1
|
B.baria
|
14
|
b.baria-s
|
104
|
240
|
Upazila : Sadar
DIRIP/BBR/Sad/
UZR/SL-04(01)/12-13/W-29
|
Improvement of Panchabati R&H road-Akhaura bazar road (Heliday) road (ID: 412132006)
Part A: Pucca Road Works. Nil
Part B:Rehabilitation Works= 4.225 km
(Ch. 0+00km to 4+225km)
Part C: Structure Works=Nil. (Total Length=4.225 km)
|
|
4.23
|
|
|
382.78
|
M/s. MRC & MMK (JV)
Kawtali
B.Baria
|
382.71
|
|
11/02/2013
|
01/07/2013
|
100
|
|
|
20/12/2018
|
|
|
2
|
B.baria
|
14
|
BijoyNagar
|
487
|
240
|
Upazila : Bijoynagar
DIRIP/BBR/Bijoy
/UZR/SL-5(01)/12-13/W-19
|
Improvement of Nurpur GC-Kalibari R&H (Simna-B.Baria road) (Bijoynagar part) (ID: 412152009)
Part A: Pucca Road Works. Nil
Part B:Rehabilitation Works= 0.67 km
(Ch. 0+00 to 0+670km)
Part C: Structure Works=Nil. (Total Length=0.670 km)
|
|
0.67
|
|
|
59.41
|
M/s. Mostafa
Kamal
|
59.41
|
|
25/07/2013
|
18/12/2013
|
100
|
|
|
20/12/2018
|
|
|
3
|
B.baria
|
14
|
sarail
|
98
|
240
|
Upazila : Sarail
DIRIP/BBR/Sarl
/UZR/SL-3(01)/15-16/W-174
|
Rehabilitation of Shahbajpur-Shahajadpur Road(Ch. 0+000km-4+850km). ID. 412942002
Part A: BC Road Works. Nil
Part B:Rehabilitation Works= 4.407 km
(Ch. 0+328km - 2+360km & 2+475km-4+850km)Part C: Structure Works=Nil.
Parte D: RCC Work=0.375km(Ch. 0+068km - 0+328km & 2+360km-2+475km). (Total Length=4.782 km)
|
|
4.78
|
|
|
361.76
|
M/S. Mahabub
Alam,Vairob, Khishorgonj
|
293.92
|
|
30/08/2016
|
06/05/2017
|
100
|
|
|
20/12/2018
|
|
|
4
|
Barguna
|
2
|
amtali
|
16
|
240
|
Upazila: AmtaliDIRIP/BRG/Amt/UZR/SL-15(02)/15-16/W-138
|
Part A: Imp. of Gulishakhali Bazar UP-Mahishkata Road & R&H-Shahjahan Mansur road-Hazar Taker Bendth-Shahid Sarwarthe School (Remaning Portion) Road (Amtali-Mahishkata R&H-Kalagacia-Kaserhat GC via Gulishakhali Bazar) ch. 2+000 km to 2+750 km. ID. 504092010
|
|
0.75
|
|
|
538.89
|
Md. Abul Kalam Azad. Natun Bazar, Patuakhali
|
452.67
|
|
17/12/2015
|
03/12/2017
|
94
|
|
|
13/05/2019
|
|
|
5
|
Barguna
|
2
|
amtali
|
16
|
240
|
Upazila: AmtaliDIRIP/BRG/Amt/VR/SL-14(04)/15-16/W-153
|
Const. of 40.00 m long RCC Girder Bridge on Gulishakhali UP-Yunus Ali Khan College-Mahishkata R&H road to Khagdon School Road (Mahiskata RHD-Gulishakhali UP via Yunus Khan College) at ch. 1+500 km. ID. 504094052 (Total (HBB)Length=0.097 km)
|
|
40.00
|
|
|
255.30
|
M/S.AAC & PC (JV),BB Road,Barguna
|
215.77
|
|
20/12/2015
|
11/03/2016
|
100
|
|
|
08/04/2019
|
|
|
6
|
Barguna
|
2
|
amtali
|
16
|
240
|
Upazila: AmtaliDIRIP/BRG/Amt/VR/SL-14(05)/16-17/W-215
|
Const. of 30.00 m long RCC Girder Bridge on Gulishakhali UP-Yunus Ali Khan College-Mahishkata R&H road to Khagdon School Road at ch. 9.00m, ID. 504094052
(Total (HBB)Length=0.033 km)
|
|
30.00
|
|
|
202.47
|
M M Builders & Engineers Ltd - M/S Tanvir Ahmed (JV), Gulshan, Dhaka
|
182.23
|
|
07/02/2018
|
30/06/2018
|
90
|
|
|
11/04/2019
|
|
|
7
|
Barguna
|
2
|
amtali
|
16
|
240
|
Upazila:Amtali DIRIP/BRG/Amt/UNR/SL-15(04)/15-16/W-152
|
Const. of 18.00 m long RCC Girder Bridge on Gulishakhali Bazar UP-Mahishkata Road & R&H-Shahjahan Mansur road-Hazar Taker Bendth-Shahid Sarwarthe School (Remaning Portion) Road (Gulishakhali UP-Kukua hat via Chunakhali bazar & Hazar Takar bandh) at ch 4+480 km. ID. 504093006
|
|
18.00
|
|
|
132.51
|
M/s. Lutful Kabir, Dilbag, Bagura, Alekanda road, Barisal.
|
108.64
|
|
20/12/2015
|
30/05/2017
|
100
|
|
|
20/12/2018
|
|
|
8
|
Barguna
|
2
|
amtali
|
16
|
240
|
Upazila: Amtali DIRIP/BRG/Amt/UZR/SL-15(03)/15-16/W-151
|
Const. of 50.00 m long RCC Girder Bridge on Gulishakhali Bazar UP-Mahishkata Road & R&H-Shahjahan Mansur road-Hazar Taker Bandh-Shahid Sarwarthe School (Remaning Portion) Road (Amtali-Mahishkata R&H-Kalagacia-Kaserhat GC via Gulishakhali Bazar) at ch. 2+924 km. ID. 504092010
|
|
50.00
|
|
|
386.65
|
M/s. Lutful Kabir, Dilbag, Bagura, Alekanda road, Barisal.
|
321.68
|
|
10/12/2015
|
31/05/2017
|
100
|
|
|
20/12/2018
|
|
|
9
|
Barguna
|
2
|
amtali
|
16
|
240
|
|
Part C: Rehab. work of Gulishakhali Bazar UP-Mahishkata Road & R&H-Shahjahan Mansur road-Hazar Taker Bendth-Shahid Sarwarthe School (Remaning Portion) Road (Gulishakhali UP-Kukua hat via Chunakhali bazar & Hazar Takar bandh). ch. 3+100 km to 4+100 km, 4+100km - 6+000km & 6+000km - 6+500km. ID. 504093006
Salvaged Tk. 2,65,309.00
(Total Length=7.561 km)
|
|
3.40
|
|
|
0.00
|
|
0.00
|
|
|
|
100
|
|
|
20/12/2018
|
|
|
10
|
Barguna
|
2
|
amtali
|
16
|
240
|
Upazila: Amtali
DIRIP/BRG/Amt/UZR/SL-15(01)/12-13/W-45
|
Imp. of Gulishakhali Bazar UP-Mahishkata Road & R&H-Shahjahan Mansur road-Hazar Taker Bendth-Shahid Sarwarthe School (Remaning Portion) Road at ch. 00-2000m. ID. 504092010
(Total Length=2.000 km)
|
|
2.00
|
|
|
181.74
|
Md. Abul Kalam Azad.
Azad Bhaban, Patuakhali
|
196.21
|
|
03/06/2013
|
31/03/2016
|
100
|
|
|
20/12/2018
|
|
|
11
|
Barguna
|
2
|
amtali
|
16
|
240
|
Upazila: Amtali
DIRIP/BRG/Amt/VR/SL-14(03)/15-16/W-139
|
Part A: Gulishakhali UP-Yunus Ali Khan College-Mahishkata R&H road to Khagdon School Road (Khakdon Chawrasta to Kakua UP via Purba Chunakhali GPS) ch.0+000 km to 0+700 km & 3+700km - 6+190km. ID. 504094070
Salvaged Tk. 9,63,702.00
|
|
3.52
|
|
|
247.02
|
Md. Shahidul Islam, Amtali, Barguna
|
209.02
|
|
17/12/2015
|
31/05/2018
|
100
|
|
|
20/12/2018
|
|
|
12
|
Barguna
|
2
|
amtali
|
16
|
240
|
Upazila: Amtali
DIRIP/BRG/Amt/VR/SL-14(02)/12-13/W-46
|
Imp. of Gulishakhali UP-Yunus Ali Khan College-Mahishkata R&H road to Khagdon School Road at ch.1700-3700m. ID. 504094052 & ID. 504094070 (Total Length=2.000 km)
|
|
2.00
|
|
|
134.74
|
Md. Golamkibria
|
154.75
|
|
20/06/2013
|
30/06/2015
|
100
|
|
|
20/12/2018
|
|
|
13
|
Barguna
|
2
|
amtali
|
16
|
240
|
Upazila: Amtali
DIRIP/BRG/AMT
/VR/SL-14(01)/12-13/W-16
|
Imp.of Gulishakhali UP-Yunus Ali Khan College-Mahishkata RHD to Khakdon School road ID: 504094052 & 504094070 [(Khakdon Chowrasta to Kukua UP via Purba Chunakhali GPS road (Purba Kewabunia RHD-Roy bala Chowrasta via Akbaria Dakhil Madrasha) road by BC (ID No-504094070)]
Part A:Pucca (BC) Road Works= 1.00km (Ch. 0+700 to 1+700 km)
Part B:Rehabilitation Works= Nil
Part C:Structure Works = 04- Nos, 3.475m (Total Length=1.000 km)
|
|
1.00
|
|
|
68.31
|
M/S GM IKFA Ent
Amtoly Borguna
|
77.68
|
|
15/01/2013
|
15/03/2015
|
100
|
|
|
20/12/2018
|
|
|
14
|
Bhola
|
4
|
charfassion
|
5
|
240
|
DIRIP/Bhl/ Chrf/VR/SL-55(05)/13-14/ W-92
|
Construction of 60.00m Long RCC girder Bridge on the road of Kashemgonj to east side of Madraj Beribadh road at Ch: 14+640km over Thalakhali Khal (ID No. 509254076) Structure Works = 01 No. (60.00m) (at Ch: 14640m.) charfession
|
|
|
60.00
|
|
337.76
|
Unas Al mamun
|
386.55
|
20/01/2014
|
20/01/2014
|
19/01/2015
|
100
|
338.79
|
88
|
11/04/2019
|
|
|
15
|
Bhola
|
4
|
charfassion
|
5
|
240
|
DIRIP/Bhl/ Chrf/ UNR/SL-49(04)/13-14/W-60
|
Imp. of Madraj Beribadh-West side Tetulia river road. (ID: 509253056). BC Road Works = 0.980km, (Ch.: 12+250km - 13+230km) Structure Works = 05 Nos (11.00m) under Charfession.
|
509253056
|
0.98
|
11.00
|
|
830.44
|
M/s Rubal Enterprise
|
646.79
|
29/01/2014
|
29/01/2014
|
28/07/2014
|
100
|
644.06
|
100
|
28/07/2014
|
|
|
16
|
Bhola
|
4
|
charfassion
|
5
|
240
|
DIRIP/Bhl/Chrf/VR/SL-51(04)/13-14/W-90
|
C40 BC Road Works = 1.910km, (Ch.: 5+440km - 74+350km) Structure Works = 08 Nos (14.25m) under Charfession.
|
|
1.91
|
14.25
|
|
142.68
|
Mohiuddin Ahamed
|
116.92
|
29/01/2014
|
29/01/2014
|
20/10/2015
|
100
|
116.90
|
100
|
27/06/2019
|
|
|
17
|
Bhola
|
4
|
charfassion
|
5
|
240
|
DIRIP/Bhl/Chrf/VR/SL-52(04)/13-14/W-91
|
Imp. of Charfokira Beribadh to Osmangornj Uniion border road. (ID: 589254874) BC Road Works = 4.360km, (Ch.: 7+500km - 8+100km, 28+670km-31+230km & 31+830km-33+030km) Structure Works = 09 Nos (6.75m)under Charfession
|
589254874
|
4.36
|
6.75
|
|
285.95
|
Unas Al mamun
|
324.45
|
20/01/2014
|
20/01/2014
|
20/10/2015
|
100
|
323.84
|
100
|
27/06/2019
|
|
|
18
|
Bhola
|
4
|
charfassion
|
5
|
240
|
Upazila: CharfashionDIRIP/BHL/Chrf/VR/SL-55(06)/16-17/W-212
|
Const. of 63.00 m long RCC Girder bridge on Kashemgonj to East side of Madraj beri bandh road. At Ch. 13410 m ID. 509254076.
(Total(Approach) Length=0.100 km)
|
|
63.00
|
|
|
352.93
|
M/s. Unus-al-Mamun, Charfashion, Bhola
|
352.79
|
|
25/01/2018
|
24/01/2019
|
65
|
|
|
13/05/2019
|
|
|
19
|
Bhola
|
4
|
charfassion
|
5
|
240
|
DIRIP/BHL/Chrf/UNR/SL-49(08)/16-17/W-211
|
Construction of 25.00 m long PC Girder Bridge on Madraj Beribadh-west side of Tetulia river road at Ch. 16285 m ID. 509253056. (Total(Approach) Length=0.100 km)
|
|
0.10
|
|
|
191.03
|
M/S Friends Corpo.Ukil Para roadBhola
|
190.95
|
|
25/01/2018
|
21/01/2019
|
70
|
|
|
13/05/2019
|
|
|
20
|
Bhola
|
4
|
charfassion
|
5
|
240
|
DIRIP/BHL/Char/VR/SL-53/15-16W-171
|
Improvement of Nurabad to east Border of Madraj Union Road from Ch: 20+600km to 21+275 km (Rd. ID: 509254075)
|
509254075
|
0.68
|
|
|
40.42
|
Md. Unas Al Mamun
|
40.40
|
25/05/2016
|
30/05/2016
|
24/11/2016
|
75
|
25.46
|
100
|
11/04/2019
|
|
|
21
|
Bhola
|
4
|
charfassion
|
5
|
240
|
DIRIP/BHL/Chrf/VR/SL-50(05)/15-16/W-142 (RW)
|
Improvement of Aslampur UP border to Osmangonj Beribadh road (Ch. 21+650km - 24+000km & 24+660km - 25+310km). ID. 509254072
(Total Length=3.00km)
|
|
3.00
|
|
|
194.65
|
M/S Poly Engineering, Corporation,10,Parara road,Barisal
|
188.82
|
|
07/12/2016
|
08/05/2018
|
100
|
|
|
08/04/2019
|
|
|
22
|
Bhola
|
4
|
charfassion
|
5
|
240
|
DIRIP/BHL/Chrf/VR/SL-56(05)/16-17/W-213
|
Const. of 30.00 m long PC Girder bridge on Aminabad Boyati Khal Bridge to east side of Madraj Beri badh Road.At ch. 16050 m. (ID:509254028). (Total(Approach) Length=0.100 km)
|
|
30.00
|
|
|
253.46
|
M/s. Unus-al-Mamun, Charfashion, Bhola
|
253.36
|
|
25/01/2018
|
24/01/2019
|
80
|
|
|
08/04/2019
|
|
|
23
|
Bhola
|
4
|
charfassion
|
5
|
240
|
DIRIP/BHL/Chrf/UNR/SL-49(06)/16-17/W-193
|
Improvement of Madraj Beribadh-west side Tetulia river road (Ch.15+490km - 17+330km & 18+150km - 20+070 km). ID. 509253056.
(Total Length=3.705km)
|
|
3.71
|
|
|
302.17
|
M/S Jashim Const.ChorfashonBhola
|
302.16
|
|
29/05/2017
|
28/05/2018
|
70
|
|
|
10/03/2019
|
|
|
24
|
Bhola
|
4
|
charfassion
|
5
|
240
|
DIRIP/Bhl/Chrf/VR/SL-55(01)/12-13/ W-34
|
Imp. of Kashemgonj to East side of Madraj beri badh road. (ID: 509254076): Part A: BC Road Works = 3.390km. (Ch.: 0+00km to 3+390km). Part B: Rehabilitation Woks = Nil. Part C: Structure Works = 12 Nos (17.25m). under Charfession upazila.
|
509254076
|
3.39
|
11.75
|
|
259.75
|
M/s. Bokshi Enterprise
|
258.67
|
28/03/2013
|
28/03/2013
|
27/09/2014
|
100
|
254.39
|
100
|
28/02/2019
|
|
|
25
|
Bhola
|
4
|
charfassion
|
5
|
240
|
Upazila: CharfashionDIRIP/BHL/Chrf/VR/SL-56(04)/16-17/W-198
|
Imp.Of Aminabad Boyati Khal Bridge to east side of Madraj Beri bandh Road (ID:509254028).
Part A:Pucca (BC) road Works=2.335km
(Ch.14+550 km to 16+885 km )
Part B:Rehabilitation Works = Nil
Part C Structure Works =6 nos (10.50m)
(Total Length=2.199 km)
|
|
2.34
|
|
|
168.79
|
M/s. Bokshi Ent. Charfashon, Bhola
|
168.76
|
|
29/05/2017
|
28/05/2018
|
100
|
|
|
10/03/2019
|
|
|
26
|
Bhola
|
4
|
charfassion
|
5
|
240
|
Upazila: Charfashion
DIRIP/BHL/Chrf/
VR/SL-52(05)/16-17/W-197
|
Imp. of Chorfakira Beribadh to Osmangonj Union borde road. ID. 509254074. at ch. 33+030km-34+251km, (Total Length=1.221km)
|
|
1.22
|
|
|
94.23
|
M/S. Saimum Traders, Charfashion, Bhola
|
94.21
|
|
29/05/2017
|
28/05/2018
|
100
|
|
|
20/12/2018
|
|
|
27
|
Bhola
|
4
|
charfassion
|
5
|
240
|
Upazila: Charfashion
DIRIP/BHL/Chrf/
VR/SL-51(06)/16-17/W-196
|
Imp. of Samraj to Char Kalmi west border road at ch. 4+190km-5+440km (ID:509254073).
(Total Length=1.250 km)
|
|
1.25
|
|
|
94.12
|
M/S Khan Traders,Charfashion, Bhola
Bhola
|
94.10
|
|
29/05/2017
|
28/05/2018
|
100
|
|
|
20/12/2018
|
|
|
28
|
Bhola
|
4
|
charfassion
|
5
|
240
|
DIRIP/BHL/Chrf/
VR/SL-50(06)/16-17/W-195
|
Improvement of Aslampur UP border to Osmangonj Beribadh road (Ch. 23+310km - 26+000km. ID. 509254072 (Total Length=0.690km)
|
|
0.69
|
|
|
39.99
|
M/s. Saimun Traders, Charfashion, Bhola
|
39.96
|
|
29/05/2017
|
06/06/2018
|
100
|
|
|
20/12/2018
|
|
|
29
|
Bhola
|
4
|
charfassion
|
5
|
240
|
DIRIP/BHL/Chrf/
VR/SL-50(04)/13-14/W-87
|
Imp.of Aslampur UP border to Osmangonj Beribandh road at ch.5+220km-7+770km, 7+920km-8+630km &17+750km-18+150km . (ID:509254072).
(Total Length=3.660km)
|
|
3.66
|
|
|
281.43
|
M/s. Jasim Const. Thanaroad, Charfashion, Bhola
|
309.49
|
|
09/03/2014
|
29/11/2015
|
100
|
|
|
20/12/2018
|
|
|
30
|
Bhola
|
4
|
charfassion
|
5
|
240
|
DIRIP/BHL/Chrf/
VR/SL-50(01)/12-13/W-06
|
Imp.of Aslampur UP border to Osmangonj Beribadh road ((ID:509254072).
