km & 7+015 km -7+150km) ii) RCC road works = 1.044 km (Ch. 0+000km – 0+450 km, 4+355 km - 4+697 km & 6+763 km - 7+015km) iii) Const.&Widening of Structure work=Nill. (Total Length=4.110 km) 4.11 550.39 MTT & MMT (JV) New Khayer Tala, Jessore 502.07 19/04/2016 14/03/2017 100 20/12/2018  
72 Jashore 41 keshabpur 303 240 Upazila : Keshobpur DIRIP/JES/Kesb/UZR/SL-57(c)(04)/15-16/W-165 Improvement & Widening by two lane of Kumira – Sagordari – Trimohoni –Rajgonj - Pulerhat (Pulerhat – Rajgonj –Trimohoni - Sagordari - Kumira) Road ID. 241383003 & 241382005 i) Imp. &Widening work by BC = 2.250 km (Ch. 32+842 km – 33+792 km, 35+292 km -36+592 km) ii) RCC road works = Nil iii) Const. & Widening of Structure work = 7 Nos (7.00 m) (Total Length=2.250 km) 2.25 441.19 M/S. Bonantor Trading Benapole road, Chanchara, Jessore. 414.72 19/04/2016 20/08/2017 100 20/12/2018  
73 Jashore 41 keshabpur 303 240 Upazila : Keshobpur DIRIP/JES/Kes/UZR/SL-57(c)(03)/15-16/W-164 Improvement & Widening by two lane of Kumira – Sagordari – Trimohoni –Rajgonj - Pulerhat (Pulerhat – Rajgonj –Trimohoni - Sagordari - Kumira) Road (ID. 241383003 & 241382005). i) Imp. &Widening work by BC = 2.500 km Ch.28+242km–28+592km,30+692km32+842m ii) RCC road works = 0.200 km (Ch.28+592km – 28+792km) iii) Const. & Widening of Structure work = 14 Nos (15.00 m) (Total Length=2.700 km) 2.70 696.62 Md. Iqbal Jamader & Asaduzzaman Salim (JV), Katia, Satkhira 644.81 25/04/2016 31/05/2018 100 20/12/2018  
74 Jashore 41 keshabpur 303 240 Upazila: Keshobpur DIRIP/JES/Kesb/UZR/SL-57(c)(02)/13-14/W-101 Improvement & Widening by two lane of Kumira – Sagordari – Trimohoni –Rajgonj - Pulerhat (Pulerhat – Rajgonj –Trimohoni - Sagordari - Kumira) Road (ID. 241382005, 241382007 & 241382004.) i) Imp. & Widening work by BC = 5.160 km (Ch. 37+650 km – 42+810 km) ii) RCC road work = 0.200 km (Ch. 37+450km – 37+650km) iii) Const. & Widening Work of Structure = 12 Nos (14.00 m) (Total Length=5.360km) 5.36 654.02 Md. Iqbal Jamader & Consortium, Katia, Town Bazar, Satkhira 601.49 22/11/2014 05/02/2016 100 20/12/2018  
75 Jashore 41 keshabpur 303 240 Upazila: Keshobpur DIRIP/JES/Kesb/UZR/SL-57(c)(01)/13-14/W-100 Improvement & Widening by two lane of Kumira – Sagordari – Trimohoni –Rajgonj - Pulerhat (Pulerhat – Rajgonj –Trimohoni - Sagordari - Kumira) Road (Part-A: ID. 241383003, Part-B: ID. 241382005). Part A: i) Imp. & Widening work by BC= 1.524 km (Ch. 27+310 km – 28+242 km, 30+100km – 30+692km) ii) RCC road works = 1.308 km (Ch. 28+792km – 30+100km) iii) Const. & Widening Work of Structure = 6 Nos (9.50 m) Part B: i) Imp. & Widening work by BC = 2.358 km (Ch. 33+792 km – 35+292 km & 36+592km – 37+450km) ii) Const. & Widening Work of Structure = 6 Nos (6.625 m) (Total Length=5.190 km) 5.19 857.26 ME-BTC (JV), Benapole road, Chanchara, Jessore 877.13 05/12/2014 04/07/2017 100 20/12/2018  
76 Jashore 41 monirampur 305 240 Upazila : Monirampur DIRIP/JES/Moni/UZR/SL-57(b)(04)/16-17/W-188 Improvement & Widening by two lane of Kumira – Sagordari – Trimohoni –Rajgonj - Pulerhat (Pulerhat – Rajgonj –Trimohoni - Sagordari - Kumira) Road .Ch. 9+590 km – 17+085 km ID. 241612007 i) Imp. &Widening work by BC = 6.829km (Ch. 9+756 km – 12+550 km & 13+050km – 17+085km) ii) RCC road works =0.666km (Ch. 9+590km – 9+756 km&12+550km-13+050km) iii) Const. & Widening of Structure work = 29 Nos (29.00 m) (Total Length=7.495 km) 7.50 814.08 Mozahar Enterp. (Pvt) Ltd & M/S Bonantor Trading Corpn. (JV) Banapol, Road, Chanchara, Jessore. 850.63 10/04/2017 09/04/2018 100 20/12/2018  
77 Jashore 41 monirampur 305 240 Upazila : Monirampur DIRIP/JES/Moni/UZR/SL-57(b)(03)/15-16/W-163 Improvement & Widening by two lane of Kumira – Sagordari – Trimohoni –Rajgonj - Pulerhat (Pulerhat – Rajgonj –Trimohoni - Sagordari - Kumira) Road ID. 241612007 i) Imp. &Widening work by BC = 3.540km (Ch. 7+150 km – 9+230 km & 22+050km – 23+510km) & Widening of single lane road into two lane by Earth work=7.495km (Ch.9+590km-17+085km ii) RCC road works =0.360km (Ch. 9+230km – 9+590 km) iii) Const. & Widening of Structure work = 6 Nos (6.00 m) (Total Length=3.900 km) 3.90 514.81 MU-BTC-JV, Banapol, Road, Chanchara, Jessore. 446.45 19/04/2016 24/05/2018 100 20/12/2018  
78 Jashore 41 monirampur 305 240 Upazila : Monirampur DIRIP/JES/Moni/UZR/SL-57(b)(02)/13-14/W-99 Improvement & Widening by two lane of Kumira – Sagordari – Trimohoni –Rajgonj - Pulerhat (Pulerhat – Rajgonj –Trimohoni - Sagordari - Kumira) Road (ID. 241612007 & 241612012). i) Imp. &Widening work = 4.559 km (Ch. 17+085 km – 19+260 km & 19+666km – 22+050km) ii) RCC road works = 0.406 km (Ch. 19+260km – 19+666km) iii) Const. & Widening of Structure work = 8 Nos (26.60 m) (Total Length=4.965 km) 4.97 761.09 ME-BTC (JV), Benapole road, Chanchara, Jessore 722.58 05/12/2014 31/12/2016 100 20/12/2018  
79 Jashore 41 monirampur 305 240 Upazila:Monirampur DIRIP/JES/Sad-Moni/UZR/SL-57(a)(01), (b)(01)/13-14/W-98 Improvement & Widening by two lane of Kumira – Sagordari – Trimohoni –Rajgonj - Pulerhat (Pulerhat – Rajgonj –Trimohoni - Sagordari – Kumira) Road.. (Part-A: ID. 241472003. Part B: ID. 241613021) Part A: Widening of single lane road into two lane by earth work =7.150km. (Ch. 0+000km – 7+150km) Part B: i) Imp. & Widening work = 3.800km. (Ch. 23+510km – 27+310km) ii) Const. & Widening Work of Structure = 5 Nos (8.00 m) (Total Length=3.800 km) 3.80 525.02 Md. Iqbal Jamader, Polashpole, Satkhira 517.62 22/11/2014 30/06/2016 100 20/12/2018  
80 Mymensingh 22 fulbaria 190 240 Upazila : Fulbaria DIRIP/MMN/Ful/ UZR/SL-48(02)/12-13/W-26 Improvement of Keshoregonj - Balughat - Santoshpur via Madhupur road (ID: 361202007) PartA:BituminousCarpetingWorks=3.00km (Ch.3+765 to 6+765 km) Part B:Rehabilitation Works = nil Part C: Structure Works=5 nos,(At Ch. 4+760km,6+000km,6+360km,6+600km & 4+350 km) (Total Length=3.000 km) 3.00 227.70 Md. Chan Mohammed Fulbaria, Mymenshing 250.36 25/03/2013 31/01/2014 100 20/12/2018  
81 Mymensingh 22 fulbaria 190 240 Upazila : Fulbaria DIRIP/MMN/Ful/ UZR/SL-48(01)/12-13/W-03 Improvement of Keshoregonj - Balughat - Santoshpur via Madhupur road (ID:361202007) PartA:BituminousCarpetingWorks=1.00km (Ch.0+680 to 1+005 & 3+090 to 3+765 km) Part B:Rehabilitation Works =1.735 km (Ch. 0+00 to 0+680 & 1+005 to 2+060 km) Part C: Structure Works 6 Nos. (13.50 km) (Total Length=2.735 km) 2.74 189.10 Md. Lal Mahmud Fulbaria, Mymensingh 179.65 11/11/2012 20/06/2013 100 20/12/2018  
82 Mymensingh 22 gaffargaon 188 240 Upazila : GafargaonDIRIP/MMN/Gafr/VR/SL-46(02)/15-16/W-161 Imp. of Maizbari - Lama Longair road via Utia bazar road (Bagbari-Longair road) (ID No. 361224043) Part A: BC Road work = 5.650 km (Ch. 3+500km - 9+150km). Part B: Rehabilitation Work = Nil Part C: Structure Work = 13 Nos. (8.125 m) (Total Length=5.650 km) 5.65 343.71 M/S Zaman Constn. 10/16, Estern Plaza, Dhaka. 321.86 01/11/2016 30/06/2017 35 08/04/2019 Work is Cancelled.
