1
|
Bagerhat
|
44
|
bagerhat-s
|
320
|
748
|
SP43064/Dier Khal Subproject
|
Re-excavation of Dier Khal (Part-1) (Ch-0+00km to 1+000km) Re-excavation of Dier Khal (Part-2) (Ch-0+000km to 1+700km) Re-excavation of Fakirer Khal (Ch-0+000km to 0+720km) Re-excavation of Putir Khal (Ch-0+000km to 0+410km) Re-excavation of Shimanar Khal (Ch-0+000km to 0+800km) Ref. Lined Section 6 Nos. On 5 Khals, And SP Identf. Signboard (2 nos.) Dier Khal re-xcavation (Ch:1000.00m - 1850.00m) 2023-24 Doyachir Khal re-xcavation (Ch:0.00m - 750.00m) 2023-24 Putir Khal re-xcavation (Ch:410.00m - 1340.00m) 2023-24 Const. of 03 Nos. Ref. lined Section on 03 Khals, SP Identf. sign board 2, SP Area Indication Post 2 Nos. | 2023-24
|
|
|
7.16
|
0.00
|
90.07
|
LCS
|
89.34
|
20/03/2024
|
31/03/2022
|
30/04/2022
|
71
|
65.87
|
73
|
30/11/2022
|
|
|
2
|
Bagerhat
|
44
|
bagerhat-s
|
320
|
748
|
SP25284/Goshala Subproject
|
Remaining work of Repair and Maintenance of WMCA Office Remaining work of Construction of RCC Drain (500mx500m, Length - 18m) Repair and Maintenance of 4vent Regulator on Goshala Khal Installation of Deep Tube-Well Maintenance 4vent Regulator on Goshala Khal, Repair and Maint. of WMCA Office Building, Construction of RCC Drain (500mmx500mm) and Installation of Deep Tube-Well (Work Incompleted, Contact Terminated)
|
|
|
0.00
|
0.00
|
54.00
|
Mohammad Eunus & Brothers(Pvt.) Ltd. Panclaish, Chittagong.
|
48.60
|
19/01/2021
|
21/10/2021
|
|
81
|
24.70
|
50
|
30/11/2022
|
|
|
3
|
Bagerhat
|
44
|
bagerhat-s
|
320
|
748
|
SP25198/Laupala-Surjabedi Subproject
|
Surjabedi khal re-excavation(ch.00-2700m) Pachur khal re-excavation(ch.00-600m) Referenced line section(4 Nos.) Bamboo bridge(4 Nos.) Rehabi. of Regu. 2V-(1.50m X 1.80) on Laupala Khal at Ch. 0+100km, Regu. 1V-(1.50m X 1.80) on Surjobedi Khal at Ch. 0+270km, Rehabi. of Pipe Sluice 1V- (900mm dia) on Panchur Khal at Ch. 0+50 km, SP Idntf S.board, SP Idntf Post | 2023-24
|
|
|
3.30
|
0.00
|
98.96
|
M/S Alif Traders
|
98.33
|
10/02/2019
|
15/01/2024
|
30/04/2019
|
100
|
81.13
|
82
|
30/11/2022
|
|
|
4
|
Bagerhat
|
44
|
bagerhat-s
|
320
|
748
|
SP14113/Nilur Khal FCD Subproject
|
Nilur khal re-excavation(ch.00-1275m) Referenced line section(2 Nos.) Bamboo bridge(3 Nos.) Structure maintenance -.
|
|
|
1.27
|
0.00
|
35.24
|
LTM-Niloy Enterpeise
|
36.19
|
07/11/2018
|
28/01/2019
|
28/04/2019
|
100
|
31.23
|
86
|
30/11/2022
|
|
|
5
|
Bagerhat
|
44
|
bagerhat-s
|
320
|
748
|
SP14112/Harikhali-Doborkhali FCD Subproject
|
Harikhali khal re-excavation (Ch.00-2100m) - (18-19) Embankment re-sectioning (Ch.370-2285m) - (18-19) Referenced line section 3 Nos. (18-19) WMCA office and 3 other structures - (18-19) Harikhali Embankment Re-Sectioning (Ch-0+00km to 0+450km) - (21-22) Harikhalil-Nayadanga Khal Re-excavation (Ch-0+00km to 0+660km) - (21-22) Majhi Danga-Railline Khal Re-excavation (Ch-0+00km to 0+490km) - (21-22) Majhidanga-Layer Parer Khal Re-excavation (Ch-0+00km to 0+280km) - (21-22) Ref. Lined Section 3 Nos. On 3 Khals - (21-22)
|
|
|
5.89
|
1.00
|
125.87
|
OTM-M/s Shahanara & Baby, Sharankhola
|
122.11
|
24/04/2022
|
18/05/2022
|
30/04/2019
|
100
|
106.06
|
86
|
30/11/2022
|
|
|
6
|
Bagerhat
|
44
|
chitalmari
|
314
|
748
|
SP13108/Kachubunia-Saratkhali FCD Subproject
|
Kachubunia Khal Re-excavation (ch0.00-4605m) Adikhali Khal Re-excavation(ch0.00-460m) Jianir Khal Re-excavation(ch0.00-500m) Adikhali Branch Khal Re-excavation (ch0.00-200m) Ref. Lined Section 8 Nos. On 4 Khals, And SP Identf. Signboard (2 nos.) Repair and Maintenance of Regulator 1Nos of (2v-1.50m x 1.80m), 2Nos of (1v-1.50 x 1.80m) Shimanar Khal Re-excavation (Ch:0.00m - 3000m) - 2023-24 Katipara Khal Re-excavation (Ch:0.00m - 1450m) - 2023-24 Umajuri Khal Re-excavation (Ch:0.00m - 1100m) - 2023-24 Adikhali Khal Re-excavation (Ch:0.00m - 1585m) - 2023-24 Naykura Khal Re-excavation (Ch:0.00m - 375m) - 2023-24 Const. of 10 Nos. Ref. lined Section on 05 Khals, SP Identf. sign board 2, SP Area Indication Post 2 Nos. | 2023-24 Construction of WMCA Office | 2023-24
|
|
|
13.27
|
1.00
|
174.16
|
Md. Badruddaza Bablu,Dumuria Bazar,Khulna
|
170.36
|
12/03/2024
|
19/05/2024
|
30/04/2021
|
78
|
104.97
|
61
|
30/11/2022
|
|
|
7
|
Bagerhat
|
44
|
chitalmari
|
314
|
748
|
SP12028/Melarkul Khal FCD Subproject
|
Melarkul khal re-excavation(ch.1960-7100m) Referenced line section (6 Nos.) Bamboo bridge (6 Nos.) Construction of WMCA Office, Electrification Works and Supplying of Office Furniture | 2023-14
|
|
|
5.14
|
1.00
|
161.59
|
M/S Masud Enterprise
|
159.28
|
10/01/2019
|
15/01/2024
|
30/04/2019
|
98
|
139.75
|
87
|
30/11/2022
|
|
|
8
|
Bagerhat
|
44
|
fakirhat
|
319
|
748
|
SP62029/KumarKhali Subproject
|
Mora Posur Khal Re-excavation(Ch-0+000km to 2+700km) Kumarkhali Khal Re-excavation(Ch-0+000km to 7+870km) Faishakhali Khal Re-excavation(Ch-0+000km to 2+950km) Datnimari Khal Re-excavation(Ch-0+000km to 2+195km) Bashabari Khal Re-excavation(Ch-0+000km to 1+1330km) Gojar Khal Re-excavation(Ch-0+000km to 2+075km) Chakulia Khal Re-excavation(Ch-0+000km to 2+115km) Ref. Lined Section 20 Nos. On 7 Khals Construction of WMCA office building
|
|
|
21.23
|
1.00
|
256.04
|
OTM-Sayed Ziaul Hoque
|
254.44
|
26/05/2022
|
11/08/2022
|
30/04/2023
|
100
|
249.47
|
98
|
30/11/2022
|
|
|
9
|
Bagerhat
|
44
|
fakirhat
|
319
|
748
|
SP11010/Maskata Khal FCD Subproject
|
Minadia Khal Re-excavation(ch0.00-1400m) Husnar Khal Re-excavation(ch0.00-1200m) Repair and Maintaence of Regulator (6v-1.50m x 1.80m ) -. Ref. Lined Section 2 Nos. On 2 Khals, And SP Identf. Signboard (2 nos.)
|
|
|
2.60
|
0.00
|
90.01
|
Md. Badruddaza Bablu,Dumuria Bazar,Khulna
|
83.13
|
28/01/2021
|
15/02/2023
|
30/04/2021
|
95
|
54.45
|
65
|
30/11/2022
|
|
|
10
|
Bagerhat
|
44
|
kachua
|
318
|
748
|
SP45180/Tengrakhali-Char Tengrakhali Subproject
|
Dharar Khal re-xcavation (Ch:0.00m - 4600.00m) Const. of 05 Nos. Ref. lined Section on 01 Khal, SP Identf. sign board 2, SP Area Indication Post 2 Nos.
|
|
|
4.60
|
0.00
|
35.16
|
LCS
|
35.16
|
01/01/1900
|
|
|
0
|
0.00
|
0
|
30/11/2022
|
|
|
11
|
Bagerhat
|
44
|
morrelganj
|
321
|
748
|
SP43072/Pathuria-Kalibari Subproject
|
Pathuria Kalibarir Embankment Re-excavation (Ch-0+00km to 7+865km) and SP Identf. Signboard (2 nos.)
|
|
|
7.86
|
0.00
|
78.75
|
LCS
|
78.75
|
07/04/2022
|
28/04/2022
|
30/03/2023
|
100
|
75.15
|
95
|
30/11/2022
|
|
|
12
|
Bagerhat
|
44
|
morrelganj
|
321
|
748
|
SP24184/Tafalbari Khal Subproject
|
Rehabilitation of OnM Shed (9x5m) - Mainttenance of Tafalbari Regulator (2v) and Goalbari Pipe Regulator (1v) -. Tafal Bari Embankment Re-Sectioning (Ch-0+000km to 1+805km) Tafal Bari Khal Re-excavation (Ch-0+000km to 1+775km) Ref. Lined Section 3 Nos. On 1 Khal
|
|
|
3.58
|
0.00
|
44.65
|
M/S Azad & Brothers, Bhuapur, Tangail
|
43.48
|
12/04/2022
|
28/04/2022
|
29/11/2022
|
40
|
16.32
|
37
|
30/11/2022
|
|
|
13
|
Bandarban
|
15
|
bandarban-s
|
109
|
748
|
SP99005/Rajvilla Shilok Khal Rubber Dam Project
|
Re-excavition of shilak Khal-320m Repair of Return Wall, & CC bolck -. Construction of RCC open Irrigation Canal. Construction of one store room. Construction of 3 nos small size pump house. Construction of 1 nos Sanitary Latrine. Construction of Irrigation Canal (A-A1=600m & B-B1= 250m. Total Length= 850m) & Maintenance of Rubber Dam (Silt removal, block setting etc) 2023-24
|
|
|
0.00
|
0.00
|
144.14
|
S. Ananta Bikash Tripura
|
147.45
|
23/12/2019
|
22/03/2020
|
16/03/2021
|
100
|
147.45
|
100
|
30/11/2022
|
|
|
14
|
Bandarban
|
15
|
bandarban-s
|
109
|
748
|
SP62055/Raicha Khal Subproject
|
Re-excavation of Raicha Khal (Ch.1+200 to Ch. 7+150 km) Const. of 6 Nos. Ref. lined Section on Raicha Khal, SP Identification Signboard 2 Nos. and Indication Post 2 Nos. Const. of Raicha Khal WRS-1 (4V-1.50m X 1.00m) at Ch. 0+870 Km On Raicha Khal (Part: A) Const. of Raicha Khal WRS-2 (4V-1.50m X 1.00m) at Ch. 2+920 Km On Raicha Khal ( Part B:) Const. of Raicha Khal WRS-3 (3V-1.50m X 1.00m) at Ch. 4+635Km On Raicha Khal ( Part C:) Const. of Raicha Khal WRS-4 (3V-1.50m X 1.00m) Ch. 5+735 Km On Raicha Khal ( Part D:) Const. of WMCA office (12.0mx6.0m) at Raicha Khl Sub-Project (Part: E)
|
|
|
4.65
|
5.00
|
487.73
|
OTM
|
466.92
|
15/01/2024
|
12/10/2023
|
|
60
|
178.07
|
38
|
30/11/2022
|
|
|
15
|
Bandarban
|
15
|
bandarban-s
|
109
|
748
|
SP62032/Ramda Khal Subproject
|
Ramda Khal Re-excavation (Ch-1+600km to 4+800km) Ref. Lined Section 3 Nos. On 1 Khal, SP Identf. Signboard (2 nos.) and Identf. Post 2 Nos. Construction of Ramda Khal. WRS (3v-1.50mx2.50m) at Ch. 3+450m of Khal Construction of WMCA office
|
|
|
3.20
|
2.00
|
302.26
|
Mahia Enterprise & Ratan sen Tanchangya (JV)
|
290.34
|
22/09/2022
|
11/01/2023
|
|
0
|
0.00
|
0
|
30/11/2022
|
|
|
16
|
Barguna
|
2
|
amtali
|
16
|
748
|
SP62043/Kalank Bogi Subproject
|
Re-excavation of Boga Khal (Ch.0+000 to Ch. 8+000 km) Re-excavation of Kalanka Khal (Ch. 0+000 to Ch. 3+702 km) Re-excavation of Bogi Khal (Ch. 0+000 to Ch. 1+500 km) Re-excavation of Nalganj Khal (Ch. 0+000 to Ch. 1+308 km) Re-excavation of Nalganj Branch Khal (Ch. 0+000 to Ch. 0+909 km) Re-excavation of Kumari Khal (Ch. 0+000 to Ch. 0+971 km) Re-excavation of Khiler Khal (Ch. 0+000 to Ch. 0+475 km) Const. of 17 Nos. Reference lined Section on 7 Khals, SP Identf. sign board 2 Nos., Demercation Post 78 Nos. and SP Indication Post 2 Nos. Const. of Culvert (2v-3.50m x 3.50m) on Kalanka Khal Construction of WMCA office
|
|
|
15.86
|
2.00
|
187.54
|
M/S Mohiuddin Ahmed
|
183.14
|
02/03/2023
|
24/03/2023
|
30/05/2023
|
70
|
136.05
|
74
|
30/11/2022
|
|
|
17
|
Barguna
|
2
|
amtali
|
16
|
748
|
SP61011/Purba Sonakhali Subproject
|
WMCA Office & Others Re-exacavation of Simmir khal (Ch-0+000km to 3+753km) Re-exacavation of Krisnaramer Khal (Ch-0+000km to 2+105km) Re-exacavation of Krisnaramer Branch khal (Ch-0+000km to 0+630km) Re-exacavation of Vider khal (Ch-0+000km to 0+929km) Re-exacavation of Babrer khal (Ch-0+000km to 0+643km) Construction of 9 Nos. Reference Lined & SP Identification signboard
|
|
|
8.06
|
1.00
|
127.43
|
Selim Khan
|
125.37
|
08/02/2021
|
15/08/2021
|
30/04/2021
|
100
|
110.18
|
87
|
30/11/2022
|
|
|
18
|
Barguna
|
2
|
amtali
|
16
|
748
|
SP61010/Paschim Chila Subproject
|
Re-exacavation of Gazir khal (Ch-0+000km to 7+300km) Re-exacavation of Dushumir Khal (Ch-0+000km to 1+000km) Re-exacavation of Dushumir Branch khal (Ch-0+000km to 1+455km) Re-exacavation of Rajersar Talukdar Barir khal (Ch-0+000km to 1+000km) Re-exacavation of Mia Gazir khal (Ch-0+000km to 2+936km) Re-exacavation of Mia Gazir Branch khal (Ch-0+000km to 1+281km) Re-exacavation of Charer khal (Ch-0+000km to 2+900km) Re-exacavation of Charer Branch khal (Ch-0+000km to 1+960km) Ref. Lined Section 19 Nos. On 8 Khals, And SP Identf. Signboard (2 nos.) Construction of WMCA office building, Office furniture, Electification works
|
|
|
19.83
|
1.00
|
179.27
|
Tuhin
Ibrahim
|
177.22
|
08/02/2021
|
16/08/2021
|
30/04/2021
|
100
|
176.52
|
100
|
30/11/2022
|
|
|
19
|
Barguna
|
2
|
amtali
|
16
|
748
|
SP44120/Jabbar Ali - Sharif Shimon Subproject
|
Re-Excavation of Balaibunia Khal (Ch.0+000 Km to 3+200 Km) Re-Excavation of Balaibunia Branch Khal (Ch.0+00 Km to 1+000 Km) Re-Excavation of Mollapara Bill Khal (Ch.0+00 Km to 1+000 Km) Re-Excavation of Fulgazi Barir CAD Khal (Ch.0+00 Km to 1+200 Km) Const. of 10 Nos. Ref. lined Section on 4 Khals, SP Identf. sign board 2 Nos. and SP Indication Post 2 Nos.
|
|
|
6.40
|
0.00
|
55.65
|
LCS President- Nesaruddin Padha
|
55.65
|
18/04/2023
|
30/04/2023
|
27/05/2023
|
96
|
40.03
|
71
|
30/11/2022
|
|
|
20
|
Barguna
|
2
|
amtali
|
16
|
748
|
SP44103/Gotkhali-Chalitabunia Khal Subproject
|
Ghotkhali khal (Ch.00-1000m) Referance Line (8 Nos.) Bamboo Bridge (4Nos.) Patakata Khal (Ch.00-7100m) Re-excavation of Katakhali khal (Ch-0.00m: to 3200.00m) 2022-23 Re-excavation of Bharanir khal (Ch-0.00m: to 2130.00m) 2022-23 Re-excavation of Jhinbunia khal (Ch-0.00m: to 3200.00m) 2022-23 Re-excavation of Boithakata khal (Ch-0.00m: to 1200.00m) 2022-23 Construction of 11 Reference-line sections in 4 canals, SP Identification sign board 2Nos. and SP Indication Post 2Nos 2022-23
|
|
|
17.83
|
0.00
|
190.92
|
Uttam Kumar
Md. Attaher
|
190.92
|
24/02/2019
|
30/04/2023
|
30/05/2023
|
100
|
188.43
|
98
|
30/11/2022
|
|
|
21
|
Barguna
|
2
|
amtali
|
16
|
748
|
SP43044/Garabunia Subproject
|
Re-Excavation of Garabunia Belaler Khal(Ch.0+000 Km to 3+080 Km) Re-Excavation of Chalitabunia Belaler Khal (Ch.0+000 Km to 0+985 Km) Re-Excavation of Garabunia Branch 1 Khal (Ch.0+000 Km to 1+050 Km) Const. of 8 Nos Reference lined Section on 3 Khals, SP Identf. sign board 2 Nos. and SP Indication Post 2 Nos. Bauria Khal re-xcavation (Ch:0.00m - 4500.00m) 2023-24 Garabunia Khal re-xcavation (Ch:0.00m - 2500.00m) 2023-24 Const. of 08 Nos. Ref. lined Section on 02 Khals, SP Identf. sign board 2, SP Area Indication Post 2 Nos. | 2023-24
|
|
|
12.11
|
0.00
|
106.89
|
LCS Presodent : Mst. Rabya Begum
|
106.90
|
14/03/2024
|
24/03/2024
|
28/05/2024
|
100
|
106.54
|
100
|
30/11/2022
|
|
|
22
|
Barguna
|
2
|
amtali
|
16
|
748
|
SP43040/Singkhali Khal Subproject
|
Morichbunia khal(ch.00-5700m) Morichbunia Branch khal(ch.00-1900m) Referenced line section(7 Nos.) Bamboo bridge(7 Nos.)
|
|
|
7.60
|
0.00
|
89.67
|
Sunil Chandra Das
Satter Khan
|
89.67
|
13/02/2019
|
11/04/2019
|
25/05/2019
|
100
|
83.64
|
93
|
30/11/2022
|
|
|
23
|
Barguna
|
2
|
amtali
|
16
|
748
|
SP25318/Mirar Khal-Magan Khar Khal Subproject
|
Sarderer khal re-excavation(ch.00-4250m) Boshirgudi khal re-excavation(ch.00-2280m) Madborer khal re-excavation(ch.00-1370m) Mouje Ali khal re-excavation(ch.00-1070m) Referenced line seciton(9 Nos.)
|
|
|
8.97
|
0.00
|
108.86
|
Subol Mazi
|
108.86
|
01/01/2018
|
28/01/2018
|
30/04/2018
|
100
|
107.28
|
98
|
30/11/2022
|
|
|
24
|
Barguna
|
2
|
bamna
|
17
|
748
|
SP13049/Dawatala DR Subproject
|
Construction of WMCA Building (Semi pacca) Re-excavation of Choto Bhaijora Khal (Ch: 0.00 - 1400 m) Re-excavation of Bhaijora Khal (Ch: 0.00 - 1025 m) Re-excavation of Darga Barir Khal (Ch: 0.00 - 1500 m) Re-excavation of Egor Khal (Ch: 0.00 - 925 m) Re-excavation of Hogol Patir Khal (Ch: 0.00 - 2400 m) and Provisional Sum. Reference Lined Section (11 nos.) and SP Identification Signboard (2 nos.)
|
|
|
7.25
|
1.00
|
82.94
|
M/S H S Engineerd
|
80.57
|
19/02/2020
|
20/08/2020
|
30/04/2020
|
100
|
80.42
|
100
|
30/11/2022
|
|
|
25
|
Barguna
|
2
|
barguna-s
|
18
|
748
|
SP62046/Sonatala Subproject
|
Re-excavation of Aga Padma Khal (Ch. 0+000 to Ch. 3+216 km) Re-excavation of Aga Padma Khal Br.1 (Ch. 0+000 to Ch. 1+205 km) Re-excavation of Aga Padma Khal-2 (Ch.0+000 to Ch.0+375 km) Re-excavation of Pritambar Khal (Ch. 0+000 to Ch. 2+130 km) Re-excavation of Sonatala Khal (Ch. 0+000 to Ch. 1+110m) Re-excavation of Sonatala Br-1 Khal (Ch. 0+000 to Ch. 0+750m) Re-excavation of Sonatala Br-2 Khal (Ch. 0+000 to Ch. 3+617m) Re-excavation of Sonatala Br-3 Khal (Ch. 0+000 to Ch. 0+460m) Re-excavation of Sonatala Br-4 Khal (Ch. 0+000 to Ch. 0+288m) Const. of 14 Nos Ref. lined Section on 9 Khal, SP Identf. sign board 2 Nos., Demarcation Post 36 Nos. and SP Indication Post 2 Nos. Construction of WMCA office
|
|
|
13.15
|
1.00
|
199.68
|
Mohammed eunus & Brothers (Pvt.) Ltd
|
197.34
|
20/03/2023
|
30/03/2023
|
30/05/2023
|
100
|
195.87
|
100
|
30/11/2022
|
|
|
26
|
Barguna
|
2
|
barguna-s
|
18
|
748
|
SP61016/Raybhog Subproject
|
Re-excavation of Rayvog Khal (Ch-0+000km to 0+822km) Re-excavation of Rayvog Branch Khal (Ch-0+000km to 0+535km) Re-excavation of Noli Chargachia Khal (Ch-0+200km to 4+340km) Re-excavation of Noli Chargachia Branch Khal (Ch-0+000km to 2+850km) Re-excavation of Kodom Tola Khal (Ch-0+000km to 3+100km) Re-excavation of Uttar khakbunia Khal (Ch-0+000km to 1+045km) Ref. Lined Section 13 Nos. On 7 Khals, And SP Identf. Signboard (2 nos.) Construction of WMCA office building
|
|
|
12.49
|
1.00
|
135.77
|
Sayed Ali
Zahanara Begum
|
133.79
|
27/12/2021
|
23/01/2022
|
28/04/2022
|
100
|
133.49
|
100
|
30/11/2022
|
|
|
27
|
Barguna
|
2
|
barguna-s
|
18
|
748
|
SP43041/Sonbunia Subproject
|
Aga Poddha khal re-excavation(ch.00-4700m) Ungaria khal re-excavation(ch.00-540m) Nolirdon khal re-excavation(ch.00-335m) Referenced line section(7 Nos.) Bamboo bridge (4 Nos.)
|
|
|
5.57
|
0.00
|
76.15
|
Yunus Akon
Md. Sagir
|
76.15
|
25/03/2019
|
08/04/2019
|
25/05/2019
|
100
|
76.11
|
100
|
30/11/2022
|
|
|
28
|
Barguna
|
2
|
barguna-s
|
18
|
748
|
SP43034/Potka Khali Subproject
|
Noli Bharani khal re-excavation(ch.2600-5950m) Noli Bharani Branch khal re-excavation(ch.00-2600m) Uttar Dhalvanga khal re-excavation(ch.00-1260m) Golbunia khal re-excavation(ch.00-985m) Tunibaria khal re-excavation(ch.00-700m) Referenced line section(11 Nos.) Bamboo bridge(11 Nos.)
|
|
|
8.89
|
0.00
|
81.28
|
Shapan
Khaleq
|
81.86
|
20/02/2019
|
01/04/2019
|
25/05/2019
|
100
|
81.86
|
100
|
30/11/2022
|
|
|
29
|
Barguna
|
2
|
barguna-s
|
18
|
748
|
SP43030/Aylapatakata Sub-project
|
Re-excavation of Lakshman Shikhari Khal (Ch-0+00km to 0+555km) Re-excavation of Panjur Khal (Ch-0+000km to 1+110km) Re-excavation of Gabtali Khal (Ch-0+000km to +720km) Re-excavation of Pakur Gachia Khal (Ch-0+000km to 2+200km) Re-excavation of Kewabunia Khal (Ch-0+000km to 0+990km) Ref. Lined Section 11 Nos. On 5 Khals, And SP Identf. Signboard (2 nos.)
|
|
|
5.57
|
0.00
|
72.77
|
Sanu Sikder
Sirin
|
72.77
|
20/03/2022
|
28/03/2022
|
29/04/2022
|
100
|
72.59
|
100
|
30/11/2022
|
|
|
30
|
Barguna
|
2
|
barguna-s
|
18
|
748
|
SP43029/Nur Ali-Burirchar Charakgachia
|
Nolitolar khal re-excavation(ch.00-4500m) Charakgachia khal re-excavation(ch.00-3800m) Referenced line section(8 Nos.) Bamboo bridge(6 Nos.)
|
|
|
8.30
|
0.00
|
89.07
|
Salma Begum
Md. Sagir Hossen
|
89.07
|
24/02/2019
|
12/03/2019
|
20/05/2019
|
100
|
88.93
|
100
|
30/11/2022
|
|
|
31
|
Barguna
|
2
|
barguna-s
|
18
|
748
|
SP42024/Nishanbari-Gazi Mahmud Subproject
|
Gazi Mahmud Khal re-excavation (Ch:0.00 - 2900m) Rashidar Khal re-excavation (Ch:0.00 - 975.00m) Nishanbaria Branch-1 Khal re-excavation (Ch:0.00 - 1100.00m) Nishanbaria Branch-2 Khal re-excavation (Ch:0.00 - 500.00m) Const. of 08 Nos. Ref. lined Section on 4 Khals, SP Identf. sign board 2, SP Area Indication Post 2 Nos.