Part A:Pucca (BC) Road Works =
(Ch. 14+370 to 15+370 km) = 1.00km (Total Length=1.00km)
|
|
1.00
|
|
|
63.71
|
M/S Jashim Const.
Thana road
Chorfashon
Bhola
|
63.70
|
|
19/02/2013
|
23/10/2014
|
100
|
|
|
20/12/2018
|
|
|
31
|
Bhola
|
4
|
charfassion
|
5
|
240
|
DIRIP/BHL/Chrf/
UNR/SL-49(07)/16-17/W-194
|
Improvement of Madraj Beribadh-west side Tetulia river road (Ch.20+070-22+870 km). ID. 509253056.
(Total Length=2.800km)
|
|
2.80
|
|
|
160.85
|
M/s. Bokshi Ent.
Chorfashon, Bhola
|
160.83
|
|
29/05/2017
|
28/05/2018
|
100
|
|
|
20/12/2018
|
|
|
32
|
Bhola
|
4
|
charfassion
|
5
|
240
|
DIRIP/BHL/Chrf/
UNR/SL-49(05)/15-16/W-140
|
Improvement of Madraj Beribadh-west side Tetulia river road (Ch.9+000km - 10+670km & 13+230km - 14+690 km). ID. 509253056.
(Total Length=3.130km)
|
|
3.13
|
|
|
221.44
|
M/s. Sayem Enterprise
|
208.80
|
|
27/10/2015
|
03/05/2016
|
100
|
|
|
20/12/2018
|
|
|
33
|
Bhola
|
4
|
charfassion
|
5
|
240
|
Tree Plantation
|
(1) Char Fakira bari Bandh Osmangong Union Barder Road at Ch. 8200-16250m (2) Kashemgong East side of Madraj Bari Bandh road at ch. 00-3390m Cherfessain
|
|
|
|
|
8.53
|
|
8.53
|
15/10/2014
|
15/10/2014
|
20/10/2014
|
100
|
6.99
|
100
|
20/10/2014
|
|
|
34
|
Bhola
|
4
|
charfassion
|
5
|
240
|
DIRIP/BHL/Chrf/VR/SL-53(03)/15-16/W-141
|
Improvement of Nurabad to east Side of Madraj union road ID.509254075 (Part-A: BC Works=5.009km, Ch: 11+522km to 11+910km & 13+400km to 13+518km, 15+100km to 18+203km and 19+200km to 20+600km) Part-C: Structure Work=1 nos (9.00m). under Charfession upazila.
|
509254075
|
5.01
|
39.75
|
|
395.63
|
Md. Unas Al Mamun
|
408.23
|
28/10/2015
|
28/10/2015
|
27/10/2016
|
100
|
406.91
|
100
|
27/10/2016
|
|
|
35
|
Bhola
|
4
|
charfassion
|
5
|
240
|
DIRIP/BHL/Charf/VR/SL-51(05)/13-14/W-95
|
Improvement of Samraj to CharKalmi West Border Road From Ch (12+6250-14+465) including 06 m Structures
|
|
1.84
|
6.00
|
|
129.43
|
M/s Jashim Const.
|
142.48
|
22/04/2014
|
22/04/2014
|
10/09/2014
|
100
|
142.43
|
100
|
10/09/2014
|
|
|
36
|
Bhola
|
4
|
charfassion
|
5
|
240
|
DIRIP/Bhl/ Chrf/ VR/SL-50(04)/13-14/ W-87,
|
Imp. of Aslampur UP border to Osmangonj Beribadh road ID: 509254072. BC Road Works = 3.66 km, (Ch.: 5+220km - 7+770km, 7+920km-8+630km & 17+750km- 18+150km). Structure Works = 17 Nos. (15.75m) under Charfession Upazila.
|
509254072
|
3.66
|
15.75
|
|
281.43
|
M/s Jashim Const.
|
309.49
|
09/03/2014
|
29/11/2015
|
29/11/2015
|
100
|
306.46
|
100
|
29/11/2015
|
|
|
37
|
Bhola
|
4
|
charfassion
|
5
|
240
|
DIRIP/Bhl/ Chrf/UNR/SL-54(03)/13-14/W-89
|
Imp. of Hajarigonj Beribadh to North side of Aslampur road (Ch: 0+000km- 4+120km) ID: 509253057.BC Road Works = 4.120 km, (Ch.: 0+000km - 4+120km). Structure Works = 15 Nos. & 28.50m. under Charfession
|
509253057
|
4.12
|
28.50
|
|
328.85
|
Unas Al mamun
|
361.67
|
09/03/2014
|
09/03/2014
|
06/03/2015
|
100
|
360.15
|
100
|
06/03/2015
|
|
|
38
|
Bhola
|
4
|
charfassion
|
5
|
240
|
DIRIP/Bhl/Chrf/VR/SL-53(02)/13-14/W-78
|
Imp. of Nurabad to East border to Madraj Union road (ID. 509254075) Part A: BC Road Works = 4+450km., (Ch.: 0+000km – 4+450km) Part B: Rehabilitation Woks = Nil. Part C: Structure Works = 06 Nos (4.50) under Charfession upazila.
|
509254075
|
4.45
|
4.50
|
|
287.41
|
Unas Al mamun
|
315.90
|
04/12/2013
|
04/12/2013
|
03/08/2014
|
100
|
315.28
|
100
|
03/08/2014
|
|
|
39
|
Bhola
|
4
|
charfassion
|
5
|
240
|
DIRIP/Bhl/Chrf/VR/SL-50(03)/13-14/W-77
|
Imp. of Aslampur UP border road to Osmangonj Beribandh road (ID. 509254072)Part A: BC Road Works = 3+960km., (Ch.: 8+670km - 11+250km, 15+370km- 16+190km & 17+190km – 17+750km) Part B: Rehabilitation Woks = Nil. Part C: Structure Works = 08 Nos (31.50m) under Charfession upazila.
|
509254072
|
3.90
|
31.50
|
|
302.44
|
M/s Jerin & Co.
|
331.80
|
23/01/2014
|
23/01/2014
|
10/09/2014
|
100
|
331.27
|
100
|
10/09/2014
|
|
|
40
|
Bhola
|
4
|
charfassion
|
5
|
240
|
DIRIP/Bhl/Chrf/VR/SL-51(03)/13-14/ W-76
|
Imp. of Samraj to Char Kalmi west border road (ID. 509254073)Part A: BC Road Works = 0.96 km, (Ch.: 1+000km - 1+366km & 2+366 km- 2+960 km). Part B: Rehabilitation Woks = .charfession
|
509254073
|
0.96
|
|
|
611.78
|
M/s Mawa Construction
|
581.21
|
01/12/2013
|
01/12/2013
|
05/06/2015
|
100
|
581.03
|
100
|
05/06/2015
|
|
|
41
|
Bhola
|
4
|
charfassion
|
5
|
240
|
DIRIP/Bhl/Chrf/VR/SL-55(04)/12-13/W-72
|
Imp. of Kashemgonj to east side of Madraj Beribadh road (ID. 509254076) Part A: BC Road Works = 3+855km., (Ch.: 11+420km - 15+275km). Part B: Rehabilitation Woks = Nil Part C: Structure Works =05 Nos
|
509254076
|
3.86
|
4.50
|
|
259.39
|
M/s Quired Enterprise
|
222.24
|
18/11/2013
|
18/11/2013
|
26/10/2015
|
100
|
218.22
|
100
|
26/10/2015
|
|
|
42
|
Bhola
|
4
|
charfassion
|
5
|
240
|
DIRIP/Bhl/Chrf/VR/SL-56(03)/12-13/W-66
|
, Imp. of Aminabad-Boyatir Khal Bridge to East side of Madraj Beribadh road (ID. 509254028) Part A: BC Road Works = 1.820km, (Ch.: 11+130km - 12+330km & 13+930 km- 14+550km).
|
509254028
|
1.82
|
44.30
|
|
125.02
|
Md. Iqbal Hossain
|
114.09
|
26/11/2013
|
26/11/2013
|
25/12/2015
|
100
|
108.69
|
100
|
25/12/2015
|
|
|
43
|
Bhola
|
4
|
charfassion
|
5
|
240
|
DIRIP/Bhl/Chrf/UNR/SL-49(03)/12-13/W-64
|
"Imp. of Madraj Beribadh-west side Tetulia river road. ID 509253056. Part A: BC Road Works = 0.820km. (Ch.: 17+330km – 18+150km) Part B: Rehabilitation Woks = Nil. Part C: Structure Works = 05Nos. (44.30m) under Charfession "
|
509253056
|
0.82
|
44.30
|
|
356.45
|
M/s Friends Corporation
|
390.56
|
19/09/2013
|
19/09/2013
|
31/12/2014
|
100
|
381.23
|
100
|
31/12/2014
|
|
|
44
|
Bhola
|
4
|
charfassion
|
5
|
240
|
DIRIP/Bhl/Chrf/VR/SL-55(03)/12-13/W-63
|
Imp. of Kashemgonj-East Side of Madraj Beribadh road (ID: 509254076) Part A: BC Road Works = 3.985km. (Ch.: 3+390km – 5+800km & 9+845km-11+420km) Part B: Rehabilitation Woks = Nil. Part C: Structure Works = 15 Nos. (52.50m).Charfession
|
509254076
|
3.99
|
52.50
|
|
355.77
|
Unas Al mamun
|
391.29
|
19/09/2013
|
19/09/2013
|
18/03/2015
|
100
|
390.23
|
100
|
18/03/2015
|
|
|
45
|
Bhola
|
4
|
charfassion
|
5
|
240
|
DIRIP/Bhl/Chrf/VR/SL-52(03)/12-13/W-62
|
"Imp. of Charfikira Beribadh to Osmangonj Union Border road (ID. 509254074) Part A: BC Road Works = 6.120km. (Ch.: 1+380km - 7+500km) Part B: Rehabilitation Woks = Nil. Part C: Structure Works = Nil. "
|
|
6.12
|
|
|
355.10
|
Unas Al mamun
|
390.11
|
19/09/2013
|
19/09/2013
|
18/03/2015
|
100
|
390.09
|
100
|
18/03/2015
|
|
|
46
|
Bhola
|
4
|
charfassion
|
5
|
240
|
DIRIP/Bhl/Chrf/VR/SL-51(02)/12-13/ W-61
|
" Imp. of Shamraj to Char Kalmi west Border road (ID. 509254073) Part A: BC Road Works = 4.300km. (Ch.: 8+350km - 12+650km). Part B: Rehabilitation Woks = Nil. Part C: Structure Works = 13 Nos (34.50m) under Charfession upazila. "
|
509254073
|
4.30
|
34.50
|
|
358.28
|
|
393.96
|
19/09/2013
|
19/09/2013
|
18/03/2015
|
100
|
392.93
|
100
|
18/03/2015
|
|
|
47
|
Bhola
|
4
|
charfassion
|
5
|
240
|
DIRIP/Bhl/Chrf/UNR/SL-54(02)/12-13/W-59
|
Imp. of Hazarigonj Beribadh to north side of Aslampur road (ID. 509253057) Part A: BC Road Works = 5.065km. (Ch.: 10+750km - 11+800km, 12+750km – 15+350km & 16+485-17+ 900km) Part B: Rehabilitation Woks = Nil. Part C: Structure Works = 06 Nos (18m) under Charfession upazila.
|
509253057
|
5.07
|
18.00
|
|
354.75
|
Md. Iqbal Hossain
|
347.61
|
08/09/2013
|
08/09/2013
|
20/05/2015
|
100
|
345.80
|
100
|
20/05/2015
|
|
|
48
|
Bhola
|
4
|
charfassion
|
5
|
240
|
DIRIP/Bhl/Chrf/UNR/SL-49(02)/12-13/W-58
|
Imp. of Madraj Beribadh to west side Tetuli river road (ID. 509253056) Part A: BC Road Works = 4.520km. (Ch.: 3+000km - 5+420km & 6+900-9+000km). Part B: Rehabilitation Woks = Nil. Part C: Structure Works = 18 Nos (32.25m) under Charfession
|
509253056
|
4.52
|
32.25
|
|
350.54
|
"M/s. Jashim Construction Charfession, Bhola"
|
384.21
|
19/09/2013
|
19/09/2013
|
18/03/2015
|
100
|
382.31
|
100
|
18/03/2015
|
|
|
49
|
Bhola
|
4
|
charfassion
|
5
|
240
|
DIRIP/Bhl/Chrf/VR/SL-56(02)/12-13/W-50
|
Imp. of Aminabad Boyati Khal bridge to east side of Madraj Beribadh road. (ID. 509254028), Part A: BC Road Works = 3.942km., (Ch.: 2+740km to 5+143km & 5+541 km-7+080km)., Part B: Rehabilitation Woks = Nil.Part C: Structure Works = 17.00 Nos (33.75m) under Charfession upazila.
|
509254028
|
3.94
|
33.75
|
|
316.90
|
Unas Al mamun
|
316.85
|
05/08/2013
|
05/08/2013
|
15/03/2015
|
100
|
316.65
|
100
|
15/03/2015
|
|
|
50
|
Bhola
|
4
|
charfassion
|
5
|
240
|
DIRIP/Bhl/Chrf/VR/SL-50(02)/12-13/W-49
|
Imp. of Aslampur UP border to Osmangonj Beribadh road (ID. 509254072), Part A: BC Road Works = 4.120km., (Ch.: 0+000km to 4+120km)., Part B: Rehabilitation Woks = Nil. Part C: Structure Works = 06 Nos (12.75m) under Charfession upazila.
|
|
4.12
|
12.75
|
|
283.76
|
M/s. Bokshi Enterprise
|
283.75
|
05/08/2013
|
05/08/2013
|
15/01/2014
|
100
|
283.67
|
100
|
15/01/2014
|
|
|
51
|
Bhola
|
4
|
charfassion
|
5
|
240
|
DIRIP/Bhl/Chrf/VR/SL-55(02)/12-13/ W-38
|
Imp. of Kashemgonj to East side of Madraj beri badh road. (ID: 509254076): Part A: BC Road Works = 1.88 km. (Ch.: 7+970km to 9+845km). Part B: Rehabilitation Woks = Nil. Part C: Structure Works = 6 Nos (11.75m) (at Ch: 8+037km, 8+292km, 8+460km, 8+615km, 9+252km & 9+442km), under Charfession upazila.
|
509254076
|
1.88
|
11.75
|
|
147.78
|
"M/s. Jashim Construction Charfession, Bhola"
|
147.68
|
28/03/2013
|
28/03/2013
|
15/03/2015
|
100
|
146.92
|
100
|
15/03/2015
|
|
|
52
|
Bhola
|
4
|
charfassion
|
5
|
240
|
DIRIP/Bhl/Chrf/VR/SL-52(02)/12-13/W-33
|
Imp. of Char Fakira beri badh to Osmangonj Union Border road. (ID: 509254074): Part A: BC Road Works = 5.530km. (Ch.: 8+200 to 11+250km, 12+ 240km to 14+720km). Part B: Rehabilitation Woks = Nil. Part C: Structure Works = 19 Nos (15.00m). under Charfession upazila.
|
509254074
|
5.53
|
15.00
|
|
40.12
|
"Md. Eunus-Al Mamun Charfession, Bhola"
|
39.30
|
24/03/2013
|
24/03/2013
|
16/01/2014
|
100
|
43.69
|
100
|
16/01/2014
|
|
|
53
|
Bhola
|
4
|
charfassion
|
5
|
240
|
DIRIP/Bhl/Chrf/VR/SL-56(01)/12-13/ W-15
|
Imp. of Aminabad Boyati khal bridge to eas side of Madraj Beribadh road. (ID: 509254028), (1) Part A: Pucca (BC) Road Work = 1.530 km. [Ch. 0+00 (Avwgbvev` eqvwZi Lvj eªx‡Ri `wÿY w`K n‡Z) to 1+530 km (Pid¨vkb †`vjvinvU wRwm †ivW ch©šÍ)] (2) Part B: Rehabilitation Woks = Nil. (3) Part C: Structure Works = 06 Nos (17.25m) (At Ch: 0+ 00, 0+345, 0+550, 1+010, 1+077 & 1+434 km).
|
509254028
|
1.53
|
17.25
|
|
133.39
|
"M/s. Al-Amin Traders, Daulatkhan, Bhola"
|
133.74
|
24/02/2013
|
24/02/2013
|
01/12/2013
|
100
|
132.99
|
100
|
01/12/2013
|
|
|
54
|
Bhola
|
4
|
charfassion
|
5
|
240
|
DIRIP/Bhl/Chrf/VR/SL-52(01)/12-13/ W-14
|
(1) Part A: Pucca (BC) Road Work = 1.250 km. [Ch. 15+000 (wgVz †Pqvig¨v‡bi evoxi wbKU n‡Z) to 16+250 km (eqvwZi Lvj ch©šÍ)] (2) Part B: Rehabilitation Woks = Nil. (3) Part C: Structure Works = 05 Nos (14.25m) (At Ch: 15+780, 16+035 & 16+250 km).
|
509254074
|
1.25
|
14.25
|
|
113.12
|
"M/s. Bokshi Enterprise Charfession, Bhola"
|
113.09
|
03/03/2013
|
03/03/2013
|
20/04/2013
|
100
|
112.19
|
100
|
20/04/2013
|
|
|
55
|
Bhola
|
4
|
charfassion
|
5
|
240
|
DIRIP/Bhl/Chrf/VR/SL-53(01)/12-13/ W-13
|
Imp. Nurabad to east Border of Madraj union road. (ID: 509254075), (1) Part A: Pucca (BC) Road Work = 1.022 km. [Ch. 7+500 (Iqv`y` wgqvi evoxi wbKU n‡Z) to 8+522 km (Xvwj nv‡Ui cwðg w`K ch©šÍ)], (2) Part B: Rehabilitation Woks = Nil. (3) Part C: Structure Works = 04 Nos (4.50m) (At Ch: 7+794, 7+914, 8+064 & 8+289 km).
|
509254075
|
1.02
|
4.50
|
|
6760145.00
|
M/s. Jashim Const. Thana road, Charfession, Bhola.
|
6758116.00
|
11/04/2013
|
11/04/2013
|
11/10/2013
|
100
|
67.51
|
100
|
11/10/2013
|
|
|
56
|
Bhola
|
4
|
charfassion
|
5
|
240
|
DIRIP/Bhl/Chrf/VR/SL-51(01)/12-13/ W-09
|
Imp. of Shamraj to Char kalmi west border road. (ID: 509254073) , (1) Part A: Pucca (BC) Road Work = 1.00 km. [Ch. 0+00 (bKwZ evoxi nvjU gmwR‡`i DËi cvk n‡Z) to 1+00 km (Rvnv½xi `yevB evox ch©šÍ)], (2) Part B: Rehabilitation Woks = Nil. (3) Part C: Structure Works = 02 Nos (1.50m) (At Ch: 0+153 & 0+820km).
|
509254073
|
1.00
|
1.50
|
|
6485554.00
|
M/s. Eunus Al-Mamun, Thana road, Bhola.
|
6484256.00
|
19/02/2013
|
19/02/2013
|
31/03/2015
|
100
|
64.84
|
100
|
31/03/2015
|
|
|
57
|
Bhola
|
4
|
charfassion
|
5
|
240
|
DIRIP/Bhl/Chrf/UNR/SL-49(01)/12-13/ W-08
|
Imp. of Madraj Baribadh to west side Tatulia river road. (ID: 509253056) , (1) Part A: Pucca (BC) Road Work = 1.00 km. [Ch. 0+00 (c~e© wgqvRvbcyi RNGPS `t cvk¦©) to 1+00 km (mvBdzj Bmjvg gywÝi evox ch©šÍ)], (2) Part B: Rehabilitation Woks = Nil. (3) Part C: Structure Works = 02 Nos (1.50m) (At Ch: 0+ 380 & 0+563 km).
|
509253056
|
1.00
|
1.50
|
|
6761510.00
|
Md. Mohashin Nagor, Dhonia, Bhola
|
6761510.00
|
10/03/2013
|
10/03/2013
|
08/10/2013
|
100
|
67.56
|
100
|
08/10/2013
|
|
|
58
|
Bhola
|
4
|
charfassion
|
5
|
240
|
DIRIP/Bhl/Chrf/UNR/SL-54(01)/12-13/ W-07
|
Imp. of Hajarigonj Beribadh to North side of Aslampur road. (ID: 509253057), (1) Part A: Pucca (BC) Road Work = 1.000 km. [Ch. 4+200 (wgwR evoxi wbKU n‡Z) to 5+200 km (e„nËi ewikvj cÖK‡íi m¤úvw`Z cvKv iv¯Ív ch©šÍ)] (2) Part B: Rehabilitation Woks = Nil. (3) Part C: Structure Works = Nil.
|
509253057
|
1.00
|
|
|
6064469.00
|
"M/s. Bengal Traders Thanaroad, Charfession, Bhola.
|
6063256.00
|
16/04/2013
|
16/04/2013
|
15/10/2013
|
100
|
49.48
|
100
|
15/10/2013
|
|
|
59
|
Bhola
|
4
|
charfassion
|
5
|
240
|
DIRIP/Bhl/Chrf/VR/SL-50(01)/12-13/ W-06
|
Imp. of Aslampur UP border to Osmangonj Beribadh road. (ID: 509254072) (1) Part A: Pucca (BC) Road Work = 1.00 km. [Ch. 14+370 (ImgvbMÄ BDwcÕi mvg‡b cvKv iv¯Ív n‡Z) to 15+370 km (cv‡Uvqvixi evox ch©šÍ)] (2) Part B: Rehabilitation Woks = Nil. (3) Part C: Structure Works = Nil.
|
509254072
|
1.00
|
|
|
6371467.00
|
M/s. Jashim Const. Thana road, Charfession, Bhola.
|
6370192.00
|
19/02/2013
|
19/02/2013
|
23/10/2014
|
100
|
63.69
|
100
|
23/10/2014
|
|
|
60
|
Cumilla
|
10
|
meghna
|
108
|
240
|
DIRIP/CML/Mgh/
VR/SL-18(01)/12-13/W-22
|
Imp. of Aralia (Muddarkandi) Ghat to Horipur-Rampur UPZ road. (ID: 419884004)
Part A: Pucca Road Works.