83 Mymensingh 22 gaffargaon 188 240 W-161(RW) Imp.of Maizbari - Lama Longair road via Utia Bazar road . 5.65 317.24 MSB-MMH-MBT(JV) Gafargaon, Mymensingh 317.10 18/04/2019 23/04/2019 22/06/2019 10 13/05/2019
84 Mymensingh 22 gaffargaon 188 240 Upazila : GafargaonDIRIP/MMN/Gaf/VR/SL-45(06)/18-19/W-219 Imp. of Dattar bazar Molmol Kachari to Vangti-Shakra-Ghagra Demail and Golabari road by HBB (Dattar bazaar Shila river road via Vangti bazar Bagra, Demail & Golabari UP to Kandi) (ID No. 361224044) Part A: HBB Road work = 2.200 km (Ch. 1+800 km - 4+000 km) Part C: Structure Work = 04 Nos. (5.25 m) (Total Length=2.200 km) 2.20 192.60   0.00 50 45 13/04/2019 Tender Invited
85 Mymensingh 22 gaffargaon 188 240 Upazila : GafargaonDIRIP/MMN/Gaf/VR/SL-45(04)/16-17/W-189 Construction of 96.20m long PC Girder Bridge on Dattar bazar Molmol Kachari to Vangti-Shakra-Ghagra Demail and Golabari road (Dattar bazaar Shila river road via Vangti bazar Bagra, Demail & Golabari UP to Kandi) (ID No. 361224044) At ch. 5450.00m. (Total (HBB)Length=0.200 km) 96.20 576.72 SHA-SC-SE (JV), Gafargaon, Mymensingh 604.70 08/05/2017 14/03/2018 90 13/04/2019  
86 Mymensingh 22 gaffargaon 188 240 Upazila : GafargaonDIRIP/MMN/Gaf/VR/SL-45(05)/16-17/W-190 Construction of 54.00m long PC Girder Bridge on Dattar bazar Molmol Kachari to Vangti-Shakra-Ghagra Demail and Golabari road (Dattar bazaar Shila river road via Vangti bazar Bagra, Demail & Golabari UP to Kandi) (ID No. 361224044) At ch. 5100.00m. (Total (HBB)Length=0.060 km) 54.00 245.47 AH-SE (JV),Gafargaon, Mymensingh 257.20 17/07/2017 20/04/2018 100 08/04/2019
87 Mymensingh 22 gaffargaon 188 240 Upazila : Gafargaon DIRIP/MMN/Gaf/UNR/SL-47(01)/14-15/W-118 Imp. of Josora UP- Shibgonj Fotangir Bazar Dola road (ID No. 361223020). Part A: BC Road work = 3.026 km (Ch. 0+000km - 3+030km). Part B: Rehabilitation = Nil Structure = 08 Nos. (6.35m) (Total Length=3.026 km) 3.03 193.95 M/s. Ahad Traders 203.53 07/05/2015 06/03/2016 100 20/12/2018  
88 Mymensingh 22 gaffargaon 188 240 Upazila : Gafargaon DIRIP/MMN/Gaf/VR/SL-46(01)/14-15/W-121 Imp. of Maizbari - Lama Longair road via Utia bazar road (Bagbari-Longair road) (ID No. 361224043) Part A: BC Road work = 3.500 km (Ch. 0+000km - 3+500km). Part B: Rehabilitation Work = Nil Part C: Structure Work = 11 Nos. (7.55m) (Total Length=3.500 km) 3.50 223.66 Md. Abdul Hamid Bacchu 234.85 29/04/2015 12/05/2016 100 20/12/2018  
89 Mymensingh 22 gaffargaon 188 240 Upazila : Gafargaon DIRIP/MMN/Gaf/VR/SL-45(03)/15-16/W-146 Imp. of HBB work on Dattar bazar Molmol Kachari to Vangti-Shakra-Ghagra Demail and Golabari road (Dattar bazaar Shila river road via Vangti bazar Bagra, Demail & Golabari UP to Kandi) (ID No. 361224044) Part A: HBB work = 2.100 km (Ch. 5+009km - 7+247km). (Total (HBB)Length=2.100 km) 2.10 81.44 Md. Mahibul Haque, Gafargaon, Mymensingh. 84.64 09/12/2015 30/06/2017 100 20/12/2018  
90 Mymensingh 22 gaffargaon 188 240 Upazila : Gafargaon DIRIP/MMN/Gaf/VR/SL-45(02)/14-15/W-120 Imp. of Dattar bazar Molmol Kachari to Vangti-Shakra-Ghagra Demail and Golabari road (Dattar bazaar Shila river road via Vangti bazar Bagra, Demail & Golabari UP to Kandi) (ID No. 361224044) Part A: BC Road work = 4.000 km (Ch. 1+000 km - 1+800 km & 4+000km-5+009 km).(According to Re-cast ). Part C: Structure Work = 09 Nos. (11.00m) (Total Length=1.800 km) 1.80 141.34 SHA-SE-LE (JV), Gafargaon, Mymensingh 141.34 01/11/2015 30/03/2018 100 20/12/2018  
91 Mymensingh 22 gaffargaon 188 240 Upazila : Gafargaon. DIRIP/MMN/Gafr /VR/SL-45(01)/12-13/W-32 Imp. of Dattar bazar Molmol Kachari to Vangti-Shakra-Ghagra Demail & Golabari road (Dattar bazar Shila river road via Vangti bazar Bagra,Demail&Golabari UP to Kandi). (ID:361224044) PartA:BituminousCarpetingWorks=1.00km (Ch. 0+000 to 1+000 km) Part B: Rehabilitation Works:=nil Part C: Structure Works = 3 nos,1.8m (Ch. +273, 0+600, 0+875km) (Total Length=1.000 km) 1.00 61.59 M/S Anika Int. 77/4,West Agargoan Dhaka-1207 67.58 30/05/2013 27/03/2014 100 20/12/2018  
92 Mymensingh 22 gaffargaon 188 240 Upazila : Gafargaon DIRIP/MMN/Gaf/UNR/SL-44(03)/14-15/W-117 Imp. of Baroihati -Kunchai-Nagurai road (Barohati GC road via Bakultala bazar) (ID No. 361223019). Part A: BC Road work = 1.710 km (Ch. 6+050km - 7+764km). (Total Length=1.710 km) 1.71 107.76 M/s. Ahad Traders 113.19 07/05/2015 05/02/2016 100 20/12/2018  
93 Mymensingh 22 gaffargaon 188 240 Upazila: Gafargaon DIRIP/MMN/GAFR /UNR/SL-44(02)/12-13/W-65 Imp.of Baroihati-Kunchai Naguari (Baroihati-GC road via Bakultala bazar) road. (ID: 361223019) Part A:Pucca (BC) Road Works =1.000 Km (Ch. 8+000 km to 9+000 km) Part B:Rehabilitation Works= Nil Part C : Structure Works= 6 Nos, 6.50m (Total Length=1.000 km) 1.00 104.26 M/S Ahad tradrs Goforgoan Mymenshing 109.45 19/06/2013 07/01/2014 100 20/12/2018  
94 Mymensingh 22 gaffargaon 188 240 Upazila : Gafargaon. DIRIP/MMN/Gafr /UNR/SL-44(01)/12-13/W-31 Imp. of Baroihati-Kunchai-Nagurai Road,(Baroihati GC road via Bakultola bazar) (ID:361223019) PartA:BituminousCarpetingWorks=1.000km (Ch5+.000 to 6+000 km) Part B: Rehabilitation Works:=nil Part C: Structure Works = 3 nos,1.8m (Ch. 5+300, 5+500, 5+823km) (Total Length=1.000 km) 1.00 61.59 M/S Anika Int. 77/4,West Agargoan Dhaka-1207 70.66 01/07/2013 26/02/2014 100 20/12/2018  
95 Mymensingh 22 gaffargaon 188 240 Upazila : Gafargaon DIRIP/MMN/Gaf/VR/SL-42(04)/16-17/W-192 Const. of 45.00m long RCC Girder Bridge on Charkamaria - Hazigonj road via Nak kata char road at Ch. 12900.00m ID. 361224001 (Total Length=0.150 km) 45.00 238.91 Arshad Hossen,Gafargaon, Mymensingh 215.02 02/05/2017 02/03/2018 100 20/12/2018  
96 Mymensingh 22 gaffargaon 188 240 Upazila : Gafargaon DIRIP/MMN/Gaf/VR/SL-42(03)/15-16/W-145 Imp. of Charkamaria - Hazigonj road via Nak kata char road (ID No. 361224001). Part A: BC Road work = 5.000 km (Ch. 11+857km - 16+857km). (Total Length=5.000 km) 5.00 312.24 M/s. Shahil Enterprise, Station road, Kishoregonj 336.58 10/12/2015 31/03/2017 100 20/12/2018  
97 Mymensingh 22 gaffargaon 188 240 Upazila : Gafargaon DIRIP/MMN/Gaf/VR/SL-42(02)/15-16/W-144 Imp. of Charkamaria - Hazigonj road via Nakkata char road (ID No. 361224001). Part A: BC Road work = 5.000 km (Ch. 6+857km - 11+857km). (Total Length=5.000 km) 5.00 313.27 M/s. Shahil Enterprise, Station road, Kishoregonj 337.63 10/12/2015 15/11/2017 100 20/12/2018  
98 Mymensingh 22 gaffargaon 188 240 Upazila : Gafargaon DIRIP/MMN/Gaf/VR/SL-42(01)/14-15/W-119 Imp. of Charkamaria - Hazigonj road via Nak kata char road (ID No. 361224001). Part A: BC Road work = 5.000 km (Ch. 1+850km - 6+857km). Part C: Structure = 09 Nos. (10.375m) (Total Length=5.000 km) 5.00 336.06 SI-SE-AT (JV), Gafargaon, Mymensingh 362.86 01/11/2015 30/04/2017 100 20/12/2018  
99 Mymensingh 22 gaffargaon 188 240 Upazila : Gafargaon. DIRIP/MMN/Gaf/UZR/SL-41(07)/17-18/W-214 Const. of 90 M long PC Girder Bridge over shila river at ch.9350 m on Gafargaon - Goyeshpur road. 90.00 0.00   0.00 100 20/12/2018 Dropped
100 Mymensingh 22 gaffargaon 188 240 Upazila : Gafargaon. DIRIP/MMN/Gaf/UZR/SL-41(06)/16-17/W-209 Imp. of Gafargaon - Goyeshpur road under Pathail UP (ID No. 361222007) Part A: BC Road work = 3.00km (Ch. 13+600km - 16+600km). Part C: Structure = 02 Nos. (1.25m) (Total Length =2.930 km) 2.93 225.27 M/s. Sohel Enterprise, Gafargaon, Mymensing 225.22 04/06/2017 30/10/2018 100 20/12/2018  
101 Mymensingh 22 gaffargaon 188 240 Upazila : Gafargaon. DIRIP/MMN/Gaf/UZR/SL-41(05)/15-16/W-143 Imp. of Gafargaon - Goyeshpur road under Pathail UP (ID No. 361222007) Part A: BC Road work = 0.695km (Ch.8+105km - 8+800km). (Total Length=0.695 km) 0.70 52.87 M/s. Sohel Enterprise, Gafargaon, Mymensing 52.73 10/02/2016 20/10/2016 100 20/12/2018  