|
|
|
5.47
|
0.00
|
37.33
|
LCS Secretary : Mst. Sabina Begum
|
37.33
|
20/02/2024
|
27/02/2024
|
28/04/2024
|
100
|
37.30
|
100
|
30/11/2022
|
|
|
32
|
Barguna
|
2
|
barguna-s
|
18
|
748
|
SP25324/Parir Khal Subproject
|
Amlokitola khal re-excavation(ch.00-6100m) Bain Samerto khal re-excavation(ch.00-2000m) Referenced line section(8 Nos.)
|
|
|
8.10
|
0.00
|
102.11
|
Sonia akter
|
102.11
|
03/01/2018
|
18/01/2018
|
25/04/2018
|
100
|
101.94
|
100
|
30/11/2022
|
|
|
33
|
Barguna
|
2
|
barguna-s
|
18
|
748
|
SP15332/Baliatali DR Subproject
|
Bara Balia Tali Khal Re-excavation(ch0.00-1200m) Baliatali Branch Khal Re-excavation(ch0.00-2160m) Agapara Branch Khal Re-excavation(ch0.00-300m) Paler Baliatali Khal Re-excavation(ch0.00-792m) Baliatali Thadamara Branch Khal Re-excavation(ch0.00-480m) Rarir Khal Re-excavation(ch0.00-365m) Ref. Lined Section 8 Nos. On 6 Khals, And SP Identf. Signboard (2 nos.)
|
|
|
5.29
|
0.00
|
42.71
|
Panu Mollick(President) Abdul Awaual
|
42.71
|
24/01/2021
|
17/02/2021
|
07/04/2021
|
100
|
42.35
|
100
|
30/11/2022
|
|
|
34
|
Barguna
|
2
|
barguna-s
|
18
|
748
|
SP15290/Maitha Khal DR Subproject
|
Amrajuri Khal re-excavation(ch.00-3500m) Khakbunia Khal re-excavation(ch.00-1485m) Koraitola Khal re-excavation(ch.00-1860m) Khejurtola Khal re-excavation(ch.00-1460m) Ehurchan Khal re-excavation(ch.00-1000m) Referenced Line section(11 Nos.) Bamboo bridge(11 Nos.)
|
|
|
9.30
|
0.00
|
91.73
|
Shree Nemai Chandra
Md. Atick Hossen
|
92.24
|
18/02/2019
|
12/03/2019
|
18/05/2019
|
100
|
92.24
|
100
|
30/11/2022
|
|
|
35
|
Barguna
|
2
|
betagi
|
2
|
748
|
SP43048/Deshantarkathi-Gouribunia Subproject
|
Re-excavation of Dasher Branch Khal-4 (Ch-0+000km to 1+100km) Re-excavation of Parer Branch Khal-1 (Ch-0+000km to 2+045km) Re-excavation of Parer Branch Khal-2 (Ch-0+000km to 0+500km) Re-excavation of Dasher Branch Khal-1 (Ch-0+00km to 0+770km) Re-excavation of Bamoner Branch Khal-1 (Ch-0+000km to 1+500km) Re-excavation of Bamoner Branch Khal-2 (Ch-0+000km to 0+900km) Re-excavation of Dasher Branch Khal-2 (Ch-000 m to 600 m) Ref. Lined Section 10 Nos. On 7 Khals, And SP Identf. Signboard (2 nos.)
|
|
|
7.41
|
0.00
|
69.84
|
Selina Khatun
Md.Hannan Sikder
|
69.84
|
15/02/2022
|
28/02/2022
|
26/04/2022
|
100
|
68.61
|
98
|
30/11/2022
|
|
|
36
|
Barguna
|
2
|
betagi
|
2
|
748
|
SP42016/Gabua Fultala Subproject
|
Re-excavation of Modoner Khal (Ch-0+00km to 1+800km) Re-excavation of Baroir Khal (Ch-0+000km to 2.400km) Re-excavation of Jintala Khal (Ch-0+000km to 1+250km) Re-excavation of Gabua Branch Khal (Ch-0+000km to 0+850km) Re-excavation of Gabua Hawlader Barir Branch Khal (Ch-0+000km to 0+700km) Re-excavation of Shaner Branch Khal (Ch-0+000km to 0+900km) Ref. Lined Section 14 Nos. On 6 Khals, And SP Identf. Signboard (2 nos.)
|
|
|
7.90
|
0.00
|
47.90
|
Munni Akther
Mst.Sania Begum
|
47.90
|
15/02/2022
|
28/02/2022
|
30/04/2022
|
100
|
46.46
|
96
|
30/11/2022
|
|
|
37
|
Barguna
|
2
|
betagi
|
2
|
748
|
SP25308/Chhoto Mokamia-Bara Mokamia Subproject
|
Houder khal re-excavation(ch.00-3200m) Houder branch khal-1re-excavation(ch.00-600m) Houder branch khal-2 re-excavation(ch.00-1300m) Houder branch khal-3 re-excavation(ch.00-1200m) Sarder jugir khal re-excavation(ch.00-1500m) Chorkhali khal re-excavation(ch.00-1525m) Kurular khal re-excavation(ch.00-600m) Referenced line section(12Nos.)
|
|
|
9.92
|
0.00
|
115.59
|
Zalil Khan
|
115.58
|
19/02/2020
|
16/01/2018
|
30/04/2018
|
100
|
115.28
|
100
|
30/11/2022
|
|
|
38
|
Barguna
|
2
|
betagi
|
2
|
748
|
SP14182/Kawnia-Mirjaganj FCD Subproject
|
Construction of WMCA Office
|
|
|
0.00
|
1.00
|
22.85
|
OTM
|
22.85
|
01/01/1900
|
|
|
0
|
0.00
|
0
|
30/11/2022
|
|
|
39
|
Barguna
|
2
|
patharghata
|
40
|
748
|
SP25315/Kalmegha-Ghutabachha Subproject
|
Choto Pathorghata khal re-excavation(ch.00-7100m) Choto Pathorghata branch khal re-excavation(ch.00-840m) Referenced line section
|
|
|
7.94
|
0.00
|
122.92
|
Sohel
|
122.92
|
12/03/2018
|
15/03/2018
|
28/04/2018
|
100
|
122.68
|
100
|
30/11/2022
|
|
|
40
|
Barguna
|
2
|
patharghata
|
40
|
748
|
SP15268/Kakchira DR Subproject
|
Golbunia khal re-excavation(ch.00-3000m) Katakhali-Fakirhat khal re-excavation(ch.00-5270m) Referenced line section on Kakchira Varani Khal (8 Nos.)
|
|
|
8.27
|
0.00
|
121.01
|
Sonkor Kormoker
|
121.88
|
27/02/2018
|
14/03/2018
|
30/04/2018
|
100
|
121.88
|
100
|
30/11/2022
|
|
|
41
|
Barguna
|
2
|
patharghata
|
40
|
748
|
SP13071/Koralia-Hazir Khal DR Subproject
|
Padda Sluicegate-Karomjatola khal re-excavation(ch.00-3100m) Gohorpur moddhokola-purbo Mirabari khal re-excavation(ch.00-2000m) Ruhita -majher khal re-excavation (ch. 00-1820 m) Koralia-Hazir khal re-excavation(ch.00-1400m)
|
|
|
8.32
|
0.00
|
119.14
|
Tariqul Khan
|
126.23
|
29/03/2018
|
03/04/2018
|
30/04/2018
|
100
|
126.23
|
100
|
30/11/2022
|
|
|
42
|
Barguna
|
2
|
Taltali
|
488
|
748
|
SP62045/Gabtalir Khal Subproject
|
Re-excavation of Baraitali Khal (Ch.0+000 to Ch.2+900 km) Re-excavation of Baraitali Branch Khal (Ch. 0+000 to Ch. 0+900 km) Re-excavation of Gabtalir Khal (Ch. 0+000 to Ch. 1+650 km) Re-excavation of Beduria Khal (Ch. 0+000 to Ch. 2+000 km) Const. of 7 Nos Reference lined Section on 4 Khal, SP Identf. sign board 2 Nos., Demarcation Post 34 Nos. and SP Indication Post 2 Nos. Construction of WMCA office. (12.00mx6.00m)
|
|
|
7.45
|
1.00
|
130.24
|
Mohammed eunus & Brothers (Pvt.) Ltd
|
127.92
|
20/03/2023
|
30/03/2023
|
25/12/2023
|
100
|
126.57
|
98
|
30/11/2022
|
|
|
43
|
Barguna
|
2
|
Taltali
|
488
|
748
|
SP62044/Gandamara Subproject
|
Re-excavation of Aowaler Khal (Ch.0+000 to Ch.2+058 km) Re-excavation of Gandamara Khal (Ch. 0+000 to Ch. 3+739 km) Const. of 6 Nos. Ref. lined Section on 2 Khals, SP Identf. sign board 2 Nos., Demercation Post 36 Nos. and SP Indication Post 2 Nos. Const. of Culvert (2v-2.50m x 3.00m) on Aowaler Khal Construction of WMCA office. (12.00m x 6.00m)
|
|
|
5.79
|
2.00
|
121.39
|
M/S Mohiuddin Ahmed
|
116.95
|
27/03/2023
|
27/03/2023
|
30/05/2023
|
60
|
77.32
|
66
|
30/11/2022
|
|
|
44
|
Barguna
|
2
|
Taltali
|
488
|
748
|
SP15333/Khatachora DR Subproject
|
Re-excavation of Khatachora Khal (Ch: 0 to 4500 m) Re-excavation of Koraitola Khal (Ch: 0 to 2700 m) Ref. Line Section (8nos.) and SP Identification Signboard (2nos.) Jayal Bhanga Khal re-excavation (Ch:0.00 - 2600m) 2023-24 Beltala Khal re-excavation (Ch:0.00 - 2200.00m) 2023-24 Ratanilla Khal re-excavation (Ch:0.00 - 1200.00m) 2023-24 Bawltala Khal re-excavation (Ch:0.00 - 800.00m) 2023-24 Const. of 10 Nos. Ref. lined Section on 4 Khals, SP Identf. sign board 2, SP Area Indication Post 2 Nos. 2023-24 Construction of WMCA Office (12m X 6m)
|
|
|
14.00
|
1.00
|
145.43
|
Sohag (President) Ali Akbar (Sec)
|
143.04
|
12/03/2024
|
22/03/2024
|
16/04/2021
|
43
|
74.19
|
51
|
30/11/2022
|
|
|
45
|
Barishal
|
5
|
babuganj
|
26
|
748
|
SP62052/Rakudia Subproject
|
Re-excavation of Bangla Kata Khal (Ch. 0+000 to Ch. 1+460 km) Re-excavation of Kalir Bazar Khal (Ch. 0+000 to Ch. 0+400 km). Re-excavation of Mominuddir Khal (Ch. 0+000 to Ch. 0+705 km) Re-excavation of Mominuddir Br. Khal (Ch. 0+000 to Ch. 0+732 km). Re-excavation of Narayan Dasher Khal (Ch. 0+000 to Ch. 0+595m) Re-excavation of Nurdir Khal (Ch. 0+000 to Ch. 1+866m) Re-excavation of Rakudia Sluice Gate Khal (Ch. 0+000 to Ch. 1+625m) Re-excavation of Yasiner Khal (Ch. 0+000 to Ch. 0+880m) Const. of 11 Nos. Reference lined Section on 8 Khals, SP Identf. sign board 2 Nos., Demercation Post 48 Nos. and SP Indication Post 2 Nos. Const. of WMCA office (12.00mx6.00m)
|
|
|
8.26
|
1.00
|
131.09
|
M/S S H Enterprise
|
128.74
|
27/03/2023
|
27/04/2023
|
31/05/2023
|
90
|
105.72
|
82
|
30/11/2022
|
|
|
46
|
Barishal
|
5
|
babuganj
|
26
|
748
|
SP62051/BaherChar Khudrakathi Subproject
|
Re-excavation of Amtalir Khal (Ch. 0+000 to Ch. 1+630 km) Re-excavation of Moragangir Khal (Ch. 0+000 to Ch. 2+350 km). Re-excavation of Madartola Khal (Ch. 0+000 to Ch. 1+300 km). Re-excavation of Sadhukathi Khal (Ch. 0+000 to Ch. 1+200m). Re-excavation of Sadhukathi Br. Khal (Ch. 0+000 to Ch. 0+300m). Const. of 7 Nos. Ref. lined Section on 5 Khals, SP Identf. sign board 2 Nos., Demercation Post 12 Nos. and SP Indication Post 2 Nos. Const. of Culvert (2V-4.0m X 4.0m) on Moragangir Khal Const. of WMCA office (12.0mx6.0m)
|
|
|
6.78
|
2.00
|
164.06
|
M/S S H Enterprise
|
159.14
|
27/03/2023
|
30/03/2023
|
31/05/2023
|
82
|
131.15
|
82
|
30/11/2022
|
|
|
47
|
Barishal
|
5
|
babuganj
|
26
|
748
|
SP45150/Chandpasha Subproject
|
Re-excavation of Daria badh Khal (Ch: 0 m - 2200 m) Re-excavation of Kolatola Khal (Ch: 0 m - 1150 m) Re-excavation of Molla barir Khal (Ch: 0 m - 1050 m) Re-excavation of Napit barir Khal (Ch: 0 m - 900 m) Re-excavation of Khan bari hota Khal (Ch: 0 m - 700 m) Ref lined Section (13nos.) and SP Signboard (2nos.)
|
|
|
6.00
|
0.00
|
56.01
|
LCS
|
56.01
|
19/11/2020
|
18/01/2021
|
30/04/2021
|
100
|
54.20
|
96
|
30/11/2022
|
|
|
48
|
Barishal
|
5
|
babuganj
|
26
|
748
|
SP44081/Thakur Mollik Subproject
|
Re-excavation of Maniruddin Khal (Ch: 0.00 - 1170 m) Re-excavation of Char Hogal Patia Khal (Ch: 0.00 - 1340 m) Re-excavation of Padar Barir Khal (Ch: 0.00 - 700 m) Re-excavation of Sarishar Khal (Ch: 0.00 - 900 m) Re-excavation of Silandia Khal (Ch: 0.00 - 1570 m) Maintenance of WMCA Office, Ref Line Section (10 nos.) and SP Signboard (2 nos.) -
|
|
|
5.68
|
0.00
|
46.72
|
Shahin & Jahanara
|
46.72
|
28/10/2020
|
01/12/2020
|
30/04/2021
|
100
|
39.99
|
85
|
30/11/2022
|
|
|
49
|
Barishal
|
5
|
babuganj
|
26
|
748
|
SP43043/Dehergati Subproject
|
Vuter Khal Re-excavation (Ch: 0.00 - 4600 m) Mullar Khal Re-excavation (Ch: 0.00 - 2860 m) Reference Lined Section (8 nos.) + SP Identification Signboard (2 nos.) Purba Rabindranagar Khal re-xcavation (Ch:0.00m - 2540m) 2023-24 Kalibari Khal re-xcavation (Ch:0.00m - 1280m) 2023-24 Chairman Bari Khal re-xcavation (Ch:0.00m - 1260m) 2023-24 Nomarjhuri Khal re-xcavation (Ch:0.00m - 1880m) 2023-24 Daragabari Khal re-xcavation (Ch:0.00m - 1500m) 2023-24 Chairman Bari Branch Khal re-xcavation (Ch:0.00m - 1080m) 2023-24 Const. of 11 Nos. Ref. lined Section on 06 Khals, SP Identf. sign board 2, SP Area Indication Post 2 Nos.| 2023-24
|
|
|
16.96
|
0.00
|
113.75
|
LCS
|
113.75
|
12/03/2024
|
25/03/2024
|
30/04/2024
|
79
|
87.45
|
76
|
30/11/2022
|
|
|
50
|
Barishal
|
5
|
babuganj
|
26
|
748
|
SP25314/Madhabpasa Subproject
|
Uttar Lafadi khal re-excavation(ch.00-3500m) Birpasha khal re-excavation(ch.00-950m) Sultan master barir khal re-excavation(ch.00-2200m) Referenced line section(9 Nos.) Bamboo bridge(11 Nos.) Shibbari Khal re-xcavation (Ch:0.00m - 2760.00m) 2023-24 Badamtali Khal re-xcavation (Ch:0.00m - 2300.00m) 2023-24 Kashaghata Khal re-xcavation (Ch:0.00m - 1500.00m) 2023-24 Kalikhala Khal re-xcavation (Ch:0.00m - 1260.00m) 2023-24 Const. of 10 Nos. Ref. lined Section on 04 Khals, SP Identf. sign board 2, SP Area Indication Post 2 Nos. | 2023-24
|
|
|
14.47
|
0.00
|
171.88
|
zayeda begum
|
171.88
|
20/03/2024
|
31/03/2024
|
30/04/2024
|
79
|
143.16
|
83
|
30/11/2022
|
|
|
51
|
Barishal
|
5
|
babuganj
|
26
|
748
|
SP14200/Chandrapara FCD Subproject
|
Chandrapara khal re-excavation(ch.00-3340m) Baka khal re-excavation(ch.00-1020m) Mushuria branch khal re-excavation(ch.00-990m) Referenced line section(5 Nos.) Chandrapara Embankment re-sectioning(ch.1300-2914m)
|
|
|
6.96
|
0.00
|
88.01
|
LCS parveen begum
|
88.01
|
29/04/2018
|
02/04/2018
|
30/04/2019
|
100
|
87.20
|
100
|
30/11/2022
|
|
|
52
|
Barishal
|
5
|
bakerganj
|
27
|
748
|
SP61024/Boalia Bakhorkathi Subproject
|
Re-excavation of Sonamukhi Khal (Ch-1+000km to 1+530km) Re-excavation of Jugibari Khal (Ch-1+000km to 1+500km) Re-excavation of Napitbari Khal (Ch-0+000km to 1+772km) Ref. Lined Section 2 Nos. On 3 Khals, And SP Identf. Signboard 2 Nos. Construction of Sonamukhi Khal Regulator (1V-1.50m X1.80m) at Ch. 0+145km of Khal Construction of Jugibari Khal Regulator (1V-1.50m X 1.80m) at Ch. 0+215km of Khal Construction of Napitbari Khal Regulator (1V-1.50 m X 1.50m) at Ch.0+450Km of Khal Construction of WMCA office
|
|
|
2.80
|
4.00
|
237.85
|
M/S Mohiuddin Ahmed
|
216.27
|
07/03/2022
|
21/07/2022
|
30/04/2023
|
82
|
157.16
|
72
|
30/11/2022
|
|
|
53
|
Barishal
|
5
|
bakerganj
|
27
|
748
|
SP44097/Dudhal Subproject
|
Beg Barir Khal re-excavation (Ch:0.00-1500m) Jele Barir Khal re-excavation (Ch:0.00-1100m) Gani Hawladar Barir Khal re-excavation (Ch:0.00-500m) Hawladar Barir Khal re-excavation (Ch:0.00-370m) Const. of 04 Nos. Ref. lined Section on 4 Khals, SP Identf. sign board 2, SP Indication Post 2 Nos. Dudhal Embankment re-sectioning (Ch:0.00 - 3750m) 2020-23
|
|
|
7.22
|
0.00
|
79.42
|
LCS
|
79.42
|
13/11/2023
|
03/04/2024
|
30/04/2024
|
96
|
49.48
|
62
|
30/11/2022
|
|
|
54
|
Barishal
|
5
|
bakerganj
|
27
|
748
|
SP24133/Padrishibpur Subproject
|
Mollar Danga Branch Khal Re-excavation(ch0.00-2200m) Sundor Khali Khal Re-excavation(ch0.00-1900m) Andar Manik Khal Re-excavation(ch0.00-1320m) Sundor Khali Brach Khal Re-excavation(ch0.00-525m) Referenced Line Section(10nos), Subproject Identification signboard (2nos.) Construction of WMCA Building (Semi pacca)
|
|
|
5.94
|
1.00
|
81.12
|
LCS
|
79.03
|
25/03/2020
|
21/01/2021
|
30/04/2021
|
100
|
74.63
|
94
|
30/11/2022
|
|
|
55
|
Barishal
|
5
|
bakerganj
|
27
|
748
|
SP15294/Kabai FCD Subproject
|
Kathalbari Khal re-xcavation (Ch:0.00m - 1250m) Hariram Khal re-xcavation (Ch:0.00m - 5930m) Kabai Embankment re-sectioning(ch: 9.720 - 11170m) Const. of 09 Nos. Ref. lined Section on 02 Khals, SP Identf. sign board 2, SP Area Indication Post 2 Nos.
|
|
|
8.63
|
0.00
|
74.76
|
LCS
|
74.81
|
14/03/2024
|
24/04/2024
|
31/05/2024
|
62
|
33.97
|
45
|
30/11/2022
|
|
|
56
|
Barishal
|
5
|
bakerganj
|
27
|
748
|
SP14123/Niamati FCD Subproject
|
Rehabilitation of Niamati Khal Regulator at ch.310m Embankment Rehabilitation of Matiadubi Khal Regulator at ch.5800m Embankment Rehabilitation of Tengrakhali Khal Regulator at ch.6300m Embankment Rehabilitation of Samaddar Khal Regulator at ch.36600m Embankment.
|
|
|
0.00
|
0.00
|
32.29
|
OTM
|
29.06
|
05/11/2023
|
16/01/2024
|
15/07/2024
|
0
|
0.00
|
0
|
30/11/2022
|
|
|
57
|
Barishal
|
5
|
banaripara
|
20
|
748
|
SP44125/Chakhar Subproject
|
Re-exacavation of Chakhar Bazar khal (Ch-0+00km to 2+950km) Re-exacavation of Pashchim Chakhar Khal (Ch-0+000km to 1+00km) Re-exacavation of Chakhar College khal (Ch-0+000km to 0+580km) Re-exacavation of Doctor Barir khal (Ch-0+000km to 0+350km) Re-exacavation of U P khal (Ch-0+000km to 0+400km) Ref. Lined Section 08 Nos. On 5 Khals, And SP Identf. Signboard (2 nos.) Construction of WMCA office building
|
|
|
5.28
|
1.00
|
64.10
|
S H Enterprise
|
63.61
|
25/01/2022
|
10/02/2022
|
30/04/2022
|
83
|
26.17
|
41
|
30/11/2022
|
|
|
58
|
Barishal
|
5
|
banaripara
|
20
|
748
|
SP22041/Jambudwip Subproject
|
Re-excavation of Machrang Khal (Ch: 0.00 - 2230 m) Re-excavation of Rajjakpur Khal (Ch: 0.00 - 2180 m) Re-excavation of NapitBarir Khal (Ch: 0.00 - 1330 m) Re-excavation of Union Parishad Khal (Ch: 0.00 - 750 m) and Provisional Sum. Reference Lined Section (10 nos.) and SP Identification Signboard (2 nos.) Construction of WMCA Office (Semi pacca)
|
|
|
6.49
|
1.00
|
79.69
|
LCS SOROYAR HOSSEN
|
76.94
|
09/03/2020
|
21/01/2021
|
31/12/2020
|
100
|
72.50
|
94
|
30/11/2022
|
|
|
59
|
Barishal
|
5
|
banaripara
|
20
|
748
|
SP22020/Kachua Subproject
|
Re-excavation of Baishari khal (Ch: 0.00 - 2540 m) Re-excavation of Kachua khal (Ch: 0.00 - 1320 m) Re-excavation of Kachua Branch khal (Ch: 0.00 - 500 m) Re-excavation of Sabuj Biplob khal (Ch: 0.00 - 1670 m) and Provisional Sum. Reference Lined Section (7 nos.) and SP Identification Signboard (2 nos.) Construction of WMCA Building (Semi pacca)
|
|
|
6.03
|
1.00
|
83.45
|
LCS omor ali
|
80.80
|
16/02/2020
|
21/01/2021
|
30/04/2020
|
100
|
75.34
|
93
|
30/11/2022
|
|
|
60
|
Barishal
|
5
|
barishal-s
|
38
|
748
|
SP62056/Tungi Baria Subproject
|
Memania Khal Re-Excavation from Ch. 0+900km to Ch. 7+168km with 1 Nos Fish Sanctury Ch.9m 1+700km) Kumar Barir Khal Re-Excavation from Ch. 0+200km to Ch. 4+038km Kanai Pura Khal Re-Excavation from Ch. 0+000km to Ch. 0+761km Const. of 13 Nos. Ref. lined Section on 03 Khals, SP Identf. sign board 2, SP Area Indication Post 2 Nos. Const. of WMCA office
|
|
|
10.86
|
1.00
|
128.69
|
OTM
|
128.69
|
01/01/1900
|
|
|
0
|
0.00
|
0
|
30/11/2022
|
|
|
61
|
Barishal
|
5
|
barishal-s
|
38
|
748
|
SP61002/Char Icha Subproject
|
Re-excavation of Mora Nadi (Ch. 2+200Km to 5+850Km) Re-excavation of Mukshiganjer Khal (Ch. 0+000Km to 2+670Km) Re-excavation of Chand Kati Khal (Ch. 0+000Km to 0+570Km) Re-excavation of Char Icha Varanir Khal (Ch. 0+000Km to 1+030Km) Re-excavation of Jiler Khal (Ch. 0+000Km to 2+100Km) Re-excavation of Jiler Branch-1 Khal (Ch. 0+000Km to 0+660Km) Re-excavation of Jiler Branch-2 Khal (Ch. 0+000Km to 1+475Km) Re-excavation of Karna Kati Khal (Ch. 0+900Km to 2+160Km) Construction of Reference Lined sections ( 14 Nos. ), Provisional Sum Construction of Bamboo bridge (14 Nos. ), Sub-Project Identification Signboard Construction of WMCA Building (Semi pacca)
|
|
|
13.41
|
1.00
|
152.52
|
S H Enterprise
|
150.39
|
06/08/2020
|
19/06/2022
|
30/04/2022
|
100
|
138.34
|
91
|
30/11/2022
|
|
|
62
|
Barishal
|
5
|
barishal-s
|
38
|
748
|
SP44111/Kasipur Subproject
|
Tulatala Khal re-excavation (Ch:0.00 - 1950m) Sharshi Khal re-excavation (Ch:0.00 - 1600m) Sharshi Branch Khal re-excavation (Ch:0.00 - 1170m) Magorpara Khal re-excavation (Ch:0.00 - 1330m) Const. of 09 Nos. Ref. lined Section on 4 Khals, SP Identf. sign board 2, SP Area Indication Post 2 Nos.
|
|
|
6.05
|
0.00
|
54.35
|
LCS
|
54.35
|
17/01/2024
|
16/03/2024
|
30/04/2024
|
50
|
18.62
|
34
|
30/11/2022
|
|
|
63
|
Barishal
|
5
|
gouranadi
|
22
|
748
|
SP61006/Hosnabad Subproject
|
Re-exacavation of Kurir Char Khal (Ch-0+000km to 3+300km) Re-exacavation of Paschim Kurir Char Khal (Ch 0+000km to 3+310km) Re-exacavation of Miar Char khal (Ch-0+800km to 3+000km) Re-exacavation of Miar Char Branch khal (Ch 0+000km to 1+900km) Construction of 10 Nos. Reference Lined sections and SP idenf. SB 2 No. Construction of WMCA office building.