(Ch. 0+000-1+000km) = 1.00 km
Part B:Rehabilitation Works= Nil
Part C: Structure Works= 02 Nos. (25.00m)(At Ch. 0+007km & 0+600km) (Total Length=1.000km)
|
|
1.00
|
|
|
180.27
|
M/S. R-Ta Entp.
Md. Abul Hossain
Bishnapur, Moulobipara,
Comilla
|
201.11
|
|
17/02/2013
|
26/01/2014
|
100
|
|
|
20/12/2018
|
|
|
61
|
Dhaka
|
24
|
dhamrai
|
215
|
240
|
DIRIP/DHK/Dham
/UZR/SL-08(04)/15-16/W-136
|
Improvement Kelia-RHD-Vum Dakhin (Joymontap GC) road (ID: 326142010) Part A: BC Road Works = 0.800 km (Ch. 9+500 km to 10+300 km)
Part B: Rehabilitation Works= Nil
Part C: Structure Works= (01 No.) 9.00m at ch. 7+400km. (Total Length=0.800km)
|
|
0.80
|
|
|
133.71
|
M/s. Dolly Construction, Pro. Md. Nasir Uddin, Senakallyan Bhaban, 195, Matijheel C/A, Dhaka
|
109.46
|
|
29/10/2015
|
30/06/2016
|
100
|
|
|
20/12/2018
|
|
|
62
|
Dhaka
|
24
|
dhamrai
|
215
|
240
|
DIRIP/DHK/Dham
/UZR/SL-08(03)/14-15/W-108
|
Imp. of Kelia RHD - Vum Dakhin (Joymontap GC) Road. (ID:326142010)
Part A: BC Road Works = 2.054 km
(Ch. 5+816 to 7+870 km)
Part B:Rehabilitation Works= Nil
Part C:Structure Works=Nil
(Total Length=2.000 km)
|
|
2.00
|
|
|
168.89
|
M/s. Nusrat Trade International. 246/2, Basila Raod, Mohammedpur, Dhaka
|
175.88
|
|
13/05/2015
|
30/04/2016
|
100
|
|
|
20/12/2018
|
|
|
63
|
Dhaka
|
24
|
dhamrai
|
215
|
240
|
DIRIP/DHK/Dham
/UZR/SL-08(02)/12-13/W-27
|
Imp. of Kelia RHD - Vum Dakhin (Joymontap GC) Road. (ID:326142010)
Part A: Pucca Road Works = 3.9660 km
(Ch. 1+816 to 5+816 km)
Part B:Rehabilitation Works= Nil
Part C:Structure Works. 01 No. 12.00 m
(At Ch.2+240 km)
(Total Length=3.966km)
|
|
3.97
|
|
|
389.93
|
M/S IPUB CYBER NET & Noori Entp (JV)
69, Narinda Road,
Sutrapur , Dhaka
|
428.75
|
|
28/03/2013
|
31/12/2017
|
100
|
|
|
20/12/2018
|
|
|
64
|
Dhaka
|
24
|
dhamrai
|
215
|
240
|
DIRIP/DHK/Dham
/UZR/SL-08(01)/12-13/W-05
|
Imp. of Kelia RHD - Vum Dakhin (Joymantap GC) Road. (ID:326142010)
Part A: Pucca Road Works. 1.00 km (Ch. 0+816 to 1+816 km)
Part B:Rehabilitation Works. 0.816km (Ch. 0+00 to 0+816 km) (Total Length=1.816km)
|
|
1.82
|
|
|
116.06
|
M/s. Mahua Entp. House No.-41, Road No.-01, Sector-05, Uttara, Dhaka
|
121.91
|
|
02/05/2013
|
30/12/2015
|
100
|
|
|
20/12/2018
|
|
|
65
|
Dhaka
|
24
|
dhamrai
|
215
|
240
|
DIRIP/DHK/Dham
/UNR/SL-07(04)/15-16/W-137
|
Improvement of Kushura UP office-Paikpara bazar road (ID: 326143021) Part A: BC Road Works = 1.450 km (Ch.6+600km to 8+050 km)
Part B: Rehabilitation Works= Nil
Part C: Structure Works= Nil (TotalLength=1.441km)
|
|
1.44
|
|
|
111.24
|
M/s. Dolly Construction, Pro. Md. Nasir Uddin, Senakallyan Bhaban, 195, Matijheel C/A, Dhaka
|
91.14
|
|
29/10/2015
|
29/06/2016
|
100
|
|
|
20/12/2018
|
|
|
66
|
Dhaka
|
24
|
dhamrai
|
215
|
240
|
DIRIP/DHK/Dham
/UNR/SL-07(03)/14-15/W-109
|
Imp. of Kushura UP office-Paikpara Bazar Road. (ID:326143021)
Part A: BC Road Works = 2.020km
(Ch. 4+580 to 6+600 km)
Part B:Rehabilitation Works. Nil.
Part C:Structure Works=Nil
(Total Length=1.980km)
|
|
1.98
|
|
|
151.04
|
M/s. Anika International, Dhaka.
|
161.53
|
|
21/05/2015
|
31/01/2017
|
100
|
|
|
20/12/2018
|
|
|
67
|
Dhaka
|
24
|
dhamrai
|
215
|
240
|
DIRIP/DHK/Dham
/UNR/SL-07(02)/12-13/W-28
|
Imp. of Kushura UP office-Paikpara Bazar Road. (ID:326143021)
Part A: Pucca Road Works = 3.480km
(Ch. 1+000 to 4+580 km)
Part B:Rehabilitation Works. Nil.
Part C:Structure Works. 02 Nos. 5.00m
At (Ch.1+100 km & 1+700km).
(Total Length=3.480km)
|
|
3.48
|
|
|
296.87
|
M/S IPUB CYBER NET & Noori Entp (JV)
69, Narinda Road,
Sutrapur , Dhaka
|
326.44
|
|
28/03/2013
|
31/12/2018
|
100
|
|
|
20/12/2018
|
|
|
68
|
Dhaka
|
24
|
dhamrai
|
215
|
240
|
DIRIP/DHK/Dham
/UNR/SL-07(01)/12-13/W-18
|
Imp. of Kushura UP office-Paikpara Bazar Road. (ID:326143021)
Part A: Pucca Road Works= 1.00 km (Ch. 0+00 to 1+00 km)
Part B:Rehabilitation Works. Nil.
Part C:Structure Works. 03 Nos. 25.50m (At Ch.6+000 km, 6+500km & 7+600km). (Total Length=1.00km)
|
|
1.00
|
|
|
118.73
|
M/S IPUB CYBER NET
69, Narinda Road,
Sutrapur , Dhaka
|
112.79
|
|
14/02/2013
|
10/12/2015
|
100
|
|
|
20/12/2018
|
|
|
69
|
Jashore
|
41
|
jashore-s
|
304
|
240
|
Upazila : Sadar
DIRIP/JES/SAD/UZR/SL-57(a)(03)/16-17/W-187
|
Improvement & Widening by two lane of Kumira – Sagordari – Trimohoni –Rajgonj - Pulerhat (Pulerhat – Rajgonj –Trimohoni - Sagordari – Kumira) Road.. (Ch. 1+000km – 4+000km) ID. 241472003.
i)1)Improvement & Widening by BC work =2.604km. (Ch. 1+000km-1+920km&2+316km-4+000km)
ii) RCC road works = 0.396 km (Ch. 1+920km – 2+316km)
iii) Const. & Widening Work of Structure = 2 Nos (1.25 m&Side drain 332.00m)
(Total Length=3.000 km)
|
|
3.00
|
|
|
372.05
|
M/S. Chitra Constn. 9- Rail Road Jessore.
|
387.61
|
|
13/04/2017
|
12/01/2018
|
100
|
|
|
20/12/2018
|
|
|
70
|
Jashore
|
41
|
jashore-s
|
304
|
240
|
Upazila : Sadar
DIRIP/JES/SAD/UZR/SL-57(a)(02)/15-16/W-180
|
Const. of 17.00m long RCC Girder bridge over Baliar Khal on Kumira-Sagardari-Trimohoni-Rajgonj-Pulerhat(Pulerhat-Rajgonj- Trimohoni- Sagardari-Kumira) Road at ch.2+708km ID|.241472003
|
|
17.00
|
|
|
132.75
|
M/S. Kumkum Enterprise 138 Noa para Road Jessore.
|
115.12
|
|
14/11/2016
|
20/06/2018
|
100
|
|
|
20/12/2018
|
|
|
71
|
Jashore
|
41
|
jashore-s
|
304
|
240
|
Upazila : Sadar
DIRIP/JES/SAD/UZR/SL-57(a)(01)/15-16/W-162
|
Improvement & Widening by two lane of Kumira – Sagordari – Trimohoni –Rajgonj - Pulerhat (Pulerhat – Rajgonj –Trimohoni - Sagordari - Kumira) Road ID. 241472003
i) Imp. &Widening work by BC = 3.066 km
(Ch. 0+450 km – 1+000 km, 4+000km - 4+355 km, 4+697 km – 6+763 km & 7+015 km -7+150km)
ii) RCC road works = 1.044 km (Ch. 0+000km – 0+450 km, 4+355 km - 4+697 km & 6+763 km - 7+015km) iii) Const.&Widening of Structure work=Nill.
(Total Length=4.110 km)
|
|
4.11
|
|
|
550.39
|
MTT & MMT (JV) New Khayer Tala, Jessore
|
502.07
|
|
19/04/2016
|
14/03/2017
|
100
|
|
|
20/12/2018
|
|
|
72
|
Jashore
|
41
|
keshabpur
|
303
|
240
|
Upazila : Keshobpur
DIRIP/JES/Kesb/UZR/SL-57(c)(04)/15-16/W-165
|
Improvement & Widening by two lane of Kumira – Sagordari – Trimohoni –Rajgonj - Pulerhat (Pulerhat – Rajgonj –Trimohoni - Sagordari - Kumira) Road ID. 241383003 & 241382005
i) Imp. &Widening work by BC = 2.250 km
(Ch. 32+842 km – 33+792 km, 35+292 km -36+592 km)
ii) RCC road works = Nil
iii) Const. & Widening of Structure work = 7 Nos (7.00 m)
(Total Length=2.250 km)
|
|
2.25
|
|
|
441.19
|
M/S. Bonantor Trading Benapole road, Chanchara, Jessore.
|
414.72
|
|
19/04/2016
|
20/08/2017
|
100
|
|
|
20/12/2018
|
|
|
73
|
Jashore
|
41
|
keshabpur
|
303
|
240
|
Upazila : Keshobpur
DIRIP/JES/Kes/UZR/SL-57(c)(03)/15-16/W-164
|
Improvement & Widening by two lane of Kumira – Sagordari – Trimohoni –Rajgonj - Pulerhat (Pulerhat – Rajgonj –Trimohoni - Sagordari - Kumira) Road (ID. 241383003 & 241382005).
i) Imp. &Widening work by BC = 2.500 km
Ch.28+242km–28+592km,30+692km32+842m ii) RCC road works = 0.200 km (Ch.28+592km – 28+792km)
iii) Const. & Widening of Structure work = 14 Nos (15.00 m)
(Total Length=2.700 km)
|
|
2.70
|
|
|
696.62
|
Md. Iqbal Jamader & Asaduzzaman Salim (JV), Katia, Satkhira
|
644.81
|
|
25/04/2016
|
31/05/2018
|
100
|
|
|
20/12/2018
|
|
|
74
|
Jashore
|
41
|
keshabpur
|
303
|
240
|
Upazila: Keshobpur
DIRIP/JES/Kesb/UZR/SL-57(c)(02)/13-14/W-101
|
Improvement & Widening by two lane of Kumira – Sagordari – Trimohoni –Rajgonj - Pulerhat (Pulerhat – Rajgonj –Trimohoni - Sagordari - Kumira) Road (ID. 241382005, 241382007 & 241382004.)
i) Imp. & Widening work by BC = 5.160 km
(Ch. 37+650 km – 42+810 km)
ii) RCC road work = 0.200 km
(Ch. 37+450km – 37+650km)
iii) Const. & Widening Work of Structure
= 12 Nos (14.00 m)
(Total Length=5.360km)
|
|
5.36
|
|
|
654.02
|
Md. Iqbal Jamader & Consortium, Katia, Town Bazar, Satkhira
|
601.49
|
|
22/11/2014
|
05/02/2016
|
100
|
|
|
20/12/2018
|
|
|
75
|
Jashore
|
41
|
keshabpur
|
303
|
240
|
Upazila: Keshobpur
DIRIP/JES/Kesb/UZR/SL-57(c)(01)/13-14/W-100
|
Improvement & Widening by two lane of Kumira – Sagordari – Trimohoni –Rajgonj - Pulerhat (Pulerhat – Rajgonj –Trimohoni - Sagordari - Kumira) Road (Part-A: ID. 241383003, Part-B: ID. 241382005).
Part A:
i) Imp. & Widening work by BC= 1.524 km
(Ch. 27+310 km – 28+242 km, 30+100km – 30+692km)
ii) RCC road works = 1.308 km
(Ch. 28+792km – 30+100km)
iii) Const. & Widening Work of Structure = 6 Nos (9.50 m)
Part B:
i) Imp. & Widening work by BC = 2.358 km
(Ch. 33+792 km – 35+292 km & 36+592km – 37+450km)
ii) Const. & Widening Work of Structure
= 6 Nos (6.625 m)
(Total Length=5.190 km)
|
|
5.19
|
|
|
857.26
|
ME-BTC (JV), Benapole road, Chanchara, Jessore
|
877.13
|
|
05/12/2014
|
04/07/2017
|
100
|
|
|
20/12/2018
|
|
|
76
|
Jashore
|
41
|
monirampur
|
305
|
240
|
Upazila : Monirampur
DIRIP/JES/Moni/UZR/SL-57(b)(04)/16-17/W-188
|
Improvement & Widening by two lane of Kumira – Sagordari – Trimohoni –Rajgonj - Pulerhat (Pulerhat – Rajgonj –Trimohoni - Sagordari - Kumira) Road .Ch. 9+590 km – 17+085 km ID. 241612007
i) Imp. &Widening work by BC = 6.829km
(Ch. 9+756 km – 12+550 km & 13+050km – 17+085km)
ii) RCC road works =0.666km (Ch. 9+590km – 9+756 km&12+550km-13+050km)
iii) Const. & Widening of Structure work = 29 Nos (29.00 m)
(Total Length=7.495 km)
|
|
7.50
|
|
|
814.08
|
Mozahar Enterp. (Pvt) Ltd & M/S Bonantor Trading Corpn. (JV) Banapol, Road, Chanchara, Jessore.
|
850.63
|
|
10/04/2017
|
09/04/2018
|
100
|
|
|
20/12/2018
|
|
|
77
|
Jashore
|
41
|
monirampur
|
305
|
240
|
Upazila : Monirampur
DIRIP/JES/Moni/UZR/SL-57(b)(03)/15-16/W-163
|
Improvement & Widening by two lane of Kumira – Sagordari – Trimohoni –Rajgonj - Pulerhat (Pulerhat – Rajgonj –Trimohoni - Sagordari - Kumira) Road ID. 241612007
i) Imp. &Widening work by BC = 3.540km
(Ch. 7+150 km – 9+230 km & 22+050km – 23+510km) & Widening of single lane road into two lane by Earth work=7.495km (Ch.9+590km-17+085km
ii) RCC road works =0.360km (Ch. 9+230km – 9+590 km)
iii) Const. & Widening of Structure work = 6 Nos (6.00 m)
(Total Length=3.900 km)
|
|
3.90
|
|
|
514.81
|
MU-BTC-JV, Banapol, Road, Chanchara, Jessore.
|
446.45
|
|
19/04/2016
|
24/05/2018
|
100
|
|
|
20/12/2018
|
|
|
78
|
Jashore
|
41
|
monirampur
|
305
|
240
|
Upazila : Monirampur
DIRIP/JES/Moni/UZR/SL-57(b)(02)/13-14/W-99
|
Improvement & Widening by two lane of Kumira – Sagordari – Trimohoni –Rajgonj - Pulerhat (Pulerhat – Rajgonj –Trimohoni - Sagordari - Kumira) Road (ID. 241612007 & 241612012).
i) Imp. &Widening work = 4.559 km
(Ch. 17+085 km – 19+260 km & 19+666km – 22+050km)
ii) RCC road works = 0.406 km (Ch. 19+260km – 19+666km)
iii) Const. & Widening of Structure work = 8 Nos (26.60 m)
(Total Length=4.965 km)
|
|
4.97
|
|
|
761.09
|
ME-BTC (JV), Benapole road, Chanchara, Jessore
|
722.58
|
|
05/12/2014
|
31/12/2016
|
100
|
|
|
20/12/2018
|
|
|
79
|
Jashore
|
41
|
monirampur
|
305
|
240
|
Upazila:Monirampur
DIRIP/JES/Sad-Moni/UZR/SL-57(a)(01), (b)(01)/13-14/W-98
|
Improvement & Widening by two lane of Kumira – Sagordari – Trimohoni –Rajgonj - Pulerhat (Pulerhat – Rajgonj –Trimohoni - Sagordari – Kumira) Road.. (Part-A: ID. 241472003. Part B: ID. 241613021)
Part A: Widening of single lane road into two lane by earth work =7.150km.
(Ch. 0+000km – 7+150km)
Part B: i) Imp. & Widening work = 3.800km.