102 Mymensingh 22 gaffargaon 188 240 Upazila : Gafargaon. DIRIP/MMN/Gaf/UZR/SL-41(04)/14-15/W-116 Imp. of Gafargaon - Goyeshpur road under Pathail UP (ID No. 361222007) Part A: BC Road work = 2.800 km (Ch. 8+800km - 11+600km). Part C : Structure = 02 Nos. (2.25m) (Total Length=2.800 km) 2.80 210.55 MAB-SE LE (JV), Gafargaon 226.35 17/05/2015 30/01/2017 100 20/12/2018  
103 Mymensingh 22 gaffargaon 188 240 Upazila : Gafargaon. DIRIP/MMN/Gafr /UZR/SL-41(03)/14-15/W-106 Imp. of Gafforgaon - Goyespur road under Paithul UP. (ID:361222007) Part A: B.C Road Works=2.960km (Ch. 4+100km to 7+060 km) Part B: Rehabilitation Works:=1.045km (Ch. 7+060km to 8+105 km) Part C: Structure Works = Nil (Total Length=4.005km) 4.01 225.34 SI-SE (JV), Sadar, Mymensingh 236.53 24/02/2015 30/04/2016 100 20/12/2018  
104 Mymensingh 22 gaffargaon 188 240 Upazila : Gafargaon. DIRIP/MMN/Gafr /UZR/SL-41(02)/12-13/W-30 Imp. of Gafforgaon - Goyespur road under Paithul UP. (ID:361222007) PartA:BituminousCarpetingWorks=1.00km (Ch. 11+600 to 12+600 km) Part B: Rehabilitation Works:=nil Part C: Structure Works = Nil (Total Length=1.000km) 1.00 79.15 Mr. Anika International, 77, West Agargaon, Dhaka 83.07 31/03/2013 20/10/2013 100 20/12/2018  
105 Mymensingh 22 gaffargaon 188 240 Upazila : Gafargaon. DIRIP/MMN/Gafr /UZR/SL-41(01)/12-13/W-04 Imp. of Gafforgaon - Goyespur road under Paithul UP. (ID:361222007) Part A: Bituminous CarpetingWorks=1.00km (Ch. 12+600 to 13+600 km) Part B: Rehabilitation Works:4.100km. (Ch. 0+000 to 4+100 km) Part C: Structure Works = Nil (Total Length=5.100 km) 5.10 115.43 Mr. Anika International, 77, West Agargaon, Dhaka 139.01 04/12/2012 14/10/2013 100 20/12/2018  
106 Mymensingh 22 mymensingh-s 208 240 Upazila : Sadar DIRIP/MMN/SAD/UNR/SL-11(03)/14-15/W-126 Improvement of Parangonj (Ambikagonj) - Ramvadropur road at ch. 10+700 km - 12+500 km. ID. No. 361523001 Part A: BC Road work = 1.800 km (Ch. 10+700km - 12+500km). Part B: Rehabilitation Work = Nil Part C: Structure Work = 2 Nos. (12.50m) (Total Length=1.798 km) 1.80 105.40 M/s. Sadek Enter. Iswargonj, Mymensingh 104.81 16/06/2015 17/05/2016 100 20/12/2018  
107 Mymensingh 22 mymensingh-s 208 240 Upazila: Sadar DIRIP/MMN/SAD /UNR/SL-11(02)/12-13/W-25 Imp. of Parangonj (Ambikagonj)-Ramvadrapur road. (ID: 361523001) Part A:Pucca (BC) Road Works=3.00km (Ch. 7+700 to 10+700 km)Part B:Rehabilitation Works= Nil Part C : Structure Works= Nil. (Total Length=3.000 km) 3.00 188.99 M/S Mohua Ent. Mirpur,Dhaka 217.22 01/07/2013 30/11/2014 100 20/12/2018  
108 Mymensingh 22 mymensingh-s 208 240 Upazila: Sadar DIRIP/MMN/SAD/ UNR/SL-11(01)/12-13/W-12 Imp. of Parangonj (Ambikagonj)-Ramvadrapur road. (ID: 361523001) Part A:Pucca (BC) Road Works=1.00 km (Ch. 6+700 to 7+700 km) Part B:Rehabilitation Works= Nil Part C : Structure Works= Nil. (Total Length=1.000 km) 1.00 65.16 M/s. Ruma Enterprise Iswargonj, Mymensing 71.61 12/02/2013 08/09/2013 100 20/12/2018  
109 Mymensingh 22 mymensingh-s 208 240 Upazila: Sadar DIRIP/MMN/Sad/UNR/SL-10(05)/17-18/W-216 Slope Protection work of Sherta bazar Borochar UP via Matkhala - Kaladoba - Seerigoldi road at ch. 0+500 km - 7+000 km)(ID: 361523013). Part A:Slope Protection Works = 0.235km (Ch. 0+500 km - 7+000km) Part B: Rehabilitation Works = Nil Part C: Structure Works = Nil Total Length ( Protective Work)=0.235 km) 0.23 14.33 M/S. Nihad Builders & Supplyerts, Nandail,Mymensingh 12.89 11/01/2018 17/05/2018 100 20/12/2018  
110 Mymensingh 22 mymensingh-s 208 240 Upazila: Sadar DIRIP/MMN/Sad/UNR/SL-10(04)/15-16/W-148 Imp.Of Sherta bazar Borochar UP via Matkhala - Kaladoba - Seerigoldi road. (ID: 361523013). Part A: BC Road Works = 5.01 km (Ch. 8+150 km - 13+160 km) Part B: Rehabilitation Works = Nil Part C: Structure Works = Nil (Total Length=5.010 km) 5.01 289.32 M/s. Nippon Enterprise & Const. Gulkibari road, Sadar Mymensingh 271.89 10/02/2016 31/12/2017 100 20/12/2018  
111 Mymensingh 22 mymensingh-s 208 240 Upazila : Sadar DIRIP/MMN/SAD/UNR/SL-10(03)/14-15/W-125 Improvement of Sherta bazaar - Borochar UP via Matkhala - Kaladoba - Seerigoldi road at ch. 4+150 km - 8+150 km. ID. No. 36523013 Part A: BC Road work = 4.000 km (Ch. 4+150km - 8+150km). Part B: Rehabilitation Work = Nil Part C: Structure Work = 6 Nos. (3.750m) (Total Length=3.998 km) 4.00 257.68 M/s. Vati Bangla Entp. Sadar, Kishorgonj 255.55 16/06/2015 29/09/2016 100 20/12/2018  
112 Mymensingh 22 mymensingh-s 208 240 Upazila: Sadar DIRIP/MMN/SAD/ UNR/SL-10(02)/12-13/W-24 Imp. of Sherta bazar Borochar UP via Matkhala - Kaladoba - Seerigoldi road (ID: 361523013). Part A:Pucca (BC) Road Works=3.00 km (Ch. 1+150 to 4+150 km ) Part B:Rehabilitation Works=nil Part C : Structure Works.=nil (Total Length=3.000km) 3.00 184.25 M/s. Jaman Construction Khathal Bagan, Dhanmondi, Dhaka 218.31 24/04/2014 28/12/2016 100 20/12/2018  
113 Mymensingh 22 mymensingh-s 208 240 Upazila: Sadar DIRIP/MMN/SAD /UNR/SL-10(01)/12-13/W-11 Imp. of Sherta bazar Borochar UP via Matkhala - Kaladoba - Seerigoldi road. (ID: 361523013). Part A:Pucca (BC) Road Works =1.150km (Ch. 0+00 to 1+150 km ) Part B:Rehabilitation Works = nil Part C : Structure Works.= nil (Total Length=1.000 km) 1.00 58.75 M/s. Ruma Enterprise Iswargonj, Mymensingh 64.56 13/02/2013 24/10/2013 100 20/12/2018  
114 Mymensingh 22 mymensingh-s 208 240 Upazila: Sadar DIRIP/MMN/Sad/ UNR/SL-09(06)/16-17/W-210 Slope protection work of somvugonj old bus stand bazar-Parangonj bazar via Sherta UP office road.(ID: 361523007) Part A: Slope protection work = 0.050km.Ch. 13+750 km - 13+800 km. Part B: Rehabilitation Works = Nil Part C: Structure Works =Nil (Total (protection work) Length=0.050 km) 0.05 5.94 M/S Ayan Enterprise,Akua,Dakhin Para,Sadar,Mymensingh 5.64 21/08/2017 24/02/2018 100 20/12/2018  
115 Mymensingh 22 mymensingh-s 208 240 Upazila: Sadar DIRIP/MMN/Sad/ UNR/SL-09(05)/16-17/W-181 Imp.Of Somvugonj old bus stand bazar-Parangonj bazar via Sherta UP office road.(ID: 361523007) Part A: BC Road Works = Nil Part B: Rehabilitation Works = 1.00km(Ch. 4+085 km - 5+085 km.) Part C: Structure Works =1(One) No(0.625m) (Total Length=1.000 km) 1.00 0.00 Susree Rani Shaha Roy,Barhatta,Netrokona 0.00 100 20/12/2018 Work Cancelled
116 Mymensingh 22 mymensingh-s 208 240 Upazila: Sadar DIRIP/MMN/Sad/ UNR/SL-09(04)/15-16/W-147 Imp.Of Somvugonj old bus stand bazar-Parangonj bazar via Sherta UP office road.(ID: 361523007) Part A: BC Road Works = 3.400 km (Ch. 14+100 km - 17+500 km.) Part B: Rehabilitation Works = Nil Part C: Structure Works = 12 Nos. (8.875m) (Total Length=3.400 km) 3.40 210.04 M/s. Ridoy Enterprise, Fulbaria, Mymensingh. 219.49 06/12/2015 30/06/2016 100 20/12/2018  
117 Mymensingh 22 mymensingh-s 208 240 Upazila : Sadar DIRIP/MMN/SAD/UNR/SL-9(03)/14-15/W-124 Improvement of Somvugonj old bus-stand bazaar - Paranjonj bazar via Sherta UP office road at ch. 10+000 km - 14+000 km. ID. No. 36523007 Part A: BC Road work = 4.000 km (Ch. 10+000km - 14+000km). Part B: Rehabilitation Work = Nil Part C: Structure Work = 8.00m (5 Nos.) (Total Length=3.998 km) 4.00 239.62 Md. Lal Mohammad Fulbaria, Mymensingh 228.38 23/06/2015 28/02/2017 100 20/12/2018  
118 Mymensingh 22 mymensingh-s 208 240 Upazila: Sadar DIRIP/MMN/SAD UNR/SL-9(02)/12-13/W-23 Imp. of Somvugonj old bus stand bazar-Parangonj bazar via Sherta UP office road.(ID: 361523007) Part A:Pucca (BC) Road Works =3.00 km (Ch. 4+600 to 7+600 km) Part B:Rehabilitation Works =nil Part C : Structure Works = Nil (Total Length=3.000km) 3.00 176.06 M/S. Saiful Bricks Sadar/Mymensing 222.09 26/03/2013 22/02/2014 100 20/12/2018  