|
|
|
10.71
|
1.00
|
151.71
|
Mother Engineering
|
152.83
|
19/12/2022
|
17/05/2022
|
30/04/2022
|
100
|
146.45
|
95
|
30/11/2022
|
|
|
64
|
Barishal
|
5
|
gouranadi
|
22
|
748
|
SP15308/Nalchira FCD Subproject
|
Gorangal khal re-excavation(ch.00-6200m) Referenced line section(6 Nos.) Bamboo bridge (6 Nos.) WMCA Office
|
|
|
6.20
|
1.00
|
130.66
|
M/S Mega Ripa Enterprise
|
131.70
|
16/10/2018
|
14/07/2019
|
30/04/2019
|
100
|
121.62
|
92
|
30/11/2022
|
|
|
65
|
Barishal
|
5
|
gouranadi
|
22
|
748
|
SP15307/Sarikal FCD Subproject
|
Char sarikal khal re-excavation(ch.00-1600m) Maddha Hasnabad khal re-excavation(ch.00-1400m) Patur khal re-excavation(ch.00-1600m) Referenced line section(5 Nos.) Bamboo bridge(3 Nos.) Embankment re-sectioning(ch.00-1200m) WMCA office & Irrigation Canal Hasnabad Khal re-xcavation (Ch:2500.00m - 3300.00m) 2023-24 Nalgura AB Khal re-xcavation (Ch:0.00m - 4500.00m) 2023-24 Const. of 07 Nos. Ref. lined Section on 02 Khals, SP Identf. sign board 2, SP Area Indication Post 2 Nos. | 2023-24
|
|
|
11.10
|
1.00
|
173.44
|
OTM
|
175.09
|
16/10/2018
|
20/11/2018
|
30/04/2024
|
92
|
140.06
|
79
|
30/11/2022
|
|
|
66
|
Barishal
|
5
|
gouranadi
|
22
|
748
|
SP15306/Mahilara FCD Subproject
|
Lebutoli khal re-excavation(ch.00-3500m) Mahilara embankment re-sectioning(ch.6600-10900m) Referenced line section(4 Nos.) Bamboo Bridge(3 Nos.) Sharifabad Khal re-xcavation (Ch:0.00m - 2450m) 2023-24 Char Diyashur Khal re-xcavation (Ch:0.00m - 1600m) 2023-24 Ramzanpur Khal re-xcavation (Ch:0.00m - 1950m) 2023-24 Ramzanpur Branch Khal re-xcavation (Ch:0.00m - 800m) 2023-24 Const. of 04 Nos. Ref. lined Section on 04 Khals, SP Identf. sign board 2, SP Area Indication Post 2 Nos. | 2023-24 Construction of WMCA Office
|
|
|
14.60
|
1.00
|
185.72
|
Sorowar Sarder
|
185.71
|
19/03/2019
|
31/03/2019
|
30/04/2024
|
50
|
120.17
|
64
|
30/11/2022
|
|
|
67
|
Barishal
|
5
|
mehendiganj
|
24
|
748
|
SP61017/Kazirhat Subproject
|
Re-Sectioning of Kazirhat Embankment (ch.0+000km to 3+600km) Re-excavation of Kazirhat Khal (Ch-1+000km to 2+400km) Re-excavation of Kazirhat Branch-1 Khal (Ch-0+000km to 1+850km) Re-excavation of Kazirhat Branch-2 Khal (Ch-0+000km to 1+500km) Re-excavation of Kazirhat Branch-3 Khal (Ch-0+200km to 1+825km) Re-excavation of Kazirhat Branch-4 Khal (Ch-0+000km to 1+585km) Re-excavation of Kataltali khal (Ch-2+800km to 4+620km) Re-excavation of Kataltali Branch khal (Ch-0+000km to 0+600km) Re-excavation of Masjid bari khal (Ch-0+000km to 2+175km) (Ch-0+000km to 0+600km) Re-excavation of Munshi bari khal (Ch-0+000km to 0+600km) Ref. Lined Section 16 Nos. On 9 Khals And SP Identf. Signboard (2 nos.) Construction of WMCA office building
|
|
|
16.75
|
1.00
|
136.54
|
S H Enterprise
|
134.56
|
26/12/2022
|
28/04/2022
|
30/04/2022
|
100
|
127.49
|
94
|
30/11/2022
|
|
|
68
|
Barishal
|
5
|
mehendiganj
|
24
|
748
|
SP44136/Paschim Cheyam Takta
|
Shayem Takta Khal re-xcavation (Ch:0.00m - 2130m) Paschim Shayem Takta Khal re-xcavation (Ch:0.00m - 2200m) Jahir Uddin Khal re-xcavation (Ch:0.00m - 1930m) Const. of 09Nos. Ref. lined Section on 03 Khals, SP Identf. sign board 2, SP Area Indication Post 2 Nos.
|
|
|
6.26
|
0.00
|
49.99
|
LCS
|
49.99
|
01/01/1900
|
|
|
0
|
0.00
|
0
|
30/11/2022
|
|
|
69
|
Barishal
|
5
|
mehendiganj
|
24
|
748
|
SP14171/Khajuria FCD Subproject
|
Char khajuria khal re-excavation(ch.00-2600m) Tulatoli khal re-excavation(ch.00-2300m) Majer khal re-excavation(ch.00-1700m) Referenced line section(6 Nos.) Bamboo bridge(1 Nos.) Embankment re-sectioning(ch.00-3200m) WMCA Office
|
|
|
9.80
|
1.00
|
142.45
|
selim
|
141.79
|
27/09/2018
|
22/11/2018
|
30/04/2019
|
100
|
136.92
|
96
|
30/11/2022
|
|
|
70
|
Barishal
|
5
|
mehendiganj
|
24
|
748
|
SP13040/Chilmari FCD Subproject
|
Naktir Khal Re-excavation (Ch: 0 - 1700 m) Beparir Khal Re-excavation (Ch: 0 - 1800 m) Khal Bunia Khal Re-excavation (Ch: 0 - 1300 m) Chilmari Embankment Re-sectioning(1500m) Refferenced line section (6 Nos.) WMCA Office and Others
|
|
|
6.30
|
1.00
|
114.49
|
salma akter
|
112.42
|
24/02/2019
|
07/08/2019
|
30/04/2019
|
100
|
108.68
|
96
|
30/11/2022
|
|
|
71
|
Barishal
|
5
|
muladi
|
25
|
748
|
SP62049/Kurir Char Miar Char Subproject
|
Re-excavation of Kadamtalar Khal (Ch. 0+100 to Ch. 2+410 km) Re-excavation of Khokon Master Bari Khal (Ch. 0+000 to Ch. 1+300 km). Re-excavation of Mostofa Bari Khal (Ch. 0+000 to Ch. 0+780 km) Re-excavation of Natachora Khal (Ch. 0+000 to Ch. 1+652m) Re-excavation of Natachora Br.1 Khal (Ch. 0+000 to Ch. 0+400m) Re-excavation of Natachora Br.2 Khal (Ch. 0+000 to Ch. 0+400m) Const. of 07 Nos Reference lined Section 6 Khals, SP Identf. sign board 2 Nos., Demercation Post 22 Nos. and SP Indication Post 2 Nos. Const. of Culvert (2V-4.0m X 4.0m) on Kadamtalar khal Const. of WMCA office (12.0mx6.0m)
|
|
|
6.84
|
2.00
|
161.30
|
M/S Amir Engineering Corporation
|
156.48
|
27/03/2023
|
29/03/2023
|
31/05/2023
|
100
|
152.20
|
97
|
30/11/2022
|
|
|
72
|
Barishal
|
5
|
muladi
|
25
|
748
|
SP25313/Char Batamara & Shafipur Subproject
|
Re-excavation of Boalia khal (Ch. 0.00 - 4600 m) Re-excavation of Boalia branch khal (Ch. 0.00 - 900 m) Reference Lined Section (7nos.), Bamboo bridge (4nos.), SP Signboard (2nos.) Maintenance of office.
|
|
|
5.50
|
0.00
|
88.61
|
md.siddikul
|
88.61
|
10/12/2020
|
12/02/2020
|
30/04/2020
|
100
|
81.16
|
91
|
30/11/2022
|
|
|
73
|
Barishal
|
5
|
muladi
|
25
|
748
|
SP15274/Sreemoti FCD Subproject
|
Re-excavation of Goloi Bhanga Khal (Ch 0 - 5150m) Re-excavation of Chardumuri tola Khal (Ch 0 - 1375m) Reference line section (3 nos.) Basher Shako (7 nos.)
|
|
|
6.52
|
0.00
|
56.48
|
yasmin begum
|
56.48
|
03/02/2019
|
04/03/2019
|
30/04/2019
|
100
|
53.59
|
94
|
30/11/2022
|
|
|
74
|
Barishal
|
5
|
muladi
|
25
|
748
|
SP14196/Toyka FCD Subproject
|
Re-excavation of Purba silimpur khal (Ch. 0.00 - 1620 m) Re-excavation of Sajir khal (Ch. 0.00 - 500 m) Re-sectioning of Toika embankment (Ch. 5900 - 9000 m) Refence lined section (4nos.) and SP identification Signboard (2nos.)
|
|
|
5.22
|
0.00
|
73.69
|
LCS tofajjel hossen
|
73.69
|
13/01/2020
|
12/02/2020
|
30/04/2020
|
100
|
71.28
|
96
|
30/11/2022
|
|
|
75
|
Barishal
|
5
|
muladi
|
25
|
748
|
SP13073/Kazir Char DR Subproject
|
Construction of WMCA Building (Semi pacca). Re-excavation of Boroier khal-1 (Ch: 0.00 - 1130 m) Re-excavation of Boroier khal-2 (Ch: 0.00 - 1050 m) Re-excavation of Pangashia branch khal (Ch: 0.00 - 1130 m) Re-excavation of Haolader barir branch khal (Ch: 0.00 - 1600 m) Reference lined section (9nos.) and Subproject Identification signboard (2nos.)
|
|
|
4.91
|
1.00
|
88.56
|
LCS sowkat hossen
|
86.42
|
05/02/2020
|
21/01/2021
|
30/04/2020
|
83
|
57.13
|
66
|
30/11/2022
|
|
|
76
|
Bhola
|
4
|
bhola-s
|
4
|
748
|
SP62047/Shyampur Kandakpur Subproject
|
Re-excavation of Shampur Khal (Ch. 0+400 to Ch. 3+813 km) Re-excavation of Medua Khal (Ch. 0+300 to Ch. 3+876km) Re-excavation of Kandakpur Khal (Ch. 0+000 to Ch. 2+4021km) Re-excavation of Kandakpur Branch Khal (Ch. 0+000 to Ch. 1+567km) Const. of 12 Nos. Ref. lined Section on 4 Khals, SP Identf. sign board 2 Nos, Demercation Post 60 Nos and SP Indication Post 2 Nos. Const. of WMCA office (12.0mx6.0m)
|
|
|
10.95
|
1.00
|
184.90
|
OTM agrement done
|
182.57
|
27/03/2023
|
22/08/2023
|
30/04/2023
|
86
|
164.97
|
90
|
30/11/2022
|
|
|
77
|
Bhola
|
4
|
bhola-s
|
4
|
748
|
SP62041/Nayar Char Subproject
|
Re-excavation of Chadhur Khal (Ch. 0+000 to Ch. 2+585 km) Re-excavation of Paschim Tangir Khal (Ch. 0+000 to Ch. 1+946km) Re-excavation of Boalkhali Khal (Ch. 0+000 to Ch. 1+801km) Re-excavation of Bakshi Barir Khal (Ch. 0+000 to Ch. 1+350km) Re-excavation of Boalkhali Branch Khal (Ch. 0+000 to Ch. 0+900km). Re-excavation of lisha Khal (Ch. 0+000 to Ch. 0+745km) Re-excavation of Tangir Khal (Ch. 0+000 to Ch. 0+570km). Const. of 11 Nos. Reference Lined sections on Chandur Khal and Sub-project Identification sign board and Indication Post Construction of WMCA office
|
|
|
8.69
|
1.00
|
116.39
|
OTM
|
114.19
|
19/02/2023
|
22/06/2023
|
30/04/2023
|
88
|
92.83
|
81
|
30/11/2022
|
|
|
78
|
Bhola
|
4
|
bhola-s
|
4
|
748
|
SP62039/Kachia Majer Char Subproject
|
Re-excavation of Ramdebpur Khal-1 (Ch. 0+000 to Ch. 1+ 571km) Re-excavation of Ramdebpur Khal-2 (Ch. 0+000 to Ch. 2+730km) Re-excavation of Ramdebpur Branch Khal-2 (Ch. 0+000 to Ch. 0+560km) Re-excavation of Char Tagbagir Khal (Ch. 0+000 to Ch. 2+600km). Re-excavation of Char Tagbagir Khal-1 (Ch. 0+000 to Ch. 0+732km) Re-excavation of Char Tagbagir Khal-2 (Ch. 0+000 to Ch. 0+903km) Const. of 11 Now RCC Reference lined Section, Subproject Identification Sign board at a Suitable place and Subproject Indicatory Post at a Suitable place Construction of WMCA office. (12mX6m)
|
|
|
9.09
|
1.00
|
153.05
|
OTM
|
150.77
|
19/02/2023
|
21/06/2023
|
30/04/2023
|
74
|
120.59
|
79
|
30/11/2022
|
|
|
79
|
Bhola
|
4
|
bhola-s
|
4
|
748
|
SP13088/South Charpata Khal DR Subproject
|
Construction of WMCA Office, Electrification Works and Supplying of Office Furniture
|
|
|
0.00
|
1.00
|
22.85
|
OTM
|
22.85
|
01/01/1900
|
|
|
0
|
0.00
|
0
|
30/11/2022
|
|
|
80
|
Bhola
|
4
|
borhanuddin
|
39
|
748
|
SP23106/Pakshia Subpoject
|
Re-excavation of Madhumita khal (Ch: 0.00 - 1.43 m) Re-excavation of Katakhali khal (Ch: 0.00 - 1.05 m) Reference Lined Section (5 nos.), SP Identifying Signboard (2 nos.) and and Provisional Sum Re-excavation of Katakhali khal Branch No. 1 (Ch: 0.00 - 1.86 m)
|
|
|
4.34
|
0.00
|
39.04
|
LCS-4
|
39.04
|
19/02/2020
|
08/03/2020
|
30/04/2021
|
100
|
38.31
|
98
|
30/11/2022
|
|
|
81
|
Bhola
|
4
|
borhanuddin
|
39
|
748
|
SP23084/Tobgi Subproject
|
Burir Khal re-xcavation (Ch:0.00m - 2800m) Manirum Branch-1 Khal re-excavation (Ch:0.00 - 2600m) Manirum Branch-2 Khal re-excavation (Ch:0.00 - 900m) Muchir Khal re-excavation (Ch:0.00 - 2100m) Chowdhurir Khal re-excavation (Ch:0.00 - 2100m) Shabuj Khal re-excavation (Ch:0.00 - 1200m) Const. of 10 Nos. Ref. lined Section on 06 Khals, SP Identf. sign board 2, SP Area Indication Post 2 Nos. Const. of WMCA office (12.0mx6.0m)
|
|
|
11.70
|
1.00
|
135.73
|
OTM
|
133.33
|
19/02/2024
|
19/03/2024
|
18/05/2024
|
95
|
117.35
|
88
|
30/11/2022
|
|
|
82
|
Bhola
|
4
|
charfassion
|
5
|
748
|
SP61009/Abdullahpur Subproject
|
WMCA Office & Others Re-exacavation of Buter khal (Ch-3+000khm to 3+710km) Re-exacavation of Chatlakhali Khsl-2 (Ch-0+000khm to 1+025km) Re-exacavation of Meduar khal (Ch-0+000khm to 2+400km) Re-exacavation of Mandar tola khal (Ch-0+500khm to 3+415km) Re-exacavation of Chatlakhali khal-1 (Ch-0+100khm to 2+150km) Re-exacavation of Lamba khali (Ch-0+000khm to 2+400km) Reference Lined sections (13 Nos. ) & Sup-project Identification signboard
|
|
|
11.50
|
1.00
|
107.70
|
Unus & Brother
|
105.53
|
28/01/2021
|
30/11/2020
|
30/04/2021
|
100
|
105.10
|
100
|
30/11/2022
|
|
|
83
|
Bhola
|
4
|
charfassion
|
5
|
748
|
SP43068/Paschim Char Madras Subproject
|
Re-excavation of Baten Khali Khal (Ch-0+00km to 1+850km) Re-excavation of Goldar Khal (Ch-0+000km to 1+050km) Re-excavation of Nawalia Khal (Ch-0+000km to 3+500km) Re-excavation of Hilar Khal (Ch-0+000km to 1+130km) Ref. Lined Section 12 Nos. On 4 Khals, And SP Identf. Signboard (2 nos.)
|
|
|
7.53
|
0.00
|
62.64
|
LCS
|
62.64
|
02/03/2022
|
21/03/2022
|
30/01/2023
|
100
|
61.13
|
97
|
30/11/2022
|
|
|
84
|
Bhola
|
4
|
charfassion
|
5
|
748
|
SP15317/Nilkamal DR & IRR Subproject
|
Guinga Khali Khal Re-excavation(ch0.00-3300m) Nill Kamal Khal Re-excavation(ch0.00-2550m) Mora Gangi Khal Re-excavation(ch0.00-5000m) Reference Line Section (10nos), Subproject Identification signboard (2nos.), Provisional Sum
|
|
|
10.85
|
0.00
|
85.30
|
LCS-7
|
85.30
|
09/03/2020
|
22/03/2020
|
30/04/2021
|
100
|
85.11
|
100
|
30/11/2022
|
|
|
85
|
Bhola
|
4
|
charfassion
|
5
|
748
|
SP15283/South Char Aicha DR & IRR Subproject
|
Dokkhin char aicha khal re-excavation(ch.00-3510m) Referenced line section(4 Nos.) Bamboo bridge(3 Nos.) Kacharir Khal re-excavation (Ch:0.00-3900m) - 2023-24 Dasher Khal re-excavation (Ch:0.00-1920m) - 2023-24 Const. of 08 Nos. Ref. lined Section on 2 Khals, SP Identf. sign board 2, SP Indication Post 2 and Demarcation Post. 36 Nos - 2023-24
|
|
|
9.33
|
0.00
|
90.38
|
LCS-9
|
90.39
|
19/10/2023
|
24/12/2023
|
30/04/2024
|
83
|
75.56
|
83
|
30/11/2022
|
|
|
86
|
Bhola
|
4
|
charfassion
|
5
|
748
|
SP15282/Sarujkhali Khal DR Subproject
|
Pangashia Khal Re-excavation(ch0.00-6050m) Surujkhali Khal Re-excavation(ch0.00-1800m) Referenced line section (8 Nos.), SP Identification signboard (2nos.) and Provisional Sum WMCA Office Building
|
|
|
7.85
|
1.00
|
102.93
|
OTM
|
100.10
|
22/03/2020
|
30/11/2020
|
30/04/2021
|
100
|
99.33
|
100
|
30/11/2022
|
|
|
87
|
Bhola
|
4
|
charfassion
|
5
|
748
|
SP15264/Aminabad DR Subproject
|
Manik khali khal re-excavation(ch.00-2800m) Gohin khali khal re-excavation(ch.00-2300m) Referenced line section(6 Nos.) Bamboo bridge(4 Nos.)
|
|
|
5.10
|
0.00
|
107.11
|
LCS-9
|
107.11
|
14/03/2019
|
04/04/2019
|
30/04/2019
|
100
|
101.55
|
94
|
30/11/2022
|
|
|
88
|
Bhola
|
4
|
lalmohan
|
6
|
748
|
SP22035/Lengutia Subproject
|
Muguria khal re-excavation(Ch-0+000km to 4+4550km) Katakhali khal re-excavation(Ch-0+000km to 1+700km) Ref. Lined Section 07 Nos. On 2 Khals SP Identf. Signboard and Indication Post (2+2 nos.) Rehabilitation of Lengatia Khal Regulator (2v-1.5m X1.5m) -. Rehabilitation of Muguria Khal-1 Regulator (2v-1.5m X1.5m) -. Rehabilitation of Muguria Khal-2 Regulator (1v-1.5m X1.5m) -. Rehabilitation of Katakhali Khal Regulator (2v-1.5m X1.5m) -.
|
|
|
6.25
|
0.00
|
78.75
|
OTM
|
77.44
|
22/09/2022
|
22/12/2022
|
30/04/2024
|
28
|
50.19
|
64
|
30/11/2022
|
|
|
89
|
Bhola
|
4
|
lalmohan
|
6
|
748
|
SP22030/Char Sakhina Subproject
|
Najirpur Khal Re-excavation (Ch: 0.00 - 1600 m) Byrabad Khal Re-excavation (Ch: 0.00 - 1800 m) Peshkarer Khal Re-excavation (Ch: 0.00 - 1650 m) Reference Lined Section (6 nos.) + SP Identification Signboard (2 nos.)
|
|
|
5.05
|
0.00
|
33.72
|
LCS
|
33.72
|
06/01/2021
|
07/02/2021
|
22/06/2023
|
100
|
33.32
|
98
|
30/11/2022
|
|
|
90
|
Bhola
|
4
|
lalmohan
|
6
|
748
|
SP22014/Farazganj Subproject
|
Referenced Line Section(4nos), Subproject Identification signboard 2nos. , Provisional Sum Dokkhin Kishorgonj Katakhali Khal Re-excavation (Ch: 0.00-2800m) Monpuria Darjibari Khal Re-excavation (Ch: 0.00-400m)
|
|
|
3.20
|
0.00
|
28.68
|
LCS-5
|
28.68
|
08/06/2020
|
18/10/2020
|
30/04/2021
|
100
|
28.31
|
98
|
30/11/2022
|
|
|
91
|
Bogura
|
51
|
adamdighi
|
347
|
748
|
SP61025/Koroi Danra Subproject
|
Re-excavation of Koroi Danra Khal (Ch-0+000km to 2+283 km) Re-excavation of Koroi Danra Branch-1 Khal (Ch-0+000km to 0+346km) Re-excavation of Koroi Danra Branch-2 Khal (Ch-0+000km to 0+317km) Re-excavation of Koroi Danra Branch-3 Khal (Ch-0+000km to 0+286km) Ref. Lined Section 6 Nos. On 4 Khals, And SP Identf. Signboard (2 nos.) Construction of Koroi Danra Khal Regulator (2v-1.5m X2.0m) at Ch. 0+100 km of Khal Construction of Culvert-1 (1v-2.50m X 2.45m) on Koroi Danra Branch-1 Khal at Ch. 0+343 km of Khal Construction of Culvert 2 (1v-2.50m X 2.25m) on Koroi Danra Branch-2 Khal at Ch. 0+313 km of Khal Construction of Culvert 3 (1v-2.50m X 2.60m) on Koroi Danra Branch-3 Khal at Ch. 0+020 km of Khal Construction of Culvert-4 (1v-2.50m X 2.25m) on Koroi Danra Branch-3 Khal at Ch. 0+210 km of Khal Construction of WMCA office
|
|
|
3.77
|
6.00
|
152.44
|
OTM
|
164.04
|
22/03/2023
|
01/06/2023
|
|
43
|
100.89
|
61
|
30/11/2022
|
|
|
92
|
Bogura
|
51
|
adamdighi
|
347
|
748
|
SP44107/Amail-Indail Subproject
|
Re-excavation of Amail-Indail Khal (Ch: 0.00 - 6000 m) Maintenance of 2V Wire, WMCA Office and Identification signboard (2nos.), Bamboo Bridge (6Nos.) -
|
|
|
6.00
|
0.00
|
60.32
|
Nazrul
|
60.32
|
12/10/2020
|
10/12/2020
|
|
41
|
8.23
|
13
|
30/11/2022
|
|
|
93
|
Bogura
|
51
|
shajahanpur
|
372
|
748
|
SP23088/Khudra Fulkot-Rajarampur Subproject
|
Re-excavation of Soulmari khal (Ch. 0.00 - 1800 m) Re-sectioning of Embankment (Ch. 0.00 - 1370 m) Construction of Bamboo bridge and 1V Regulator Maintenance Tree Plantation (1261 nos.), Ref lined (3nos.), SP Signboard (2nos.), WMCA office maint.