(Ch. 23+510km – 27+310km)
ii) Const. & Widening Work of Structure = 5 Nos (8.00 m) (Total Length=3.800 km)
|
|
3.80
|
|
|
525.02
|
Md. Iqbal Jamader, Polashpole, Satkhira
|
517.62
|
|
22/11/2014
|
30/06/2016
|
100
|
|
|
20/12/2018
|
|
|
80
|
Mymensingh
|
22
|
fulbaria
|
190
|
240
|
Upazila : Fulbaria
DIRIP/MMN/Ful/
UZR/SL-48(02)/12-13/W-26
|
Improvement of Keshoregonj - Balughat - Santoshpur via Madhupur road
(ID: 361202007)
PartA:BituminousCarpetingWorks=3.00km (Ch.3+765 to 6+765 km)
Part B:Rehabilitation Works = nil
Part C: Structure Works=5 nos,(At Ch. 4+760km,6+000km,6+360km,6+600km & 4+350 km)
(Total Length=3.000 km)
|
|
3.00
|
|
|
227.70
|
Md. Chan Mohammed
Fulbaria, Mymenshing
|
250.36
|
|
25/03/2013
|
31/01/2014
|
100
|
|
|
20/12/2018
|
|
|
81
|
Mymensingh
|
22
|
fulbaria
|
190
|
240
|
Upazila : Fulbaria
DIRIP/MMN/Ful/
UZR/SL-48(01)/12-13/W-03
|
Improvement of Keshoregonj - Balughat - Santoshpur via Madhupur road (ID:361202007)
PartA:BituminousCarpetingWorks=1.00km (Ch.0+680 to 1+005 & 3+090 to 3+765 km)
Part B:Rehabilitation Works =1.735 km
(Ch. 0+00 to 0+680 & 1+005 to 2+060 km)
Part C: Structure Works 6 Nos. (13.50 km)
(Total Length=2.735 km)
|
|
2.74
|
|
|
189.10
|
Md. Lal Mahmud
Fulbaria, Mymensingh
|
179.65
|
|
11/11/2012
|
20/06/2013
|
100
|
|
|
20/12/2018
|
|
|
82
|
Mymensingh
|
22
|
gaffargaon
|
188
|
240
|
Upazila : GafargaonDIRIP/MMN/Gafr/VR/SL-46(02)/15-16/W-161
|
Imp. of Maizbari - Lama Longair road via Utia bazar road (Bagbari-Longair road) (ID No. 361224043)
Part A: BC Road work = 5.650 km
(Ch. 3+500km - 9+150km).
Part B: Rehabilitation Work = Nil
Part C: Structure Work = 13 Nos. (8.125 m)
(Total Length=5.650 km)
|
|
5.65
|
|
|
343.71
|
M/S Zaman Constn. 10/16, Estern Plaza, Dhaka.
|
321.86
|
|
01/11/2016
|
30/06/2017
|
35
|
|
|
08/04/2019
|
|
|
83
|
Mymensingh
|
22
|
gaffargaon
|
188
|
240
|
W-161(RW)
|
Imp.of Maizbari - Lama Longair road via Utia Bazar road .
|
|
5.65
|
|
|
317.24
|
MSB-MMH-MBT(JV) Gafargaon, Mymensingh
|
317.10
|
18/04/2019
|
23/04/2019
|
22/06/2019
|
10
|
|
|
13/05/2019
|
|
|
84
|
Mymensingh
|
22
|
gaffargaon
|
188
|
240
|
Upazila : GafargaonDIRIP/MMN/Gaf/VR/SL-45(06)/18-19/W-219
|
Imp. of Dattar bazar Molmol Kachari to Vangti-Shakra-Ghagra Demail and Golabari road by HBB (Dattar bazaar Shila river road via Vangti bazar Bagra, Demail & Golabari UP to Kandi) (ID No. 361224044)
Part A: HBB Road work = 2.200 km
(Ch. 1+800 km - 4+000 km)
Part C: Structure Work = 04 Nos. (5.25 m)
(Total Length=2.200 km)
|
|
2.20
|
|
|
192.60
|
|
0.00
|
|
|
|
50
|
|
45
|
13/04/2019
|
|
|
85
|
Mymensingh
|
22
|
gaffargaon
|
188
|
240
|
Upazila : GafargaonDIRIP/MMN/Gaf/VR/SL-45(04)/16-17/W-189
|
Construction of 96.20m long PC Girder Bridge on Dattar bazar Molmol Kachari to Vangti-Shakra-Ghagra Demail and Golabari road (Dattar bazaar Shila river road via Vangti bazar Bagra, Demail & Golabari UP to Kandi) (ID No. 361224044) At ch. 5450.00m.
(Total (HBB)Length=0.200 km)
|
|
96.20
|
|
|
576.72
|
SHA-SC-SE (JV), Gafargaon, Mymensingh
|
604.70
|
|
08/05/2017
|
14/03/2018
|
90
|
|
|
13/04/2019
|
|
|
86
|
Mymensingh
|
22
|
gaffargaon
|
188
|
240
|
Upazila : GafargaonDIRIP/MMN/Gaf/VR/SL-45(05)/16-17/W-190
|
Construction of 54.00m long PC Girder Bridge on Dattar bazar Molmol Kachari to Vangti-Shakra-Ghagra Demail and Golabari road (Dattar bazaar Shila river road via Vangti bazar Bagra, Demail & Golabari UP to Kandi) (ID No. 361224044) At ch. 5100.00m.
(Total (HBB)Length=0.060 km)
|
|
54.00
|
|
|
245.47
|
AH-SE (JV),Gafargaon, Mymensingh
|
257.20
|
|
17/07/2017
|
20/04/2018
|
100
|
|
|
08/04/2019
|
|
|
87
|
Mymensingh
|
22
|
gaffargaon
|
188
|
240
|
Upazila : Gafargaon
DIRIP/MMN/Gaf/UNR/SL-47(01)/14-15/W-118
|
Imp. of Josora UP- Shibgonj Fotangir Bazar Dola road (ID No. 361223020).
Part A: BC Road work = 3.026 km
(Ch. 0+000km - 3+030km).
Part B: Rehabilitation = Nil
Structure = 08 Nos. (6.35m)
(Total Length=3.026 km)
|
|
3.03
|
|
|
193.95
|
M/s. Ahad Traders
|
203.53
|
|
07/05/2015
|
06/03/2016
|
100
|
|
|
20/12/2018
|
|
|
88
|
Mymensingh
|
22
|
gaffargaon
|
188
|
240
|
Upazila : Gafargaon
DIRIP/MMN/Gaf/VR/SL-46(01)/14-15/W-121
|
Imp. of Maizbari - Lama Longair road via Utia bazar road (Bagbari-Longair road) (ID No. 361224043)
Part A: BC Road work = 3.500 km
(Ch. 0+000km - 3+500km).
Part B: Rehabilitation Work = Nil
Part C: Structure Work = 11 Nos. (7.55m)
(Total Length=3.500 km)
|
|
3.50
|
|
|
223.66
|
Md. Abdul Hamid Bacchu
|
234.85
|
|
29/04/2015
|
12/05/2016
|
100
|
|
|
20/12/2018
|
|
|
89
|
Mymensingh
|
22
|
gaffargaon
|
188
|
240
|
Upazila : Gafargaon
DIRIP/MMN/Gaf/VR/SL-45(03)/15-16/W-146
|
Imp. of HBB work on Dattar bazar Molmol Kachari to Vangti-Shakra-Ghagra Demail and Golabari road (Dattar bazaar Shila river road via Vangti bazar Bagra, Demail & Golabari UP to Kandi) (ID No. 361224044)
Part A: HBB work = 2.100 km
(Ch. 5+009km - 7+247km).
(Total (HBB)Length=2.100 km)
|
|
2.10
|
|
|
81.44
|
Md. Mahibul Haque, Gafargaon, Mymensingh.
|
84.64
|
|
09/12/2015
|
30/06/2017
|
100
|
|
|
20/12/2018
|
|
|
90
|
Mymensingh
|
22
|
gaffargaon
|
188
|
240
|
Upazila : Gafargaon
DIRIP/MMN/Gaf/VR/SL-45(02)/14-15/W-120
|
Imp. of Dattar bazar Molmol Kachari to Vangti-Shakra-Ghagra Demail and Golabari road (Dattar bazaar Shila river road via Vangti bazar Bagra, Demail & Golabari UP to Kandi) (ID No. 361224044)
Part A: BC Road work = 4.000 km
(Ch. 1+000 km - 1+800 km & 4+000km-5+009 km).(According to Re-cast ).
Part C: Structure Work = 09 Nos. (11.00m)
(Total Length=1.800 km)
|
|
1.80
|
|
|
141.34
|
SHA-SE-LE (JV), Gafargaon, Mymensingh
|
141.34
|
|
01/11/2015
|
30/03/2018
|
100
|
|
|
20/12/2018
|
|
|
91
|
Mymensingh
|
22
|
gaffargaon
|
188
|
240
|
Upazila : Gafargaon.
DIRIP/MMN/Gafr
/VR/SL-45(01)/12-13/W-32
|
Imp. of Dattar bazar Molmol Kachari to Vangti-Shakra-Ghagra Demail & Golabari road (Dattar bazar Shila river road via Vangti bazar Bagra,Demail&Golabari UP to Kandi). (ID:361224044) PartA:BituminousCarpetingWorks=1.00km (Ch. 0+000 to 1+000 km)
Part B: Rehabilitation Works:=nil
Part C: Structure Works = 3 nos,1.8m
(Ch. +273, 0+600, 0+875km)
(Total Length=1.000 km)
|
|
1.00
|
|
|
61.59
|
M/S Anika Int.
77/4,West Agargoan
Dhaka-1207
|
67.58
|
|
30/05/2013
|
27/03/2014
|
100
|
|
|
20/12/2018
|
|
|
92
|
Mymensingh
|
22
|
gaffargaon
|
188
|
240
|
Upazila : Gafargaon
DIRIP/MMN/Gaf/UNR/SL-44(03)/14-15/W-117
|
Imp. of Baroihati -Kunchai-Nagurai road (Barohati GC road via Bakultala bazar) (ID No. 361223019).
Part A: BC Road work = 1.710 km
(Ch. 6+050km - 7+764km). (Total Length=1.710 km)
|
|
1.71
|
|
|
107.76
|
M/s. Ahad Traders
|
113.19
|
|
07/05/2015
|
05/02/2016
|
100
|
|
|
20/12/2018
|
|
|
93
|
Mymensingh
|
22
|
gaffargaon
|
188
|
240
|
Upazila: Gafargaon
DIRIP/MMN/GAFR
/UNR/SL-44(02)/12-13/W-65
|
Imp.of Baroihati-Kunchai Naguari (Baroihati-GC road via Bakultala bazar) road. (ID: 361223019)
Part A:Pucca (BC) Road Works =1.000 Km
(Ch. 8+000 km to 9+000 km)
Part B:Rehabilitation Works= Nil
Part C : Structure Works= 6 Nos, 6.50m
(Total Length=1.000 km)
|
|
1.00
|
|
|
104.26
|
M/S Ahad tradrs
Goforgoan
Mymenshing
|
109.45
|
|
19/06/2013
|
07/01/2014
|
100
|
|
|
20/12/2018
|
|
|
94
|
Mymensingh
|
22
|
gaffargaon
|
188
|
240
|
Upazila : Gafargaon.
DIRIP/MMN/Gafr
/UNR/SL-44(01)/12-13/W-31
|
Imp. of Baroihati-Kunchai-Nagurai Road,(Baroihati GC road via Bakultola bazar) (ID:361223019)
PartA:BituminousCarpetingWorks=1.000km (Ch5+.000 to 6+000 km)
Part B: Rehabilitation Works:=nil
Part C: Structure Works = 3 nos,1.8m
(Ch. 5+300, 5+500, 5+823km) (Total Length=1.000 km)
|
|
1.00
|
|
|
61.59
|
M/S Anika Int.
77/4,West Agargoan
Dhaka-1207
|
70.66
|
|
01/07/2013
|
26/02/2014
|
100
|
|
|
20/12/2018
|
|
|
95
|
Mymensingh
|
22
|
gaffargaon
|
188
|
240
|
Upazila : Gafargaon
DIRIP/MMN/Gaf/VR/SL-42(04)/16-17/W-192
|
Const. of 45.00m long RCC Girder Bridge on Charkamaria - Hazigonj road via Nak kata char road at Ch. 12900.00m ID. 361224001
(Total Length=0.150 km)
|
|
45.00
|
|
|
238.91
|
Arshad Hossen,Gafargaon, Mymensingh
|
215.02
|
|
02/05/2017
|
02/03/2018
|
100
|
|
|
20/12/2018
|
|
|
96
|
Mymensingh
|
22
|
gaffargaon
|
188
|
240
|
Upazila : Gafargaon
DIRIP/MMN/Gaf/VR/SL-42(03)/15-16/W-145
|
Imp. of Charkamaria - Hazigonj road via Nak kata char road (ID No. 361224001).
Part A: BC Road work = 5.000 km
(Ch. 11+857km - 16+857km). (Total Length=5.000 km)
|
|
5.00
|
|
|
312.24
|
M/s. Shahil Enterprise, Station road, Kishoregonj
|
336.58
|
|
10/12/2015
|
31/03/2017
|
100
|
|
|
20/12/2018
|
|
|
97
|
Mymensingh
|
22
|
gaffargaon
|
188
|
240
|
Upazila : Gafargaon
DIRIP/MMN/Gaf/VR/SL-42(02)/15-16/W-144
|
Imp. of Charkamaria - Hazigonj road via Nakkata char road (ID No. 361224001).
Part A: BC Road work = 5.000 km
(Ch. 6+857km - 11+857km). (Total Length=5.000 km)
|
|
5.00
|
|
|
313.27
|
M/s. Shahil Enterprise, Station road, Kishoregonj
|
337.63
|
|
10/12/2015
|
15/11/2017
|
100
|
|
|
20/12/2018
|
|
|
98
|
Mymensingh
|
22
|
gaffargaon
|
188
|
240
|
Upazila : Gafargaon
DIRIP/MMN/Gaf/VR/SL-42(01)/14-15/W-119
|
Imp. of Charkamaria - Hazigonj road via Nak kata char road (ID No. 361224001).
Part A: BC Road work = 5.000 km
(Ch. 1+850km - 6+857km).
Part C: Structure = 09 Nos. (10.375m)
(Total Length=5.000 km)
|
|
5.00
|
|
|
336.06
|
SI-SE-AT (JV), Gafargaon, Mymensingh
|
362.86
|
|
01/11/2015
|
30/04/2017
|
100
|
|
|
20/12/2018
|
|
|
99
|
Mymensingh
|
22
|
gaffargaon
|
188
|
240
|
Upazila : Gafargaon.
DIRIP/MMN/Gaf/UZR/SL-41(07)/17-18/W-214
|
Const. of 90 M long PC Girder Bridge over shila river at ch.9350 m on Gafargaon - Goyeshpur road.
|
|
90.00
|
|
|
0.00
|
|
0.00
|
|
|
|
100
|
|
|
20/12/2018
|
|
|
100
|
Mymensingh
|
22
|
gaffargaon
|
188
|
240
|
Upazila : Gafargaon.
DIRIP/MMN/Gaf/UZR/SL-41(06)/16-17/W-209
|
Imp. of Gafargaon - Goyeshpur road under Pathail UP (ID No. 361222007)
Part A: BC Road work = 3.00km
(Ch. 13+600km - 16+600km). Part C: Structure = 02 Nos. (1.25m) (Total Length =2.930 km)
|
|
2.93
|
|
|
225.27
|
M/s. Sohel Enterprise, Gafargaon, Mymensing
|
225.22
|
|
04/06/2017
|
30/10/2018
|
100
|
|
|
20/12/2018
|
|
|
101
|
Mymensingh
|
22
|
gaffargaon
|
188
|
240
|
Upazila : Gafargaon.
DIRIP/MMN/Gaf/UZR/SL-41(05)/15-16/W-143
|
Imp. of Gafargaon - Goyeshpur road under Pathail UP (ID No. 361222007)
Part A: BC Road work = 0.695km (Ch.8+105km - 8+800km). (Total Length=0.695 km)
|
|
0.70
|
|
|
52.87
|
M/s. Sohel Enterprise, Gafargaon, Mymensing
|
52.73
|
|
10/02/2016
|
20/10/2016
|
100
|
|
|
20/12/2018
|
|
|
102
|
Mymensingh
|
22
|
gaffargaon
|
188
|
240
|
Upazila : Gafargaon.
DIRIP/MMN/Gaf/UZR/SL-41(04)/14-15/W-116
|
Imp. of Gafargaon - Goyeshpur road under Pathail UP (ID No. 361222007)
Part A: BC Road work = 2.800 km
(Ch. 8+800km - 11+600km). Part C : Structure = 02 Nos. (2.25m) (Total Length=2.800 km)
|
|
2.80
|
|
|
210.55
|
MAB-SE LE (JV), Gafargaon
|
226.35
|
|
17/05/2015
|
30/01/2017
|
100
|
|
|
20/12/2018
|
|
|
103
|
Mymensingh
|
22
|
gaffargaon
|
188
|
240
|
Upazila : Gafargaon.
DIRIP/MMN/Gafr
/UZR/SL-41(03)/14-15/W-106
|
Imp. of Gafforgaon - Goyespur road under Paithul UP. (ID:361222007)
Part A: B.C Road Works=2.960km
(Ch. 4+100km to 7+060 km)
Part B: Rehabilitation Works:=1.045km
(Ch. 7+060km to 8+105 km)
Part C: Structure Works = Nil
(Total Length=4.005km)
|
|
4.01
|
|
|
225.34
|
SI-SE (JV), Sadar, Mymensingh
|
236.53
|
|
24/02/2015
|
30/04/2016
|
100
|
|
|
20/12/2018
|
|
|
104
|
Mymensingh
|
22
|
gaffargaon
|
188
|
240
|
Upazila : Gafargaon.
DIRIP/MMN/Gafr
/UZR/SL-41(02)/12-13/W-30
|
Imp. of Gafforgaon - Goyespur road under Paithul UP. (ID:361222007)
PartA:BituminousCarpetingWorks=1.00km (Ch. 11+600 to 12+600 km)
Part B: Rehabilitation Works:=nil
Part C: Structure Works = Nil
(Total Length=1.000km)
|
|
1.00
|
|
|
79.15
|
Mr. Anika International,
77, West Agargaon, Dhaka
|
83.07
|
|
31/03/2013
|
20/10/2013
|
100
|
|
|
20/12/2018
|
|
|
105
|
Mymensingh
|
22
|
gaffargaon
|
188
|
240
|
Upazila : Gafargaon.
DIRIP/MMN/Gafr
/UZR/SL-41(01)/12-13/W-04
|
Imp. of Gafforgaon - Goyespur road under Paithul UP. (ID:361222007)
Part A: Bituminous CarpetingWorks=1.00km (Ch. 12+600 to 13+600 km)
Part B: Rehabilitation Works:4.100km. (Ch. 0+000 to 4+100 km) Part C: Structure Works = Nil (Total Length=5.100 km)
|
|
5.10
|
|
|
115.43
|
Mr. Anika International,
77, West Agargaon, Dhaka
|
139.01
|
|
04/12/2012
|
14/10/2013
|
100
|
|
|
20/12/2018
|
|
|
106
|
Mymensingh
|
22
|
mymensingh-s
|
208
|
240
|
Upazila : Sadar
DIRIP/MMN/SAD/UNR/SL-11(03)/14-15/W-126
|
Improvement of Parangonj (Ambikagonj) - Ramvadropur road at ch. 10+700 km - 12+500 km. ID. No. 361523001
Part A: BC Road work = 1.800 km
(Ch. 10+700km - 12+500km).
Part B: Rehabilitation Work = Nil
Part C: Structure Work = 2 Nos. (12.50m)
(Total Length=1.798 km)
|
|
1.80
|
|
|
105.40
|
M/s. Sadek Enter. Iswargonj, Mymensingh
|
104.81
|
|
16/06/2015
|
17/05/2016
|
100
|
|
|
20/12/2018
|
|
|
107
|
Mymensingh
|
22
|
mymensingh-s
|
208
|
240
|
Upazila: Sadar
DIRIP/MMN/SAD
/UNR/SL-11(02)/12-13/W-25
|
Imp. of Parangonj (Ambikagonj)-Ramvadrapur road. (ID: 361523001)
Part A:Pucca (BC) Road Works=3.00km (Ch. 7+700 to 10+700 km)Part B:Rehabilitation Works= Nil
Part C : Structure Works= Nil.