119 Mymensingh 22 mymensingh-s 208 240 Upazila: Sadar DIRIP/MMN/SAD/ UNR/SL-9(01)/12-13/W-10 Imp. of Somvugonj old bus stand bazar-Parangonj bazar via Sherta UP office road.(ID: 361523007) Part A:Pucca (BC) Road Works =1.00km. (Ch. 2+900 to 3+900 km) Part B:Rehabilitation Works= nil Part C : Structure Works =03 Nos. (8.00m) (Total Length=1.000 km) 1.00 82.92 M/s. Ruma Enterprise Mymensing 87.12 12/02/2013 08/09/2013 100 20/12/2018  
120 Netrokona 25 durgapur 187 240 Upazila: DurgapurDIRIP/NET/Durg/UNR/SL-23(08)/16-17/W-206 Improvement Work Of Gawkandia UP Office-Janjail Bazar via Shankarpur Bazar road at Ch. 5+300Km -10+300Km ID. 372183009 (Total Length=4.760 km) 4.76 265.28 M/S Bhuyan Enterprise,Netrokona 276.94 30/06/2017 23/11/2018 50 13/05/2019  
121 Netrokona 25 durgapur 187 240 Upazila: DurgapurDIRIP/NET/Durg/UNR/SL-23(07)/15-16/W-179 Const. of 30.00m long RCC Girder Bridge on Gawkandia UP Office-Janjail Bazar via Shankarpur Bazar road at Ch. 9550.00m ID. 372183009 30.00 154.26 Monzurul Haque, Mymenshing 153.39 06/09/2016 07/01/2018 100 10/03/2019  
122 Netrokona 25 durgapur 187 240 Upazila: DurgapurDIRIP/NET/Durg/UNR/SL-23(05)/15-16/W-177 Const. of 35.00m long RCC Girder Bridge on Gawkandia UP Office-Janjail Bazar via Shankarpur Bazar road at Ch. 4425.00m ID. 372183009) 35.00 168.21 Monzurul Haque, Mymenshing 167.29 06/09/2016 01/07/2018 65 10/03/2019  
123 Netrokona 25 durgapur 187 240 Upazila: DurgapurDIRIP/NET/Durg/UNR/SL-23(03)/15-16/W-175 Const. of 36.00m long RCC Girder Bridge on Gawkandia UP Office-Janjail Bazar via Shankarpur Bazar road at Ch. 2850.00m ID. 372183009 36.00 225.95 M.A. Wahed, Madan,Netrokona 223.00 24/08/2016 25/12/2017 100 10/03/2019  
124 Netrokona 25 durgapur 187 240 Upazila: Durgapur DIRIP/NET/Durg/UNR/SL-23(06)/15-16/W-178 Const. of 51.00m long RCC Girder Bridge on Gawkandia UP Office-Janjail Bazar via Shankarpur Bazar road at Ch. 5200.00m ID. 372183009 51.00 289.85 Asim Singh, Jaria Bazar, Netrokona. 288.91 22/08/2016 22/02/2018 100 20/12/2018  
125 Netrokona 25 durgapur 187 240 Upazila: Durgapur DIRIP/NET/Durg/UNR/SL-23(04)/15-16/W-176 Const. of 51.00m long RCC Girder Bridge on Gawkandia UP Office-Janjail Bazar via Shankarpur Bazar road at Ch. 3400.00m ID. 372183009 51.00 294.20 Baset Prokousholi, Netrokona 292.77 28/08/2016 28/02/2018 100 20/12/2018  
126 Netrokona 25 durgapur 187 240 Upazila: Durgapur DIRIP/NET/Durg/UNR/SL-23(02)/15-16/W-172 Rehabilitation work of Gawkandia UP Office-Janjail Bazar via Shankarpur Bazar road. (Ch. 13+700 km to 14+935 km) ID. 372183009 (Total Length=1.235 km) 1.24 88.42 Baset Prokousholi, Netrokona 87.12 19/06/2016 30/03/2018 100 20/12/2018  
127 Netrokona 25 durgapur 187 240 Upazila: Durgapur DIRIP/NTR/Durg/ /UNR/SL-23(01)/13-14/W-88 Imp. of Goawkandia UP office to Janjail bazar via Shankarpur bazar road. Ch. 1+800 km to 5+020 km. ID. No. 372183009. (Total Length=3.220km) 3.22 208.58 S,M. Angur, Mukterpara, Netrakona 208.58 16/02/2014 07/12/2014 100 20/12/2018  
128 Netrokona 25 durgapur 187 240 Upazila: Durgapur DIRIP/NTR/Durg/UNR /SL-22(02)/14-15/W-135 Rehabilitation work of Durgapur UP office-Kalikapur bazar road. ID. 372183003 Part A: BC Road Work = Nil Part B: Rehabilitation Work = 0.895 km (ch. 1+164km - 2+059km.) Part C: Structure Work = Nil (Total Length=0.895 km) 0.90 53.58 M/s. Pritom Enterprise, Pro. Dipankar Sarker, Mukterpara, Netrakona 42.97 20/10/2015 16/04/2016 100 20/12/2018  
129 Netrokona 25 durgapur 187 240 Upazila: Durgapur DIRIP/NTR/Durg /UNR/SL-22(01)/12-13/W-02 Improvement of Durgapur UP office-Kalikapur bazar road. (ID: 372183003) Part A:Bituminous Carpeting Works=1.00km (Ch. 3+560 km to 4+560 km) Part B: Rehabilitation Works= Nil Part C: Structure Works (At Ch. 6+770, 7+390, 7+870 & 10+870 km . 1.00 132.17 M/S Bishwas Traders Pro. Md. Aradhon Kolmakanda Netrokona 124.41 19/11/2012 01/03/2015 100 20/12/2018  
130 Netrokona 25 kalmakanda 189 240 Upazila: KalmakandaDIRIP/NET/Kal/UNR/SL-26(11)/16-17/W-205 Rehabilitation Work of Kailahati UP office (Sidhly)- Palpara bazar via Anandapur bazar Panch Katha bazar road (ID: 372403001 (Ch. 6+048 km to 8+630km). (Total Length=2.580 km) 2.58 213.96 S.M.Angur,Netrakona 192.57 04/06/2017 28/08/2018 73 08/04/2019  
131 Netrokona 25 kalmakanda 189 240 Upazila: KalmakandaDIRIP/NTR/KAL//VR/SL-27(05)/16-17/W-204 Improvement of Kalmakanda-Baruakona Road (ID: 372404013 Part A:Bituminous Carpeting Works =2.160Km(Ch. 5+340 km to 7+500km) Part B: Rehabilitation Works= Nil Part C: Structure Works = 3-Nos(10.80m) (Total Length=1.946 km) 1.95 192.06 Asim Singh, Jaria Bazar, Netrokona. 172.86 11/06/2017 06/11/2018 80 08/04/2019  
132 Netrokona 25 kalmakanda 189 240 Upazila: Kalmakanda DIRIP/NTR/KAL/ /VR/SL-27(04)/15-16/W-167 Cont. of 69.00m Long RCC Girder Bridge on Colmakanda-Baruakona Road. (Colmakanda-(Chinahala Moar)-Baruakona Road) at Ch.5+260km--, ID-372404013 (Total (HBB) Length=0.150 km) 69.00 390.86 Asim Singh, Jaria Bazar, Netrokona. 300.49 09/05/2016 30/10/2018 100 20/12/2018  
133 Netrokona 25 kalmakanda 189 240 Upazila: Kalmakanda DIRIP/NTR/KAL/ /VR/SL-27(03)/14-15/W-128 Imp. Of Kalmakanda-Baruakona road at ch. 4+096km-5+216km. ID. 372404013 (Total Length=1.120 km) 1.12 77.57 Osim Singh, Jaria bazar, Purbadhala, Netrakona 61.47 07/09/2015 03/12/2015 100 20/12/2018  
134 Netrokona 25 kalmakanda 189 240 Upazila: Kalmakanda DIRIP/NTR/Kal /VR/SL-27(02)/13-14/W-79 Improvement of Kalmakanda Baruakona Road (ID:372404013(Ch.1+000kmto4+096km). (Total Length=3.096 km) 3.10 198.32 M/s. Hawlader Builders, West Chalkpara, Netrakona 226.49 04/02/2014 26/02/2015 100 20/12/2018  
135 Netrokona 25 kalmakanda 189 240 Upazila: Kalmakanda DIRIP/NTR/Kal /VR/SL-27(01)/12-13/W-37 Improvement of Kalmakanda-Baruakona Road (ID: 372404013 Part A:Bituminous Carpeting Works =01 Km (Ch. 0+00 km to 1+000km) Part B: Rehabilitation Works= Nil Part C: Structure Works = Nil (Total Length=1.000 km) 1.00 64.72 M/s. Roky Entp. Pro. Md. Kibria (Rupon), Chalk para Netrokona 64.56 09/04/2013 30/05/2014 100 20/12/2018  
136 Netrokona 25 kalmakanda 189 240 Upazila: Kalmakanda DIRIP/NET/Kal/UNR/SL-26(10)/15-16/W-168 Const. of 51.00m long RCC Girder Bridge on Kailahati UP office (Sidhly) Palpara bazar via Anandapur bazar Panch Katha bazar road at ch. 10+350km. ID. 372403001 (Total (HBB) Length=0.100 km) 51.00 328.53 Challenger & Tajuddin Farash Sentu (JV) 254.71 09/05/2016 25/06/2017 100 20/12/2018  
137 Netrokona 25 kalmakanda 189 240 Upazila: Kalmakanda DIRIP/NET/Kal/UNR/SL-26(09)/15-16/W-160 Imp. of Kailahati UP office (Sidhly) - Palpara bazar via Anandapur bazar Panch Katha bazar road. (ch. 8+630 km-15+100 km). ID. 372403001 (Total Length=6.003 km) 6.00 408.58 M/S Priti Enterprise, Sunamgonj-M/S. Baset Prokousholi, Netokona (JV) 428.42 07/03/2016 30/06/2018 100 20/12/2018  
138 Netrokona 25 kalmakanda 189 240 Upazila: Kalmakanda DIRIP/NTR/KAL/ /UNR/SL-26(08)/14-15/W-129 Imp. Of Kailahati UP office (Sidhly) Palpara bazar via Anandapur bazar Panch Katha bazar road at ch. 3+000km-6+048km. ID. 372403001 (Total Length=3.000km) 3.00 221.67 M/s. Subrato Sutradhar-M/s. Pretom Enterprise (JV), 27 Wazed Complex, Netrakona. 185.12 08/09/2015 06/09/2016 100 20/12/2018  
139 Netrokona 25 kalmakanda 189 240 Upazila: Kalmakanda DIRIP/NTR/Kal /UNR/SL-26(07)/13-14/W-86 Const. of 62.00m long RCC Girder bridge on Kailahati UP office (Sidhly) Palpara bazar via Anandapur bazar Panch Katha bazar road at ch. 14850m. ID. 372403001. 62.00 343.68 Sheikh Hemayet Ali, Malni road, Netrakona 393.99 04/02/2014 29/08/2015 100 20/12/2018  