|
|
|
3.17
|
0.00
|
76.37
|
Mst.Selena Aktar
|
76.37
|
23/01/2020
|
09/02/2020
|
21/12/2021
|
100
|
67.55
|
88
|
30/11/2022
|
|
|
94
|
Bogura
|
51
|
sherpur
|
355
|
748
|
SP62033/Naldangi Shuvagachha Subproject
|
Naldangi Shuvagacha Khal Re-excavation(Ch-0+800km to 3+600km) Naldangi Shuvagacha Branch Khal Re-excavation (Ch-0+00km to 3+535km) Ref. Lined Section 7 Nos. On 2 Khals, SP Identf. Sign.brd (2 nos.) and Identf. Post 2 Nos. Construction of Shuvagacha Regulator (5v-1.50m x1.80m) at Ch. 1+950m of Khal Construction of WMCA office
|
|
|
6.33
|
2.00
|
228.15
|
Mst.Bilkis Khatun
|
242.84
|
15/09/2023
|
16/10/2022
|
|
44
|
154.94
|
63
|
30/11/2022
|
|
|
95
|
Bogura
|
51
|
sherpur
|
355
|
748
|
SP25270/Maniker Khal-Kochua Beel Subproject
|
Re-excavation of Maniker khal (Ch: 0.00 - 3600 m) Maintainace of Regulator (2V) and WMCA office and Ref. lined (3nos.), SP signboard (2nos.) -
|
|
|
3.60
|
0.00
|
28.84
|
Mst.Moriom Begum
|
28.84
|
10/03/2020
|
18/03/2020
|
31/12/2020
|
100
|
27.30
|
94
|
30/11/2022
|
|
|
96
|
Bogura
|
51
|
shibganj
|
356
|
748
|
SP24140/Chitlar Khal Subproject
|
Chitlar khal re-excavation(ch.00-7000m) Referenced line section(6 Nos.) Bamboo Bridge(3 Nos.) Maintaince of WMCA office & 2nos Wair -
|
|
|
7.00
|
0.00
|
90.47
|
OTM
|
90.47
|
12/06/2019
|
15/04/2019
|
30/04/2020
|
100
|
82.17
|
90
|
30/11/2022
|
|
|
97
|
Bogura
|
51
|
sonatala
|
357
|
748
|
SP11003/Lohagara Khal FCD Subproject
|
Rehabilation of 2Nos WRS-2V n 4V -. Construction of WMCA Building (Semi pacca)
|
|
|
0.00
|
1.00
|
42.71
|
Jarin Enterprise
|
38.44
|
04/02/2020
|
15/02/2020
|
15/07/2020
|
100
|
38.41
|
100
|
30/11/2022
|
|
|
98
|
C. nawabganj
|
47
|
gomostapur
|
331
|
748
|
SP25238/Hogla-Darabaj Subproject
|
Const. of RCC Over Head Tank (4.45x3.00m) Ch. 0+450km | 2023-24 Const. of RCC Pumping Platform, Ram and Stair | 2023-24 Const. of RCC Pumping Platform near Hogla (Darmus) Beel | 2023-24 Const. of 1-500 mm dia UPVC Buried Pipe Main Line from 2nd Lift Bailibridge to Over Head Tank Ch: 0+000 km to 0+450km (Total Langth A-K=450m) 2023-24 Const. of 1-355mm dia UPVC Buried Pipe Line near Tower to Shesha Vati Ch: 0+000 km to 1+000 km (Total Langth H-L=1000m) | 2023-24 Const. of RCC open Irrigation Canel Main line End (G-P=500m) from Ch:1+200km to 1+700km (Size 500mmx500m), Nalkati to Nalkatibeel (M-N=350m) from 0+030km to 0+380km (Size 500mmx500m), Gabtala to Nalkathibeel Middle point (M-O =250m) from ch. 0+030km to 0+280km (Size 500mmx500m) | 2023-24
|
|
|
0.00
|
0.00
|
178.58
|
OTM
|
178.58
|
01/01/1900
|
|
|
0
|
0.00
|
0
|
30/11/2022
|
|
|
99
|
C. nawabganj
|
47
|
gomostapur
|
331
|
748
|
SP25237/Hogla-Damosh Subproject
|
UPVC Buried pipe,RCC pumping platform with stair guide,Exten.WMCA office and Godown
|
|
|
0.00
|
0.00
|
116.89
|
Md. Shah Alamgir
|
94.52
|
30/07/2019
|
03/12/2019
|
02/06/2020
|
100
|
83.90
|
88
|
30/11/2022
|
|
|
100
|
C. nawabganj
|
47
|
gomostapur
|
331
|
748
|
SP25195/Sonar Bangla Subproject
|
UPVC Buried pipe and RCC Guide wall
|
|
|
0.00
|
0.00
|
120.23
|
Md. Shah Alamgir
|
105.49
|
30/07/2019
|
08/12/2019
|
17/01/2021
|
100
|
104.92
|
100
|
30/11/2022
|
|
|
101
|
C. nawabganj
|
47
|
gomostapur
|
331
|
748
|
SP15297/Pabdamari & Charal Beel FCD Subproject
|
Pabdamari Churoi Beel Embankment Re-habilitation (ch0.00-8222m), and Subproject Identification signb
|
|
|
8.22
|
0.00
|
79.28
|
LCS
|
79.28
|
08/06/2020
|
13/12/2020
|
30/03/2021
|
100
|
78.07
|
98
|
30/11/2022
|
|
|
102
|
C. nawabganj
|
47
|
nachol
|
339
|
748
|
SP25267/Chandpara Subproject
|
Construction of 1-250mm dia uPvc Buried Pipe Line B-B1-B1 Ch. 0+000km to 0+600km (Length=600m) Construction of 1-500mm dia uPvc Buried Pipe Line B-C-D-E-F-G Ch. 0+000km to 0+850km (Length=850m) Construction of 1-315mm dia uPvc Buried Pipe Line G-H-I-J Ch. 0+850km to 1+590km (Length=740m) Construction of 1-280mm dia uPvc Buried Pipe Line J-J1-J2 Ch. 1+590km to 2+700km (Length=1110m) Construction of 5 Nos. Brick Name Plates and Two Nos. Project Indentification Signbord
|
|
|
0.00
|
0.00
|
135.66
|
Bismillah Trading co & Ethen Enterprise Pvt.Ltd (JV)
|
122.09
|
28/12/2021
|
29/03/2022
|
20/03/2023
|
100
|
122.06
|
100
|
30/11/2022
|
|
|
103
|
C. nawabganj
|
47
|
nawabganj-s
|
340
|
748
|
SP46278/Gorakhonathpur CAD Subproject
|
Construction of RCC Main Open Irr. Canal at line EF Ch. 1.540 km to 2.920 km (L: 1.36km) Construction of RCC Branch Open Irr. Canal line DID2 at Ch. 1.100 km to 1.890 km (L: 0.790km) 2 nos. RCC Aqueduct Main Open Irr. Canal at line EF Ch. 1.540 km and 2.920 km, 2nos. SP Signboard
|
|
|
0.00
|
0.00
|
134.85
|
Md. Abdul Mannan
|
141.40
|
06/12/2020
|
22/02/2021
|
15/06/2022
|
100
|
135.70
|
95
|
30/11/2022
|
|
|
104
|
C. nawabganj
|
47
|
nawabganj-s
|
340
|
748
|
SP46261/Sreerampur Subproject
|
Construction of RRC Open Irrigation Canal Line EF: Ch: 1254m-1500m. Construction of RRC Open Irrigation Canal Line FF1: Ch: 0.00m-445m. Construction of RRC Open Irrigation Canal Line DD1: Ch: 0.00m-460m. Construction of RRC Open Irrigation Canal Line FG: Ch: 1500m-1805m. Construction of RRC Pumping Platfrom With RCC Stair Near Mohananda River. WMCA Office and Others Construction of 1-900 mm dia RCC Drainage Pipe Line HH1: Ch. 0.00-680 m.
|
|
|
0.00
|
1.00
|
178.00
|
M/s.Mau Construction & M/s.Dulha Enterprise(JV)
|
186.84
|
08/06/2020
|
25/10/2020
|
15/12/2021
|
100
|
186.82
|
100
|
30/11/2022
|
|
|
105
|
C. nawabganj
|
47
|
nawabganj-s
|
340
|
748
|
SP44121/Kalitala Kashmahal Subproject
|
Laying of 1-500 mm dia UPVC Buried Pipe Main Line=70m (A-A3) & 2nd Lift Over Head Tank Gonshapara at ch: 0+000 km to 1+200 km (D-D1) Length 1200m Total Langth= (70+1200) =1270m Laying of 1-315 mm dia UPVC Buried Pipe Line (D-D2), 2nd Lift over Head Tank To Nadashi School at Ch: 0+000 km to 1+000 km Laying of 1-250 mm dia UPVC Buried Pipe Line (D-D3) Bhut Pukur to North Bhut Pukur at Ch 0+00km to 0+450km =450m and Mot Pukur to East Mot Pukur (E-F) at Ch 0+000 to 0+250km=250m (Total 700m) Construction of RCC Over Head Tank-3 (4.45x3.00m) near 2nd Lift Bhut Pukur
|
|
|
0.00
|
0.00
|
168.92
|
Barendra Constraction LTD
|
168.66
|
19/02/2024
|
21/05/2024
|
|
0
|
0.00
|
0
|
30/11/2022
|
|
|
106
|
C. nawabganj
|
47
|
nawabganj-s
|
340
|
748
|
SP44087/Mohadanga Panna Beel Subproject
|
Construction of RCC Pump Operating Platform, Ramp and Stair near Header Tank Construction Over Head Tank (3.00m X 4.45m) Near Panna Beel Mango Garden Const. of Join. Chamber,1-500 mm UPVC Buried Line Pipe Rest (L-90m) Wall and Br Name Plate S.Board Construction of 1-500mm UPVC Main Buried Pipe from New OHT to Gobura pukur, Ch.0+00km to 1+650km Const. of 1-250mm UPVC Branch-1 Buried Pipe from Existing OHT to Mona pukur, Ch.0+00 km to 0+650km Const. of 1-250mm UPVC Branch-2 Buried Pipe from Existing OHT to Goburatola, Ch.0+00 km to 0+550km Const. of 1-250mm UPVC Branch-3 Buried Pipe from Existing OHT to Hosendanga, Ch.0+00 km to 0+350km Maint. WMCA Off. and Const. of 1 Toilet (1.50m X 2.10m) Including Sanit. Works, Submer. Pump.
|
|
|
0.00
|
0.00
|
200.80
|
Md.Shah Alamgir
|
210.81
|
12/05/2022
|
27/07/2022
|
|
97
|
205.39
|
97
|
30/11/2022
|
|
|
107
|
C. nawabganj
|
47
|
nawabganj-s
|
340
|
748
|
SP43039/Ghoghodima Khutbatala Subproject
|
Construction of RCC Pump Operating Platefrom Ramp and Stair (Size:2.4mX12.575m) Const. RCC Cover Slab (10Nos), Brick Name Plate (10Nos), SP Sign board and Post (2 Nos) Construction of RCC Open Irrigation Canal line B1-B2 from Ch. 0+000 km to 0+200 km Construction of RCC Over Head Tank (4.450m X 3.00m) near Bifurcation Point Construction of 1-450mm dia UPVC buried Pipe Line C-G from Ch.0+000km to1+075km Const. 1-315mm dia UPVC buried Pipe G-H from Ch.0+0km to0+375km&Line G-G1 from Ch.0+0km to Ch.0+500 Repair and Maintenace of WMCA Office (12.00m X6.00m) - Const. of 1-450mm dia Upvc Buried Pipe Main Line (G-J-I) at Ch. 1+075km to Ch. 3+075km | 2023-24 Const. of 1-315mm dia Upvc Buried Pipe Main Line (J-J1) (Alfaz Land) Ch. 0+000km to (Akram hazi Deep) Ch. 0+500km (Length=500m) | 2023-24 Const. of RCC Open Irrigation Canal (E-F) Ch. 1+416km to Ch. 1+666km) Length= 250m | 2023-24
|
|
|
0.00
|
0.00
|
327.90
|
Md.Shah Alamgir
|
337.42
|
22/02/2027
|
30/11/2022
|
10/05/2023
|
89
|
313.23
|
92
|
30/11/2022
|
|
|
108
|
C. nawabganj
|
47
|
nawabganj-s
|
340
|
748
|
SP25289/Chapai Grameen Subproject
|
Construction of Header Tank-01 (6.10m* 3.00m) near zero point (Mohananda River) Re-laying of 1-500mm dia UpvcBuried pipe from ch.13m-1903m=1890m near zampukur. Re-laying of 1-400mm dia UpvcBuried pipe from ch.0.00m (zampukur OHT) - 460.00m Eest of koroitala. Laying of 1-355 mm dia UPVC Buried Pipe Line B-B5 from Ch.0+000km to Ch.0+500 km (2022-23) Laying of 1-500 mm dia UPVC Buried Pipe Line M-N from Ch.0+000km to Ch.2+000 km (2022-23) Construction of Over Head Tank (6.050m X 3.175m) Near Jampukur (2022-23) Construction of Rcc Platform, Brick Name Plate, SPISB & SPIP (2022-23) Const. of Rcc Box Culvert (750mm X 750mm) Near Chapai Bazar, Chapainawabjonj to Gomostapur Main RHD Road at Chapai-Grameen CAD (2023-24)
|
|
|
0.00
|
1.00
|
404.06
|
OTM
|
393.38
|
16/02/2020
|
23/08/2020
|
05/04/2021
|
66
|
374.60
|
95
|
30/11/2022
|
|
|
109
|
C. nawabganj
|
47
|
nawabganj-s
|
340
|
748
|
SP25288/Dariapur Subproject
|
Re-Laying of 1-500mm dia Upvc Buried Pipe Main Lain BE.Ch.950m-2890m (Length=1940m) Laying of 1-400mm dia Buried Pipe of Main Lain EM. Ch.2890m-3690m (Length=800m) Construction of Over Header Tank (3.00mx 4.30m) (2nd Lift) near Gohal Pukur Construction of 2 Nos. PVC Pipe Rest Construction of 7 Nos. Check Gate Chamber Construction of One RCC Operating Platfrom Const. of 2-500mm dia Upvc Buried Pipe Main Line (A-B1) from ch. 0+000km to 0+950km (Length=950×2=1900m) 2023-24 Const. of 1-400mm dia Upvc Buried Pipe Main Line (M-N) from ch. 3+690km to 5+490km (Length=1800m) 2023-24 Const. of 1-355mm dia Upvc Buried Pipe Branch Line (G1-G2=1000m) North of Main line from ch. 0+000km to 1+000km & G1-G3=1000m (Length=2000m) 2023-24
|
|
|
0.00
|
0.00
|
543.97
|
OTM
|
532.04
|
27/02/2020
|
19/11/2020
|
25/01/2022
|
66
|
214.72
|
40
|
30/11/2022
|
|
|
110
|
C. nawabganj
|
47
|
nawabganj-s
|
340
|
748
|
SP25257/Gohalbari Subproject
|
7 Nos RCC branch canal, RCC cover slab and footpath,RCC pumping platform with RCC stair Construction of RCC Open Irrigation Canal A1-A2 From Ch.0+000 km to 2+000 Km (22-23) Cnst. RCC Open Irrig. Cnl Line K-K1-Ch.0+0km to 0+100 Km & Line S-S1 - Ch 0+00km - 0+200km (22-23) Cnst RCC Open Irrig. Cnl Line R2-R3-Ch.0+0 km to 0+900 Km. SP Identf S.boardANDIndica. Post (22-23)
|
|
|
0.00
|
0.00
|
255.93
|
Md. Sohel
|
262.89
|
30/07/2019
|
27/12/2022
|
05/06/2020
|
97
|
230.67
|
87
|
30/11/2022
|
|
|
111
|
C. nawabganj
|
47
|
nawabganj-s
|
340
|
748
|
SP25241/Palsha-Moheshpur Subproject
|
Construction of WMCA Office, Electrification Work, Office Furnitures Construction of RCC over Head Tank Construction of UPVC Buried pipe Lain FF5F7. Ch. 0m-900m Laying of 1-400mm dia Construction of RCC Buried Pipe Lain AB. Ch.0 m-25 m and DF Line: Ch. 1070m-1660m Construction of UPVC Burried Pipe Line D1D2; Ch.0m-170m and F7F8 Line Ch.0m-580m and F7 Construction of UPVC Burried Pipe Line F2F4; Ch.0m-150m and F5F6; Line Ch.0m-150m Construction of RCC Pumping Platform (12mx3m) Contst. of Laying of 1-500mm dia Upvc Buried Pipe 2nd Main Line (F-F12)=1400m from Loila Pond to Hazra Pond (ch. 0+000km to 1+400km) and (Laying of 1-500mm dia Upvc Buried Pipe Main Line (F12-F13)=780m from Hazra Pond to Jordani Three Mohoni (ch. 1+400km to 2+180km) (Total Length 1400m+780m= 2180m) 2023-24 Const. of Laying of 1-315mm dia Upvc Buried Pipe Branch Line F14-F15=780m from Hiru Deep to Shahin Bathan Ch. 0+000km to 0+780km | 2023-24 Cosnt. of RCC Over Head Tank (4.45mx3.00m) at Hazra Pond (Ch.1+400km of 2nd Main Buried Pipe Line) | 2023-24
|
|
|
0.00
|
1.00
|
414.13
|
OTM
|
406.09
|
27/02/2020
|
19/11/2020
|
28/06/2022
|
70
|
195.18
|
48
|
30/11/2022
|
|
|
112
|
C. nawabganj
|
47
|
nawabganj-s
|
340
|
748
|
SP25197/Chechinia Subproject
|
Re-Laying of 1-500mm dia UPVC Buried Pipe Line A-F from Ch.0+00km to 3+400 km Laying of 1-315mm dia UPVC Buried Line L-L1 from Ch.0km to 0+500km and Line J-J1 - Ch.0km to 0+325km Cons. of RCC Pump Platfrom (2.40mX12.575m) at zero point 1Nos, Name Plate (7Nos),SP Signboard & Posts 2Nos
|
|
|
0.00
|
0.00
|
306.76
|
Sanitary Museum & M/S Md. Wasimul Haque (JV)
|
299.09
|
06/10/2022
|
27/12/2022
|
|
98
|
267.49
|
89
|
30/11/2022
|
|
|
113
|
C. nawabganj
|
47
|
nawabganj-s
|
340
|
748
|
SP22023/Nayagola-Mohananda Subproject
|
Construction of 2-315mm dia UPVC buried Pipe Line A-A1 from Ch.0+000km to 1+250km Construction of 1-400mm dia UPVC buried Pressure Pipe Line A1-A2 from Ch.0+000km to1+750km Construction of RCC Over Head Tank(6.050m X 3.175m) near Luxman Pond Construction of RCC Open Irrigation Canal line B1-B2 from Ch. 0+450 km to 0+950 km Construction of Two Now RCC Platfrom , Eight Now. Brick Name Plate and Two Now. SPISB (Total=12Nos)
|
|
|
0.00
|
0.00
|
243.27
|
Md.Selim Reza
|
256.85
|
01/09/2022
|
20/11/2022
|
|
76
|
219.61
|
85
|
30/11/2022
|
|
|
114
|
C. nawabganj
|
47
|
nawabganj-s
|
340
|
748
|
SP22022/Behula Subproject
|
Construction of 1-315mm dia UPVC buried Pipe Line G-H, G-G1, & G-G2 (Length = 1000m) Construction of RCC Open Irrigation Canal line I-J, J-K & J-L (Length=500m)
|
|
|
0.00
|
0.00
|
67.37
|
Sanitary Museum
|
70.40
|
28/08/2022
|
27/12/2022
|
24/12/2023
|
100
|
69.41
|
98
|
30/11/2022
|
|
|
115
|
C. nawabganj
|
47
|
nawabganj-s
|
340
|
748
|
SP22021/Mohammadkhani Subproject
|
Over Head Tank & Barid pipe 2-300mm dia Re-Const. of RCC Open Irrigation Canal A-B Ch.0+000 km to 0+400 Km. 2 SP Idntf. S. board & 2 post (22-23) Re-Construction of RCC Open Irrigation Canal B-D Ch.0+000 km to 0+750 Km (22-23) Re-Construction of RCC Open Irrigation Canal B-C Ch.0+000 km to 1+050 Km (22-23) Construction of RCC Irrigation Canal F-F1 Ch.0+000 km to 0+900 Km (22-23) Construction of RCC Open Irrigation Canal A1-A2 Ch.0+000 km to 0+250 Km (22-23) Construction of RCC Open Irrigation Canal E-E1 Ch.0+000 km to 0+500Km (22-23) Construction of Extension of Existing RCC Sumps (3.05m X 2.30m) and (3.95mX1.90m) - (22-23) Const. 5-250mm dia Upvc Pressure Buried Pipe (Replacing existing & damaged 5-200mm dia Upvc pipe) 2nd Lift Showratola to Fultola Water Reservation at (A3-A4) ch.0+000km to 1+200km (Length 1200m) - 2023-24 Const. of RCC Open Irrigation Canal (0.60m x 0.60m) on Harudhigi to East side MP Bathen Bari line at (F1-F2) ch.0+900km to 1+400km | 2023-24
|
|
|
0.00
|
0.00
|
514.07
|
OTM
|
509.94
|
20/02/2018
|
21/05/2024
|
10/01/2019
|
90
|
472.64
|
92
|
30/11/2022
|
|
|
116
|
C. nawabganj
|
47
|
nawabganj-s
|
340
|
748
|
SP11004/Agrani Irrigation CAD Subproject
|
Construction of 1-355mm dia UPVC Buried Pipe Branch Lines BR-8 From Ch.(0.00 m+500 m) Construction of 1-355mm dia UPVC Buried Pipe Lines BR-5E From Ch.(0.00m to 500 m) Re-Construction of RCC Open Main Irrigation Canal From Ch.(1950 m to 2167 m) and Ch.(2337m to 2490m) Re-Cons. of RCC Open Branch Irr. Canal BR-3 From Ch.(0.00 m to 890 m) and Ch.(1050 m to 1320m) Re-Construction of RCC Open Branch Irrigation Canal BR-6E From Ch.(0.00 to 400 m) Construction of RCC Pump Operating Platform (21.50m x 1.85m x 0.50m) and Extension of Existing Sump (4.00m x 1.65m x 1.80m) at Zero point (2023-24 FY) Construction of RCC Slope Protection Work by Double Plate Palisading near pond (Ch. 0+000 Km to Ch. 0+095 Km) (2023-24 FY) Construction of RCC Irrigation Open Canal Line: R1-R2 (Bidirpur Math) (Ch. 0+00 Km to Ch. 0+385 Km) (2023-24 FY) Construction of RCC Irrigation Open Canal Line: R3-R4 (Khondar Math) (Ch. 0+00 Km to Ch. 0+380 Km) (2023-24 FY) Construction of RCC Irrigation Open Canal Line: R5-R6 (Modonbari Math) (Ch. 0+00 Km to Ch. 0+450 Km) (2023-24 FY) Laying of 1-250mm Dia uPVC Buried pipe Line: P1-P2 (Milki Math) (Ch. 0+000 Km to Ch. 0+350Km) (2023-24 FY) Laying of 1-250mm Dia uPVC Buried pipe Line: P5-P6 (Bishu Miah Math) (Ch. 0+000 Km to Ch. 0+250Km) (2023-24 FY) Laying of 1-355mm Dia uPVC Buried Line: P7-P8 (Ruhul Scheme) (Ch. 0+000 Km to Ch. 1+050Km) (2023-24 FY) Laying of 1-250mm Dia uPVC Buried pipe Line: P9-P10 (Gorostan Math) (Ch. 0+000 Km to Ch. 0+300Km) (2023-24 FY) Laying of 1-355mm Dia uPVC Buried pipe Line: P11-P12 (Gucchagram) (Ch. 0+000 Km to Ch. 1+000Km) (2023-24 FY) Laying of 1-355mm Dia uPVC Buried pipe Line: P13-P14 (Kamitikar Math-1) (Ch. 0+000 Km to Ch. 0+700Km) (2023-24 FY) Laying of 1-250mm Dia uPVC Buried pipe Line: P15-P16 (Kamitikar Math-2) (Ch. 0+000 Km to Ch. 0+400Km) (2023-24 FY) Laying of 1-250mm Dia uPVC Buried pipe Line: P17-P18 (Kamitikar Math-3) (Ch. 0+000 Km to Ch. 0+260Km) (2023-24 FY)
|
|
|
0.00
|
0.00
|
467.88
|
M/s.Mau Construction & M/s.Dulha Enterprise(JV)
|
456.26
|
21/09/2023
|
25/10/2020
|
20/04/2021
|
51
|
322.63
|
70
|
30/11/2022
|
|
|
117
|
C. nawabganj
|
47
|
shibganj
|
341
|
748
|
SP62035/Moheshpur CAD Subproject
|
Construction of RCC Lined Canal (4.498km),20nos 2m RCC Slab, Distribution Box, Outfall With gate 25n Construction of Stair, Pump Platform and Sump. Estimate for the Construction of 6nos Culvert Construction of 8 Nos Syphone Construction of WMCA Office and Sub-Project Indication Sign Board & Post.
|
|
|
0.00
|
1.00
|
429.85
|
Abdul Mannan & Mminul Hoque JV
|
446.88
|
07/11/2022
|
25/01/2023
|
|
70
|
352.44
|
78
|
30/11/2022
|
|
|
118
|
Chuadanga
|
42
|
alamdanga
|
311
|
748
|
SP45212/Nauda Durgapur - Maddamath Subproject
|
Re-excavation of Nauda Durgapur khal (Ch: 0.00 - 1000 m) Reference Lined Section 2 nos. (Ch-100m & 800m) and SP Identification Signboard (2 nos.) Repair & Maintenance of Regulator (Rubber Seal, Gear box , block placing etc.) (Size 1V-1.50mX1.80m.) Repair & Maintenance of WMCA Office Building (Tube well, Painting etc.) (Size 12.00mX6.00m.)
|
|
|
1.00
|
0.00
|
21.05
|
Md.Tokbul Hossain
|
21.05
|
21/11/2023
|
27/12/2023
|
30/12/2023
|
60
|
11.65
|
55
|
30/11/2022
|
|
|
119
|
Chuadanga
|
42
|
alamdanga
|
311
|
748
|
SP24163/Bhangabari-Amanjhola Beel Subproject
|
Re-excavation of Amonjhola khal (Ch: 0.00 - 1780 m) Ref. Lined Section (2 nos.) and SP identification Signboard (2 nos.)
|
|
|
1.78
|
0.00
|
28.22
|
Md.Mominul
|
28.22
|
16/02/2020
|
15/09/2020
|
30/04/2021
|
100
|
25.82
|
91
|
30/11/2022
|
|
|
120
|
Chuadanga
|
42
|
chuadanga-s
|
294
|
748
|
SP14138/Kamri-Paksia Beel FCD Subproject
|
Kamria Paksia khal re-excavation(ch.1000-3040m) Referenced line section
|
|
|
2.04
|
0.00
|
65.77
|
Rahima Khatun
|
65.77
|
18/03/2018
|
22/03/2018
|
30/04/2018
|
100
|
26.21
|
39
|
30/11/2022
|
|
|
121
|
Chuadanga
|
42
|
damurhuda
|
290
|
748
|
SP14172/Barade-Kamarpara FCD Subproject
|
Baradi Kamarpara Khal Re-excavation(Ch-0+000km to 1+000km) RCC Ref. Lined Section 1 Nos. Repair of WMCA office- Repair of Box Culvent Repair of 2Vent Regulator -.
|
|
|
1.00
|
0.00
|
21.12
|
Mr.Muntaz Hossain
|
20.56
|
05/06/2022
|
08/05/2022
|
30/12/2022
|
100
|
17.75
|
86
|
30/11/2022
|
|
|
122
|
Chuadanga
|
42
|
damurhuda
|
290
|
748
|
SP14136/Gopalkhali FCD Subproject
|
Gopalkhali khal re-excavation(ch.00-1000m) Referenced line section(2 Nos.) Bamboo bridge(1 Nos.)
|
|
|
1.00
|
0.00
|
22.01
|
Sajjad Ahmed
|
22.01
|
05/11/2018
|
13/12/2018
|
28/04/2019
|
100
|
15.15
|
68
|
30/11/2022
|
|
|
123
|
Chuadanga
|
42
|
damurhuda
|
290
|
748
|
SP12018/Razukhali Khal FCD Subproject
|
Rajukhali khal re-excavation(ch.00-2750m) Referenced line section(3 Nos.) Bamboo bridge(3 Nos.)
|
|
|
2.75
|
0.00
|
36.64
|
LCS
|
36.64
|
28/01/2019
|
19/02/2019
|
30/04/2019
|
100
|
17.99
|
49
|
30/11/2022
|
|
|
124
|
Chuadanga
|
42
|
jibannagar
|
295
|
748
|
SP15286/Aruar Khal DR & WCS Subproject
|
Re-excavation of Aruar khal (Ch: 0.00 - 2040 m) Weir (2v) maintaenance at Aruar khal. Reference lined section (3nos.), Bamboo bridge (3nos.) and SP identification signboard (2nos.)
|
|
|
2.04
|
0.00
|
22.37
|
Razu Ahmed
|
22.37
|
23/02/2020
|
30/04/2020
|
30/04/2020
|
100
|
17.66
|
78
|
30/11/2022
|
|
|
125
|
Chuadanga
|
42
|
jibannagar
|
295
|
748
|
SP15231/Digrir Beel DR Subproject
|
Re-excavation of Kazia Khal (Ch: 0.00 - 4200.00 m) Re-excavation of Digrir Khal (Ch: 0.00 - 0.800 m) Reference Lined Section (7 nos.) and SP Identification Signboard (2 nos.)