(Total Length=3.000 km)
|
|
3.00
|
|
|
188.99
|
M/S Mohua Ent.
Mirpur,Dhaka
|
217.22
|
|
01/07/2013
|
30/11/2014
|
100
|
|
|
20/12/2018
|
|
|
108
|
Mymensingh
|
22
|
mymensingh-s
|
208
|
240
|
Upazila: Sadar
DIRIP/MMN/SAD/
UNR/SL-11(01)/12-13/W-12
|
Imp. of Parangonj (Ambikagonj)-Ramvadrapur road. (ID: 361523001)
Part A:Pucca (BC) Road Works=1.00 km (Ch. 6+700 to 7+700 km)
Part B:Rehabilitation Works= Nil
Part C : Structure Works= Nil. (Total Length=1.000 km)
|
|
1.00
|
|
|
65.16
|
M/s. Ruma Enterprise
Iswargonj, Mymensing
|
71.61
|
|
12/02/2013
|
08/09/2013
|
100
|
|
|
20/12/2018
|
|
|
109
|
Mymensingh
|
22
|
mymensingh-s
|
208
|
240
|
Upazila: Sadar DIRIP/MMN/Sad/UNR/SL-10(05)/17-18/W-216
|
Slope Protection work of Sherta bazar Borochar UP via Matkhala - Kaladoba - Seerigoldi road at ch. 0+500 km - 7+000 km)(ID: 361523013).
Part A:Slope Protection Works = 0.235km
(Ch. 0+500 km - 7+000km)
Part B: Rehabilitation Works = Nil
Part C: Structure Works = Nil Total Length ( Protective Work)=0.235 km)
|
|
0.23
|
|
|
14.33
|
M/S. Nihad Builders & Supplyerts, Nandail,Mymensingh
|
12.89
|
|
11/01/2018
|
17/05/2018
|
100
|
|
|
20/12/2018
|
|
|
110
|
Mymensingh
|
22
|
mymensingh-s
|
208
|
240
|
Upazila: Sadar DIRIP/MMN/Sad/UNR/SL-10(04)/15-16/W-148
|
Imp.Of Sherta bazar Borochar UP via Matkhala - Kaladoba - Seerigoldi road.
(ID: 361523013).
Part A: BC Road Works = 5.01 km
(Ch. 8+150 km - 13+160 km)
Part B: Rehabilitation Works = Nil
Part C: Structure Works = Nil (Total Length=5.010 km)
|
|
5.01
|
|
|
289.32
|
M/s. Nippon Enterprise & Const. Gulkibari road, Sadar Mymensingh
|
271.89
|
|
10/02/2016
|
31/12/2017
|
100
|
|
|
20/12/2018
|
|
|
111
|
Mymensingh
|
22
|
mymensingh-s
|
208
|
240
|
Upazila : Sadar
DIRIP/MMN/SAD/UNR/SL-10(03)/14-15/W-125
|
Improvement of Sherta bazaar - Borochar UP via Matkhala - Kaladoba - Seerigoldi road at ch. 4+150 km - 8+150 km. ID. No. 36523013
Part A: BC Road work = 4.000 km
(Ch. 4+150km - 8+150km).
Part B: Rehabilitation Work = Nil
Part C: Structure Work = 6 Nos. (3.750m)
(Total Length=3.998 km)
|
|
4.00
|
|
|
257.68
|
M/s. Vati Bangla Entp. Sadar, Kishorgonj
|
255.55
|
|
16/06/2015
|
29/09/2016
|
100
|
|
|
20/12/2018
|
|
|
112
|
Mymensingh
|
22
|
mymensingh-s
|
208
|
240
|
Upazila: Sadar
DIRIP/MMN/SAD/
UNR/SL-10(02)/12-13/W-24
|
Imp. of Sherta bazar Borochar UP via Matkhala - Kaladoba - Seerigoldi road
(ID: 361523013).
Part A:Pucca (BC) Road Works=3.00 km
(Ch. 1+150 to 4+150 km )
Part B:Rehabilitation Works=nil
Part C : Structure Works.=nil
(Total Length=3.000km)
|
|
3.00
|
|
|
184.25
|
M/s. Jaman
Construction
Khathal Bagan, Dhanmondi, Dhaka
|
218.31
|
|
24/04/2014
|
28/12/2016
|
100
|
|
|
20/12/2018
|
|
|
113
|
Mymensingh
|
22
|
mymensingh-s
|
208
|
240
|
Upazila: Sadar
DIRIP/MMN/SAD
/UNR/SL-10(01)/12-13/W-11
|
Imp. of Sherta bazar Borochar UP via Matkhala - Kaladoba - Seerigoldi road.
(ID: 361523013).
Part A:Pucca (BC) Road Works =1.150km
(Ch. 0+00 to 1+150 km )
Part B:Rehabilitation Works = nil
Part C : Structure Works.= nil
(Total Length=1.000 km)
|
|
1.00
|
|
|
58.75
|
M/s. Ruma Enterprise
Iswargonj, Mymensingh
|
64.56
|
|
13/02/2013
|
24/10/2013
|
100
|
|
|
20/12/2018
|
|
|
114
|
Mymensingh
|
22
|
mymensingh-s
|
208
|
240
|
Upazila: Sadar
DIRIP/MMN/Sad/
UNR/SL-09(06)/16-17/W-210
|
Slope protection work of somvugonj old bus stand bazar-Parangonj bazar via Sherta UP office road.(ID: 361523007)
Part A: Slope protection work = 0.050km.Ch. 13+750 km - 13+800 km.
Part B: Rehabilitation Works = Nil
Part C: Structure Works =Nil
(Total (protection work) Length=0.050 km)
|
|
0.05
|
|
|
5.94
|
M/S Ayan Enterprise,Akua,Dakhin Para,Sadar,Mymensingh
|
5.64
|
|
21/08/2017
|
24/02/2018
|
100
|
|
|
20/12/2018
|
|
|
115
|
Mymensingh
|
22
|
mymensingh-s
|
208
|
240
|
Upazila: Sadar
DIRIP/MMN/Sad/
UNR/SL-09(05)/16-17/W-181
|
Imp.Of Somvugonj old bus stand bazar-Parangonj bazar via Sherta UP office road.(ID: 361523007)
Part A: BC Road Works = Nil
Part B: Rehabilitation Works = 1.00km(Ch. 4+085 km - 5+085 km.)
Part C: Structure Works =1(One) No(0.625m)
(Total Length=1.000 km)
|
|
1.00
|
|
|
0.00
|
Susree Rani Shaha Roy,Barhatta,Netrokona
|
0.00
|
|
|
|
100
|
|
|
20/12/2018
|
|
|
116
|
Mymensingh
|
22
|
mymensingh-s
|
208
|
240
|
Upazila: Sadar
DIRIP/MMN/Sad/
UNR/SL-09(04)/15-16/W-147
|
Imp.Of Somvugonj old bus stand bazar-Parangonj bazar via Sherta UP office road.(ID: 361523007)
Part A: BC Road Works = 3.400 km
(Ch. 14+100 km - 17+500 km.)
Part B: Rehabilitation Works = Nil
Part C: Structure Works = 12 Nos. (8.875m)
(Total Length=3.400 km)
|
|
3.40
|
|
|
210.04
|
M/s. Ridoy Enterprise, Fulbaria, Mymensingh.
|
219.49
|
|
06/12/2015
|
30/06/2016
|
100
|
|
|
20/12/2018
|
|
|
117
|
Mymensingh
|
22
|
mymensingh-s
|
208
|
240
|
Upazila : Sadar
DIRIP/MMN/SAD/UNR/SL-9(03)/14-15/W-124
|
Improvement of Somvugonj old bus-stand bazaar - Paranjonj bazar via Sherta UP office road at ch. 10+000 km - 14+000 km. ID. No. 36523007
Part A: BC Road work = 4.000 km
(Ch. 10+000km - 14+000km).
Part B: Rehabilitation Work = Nil
Part C: Structure Work = 8.00m (5 Nos.)
(Total Length=3.998 km)
|
|
4.00
|
|
|
239.62
|
Md. Lal Mohammad Fulbaria, Mymensingh
|
228.38
|
|
23/06/2015
|
28/02/2017
|
100
|
|
|
20/12/2018
|
|
|
118
|
Mymensingh
|
22
|
mymensingh-s
|
208
|
240
|
Upazila: Sadar
DIRIP/MMN/SAD
UNR/SL-9(02)/12-13/W-23
|
Imp. of Somvugonj old bus stand bazar-Parangonj bazar via Sherta UP office road.(ID: 361523007)
Part A:Pucca (BC) Road Works =3.00 km (Ch. 4+600 to 7+600 km)
Part B:Rehabilitation Works =nil
Part C : Structure Works = Nil (Total Length=3.000km)
|
|
3.00
|
|
|
176.06
|
M/S. Saiful Bricks
Sadar/Mymensing
|
222.09
|
|
26/03/2013
|
22/02/2014
|
100
|
|
|
20/12/2018
|
|
|
119
|
Mymensingh
|
22
|
mymensingh-s
|
208
|
240
|
Upazila: Sadar
DIRIP/MMN/SAD/
UNR/SL-9(01)/12-13/W-10
|
Imp. of Somvugonj old bus stand bazar-Parangonj bazar via Sherta UP office road.(ID: 361523007)
Part A:Pucca (BC) Road Works =1.00km.
(Ch. 2+900 to 3+900 km)
Part B:Rehabilitation Works= nil
Part C : Structure Works =03 Nos. (8.00m)
(Total Length=1.000 km)
|
|
1.00
|
|
|
82.92
|
M/s. Ruma Enterprise
Mymensing
|
87.12
|
|
12/02/2013
|
08/09/2013
|
100
|
|
|
20/12/2018
|
|
|
120
|
Netrokona
|
25
|
durgapur
|
187
|
240
|
Upazila: DurgapurDIRIP/NET/Durg/UNR/SL-23(08)/16-17/W-206
|
Improvement Work Of Gawkandia UP Office-Janjail Bazar via Shankarpur Bazar road at Ch. 5+300Km -10+300Km ID. 372183009 (Total Length=4.760 km)
|
|
4.76
|
|
|
265.28
|
M/S Bhuyan Enterprise,Netrokona
|
276.94
|
|
30/06/2017
|
23/11/2018
|
50
|
|
|
13/05/2019
|
|
|
121
|
Netrokona
|
25
|
durgapur
|
187
|
240
|
Upazila: DurgapurDIRIP/NET/Durg/UNR/SL-23(07)/15-16/W-179
|
Const. of 30.00m long RCC Girder Bridge on Gawkandia UP Office-Janjail Bazar via Shankarpur Bazar road at Ch. 9550.00m ID. 372183009
|
|
30.00
|
|
|
154.26
|
Monzurul Haque, Mymenshing
|
153.39
|
|
06/09/2016
|
07/01/2018
|
100
|
|
|
10/03/2019
|
|
|
122
|
Netrokona
|
25
|
durgapur
|
187
|
240
|
Upazila: DurgapurDIRIP/NET/Durg/UNR/SL-23(05)/15-16/W-177
|
Const. of 35.00m long RCC Girder Bridge on Gawkandia UP Office-Janjail Bazar via Shankarpur Bazar road at Ch. 4425.00m ID. 372183009)
|
|
35.00
|
|
|
168.21
|
Monzurul Haque, Mymenshing
|
167.29
|
|
06/09/2016
|
01/07/2018
|
65
|
|
|
10/03/2019
|
|
|
123
|
Netrokona
|
25
|
durgapur
|
187
|
240
|
Upazila: DurgapurDIRIP/NET/Durg/UNR/SL-23(03)/15-16/W-175
|
Const. of 36.00m long RCC Girder Bridge on Gawkandia UP Office-Janjail Bazar via Shankarpur Bazar road at Ch. 2850.00m ID. 372183009
|
|
36.00
|
|
|
225.95
|
M.A. Wahed, Madan,Netrokona
|
223.00
|
|
24/08/2016
|
25/12/2017
|
100
|
|
|
10/03/2019
|
|
|
124
|
Netrokona
|
25
|
durgapur
|
187
|
240
|
Upazila: Durgapur
DIRIP/NET/Durg/UNR/SL-23(06)/15-16/W-178
|
Const. of 51.00m long RCC Girder Bridge on Gawkandia UP Office-Janjail Bazar via Shankarpur Bazar road at Ch. 5200.00m ID. 372183009
|
|
51.00
|
|
|
289.85
|
Asim Singh, Jaria Bazar, Netrokona.
|
288.91
|
|
22/08/2016
|
22/02/2018
|
100
|
|
|
20/12/2018
|
|
|
125
|
Netrokona
|
25
|
durgapur
|
187
|
240
|
Upazila: Durgapur
DIRIP/NET/Durg/UNR/SL-23(04)/15-16/W-176
|
Const. of 51.00m long RCC Girder Bridge on Gawkandia UP Office-Janjail Bazar via Shankarpur Bazar road at Ch. 3400.00m ID. 372183009
|
|
51.00
|
|
|
294.20
|
Baset Prokousholi,
Netrokona
|
292.77
|
|
28/08/2016
|
28/02/2018
|
100
|
|
|
20/12/2018
|
|
|
126
|
Netrokona
|
25
|
durgapur
|
187
|
240
|
Upazila: Durgapur
DIRIP/NET/Durg/UNR/SL-23(02)/15-16/W-172
|
Rehabilitation work of Gawkandia UP Office-Janjail Bazar via Shankarpur Bazar road. (Ch. 13+700 km to 14+935 km) ID. 372183009 (Total Length=1.235 km)
|
|
1.24
|
|
|
88.42
|
Baset Prokousholi,
Netrokona
|
87.12
|
|
19/06/2016
|
30/03/2018
|
100
|
|
|
20/12/2018
|
|
|
127
|
Netrokona
|
25
|
durgapur
|
187
|
240
|
Upazila: Durgapur
DIRIP/NTR/Durg/
/UNR/SL-23(01)/13-14/W-88
|
Imp. of Goawkandia UP office to Janjail bazar via Shankarpur bazar road. Ch. 1+800 km to 5+020 km. ID. No. 372183009. (Total Length=3.220km)
|
|
3.22
|
|
|
208.58
|
S,M. Angur, Mukterpara, Netrakona
|
208.58
|
|
16/02/2014
|
07/12/2014
|
100
|
|
|
20/12/2018
|
|
|
128
|
Netrokona
|
25
|
durgapur
|
187
|
240
|
Upazila: Durgapur DIRIP/NTR/Durg/UNR
/SL-22(02)/14-15/W-135
|
Rehabilitation work of Durgapur UP office-Kalikapur bazar road. ID. 372183003 Part A: BC Road Work = Nil
Part B: Rehabilitation Work = 0.895 km (ch. 1+164km - 2+059km.)
Part C: Structure Work = Nil (Total Length=0.895 km)
|
|
0.90
|
|
|
53.58
|
M/s. Pritom Enterprise, Pro. Dipankar Sarker, Mukterpara, Netrakona
|
42.97
|
|
20/10/2015
|
16/04/2016
|
100
|
|
|
20/12/2018
|
|
|
129
|
Netrokona
|
25
|
durgapur
|
187
|
240
|
Upazila: Durgapur
DIRIP/NTR/Durg
/UNR/SL-22(01)/12-13/W-02
|
Improvement of Durgapur UP office-Kalikapur bazar road. (ID: 372183003)
Part A:Bituminous Carpeting Works=1.00km
(Ch. 3+560 km to 4+560 km)
Part B: Rehabilitation Works= Nil
Part C: Structure Works
(At Ch. 6+770, 7+390, 7+870 & 10+870 km .
|
|
1.00
|
|
|
132.17
|
M/S Bishwas Traders
Pro. Md. Aradhon
Kolmakanda
Netrokona
|
124.41
|
|
19/11/2012
|
01/03/2015
|
100
|
|
|
20/12/2018
|
|
|
130
|
Netrokona
|
25
|
kalmakanda
|
189
|
240
|
Upazila: KalmakandaDIRIP/NET/Kal/UNR/SL-26(11)/16-17/W-205
|
Rehabilitation Work of Kailahati UP office (Sidhly)- Palpara bazar via Anandapur bazar Panch Katha bazar road (ID: 372403001 (Ch. 6+048 km to 8+630km). (Total Length=2.580 km)
|
|
2.58
|
|
|
213.96
|
S.M.Angur,Netrakona
|
192.57
|
|
04/06/2017
|
28/08/2018
|
73
|
|
|
08/04/2019
|
|
|
131
|
Netrokona
|
25
|
kalmakanda
|
189
|
240
|
Upazila: KalmakandaDIRIP/NTR/KAL//VR/SL-27(05)/16-17/W-204
|
Improvement of Kalmakanda-Baruakona Road (ID: 372404013
Part A:Bituminous Carpeting Works =2.160Km(Ch. 5+340 km to 7+500km)
Part B: Rehabilitation Works= Nil
Part C: Structure Works = 3-Nos(10.80m)
(Total Length=1.946 km)
|
|
1.95
|
|
|
192.06
|
Asim Singh, Jaria Bazar, Netrokona.
|
172.86
|
|
11/06/2017
|
06/11/2018
|
80
|
|
|
08/04/2019
|
|
|
132
|
Netrokona
|
25
|
kalmakanda
|
189
|
240
|
Upazila: Kalmakanda
DIRIP/NTR/KAL/
/VR/SL-27(04)/15-16/W-167
|
Cont. of 69.00m Long RCC Girder Bridge on Colmakanda-Baruakona Road. (Colmakanda-(Chinahala Moar)-Baruakona Road) at Ch.5+260km--, ID-372404013 (Total (HBB) Length=0.150 km)
|
|
69.00
|
|
|
390.86
|
Asim Singh, Jaria Bazar, Netrokona.
|
300.49
|
|
09/05/2016
|
30/10/2018
|
100
|
|
|
20/12/2018
|
|
|
133
|
Netrokona
|
25
|
kalmakanda
|
189
|
240
|
Upazila: Kalmakanda
DIRIP/NTR/KAL/
/VR/SL-27(03)/14-15/W-128
|
Imp. Of Kalmakanda-Baruakona road at ch. 4+096km-5+216km. ID. 372404013 (Total Length=1.120 km)
|
|
1.12
|
|
|
77.57
|
Osim Singh, Jaria bazar, Purbadhala, Netrakona
|
61.47
|
|
07/09/2015
|
03/12/2015
|
100
|
|
|
20/12/2018
|
|
|
134
|
Netrokona
|
25
|
kalmakanda
|
189
|
240
|
Upazila: Kalmakanda
DIRIP/NTR/Kal
/VR/SL-27(02)/13-14/W-79
|
Improvement of Kalmakanda Baruakona Road (ID:372404013(Ch.1+000kmto4+096km). (Total Length=3.096 km)
|
|
3.10
|
|
|
198.32
|
M/s. Hawlader Builders, West Chalkpara, Netrakona
|
226.49
|
|
04/02/2014
|
26/02/2015
|
100
|
|
|
20/12/2018
|
|
|
135
|
Netrokona
|
25
|
kalmakanda
|
189
|
240
|
Upazila: Kalmakanda
DIRIP/NTR/Kal
/VR/SL-27(01)/12-13/W-37
|
Improvement of Kalmakanda-Baruakona Road (ID: 372404013
Part A:Bituminous Carpeting Works =01 Km
(Ch. 0+00 km to 1+000km)
Part B: Rehabilitation Works= Nil
Part C: Structure Works = Nil (Total Length=1.000 km)
|
|
1.00
|
|
|
64.72
|
M/s. Roky Entp.