140 Netrokona 25 kalmakanda 189 240 Upazila: Kalmakanda DIRIP/NTR/Kal /UNR/SL-26(06)/13-14/W-85 Const. of 62.00m long RCC Girder bridge on Kailahati UP office (Sidhly) Palpara bazar via Anandapur bazar Panch Katha bazar road at ch. 13020m. ID. 372403001. 62.00 343.45 MAW-RI (JV), Madan, Netrakona 392.87 04/02/2014 28/08/2015 100 20/12/2018  
141 Netrokona 25 kalmakanda 189 240 Upazila: Kalmakanda DIRIP/NTR/Kal /UNR/SL-26(05)/13-14/W-84 Const. of 39.00m long RCC Girder bridge on Kailahati UP office (Sidhly) Palpara bazar via Anandapur bazar Panch Katha bazar road at ch. 11945m. ID. 372403001. 39.00 248.36 PE-BP (JV), Choto bazar, Netrakona 284.13 04/02/2014 31/12/2014 100 20/12/2018  
142 Netrokona 25 kalmakanda 189 240 Upazila: Kalmakanda DIRIP/NTR/Kal /UNR/SL-26(04)/13-14/W-83 Const. of 22.10m long RCC Girder bridge on Kailahati UP office (Sidhly) Palpara bazar via Anandapur bazar Panch Katha bazar road at ch. 9905m. ID. 372403001. 22.10 158.91 Shyamol Chandra Shaha, Borobazar, Netrakona 188.20 04/02/2014 22/01/2015 100 20/12/2018  
143 Netrokona 25 kalmakanda 189 240 Upazila: Kalmakanda DIRIP/NTR/Kal /UNR/SL-26(03)/13-14/W-82 Const. of 22.10m long RCC Girder bridge on Kailahati UP office (Sidhly) Palpara bazar via Anandapur bazar Panch Katha bazar road at ch. 9045m. ID. 372403001. 22.10 158.11 Samiran Chowdhury, Ukilpara, Netrakona 186.84 04/02/2014 18/01/2015 100 20/12/2018  
144 Netrokona 25 kalmakanda 189 240 Upazila: Kalmakanda DIRIP/NTR/Kal /UNR/SL-26(02)/13-14/W-81 Const. of 39.00m long RCC Girder bridge on Kailahati UP office (Sidhly) Palpara bazar via Anandapur bazar Panch Katha bazar road at ch. 6000m. ID. 372403001. 39.00 246.61 Osim Singh, Jaria bazar, Purbadhala, Netrakona 305.50 04/02/2014 24/01/2015 100 20/12/2018  
145 Netrokona 25 kalmakanda 189 240 Upazila: Kalmakanda DIRIP/NTR/Kal /UNR/SL-26(01)/13-14/W-80 Improvement of Kailahati UP office (Sidhly) Palpara bazar via Anandapur bazar Panch Katha bazar road (ID: 372403001 (Ch. 0+000 km to 3+000km). (Total Length=3.000 km) 3.00 195.15 M/s. S M Kamrul Hassan, Mukterpara, Netrakona 222.98 04/02/2014 31/01/2015 100 20/12/2018  
146 Netrokona 25 kalmakanda 189 240 Upazila: Kalmakanda DIRIP/NTR/Kal /UNR/SL-25(01)/12-13/W-36 Improvement of Moheshkhola Bazar - Bharatpur Via Lengura UP Office Road (ID: 372403008) Part A: BC Road Works=Nil Part B: Rehabilitation Works= Nil Part C: Structure Works = 1-no, 13.50m,At ch 1+058Km 13.50 44.38 M/s. New Asa Trad Netrokona Pro. Md. Nazmush Shahadat Choto Bazar, Netrakona 46.60 24/04/2013 05/04/2014 100 20/12/2018  
147 Netrokona 25 kalmakanda 189 240 Upazila: Kalmakanda DIRIP/NET/Kal/UZR/SL-24(04)/15-16/W-166 Const. of 22.00m long RCC Girder Bridge on Kailati-Bishorpasha road (Kalmakanda GC - (Kalihala) - Bishorpasha GC road) at ch. 7+450 km. ID. 372402004 (Total Length=0.060 km) 22.00 219.21 M.A Wahid, Netrokona 165.01 09/05/2016 30/06/2018 100 20/12/2018  
148 Netrokona 25 kalmakanda 189 240 Upazila: Kalmakanda DIRIP/NET/Kal/UZR/SL/24(03)/15-16/W-159 Imp. Of Kailati-Bishorpasha road at ch.5+110km-7+710km & ch.7+710km-7+950km. ID. 372402004 (Total Length=2.780 km) 2.78 281.39 Md. Farid Uddin, A/36, Upashahar, Rajshahi 278.24 02/03/2016 20/03/2018 100 20/12/2018  
149 Netrokona 25 kalmakanda 189 240 Upazila: Kalmakanda DIRIP/NTR/KAL/ /UZR/SL-24(02)/14-15/W-127 Imp. Of Kailati-Bishorpasha road at ch. 2+000km-5+110km. ID. 372402004 (Total Length=3.000 km) 3.00 351.30 Oshim Singh, Zaria bazar, Netrokona. 287.96 08/09/2015 06/06/2016 100 20/12/2018  
150 Netrokona 25 kalmakanda 189 240 Upazila: Kalmakanda DIRIP/NTR/Kal /UZR/SL-24(01)/12-13/W-35 Improvement of Kailati (Kalihala)Bishorpasha Road (ID: 372402004 Part A:BC Road Works =1.00km (Ch. 0+00 km to 1+000km) Part B: Rehabilitation Works= Nil Part C: Structure Works = Nil (Total Length=1.000 km) 1.00 73.19 Md. Inzil mia Kalmakanda Netrokona 73.12 18/03/2013 03/12/2013 100 20/12/2018  
151 Netrokona 25 madan 191 240 Upazila: MadanDIRIP/NTR/Madan/UZR/SL-13(01)/16-17/W-199 Improvement of Connecting road for the RCC Bridge over Bunni River on Madan- Tangail Connecting road (Fatepur GC- Tangail GC Road) (ID: 372562006) Part A:BC Road Works=0.910km (Ch. 2+289 km to 3+239 km) Part B: Rehabilitation Works= Nil Part C: Structure Works= Nil (Total Length=0.910 km) 0.91 220.28 Samiran Chowdhury, Ukilpara, Netrakona 198.25 24/05/2017 24/05/2018 100 13/05/2019  
152 Satkhira 39 tala 312 240 Upazila: Tala DIRIP/SAT/Tal/UZR/SL-57(d)(03)/16-17/W-208 Const.of Protective Work on Kumira–Sagordari – Trimohoni –Rajgonj -Pulerhat (Pulerhat – Rajgonj –Trimohoni - Sagordari - Kumira) Road by two lane . At ch. 43.952km to 44+138km (ID.287902003). (Total (Protactive Work) Length=0.186 km) 0.19 23.99 M/S Boshu Traders, Tala , Satkhira 21.59 29/06/2017 30/03/2018 100 20/12/2018  
153 Satkhira 39 tala 312 240 Upazila: Tala DIRIP/SAT/Tal/UZR/SL-57(d)(02)/15-16/W-155 Improvement & Widening by two lane of Kumira – Sagordari – Trimohoni –Rajgonj - Pulerhat (Pulerhat – Rajgonj –Trimohoni - Sagordari - Kumira) Road (ID. 287902003). i) BC road work =3.000 km (Ch. 43+296 km – 46+296 km) ii) Structure = 3 Nos (1.85 m) (Total Length=3.000 km) 3.00 299.00 Md. Iqbal Jamaddar, Polashpole, Satkhira 263.17 25/01/2016 28/02/2017 100 20/12/2018  
154 Satkhira 39 tala 312 240 Upazila: Tala DIRIP/SAT/Tal/UZR/SL-57(d)(01)/13-14/W-102 Improvement & Widening by two lane of Kumira – Sagordari – Trimohoni –Rajgonj - Pulerhat (Pulerhat – Rajgonj –Trimohoni - Sagordari - Kumira) Road (ID. 287902003). i) Imp. & Widening work by BC=2.014km (Ch. 46+296 km – 48+310 km) & Widening of single lane road into two lane by earth work = 5.500km. (Ch. 42+810km – 48+310km). ii) Const. & Widening Work of Structure = 1 No (1.00 m) At ch. 48973.00m. (Total Length=2.014km) 2.01 242.95 Sk. Shirazul Haque, Labsha, Satkhira 213.16 20/11/2014 22/06/2015 100 20/12/2018  
155 Sunamganj 64 biswamvarpur 464 240 Upazila: BiswamberpurDIRIP/SNM/l/Bshm/UZR/SL-17(c)(03)/15-16/W-170 Rehabilitation work of Dharmapasha - Madha Nagar -Moheshkhola - Takerhat - Lawerghor - Sunamgonj road (Biswamberpur part) (Mongalkata (Kapna) - Chinakandi - Sorupgonj - Moheskhola road) (Ch. 7+500 km - 13+130 km). ID. 690182005 (Total Length=5.497 km) 5.50 343.06 AR=RM=SM=JV, Notun Bazar Sunamgonj 295.02 26/01/2017 25/01/2018 60 13/05/2019  
156 Sunamganj 64 biswamvarpur 464 240 Upazila :BiswamberpurDIRIP/SNM/l/Bshm/UZR/SL-17(c)(02)/15-16/W-169 Rehabilitation work of Dharmapasha - Madha Nagar -Moheshkhola - Takerhat - Lawerghor - Sunamgonj road (Biswamberpur part) (Biswamberpur - Polash - Chinakandi road) ID. 690182001 Part A: i) BC Road work = 0.595 km (Ch. 0+000 km - 0+605 km) ii) Rehabilitation work) = 4.282 km (Ch. 4+950 km - 8+100 km, 8+400km - 9+520km & 9+820km - 9+870km Part B: RCC Work = 0.300 km (Ch. 8+100 km - 8+400 km) Part C: Structure Works = 04 Nos. (9.875 m). (Total Length=5.177 km) 5.18 369.14 AR=RM=SM=JV, Notun Bazar Sunamgonj 316.94 26/01/2017 25/01/2018 80 08/04/2019  
157 Sunamganj 64 biswamvarpur 464 240 Upazila : Biswamberpur DIRIP/SNM/l/Bshm/UZR/SL-17(c)(01)/12-13/W-44 Const. of 27m long RCC Girder bridge on Dharmapasha-Madhanagor-Moheshkhola-Takerhat Lawererghor-Sunamgonj road (Biswamberpur Part). at ch. 11+320km. ID. 690182005. 27.00 73.00 Hazi sadek ali & sons, Jamalgonj sunamgonj 73.00 18/04/2013 10/12/2013 100 20/12/2018  
158 Sunamganj 64 derai 483 240 (W-207 Rehabilitation works of Derai-Dhal-Markuli bazar road . (ID:690292004), Ch. 0+000km to 16+074 km & 18+114km to 19+845km. (Total Length=17.485km) 17.49 1998.87 Rana Builders-Hasan Builders (JV),55,West Panthapath, Dhaka-1205 2014.55 14/11/2017 30/04/2018 0 08/04/2019 Court Case.