|
|
|
5.00
|
0.00
|
45.44
|
Mst.Taz Nahar
|
45.44
|
18/01/2021
|
25/01/2021
|
30/04/2021
|
100
|
39.22
|
86
|
30/11/2022
|
|
|
126
|
Chuadanga
|
42
|
jibannagar
|
295
|
748
|
SP15230/Shankheri & Ruer Beel FCD Subproject
|
Sakharia Ruier khal re-excavation(ch.00-1000m) Referenced line section
|
|
|
1.00
|
0.00
|
13.93
|
Md.Shakwat
|
13.93
|
07/03/2018
|
13/03/2018
|
30/04/2018
|
100
|
13.92
|
100
|
30/11/2022
|
|
|
127
|
Jashore
|
41
|
bagherpara
|
300
|
748
|
SP43063/Kuthurakandi Khal Subproject
|
Re-Excavation of Kathurakandi Khal (Ch.0+000 Km to 0+400 Km) Const. of 1 No. Reference Lined on 1 Khal (Ch. 100m) SP Identification sign board 2 Nos., SP Indication Post 2 Nos., SP Demarcation Post and Repair of Kathurakandi Khal Regulator (2v-1.50mx1.80)
|
|
|
0.40
|
0.00
|
11.52
|
LCS-2
|
11.52
|
16/02/2023
|
05/03/2023
|
30/04/2023
|
100
|
11.47
|
100
|
30/11/2022
|
|
|
128
|
Jashore
|
41
|
chowgacha
|
301
|
748
|
SP44074/Swarupdaha Dhunar Khal Subproject
|
Dhunar Khal Re-excavation(ch0.00-970m) Maintainace of Sukra Khal Regultor, WMCA Office and Ref. Lined 2 On 1 Khals, Identf. Signboard (2 nos.), Tubewell, Toilet -
|
|
|
0.97
|
0.00
|
13.14
|
LCS-2
|
13.14
|
31/01/2021
|
19/03/2021
|
29/04/2021
|
100
|
13.11
|
100
|
30/11/2022
|
|
|
129
|
Jashore
|
41
|
jashore-s
|
304
|
748
|
SP24144/Dolpur-Mukteshwary Khal Subproject
|
Re-excavation of Dolpur Khal (Ch.0+000 Km to 1+075 Km) Re-excavation of Mukteshwary Khal (Ch.0+000 Km to 1+410 Km) Reference Lined section (6Nos. Dolpur-Ch: 100m,500m,1000m & Mukteshwary-Ch: 100m,700m,1400m) & SP Identification Sign Board & Post (2Nos.)
|
|
|
2.48
|
0.00
|
21.69
|
LCS-2 (430-1075)m
|
21.72
|
20/12/2023
|
24/12/2023
|
|
66
|
13.89
|
63
|
30/11/2022
|
|
|
130
|
Jashore
|
41
|
jashore-s
|
304
|
748
|
SP13079/Ichali WCS Subproject
|
Maintenance to WMCA Office,Elec. Painting, 1 Toilet, 1 Urinal Works, 1 Tubewell and SP Sign board - Extension of RCC Irrigation Open Canal (550 m) Repairing and Maintenance of Hand Wheel Type Lifting Device of Pipe Sluice -.
|
|
|
0.00
|
0.00
|
32.73
|
OTM
|
26.53
|
18/01/2021
|
01/02/2021
|
20/07/2021
|
100
|
24.40
|
91
|
30/11/2022
|
|
|
131
|
Jashore
|
41
|
jhikargacha
|
302
|
748
|
SP15281/Padma Beel FCD Subproject
|
Repair and Maintenance of WMCA Office (Brick work, RCC, Plaster, Electrictal work etc.) Repair and Maintenance of Regulator (Size 1V-1.50mX1.80m.) Block, gate etc. Re-excavation of Padma Beel Khal (Ch.0+000 Km to 0+590 Km) Reference Lined section (1Nos. Padma beel khal-Ch:100m) & SP Identification Sign Board
|
|
|
0.59
|
0.00
|
9.66
|
M/S Asad Steel Plaza, Monirampur, Jashore.
|
10.05
|
20/12/2023
|
24/12/2023
|
30/04/2024
|
100
|
8.74
|
86
|
30/11/2022
|
|
|
132
|
Jashore
|
41
|
keshabpur
|
303
|
748
|
SP12030/Baga Beel FCD Subproject
|
Re-excavation of Baga Khal Ref. lined section (2 nos.), SP Identification Sign Board, Tree Plantation and Bamboo Bridge. Construction of WMCA office building
|
|
|
0.90
|
1.00
|
46.60
|
OTM
|
45.28
|
31/12/2019
|
25/04/2022
|
25/03/2021
|
100
|
44.65
|
98
|
30/11/2022
|
|
|
133
|
Jhalokathi
|
6
|
jhalokathi-s
|
31
|
748
|
SP62028/Bazitpur DR Subproject
|
Re-excavation of Balokdia Sarder Barir Khal (Ch-0+000km to 1+900km) Re-excavation of Uttam Nagar Dasher Barir (Part-1) Khal (Ch-0+000km to 0+990km) Re-excavation of Uttam Nagar Dasher Barir (Part-2) Khal (Ch-0+000km to 1+235km) Re-excavation of Bajitpur Khal (Ch-0+000km to 2+300km) Re-excavation of Kalyankati Khal (Ch-0+000km to 1+860km) Re-excavation of Gagan Sailatala Khal (Ch-0+000km to 1+493km) Re-excavation of Shibaikati Grameen Bank Khal (Ch-0+000km to 3+300km) Re-excavation of Gagan Bazar Khal (Ch-0+000km to 3+115km) Re-excavation of Alokdia Chowkider Barir Khal (Ch-0+00km to 1+580km) Ref. Lined Section 22 Nos. On 9 Khals, And SP Identf. Signboard (2 nos.) Construction of WMCA office
|
|
|
17.77
|
1.00
|
157.96
|
OTM
|
157.01
|
05/05/2022
|
13/01/2023
|
|
97
|
106.06
|
67
|
30/11/2022
|
|
|
134
|
Jhalokathi
|
6
|
jhalokathi-s
|
31
|
748
|
SP46239/Kirtipasha Subproject
|
Re-exacavation of Badhakhali Khal (Ch-0+00km to 2+600km) Re-exacavation of Khardarbahar Khal (Ch-0+000km to 1+800km) Re-exacavation of Dumuria Khal (Ch-0+000km to 1+650km) Re-exacavation of Andir Khal (Ch-0+000km to 0+700km) Re-exacavation of Kamli Kanda Khal (Ch-0+000km to 0+560km) Ref. Lined Section 13 Nos. On 5 Khals, And SP Identf. Signboard (2 nos.) Construction of WMCA office building Sangkar Dhabal Khal re-xcavation (Ch:0.00m - 1600.00m) 2023-24 Uttar Basin Khal re-xcavation (Ch:0.00m - 700.00m) 2023-24 Khajura Branch Khal 1 re-xcavation (Ch:0.00m - 750.00m) 2023-24 Andir Khal re-xcavation (Ch:0.00m - 150.00m) 2023-24 Const. of 06 Nos. Ref. lined Section on 03 Khals and SP Area Indication Post 2 Nos. | 2023-24
|
|
|
10.51
|
1.00
|
93.77
|
OTM
|
92.41
|
30/12/2021
|
29/05/2022
|
29/05/2022
|
79
|
73.25
|
79
|
30/11/2022
|
|
|
135
|
Jhalokathi
|
6
|
jhalokathi-s
|
31
|
748
|
SP46235/Ashiar DR Subproject
|
Nur Muhammad Barir Khal Re-excavation(ch0.00-1800m) Talukdar Barir Khal Re-excavation(ch0.00-1200m) Noya Barir Khal Re-excavation(ch0.00-950m) Karim Shikdar Barir Khal Re-excavation(ch0.00-1750m) Gawchar Pali Khal Re-excavation(ch0.00-1500m) Reference Lined Section 10 Nos. On 5 Khals, And SP Identification Signboard (2 nos.) Construction of WMCA Office, Electrification Works and Furniture Supply
|
|
|
7.20
|
1.00
|
77.50
|
OTM
|
77.39
|
15/11/2020
|
20/04/2021
|
30/04/2021
|
100
|
77.32
|
100
|
30/11/2022
|
|
|
136
|
Jhalokathi
|
6
|
jhalokathi-s
|
31
|
748
|
SP44117/Deulkathi-Binnapara Subproject
|
Re-Excavation of Astakhan Majhibarir Khal (Ch.0+000 Km to 1+900 Km) Re-Excavation of Dewolkathi Berpasha Khal (Ch.0+000 Km to 3+200 Km) Re-Excavation of Binnapara Biler Khal (Ch.0+000 Km to 2+100 Km) Re-Excavation of Shudharam Branch Khal (Ch.0+000 Km to 0+900 Km) Const. of 11 Nos. Reference lined Section on 4 Khals, SP Identf. sign board 2 Nos. and SP Indication Post 2 Nos.
|
|
|
8.10
|
0.00
|
63.82
|
LCS
|
63.82
|
20/02/2023
|
02/03/2023
|
28/05/2023
|
100
|
63.58
|
100
|
30/11/2022
|
|
|
137
|
Jhalokathi
|
6
|
jhalokathi-s
|
31
|
748
|
SP44106/Sachilapur Subproject
|
Ref. Lined Section 11 Nos. On 6 Khals, And SP Identf. Signboard (2 nos.) Re-excavation of Bepari Barir Khal (Ch-0+00km to 2+450km) Re-excavation of Yousufdee Khal (Ch-0+000km to 1+300km) Re-excavation of Bepari Barir Branch Khal (Ch-0+000km to 0+600km) Re-excavation of Khan Barir Khal (Ch-0+000km to 0+400km) Re-excavation of Dattar Khal (Ch-0+000km to 0+350km) Re-excavation of Mafiruddin Khal (Ch-0+000km to 0+400km) Rehabilitation of WMCA office -
|
|
|
5.50
|
0.00
|
60.67
|
OTM
|
60.58
|
03/04/2022
|
24/01/2023
|
30/05/2022
|
100
|
59.10
|
97
|
30/11/2022
|
|
|
138
|
Jhalokathi
|
6
|
jhalokathi-s
|
31
|
748
|
SP44104/Sarengal Subproject
|
Ashutash Mazumdar Barir Khal Re-excavation (Ch: 0.00 - 2010 m) ChannuDev Barir Khal Re-excavation (Ch: 0.00 - 1700 m) Sheikh Mujibar Barir Khal Re-excavation (Ch: 0.00 - 650.00 m) Chatarji Barir Khal Re-excavation (Ch: 0.00 - 650.00 m) Kali Barir Khal Re-excavation (Ch: 0.00 - 600 m) Pakmahar GPS Khal Re-excavation (Ch: 0.00 - 650.00 m) Galaikhala Khal Re-excavation (Ch: 0.00 - 500.00 m) Mawlana Jahiruddin Khal Re-excavation (Ch: 0.00 - 300.00 m) Reference Lined Section (12 nos.) + SP Identification Signboard (2 nos.) Abdul Haque Talukdar Barir Khal re-xcavation (Ch:0.00m - 1260.00m) 2023-24 Badal Khan Barir Khal re-xcavation (Ch:0.00m - 670.00m) 2023-24 Masud Khan Barir Khal re-xcavation (Ch:0.00m - 650.00m) 2023-24 Mir Adbul Barir Khal re-xcavation (Ch:0.00m - 400.00m) 2023-24 Sarengal Madrasha Khal re-xcavation (Ch:0.00m - 325.00m) 2023-24 Mridha Barir Khal re-xcavation (Ch:0.00m - 315.00m) 2023-24 Const. of 07 Nos. Ref. lined Section on 06 Khals, SP Identf. sign board 2, SP Area Indication Post 2 Nos. | 2023-24
|
|
|
10.68
|
0.00
|
99.39
|
LCS
|
99.10
|
30/12/2020
|
25/01/2021
|
26/04/2021
|
86
|
75.43
|
76
|
30/11/2022
|
|
|
139
|
Jhalokathi
|
6
|
jhalokathi-s
|
31
|
748
|
SP44077/Saorakathi Subproject
|
Construction of 9 RCC reference-line sections in 4 canals, and SP Signboard Re-excavation of Ramzankathi Napitbari khal
(Ch: 0.00m to 2495m) Re-excavation of Nur Mohammad Shikdarbari khal
(Ch: 0.00m to 1910m) Re-excavation of Haoladarbarir khal
(Ch: 0.00m to 1200m) Re-excavation of Majed Mollikbarir khal
(Ch: 0.00m to 900m) Sharif Bari Khal re-xcavation (Ch:0.00m - 1590.00m) 2023-24 Shaiz Uddin Barir Khal re-xcavation (Ch:0.00m - 2310.00m) 2023-24 Abid Mulla Barir Khal re-xcavation (Ch:0.00m - 1450.00m) 2023-24 Jorapul Khal re-xcavation (Ch:0.00m - 850.00m) 2023-24 Gohuder Hat Khal re-xcavation (Ch:0.00m - 800.00m) 2023-24 Const. of 10 Nos. Ref. lined Section on 05 Khals, SP Identf. sign board 2, SP Area Indication Post 2 Nos. | 2023-24
|
|
|
13.50
|
0.00
|
116.00
|
LCS
|
113.03
|
17/04/2023
|
25/04/2023
|
28/05/2023
|
77
|
82.38
|
72
|
30/11/2022
|
|
|
140
|
Jhalokathi
|
6
|
jhalokathi-s
|
31
|
748
|
SP22002/Nabogram Subproject
|
Betora khal re-excavation (Ch.00-1500m) Rampura khal re-excavation (Ch.00-3000m) Napitkhali khal re-excavation (Ch.00-2300m) Gudighata khal re-excavation (Ch.00-600m) Referenced line section 9 Nos. Bamboo bridge 9 Nos. Ganginar Khal re-xcavation (Ch:0.00m - 3100.00m) 2023-24 Const. of 03 Nos. Ref. lined Section on 01 Khal, SP Identf. sign board 2, SP Area Indication Post 2 Nos. | 2023-24
|
|
|
10.50
|
0.00
|
105.21
|
LCS
|
105.20
|
05/02/2019
|
26/03/2024
|
30/04/2019
|
87
|
71.89
|
68
|
30/11/2022
|
|
|
141
|
Jhalokathi
|
6
|
jhalokathi-s
|
31
|
748
|
SP15236/Natullabad DR Subproject
|
Shah Bangol khal Re-excavation(ch.00-1500m) Latimsar khal Re-excavation(ch.00-1350m) Hazi Barir khal Re-excavation(ch.00-1800m) Khalifa Barir khal Re-excavation(ch.00-650m) Sikder Barir khal Re-excavation(ch.00-425m) Referenced line section(9 Nos.) Bamboo bridge(9 Nos.) WMCA Office and Others
|
|
|
5.72
|
1.00
|
68.46
|
OTM
|
66.38
|
19/03/2019
|
25/03/2019
|
30/04/2019
|
100
|
65.78
|
100
|
30/11/2022
|
|
|
142
|
Jhalokathi
|
6
|
jhalokathi-s
|
31
|
748
|
SP15233/Ponabalia DR Subproject
|
Kalia Barir Khal re-excavation (Ch:0.00-2100m) Baritala Khal re-excavation (Ch:0.00-2350m) Nager Bari Khal re-excavation (Ch:0.00-1250m) Hazragati Khal re-excavation (Ch:0.00-2050m) Balmari Khal re-excavation (Ch:0.00-0.500m) Ichalia Khal re-excavation (Ch:0.00-1350m) Dhalu Fakirbari Khal re-excavation (Ch:0.00-2400m) Kulitala Khal re-excavation (Ch:0.00-2350m) Const. of 20 Nos. Ref. lined Section on 8 Khals, SP Identf. sign board 2, SP Indication Post 2 and Demarcation Post. 44 Nos.
|
|
|
14.35
|
0.00
|
120.85
|
LCS
|
120.85
|
19/10/2023
|
21/12/2023
|
|
81
|
85.60
|
70
|
30/11/2022
|
|
|
143
|
Jhalokathi
|
6
|
jhalokathi-s
|
31
|
748
|
SP14206/Basanda DR Subproject
|
Re-Excavation of NarBarir Khal (Ch.0+000 Km to 2+030 Km) Re-Excavation of Bousher Khal (Ch.0+700 Km to 2+025 Km) Re-Excavation of Bousher Branch Khal (Ch.0+000 Km to 0+600 Km) Re-Excavation of Chawpala Khal (Ch.0+000 Km to 1+330 Km) Re-Excavation of Raja Miar Khal (Ch.0+000 Km to 1+790 Km) Const. of 10 Nos. Ref. lined Section on 5 Khals, SP Identf. sign board 2 and SP Indication Post 2
|
|
|
7.77
|
0.00
|
62.16
|
LCS
|
62.16
|
17/04/2023
|
25/04/2023
|
29/05/2023
|
100
|
61.62
|
100
|
30/11/2022
|
|
|
144
|
Jhalokathi
|
6
|
jhalokathi-s
|
31
|
748
|
SP13059/Binoykathi DR Subproject
|
Khagutia khal re-excavation(ch.00-2460m) Dokkhin Manpasa khondoker barir khal re-excavation(ch.00-18500m) Khagutia Majhibarir khal re-excavation(ch.00-650m) Bishnudia Hawladar barir khal re-excavation(ch.00-1000m) Referenced line section(8 Nos.) Bamboo bridge(7 Nos.)
|
|
|
5.96
|
0.00
|
60.54
|
LCS
|
60.54
|
12/02/2019
|
28/02/2019
|
30/04/2019
|
100
|
58.01
|
95
|
30/11/2022
|
|
|
145
|
Jhalokathi
|
6
|
jhalokathi-s
|
31
|
748
|
SP11009/Kafurkathi Khal DR Subproject
|
Poschim Kafurkathi rambala barir khal re-excavation(ch.00-1775m) Kafurkathi Sunil beparir khal re-excavation(ch.00-1650m) Sotodaskathi Sorojit Howladar barir khal re-excavation(ch.00-1516m) Poschim Kafurkathi majhi barir khal re-excavation(ch.00-350m) Referenced line section(7 Nos.) Bamboo bridge(7 Nos.) Construction of WMCA Office(12m X 6m), Electrification Works and Furniture Supply
|
|
|
5.29
|
1.00
|
120.73
|
OTM
|
120.69
|
18/11/2018
|
26/04/2021
|
25/04/2019
|
100
|
114.51
|
94
|
30/11/2022
|
|
|
146
|
Jhalokathi
|
6
|
kathalia
|
32
|
748
|
SP44085/Aorabunia Subproject
|
Re-excavation of Bansh Tala Katakhali Khal (Ch-0+00km to 2+000km) Re-excavation of ChayAni Khal (Ch-0+000km to 1+000km) Re-excavation of Minar Khal (Ch-0+000km to 1+700km) Re-excavation of ShimulTala Boro Barir Khal (Ch-0+000km to 1+600km) Re-excavation of Rayer MadarGachia Khal (Ch-0+000km to 1+200km) Re-excavation of Boro Barir Khal (Ch-0+000km to 0+600km) Ref. Lined Section 14 Nos. On 6 Khals, And SP Identf. Signboard (2 nos.)
|
|
|
8.10
|
0.00
|
86.89
|
LCS
|
86.89
|
20/03/2022
|
28/03/2022
|
30/05/2022
|
100
|
85.61
|
98
|
30/11/2022
|
|
|
147
|
Jhalokathi
|
6
|
kathalia
|
32
|
748
|
SP44083/Amua Patikhalghata Subproject
|
Construction of 6 RCC reference-line sections on 3 canals and SP Signboard. Re-excavation of Kewabuniya khal (Ch: 0.00m to 2200.00m) Re-excavation of Kewabuniya Branch khal (Ch: 0.00m to 1400.00m) Re-excavation of Thakur Bari khal (Ch: 0.00m to 1600.00m)
|
|
|
5.20
|
0.00
|
45.74
|
LCS
|
45.74
|
17/04/2023
|
21/04/2023
|
29/05/2023
|
100
|
32.81
|
71
|
30/11/2022
|
|
|
148
|
Jhalokathi
|
6
|
nalchity
|
33
|
748
|
SP61003/Kulkathi Drainage Sbproject
|
WMCA Office and Others Re-exacavation of Baworer khal (Ch-0+500khm to 3+078km) Re-exacavation of Baworer Branch khal (Ch-0+000khm to 1+803km) Re-exacavation of Akota khal (Ch-0+000khm to 1+618km) Re-exacavation of Aokta Branch khal (Ch-0+000khm to 0+471km) Re-exacavation of Mali bari khal (Ch-0+000khm to 1+677km Re-exacavation of Soroi khal (Ch-0+000khm to 3+008km) Re-exacavation of Kulkathi khal (Ch-0+000khm to 1+040km) Ref. Lined sections ( 13 Nos. ) , SP signboard
|
|
|
12.19
|
1.00
|
108.05
|
OTM
|
107.93
|
19/11/2020
|
28/12/2020
|
30/04/2021
|
100
|
107.34
|
100
|
30/11/2022
|
|
|
149
|
Jhalokathi
|
6
|
nalchity
|
33
|
748
|
SP44076/Paschim Gopalpur Subproject
|
Re-Excavation of NapitKhali Khal (Ch.0+000 Km to 2+000 Km) Re-Excavation of BudaiKhali Khal (Ch.0+700 Km to 1+200 Km) Re-Excavation of Maddha Katakhali Khal (Ch.0+000 Km to 1+050 Km) Re-Excavation of Bhadra Khal (Ch.0+000 Km to 2+000 Km) Re-Excavation of MemberKhali Khal (Ch.0+000 Km to 1+650 Km) Const. of 12 Nos. Ref. lined Section on 5 Khal, SP Identf. sign board 2 Nos. and SP Indication Post 2 Nos.
|
|
|
7.90
|
0.00
|
63.37
|
LCS
|
63.37
|
17/04/2023
|
26/04/2023
|
|
100
|
44.94
|
70
|
30/11/2022
|
|
|
150
|
Jhalokathi
|
6
|
nalchity
|
33
|
748
|
SP43070/Panchagram Subproject
|
Kaparkathi Pawta Khal re-xcavation (Ch:0.00m - 3000m) Maluhar Mukhiya Khal re-xcavation (Ch:0.00m - 2750m) Mukhiya Branch-1 Khal re-xcavation (Ch:0.00m - 500m) Const. of 05 Nos. Ref. lined Section on 03 Khals, SP Identf. sign board 2, SP Area Indication Post 2 Nos.
|
|
|
6.25
|
0.00
|
59.92
|
LCS
|
59.92
|
19/02/2024
|
26/02/2024
|
|
61
|
14.98
|
24
|
30/11/2022
|
|
|
151
|
Jhalokathi
|
6
|
nalchity
|
33
|
748
|
SP25331/Kathipara-Tetulbari Subproject
|
AkonBarir khal re-excavation(ch.00-2000m) Gazi Barir khal re-excavation(ch.00-1100m) Molla Barir khal re-excavation(ch.00-1230m) Ukil Barir khal re-excavation(ch.00-1100m) Referenced line section(9 Nos.) Bamboo Bridge(9 Nos.)
|
|
|
5.43
|
0.00
|
61.22
|
LCS
|
61.22
|
01/04/2019
|
04/04/2019
|
30/04/2019
|
100
|
60.62
|
100
|
30/11/2022
|
|
|
152
|
Jhalokathi
|
6
|
nalchity
|
33
|
748
|
SP25320/Rajabaria Subproject
|
Katakhali khal re-excavation(ch.00-4500m) Referenced Line section(5 Nos.) Bamboo bridge(3 Nos.)
|
|
|
4.50
|
0.00
|
59.46
|
LCS
|
59.46
|
18/02/2019
|
28/02/2019
|
30/04/2019
|
100
|
56.83
|
95
|
30/11/2022
|
|
|
153
|
Jhalokathi
|
6
|
nalchity
|
33
|
748
|
SP25319/Kusangal-Manapasa Subproject
|
Sharif Khali Khal Re-excavation(ch0.00-3200m) Sarmahal Singha Barir Khal Re-excavation(ch0.00-1950m) Ref. Line Section(7nos), SP Identification signboard (2nos.) and Provisional Sum Repair of WMCA Office Building -
|
|
|
5.15
|
0.00
|
67.00
|
OTM
|
67.00
|
16/03/2020
|
08/04/2020
|
29/04/2020
|
100
|
64.06
|
95
|
30/11/2022
|
|
|
154
|
Jhalokathi
|
6
|
nalchity
|
33
|
748
|
SP25310/Subidpur-Nalbunia Subprject
|
Bowniar Khal re-excavation (Ch:0.00m - 1600m) Bagher Khal re-excavation (Ch:0.00 - 1460m) Uzirbarir Khal re-excavation (Ch:0.00 - 1200m) Shudhir Barir Khal re-excavation (Ch:0.00 - 1150m) Bowniar Branch Khal re-excavation (Ch:0.00 - 840m) Shonarvita Khal re-excavation (Ch:0.00 - 580m) Fakir Barir Khal re-excavation (Ch:0.00 - 500m) Const. of 11 Nos. Ref. lined Section on 07 Khals, SP Identf. sign board 2, SP Area Indication Post 2 Nos.
|
|
|
7.33
|
0.00
|
53.46
|
LCS
|
53.46
|
15/02/2024
|
04/03/2024
|
|
72
|
26.30
|
49
|
30/11/2022
|
|
|
155
|
Jhalokathi
|
6
|
nalchity
|
33
|
748
|
SP15218/Dapdapia FCD Subproject
|
Gohalkathi-Kajem Ali khan barir khal re-excavation(ch.00-4000m) Nager barir khal re-excavation(ch.00-1500m) Talukder barir khal re-excavation(ch.00-1500m) Biswas barir khal re-excavation(ch.00-1000m) Referenced line section (9 Nos.) Bamboo bridge (9 Nos.) Embankment re-sectioning(ch.00-1385m)
|
|
|
9.38
|
0.00
|
92.34
|
LCS
|
92.33
|
12/09/2018
|
01/01/2019
|
30/04/2019
|
100
|
88.71
|
96
|
30/11/2022
|
|
|
156
|
Jhalokathi
|
6
|
nalchity
|
33
|
748
|
SP14214/Magor FCD Subproject
|
Re-excavation of Khaokhir khal (Ch. 0.00 - 2950 m) Re-excavation of Mirhar khal (Ch. 0.00 - 2100 m) Re-excavation of Khaokhir-Srirampur khal (Ch. 0.00 - 900 m) Reference lined Section (9nos.) Bamboo bridge (61.5m, 6nos.) and SP identification signboard (2nos.) Construction of WMCA building (Semi pacca)
|
|
|
5.95
|
1.00
|
111.26
|
OTM
|
109.16
|
13/01/2020
|
20/01/2021
|
28/04/2021
|
100
|
104.01
|
95
|
30/11/2022
|
|
|
157
|
Jhalokathi
|
6
|
nalchity
|
33
|
748
|
SP14174/Bhairabpasa FCD Subproject
|
Pramahar Mallik Bari. Khal re-excavation (Ch:0.00m - 2700m) Pramahar Jamaddar Barir Khal re-excavation (Ch:0.00 - 1600m) Dhapar Gazi Barir Khal re-excavation (Ch:0.00 - 1350m) Pratap Sharif Barir Khal re-excavation (Ch:0.00 - 1200m) Ghatakhalilr Khal re-excavation (Ch:1700 - 2850m) Nalir Khal re-excavation (Ch:2150 - 3300m) Pratap Khalir Khalifa Bari Khal re-excavation (Ch:0.00 - 1050m) Pratap Hawladar Bari Khal re-excavation (Ch:0.00 - 1015m) Khalifa Bari Khal re-excavation (Ch:0.00 - 600m) Bhairab Pasha Khal re-excavation (Ch:3300 - 3750m) Const. of 12 Nos. Ref. lined Section on 10 Khals, SP Identf. sign board 2, SP Area Indication Post 2 Nos.