Pro. Md. Kibria (Rupon), Chalk para
Netrokona
|
64.56
|
|
09/04/2013
|
30/05/2014
|
100
|
|
|
20/12/2018
|
|
|
136
|
Netrokona
|
25
|
kalmakanda
|
189
|
240
|
Upazila: Kalmakanda
DIRIP/NET/Kal/UNR/SL-26(10)/15-16/W-168
|
Const. of 51.00m long RCC Girder Bridge on Kailahati UP office (Sidhly) Palpara bazar via Anandapur bazar Panch Katha bazar road at ch. 10+350km. ID. 372403001 (Total (HBB) Length=0.100 km)
|
|
51.00
|
|
|
328.53
|
Challenger & Tajuddin Farash Sentu (JV)
|
254.71
|
|
09/05/2016
|
25/06/2017
|
100
|
|
|
20/12/2018
|
|
|
137
|
Netrokona
|
25
|
kalmakanda
|
189
|
240
|
Upazila: Kalmakanda
DIRIP/NET/Kal/UNR/SL-26(09)/15-16/W-160
|
Imp. of Kailahati UP office (Sidhly) - Palpara bazar via Anandapur bazar Panch Katha bazar road. (ch. 8+630 km-15+100 km). ID. 372403001 (Total Length=6.003 km)
|
|
6.00
|
|
|
408.58
|
M/S Priti Enterprise, Sunamgonj-M/S. Baset Prokousholi, Netokona (JV)
|
428.42
|
|
07/03/2016
|
30/06/2018
|
100
|
|
|
20/12/2018
|
|
|
138
|
Netrokona
|
25
|
kalmakanda
|
189
|
240
|
Upazila: Kalmakanda
DIRIP/NTR/KAL/
/UNR/SL-26(08)/14-15/W-129
|
Imp. Of Kailahati UP office (Sidhly) Palpara bazar via Anandapur bazar Panch Katha bazar road at ch. 3+000km-6+048km. ID. 372403001 (Total Length=3.000km)
|
|
3.00
|
|
|
221.67
|
M/s. Subrato Sutradhar-M/s. Pretom Enterprise (JV), 27 Wazed Complex, Netrakona.
|
185.12
|
|
08/09/2015
|
06/09/2016
|
100
|
|
|
20/12/2018
|
|
|
139
|
Netrokona
|
25
|
kalmakanda
|
189
|
240
|
Upazila: Kalmakanda
DIRIP/NTR/Kal
/UNR/SL-26(07)/13-14/W-86
|
Const. of 62.00m long RCC Girder bridge on Kailahati UP office (Sidhly) Palpara bazar via Anandapur bazar Panch Katha bazar road at ch. 14850m. ID. 372403001.
|
|
62.00
|
|
|
343.68
|
Sheikh Hemayet Ali, Malni road, Netrakona
|
393.99
|
|
04/02/2014
|
29/08/2015
|
100
|
|
|
20/12/2018
|
|
|
140
|
Netrokona
|
25
|
kalmakanda
|
189
|
240
|
Upazila: Kalmakanda
DIRIP/NTR/Kal
/UNR/SL-26(06)/13-14/W-85
|
Const. of 62.00m long RCC Girder bridge on Kailahati UP office (Sidhly) Palpara bazar via Anandapur bazar Panch Katha bazar road at ch. 13020m. ID. 372403001.
|
|
62.00
|
|
|
343.45
|
MAW-RI (JV), Madan, Netrakona
|
392.87
|
|
04/02/2014
|
28/08/2015
|
100
|
|
|
20/12/2018
|
|
|
141
|
Netrokona
|
25
|
kalmakanda
|
189
|
240
|
Upazila: Kalmakanda
DIRIP/NTR/Kal
/UNR/SL-26(05)/13-14/W-84
|
Const. of 39.00m long RCC Girder bridge on Kailahati UP office (Sidhly) Palpara bazar via Anandapur bazar Panch Katha bazar road at ch. 11945m. ID. 372403001.
|
|
39.00
|
|
|
248.36
|
PE-BP (JV), Choto bazar, Netrakona
|
284.13
|
|
04/02/2014
|
31/12/2014
|
100
|
|
|
20/12/2018
|
|
|
142
|
Netrokona
|
25
|
kalmakanda
|
189
|
240
|
Upazila: Kalmakanda
DIRIP/NTR/Kal
/UNR/SL-26(04)/13-14/W-83
|
Const. of 22.10m long RCC Girder bridge on Kailahati UP office (Sidhly) Palpara bazar via Anandapur bazar Panch Katha bazar road at ch. 9905m. ID. 372403001.
|
|
22.10
|
|
|
158.91
|
Shyamol Chandra Shaha, Borobazar, Netrakona
|
188.20
|
|
04/02/2014
|
22/01/2015
|
100
|
|
|
20/12/2018
|
|
|
143
|
Netrokona
|
25
|
kalmakanda
|
189
|
240
|
Upazila: Kalmakanda
DIRIP/NTR/Kal
/UNR/SL-26(03)/13-14/W-82
|
Const. of 22.10m long RCC Girder bridge on Kailahati UP office (Sidhly) Palpara bazar via Anandapur bazar Panch Katha bazar road at ch. 9045m. ID. 372403001.
|
|
22.10
|
|
|
158.11
|
Samiran Chowdhury, Ukilpara, Netrakona
|
186.84
|
|
04/02/2014
|
18/01/2015
|
100
|
|
|
20/12/2018
|
|
|
144
|
Netrokona
|
25
|
kalmakanda
|
189
|
240
|
Upazila: Kalmakanda
DIRIP/NTR/Kal
/UNR/SL-26(02)/13-14/W-81
|
Const. of 39.00m long RCC Girder bridge on Kailahati UP office (Sidhly) Palpara bazar via Anandapur bazar Panch Katha bazar road at ch. 6000m. ID. 372403001.
|
|
39.00
|
|
|
246.61
|
Osim Singh, Jaria bazar, Purbadhala, Netrakona
|
305.50
|
|
04/02/2014
|
24/01/2015
|
100
|
|
|
20/12/2018
|
|
|
145
|
Netrokona
|
25
|
kalmakanda
|
189
|
240
|
Upazila: Kalmakanda
DIRIP/NTR/Kal
/UNR/SL-26(01)/13-14/W-80
|
Improvement of Kailahati UP office (Sidhly) Palpara bazar via Anandapur bazar Panch Katha bazar road (ID: 372403001 (Ch. 0+000 km to 3+000km). (Total Length=3.000 km)
|
|
3.00
|
|
|
195.15
|
M/s. S M Kamrul Hassan, Mukterpara, Netrakona
|
222.98
|
|
04/02/2014
|
31/01/2015
|
100
|
|
|
20/12/2018
|
|
|
146
|
Netrokona
|
25
|
kalmakanda
|
189
|
240
|
Upazila: Kalmakanda
DIRIP/NTR/Kal
/UNR/SL-25(01)/12-13/W-36
|
Improvement of Moheshkhola Bazar - Bharatpur Via Lengura UP Office Road (ID: 372403008)
Part A: BC Road Works=Nil
Part B: Rehabilitation Works= Nil
Part C: Structure Works = 1-no, 13.50m,At ch 1+058Km
|
|
13.50
|
|
|
44.38
|
M/s. New Asa Trad
Netrokona
Pro. Md. Nazmush Shahadat
Choto Bazar, Netrakona
|
46.60
|
|
24/04/2013
|
05/04/2014
|
100
|
|
|
20/12/2018
|
|
|
147
|
Netrokona
|
25
|
kalmakanda
|
189
|
240
|
Upazila: Kalmakanda
DIRIP/NET/Kal/UZR/SL-24(04)/15-16/W-166
|
Const. of 22.00m long RCC Girder Bridge on Kailati-Bishorpasha road (Kalmakanda GC - (Kalihala) - Bishorpasha GC road) at ch. 7+450 km. ID. 372402004 (Total Length=0.060 km)
|
|
22.00
|
|
|
219.21
|
M.A Wahid, Netrokona
|
165.01
|
|
09/05/2016
|
30/06/2018
|
100
|
|
|
20/12/2018
|
|
|
148
|
Netrokona
|
25
|
kalmakanda
|
189
|
240
|
Upazila: Kalmakanda
DIRIP/NET/Kal/UZR/SL/24(03)/15-16/W-159
|
Imp. Of Kailati-Bishorpasha road at ch.5+110km-7+710km & ch.7+710km-7+950km. ID. 372402004 (Total Length=2.780 km)
|
|
2.78
|
|
|
281.39
|
Md. Farid Uddin, A/36, Upashahar, Rajshahi
|
278.24
|
|
02/03/2016
|
20/03/2018
|
100
|
|
|
20/12/2018
|
|
|
149
|
Netrokona
|
25
|
kalmakanda
|
189
|
240
|
Upazila: Kalmakanda
DIRIP/NTR/KAL/
/UZR/SL-24(02)/14-15/W-127
|
Imp. Of Kailati-Bishorpasha road at ch. 2+000km-5+110km. ID. 372402004 (Total Length=3.000 km)
|
|
3.00
|
|
|
351.30
|
Oshim Singh, Zaria bazar, Netrokona.
|
287.96
|
|
08/09/2015
|
06/06/2016
|
100
|
|
|
20/12/2018
|
|
|
150
|
Netrokona
|
25
|
kalmakanda
|
189
|
240
|
Upazila: Kalmakanda
DIRIP/NTR/Kal
/UZR/SL-24(01)/12-13/W-35
|
Improvement of Kailati (Kalihala)Bishorpasha Road
(ID: 372402004
Part A:BC Road Works =1.00km
(Ch. 0+00 km to 1+000km)
Part B: Rehabilitation Works= Nil
Part C: Structure Works = Nil (Total Length=1.000 km)
|
|
1.00
|
|
|
73.19
|
Md. Inzil mia
Kalmakanda
Netrokona
|
73.12
|
|
18/03/2013
|
03/12/2013
|
100
|
|
|
20/12/2018
|
|
|
151
|
Netrokona
|
25
|
madan
|
191
|
240
|
Upazila: MadanDIRIP/NTR/Madan/UZR/SL-13(01)/16-17/W-199
|
Improvement of Connecting road for the RCC Bridge over Bunni River on Madan- Tangail Connecting road (Fatepur GC- Tangail GC Road) (ID: 372562006)
Part A:BC Road Works=0.910km
(Ch. 2+289 km to 3+239 km)
Part B: Rehabilitation Works= Nil
Part C: Structure Works= Nil (Total Length=0.910 km)
|
|
0.91
|
|
|
220.28
|
Samiran Chowdhury, Ukilpara, Netrakona
|
198.25
|
|
24/05/2017
|
24/05/2018
|
100
|
|
|
13/05/2019
|
|
|
152
|
Satkhira
|
39
|
tala
|
312
|
240
|
Upazila: Tala
DIRIP/SAT/Tal/UZR/SL-57(d)(03)/16-17/W-208
|
Const.of Protective Work on Kumira–Sagordari – Trimohoni –Rajgonj -Pulerhat (Pulerhat – Rajgonj –Trimohoni - Sagordari - Kumira) Road by two lane . At ch. 43.952km to 44+138km (ID.287902003). (Total (Protactive Work) Length=0.186 km)
|
|
0.19
|
|
|
23.99
|
M/S Boshu Traders, Tala , Satkhira
|
21.59
|
|
29/06/2017
|
30/03/2018
|
100
|
|
|
20/12/2018
|
|
|
153
|
Satkhira
|
39
|
tala
|
312
|
240
|
Upazila: Tala
DIRIP/SAT/Tal/UZR/SL-57(d)(02)/15-16/W-155
|
Improvement & Widening by two lane of Kumira – Sagordari – Trimohoni –Rajgonj - Pulerhat (Pulerhat – Rajgonj –Trimohoni - Sagordari - Kumira) Road (ID. 287902003).
i) BC road work =3.000 km
(Ch. 43+296 km – 46+296 km)
ii) Structure = 3 Nos (1.85 m) (Total Length=3.000 km)
|
|
3.00
|
|
|
299.00
|
Md. Iqbal Jamaddar, Polashpole, Satkhira
|
263.17
|
|
25/01/2016
|
28/02/2017
|
100
|
|
|
20/12/2018
|
|
|
154
|
Satkhira
|
39
|
tala
|
312
|
240
|
Upazila: Tala
DIRIP/SAT/Tal/UZR/SL-57(d)(01)/13-14/W-102
|
Improvement & Widening by two lane of Kumira – Sagordari – Trimohoni –Rajgonj - Pulerhat (Pulerhat – Rajgonj –Trimohoni - Sagordari - Kumira) Road (ID. 287902003).
i) Imp. & Widening work by BC=2.014km
(Ch. 46+296 km – 48+310 km) & Widening of single lane road into two lane by earth work = 5.500km. (Ch. 42+810km – 48+310km).
ii) Const. & Widening Work of Structure = 1 No (1.00 m) At ch. 48973.00m. (Total Length=2.014km)
|
|
2.01
|
|
|
242.95
|
Sk. Shirazul Haque, Labsha, Satkhira
|
213.16
|
|
20/11/2014
|
22/06/2015
|
100
|
|
|
20/12/2018
|
|
|
155
|
Sunamganj
|
64
|
biswamvarpur
|
464
|
240
|
Upazila: BiswamberpurDIRIP/SNM/l/Bshm/UZR/SL-17(c)(03)/15-16/W-170
|
Rehabilitation work of Dharmapasha - Madha Nagar -Moheshkhola - Takerhat - Lawerghor - Sunamgonj road (Biswamberpur part) (Mongalkata (Kapna) - Chinakandi - Sorupgonj - Moheskhola road) (Ch. 7+500 km - 13+130 km). ID. 690182005 (Total Length=5.497 km)
|
|
5.50
|
|
|
343.06
|
AR=RM=SM=JV, Notun Bazar Sunamgonj
|
295.02
|
|
26/01/2017
|
25/01/2018
|
60
|
|
|
13/05/2019
|
|
|
156
|
Sunamganj
|
64
|
biswamvarpur
|
464
|
240
|
Upazila :BiswamberpurDIRIP/SNM/l/Bshm/UZR/SL-17(c)(02)/15-16/W-169
|
Rehabilitation work of Dharmapasha - Madha Nagar -Moheshkhola - Takerhat - Lawerghor - Sunamgonj road (Biswamberpur part) (Biswamberpur - Polash - Chinakandi road) ID. 690182001
Part A: i) BC Road work = 0.595 km (Ch. 0+000 km - 0+605 km)
ii) Rehabilitation work) = 4.282 km
(Ch. 4+950 km - 8+100 km, 8+400km - 9+520km & 9+820km - 9+870km
Part B: RCC Work = 0.300 km (Ch. 8+100 km - 8+400 km)
Part C: Structure Works = 04 Nos. (9.875 m). (Total Length=5.177 km)
|
|
5.18
|
|
|
369.14
|
AR=RM=SM=JV, Notun Bazar Sunamgonj
|
316.94
|
|
26/01/2017
|
25/01/2018
|
80
|
|
|
08/04/2019
|
|
|
157
|
Sunamganj
|
64
|
biswamvarpur
|
464
|
240
|
Upazila : Biswamberpur
DIRIP/SNM/l/Bshm/UZR/SL-17(c)(01)/12-13/W-44
|
Const. of 27m long RCC Girder bridge on Dharmapasha-Madhanagor-Moheshkhola-Takerhat Lawererghor-Sunamgonj road (Biswamberpur Part). at ch. 11+320km. ID. 690182005.
|
|
27.00
|
|
|
73.00
|
Hazi sadek ali
& sons, Jamalgonj
sunamgonj
|
73.00
|
|
18/04/2013
|
10/12/2013
|
100
|
|
|
20/12/2018
|
|
|
158
|
Sunamganj
|
64
|
derai
|
483
|
240
|
(W-207
|
Rehabilitation works of Derai-Dhal-Markuli bazar road . (ID:690292004), Ch. 0+000km to 16+074 km & 18+114km to 19+845km. (Total Length=17.485km)
|
|
17.49
|
|
|
1998.87
|
Rana Builders-Hasan Builders (JV),55,West Panthapath, Dhaka-1205
|
2014.55
|
|
14/11/2017
|
30/04/2018
|
0
|
|
|
08/04/2019
|
|
|
159
|
Sunamganj
|
64
|
derai
|
483
|
240
|
Upazila: Derai
DIRIP/SNM/Dri/UZR/SL-21(02/14-15/W-122
|
Imp.of Derai-Dhal-Markuli bazar road. (ID:690292004) Ch. 16+074km to 16+154 km & 19+845km to 20+968km. (Total Length=1.203 km)
|
|
1.20
|
|
|
162.34
|
M/s. Belal Entp.