159 Sunamganj 64 derai 483 240 Upazila: Derai DIRIP/SNM/Dri/UZR/SL-21(02/14-15/W-122 Imp.of Derai-Dhal-Markuli bazar road. (ID:690292004) Ch. 16+074km to 16+154 km & 19+845km to 20+968km. (Total Length=1.203 km) 1.20 162.34 M/s. Belal Entp. Hazipara, Sunamgonj 125.58 01/07/2015 30/06/2016 100 20/12/2018  
160 Sunamganj 64 dharmapasha 471 240 Upazila: Dharmapasha DIRIP/SNM/Dhrm/UZR/SL-17(a)(09)/14-15/W-123 Imp. of Dharmapasha-Madhanagar - Moheshkhola - Takerhat - Lawerghor -Sunamgonj road (Dharmapasha Part) Ch. 10+080 - 14+200 km(ID: 690322006). (Total Length=4.000 km) 4.00 370.20 Md. Nurul Islam, Mahila College road, Saunamgonj 387.79 07/08/2015 30/03/2018 100 20/12/2018  
161 Sunamganj 64 dharmapasha 471 240 Upazila: Dharmapasha DIRIP/SNM/Dhrm/UZR/SL-17(a)(08)/13-14/W-97 Imp. of Dharmapasha-Madhanagar - Moheshkhola – Takerhat – Lawerghor – Sunamgonj road (Dharmapasha Part) Ch. 8+030 - 10+080 km(ID. 690322006) (Total Length=2.000 km) 2.00 159.58 M/s. Subrato Sutradhar, Satpai, Netrakona 165.20 07/08/2015 06/08/2016 100 20/12/2018  
162 Sunamganj 64 dharmapasha 471 240 Upazila: Dharmapasha DIRIP/SNM/Dhrm/UZR/SL-17(a)(07)/13-14/W-96 Imp. of Dharmapasha-Madhanagar - Moheshkhola – Takerhat – Lawerghor – Sunamgonj road (Dharmapasha Part) Ch. 0+000 - 0+900 km (ID. 690322003) (Total Length=0.900km) 0.90 0.00   0.00 100 20/12/2018 Dropped
163 Sunamganj 64 dharmapasha 471 240 Upazila : Dharmapasha DIRIP/SNM/Dhrm/UZR/SL-17(a)(06)/12-13/W-48 Imp. of Dharmapasha-Madhanagor-Moheshkhola-Takerhat - Lawerghor - Sunamgonj road (Dharmapasha Part). at ch. 7+020km-8+028km. (ID: 690322006) (Total Length=1.000 km) 1.00 80.06 M/s. Sawdagar Builders Hasannagar, Sunamgonj 91.99 01/10/2013 30/11/2015 100 20/12/2018  
164 Sunamganj 64 dharmapasha 471 240 Upazila : Dharmapasha DIRIP/SNM/Dhrm /UZR/SL-17a(05)/12-13/W-43 Imp. Of Dharmapasha-Madha Nagar-Moheshkhola-Takerhat-Lawerghor-Sunamgonj road (Dharmapasha part) at ch. 1+400km-2+420km . ID. 690322004 (Total Length=0.800 km) 0.80 449.33 SC-BP (JV), Chotobazar, Netrakona 498.47 01/05/2013 30/04/2014 100 20/12/2018  
165 Sunamganj 64 dharmapasha 471 240 Upazila : Dharmapasha DIRIP/SNM/Dhrm /UZR/SL-17a(04)/12-13/W-42 Imp. Of Dharmapasha-Madha Nagar-Moheshkhola-Takerhat-Lawerghor-Sunamgonj road (Dharmapasha part) at ch. 0+000km-1+400km. ID. 690322004 (Total Length=0.945 km) 0.96 435.78 SC-BP (JV), Chotobazar, Netrakona 482.61 01/05/2013 30/03/2015 100 20/12/2018  
166 Sunamganj 64 dharmapasha 471 240 Upazila : Dharmapasha DIRIP/SNM/Dhrm /UZR/SL-17a(03)/12-13/W-41 Const. of 04 nos. box culverts (12.30m) on Dharmapasha-Madha Nagar-Moheshkhola-Takerhat Lawerghor Sunamgonjroad (Dharmapasha part) at ch. 6+450km. 12+625km, 12+720km, 12+970km ID. 690322006 12.30 55.89 Jahirul Amin, Dharmapasha, Sunamgonj 58.68 24/04/2013 05/02/2014 100 20/12/2018  
167 Sunamganj 64 dharmapasha 471 240 Upazila : Dharmapasha DIRIP/SNM/Dhrm /UZR/SL-17a(02)/12-13/W-40 Const. of 42.00m long RCC Girder bridge on Dharmapasha-Madha Nagar-Moheshkhola-Takerhat-Lawerghor-Sunamgonj road (Dharmapasha part) at ch. 12+250km. ID. 690322006 42.00 148.37 M/S Nabi hossain Jamalgonj Shunamgonj 171.50 01/06/2013 30/05/2014 100 20/12/2018  
168 Sunamganj 64 dharmapasha 471 240 Upazila : Dharmapasha DIRIP/SNM/Dhrm /UZR/SL-17a(01)/12-13/W-39 Const. of 42.00m long RCC Girder bridge on Dharmapasha-Madha Nagar-Moheshkhola-Takerhat-Lawerghor-Sunamgonj road (Dharmapasha part) at ch. 9+000km. ID. 690322006 42.00 154.77 M/S Nabi hossain Jamalgonj Shunamgonj 179.01 01/06/2013 30/05/2014 100 20/12/2018  
169 Sunamganj 64 jamalganj 468 240 Upazila: JamalgonjDIRIP/SNM/Jml//UZR/SL-20(d)(03)/16-17/W-185 Rehabilitation works of Netrakona – Dharmapasha – Jamalgonj – Sunamgonj raod (Jamalgonj – Joynagar road) at ch. 0+000km-2+200 km. (ID. 690502001) (Total Length=2.197 km) 2.20 206.34 M/S Howlader Builders,chak para, Netrakona 191.69 07/04/2017 10/06/2017 75 13/05/2019  
170 Sunamganj 64 jamalganj 468 240 Upazila: JamalgonjDIRIP/SNM/Jml/UZR/SL-20(c )(02)/14-15/W-115 Rehabilitation work of Netrokona - Dharmapasha - Jamalgonj - Sunamgonj road (Jamalgonj –Selimgonj road) Ch.2+800km - 5+400km (ID: 690502003). (Total Length=2.539 km) 2.54 137.66 Sujib Ranjan Das, Bagbari, Sylhet 115.63 01/12/2015 30/11/2016 60 13/05/2019  
171 Sunamganj 64 jamalganj 468 240 Upazila: JamalgonjDIRIP/SNM/Jml/UZR/SL-20 (c)(05)/16-17/W-183 Rehabilitation work of Netrokona - Dharmapasha - Jamalgonj - Sunamgonj road (Jamalgonj –Selimgonj road) Ch. 1+000km - 2+830 km (ID: 690502003). (Total Length=1.811 km) 1.81 135.77 M/S Shahid Brother!s Elite House Motijil C/A Dhaka 127.13 04/07/2017 28/02/2018 100 08/04/2019  
172 Sunamganj 64 jamalganj 468 240 Upazila: JamalgonjDIRIP/SNM/Jml//UZR/SL-20(d)(04)/16-17/W-186 Rehabilitation works of Netrakona – Dharmapasha – Jamalgonj – Sunamgonj raod (Jamalgonj – Joynagar road) at ch. 9+044km-11+300 km. (ID. 690502001) (Total Length=1.950 km) 1.95 177.02 M/S Shahid Brother!s Elite House Motijil C/A Dhaka 166.37 07/04/2017 28/02/2018 100 10/03/2019  
173 Sunamganj 64 jamalganj 468 240 Upazila: Jamalgonj DIRIP/SNM/Jml//UZR/SL-20(d)(02)/15-16/W-149 Rehabilitation works of Netrakona – Dharmapasha – Jamalgonj – Sunamgonj raod (Jamalgonj – Joynagar road) at ch. 6+930km-9+044 km. (ID. 690502001) (Total Length=2.100 km) 2.10 189.37 Kazi Nasir Uddin Shologhar, Sunamgonj 158.00 01/12/2015 30/11/2016 100 20/12/2018  
174 Sunamganj 64 jamalganj 468 240 Upazila: Jamalgonj DIRIP/SNM/Jml//UZR/SL-20(d)(01)/12-13/W-51 Rehabilitation works of Netrakona – Dharmapasha – Jamalgonj – Sunamgonj raod (Jamalgonj – Joynagar road) at ch. 2+100km-6+930km. (ID. 690502001) (Total Length=4.830 km) 4.83 368.24 M/S Mahbub enterprise Jamaipara Sunamgonj 399.94 18/06/2013 17/06/2014 100 20/12/2018  
175 Sunamganj 64 jamalganj 468 240 Upazila: Jamalgonj DIRIP/SNM/Jml/UZR/SL-20 (c)(06)/16-17/W-184 Rehabilitation work of Netrokona - Dharmapasha - Jamalgonj - Sunamgonj road (Jamalgonj –Selimgonj road) Ch. 5+400 km - 8+385 km (ID: 690502003). (Total Length=2.956 km) 2.96 228.54 M/S Mahbub enterprise Jamaipara Sunamgonj 212.08 17/04/2017 30/11/2017 100 20/12/2018  
176 Sunamganj 64 jamalganj 468 240 Upazila: Jamalgonj DIRIP/SNM/Jml/UZR/SL-20 (c)(04)/16-17/W-182 Rehabilitation work of Netrokona - Dharmapasha - Jamalgonj - Sunamgonj road (Jamalgonj –Selimgonj road) Ch. 0+000 km - 1+000 km (ID: 690502003). (Total Length=0.987 km) 0.99 77.87 M/S Pusha enterprise Jamalgonj Sunamgonj 71.53 07/04/2017 06/10/2017 100 20/12/2018  
177 Sunamganj 64 jamalganj 468 240 Upazila: Jamalgonj DIRIP/SNM/Jml/UZR/SL-20 (c)(03)/15-16/W-150 Rehabilitation work of Netrokona - Dharmapasha - Jamalgonj - Sunamgonj road (Jamalgonj –Selimgonj road) Ch. 8+816 km - 11+250 km (ID: 690502003). (Total Length=2.420 km) 2.42 192.06 M/S Mahbub enterprise Jamaipara Sunamgonj 188.22 20/01/2016 25/02/2017 100 20/12/2018  
178 Sunamganj 64 jamalganj 468 240     0.00   0.00 100 20/12/2018  
179 Sunamganj 64 jamalganj 468 240 Upazila : Jamalgonj DIRIP/SNM/Jamal/UZR/SL-20(c)(01)/12-13/W-47 Imp. of Netrakona-Dharmapasha-Jamalgonj-Sunamgonj road (Jamalgonj-Salimgonj road) at ch. 1+000km-2+400km & 6+435km - 6+475km. ID. 690502003. (Total length=1.430 km) 1.43 304.95 Kazi Nasim Uddin & M/S Shoeb Entp. (JV), Shologhar, Sunamgonj 335.11 01/05/2013 30/04/2014 100 20/12/2018  
180 Sunamganj 64 sunamganj-s 466 240 Upazila: Sadar DIRIP/SNM/SAD//UZR/SL-20(e)(01)/15-16/W-154 Imp. of Netrokona-Dharmopasha-Jamalgonj-Sunamgonj road (Katuir-Joynagar road) at ch. 10+000 km to 12+730 km. ID. 690892001 (Total Length=2.669 km) 2.67 194.58 Kazi Md. Nasim Uddin, Shologhor, Sunamganj 161.65 01/02/2016 30/05/2017 100 20/12/2018  
181 Sunamganj 64 tahirpur 465 240 Upazila: TahirpurDIRIP/SNM/Thpr/UZR/SL-17(b)(17)/17-18/W-217 Const. of (a) 1x1.00mx1.00m RCC U-Drain at ch. 2150m (b)2x4.00mx3.00m RCC box Culvert at ch. 9300m (c)2x4.00mx3.00m RCC box Culvert at ch. 16800m on Dharmapasha-Madhanagar - Moheshkhola - Takerhat - Lawerghor -Sunamgonj road (Tahirpur Part) ID: 690922006). 18.80 59.82 M/S.S.D , Enterprise, Hazipara, Suamgonj 56.83 01/08/2018 31/05/2019 100 13/05/2019  