|
|
|
12.26
|
0.00
|
134.08
|
LCS
|
134.08
|
15/02/2024
|
26/02/2024
|
|
77
|
33.52
|
24
|
30/11/2022
|
|
|
158
|
Jhalokathi
|
6
|
rajapur
|
34
|
748
|
SP44080/Chollish Kawnia Subproject
|
Kandir Barir Khal re-excavation (Ch:0.00 - 2685m) Chun Pori Khal re-excavation (Ch:0.00 - 2560m) Bilash Kurir Khal re-excavation (Ch:0.00 - 1505m) Butmara Khal re-excavation (Ch:0.00 - 1600m) Mirdha Barir Khal re-excavation (Ch:0.00 - 1420m) Const. of 12 Nos. Ref. lined Section on 5 Khals, SP Identf. sign board 2, SP Area Indication Post 2 Nos.
|
|
|
9.77
|
0.00
|
69.41
|
LCS
|
69.41
|
13/11/2023
|
08/02/2024
|
|
72
|
17.35
|
25
|
30/11/2022
|
|
|
159
|
Jhalokathi
|
6
|
rajapur
|
34
|
748
|
SP15288/Rajapur DR Subproject
|
Construction of WMCA Building (Semi pacca) Re-excavation of Boro Khaibatra khal (Ch: 0.00 - 4810 m) Re-excavation of Rajpur dulu hawladar khal (Ch: 0.00 - 1720 m) Re-excavation of Algi pona khal (Ch: 0.00 - 3910 m) Re-excavation of Choto Boro Khaibatra shikdar bari khal (Ch: 0.00 - 1400 m) Reference Lined section (14 nos.) and Subproject Identification Signboard (2 nos.)
|
|
|
11.84
|
1.00
|
104.45
|
OTM
|
102.36
|
16/02/2020
|
20/01/2021
|
26/04/2021
|
96
|
89.77
|
87
|
30/11/2022
|
|
|
160
|
Jhalokathi
|
6
|
rajapur
|
34
|
748
|
SP15217/Saturia DR Subproject
|
WMCA Office & Others Re-excavation of Boro Molla khal Re-excavation of Halder khalir branch khal Re-excavation of Tolatala khal Re-excavation of Majhi Barir khal Rfeference line section (9nos, 4nos.khal) Bamboo bridge (9nos, 95m) Tree Plantation (6544nos.) and Subproject Identification signboard (2nos.)
|
|
|
6.54
|
1.00
|
117.81
|
OTM
|
115.73
|
30/10/2019
|
20/01/2021
|
27/04/2020
|
88
|
102.84
|
88
|
30/11/2022
|
|
|
161
|
Jhenaidah
|
36
|
harinakunda
|
307
|
748
|
SP44084/Shitly Khal Subproject
|
Re-excavation of Hatar Khal Referenced line section (7nos.) Bamboo bridge (7nos, 84m) Tree Plantation (6200nos.) and Subproject Identification signboard (2nos.)
|
|
|
6.20
|
0.00
|
77.47
|
LCS-4
|
77.47
|
07/11/2019
|
10/12/2019
|
29/12/2020
|
75
|
63.74
|
82
|
30/11/2022
|
|
|
162
|
Jhenaidah
|
36
|
jhenaidah-s
|
308
|
748
|
SP14204/Gorer Beel DR Subproject
|
Re-excavation of Gorer Khal (Ch. 0+000 to Ch. 2+290 Km.) Reference lined section (3 nos.) and Bamboo Bridge (3 nos.) WMCA Office & others Tree Plantation (2294nos.) and Subproject Identification signboard (2nos.)
|
|
|
2.29
|
1.00
|
68.27
|
Liton Traders
|
66.11
|
13/11/2019
|
28/03/2020
|
27/08/2020
|
75
|
56.80
|
85
|
30/11/2022
|
|
|
163
|
Jhenaidah
|
36
|
jhenaidah-s
|
308
|
748
|
SP12023/Baroikhali Khal FCD Subproject
|
Protective Work on D/S Regulator Re-excavation of Baroikhali Khal (Ch: 0.00 - 1.2 km) and Provisional Sum. Reference Lined Section (2 nos.) and SP Identification Signboard (2 nos.)
|
|
|
1.20
|
0.00
|
18.24
|
OTM
|
17.29
|
20/02/2020
|
20/02/2021
|
24/04/2022
|
100
|
17.09
|
98
|
30/11/2022
|
|
|
164
|
Jhenaidah
|
36
|
kaliganj
|
309
|
748
|
SP24179/Tetul Beel - Uri Beela Subproject
|
Re-excavation of Urir beel chalabora khal (Ch. 0.00-3400m) Reference Lined Section (4nos.) and Bamboo bridge (4nos.) Tree Plantation (3402nos.) and Subproject Identification Signboard (2nos.)
|
|
|
3.40
|
0.00
|
41.08
|
LCS-6
|
40.87
|
29/12/2019
|
10/02/2020
|
17/10/2021
|
73
|
33.70
|
82
|
30/11/2022
|
|
|
165
|
Jhenaidah
|
36
|
kaliganj
|
309
|
748
|
SP14198/Natopara Beel DR Subproject
|
Re-Excavation of Baliakuna Khal(Ch.0+000 Km to 1+100 Km) Const. of 2 Nos. Reference lined Section on 1 Khal (Ch. 100m, 1100m), SP Identf. sign board 2 Nos., SP Indication Post 2 Nos. and Demarcation Post 08 Nos. Construction of WMCA office
|
|
|
1.10
|
1.00
|
37.06
|
M/S Khaja Enterprise Shohid Abdul Gofur Sarak Jhenaidah
|
34.71
|
14/02/2023
|
28/02/2023
|
25/03/2024
|
100
|
32.39
|
93
|
30/11/2022
|
|
|
166
|
Jhenaidah
|
36
|
kaliganj
|
309
|
748
|
SP13048/Shirish Kath Khal FCD Subproject
|
Re-excavation of Arua-Saloa (Shirishkath) khal (Ch. 3000m - 4025m) WMCA Office and Others SP Signboard and Referenced line section (1nos, ch=3400m) Shirishkath Khal re-excavation (Ch:0.00 - 3000m and 4025m - 6200m) - 2023-24 Const. SP Identf. sign board 6 Nos. and SP Area Indication Post 2 Nos - 2023-24
|
|
|
6.20
|
1.00
|
73.60
|
Mrs.Rupom Enterprize
|
72.19
|
22/02/2024
|
29/02/2024
|
30/04/2021
|
99
|
65.03
|
90
|
30/11/2022
|
|
|
167
|
Jhenaidah
|
36
|
kotchandpur
|
299
|
748
|
SP62054/Padmabeel Ghoramara Chatarbeel Khal Subproject
|
Re-excavation of Padma Beel Ghoramara Chatar Beel Khal (Ch.0+000 to Ch. 2+450 km) Const. of 3 Nos. Reference lined Section on 1 Khal, SP Identf. Sign Board 2 Nos and SP Indication Post 2 Nos. Const. of Padma Beel WRS (4v-1.50m x 1.80m) Const. of WMCA office (12.0mx6.0m)
|
|
|
2.45
|
2.00
|
229.87
|
Shaikat Enterprise
|
182.47
|
08/08/2023
|
20/09/2023
|
|
68
|
143.47
|
78
|
30/11/2022
|
|
|
168
|
Jhenaidah
|
36
|
moheshpur
|
283
|
748
|
SP61004/Jadavpur Subproject
|
Construction of Kultala Khal WRS at Ch-2+385 km WMCA Office and Others Re-excavation of Kultala khal (Ch: 0 - 7.6km) Re-excavation of Pathra Nalpattua khal (Ch: 0 - 4.82 km) Ref. lined section (13 Nos.) and SP Signboard (2 Nos.) RCC Drainage Pipe (16X2 Nos, 58.56m)
|
|
|
12.41
|
2.00
|
349.73
|
Natural-SE-JV.
|
321.39
|
19/11/2020
|
20/02/2021
|
24/04/2022
|
100
|
298.73
|
92
|
30/11/2022
|
|
|
169
|
Jhenaidah
|
36
|
moheshpur
|
283
|
748
|
SP12024/Goalhuda Khal FCD Subproject
|
Re-excavation of Goalhoda khal (Ch: 0.00 - 310 m) Re-sectioning of Goalhoda-Saratola Embankment (Ch: 50 - 2700 m) Ref. Lined (1no.), Goalhoda Regulator Maint, Bamboo bridge (1no.), SP signboard (2nos.)
|
|
|
2.96
|
0.00
|
56.70
|
LCS-8
|
56.70
|
27/01/2020
|
23/03/2020
|
24/04/2022
|
100
|
44.65
|
78
|
30/11/2022
|
|
|
170
|
Joypurhat
|
50
|
joypurhat-s
|
346
|
748
|
SP15221/Hatigara-Kamalpur WCS Subproject
|
Re-excavation of Hatigara-Kamalpur Khal Reference line section (6nos.) Basher Shako (2nos, L=34m) Construction of WMCA Office and WRS Maintenance (weir)
|
|
|
6.70
|
1.00
|
136.62
|
LCS
|
133.59
|
17/04/2019
|
15/04/2020
|
30/04/2020
|
100
|
120.96
|
90
|
30/11/2022
|
|
|
171
|
Joypurhat
|
50
|
kalai
|
363
|
748
|
SP24143/Kadirpur-Bakhara Subproject
|
Re-excavation Kadirpur-Bakhra Khal Reference line section (5nos.) and Basher Shako (3nos, L=42m) Maintenance of Water Structure
|
|
|
3.60
|
0.00
|
51.04
|
LCS-11
|
51.05
|
17/04/2019
|
24/02/2022
|
30/04/2022
|
100
|
46.70
|
91
|
30/11/2022
|
|
|
172
|
Joypurhat
|
50
|
kalai
|
363
|
748
|
SP13091/Kanmona-Haraboti WCS Subproject
|
Harabati Khal re-xcavation (Ch:0.00m - 10000m) Const. of 05 Nos. Ref. lined Section on 01 Khal, SP Identf. sign board 2, SP Area Indication Post 2 Nos.
|
|
|
10.00
|
0.00
|
137.44
|
LCS
|
137.44
|
29/02/2024
|
25/03/2024
|
|
50
|
121.83
|
88
|
30/11/2022
|
|
|
173
|
Joypurhat
|
50
|
khetlal
|
361
|
748
|
SP15220/Pathanpara-Koitahar WCS Subproject
|
Re-excavation of Patahnpara - Koitahar Khal (Ch-0+000km to 7+600km) Ref. Lined Section 7 Nos. On 1 Khals, And SP Identf. Signboard (2 nos.) Rehabilitation of Pathanpara - Koitahar Khal WRS (2v-1.5mx1.8m) -. Construction of WMCA office building
|
|
|
7.60
|
1.00
|
63.59
|
OTM
|
61.34
|
31/08/2020
|
24/02/2022
|
30/04/2022
|
100
|
59.27
|
96
|
30/11/2022
|
|
|
174
|
Joypurhat
|
50
|
panchbibi
|
362
|
748
|
SP61015/Shekta Chaksamser Khal Subproject
|
Re-exacavation of Shekta-Chak Samser Khal (Ch-0+300km to 4+590km) Re-exacavation of Shekta-Chak Samser Branch Khal (Ch-0+000km to 2+202km) Ref. Lined Section 6 Nos. On 2 Khal And SP Identf. Signboard (2 nos.) Shekta-Chak Samser Khal WRS-1 (2v-1.5mX2.5m) at Ch. 0+710 km Construction of WMCA office building. Shekta-Chak Samser Khal WRS-2 (2v-1.5mX1.5m) at Ch. 3+560
|
|
|
6.49
|
3.00
|
190.89
|
OTM, Md. Sohel,Santahar,Bogra.
|
202.09
|
19/12/2021
|
22/03/2022
|
30/04/2022
|
100
|
198.10
|
98
|
30/11/2022
|
|
|
175
|
Joypurhat
|
50
|
panchbibi
|
362
|
748
|
SP44109/Jhinaigari Khal Subproject
|
Jhenaigari Khal re-excavation (Ch:0.00 - 7500m) Const. of 08 Nos. Ref. lined Section on 1 Khal
|
|
|
7.50
|
0.00
|
83.28
|
LCS
|
83.27
|
15/02/2024
|
07/03/2024
|
25/04/2024
|
100
|
79.36
|
95
|
30/11/2022
|
|
|
176
|
Joypurhat
|
50
|
panchbibi
|
362
|
748
|
SP22015/Amirpur-Barail Subproject
|
Amirpur Borail khal & Branch khal- 1 re-excavation(ch.00-6100m&ch.00-870m) Referenced line section(5 Nos.)
|
|
|
6.97
|
0.00
|
56.02
|
SABANA MUSTARIN
|
56.02
|
08/02/2018
|
05/03/2018
|
30/04/2018
|
100
|
51.89
|
92
|
30/11/2022
|
|
|
177
|
Joypurhat
|
50
|
panchbibi
|
362
|
748
|
SP15277/Boyra-Srikrishnapur DR & WCS Subproject
|
WMCA Office and Others Boyra-Srikrishnapur khal re-excavation(ch.00-6800m) Referenced line section(5 Nos.)
|
|
|
6.80
|
1.00
|
106.30
|
TOFAZZOL
|
104.38
|
28/01/2019
|
07/07/2019
|
30/04/2018
|
100
|
96.89
|
92
|
30/11/2022
|
|
|
178
|
Joypurhat
|
50
|
panchbibi
|
362
|
748
|
SP13078/Baharampur FCD Subproject
|
Re-sectioning of Bahrampur Embankment (Ch-0+000km to 1+300km) and SP Identification Signboard & Post (2Nos.)
|
|
|
1.30
|
0.00
|
22.58
|
LCS
|
22.58
|
15/10/2023
|
13/11/2023
|
25/04/2024
|
100
|
21.38
|
94
|
30/11/2022
|
|
|
179
|
Khagrachari
|
16
|
khagrachari-s
|
110
|
748
|
SP61021/Jatindrapara Subproject
|
Construction of Buried Pipe Network System. (Length-7294m) Construction of Header Tank Construction of WMCA office
|
|
|
0.00
|
1.00
|
307.53
|
Prime-Tripura
|
335.16
|
29/05/2022
|
19/06/2022
|
|
90
|
201.88
|
60
|
30/11/2022
|
|
|
180
|
Khagrachari
|
16
|
mahalchari
|
111
|
748
|
SP61023/KayangGhat Subproject
|
Re-excavation of Jaduganala Khal (Ch-0+000km to 3+200km) and Inspection Dyke (Ch-0+200km to 1+400km) Re-excavation of Jaduganala Branch-1 Khal (Ch-0+000km to 0+200km) Re-excavation of Jaduganala Branch-2 Khal (Ch-0+000km to 0+200km) Ref. Lined Section 5 Nos. On 3 Khals, And SP Identf. Signboard (2 nos.) Construction of Jaduganala Khal WRS (3V-1.50m X2.0m) at Ch.1380m of Khal Construction of Drainage Culvent-1 on Branch-2 (1V-2.50m X 3.50m) at Ch.0+025km of Khal Construction of WMCA office Construction of Drainage Culvent-2 on Field canal (1V-2.0m X 2.50m) at Ch.0+015Km of Khal
|
|
|
3.60
|
4.00
|
220.24
|
S. Ananta Bikas Tripura
|
233.59
|
29/04/2022
|
30/05/2022
|
24/03/2024
|
100
|
230.44
|
98
|
30/11/2022
|
|
|
181
|
Khagrachari
|
16
|
panchari
|
113
|
748
|
SP99007/Chengi River Rubber Dam Project
|
Re-excavation of the Changi River Sand Bar and Vegetative Bank Protection at U/S of Rubber Dam. Re-excavation of the Changi River Sand Bar and Vegetative Bank Protection at D/S of Rubber Dam. Construction of RCC Open Irrigation Canal Works (at 2 location @ 500m = 1000m) Repairing and Maintenance of East Side Rubber Bag Works (40m) -. Repairing and Maintenance of Railing and Wearing Course (0.00m-81.00m) -. Const. of RCC Irrigation Canal of Lilamohan Karbaripara from Ch.0+000 km to 0+427 Km Const. of RCC Irrigation Canal of Jatirmoy Karbaripara from Ch.0+000 km to 0+274 Km Const. of RCC Irrigation Canal of Jatirmoy Karbaripara from Ch.0+000 km to 0+457 Km Const. of RCC Irri Cnl of Lilamohon Karbari-Shanti Ranjan Karbaripara from Ch. 0+000 km to 0+366 Km Const. of RCC Irrigation Canal of Lilamohan Karbaripara from Ch.0+000 km to 0+274 Km Const. of RCC Irrigation Canal of Lilamohan Karbaripara from Ch.0+000 km to 0+335 Km Const. of RCC Irri Cnl of Uttar Shantipur from Ch.0+00 km to 0+267 Km and Sply of One 20 HP Pump Mot
|
|
|
0.00
|
0.00
|
296.66
|
S. Ananta Bikas Tripura
|
295.76
|
20/07/2022
|
10/08/2022
|
30/06/2021
|
100
|
295.76
|
100
|
30/11/2022
|
|
|
182
|
Khulna
|
35
|
batiaghata
|
264
|
748
|
SP61019/Jalma Drainage Subproject
|
Re-excavation of Guptomi Khal (Ch-0+675km to 1+700km) Re-excavation of Kata Khal (Ch 0+000km to 1+280km) Re-excavation of Singh khal (Ch-0+430km to 0+810km) Re-excavation of Enader khal (Ch-0+000km to 4+000km) Re-excavation of Joypur Khal (Ch-0+000km to 1+900km) Ref. Lined Section 09 Nos. On 5 Khals, And SP Identf. Signboard (2 nos.) Construction of WMCA Office Building
|
|
|
8.58
|
1.00
|
134.26
|
OTM
|
134.26
|
10/01/2022
|
10/04/2022
|
|
78
|
101.73
|
75
|
30/11/2022
|
|
|
183
|
Khulna
|
35
|
batiaghata
|
264
|
748
|
SP12026/Narayankhali FCD Subproject
|
Doania khal re-excavation(ch.80-1760m) Koria Vita khal re-excavation(ch.00-890m) Embankment re-sectioning(Ch.900m-1390m, Ch. 4075m - 4865m) Bamboo Bridge(4 Nos.) Reference Line Section (7nos.) Maintenance of Regulator & Box Sluice -. Narayankhali Embankment re-sectioning(ch:4570m - 5170m) 2023-24 Ghater Khal re-excavation (Ch:0.00 - 1600m) 2023-24 Jabbar Ali Khal re-excavation (Ch:0.00 - 1300.00m) 2023-24 Shewlabunia Khal re-excavation (Ch:0.00 - 1700.00m) 2023-24 Shewlabunia Branch Khal re-excavation (Ch:0.00 - 1300.00m) 2023-24 Const. of 08 Nos. Ref. lined Section on 4 Khals, SP Identf. sign board 2, SP Area Indication Post 2 Nos. | 2023-24
|
|
|
10.35
|
0.00
|
216.35
|
md. Badruddaza Bablu, Dumuria bazar, Khulna.
|
225.01
|
24/04/2019
|
15/04/2019
|
30/04/2020
|
91
|
184.82
|
82
|
30/11/2022
|
|
|
184
|
Khulna
|
35
|
dacope
|
263
|
748
|
SP62040/Laudove Subproject
|
Re-excavation of Laudove Khal (Ch. 0+100 to Ch. 6+053 km) Re-excavation of Khutakhali Khal (Ch. 0+200 to Ch. 5+200 km) Re-excavation of Kalikabati Khal (Ch. 0+200 to Ch. 4+000 km). Re-excavation of Ruakata Khal (Ch. 0+000 to Ch. 2+750m) Re-excavation of Ruakata Branch Khal (Ch. 0+000 to Ch. 1+400km) Re-excavation of Harintana Khal (Ch. 0+000 to Ch. 1+310 km) Const. of 20 Nos Reference lined Section on Laudove Khal (Ch.400m, 1500m, 2400 m, 3400m, 4200m & 5800m), Kalikabati Khal (Ch.500m, 1300m, 2300m & 3700m), Khutakhali Khal (Ch.500m, 1200m, 2400m, 3600m & 4200m) Ruakata Khal (Ch. 300m , 1200m & 2400m), R Construction of WMCA office. (12.00mx6.00m)
|
|
|
20.21
|
1.00
|
273.73
|
OTM
|
273.54
|
19/02/2023
|
16/03/2023
|
30/03/2024
|
82
|
211.80
|
77
|
30/11/2022
|
|
|
185
|
Khulna
|
35
|
dumuria
|
274
|
748
|
SP13106/Bagchar-Badurgacha FCD Subproject
|
Re-sectioning of Embankment (Ch 0.00 to 0.84 km.) Re-sectioning of Embankment (Ch 1.25 to 1.85 km.) Construction of Embankment slope Protection work (From ch. 1250 m to ch. 1850m) Construction of Embankment slope Protection work (From ch. 1880 m to ch. 2250m) Rehabilitation of Simanar Khal Regulator at ch. 1850m -. Rehabilitation of Bakotmari Khal Regulator at ch. 9525m -.
|
|
|
1.81
|
0.00
|
304.52
|
OTM
|
294.63
|
10/05/2020
|
28/08/2022
|
29/08/2020
|
100
|
282.13
|
95
|
30/11/2022
|
|
|
186
|
Khulna
|
35
|
dumuria
|
274
|
748
|
SP13099/Latabunia FCD Subproject
|
Re-excavation of Latabunia Songjog Khal (Ch: 0.00 - 230 m) Re-excavation of Latabunia Embankment (Ch: 0.00 - 7775 m) Reference Lined Section (1 nos.) and SP Identification Signboard (2 nos.) 1 Vent (1x1.5m x 1.5m) Regulator Repair -.
|
|
|
8.00
|
0.00
|
89.28
|
M/s Foisai Traders
|
88.72
|
08/10/2020
|
23/02/2021
|
30/03/2022
|
100
|
88.47
|
100
|
30/11/2022
|
|
|
187
|
Khulna
|
35
|
rupsa
|
279
|
748
|
SP25228/Sreerampur Subproject
|
Re-excavation of Moni Khal (Ch: 0.00 - 1100 m) Re-excavation of Branch Khal-1 (Ch: 0.00 - 600 m) Re-excavation of Branch Khal-2 (Ch: 0.00 - 350 m) Re-excavation of Sree Rampur Embankment (Ch: 0.00 - 2950 m) Reference Lined Section (6 nos.) and SP Identification Signboard (2 nos.)
|
|
|
4.95
|
0.00
|
53.72
|
LCS
|
53.73
|
08/10/2020
|
04/01/2021
|
29/04/2021
|
100
|
49.55
|
92
|
30/11/2022
|
|
|
188
|
Khulna
|
35
|
rupsa
|
279
|
748
|
SP21011/Padma Beel Subproject
|
Rehabilation of Eixsting Padma Beel Regulator. (4V-1.65mx1.875m) -.
|
|
|
0.00
|
0.00
|
16.98
|
M/S Nurjahan Enterprise
|
16.84
|
08/02/2022
|
05/07/2022
|
01/04/2023
|
100
|
16.80
|
100
|
30/11/2022
|
|
|
189
|
Khulna
|
35
|
rupsa
|
279
|
748
|
SP12027/Jabusa Beel FCD Subproject
|
Gupia khal re-excavation(ch.00-1075m) Gupia khal re-excavation(ch.3000-3840m) Saijar khal re-excavation(ch.00-560m) Fedur khal re-excavation(ch.00-430m) Embankment re-sectioning(ch.00-2808m) Bamboo bridge(4 Nos.) Referenced line section(6 Nos.) Protection Work Repair & Maintenance of Regulator (1v-1.2mx1.5m) on Harania Khal -. Repair & Maintenance of Regulator (2v-1.5mx1.8m) on Gupiar Khal -. Repair & Maintenance of Regulator (2v-1.5mx1.8m) on Shukumarir Khal -. Repair & Maintenance of Box Sluice (1v-1.2mx1.2m) on Hori Ghosh Khal -. Repair & Maintenance of PipeSluice (1v-900mm) dia on Noashia Khal -.
|
|
|
5.71
|
0.00
|
165.66
|
Sk. Idris Ali, Basabati, Bagerhat.
|
161.45
|
28/04/2022
|
15/07/2019
|
15/05/2019
|
100
|
149.67
|
92
|
30/11/2022
|
|
|
190
|
Kushtia
|
40
|
bheramara
|
288
|
748
|
SP15261/Satbaria-Dharampur DR & WCS Subproject
|
Satbaria-Dharampur Khal Re-excavation(ch0.00-2400m) Ref. Lined Section 2 Nos. On 1 Khals, And SP Identf. Signboard (2 nos.) WMCA office, Placement of Pre-cost Rcc pipe infront of WMCA office Repair work of single vent Sluice gate -.
|
|
|
2.40
|
1.00
|
57.72
|
OTM
|
57.20
|
31/03/2021
|
18/03/2021
|
30/09/2021
|
100
|
51.36
|
89
|
30/11/2022
|
|
|
191
|
Kushtia
|
40
|
bheramara
|
288
|
748
|
SP13111/Bahirchar FCD Subproject
|
Podda Nodir Embankment re-sectioning(ch.4260-6550m) Repair of Podda Nodir Embankments Regulator
|
|
|
2.29
|
0.00
|
49.89
|
LCS-10
|
45.30
|
29/12/2020
|
28/03/2018
|
30/04/2017
|
100
|
38.54
|
85
|
30/11/2022
|
|
|
192
|
Kushtia
|
40
|
khoksha
|
284
|
748
|
SP46279/Komorbogh-Raipur Ajail Subproject
|
Ajail Khal Re-excavation(ch0.00-2500m) Raypur Khal Part 1 Re-excavation(ch0.00-0.830m) Raypur Khal Part 2 Re-excavation(ch0.00-1410m) Reference Lined Section On Ajail Khal, Raypur Khal P-1and Roypur Khal P-2 (4 Nos.) Identificat -2nos Hizlabat Khal re-xcavation (Ch:0.00m - 2200.00m) 2023-24 Raypur Branch Khal re-xcavation (Ch:0.00m - 800.00m) 2023-24 Ganeshpur Khal re-xcavation (Ch:0.00m - 500.00m) 2023-24 Azail Branch-1 Khal re-xcavation (Ch:0.00m - 1100.00m) 2023-24 Azail Branch-2 Khal re-xcavation (Ch:0.00m - 1200.00m) 2023-24 Const. of 03 Nos. Ref. lined Section on 03 Khals, SP Identf. sign board 2, SP Area Indication Post 2 Nos. | 2023-24
|
|
|
10.54
|
0.00
|
54.19
|
LCS-3
|
54.19
|
15/11/2020
|
14/03/2024
|
31/05/2024
|
95
|
50.32
|
92
|
30/11/2022
|
|
|
193
|
Kushtia
|
40
|
khoksha
|
284
|
748
|
SP12029/Sirajpur Haor FCD Subproject
|
Sirajpur Khal Re-excavation (Ch: 0.00 - 4400 m) Reference Lined Section (5 nos.) and SP Identification Signboard (2 nos.)