Hazipara,
Sunamgonj
|
125.58
|
|
01/07/2015
|
30/06/2016
|
100
|
|
|
20/12/2018
|
|
|
160
|
Sunamganj
|
64
|
dharmapasha
|
471
|
240
|
Upazila: Dharmapasha
DIRIP/SNM/Dhrm/UZR/SL-17(a)(09)/14-15/W-123
|
Imp. of Dharmapasha-Madhanagar - Moheshkhola - Takerhat - Lawerghor -Sunamgonj road (Dharmapasha Part) Ch. 10+080 - 14+200 km(ID: 690322006). (Total Length=4.000 km)
|
|
4.00
|
|
|
370.20
|
Md. Nurul Islam,
Mahila College
road, Saunamgonj
|
387.79
|
|
07/08/2015
|
30/03/2018
|
100
|
|
|
20/12/2018
|
|
|
161
|
Sunamganj
|
64
|
dharmapasha
|
471
|
240
|
Upazila: Dharmapasha
DIRIP/SNM/Dhrm/UZR/SL-17(a)(08)/13-14/W-97
|
Imp. of Dharmapasha-Madhanagar - Moheshkhola – Takerhat – Lawerghor – Sunamgonj road (Dharmapasha Part) Ch. 8+030 - 10+080 km(ID. 690322006) (Total Length=2.000 km)
|
|
2.00
|
|
|
159.58
|
M/s. Subrato Sutradhar, Satpai, Netrakona
|
165.20
|
|
07/08/2015
|
06/08/2016
|
100
|
|
|
20/12/2018
|
|
|
162
|
Sunamganj
|
64
|
dharmapasha
|
471
|
240
|
Upazila: Dharmapasha
DIRIP/SNM/Dhrm/UZR/SL-17(a)(07)/13-14/W-96
|
Imp. of Dharmapasha-Madhanagar - Moheshkhola – Takerhat – Lawerghor – Sunamgonj road (Dharmapasha Part) Ch. 0+000 - 0+900 km (ID. 690322003) (Total Length=0.900km)
|
|
0.90
|
|
|
0.00
|
|
0.00
|
|
|
|
100
|
|
|
20/12/2018
|
|
|
163
|
Sunamganj
|
64
|
dharmapasha
|
471
|
240
|
Upazila : Dharmapasha
DIRIP/SNM/Dhrm/UZR/SL-17(a)(06)/12-13/W-48
|
Imp. of Dharmapasha-Madhanagor-Moheshkhola-Takerhat - Lawerghor - Sunamgonj road (Dharmapasha Part). at ch. 7+020km-8+028km. (ID: 690322006) (Total Length=1.000 km)
|
|
1.00
|
|
|
80.06
|
M/s. Sawdagar Builders
Hasannagar, Sunamgonj
|
91.99
|
|
01/10/2013
|
30/11/2015
|
100
|
|
|
20/12/2018
|
|
|
164
|
Sunamganj
|
64
|
dharmapasha
|
471
|
240
|
Upazila : Dharmapasha
DIRIP/SNM/Dhrm
/UZR/SL-17a(05)/12-13/W-43
|
Imp. Of Dharmapasha-Madha Nagar-Moheshkhola-Takerhat-Lawerghor-Sunamgonj road (Dharmapasha part) at ch. 1+400km-2+420km . ID. 690322004 (Total Length=0.800 km)
|
|
0.80
|
|
|
449.33
|
SC-BP (JV), Chotobazar,
Netrakona
|
498.47
|
|
01/05/2013
|
30/04/2014
|
100
|
|
|
20/12/2018
|
|
|
165
|
Sunamganj
|
64
|
dharmapasha
|
471
|
240
|
Upazila : Dharmapasha
DIRIP/SNM/Dhrm
/UZR/SL-17a(04)/12-13/W-42
|
Imp. Of Dharmapasha-Madha Nagar-Moheshkhola-Takerhat-Lawerghor-Sunamgonj road (Dharmapasha part) at ch. 0+000km-1+400km. ID. 690322004 (Total Length=0.945 km)
|
|
0.96
|
|
|
435.78
|
SC-BP (JV), Chotobazar,
Netrakona
|
482.61
|
|
01/05/2013
|
30/03/2015
|
100
|
|
|
20/12/2018
|
|
|
166
|
Sunamganj
|
64
|
dharmapasha
|
471
|
240
|
Upazila : Dharmapasha
DIRIP/SNM/Dhrm
/UZR/SL-17a(03)/12-13/W-41
|
Const. of 04 nos. box culverts (12.30m) on Dharmapasha-Madha Nagar-Moheshkhola-Takerhat Lawerghor Sunamgonjroad (Dharmapasha part) at ch. 6+450km. 12+625km, 12+720km, 12+970km ID. 690322006
|
|
12.30
|
|
|
55.89
|
Jahirul Amin, Dharmapasha,
Sunamgonj
|
58.68
|
|
24/04/2013
|
05/02/2014
|
100
|
|
|
20/12/2018
|
|
|
167
|
Sunamganj
|
64
|
dharmapasha
|
471
|
240
|
Upazila : Dharmapasha
DIRIP/SNM/Dhrm
/UZR/SL-17a(02)/12-13/W-40
|
Const. of 42.00m long RCC Girder bridge on Dharmapasha-Madha Nagar-Moheshkhola-Takerhat-Lawerghor-Sunamgonj road (Dharmapasha part) at ch. 12+250km. ID. 690322006
|
|
42.00
|
|
|
148.37
|
M/S Nabi hossain
Jamalgonj
Shunamgonj
|
171.50
|
|
01/06/2013
|
30/05/2014
|
100
|
|
|
20/12/2018
|
|
|
168
|
Sunamganj
|
64
|
dharmapasha
|
471
|
240
|
Upazila : Dharmapasha
DIRIP/SNM/Dhrm
/UZR/SL-17a(01)/12-13/W-39
|
Const. of 42.00m long RCC Girder bridge on Dharmapasha-Madha Nagar-Moheshkhola-Takerhat-Lawerghor-Sunamgonj road (Dharmapasha part) at ch. 9+000km. ID. 690322006
|
|
42.00
|
|
|
154.77
|
M/S Nabi hossain
Jamalgonj
Shunamgonj
|
179.01
|
|
01/06/2013
|
30/05/2014
|
100
|
|
|
20/12/2018
|
|
|
169
|
Sunamganj
|
64
|
jamalganj
|
468
|
240
|
Upazila: JamalgonjDIRIP/SNM/Jml//UZR/SL-20(d)(03)/16-17/W-185
|
Rehabilitation works of Netrakona – Dharmapasha – Jamalgonj – Sunamgonj raod (Jamalgonj – Joynagar road) at ch. 0+000km-2+200 km. (ID. 690502001) (Total Length=2.197 km)
|
|
2.20
|
|
|
206.34
|
M/S Howlader Builders,chak para, Netrakona
|
191.69
|
|
07/04/2017
|
10/06/2017
|
75
|
|
|
13/05/2019
|
|
|
170
|
Sunamganj
|
64
|
jamalganj
|
468
|
240
|
Upazila: JamalgonjDIRIP/SNM/Jml/UZR/SL-20(c )(02)/14-15/W-115
|
Rehabilitation work of Netrokona - Dharmapasha - Jamalgonj - Sunamgonj road (Jamalgonj –Selimgonj road) Ch.2+800km - 5+400km (ID: 690502003). (Total Length=2.539 km)
|
|
2.54
|
|
|
137.66
|
Sujib Ranjan Das, Bagbari, Sylhet
|
115.63
|
|
01/12/2015
|
30/11/2016
|
60
|
|
|
13/05/2019
|
|
|
171
|
Sunamganj
|
64
|
jamalganj
|
468
|
240
|
Upazila: JamalgonjDIRIP/SNM/Jml/UZR/SL-20 (c)(05)/16-17/W-183
|
Rehabilitation work of Netrokona - Dharmapasha - Jamalgonj - Sunamgonj road (Jamalgonj –Selimgonj road) Ch. 1+000km - 2+830 km (ID: 690502003). (Total Length=1.811 km)
|
|
1.81
|
|
|
135.77
|
M/S Shahid Brother!s Elite House Motijil C/A Dhaka
|
127.13
|
|
04/07/2017
|
28/02/2018
|
100
|
|
|
08/04/2019
|
|
|
172
|
Sunamganj
|
64
|
jamalganj
|
468
|
240
|
Upazila: JamalgonjDIRIP/SNM/Jml//UZR/SL-20(d)(04)/16-17/W-186
|
Rehabilitation works of Netrakona – Dharmapasha – Jamalgonj – Sunamgonj raod (Jamalgonj – Joynagar road) at ch. 9+044km-11+300 km. (ID. 690502001) (Total Length=1.950 km)
|
|
1.95
|
|
|
177.02
|
M/S Shahid Brother!s Elite House Motijil C/A Dhaka
|
166.37
|
|
07/04/2017
|
28/02/2018
|
100
|
|
|
10/03/2019
|
|
|
173
|
Sunamganj
|
64
|
jamalganj
|
468
|
240
|
Upazila: Jamalgonj
DIRIP/SNM/Jml//UZR/SL-20(d)(02)/15-16/W-149
|
Rehabilitation works of Netrakona – Dharmapasha – Jamalgonj – Sunamgonj raod (Jamalgonj – Joynagar road) at ch. 6+930km-9+044 km. (ID. 690502001) (Total Length=2.100 km)
|
|
2.10
|
|
|
189.37
|
Kazi Nasir Uddin
Shologhar, Sunamgonj
|
158.00
|
|
01/12/2015
|
30/11/2016
|
100
|
|
|
20/12/2018
|
|
|
174
|
Sunamganj
|
64
|
jamalganj
|
468
|
240
|
Upazila: Jamalgonj
DIRIP/SNM/Jml//UZR/SL-20(d)(01)/12-13/W-51
|
Rehabilitation works of Netrakona – Dharmapasha – Jamalgonj – Sunamgonj raod (Jamalgonj – Joynagar road) at ch. 2+100km-6+930km. (ID. 690502001) (Total Length=4.830 km)
|
|
4.83
|
|
|
368.24
|
M/S Mahbub enterprise
Jamaipara
Sunamgonj
|
399.94
|
|
18/06/2013
|
17/06/2014
|
100
|
|
|
20/12/2018
|
|
|
175
|
Sunamganj
|
64
|
jamalganj
|
468
|
240
|
Upazila: Jamalgonj
DIRIP/SNM/Jml/UZR/SL-20 (c)(06)/16-17/W-184
|
Rehabilitation work of Netrokona - Dharmapasha - Jamalgonj - Sunamgonj road (Jamalgonj –Selimgonj road) Ch. 5+400 km - 8+385 km (ID: 690502003). (Total Length=2.956 km)
|
|
2.96
|
|
|
228.54
|
M/S Mahbub enterprise
Jamaipara
Sunamgonj
|
212.08
|
|
17/04/2017
|
30/11/2017
|
100
|
|
|
20/12/2018
|
|
|
176
|
Sunamganj
|
64
|
jamalganj
|
468
|
240
|
Upazila: Jamalgonj
DIRIP/SNM/Jml/UZR/SL-20 (c)(04)/16-17/W-182
|
Rehabilitation work of Netrokona - Dharmapasha - Jamalgonj - Sunamgonj road (Jamalgonj –Selimgonj road) Ch. 0+000 km - 1+000 km (ID: 690502003). (Total Length=0.987 km)
|
|
0.99
|
|
|
77.87
|
M/S Pusha enterprise
Jamalgonj
Sunamgonj
|
71.53
|
|
07/04/2017
|
06/10/2017
|
100
|
|
|
20/12/2018
|
|
|
177
|
Sunamganj
|
64
|
jamalganj
|
468
|
240
|
Upazila: Jamalgonj
DIRIP/SNM/Jml/UZR/SL-20 (c)(03)/15-16/W-150
|
Rehabilitation work of Netrokona - Dharmapasha - Jamalgonj - Sunamgonj road (Jamalgonj –Selimgonj road) Ch. 8+816 km - 11+250 km (ID: 690502003). (Total Length=2.420 km)
|
|
2.42
|
|
|
192.06
|
M/S Mahbub enterprise
Jamaipara
Sunamgonj
|
188.22
|
|
20/01/2016
|
25/02/2017
|
100
|
|
|
20/12/2018
|
|
|
178
|
Sunamganj
|
64
|
jamalganj
|
468
|
240
|
|
|
|
|
|
|
0.00
|
|
0.00
|
|
|
|
100
|
|
|
20/12/2018
|
|
|
179
|
Sunamganj
|
64
|
jamalganj
|
468
|
240
|
Upazila : Jamalgonj
DIRIP/SNM/Jamal/UZR/SL-20(c)(01)/12-13/W-47
|
Imp. of Netrakona-Dharmapasha-Jamalgonj-Sunamgonj road (Jamalgonj-Salimgonj road) at ch. 1+000km-2+400km & 6+435km - 6+475km. ID. 690502003. (Total length=1.430 km)
|
|
1.43
|
|
|
304.95
|
Kazi Nasim Uddin
&
M/S Shoeb Entp. (JV), Shologhar, Sunamgonj
|
335.11
|
|
01/05/2013
|
30/04/2014
|
100
|
|
|
20/12/2018
|
|
|
180
|
Sunamganj
|
64
|
sunamganj-s
|
466
|
240
|
Upazila: Sadar
DIRIP/SNM/SAD//UZR/SL-20(e)(01)/15-16/W-154
|
Imp. of Netrokona-Dharmopasha-Jamalgonj-Sunamgonj road (Katuir-Joynagar road) at ch. 10+000 km to 12+730 km. ID. 690892001 (Total Length=2.669 km)
|
|
2.67
|
|
|
194.58
|
Kazi Md. Nasim Uddin, Shologhor, Sunamganj
|
161.65
|
|
01/02/2016
|
30/05/2017
|
100
|
|
|
20/12/2018
|
|
|
181
|
Sunamganj
|
64
|
tahirpur
|
465
|
240
|
Upazila: TahirpurDIRIP/SNM/Thpr/UZR/SL-17(b)(17)/17-18/W-217
|
Const. of (a) 1x1.00mx1.00m RCC U-Drain at ch. 2150m (b)2x4.00mx3.00m RCC box Culvert at ch. 9300m (c)2x4.00mx3.00m RCC box Culvert at ch. 16800m on Dharmapasha-Madhanagar - Moheshkhola - Takerhat - Lawerghor -Sunamgonj road (Tahirpur Part) ID: 690922006).
|
|
18.80
|
|
|
59.82
|
M/S.S.D , Enterprise, Hazipara, Suamgonj
|
56.83
|
|
01/08/2018
|
31/05/2019
|
100
|
|
|
13/05/2019
|
|
|
182
|
Sunamganj
|
64
|
tahirpur
|
465
|
240
|
W-113 (Remaining Work)
|
Const. of 32.00m long RCC Girder bridge on Dharmapasha-Madha Nagar-Moheshkhola-Takerghat-Lawerghor-Sunamgonj road (Moheshkhola-Takerghat-Muksudpur-Chinakandi road) at ch. 7750m over Charagaon Chara (ID. 690922006). (Taherpur part)
|
|
32.00
|
|
|
87.60
|
|
0.00
|
|
|
|
45
|
|
|
08/04/2019
|
|
|
183
|
Sunamganj
|
64
|
tahirpur
|
465
|
240
|
Upazila: Tahirpur
DIRIP/SNM/Thpr/UZR/SL-17(b)(16)/15-16/W-173
|
Slope protective Work of Dharmapasha-Madhanagar - Moheshkhola - Takerhat - Lawerghor -Sunamgonj road (Tahirpur Part) at ch. 13+870km - 19+510km ) ID: 690922006). (Total Length=0.120 km)
|
|
0.12
|
|
|
96.27
|
Aminul Islam Salim, Sholaghar, Sunamgonj.
|
72.76
|
|
22/09/2016
|
25/08/2017
|
100
|
|
|
20/12/2018
|
|
|
184
|
Sunamganj
|
64
|
tahirpur
|
465
|
240
|
Upazila: Tahirpur
DIRIP/SNM/Thpr/UZR/SL-17(b)(14)/14-15/W-113
|
Const. of 32.00m long RCC Girder bridge on Dharmapasha-Madha Nagar-Moheshkhola-Takerghat-Lawerghor-Sunamgonj road (Moheshkhola-Takerghat-Muksudpur-Chinakandi road) at ch. 7750m over Charagaon Chara (ID. 690922006). (Taherpur part)
|
|
32.00
|
|
|
92.81
|
Md. Atiqur Rahman, Natunpara, Sunamgonj.
|
92.81
|
|
01/06/2015
|
30/06/2016
|
100
|
|
|
20/12/2018
|
|
|
185
|
Sunamganj
|
64
|
tahirpur
|
465
|
240
|
Upazila: Tahirpur
DIRIP/SNM/Thpr/UZR/SL-17(b)(13)/14-15/W-112
|
Const. of 38.00m long RCC Girder bridge on Dharmapasha-Madha Nagar-Moheshkhola-Takerghat-Lawerghor-Sunamgonj road at ch. 4400m. over Ronju Chara (ID. 690922006). (Taherpur part) (Total Length=0.100 km)
|
|
38.00
|
|
|
251.50
|
M/s. Belal Entp. Hazipara, Sunamgonj
|
250.96
|
|
01/06/2015
|
30/06/2017
|
100
|
|
|
20/12/2018
|
|
|
186
|
Sunamganj
|
64
|
tahirpur
|
465
|
240
|
Upazila: Tahirpur
DIRIP/SNM/Thpr/UZR/SL-17(b)(12)/14-15/W-111
|
Const. of 50.00m long RCC Girder bridge on Dharmapasha-Madha Nagar-Moheshkhola-Takerghat-Lawerghor-Sunamgonj road at ch. 10700m. over Lakma Chara (ID. 690922006).(Taherpur part)
|
|
50.00
|
|
|
313.46
|
H.S.-PE-AR, Jamalgonj
|
278.11
|
|
14/05/2015
|
31/12/2016
|
100
|
|
|
20/12/2018
|
|
|
187
|
Sunamganj
|
64
|
tahirpur
|
465
|
240
|
Upazila: Tahirpur
DIRIP/SNM/Thpr/UZR/SL-17(b)(11)/14-15/W-110
|
Const. of 75.00m long RCC Girder bridge on Dharmapasha-Madha Nagar-Moheshkhola-Takerghat-Lawerghor-Sunamgonj road(Moheshkhola-Tekerghat-Muksudpur-Chinakandi road) at ch. 5650m. over Kolagaon Chara Khal. (ID. 690922006). (Taherpur part) (Total Length=0.120 km)
|
|
75.00
|
|
|
353.50
|
JV of RAAM, Sunamgonj.
|
301.70
|
|
01/06/2015
|
30/06/2017
|
100
|
|
|
20/12/2018
|
|
|
188
|
Sunamganj
|
64
|
tahirpur
|
465
|
240
|
Upazila: Tahirpur
DIRIP/SNM/Thpr/UZR/SL-17(b)(09)/13-14/W-93
|
Rehabilitation work of Dharmapasha- Madhanagar - Moheshkhola – Takerhat – Lawerghor – Sunamgonj road (Tahirpur Part) ch. 13+870km to 16+650km (ID. 690922006) (Total Length=2.780 km)
|
|
2.78
|
|
|
228.15
|
M/s. Sajib Ranjan Das, 197, Bagbari, Sylhet.
|
225.72
|
|
01/07/2014
|
31/03/2016
|
100
|
|
|
20/12/2018
|
|
|
189
|
Sunamganj
|
64
|
tahirpur
|
465
|
240
|
Upazila: Tahirpur
DIRIP/SNM/Thpr/UZR/SL-17(b)(08)/12-13/W-73
|
Const. of 12 nos RCC box culvert on Dharmapasha- Madhanagar - Moheshkhola – Takerhat – Lawerghor – Sunamgonj road (Tahirpur Part) at different ch. (ID. 690922006)
|
|
90.00
|
|
|
286.48
|
M/s. Sawdagar Builders
Hasannagar, Sunamgonj
|
332.28
|
|
27/11/2013
|
26/11/2014
|
100
|
|
|
20/12/2018
|
|
|
190
|
Sunamganj
|
64
|
tahirpur
|
465
|
240
|
Upazila: Tahirpur
DIRIP/SNM/Thpr/UZR/SL-17(b)(07)/12-13/W-57
|
Const. of 4x4.00x4.00 box culvert on Dharmapasha- Madhanagar - Moheshkhola – Takerhat – Lawerghor – Sunamgonj road (Tahirpur Part) at ch. 23000m. (ID. 690922006
|
|
16.00
|
|
|
49.27
|
Talukder Ent.