182 Sunamganj 64 tahirpur 465 240 W-113 (Remaining Work) Const. of 32.00m long RCC Girder bridge on Dharmapasha-Madha Nagar-Moheshkhola-Takerghat-Lawerghor-Sunamgonj road (Moheshkhola-Takerghat-Muksudpur-Chinakandi road) at ch. 7750m over Charagaon Chara (ID. 690922006). (Taherpur part) 32.00 87.60   0.00 45 08/04/2019 Tender Invited
183 Sunamganj 64 tahirpur 465 240 Upazila: Tahirpur DIRIP/SNM/Thpr/UZR/SL-17(b)(16)/15-16/W-173 Slope protective Work of Dharmapasha-Madhanagar - Moheshkhola - Takerhat - Lawerghor -Sunamgonj road (Tahirpur Part) at ch. 13+870km - 19+510km ) ID: 690922006). (Total Length=0.120 km) 0.12 96.27 Aminul Islam Salim, Sholaghar, Sunamgonj. 72.76 22/09/2016 25/08/2017 100 20/12/2018  
184 Sunamganj 64 tahirpur 465 240 Upazila: Tahirpur DIRIP/SNM/Thpr/UZR/SL-17(b)(14)/14-15/W-113 Const. of 32.00m long RCC Girder bridge on Dharmapasha-Madha Nagar-Moheshkhola-Takerghat-Lawerghor-Sunamgonj road (Moheshkhola-Takerghat-Muksudpur-Chinakandi road) at ch. 7750m over Charagaon Chara (ID. 690922006). (Taherpur part) 32.00 92.81 Md. Atiqur Rahman, Natunpara, Sunamgonj. 92.81 01/06/2015 30/06/2016 100 20/12/2018 Work Cancelled
185 Sunamganj 64 tahirpur 465 240 Upazila: Tahirpur DIRIP/SNM/Thpr/UZR/SL-17(b)(13)/14-15/W-112 Const. of 38.00m long RCC Girder bridge on Dharmapasha-Madha Nagar-Moheshkhola-Takerghat-Lawerghor-Sunamgonj road at ch. 4400m. over Ronju Chara (ID. 690922006). (Taherpur part) (Total Length=0.100 km) 38.00 251.50 M/s. Belal Entp. Hazipara, Sunamgonj 250.96 01/06/2015 30/06/2017 100 20/12/2018  
186 Sunamganj 64 tahirpur 465 240 Upazila: Tahirpur DIRIP/SNM/Thpr/UZR/SL-17(b)(12)/14-15/W-111 Const. of 50.00m long RCC Girder bridge on Dharmapasha-Madha Nagar-Moheshkhola-Takerghat-Lawerghor-Sunamgonj road at ch. 10700m. over Lakma Chara (ID. 690922006).(Taherpur part) 50.00 313.46 H.S.-PE-AR, Jamalgonj 278.11 14/05/2015 31/12/2016 100 20/12/2018  
187 Sunamganj 64 tahirpur 465 240 Upazila: Tahirpur DIRIP/SNM/Thpr/UZR/SL-17(b)(11)/14-15/W-110 Const. of 75.00m long RCC Girder bridge on Dharmapasha-Madha Nagar-Moheshkhola-Takerghat-Lawerghor-Sunamgonj road(Moheshkhola-Tekerghat-Muksudpur-Chinakandi road) at ch. 5650m. over Kolagaon Chara Khal. (ID. 690922006). (Taherpur part) (Total Length=0.120 km) 75.00 353.50 JV of RAAM, Sunamgonj. 301.70 01/06/2015 30/06/2017 100 20/12/2018  
188 Sunamganj 64 tahirpur 465 240 Upazila: Tahirpur DIRIP/SNM/Thpr/UZR/SL-17(b)(09)/13-14/W-93 Rehabilitation work of Dharmapasha- Madhanagar - Moheshkhola – Takerhat – Lawerghor – Sunamgonj road (Tahirpur Part) ch. 13+870km to 16+650km (ID. 690922006) (Total Length=2.780 km) 2.78 228.15 M/s. Sajib Ranjan Das, 197, Bagbari, Sylhet. 225.72 01/07/2014 31/03/2016 100 20/12/2018  
189 Sunamganj 64 tahirpur 465 240 Upazila: Tahirpur DIRIP/SNM/Thpr/UZR/SL-17(b)(08)/12-13/W-73 Const. of 12 nos RCC box culvert on Dharmapasha- Madhanagar - Moheshkhola – Takerhat – Lawerghor – Sunamgonj road (Tahirpur Part) at different ch. (ID. 690922006) 90.00 286.48 M/s. Sawdagar Builders Hasannagar, Sunamgonj 332.28 27/11/2013 26/11/2014 100 20/12/2018  
190 Sunamganj 64 tahirpur 465 240 Upazila: Tahirpur DIRIP/SNM/Thpr/UZR/SL-17(b)(07)/12-13/W-57 Const. of 4x4.00x4.00 box culvert on Dharmapasha- Madhanagar - Moheshkhola – Takerhat – Lawerghor – Sunamgonj road (Tahirpur Part) at ch. 23000m. (ID. 690922006 16.00 49.27 Talukder Ent. (JV0 49.25 12/05/2013 11/05/2014 100 20/12/2018  
191 Sunamganj 64 tahirpur 465 240 Upazila: Tahirpur DIRIP/SNM/Thpr/UZR/SL-17(b)(06)/12-13/W-56 Const. of 2x4.00x4.00 box culvert on Dharmapasha- Madhanagar - Moheshkhola – Takerhat – Lawerghor – Sunamgonj road (Tahirpur Part) at ch. 8100m. (ID. 690922006) 8.00 29.60 M/s. Sawdagar Builders Hasannagar, Sunamgonj 34.00 01/10/2013 30/09/2014 100 20/12/2018  
192 Sunamganj 64 tahirpur 465 240 Upazila: Tahirpur DIRIP/SNM/Thpr/UZR/SL-17(b)(05)/12-13/W-55 Const. of 4x4.00x4.00 box culvert on Dharmapasha- Madhanagar - Moheshkhola – Takerhat – Lawerghor – Sunamgonj road (Tahirpur Part) at ch. 6850m. (ID. 690922006) 16.00 49.15 M/s. Sawdagar Builders Hasannagar, Sunamgonj 56.47 01/10/2013 30/09/2014 100 20/12/2018  
193 Sunamganj 64 tahirpur 465 240 Upazila: Tahirpur DIRIP/SNM/Thpr//UZR/SL-17(b)(04)/12-13/W-54 Const. of 2x4.00x3.00 box culvert on Dharmapasha- Madhanagar - Moheshkhola – Takerhat – Lawerghor – Sunamgonj road (Tahirpur Part) at ch. 4500m. (ID. 690922006) 8.00 25.51 M/s. Sawdagar Builders Hasannagar, Sunamgonj 29.31 01/10/2013 30/07/2014 100 20/12/2018  
194 Sunamganj 64 tahirpur 465 240 Upazila: Tahirpur DIRIP/SNM/Thpr//UZR/SL-17(b)(03)/12-13/W-53 Const. of 2x4.00x3.00 box culvert on Dharmapasha- Madhanagar - Moheshkhola – Takerhat – Lawerghor – Sunamgonj road (Tahirpur Part) at ch. 3400m. (ID. 690922006) 8.00 29.60 M/S Mahbub enterprise Jamaipara Sunamgonj 33.86 01/10/2013 30/07/2014 100 20/12/2018  
195 Sunamganj 64 tahirpur 465 240 Upazila: Tahirpur DIRIP/SNM/Thpr//UZR/SL-17(b)(02)/12-13/W-52 Const. of 4x4.00x3.00 box culvert on Dharmapasha- Madhanagar - Moheshkhola – Takerhat – Lawerghor – Sunamgonj road (Tahirpur Part) at ch. 3000m. (ID. 690922006) 16.00 43.81 M/s. Hasan Enterprise Jamaipara, Sunamgonj 50.14 01/10/2013 30/07/2014 100 20/12/2018  
196 Sunamganj 64 tahirpur 465 240 W-21 (Remaining Work) Remaining work of Dharmapasha-Maddyanagar-Moheshkhola-Takerghat-Lowerghar road (Tahirpur Part) (ID: 690922006) (Ch.12+870 km to 13+870 km) 1.00 56.09 M/s. Bastha Nirman Sangastha, Sunamganj 48.78 01/10/2015 31/03/2016 100 20/12/2018 Remaining Work
197 Sunamganj 64 tahirpur 465 240 Upazila : Tahirpur DIRIP/SNM/Tahir/ UZR/SL-17(b)(01)/12-13/W-21 Improvement of Dharmapasha-Maddyanagar-Moheshkhola-Takerghat-Lowerghar road (Tahirpur Part) (ID: 690922006) (Ch.12+870 km to 13+870 km) 1.00 58.28 Mr. Amal Kanti Chowdhury Hassannagor Sunamgonj 55.36 15/02/2013 14/08/2013 100 20/12/2018 Work Cancelled
198 Tangail 18 mirzapur 143 240 Upazila: Mirzapur.DIRIP/TAN/Mirz/UZR/SL-35(b)(01)/14-15/W-103 Const. of 99.00m long RCC Girder bridge on Kurni-Fatepur-Kanchanpur GC road at ch. 7+845km (ID: 393662004) Part A: BC Road work = Nil Part B: Rehabilitation = Nil Part C: Structure = 01 No. (99.00m) at ch 7+845km. (Total ( HBB) Length=0.120 km) 99.00 440.06 M/S Orient Trade International, 17/18, Akkhaydas lane, Gendaria, Sutrapur,Dhaka 559.40 21/12/2014 20/12/2016 95 08/04/2019
199 Tangail 18 mirzapur 143 240 Upazila: Mirzapur.DIRIP/TAN/Mirz/UZR/SL-35(b)(02)/17-18/W-218 Approach/Bank Protaction of 99.00m long RCC Girder bridge on Kurni-Fatepur-Kanchanpur GC road at ch. 7+845km (ID: 393662004) Total ( Protactive Work) Length= 0.302 km) 99.00 283.72   0.00 65 08/04/2019 Tender Invited
200 Tangail 18 mirzapur 143 240 Upazila: Mirzapur.DIRIP/TAN/Mirz/VR-34(02)/16-17/W-203 Improvement of Paharpur - Mirzapur-Amrail via sorab nagor road. (ID:393664030 )Part A: HBB Road Works=5.620km (Ch.2+223km to 7+843 km) Part B:Rehabilitation Works=nil Part C: Structure Works= 01- no Bridge 20.00m & 09- nos Culvert 29.50 m (Total (HBB)Length=5.566 km) 5.57 1133.95 United CommercialCenter Ltd.Richi Enterprise (JV), Jatrabari, Dhaka 1099.63 22/06/2017 28/03/2018 55 08/04/2019  
201 Tangail 18 mirzapur 143 240 Upazila: Mirzapur. DIRIP/TAN/Mirz/VR/SL-39(01)/14-15/W-114 Const. of 24.00m long RCC Girder bridge on Baimhati-Bawer-Kumarjani road over Mora river at ch. 1+200km (ID: 393664078) Part C: Structure = 01 No. 24.00m 24.00 114.10 Alif Traders, Sabalia, Tangail 98.32 27/05/2015 26/05/2016 100 20/12/2018  
202 Tangail 18 mirzapur 143 240 Upazila: Mirzapur. DIRIP/TAN/Mirz/VR/SL-38(01)/14-15/W-104 Const. of 81.00m long PC Girder bridge on Dewhata bazaar-Kumarzani road at ch. 0+200km (ID: 393664077) Part A: BC Road work = Nil Part B: Rehabilitation = Nil Part C: Structure = 01 No. (81.00m) at ch. 0+200 km (Total (HBB)Length=0.090 km 81.00 354.01 Azad Engineer, Khulna Office, 89,R/W App Road, Khulna 345.77 11/12/2014 10/12/2015 100 20/12/2018  