|
|
|
4.40
|
0.00
|
53.55
|
LCS
|
53.55
|
08/01/2023
|
25/01/2023
|
30/05/2023
|
100
|
48.20
|
90
|
30/11/2022
|
|
|
194
|
Kushtia
|
40
|
kumarkhali
|
291
|
748
|
SP62027/Sadarpur Baruria khal Subproject
|
Re-excavation of Sadarpur baruria Khal (Ch-0+000km to 6+135km) Re-excavation of Chadpur beeler Khal (Ch-0+300km to 3+600km) Construction of WMCA office Ref. Lined Section 10 Nos. On 2 Khals, And SP Identf. Signboard (2 nos.) Construction of Baruria khal Box culvert (2v-3.50mx4.40m) atch.5+388km | 2023-24
|
|
|
9.43
|
2.00
|
147.97
|
OTM
|
147.97
|
24/04/2022
|
31/05/2023
|
30/05/2023
|
60
|
93.38
|
63
|
30/11/2022
|
|
|
195
|
Magura
|
38
|
magura-s
|
271
|
748
|
SP24118/Lakshmipur Khal Subproject
|
Re-excavation of Lakshmipur Khal (Ch: 0.00 - 2.1 m) and Provisional Sum. Reference Lined Section (3 nos.) and SP Identification Signboard (2 nos.) Repairing of WMCA Building (Semi pacca) -
|
|
|
2.10
|
0.00
|
27.12
|
OTM
|
26.48
|
20/02/2020
|
10/09/2020
|
28/04/2021
|
100
|
22.00
|
83
|
30/11/2022
|
|
|
196
|
Meherpur
|
43
|
gangni
|
296
|
748
|
SP25268/Nagder Khal Subproject
|
Re-excavation of Markar Khal Referance line section (5 nos, L=88m) Bamboo bridge (4 nos.) Maintenance of WMCA Office -
|
|
|
4.10
|
0.00
|
148.59
|
LCS
|
148.59
|
08/04/2019
|
11/04/2019
|
30/05/2019
|
100
|
146.00
|
98
|
30/11/2022
|
|
|
197
|
Meherpur
|
43
|
gangni
|
296
|
748
|
SP14175/Pirtola FCD Subproject
|
Re-Excavation of Pirtala Khal (Ch.0+000 Km to 1+500Km) Construction of 1 Nos. Reference Lined sections on the Khal(Ch. 45, 100, 1450m), Sub-project Identification sign board and Sub-project Indication Post
|
|
|
1.50
|
0.00
|
20.32
|
pirtola khal pabasas ltd
|
28.78
|
09/02/2023
|
27/02/2023
|
30/04/2023
|
100
|
28.78
|
100
|
30/11/2022
|
|
|
198
|
Meherpur
|
43
|
meherpur-s
|
310
|
748
|
SP44101/Bonduk Khali Khal Subproject
|
Re-excavation of Banduk Khali Khal (Ch-0+00km to 0+910km) Ref. Lined Section 2 Nos. On 1 Khals, And SP Identf. Signboard (2 nos.) Rehabilitation of Eixsting WMCA Office Building - Rehabilitation of Eixsting Bonduk Khali Khal Regulator -.
|
|
|
0.91
|
0.00
|
17.08
|
LCS.Bondhukkhali pabasas ltd
|
16.04
|
15/03/2022
|
30/05/2022
|
30/06/2023
|
100
|
14.33
|
89
|
30/11/2022
|
|
|
199
|
Meherpur
|
43
|
meherpur-s
|
310
|
748
|
SP24135/Gomara Beel Subproject
|
Re-Excavation of Gomra Khal (Ch.0+000 Km to 0+760 Km) Const. of 1 No. Reference Lined on 1 Khals (Ch. 100m) SP Identification sign board 2 Nos., SP Indication Post 2 Nos., SP Demarcation Post and Repair of Gomra Khal Regulator (2v-1.50mx1.80)
|
|
|
0.76
|
0.00
|
20.85
|
LCS
|
18.34
|
09/02/2023
|
10/03/2023
|
30/04/2023
|
0
|
0.00
|
0
|
30/11/2022
|
|
|
200
|
Meherpur
|
43
|
meherpur-s
|
310
|
748
|
SP15237/Kakrajal FCD Subproject
|
Re-excavation of Kakrajal Khal (Ch: 0.00 - 2850 m) and Provisional Sum. Reference Lined Section (4 nos.) and SP Identification Signboard (2 nos.) Maintenance work of 2V Regulator -.
|
|
|
2.85
|
0.00
|
31.60
|
Jahirul Ltd. MollikPara,Meherpur
|
31.23
|
09/03/2020
|
07/06/2020
|
30/04/2020
|
100
|
28.95
|
92
|
30/11/2022
|
|
|
201
|
Meherpur
|
43
|
mujib nagar
|
298
|
748
|
SP62038/Muratala CAD Subproject
|
Part-A. Construction of Upvc Burried Pipe Network System (Total Length=4.945km) With Associate Structure Part-B. Construction of Header Tank (Size: 6.5m X 4.5m X 6.0m) Const. of WMCA office (12.0 m X 6.0m), 2 Nos SP Identification Signboard & 2 Nos SP. Indication Post.
|
|
|
0.00
|
1.00
|
222.96
|
OTM
|
218.61
|
16/03/2023
|
22/11/2023
|
20/05/2024
|
93
|
189.25
|
86
|
30/11/2022
|
|
|
202
|
Naogaon
|
45
|
atrai
|
336
|
748
|
SP99003/Atrai River Rubber Dam Project
|
Repairing and Maintenace of Rubber dam Structure and Project Identification Sign board Repair and Rehabilitation of Atrai River Rubber dam (InComplete Work) FY-2022-23
|
|
|
0.00
|
0.00
|
39.60
|
OTM
|
39.99
|
09/03/2023
|
22/05/2023
|
15/05/2023
|
100
|
39.10
|
97
|
30/11/2022
|
|
|
203
|
Naogaon
|
45
|
atrai
|
336
|
748
|
SP43042/Atrai-Burigonj Subproject
|
Re-excavation of Puratan Atrai River Khal (Ch-0+00km to 6+500km) Ref. Lined Section 8 Nos. On 1 Khals, And SP Identf. Signboard (2 nos.)
|
|
|
6.50
|
0.00
|
95.33
|
LCS
|
95.33
|
02/03/2022
|
16/03/2022
|
30/04/2022
|
100
|
94.46
|
100
|
30/11/2022
|
|
|
204
|
Naogaon
|
45
|
atrai
|
336
|
748
|
SP43032/Chalk Temukh-Islamgati Subproject
|
Re-excavation of Chalktemukh-Islamgathi Khal (Ch-0+00km to 4+200km) Re-excavation of Shamash Para Khal (Ch-0+00km to 2+500km)
|
|
|
6.70
|
0.00
|
70.57
|
LCS
|
70.57
|
12/04/2022
|
02/05/2022
|
31/05/2022
|
100
|
39.90
|
56
|
30/11/2022
|
|
|
205
|
Naogaon
|
45
|
atrai
|
336
|
748
|
SP25328/Islamgathi-Maria-Kosiabari Subproject
|
Re-excavation of Islamgati Maria Kashiyabari Khal (Ch-0+00km to 5+000km) Ref. Lined Section 5 Nos. On 1 Khals, And SP Identf. Signboard (2 nos.)
|
|
|
5.00
|
0.00
|
71.34
|
LCS
|
71.34
|
02/03/2022
|
16/03/2022
|
30/04/2022
|
100
|
55.89
|
78
|
30/11/2022
|
|
|
206
|
Naogaon
|
45
|
atrai
|
336
|
748
|
SP25327/Lalpara-Paisanta Subproject
|
Construction of Elevated WMCA Office (12m X 6m), Electrification Works and Office Furniture Lalpara Paisaota Khal Re-excavation(ch0.00-4000m) Ref. Lined Section 5 Nos. On 1 Khals, And SP Identf. Signboard (2 nos.)
|
|
|
4.00
|
1.00
|
72.08
|
OTM
|
69.70
|
31/01/2021
|
25/02/2021
|
25/04/2021
|
100
|
68.21
|
97
|
30/11/2022
|
|
|
207
|
Naogaon
|
45
|
dhamoirhat
|
328
|
748
|
SP22005/Mongol Khal Subproject
|
Mongol khal re-excavation (Ch.00-4000m) Referenced line section (4 Nos.) Bamboo bridge 1 Nos. (20m) Mangal Khal re-xcavation (Ch:4.00m - 9850.00m) 2023-24 Const. of 06 Nos. Ref. lined Section on 01 Khal, SP Identf. sign board 2, SP Area Indication Post 2 Nos. | 2023-24
|
|
|
9.85
|
0.00
|
163.27
|
LCS
|
163.27
|
25/03/2024
|
14/03/2019
|
20/04/2019
|
96
|
137.50
|
84
|
30/11/2022
|
|
|
208
|
Naogaon
|
45
|
dhamoirhat
|
328
|
748
|
SP15315/Lodipur-Dhananjoy DR & WCS Subproject
|
Re-excavation of Mahmudpur Khal (Ch-0+000km to 4+200km) Ref. Lined Section 5 Nos. On 1 Khals, And SP Identf. Signboard (2 nos.) Mahmudpur Khal re-xcavation (Ch:0.00m - 5000.00m) 2023-24 Const. of 06 Nos. Ref. lined Section on 01 Khal, SP Identf. sign board 2, SP Area Indication Post 2 Nos. | 2023-24
|
|
|
9.20
|
0.00
|
70.87
|
LCS
|
70.94
|
29/03/2022
|
12/04/2022
|
31/05/2022
|
95
|
60.54
|
85
|
30/11/2022
|
|
|
209
|
Naogaon
|
45
|
dhamoirhat
|
328
|
748
|
SP15224/Ghukshi WCS Subproject
|
Const. of 07 Nos. Ref. lined Section on 1 Khal, SP Area Indication Post 2 Nos. and Demarcation Post 2 Nos. | 2023-24 Ref. lined (4 nos.), Bamboo bridge (2 nos.) and SP signboard (2 nos.) Ghukshi Khal re-excavation (Ch:3500.00m - 9500.00m) 2023-24 Const. of 07 Nos. Ref. lined Section on 1 Khal, SP Area Indication Post 2 Nos. and Demarcation Post 2 Nos. 2023-24
|
|
|
9.50
|
0.00
|
122.79
|
LCS
|
122.34
|
16/02/2020
|
07/01/2024
|
28/04/2024
|
100
|
118.70
|
97
|
30/11/2022
|
|
|
210
|
Naogaon
|
45
|
dhamoirhat
|
328
|
748
|
SP15222/Titukata Khal WCS Subproject
|
Re-excavation of Tutikhali khal (7700 m - 10800 m) Ref. lined Section (4 nos.) and SP Identification signboard (2 nos.) Tutikata Khal re-excavation (Ch.0.00-7650.00m) 2023-24 Const. of 9 Nos. Ref. lined Section on 1 Khal, SP Indication Post 2 and Demarcation Post. 40 Nos. - 2023-24
|
|
|
10.75
|
0.00
|
134.81
|
LCS
|
134.41
|
19/10/2023
|
03/12/2023
|
25/04/2020
|
100
|
131.71
|
97
|
30/11/2022
|
|
|
211
|
Naogaon
|
45
|
mohadevpur
|
322
|
748
|
SP25205/Khorda Kalna Khal Subproject
|
Reference line section (4nos.) Re-excavation of Khordo Kalna Khal (Ch. 0 - 1800 m & 4140 - 6400 m) Basher Shako (4nos.) Khordo Kalna Khal re-excavation (Ch:0.00-4140m) 2023-24 Const. of 5 Nos. Ref. lined Section on 1 Khal, SP Identf. sign board 2, SP Indication Post 2 Nos. - 2023-24
|
|
|
8.20
|
0.00
|
107.52
|
LCS
|
107.51
|
24/01/2019
|
17/02/2019
|
25/04/2024
|
100
|
102.86
|
95
|
30/11/2022
|
|
|
212
|
Naogaon
|
45
|
mohadevpur
|
322
|
748
|
SP13074/Ramchandrapur FCD Subproject
|
Ramchandrapur khal re-excavation(ch.00-740m) Ramchandrapur Embankment re-sectioning(ch.00-3050m) Referenced line section(1 Nos.) Bamboo bridge(1 Nos.)
|
|
|
3.79
|
0.00
|
79.53
|
LCS
|
79.53
|
21/01/2019
|
18/02/2019
|
25/04/2019
|
100
|
77.23
|
97
|
30/11/2022
|
|
|
213
|
Naogaon
|
45
|
naogaon-s
|
329
|
748
|
SP61026/Gonga Kandipara Jindapirtala Subproject
|
Re-excavation of Zindapirtala Khal (Ch-0+000km to 1+680km) Construction of 02 Nos.Reference Lined sections on Zindapirtala Khal (Ch.1) 200, 1500m) Construction of Zindapirtala Khal Regulator (1V-1.50m X1.80m) at Ch. 0+130km of Khal Construction of Improvement of 50m approach Road on both side of Proposed Regulator at Ch. 0+130km Construction of WMCA office
|
|
|
1.68
|
2.00
|
141.03
|
OTM
|
171.60
|
29/03/2022
|
30/12/2022
|
31/05/2022
|
82
|
124.33
|
72
|
30/11/2022
|
|
|
214
|
Naogaon
|
45
|
niamatpur
|
332
|
748
|
SP25199/Pathkoil-Mohammadpur Subproject
|
Pathkoil Muhammadpur Khal re-xcavation (Ch:0.00m - 6000m) Const. of 04 Nos. Ref. lined Section on 01 Khal, SP Identf. sign board 2, SP Area Indication Post 2 Nos.
|
|
|
6.00
|
0.00
|
68.81
|
LCS
|
68.81
|
07/03/2024
|
03/04/2024
|
|
70
|
29.24
|
42
|
30/11/2022
|
|
|
215
|
Naogaon
|
45
|
niamatpur
|
332
|
748
|
SP14157/Niamatpur-Gahail WCS Subproject
|
Re-excavation of Niamatpur Gahail Khal (Ch-0+000km to 5+400km) Ref. lined section (4 nos.) and SP identification signboard &post (2 nos.)
|
|
|
5.40
|
0.00
|
82.64
|
LCS
|
82.64
|
15/10/2023
|
11/12/2023
|
|
90
|
65.35
|
79
|
30/11/2022
|
|
|
216
|
Naogaon
|
45
|
patnitala
|
327
|
748
|
SP14156/Katabari FCD Subproject
|
Katabari khal re-excavation(ch.00-2800m) Embankment re-sectioning(ch.00-1200m) Referenced line section(3 Nos.) Bamboo bridge(3 nos) Katabari Khal re-excavation (Ch.3300.00-6800.00m) 2023-24 Katabari Branch Khal re-excavation (Ch.0.00-1300.00m) 2023-24 Const. of 7 Nos. Ref. lined Section on 2 Khals, SP Identf. sign board 2, SP Indication Post 2 and Demarcation Post. 44 Nos - 2023-24
|
|
|
8.75
|
0.00
|
82.05
|
LCS
|
82.05
|
19/10/2023
|
18/12/2023
|
25/04/2019
|
95
|
66.38
|
80
|
30/11/2022
|
|
|
217
|
Naogaon
|
45
|
patnitala
|
327
|
748
|
SP14155/Abadia FCD Subproject
|
Abadia Khal Re-excavation(ch0.00-2850m) Reference Line Section (4 Nos.), Provisional Sum and Subproject Identification signboard (2 nos.) Construction of WMCA Office | 2023-24
|
|
|
2.80
|
1.00
|
49.17
|
OTM
|
47.21
|
27/01/2024
|
22/03/2020
|
30/04/2020
|
81
|
33.72
|
71
|
30/11/2022
|
|
|
218
|
Naogaon
|
45
|
shapahar
|
324
|
748
|
SP24164/Doharakhari-Tarachandkhari Subproject
|
Doharakhali Khal Re-excavation (Ch: 4740.00-6140.00) Reference Line Section (3nos.) Fruit Tree Plantation (1402 Nos.) Tarachand Khari Khal re-excavation (Ch:0.00-4000m) 2023-24 Tarachand Khari Branch Khal re-excavation (Ch:0.00-1050m) 2023-24 Const. of 7 Nos. Ref. lined Section on 2 Khals, SP Identf. sign board 2, SP Indication Post 2 Nos. 2023-24
|
|
|
6.45
|
0.00
|
150.62
|
LCS
|
150.62
|
29/05/2019
|
13/12/2023
|
30/06/2019
|
83
|
143.78
|
95
|
30/11/2022
|
|
|
219
|
Narail
|
37
|
kalia
|
268
|
748
|
SP22013/Jogania Beel Subproject
|
Re-excavation of Shitki Khal (Ch-0+00km to 4+000km) Re-excavation of Dudhkura Khal (Ch-0+000km to 1+100km) Ref. Lined Section 6 Nos. On 2 Khals, And SP Identification Signboard (2 nos.)
|
|
|
5.10
|
0.00
|
31.67
|
LCS
|
31.67
|
20/02/2022
|
10/03/2022
|
30/04/2022
|
100
|
28.42
|
89
|
30/11/2022
|
|
|
220
|
Narail
|
37
|
kalia
|
268
|
748
|
SP15326/Gachbaria Khal DR Subproject
|
Badangati Khal Re-excavation(ch0.00-800m) Kata Khal Re-excavation(ch0.00-600m) Ref. Lined Section 2 Nos. On 2 Khals, And SP Identf. Signboard (2 nos.) Construction of WMCA office building
|
|
|
1.40
|
1.00
|
35.50
|
OTM
|
33.54
|
31/01/2021
|
28/03/2021
|
15/06/2021
|
100
|
32.72
|
97
|
30/11/2022
|
|
|
221
|
Narail
|
37
|
kalia
|
268
|
748
|
SP15325/Mulasree-Pakhimara FCD Subproject
|
Mulasri Embankment re-sectioning (ch:0.00 - 1500m) Mulasri Khal re-excavation (Ch:0.00m - 1200m) Const. of 02 Nos. Ref. lined Section on 01 Khal, SP Identf. sign board 2, SP Area Indication Post 2 Nos.
|
|
|
2.70
|
0.00
|
34.37
|
LCS
|
33.64
|
15/02/2024
|
19/03/2024
|
08/05/2024
|
100
|
101.49
|
100
|
30/11/2022
|
|
|
222
|
Narail
|
37
|
lohagara
|
267
|
748
|
SP13076/Maigram FCD Subproject
|
Maigram Embankment Re-Sectioning (Ch:0.00m-1950.00m) Maigram Khal Re-excavation(ch:0.00-1450.00m) Ref. Lined Section 2 Nos. On 1 Khal And SP Identf. Signboard (2 nos.) Construction of WMCA office building
|
|
|
3.40
|
1.00
|
53.42
|
OTM
|
51.59
|
04/04/2021
|
16/11/2021
|
31/05/2021
|
100
|
33.66
|
65
|
30/11/2022
|
|
|
223
|
Narail
|
37
|
narail-s
|
266
|
748
|
SP61008/SadhuKhali Bager Khal Subproject
|
Part-A Bager khal WRS (1v-1.50mx1.0m) with Existing culvert at Ch. 2712m WMCA Office & Others Re-exacavation of Bager khal (Ch-0+300km to 3+200km) Re-exacavation of Elindir khal (Ch-0+000km to 0+583km) Re-exacavation of Bager khal Br.(Ch-0+000km to 0+265km) Reference Lined Sections (5nos.) and Sup-project Identification signboard
|
|
|
3.74
|
2.00
|
55.34
|
M/S Liton Trading
|
51.03
|
28/01/2021
|
24/10/2021
|
30/04/2022
|
100
|
50.24
|
98
|
30/11/2022
|
|
|
224
|
Narail
|
37
|
narail-s
|
266
|
748
|
SP25283/Shaikati Subproject
|
Seikhhati khal re-excavation(ch.00-1470m) Referenced line section(2 Nos.) Bamboo bridge(1 Nos.)
|
|
|
1.47
|
0.00
|
18.95
|
LCS president Nasima Begum
|
18.95
|
19/03/2019
|
31/03/2019
|
12/06/2019
|
100
|
16.50
|
87
|
30/11/2022
|
|
|
225
|
Narail
|
37
|
narail-s
|
266
|
748
|
SP25279/Bhomordia Subproject
|
Re-excavation of Bhomordia Khal (Ch-0+00km to 0+610km) Ref. Lined Section 1 Nos. On 1 Khals, And SP Identf. Signboard (2 nos.) Repair & Maintenance work of 1vent (1.5mx1.8m) Regulater -.
|
|
|
0.61
|
0.00
|
10.87
|
OTM
|
10.87
|
27/03/2022
|
13/04/2022
|
31/05/2022
|
100
|
7.18
|
66
|
30/11/2022
|
|
|
226
|
Narail
|
37
|
narail-s
|
266
|
748
|
SP25219/Debbhog-Sheikhpara Subproject
|
Debvoge khal re-excavation(ch.00-3600m) Sekhpara khal re-excavation(ch.00-1850m) Referenced line section (5 Nos.) Bamboo bridge(2 Nos.)
|
|
|
5.40
|
0.00
|
87.36
|
LCS Presodent : Md. Mizanur Mollah
Secretary :Md. Aiub Hossen
|
87.36
|
12/11/2019
|
01/03/2019
|
31/12/2020
|
75
|
52.98
|
60
|
30/11/2022
|
|
|
227
|
Narail
|
37
|
narail-s
|
266
|
748
|
SP25202/Bahirgram Subproject
|
Maintainance of Regulator (2nos.) -. Re-excavation of Bahirgram branch khal Tree Plantation (2000nos), Referenced line(6nos.), SP signboard (2nos.), Bamboo bridge (2nos).
|
|
|
2.40
|
0.00
|
49.02
|
OTM
|
47.66
|
13/11/2020
|
30/07/2020
|
31/12/2020
|
100
|
42.77
|
89
|
30/11/2022
|
|
|
228
|
Narail
|
37
|
narail-s
|
266
|
748
|
SP13067/Khatnur Beel WCS Subproject
|
Re-Excavation of Bill Katuria Khal (Ch.0+000 Km to 1+600 Km) Const. of 2 Nos. RCC Ref. lined Section on 1 Khal, SP Identf. sign board 2 Nos. and SP Indication Post 2 Nos.
|
|
|
1.60
|
0.00
|
21.26
|
LCS 1
|
21.26
|
18/04/2023
|
05/05/2023
|
30/05/2024
|
100
|
19.85
|
93
|
30/11/2022
|
|
|
229
|
Narail
|
37
|
narail-s
|
266
|
748
|
SP12038/Chanduliar Char FCD Subproject
|
Chanduliar Khal Re-excavation (Ch-0+00km to 0+500km) RCC Ref. Section 1 Nos. Repair & Maintenance work of 1vent Regulater -.
|
|
|
0.50
|
0.00
|
11.25
|
OTM
|
10.60
|
24/05/2022
|
05/09/2022
|
30/04/2023
|
100
|
4.15
|
39
|
30/11/2022
|
|
|
230
|
Natore
|
46
|
baraigram
|
330
|
748
|
SP25231/Mesoghata Beel Subproject
|
Dewya Khal Re-excavation (ch0.00-5100m) Baghmara to Narayanpur Beel Khal Re-excavation (ch0.00-1300m) Mechoghata Embankment Re-Sectioning (LS Ch: 45 m and RS 25 m), 8 RLS on 2 K. SP IS. 2Nos 2 Wire Repair on Dewya Khal (00.00 3*1.5m 1.8m Vent - 2700 2*1.5m 1.8m vent wair)
|
|
|
6.47
|
0.00
|
44.88
|
LCS
|
44.88
|
28/01/2021
|
28/02/2021
|
30/04/2021
|
100
|
43.27
|
96
|
30/11/2022
|
|
|
231
|
Natore
|
46
|
baraigram
|
330
|
748
|
SP24146/Beel Gorila Subproject
|
Re-excavation of Beel Gorila Khal (Ch 00.00-3700.00m ) Rehabilatation of WMCA Office and Rehabilatation of Beel Gorila Regulator (2V) Reference lined section (3 nos.) and SP Identification Signboard (2 nos.)
|
|
|
3.70
|
0.00
|
46.87
|
LCS
|
46.30
|
13/01/2020
|
15/04/2020
|
30/04/2021
|
100
|
45.04
|
97
|
30/11/2022
|
|
|
232
|
Natore
|
46
|
baraigram
|
330
|
748
|
SP15254/Dhulai Beel DR Subproject
|
Re-excavation of Dhulai Beel Khal Tree Plantation (2100nos.),Reference lined (3nos.), SP signboard (2nos.), Bamboo Bridge (1no, 15m)
|
|
|
2.10
|
0.00
|
39.68
|
LCS
|
39.68
|
07/11/2019
|
30/01/2020
|
30/04/2021
|
100
|
35.27
|
88
|
30/11/2022
|
|
|
233
|
Natore
|
46
|
gurudaspur
|
333
|
748
|
SP98005/Atrai River Rubber Dam Project
|
Bishani khal re-excavation(ch.00-4300m) WMCA office& pump house repair -
|
|
|
4.30
|
0.00
|
94.53
|
LCS-9
|
94.53
|
29/03/2018
|
15/04/2018
|
30/04/2019
|
100
|
91.18
|
96
|
30/11/2022
|
|
|
234
|
Natore
|
46
|
gurudaspur
|
333
|
748
|
SP62030/Chalanali Charkadah Kandipara Subproject
|
Re-excavation of Chalanali Dadua Khal. (Ch-0+000km to 9+258km) Ref. Lined Section 10 Nos. On 1 Khals, SP Identf. Signboard and SP Identf. Post Construction of Chalanali Dadua Khal WRS (4v-1.50mx1.5.00m) at Ch. 2+775m of Khal Construction of Chalanali Dadua Box Culvert (2v-3.0mx4.5m) at Ch. 1+362m of Khal. Construction of WMCA office
|
|
|
9.25
|
3.00
|
269.17
|
M/S Ideal Enterprise
|
269.17
|
21/05/2022
|
24/05/2022
|
30/10/2023
|
100
|
268.92
|
100
|
30/11/2022
|
|
|
235
|
Natore
|
46
|
gurudaspur
|
333
|
748
|
SP45196/Dighdaria Subproject
|
Maminer Khal Re-excavation (Ch: 0.00 - 1700 m) Shutigari Khal Re-excavation (Ch: 0.00 - 1100 m) Dighadaria Embankment Re-Sectioning (Ch: 0.00 - 2650 m) Reference Lined Section (5 nos.) and SP Identification Signboard (2 nos.)
|
|
|
5.45
|
0.00
|
63.22
|
LCS
|
63.22
|
15/12/2020
|
07/02/2021
|
30/05/2022
|
100
|
60.58
|
95
|
30/11/2022
|
|
|
236
|
Natore
|
46
|
natore-s
|
335
|
748
|
SP24129/Nepal Dighi Goal Dighi Subproject
|
Nepal Dighi-Goal Dighi khal re-excavation(ch.00-2300m) Maintenance of sluicegate(at ch.175m) Maintenance of WMCA Office - Referenced line section(3 Nos.) Bamboo bridge(2 Nos.)
|
|
|
2.30
|
0.00
|
62.69
|
Md. Hazrat Ali
|
62.69
|
12/09/2018
|
20/01/2019
|
30/04/2019
|
100
|
51.63
|
82
|
30/11/2022
|
|
|
237
|
Natore
|
46
|
natore-s
|
335
|
748
|
SP13070/Rampur FCD Subproject
|
Re-Excavation of Rampur Khal (Ch.0.00m to 2100m) Repair of Rampur Regulator (1 Vent-1.50mX1.50m), Construction of 03 Nos. RCC Reference Lined sections on 1 Khal, Sub-Project Identification Sign Board (2Nos.) and Sub-Project Indication Post (2Nos.)