(JV0
|
49.25
|
|
12/05/2013
|
11/05/2014
|
100
|
|
|
20/12/2018
|
|
|
191
|
Sunamganj
|
64
|
tahirpur
|
465
|
240
|
Upazila: Tahirpur
DIRIP/SNM/Thpr/UZR/SL-17(b)(06)/12-13/W-56
|
Const. of 2x4.00x4.00 box culvert on Dharmapasha- Madhanagar - Moheshkhola – Takerhat – Lawerghor – Sunamgonj road (Tahirpur Part) at ch. 8100m. (ID. 690922006)
|
|
8.00
|
|
|
29.60
|
M/s. Sawdagar Builders
Hasannagar, Sunamgonj
|
34.00
|
|
01/10/2013
|
30/09/2014
|
100
|
|
|
20/12/2018
|
|
|
192
|
Sunamganj
|
64
|
tahirpur
|
465
|
240
|
Upazila: Tahirpur
DIRIP/SNM/Thpr/UZR/SL-17(b)(05)/12-13/W-55
|
Const. of 4x4.00x4.00 box culvert on Dharmapasha- Madhanagar - Moheshkhola – Takerhat – Lawerghor – Sunamgonj road (Tahirpur Part) at ch. 6850m. (ID. 690922006)
|
|
16.00
|
|
|
49.15
|
M/s. Sawdagar Builders
Hasannagar, Sunamgonj
|
56.47
|
|
01/10/2013
|
30/09/2014
|
100
|
|
|
20/12/2018
|
|
|
193
|
Sunamganj
|
64
|
tahirpur
|
465
|
240
|
Upazila: Tahirpur
DIRIP/SNM/Thpr//UZR/SL-17(b)(04)/12-13/W-54
|
Const. of 2x4.00x3.00 box culvert on Dharmapasha- Madhanagar - Moheshkhola – Takerhat – Lawerghor – Sunamgonj road (Tahirpur Part) at ch. 4500m. (ID. 690922006)
|
|
8.00
|
|
|
25.51
|
M/s. Sawdagar Builders
Hasannagar, Sunamgonj
|
29.31
|
|
01/10/2013
|
30/07/2014
|
100
|
|
|
20/12/2018
|
|
|
194
|
Sunamganj
|
64
|
tahirpur
|
465
|
240
|
Upazila: Tahirpur
DIRIP/SNM/Thpr//UZR/SL-17(b)(03)/12-13/W-53
|
Const. of 2x4.00x3.00 box culvert on Dharmapasha- Madhanagar - Moheshkhola – Takerhat – Lawerghor – Sunamgonj road (Tahirpur Part) at ch. 3400m. (ID. 690922006)
|
|
8.00
|
|
|
29.60
|
M/S Mahbub enterprise
Jamaipara
Sunamgonj
|
33.86
|
|
01/10/2013
|
30/07/2014
|
100
|
|
|
20/12/2018
|
|
|
195
|
Sunamganj
|
64
|
tahirpur
|
465
|
240
|
Upazila: Tahirpur
DIRIP/SNM/Thpr//UZR/SL-17(b)(02)/12-13/W-52
|
Const. of 4x4.00x3.00 box culvert on Dharmapasha- Madhanagar - Moheshkhola – Takerhat – Lawerghor – Sunamgonj road (Tahirpur Part) at ch. 3000m. (ID. 690922006)
|
|
16.00
|
|
|
43.81
|
M/s. Hasan Enterprise
Jamaipara, Sunamgonj
|
50.14
|
|
01/10/2013
|
30/07/2014
|
100
|
|
|
20/12/2018
|
|
|
196
|
Sunamganj
|
64
|
tahirpur
|
465
|
240
|
W-21 (Remaining Work)
|
Remaining work of Dharmapasha-Maddyanagar-Moheshkhola-Takerghat-Lowerghar road (Tahirpur Part) (ID: 690922006)
(Ch.12+870 km to 13+870 km)
|
|
1.00
|
|
|
56.09
|
M/s. Bastha Nirman Sangastha, Sunamganj
|
48.78
|
|
01/10/2015
|
31/03/2016
|
100
|
|
|
20/12/2018
|
|
|
197
|
Sunamganj
|
64
|
tahirpur
|
465
|
240
|
Upazila : Tahirpur
DIRIP/SNM/Tahir/
UZR/SL-17(b)(01)/12-13/W-21
|
Improvement of Dharmapasha-Maddyanagar-Moheshkhola-Takerghat-Lowerghar road (Tahirpur Part) (ID: 690922006)
(Ch.12+870 km to 13+870 km)
|
|
1.00
|
|
|
58.28
|
Mr. Amal Kanti Chowdhury
Hassannagor
Sunamgonj
|
55.36
|
|
15/02/2013
|
14/08/2013
|
100
|
|
|
20/12/2018
|
|
|
198
|
Tangail
|
18
|
mirzapur
|
143
|
240
|
Upazila: Mirzapur.DIRIP/TAN/Mirz/UZR/SL-35(b)(01)/14-15/W-103
|
Const. of 99.00m long RCC Girder bridge on Kurni-Fatepur-Kanchanpur GC road at ch. 7+845km (ID: 393662004)
Part A: BC Road work = Nil
Part B: Rehabilitation = Nil
Part C: Structure = 01 No. (99.00m) at ch 7+845km.
(Total ( HBB) Length=0.120 km)
|
|
99.00
|
|
|
440.06
|
M/S Orient Trade International, 17/18, Akkhaydas lane, Gendaria, Sutrapur,Dhaka
|
559.40
|
|
21/12/2014
|
20/12/2016
|
95
|
|
|
08/04/2019
|
|
|
199
|
Tangail
|
18
|
mirzapur
|
143
|
240
|
Upazila: Mirzapur.DIRIP/TAN/Mirz/UZR/SL-35(b)(02)/17-18/W-218
|
Approach/Bank Protaction of 99.00m long RCC Girder bridge on Kurni-Fatepur-Kanchanpur GC road at ch. 7+845km (ID: 393662004) Total ( Protactive Work) Length= 0.302 km)
|
|
99.00
|
|
|
283.72
|
|
0.00
|
|
|
|
65
|
|
|
08/04/2019
|
|
|
200
|
Tangail
|
18
|
mirzapur
|
143
|
240
|
Upazila: Mirzapur.DIRIP/TAN/Mirz/VR-34(02)/16-17/W-203
|
Improvement of Paharpur - Mirzapur-Amrail via sorab nagor road. (ID:393664030 )Part A: HBB Road Works=5.620km
(Ch.2+223km to 7+843 km)
Part B:Rehabilitation Works=nil
Part C: Structure Works= 01- no Bridge 20.00m & 09- nos Culvert 29.50 m
(Total (HBB)Length=5.566 km)
|
|
5.57
|
|
|
1133.95
|
United CommercialCenter Ltd.Richi Enterprise (JV), Jatrabari, Dhaka
|
1099.63
|
|
22/06/2017
|
28/03/2018
|
55
|
|
|
08/04/2019
|
|
|
201
|
Tangail
|
18
|
mirzapur
|
143
|
240
|
Upazila: Mirzapur.
DIRIP/TAN/Mirz/VR/SL-39(01)/14-15/W-114
|
Const. of 24.00m long RCC Girder bridge on Baimhati-Bawer-Kumarjani road over Mora river at ch. 1+200km (ID: 393664078)
Part C: Structure = 01 No. 24.00m
|
|
24.00
|
|
|
114.10
|
Alif Traders, Sabalia, Tangail
|
98.32
|
|
27/05/2015
|
26/05/2016
|
100
|
|
|
20/12/2018
|
|
|
202
|
Tangail
|
18
|
mirzapur
|
143
|
240
|
Upazila: Mirzapur.
DIRIP/TAN/Mirz/VR/SL-38(01)/14-15/W-104
|
Const. of 81.00m long PC Girder bridge on Dewhata bazaar-Kumarzani road at ch. 0+200km (ID: 393664077)
Part A: BC Road work = Nil
Part B: Rehabilitation = Nil
Part C: Structure = 01 No. (81.00m) at ch. 0+200 km
(Total (HBB)Length=0.090 km
|
|
81.00
|
|
|
354.01
|
Azad Engineer, Khulna Office, 89,R/W App Road, Khulna
|
345.77
|
|
11/12/2014
|
10/12/2015
|
100
|
|
|
20/12/2018
|
|
|
203
|
Tangail
|
18
|
mirzapur
|
143
|
240
|
Upazila: Mirzapur.
DIRIP/TAN/Mirz/
VR/Sl-37(01)/13-14/W-75
|
Const. of 99.92m long RCC Girder bridge on Fatepur bazar-Chowbaria road at ch.4+175km (ID. 393664031)
|
|
99.92
|
|
|
378.07
|
M/s. Taposh Traders. Thanapara, Tangail
|
453.63
|
|
07/01/2014
|
30/12/2016
|
100
|
|
|
20/12/2018
|
|
|
204
|
Tangail
|
18
|
mirzapur
|
143
|
240
|
Upazila: Mirzapur.
DIRIP/TAN/Mirz/VR/SL-36(01)/14-15/W-107
|
Const. of 81.00m long RCC Girder bridge over Kunai river on Takia-Kadma road at ch. 1470m (ID: 393665045)
Part A: BC Road work = Nil
Part B: Rehabilitation = Nil
Part C: Structure = 01 No. 81.00m
|
|
81.00
|
|
|
384.27
|
Alif Traders
& Nabila Enterprise-JV, Sabalia, Tangail
|
384.27
|
|
04/03/2015
|
30/11/2016
|
100
|
|
|
20/12/2018
|
|
|
205
|
Tangail
|
18
|
mirzapur
|
143
|
240
|
Upazila: Mirzapur.
DIRIP/TAN/Mirz
/VR-34(01)/12-13/W-71
|
Improvement of Paharpur - Mirzapur-Amrail via sorab nagor road. (ID:393664030 )Part A: BC Road Works=2.223 km
(Ch.0+000 km to 2+223 km)
Part B:Rehabilitation Works=nil
Part C: Structure Works= 1 (one) no(1.6m)
(Total Length=2.223 km)
|
|
2.22
|
|
|
138.16
|
Rahman const
Pro. Motiur rahman
Akurtakur Para
Tangil
|
158.79
|
|
23/09/2013
|
23/04/2014
|
100
|
|
|
20/12/2018
|
|
|
206
|
Tangail
|
18
|
mirzapur
|
143
|
240
|
Upazila: Mirzapur.
DIRIP/TAN/Mirz/VR/SL-33(03)/16-17/W-200
|
Imp. of Gallibazar-Gramati-Panimashail road. ID. 393664006
Part A: BC Road work = 0.662 km ( Ch. 5+500 km-6+162 km)
Part B: Rehabilitation = Nil
Part C: Structure = Nil (Total Length=0.662 km)
|
|
0.66
|
|
|
43.39
|
M/S. Talukder International, 610, Kazipara, Mirpur, Dhaka
|
46.75
|
|
24/08/2017
|
23/02/2018
|
100
|
|
|
20/12/2018
|
|
|
207
|
Tangail
|
18
|
mirzapur
|
143
|
240
|
Upazila: Mirzapur.
DIRIP/TAN/Mirz/VR/SL-33(02)/14-15/W-133
|
Imp. of Gallibazar-Gramati-Panimashail road. ID. 393664006
Part A: BC Road work = 3.500 km ( Ch. 2+000 km-5+500 km)
Part B: Rehabilitation = Nil
Part C: Structure = 03 No. 4.25m (Total Length=3.500 km)
|
|
3.50
|
|
|
223.48
|
M/s. Khan & Co. 79, Pourashava Market, Tangail
|
202.24
|
|
20/09/2015
|
30/12/2016
|
100
|
|
|
20/12/2018
|
|
|
208
|
Tangail
|
18
|
mirzapur
|
143
|
240
|
Upazila: Mirzapur.
DIRIP/TAN/Mirz
/VR-33(01)/12-13/W-70
|
Improvement of Galibazar-Gramati-Panimashail Road (ID: 393664006) Part: A Road Works =2.00 km
(Ch.0+000 km to 2+000 km)
Part B:Rehabilitation Works=nil
Part C: Structure Works= nil (Total Length=2.000 km)
|
|
2.00
|
|
|
118.13
|
M/s. Taposh Traders.
Thanapara, Tangail
|
141.16
|
|
30/01/2014
|
25/01/2015
|
100
|
|
|
20/12/2018
|
|
|
209
|
Tangail
|
18
|
mirzapur
|
143
|
240
|
Upazila: Mirzapur
DIRIP/TAN/Mirz/VR/SL-32(03/16-17/W-202
|
Imp. of Bardam - Chitmamudpur road.
ID. 393665017
Part A: BC Road work = 0.580 km ( Ch. 8+700 km-9+280 km)
Part B: Rehabilitation = Nil
Part C: Structure = 03 Nos (1.875m )
(Total Length=0.580 km)
|
|
0.58
|
|
|
44.01
|
M/S. Mridha Enterprise, Mirzapur, Tangail
|
44.01
|
|
13/08/2017
|
02/12/2018
|
100
|
|
|
20/12/2018
|
|
|
210
|
Tangail
|
18
|
mirzapur
|
143
|
240
|
Upazila: Mirzapur
DIRIP/TAN/Mirz/VR/SL-32(02/14-15/W-132
|
Imp. of Bardam - Chitmamudpur road.
ID. 393665017
Part A: BC Road work = 2.200km ( Ch. 4+500 km-6+700 km)
Part B: Rehabilitation = Nil
Part C: Structure = 06 No. 3.75m
(Total Length=2.200km)
|
|
2.20
|
|
|
128.14
|
M/s. Taposh Traders, Thanapara, Tangail
|
121.65
|
|
03/09/2015
|
06/02/2016
|
100
|
|
|
20/12/2018
|
|
|
211
|
Tangail
|
18
|
mirzapur
|
143
|
240
|
Upazila: Mirzapur.
DIRIP/TAN/Mirz
/VR-32(01)/12-13/W-69
|
Improvement of Bardam-Chitmamudpur Road
(ID: 393665017)
Part A: Pucca Road Works=2.00 km
(Ch. 6+700 km to 8+700 km)
Part B:Rehabilitation Works=4.500km
(Ch 0+00 to 4+500)
Part C: Structure Works= nil (Total Length=6.500 km)
|
|
6.50
|
|
|
179.93
|
M/s. Taposh Traders.
Thanapara, Tangail
|
215.04
|
|
30/01/2014
|
07/05/2017
|
100
|
|
|
20/12/2018
|
|
|
212
|
Tangail
|
18
|
mirzapur
|
143
|
240
|
Upazila: Mirzapur
DIRIP/TAN/Mirz/UNR/SL-31(03)/14-15/W-131
|
Imp. of Ajgana Up (Hatubhanga GC)-Kuripara road ID. 393663016
Part A: BC Road work = 0.400 km ( Ch. 4+000 km-4+400 km)
Part B: Rehabilitation = Nil
Part C: Structure = Nil
(Total Length=0.400km)
|
|
0.40
|
|
|
23.97
|
M/s. Oboni Enterprise, Gopalpur, Tangail
|
22.49
|
|
03/09/2015
|
28/06/2016
|
100
|
|
|
20/12/2018
|
|
|
213
|
Tangail
|
18
|
mirzapur
|
143
|
240
|
Upazila: Mirzapur
DIRIP/TAN/Mirz/UNR/SL-31(02)/14-15/W-105
|
Imp. of Azgana UP (Hatubhanga GC)-Kuripara road (ID: 393663016)
Part A: BC Road work = 1.507 km
at ch. 0+493km – 2+000 km
Part B: Rehabilitation = 0.493 km
at ch. 0+000km – 0+493 km
Part C: Structure = 06 Nos. (3.75m)
(Total Length=2.00km)
|
|
2.00
|
|
|
119.74
|
Rahman const
Akurtakur Para, C&B road,
Tangil
|
138.30
|
|
10/12/2014
|
31/05/2016
|
100
|
|
|
20/12/2018
|
|
|
214
|
Tangail
|
18
|
mirzapur
|
143
|
240
|
Upazila: Mirzapur.
DIRIP/TAN/Mirz
/UNR-31(01)/12-13/W-68
|
Improvement of Azgana UP (Hatubhanga GC)-Kuripara Road.
(ID: 393663016)
Part A: Pucca Road Works=2.00 km
(Ch. 2+000 km to 4+000 km)
Part B:Rehabilitation Works= Nil
Part C: StructureWorks=07nos(4.375m) (Total Length=2.00km)
|
|
2.00
|
|
|
122.37
|
M/s. Akter Trading Corporation,
Sirajgonj Sadar, Sirajgonj
|
146.81
|
|
21/10/2013
|
02/06/2014
|
100
|
|
|
20/12/2018
|
|
|
215
|
Tangail
|
18
|
mirzapur
|
143
|
240
|
Upazila:Mirzapur. DIRIP/Tan/Mirz/UZR/SL-30(04)/15-16/W-158
|
Improvement of Mirzapur-Pathorghata-Taktarchala road. Ch. 0+500 km - 0+620 km, 0+920 km - 1+085 km & 2+658 km to 8+961 km) ID. 393662006 (Total Length=6.588 km)
|
|
6.59
|
|
|
484.43
|
M/s. Alif Traders, & Nabila Enterprise (JB) District Gate, Sabalia, Tangail
|
500.20
|
|
23/03/2016
|
31/01/2018
|
100
|
|
|
20/12/2018
|
|
|
216
|
Tangail
|
18
|
mirzapur
|
143
|
240
|
Upazila:Mirzapur. DIRIP/Tan/Mirz/UZR/SL-30(03)/15-16/W-157
|
Rehabilitation work of Mirzapur-Pathorghata-Taktarchala road. (Ch. 0+000 km - 0+500 km & 1+085 km - 2+658 km) ID. 393662006 (Total Length=2.073 km)
|
|
2.07
|
|
|
92.91
|
M/s. Alif Traders, Sabalia, Tangail
|
96.52
|
|
15/02/2016
|
14/02/2017
|
100
|
|
|
20/12/2018
|
|
|
217
|
Tangail
|
18
|
mirzapur
|
143
|
240
|
Upazila: Mirzapur.
DIRIP/TAN/Mirz
/UZR-30(02)/12-13/W-67
|
Improvement of Mirzapur-Pathorghata-Taktarchala Road
Part A: Pucca Road Works=1.213 km (ID: 393662006)
(Ch. 12+994 km to 14+207 km)
Part B:Rehabilitation Works= Nil
Part C: Structure Works= nil (Total Length=1.213 km)
|
|
1.21
|
|
|
89.03
|
M/S.Alif Traders
Pro. M. R. Khan (Tutul)
Sabalia, Tangail.
|
106.80
|
|
21/10/2013
|
27/02/2014
|
100
|
|
|
20/12/2018
|
|
|
218
|
Tangail
|
18
|
mirzapur
|
143
|
240
|
Upazila: Mirzapur.
DIRIP/TAN/Mirz
/UZR-30(01)/12-13/W-01
|
Improvement of Mirzapur- Pathorghata-Taktarchala Road (ID: 393662006)
Part A: Pucca Road Works=1.00km.
(Ch. 14+207 km to 15+207 km)
Part B:Rehabilitation Works=4.784km.
(Ch. 8+961 km to 11+903 km,16+247Km to 18+200Km)
Part C: Structure Works=3 Nos,18.00m. (Total Length=5.784km)
|
|
5.78
|
|
|
262.81
|
M/S.Alif Traders
Pro. M. R. Khan (Tutul)
Sabalia, Tangail.
|
288.86
|
|
13/01/2013
|
19/07/2013
|
100
|
|
|
20/12/2018
|
|
|
219
|
Tangail
|
18
|
mirzapur
|
143
|
240
|
Upazila: Mirzapur.
DIRIP/TAN/Mirz/UNR/SL-29(04)/16-17/W-201
|
Improvement of Mirzapur-Amrail-Talipara-Kamarpara road at ch. 8+470 km - 8+690) ID. 393663001. (Total Length=0.220 km)
|
|
0.22
|
|
|
18.20
|
M/s. Alif Traders, Sabalia, Tangail
|
19.09
|
|
06/02/2017
|
26/11/2017
|
100
|
|
|
20/12/2018
|
|
|
220
|
Tangail
|
18
|
mirzapur
|
143
|
240
|
Upazila:Mirzapur DIRIP/Tan/Mirz/UNR/SL-29(03)/15-16/W-156
|
Rehabilitation work of Mirzapur-Amrail-Talipara-Kamarpara road at ch. 7+408 km - 8+470) ID. 393663001. (Total Length=1.062km)
|
|
1.06
|
|
|
79.95
|
M/s. Alif Traders, Sabalia, Tangail
|
83.83
|
|
15/02/2016
|
28/04/2018
|
100
|
|
|
20/12/2018
|
|
|
221
|
Tangail
|
18
|
mirzapur
|
143
|
240
|
Upazila: Mirzapur
DIRIP/TAN/Mirz/UNR/SL-29(02)/14-15/W-134
|
Rehabilitation work of Mirzapur-Amrail-Talipara-Kamarpara Road (ID: 393663001)
Part A: BC Road Works=Nil
Part B: Rehabilitation Works= 3.659 km (Ch.0+749 km to 2+250 km& 4+250km to 6+408km)Part C: Structure Works= 02 Nos. 8.00 m (Total Length=3.659 km)
|
|
3.66
|
|
|
242.40
|
Md. Abdul Jalil Sarker, Akur-Takurpara, Tangail
|
220.11
|
|
20/09/2015
|
19/06/2016
|
100
|
|
|
20/12/2018
|
|
|
222
|
Tangail
|
18
|
mirzapur
|
143
|
240
|
Upazila: Mirzapur.
DIRIP/TAN/Mirz
/UNR-29(01)/12-13/W-17
|
Improvement of Mirzapur-Amrail-Talipara-Kamarpara Road (Mirzapur H/Q-Hariabazar via Kamarpara bazar road) (ID: 393663001)
Part A: Pucca Road Works=1.00 km
(Ch. 6+408 km to 7+408 km)
Part B:Rehabilitation Works= 2.00km (Ch.2+250 km to 4+250 km)
Part C: Structure Works= 1 No. 3.50m
(At Ch.4+450 km) (Total Length=2.539 km)
|
|
2.54
|
|
|
249.23
|
M/S. Sayed Mozibar Rahman,
College Para, Tangail
|
256.63
|
|
16/04/2013
|
30/11/2014
|
100
|
|
|
20/12/2018
|
|