203 Tangail 18 mirzapur 143 240 Upazila: Mirzapur. DIRIP/TAN/Mirz/ VR/Sl-37(01)/13-14/W-75 Const. of 99.92m long RCC Girder bridge on Fatepur bazar-Chowbaria road at ch.4+175km (ID. 393664031) 99.92 378.07 M/s. Taposh Traders. Thanapara, Tangail 453.63 07/01/2014 30/12/2016 100 20/12/2018  
204 Tangail 18 mirzapur 143 240 Upazila: Mirzapur. DIRIP/TAN/Mirz/VR/SL-36(01)/14-15/W-107 Const. of 81.00m long RCC Girder bridge over Kunai river on Takia-Kadma road at ch. 1470m (ID: 393665045) Part A: BC Road work = Nil Part B: Rehabilitation = Nil Part C: Structure = 01 No. 81.00m 81.00 384.27 Alif Traders & Nabila Enterprise-JV, Sabalia, Tangail 384.27 04/03/2015 30/11/2016 100 20/12/2018  
205 Tangail 18 mirzapur 143 240 Upazila: Mirzapur. DIRIP/TAN/Mirz /VR-34(01)/12-13/W-71 Improvement of Paharpur - Mirzapur-Amrail via sorab nagor road. (ID:393664030 )Part A: BC Road Works=2.223 km (Ch.0+000 km to 2+223 km) Part B:Rehabilitation Works=nil Part C: Structure Works= 1 (one) no(1.6m) (Total Length=2.223 km) 2.22 138.16 Rahman const Pro. Motiur rahman Akurtakur Para Tangil 158.79 23/09/2013 23/04/2014 100 20/12/2018  
206 Tangail 18 mirzapur 143 240 Upazila: Mirzapur. DIRIP/TAN/Mirz/VR/SL-33(03)/16-17/W-200 Imp. of Gallibazar-Gramati-Panimashail road. ID. 393664006 Part A: BC Road work = 0.662 km ( Ch. 5+500 km-6+162 km) Part B: Rehabilitation = Nil Part C: Structure = Nil (Total Length=0.662 km) 0.66 43.39 M/S. Talukder International, 610, Kazipara, Mirpur, Dhaka 46.75 24/08/2017 23/02/2018 100 20/12/2018  
207 Tangail 18 mirzapur 143 240 Upazila: Mirzapur. DIRIP/TAN/Mirz/VR/SL-33(02)/14-15/W-133 Imp. of Gallibazar-Gramati-Panimashail road. ID. 393664006 Part A: BC Road work = 3.500 km ( Ch. 2+000 km-5+500 km) Part B: Rehabilitation = Nil Part C: Structure = 03 No. 4.25m (Total Length=3.500 km) 3.50 223.48 M/s. Khan & Co. 79, Pourashava Market, Tangail 202.24 20/09/2015 30/12/2016 100 20/12/2018  
208 Tangail 18 mirzapur 143 240 Upazila: Mirzapur. DIRIP/TAN/Mirz /VR-33(01)/12-13/W-70 Improvement of Galibazar-Gramati-Panimashail Road (ID: 393664006) Part: A Road Works =2.00 km (Ch.0+000 km to 2+000 km) Part B:Rehabilitation Works=nil Part C: Structure Works= nil (Total Length=2.000 km) 2.00 118.13 M/s. Taposh Traders. Thanapara, Tangail 141.16 30/01/2014 25/01/2015 100 20/12/2018  
209 Tangail 18 mirzapur 143 240 Upazila: Mirzapur DIRIP/TAN/Mirz/VR/SL-32(03/16-17/W-202 Imp. of Bardam - Chitmamudpur road. ID. 393665017 Part A: BC Road work = 0.580 km ( Ch. 8+700 km-9+280 km) Part B: Rehabilitation = Nil Part C: Structure = 03 Nos (1.875m ) (Total Length=0.580 km) 0.58 44.01 M/S. Mridha Enterprise, Mirzapur, Tangail 44.01 13/08/2017 02/12/2018 100 20/12/2018  
210 Tangail 18 mirzapur 143 240 Upazila: Mirzapur DIRIP/TAN/Mirz/VR/SL-32(02/14-15/W-132 Imp. of Bardam - Chitmamudpur road. ID. 393665017 Part A: BC Road work = 2.200km ( Ch. 4+500 km-6+700 km) Part B: Rehabilitation = Nil Part C: Structure = 06 No. 3.75m (Total Length=2.200km) 2.20 128.14 M/s. Taposh Traders, Thanapara, Tangail 121.65 03/09/2015 06/02/2016 100 20/12/2018  
211 Tangail 18 mirzapur 143 240 Upazila: Mirzapur. DIRIP/TAN/Mirz /VR-32(01)/12-13/W-69 Improvement of Bardam-Chitmamudpur Road (ID: 393665017) Part A: Pucca Road Works=2.00 km (Ch. 6+700 km to 8+700 km) Part B:Rehabilitation Works=4.500km (Ch 0+00 to 4+500) Part C: Structure Works= nil (Total Length=6.500 km) 6.50 179.93 M/s. Taposh Traders. Thanapara, Tangail 215.04 30/01/2014 07/05/2017 100 20/12/2018  
212 Tangail 18 mirzapur 143 240 Upazila: Mirzapur DIRIP/TAN/Mirz/UNR/SL-31(03)/14-15/W-131 Imp. of Ajgana Up (Hatubhanga GC)-Kuripara road ID. 393663016 Part A: BC Road work = 0.400 km ( Ch. 4+000 km-4+400 km) Part B: Rehabilitation = Nil Part C: Structure = Nil (Total Length=0.400km) 0.40 23.97 M/s. Oboni Enterprise, Gopalpur, Tangail 22.49 03/09/2015 28/06/2016 100 20/12/2018  
213 Tangail 18 mirzapur 143 240 Upazila: Mirzapur DIRIP/TAN/Mirz/UNR/SL-31(02)/14-15/W-105 Imp. of Azgana UP (Hatubhanga GC)-Kuripara road (ID: 393663016) Part A: BC Road work = 1.507 km at ch. 0+493km – 2+000 km Part B: Rehabilitation = 0.493 km at ch. 0+000km – 0+493 km Part C: Structure = 06 Nos. (3.75m) (Total Length=2.00km) 2.00 119.74 Rahman const Akurtakur Para, C&B road, Tangil 138.30 10/12/2014 31/05/2016 100 20/12/2018  
214 Tangail 18 mirzapur 143 240 Upazila: Mirzapur. DIRIP/TAN/Mirz /UNR-31(01)/12-13/W-68 Improvement of Azgana UP (Hatubhanga GC)-Kuripara Road. (ID: 393663016) Part A: Pucca Road Works=2.00 km (Ch. 2+000 km to 4+000 km) Part B:Rehabilitation Works= Nil Part C: StructureWorks=07nos(4.375m) (Total Length=2.00km) 2.00 122.37 M/s. Akter Trading Corporation, Sirajgonj Sadar, Sirajgonj 146.81 21/10/2013 02/06/2014 100 20/12/2018  
215 Tangail 18 mirzapur 143 240 Upazila:Mirzapur. DIRIP/Tan/Mirz/UZR/SL-30(04)/15-16/W-158 Improvement of Mirzapur-Pathorghata-Taktarchala road. Ch. 0+500 km - 0+620 km, 0+920 km - 1+085 km & 2+658 km to 8+961 km) ID. 393662006 (Total Length=6.588 km) 6.59 484.43 M/s. Alif Traders, & Nabila Enterprise (JB) District Gate, Sabalia, Tangail 500.20 23/03/2016 31/01/2018 100 20/12/2018  
216 Tangail 18 mirzapur 143 240 Upazila:Mirzapur. DIRIP/Tan/Mirz/UZR/SL-30(03)/15-16/W-157 Rehabilitation work of Mirzapur-Pathorghata-Taktarchala road. (Ch. 0+000 km - 0+500 km & 1+085 km - 2+658 km) ID. 393662006 (Total Length=2.073 km) 2.07 92.91 M/s. Alif Traders, Sabalia, Tangail 96.52 15/02/2016 14/02/2017 100 20/12/2018  
217 Tangail 18 mirzapur 143 240 Upazila: Mirzapur. DIRIP/TAN/Mirz /UZR-30(02)/12-13/W-67 Improvement of Mirzapur-Pathorghata-Taktarchala Road Part A: Pucca Road Works=1.213 km (ID: 393662006) (Ch. 12+994 km to 14+207 km) Part B:Rehabilitation Works= Nil Part C: Structure Works= nil (Total Length=1.213 km) 1.21 89.03 M/S.Alif Traders Pro. M. R. Khan (Tutul) Sabalia, Tangail. 106.80 21/10/2013 27/02/2014 100 20/12/2018  
218 Tangail 18 mirzapur 143 240 Upazila: Mirzapur. DIRIP/TAN/Mirz /UZR-30(01)/12-13/W-01 Improvement of Mirzapur- Pathorghata-Taktarchala Road (ID: 393662006) Part A: Pucca Road Works=1.00km. (Ch. 14+207 km to 15+207 km) Part B:Rehabilitation Works=4.784km. (Ch. 8+961 km to 11+903 km,16+247Km to 18+200Km) Part C: Structure Works=3 Nos,18.00m. (Total Length=5.784km) 5.78 262.81 M/S.Alif Traders Pro. M. R. Khan (Tutul) Sabalia, Tangail. 288.86 13/01/2013 19/07/2013 100 20/12/2018  
219 Tangail 18 mirzapur 143 240 Upazila: Mirzapur. DIRIP/TAN/Mirz/UNR/SL-29(04)/16-17/W-201 Improvement of Mirzapur-Amrail-Talipara-Kamarpara road at ch. 8+470 km - 8+690) ID. 393663001. (Total Length=0.220 km) 0.22 18.20 M/s. Alif Traders, Sabalia, Tangail 19.09 06/02/2017 26/11/2017 100 20/12/2018  
220 Tangail 18 mirzapur 143 240 Upazila:Mirzapur DIRIP/Tan/Mirz/UNR/SL-29(03)/15-16/W-156 Rehabilitation work of Mirzapur-Amrail-Talipara-Kamarpara road at ch. 7+408 km - 8+470) ID. 393663001. (Total Length=1.062km) 1.06 79.95 M/s. Alif Traders, Sabalia, Tangail 83.83 15/02/2016 28/04/2018 100 20/12/2018  
221 Tangail 18 mirzapur 143 240 Upazila: Mirzapur DIRIP/TAN/Mirz/UNR/SL-29(02)/14-15/W-134 Rehabilitation work of Mirzapur-Amrail-Talipara-Kamarpara Road (ID: 393663001) Part A: BC Road Works=Nil Part B: Rehabilitation Works= 3.659 km (Ch.0+749 km to 2+250 km& 4+250km to 6+408km)Part C: Structure Works= 02 Nos. 8.00 m (Total Length=3.659 km) 3.66 242.40 Md. Abdul Jalil Sarker, Akur-Takurpara, Tangail 220.11 20/09/2015 19/06/2016 100 20/12/2018  
222 Tangail 18 mirzapur 143 240 Upazila: Mirzapur. DIRIP/TAN/Mirz /UNR-29(01)/12-13/W-17 Improvement of Mirzapur-Amrail-Talipara-Kamarpara Road (Mirzapur H/Q-Hariabazar via Kamarpara bazar road) (ID: 393663001) Part A: Pucca Road Works=1.00 km (Ch. 6+408 km to 7+408 km) Part B:Rehabilitation Works= 2.00km (Ch.2+250 km to 4+250 km) Part C: Structure Works= 1 No. 3.50m (At Ch.4+450 km) (Total Length=2.539 km) 2.54 249.23 M/S. Sayed Mozibar Rahman, College Para, Tangail 256.63 16/04/2013 30/11/2014 100 20/12/2018