|
|
|
2.10
|
0.00
|
18.80
|
LCS
|
18.80
|
05/12/2022
|
22/02/2023
|
30/04/2023
|
100
|
17.46
|
92
|
30/11/2022
|
|
|
238
|
Natore
|
46
|
singra
|
345
|
748
|
SP61022/Ramananda Khajura Subproject
|
Re-excavation of Ramananda Khal (Ch-0+000km to 5+775km) Ref. Lined Section 6 Nos. On 1 Khals, And SP Identf. Signboard (2 nos.) Construction of Ramananda Khal WRS (3v-1.50mx2.00m) at Ch. 2+500m of Khal. Construction of Rcc Drainage Culvent (1v-2.00mx2.00m)at Ch. 4+800m of Khal Construction of WMCA office
|
|
|
5.77
|
3.00
|
186.12
|
OTM
|
191.80
|
08/02/2022
|
30/05/2022
|
30/04/2022
|
75
|
158.81
|
82
|
30/11/2022
|
|
|
239
|
Pabna
|
49
|
atghoria
|
342
|
748
|
SP43028/Sapdanga Khal Subproject
|
Sapdanga Khal re-excavation (Ch:0.00 - 5050m) Const. of 05 Nos. Ref. lined Section on 1 Khal, SP Identf. sign board 2, SP Area Indication Post 2 Nos.
|
|
|
5.05
|
0.00
|
28.46
|
LCS
|
28.46
|
20/11/2023
|
27/11/2023
|
|
100
|
22.70
|
79
|
30/11/2022
|
|
|
240
|
Pabna
|
49
|
bera
|
343
|
748
|
SP62037/Dayarampur Gopselenda Khal Subproject
|
Re-excavation of Dyarampur Khal (Ch. 0+000 to Ch. 0+430km), Const. of RCC Reference lined Section Doyarampur Khal (Ch.0+100km), SP Identification Sign board at a Suitable place and SP Indicatory Post at a Suitable place Construction of Doyarampur Gopsalenda Khal Regulator (2V-1.5m X 1.8m)
|
|
|
0.43
|
1.00
|
104.25
|
OTM
|
107.32
|
29/12/2022
|
08/01/2023
|
|
81
|
82.30
|
76
|
30/11/2022
|
|
|
241
|
Pabna
|
49
|
chatmohar
|
344
|
748
|
SP14195/Kurulia Beel FCD Subproject
|
Vadra sluicegate -Mosharaf Hossener Dip mechine porjonto(ch.00-2100m)
|
|
|
2.10
|
0.00
|
29.92
|
LCS
|
29.92
|
29/03/2018
|
10/04/2018
|
31/05/2018
|
100
|
25.00
|
83
|
30/11/2022
|
|
|
242
|
Pabna
|
49
|
santhia
|
385
|
748
|
SP15255/Chinanary-Bhitapara DR & WCS Subproject
|
Chinanary-Bhitapara khal re-excavation(ch.2200-3100m) Wire repair work -.
|
|
|
0.90
|
0.00
|
32.18
|
LCS
|
32.18
|
29/03/2018
|
10/04/2018
|
31/05/2018
|
100
|
25.00
|
77
|
30/11/2022
|
|
|
243
|
Pabna
|
49
|
sujanagar
|
384
|
748
|
SP42027/Nuruddin Khal Subproject
|
Re-excavation of Nuruddin Khal (ch0.00-2400m) Referenced line section (3nos.) and Bamboo bridge (3nos.) Tree Plantation (2400nos.) and Subproject Identification Signboard (2nos.)
|
|
|
2.40
|
0.00
|
48.55
|
LCS
|
48.55
|
13/11/2019
|
26/01/2020
|
31/03/2020
|
100
|
37.81
|
77
|
30/11/2022
|
|
|
244
|
Patuakhali
|
1
|
bauphal
|
19
|
748
|
SP43058/Shabupura Khal Subproject
|
Re-excavation of Fultala Khal-1 (Ch-0+00km to 1+600km) Re-excavation of Fultala Khal-2 (Ch-0+000km to 1+800km) Re-excavation of Fultala Khal-3 (Ch-0+000km to 0+820km) Re-excavation of Fultala Khal-4 (Ch-0+000km to 0+500km) Re-excavation of Uttar Raj Nagar Khal (Ch-0+000km to 1+400km) Re-excavation of Gazi Hota-2 Khal (Ch-0+000km to 1+100km) Ref. Lined Section 13 Nos. On 6 Khals, And SP Identf. Signboard (2 nos.) Rehabilitation of WMCA Office -
|
|
|
7.22
|
0.00
|
71.76
|
MD. KHOKON SHIKDAR
|
71.27
|
22/06/2022
|
25/07/2022
|
30/04/2022
|
100
|
70.90
|
100
|
30/11/2022
|
|
|
245
|
Patuakhali
|
1
|
bauphal
|
19
|
748
|
SP43050/Moddah-Purba Rajapur Subproject
|
Shikhol Gara Khal Re-excavation(ch0.00-2500m) Kumar Khali Branch Khal Re-excavation(ch0.00-2100m) Hisbullah Khal Re-excavation(ch0.00-1380m) Dighir Par Khal Re-excavation(ch0.00-900m) Souder Khal Re-excavation(ch0.00-500m) Thakur Bari Khal Re-excavation(ch0.00-500m) Ref. Lined Section 12 Nos. On 6 Khals, And SP Identf. Signboard (2 nos.) Maintenace of WMCA office building -
|
|
|
7.88
|
0.00
|
71.29
|
Shidul rahaman/Farjana
|
70.93
|
31/01/2021
|
26/07/2021
|
30/04/2022
|
100
|
69.03
|
97
|
30/11/2022
|
|
|
246
|
Patuakhali
|
1
|
bauphal
|
19
|
748
|
SP41005/Kanakdia FMD Subproject
|
Re-Sectioning of Kanadia Embankment(Ch.0+000 Km to 7+750 Km) Re-Excavation of Amirabad Khal (Ch.0+000 Km to 2+750 Km) Re-Excavation of Narayanpasha Branch Khal (Ch.0+000 Km to 1+200 Km) Re-Excavation of Dakual Khal (Ch.0+000 Km to 0+600 Km) Const. of 6 Nos. Reference Lined on 3 Khals, SP Identification sign board 2 Nos. and SP Indication Post 2 Nos.
|
|
|
12.30
|
0.00
|
111.86
|
LCS-08
|
111.86
|
28/02/2023
|
05/03/2023
|
30/05/2023
|
100
|
110.11
|
98
|
30/11/2022
|
|
|
247
|
Patuakhali
|
1
|
bauphal
|
19
|
748
|
SP22027/Dhulia Subproject
|
Dhulia Embankment re-sectioning(ch:350.00 - 2400m, 4870m - 6250m and 11300m - 12790m), Const. SP Identf. sign board 2 Nos. and SP Area Indication Post 2 Nos. Rehabi. of 2Nos Regulator (1v-1.50mx1.50m) on Mondal bari Khal At Ch-12+809Km (emb) and Patuakhali Khal At ch.19+204Km (emb) Rehabi. 1No Regulator (1v-1.50mx1.50m) on Rabaiyer Bazer Khal At Ch-2+850 Maint. of WMCA Office
|
|
|
4.92
|
0.00
|
74.99
|
OTM
|
74.99
|
17/01/2024
|
|
|
22
|
32.54
|
43
|
30/11/2022
|
|
|
248
|
Patuakhali
|
1
|
bauphal
|
19
|
748
|
SP15345/Rajapur Patilapara FCD Subproject
|
Rajapur-Patilapara Embankment re-sectioning(ch:0.00 - 1000m and 2700m - 3250m) Rajapur Khal re-excavation (Ch:0.00 - 1600m) Kachabunia Khal re-excavation (Ch:0.00 - 450m) Burir Khal re-excavation (Ch:0.00 - 1700m) Rajapur Branch Khal re-excavation (Ch:0.00 - 1180m) Mahish Barir Khal re-excavation (Ch:0.00 - 1250m) Const. of 09 Nos. Ref. lined Section on 5 Khals, SP Identf. sign board 2, SP Area Indication Post 2 Nos. Rehabilitation of Regula. (1V-1.5m x 1.5) on Burir khal, Rehabilitation of 2Nos Regu. (2V-1.5m x 1.5) on Rajapur Branch & Kalia Barir khal, Rehabi. of 2Nos Regulator (1V-1.5m x 1.5) on Arinow & Patilapara Khal
|
|
|
7.73
|
0.00
|
79.46
|
M/S Mohiuddin Ahmed
|
78.05
|
14/11/2023
|
30/01/2024
|
30/04/2024
|
87
|
61.15
|
78
|
30/11/2022
|
|
|
249
|
Patuakhali
|
1
|
bauphal
|
19
|
748
|
SP14194/Anarashia FCD Subproject
|
Rehebilitation of 2Nos Regulator (Size 1V-1.50mX1.80m.) at ch. 5680m & ch. 6530m on Meser Khal. Rehebilitation of 3Nos Pipe Sluice (Size 1V-900mm) at ch. 200m on Betaler khal-1, ch.3235m on Betaler khal-2 & ch. 4125m on Meser Khal. Rehebilitation of 1No. Regulator (Size 2V-1.50mX1.50m.) at ch. 200m on Betaler khal-2 Re-excavation of Betaler Khal-2 (Ch-0+000km to 1+950km) Re-excavation of Betaler Khal-1 (Ch-0+000km to 1+650km) Re-excavation of Meser Khal (Ch-0+000km to 0+750km) Re-excavation of Bausar Khal (Ch-0+000km to 0+500km) Re-excavation of Bangar Khal (Ch-0+000km to 0+500km) Ref. Lined Section 8 Nos. On 5 Khals, And SP Identf. Signboard (2 nos.)
|
|
|
168.70
|
0.00
|
67.76
|
M/S Mohiuddin Ahmed
|
66.64
|
28/11/2023
|
20/02/2024
|
30/04/2024
|
97
|
63.34
|
95
|
30/11/2022
|
|
|
250
|
Patuakhali
|
1
|
bauphal
|
19
|
748
|
SP14192/Char Roy Shaheb FCD Subproject
|
Char Alji Khal Re-excavation(ch: 0.00-1900 m) Char Kachua Khal Re-excavation(ch: 0.00-650 m) Char Roy Shaherb Embankment Re-sectioning (Ch: 5035 - 13550 m) Reference Lined Section (4 nos.) and SP Identification Signboard (2 nos.) WMCA Office Construction, Electrification Works and Furniture Supply Regulator Repair of Char Kachua Khal -. Regulator Repairs of Dakshin Char Mizan Khal -. Regulator Repairs of Char Alji Khal -.
|
|
|
11.06
|
1.00
|
121.99
|
Presideny:Sohel Rana
Secretary:Mahinur
|
119.36
|
28/11/2020
|
23/02/2021
|
30/04/2021
|
96
|
114.14
|
95
|
30/11/2022
|
|
|
251
|
Patuakhali
|
1
|
galachipa
|
1
|
748
|
SP62053/Guabaria Subproject
|
Re-excavation of Paschim Guabaria Khal (Ch.0+000 to Ch. 3+887 km) Re-excavation of Taltalir Khal (Ch. 0+000 to Ch. 2+207 km) Re-excavation of Puraba Guabaria Khal (Ch.0+000 to Ch. 2+002 km) Re-excavation of Lamnar Khal (Ch. 0+000 to Ch. 1+180 km) Const. of 9 Nos. Ref. lined Section, SP Identification Signboard and Post 2 Nos. and Demarcation Post 22 Nos. Construction of WMCA office
|
|
|
9.27
|
1.00
|
152.11
|
Md.Mohibul Islam
|
149.78
|
27/03/2023
|
28/03/2023
|
30/05/2024
|
96
|
128.22
|
85
|
30/11/2022
|
|
|
252
|
Patuakhali
|
1
|
galachipa
|
1
|
748
|
SP61018/Uttar Char Bishwas Subproject
|
Re-exacavation of Annir Khal (Ch-0+00km to 8+568km) Re-excavation of Char Agosthi Khal (Ch-0+00km to 6+215km) Re-excavation of Modon Hawlader Barir Khal (Ch-0+000km to 2+472km) Ref. Lined Section 19 Nos. On 3 Khals, And SP Identf. Signboard (2 nos.) Construction of WMCA office building
|
|
|
17.25
|
1.00
|
207.38
|
M/S Ayan Enterprise
|
205.65
|
26/12/2021
|
27/03/2022
|
30/04/2022
|
100
|
199.26
|
96
|
30/11/2022
|
|
|
253
|
Patuakhali
|
1
|
mirjaganj
|
13
|
748
|
SP62048/Madhya Amragachia Subproject
|
Re-excavation of Bebajia Khal (Ch. 0+000 to Ch. 3+000 km) Re-excavation of Ruitar Khal (Ch. 0+000 to Ch.1+885 km) Re-excavation of Daser Danga Khal (Ch. 0+000 to Ch. 2+256 km) Re-excavation of Molla Barir Khal (Ch. 0+000 to Ch. 1+550 km) Re-excavation of Thakurer Khal (Ch. 0+000 to Ch. 1+710m) Re-excavation Nizam Alir Khal (Ch. 0+000 to Ch. 2+800m) Const. of 14 Nos. Ref. lined Section, SP Indentification signboard and Post 2 Nos. and Demarcation Post 48 Nos. Construction of WMCA office Construction of Thakurer Khal Box culvert (2v-2.80m x 3.70m) at ch.0+625km | 2023-24 Construction of Ruiter Khal Box culvert (1v-3.5m x 3.70m) at ch.0+400km | 2023-24 Construction of Ruiter Khal Box culvert (1v-3.5m x 3.70m) at ch.1+885km | 2023-24
|
|
|
13.20
|
4.00
|
209.04
|
OTM
|
206.70
|
27/03/2023
|
28/03/2023
|
30/05/2023
|
72
|
126.79
|
61
|
30/11/2022
|
|
|
254
|
Patuakhali
|
1
|
mirjaganj
|
13
|
748
|
SP61013/Dakkhin Amragachhia Subproject
|
Re-excavation Gawatala Char Khal (Ch-0+000km to 0+930km) Re-excavation of Napiter Khal (Ch-0+000km to 1+440km) Re-excavation of Hashemer khal (Ch-0+00km to 0+615km) Re-excavation of Jugir khal (Ch-0+000km to 0+915km) Re-exacavation of Kamarer Khal (Ch-0+000km to 1+374km) Re-excavation of Purbo Awra to Pashim Awra khal (Ch-0+000km to 2+800km) Re-excavation of Uttar Awra Mongoler khal (Ch-0+000km to 2+775km) Ref. Lined Section 13 Nos. On 7 Khals, And SP Identf. Signboard (2 nos.) Construction of WMCA office building Const. of Gawatala Khal Box culvert (2v-3.00mx3.50m) at ch.0+010km | 2023-24
|
|
|
10.82
|
2.00
|
135.07
|
OTM
|
133.08
|
22/02/2022
|
27/03/2022
|
30/04/2022
|
90
|
104.37
|
78
|
30/11/2022
|
|
|
255
|
Patuakhali
|
1
|
mirjaganj
|
13
|
748
|
SP25210/Deuli-Subidkhali Subproject
|
Golkhali Branch Khal re-xcavation (Ch:0.00m - 3000.00m) 2023-24 Charer Khal re-xcavation (Ch:0.00m - 2300.00m) 2023-24 Const. of 07 Nos. Ref. lined Section on 02 Khals, SP Identf. sign board 2, SP Area Indication Post 2 Nos. | 2023-24
|
|
|
5.30
|
0.00
|
48.73
|
LCS-3
|
48.73
|
16/05/2024
|
10/06/2024
|
|
25
|
12.16
|
24
|
30/11/2022
|
|
|
256
|
Patuakhali
|
1
|
patuakhali-s
|
14
|
748
|
SP62050/Saula Subproject
|
Re-excavation of Bhayalar Khal (Ch. 0+000 to Ch. 1+166 km) Re-excavation of Bhuria Khal (Ch. 0+000 to Ch. 2+210 km) Re-excavation of Biler Bari Khal (Ch. 0+000 to Ch. 2+600 km) Re-excavation of Biler Bari Br. Khal (Ch. 0+000 to Ch. 0+387 km) Re-excavation of Boyati Bari Khal (Ch. 0+000 to Ch. 0+880m) Re-excavation of Saula Sikdar Bari Khal (Ch. 0+000 to Ch. 1+160m) Const. of 09 Nos. Ref. Lined Section and SP Identification Signboard Construction of WMCA office
|
|
|
8.40
|
1.00
|
159.72
|
Md.Mohibul Islam
|
155.87
|
27/03/2023
|
28/03/2023
|
30/05/2023
|
100
|
153.93
|
98
|
30/11/2022
|
|
|
257
|
Patuakhali
|
1
|
patuakhali-s
|
14
|
748
|
SP44143/Hetalia-Ballabhpur Khal Subproject
|
Re-excavation of Hetalia Khal (Ch: 0 m to 2076 m) Re-excavation of Dudhar Khal (Ch: 0 m to 1160 m) Re-excavation of Poshurbunia Khal (Ch: 0 m to 1450 m) Re-excavation of Bausar Khal (Ch: 0 m to 1235 m) Re-excavation of Bahalgachia Khal (Ch: 0 m to 1150 m) Ref line section (5 nos. ) and SP signboard (2 nos.) Charabunia Switch to Miya Bari Ballavpur Khal re-xcavation (Ch:0.00m - 2800.00m) 2023-24 Wazid Bari Katakhali Khal re-xcavation (Ch:0.00m - 2800.00m) 2023-24 Kalam Gazi to Bahalgachiya Bharania Khal re-xcavation (Ch:0.00m - 1800.00m) 2023-24 Const. of 08 Nos. Ref. lined Section on 03 Khals, SP Identf. sign board 2, SP Area Indication Post 2 Nos. | 2023-24
|
|
|
14.47
|
0.00
|
110.01
|
pesident:Mst.Nur-Jahan Begum
Secretary:Md.Yousuf monsi
|
109.98
|
31/03/2024
|
31/03/2024
|
31/05/2024
|
100
|
108.56
|
98
|
30/11/2022
|
|
|
258
|
Patuakhali
|
1
|
patuakhali-s
|
14
|
748
|
SP15316/Bhagirabad-Jainkathi FCD Subproject
|
Kalibari khal re-excavation(ch.00-800m) Referenced line section((2 Nos.) Bamboo bridge((1 Nos.) Embankment re-sectioning(ch.00-1800m)
|
|
|
2.60
|
0.00
|
51.85
|
LCS
|
51.85
|
25/09/2018
|
08/01/2019
|
30/09/2019
|
100
|
49.56
|
95
|
30/11/2022
|
|
|
259
|
Patuakhali
|
1
|
patuakhali-s
|
14
|
748
|
SP15266/Barabighai DR Subproject
|
Chakar Bari Khal Re-excavation(ch0.00-2500m) Katakhali Khal Re-excavation(ch0.00-1650m) Shadhu Akan Khal Re-excavation(ch0.00-2000m) Shedam Gain Khal Re-excavation(ch0.00-950m) Titkata Khal Re-excavation(ch0.00-1550m) Ref. Lined Section 8 Nos. On 5 Khals, And SP Identf. Signboard (2 nos.)
|
|
|
8.65
|
0.00
|
76.16
|
Sohidul/Nasima
|
76.16
|
27/01/2021
|
27/03/2021
|
30/04/2021
|
100
|
70.72
|
92
|
30/11/2022
|
|
|
260
|
Patuakhali
|
1
|
patuakhali-s
|
14
|
748
|
SP15265/Pairakunja FCD Subproject
|
Embankment Re-exca (Ch: 500 - 3227 m, 5600 - 7100 m and 8800 - 10800 m ) 2 SP Identifying Board Repair of Galachipa Khal Regulator (3 Vent) -. Repair of Durgapur Khal Regulator (2 Vent) -. Repair of Kurir Khal Regulator (2 Vent) -. Repair of Hala BashKhali Khal Pipe Sluice (1 Vent) -. Repair of Golabunia Khal Pipe Sluice (1 Vent) -. Durgpur Khal re-xcavation (Ch:0.00m - 2200.00m) 2023-24 Gilabuni Khal re-xcavation (Ch:0.00m - 2050.00m) 2023-24 Eitbaria Khal re-xcavation (Ch:0.00m - 2000.00m) 2023-24 Lakshmipur Shiri Khali Khal re-xcavation (Ch:0.00m - 1600.00m) 2023-24 Const. of 10 Nos. Ref. lined Section on 04 Khals, SP Area Indication Post 2 Nos. | 2023-24 Cons. of Pipe Sluice (1V- 600m dia at Ch. 9+110 km of Embankment.) & Cons. of Pipe Sluice (1V-600m dia at Ch. 10+800 km of Embankment.) 2023-24
|
|
|
14.07
|
1.00
|
219.19
|
President:mokbul hossain
Secretary:ali akbor mirrida
|
199.24
|
28/10/2020
|
28/12/2020
|
30/04/2021
|
60
|
153.45
|
77
|
30/11/2022
|
|
|
261
|
Patuakhali
|
1
|
patuakhali-s
|
14
|
748
|
SP13104/Barobigha Mollabari FCD Subproject
|
Embankment Re-Sectioning (Ch: 1320.00m-5500.00 m)
|
|
|
4.18
|
0.00
|
84.55
|
syed Nurul Islam/Md Kobir Uddin
|
84.55
|
14/02/2021
|
27/03/2021
|
30/04/2021
|
100
|
83.45
|
98
|
30/11/2022
|
|
|
262
|
Patuakhali
|
1
|
patuakhali-s
|
14
|
748
|
SP13103/Hetalia-Madarbunia FCD Subproject
|
Patabunia khal re-excavation(ch.00-2200m) Meser Mollar khal re-excavation(ch.00-1000m) Hetalia embankment re-sectioning(ch.1000-4000m) Referenced line section(4 Nos.) WMCA Office and Others Bamboo bridge(2nos)
|
|
|
6.20
|
1.00
|
127.46
|
Md.Kholil Kazi/Abu Hawlader
|
126.28
|
19/03/2019
|
25/07/2019
|
30/04/2019
|
100
|
125.65
|
100
|
30/11/2022
|
|
|
263
|
Pirojpur
|
3
|
bhandaria
|
35
|
748
|
SP15322/Harinpala FCD Subproject
|
Paddha branch khal -1(ch.00-900m) Embankment re-sectioning(ch.700-2250m) Referenced line section(2 Nos.) Bamboo bridge(1 Nos.) Ruhita Khal re-xcavation (Ch:0.00m - 1350.00m) 2023-24 Padma Branch-2 Khal re-xcavation (Ch:0.00m - 950.00m) 2023-24 Master Khal re-xcavation (Ch:0.00m - 900.00m) 2023-24 Const. of 04 Nos. Ref. lined Section on 03 Khals, SP Identf. sign board 2, SP Area Indication Post 2 Nos. | 2023-24
|
|
|
5.65
|
0.00
|
82.66
|
Mrs Kohinur
|
82.66
|
13/03/2024
|
31/03/2024
|
30/04/2019
|
93
|
63.61
|
76
|
30/11/2022
|
|
|
264
|
Pirojpur
|
3
|
bhandaria
|
35
|
748
|
SP15271/Matibhanga DR Subproject
|
Re-excavation of Rustam Member er Barir Khal (Ch: 0.00 - 1.8 km) Re-excavation of Shatkona Maddho Malar Khal (Ch: 0.00 m - 950 m) Re-excavation of Patlakhali Shikhdar Barir Khal (Ch: 0.00 - 1.7 km) Re-excavation of Gazi Panchayet Khal (Ch: 0.00 - 1.2 km) Reference Lined Section (10 nos.), SP Identification Signboard (2 nos.) and Provisional Sum. Construction of WMCA Office (Semi pacca)
|
|
|
5.65
|
1.00
|
84.48
|
LCS
|
81.75
|
11/02/2020
|
09/02/2021
|
26/04/2021
|
100
|
77.73
|
95
|
30/11/2022
|
|
|
265
|
Pirojpur
|
3
|
indurkani
|
3
|
748
|
SP13075/Balipara FCD Subproject
|
WMCA Office and Others
|
|
|
0.00
|
1.00
|
20.45
|
OTM
|
18.40
|
23/11/2020
|
03/02/2021
|
|
85
|
13.42
|
72
|
30/11/2022
|
|
|
266
|
Pirojpur
|
3
|
indurkani
|
3
|
748
|
SP13069/Saidkhali FCD Subproject
|
Re-excavation of Kanchar Khal (Ch-0+00km to 2+000km) Re-excavation of DhepshaBunia Khal (Ch-0+000km to 3+100km) Ref. Lined Section 7 Nos. On 2 Khals, And SP Identf. Signboard (2 nos.)
|
|
|
5.10
|
0.00
|
59.76
|
LCS
|
59.76
|
20/02/2022
|
16/05/2022
|
30/06/2022
|
100
|
55.89
|
93
|
30/11/2022
|
|
|
267
|
Pirojpur
|
3
|
kawkhali
|
36
|
748
|
SP12019/Nilty-Chirapara FCD Subproject
|
Kachari Barir Khal re-excavation(ch00-2950m) Kumar Barir Khal re-excavation(ch00-1650m) Kesta Khal re-excavation(ch00-630m) Referenced line section(6 Nos.) Bamboo Bridge(6 Nos.)
|
|
|
5.23
|
0.00
|
83.41
|
Siddikkur
|
83.41
|
27/03/2019
|
05/02/2020
|
30/04/2020
|
100
|
76.43
|
91
|
30/11/2022
|
|
|
268
|
Pirojpur
|
3
|
mothbaria
|
37
|
748
|
SP62034/Gulbunia Pashuria Subproject
|
Re-excavation of Pashuria Khal (Ch.0+000 to Ch. 2+028km) Re-excavation of Pashuria Br. Khan (Ch.0+000 to Ch. 1+020 km) Re-excavation of Dhupati Khal (Ch.0+000 to Ch.1+390km) Cons. of Lined sections 4 Nos. on 3 Khal, SP Identification Signboard 2 Nos. & Posts 2Nos Construction of WMCA office
|
|
|
4.43
|
1.00
|
51.82
|
OTM
|
49.66
|
25/10/2022
|
27/02/2023
|
08/09/2023
|
83
|
41.08
|
82
|
30/11/2022
|
|
|
269
|
Pirojpur
|
3
|
mothbaria
|
37
|
748
|
SP61007/Fuljhuri Patakata DR Subproject
|
Re-exacavation of Gorar Part-1 khal (Ch-0+700km to 1+500km) Re-exacavation of Gorar Part-2 Khal (Ch-0+000km to 1+300km) Re-exacavation of Gorar Branch khal (Ch-0+000km to +320km) Re-exacavation of Bouser khal (Ch-0+000km to 2+671km) Re-exacavation of Bouser Branch khal (Ch-0+000km to 0+600km) Re-exacavation of Fuljuri khal (Ch-0+000km to 1+480km) Re-exacavation of Gazir khal (Ch-0+000km to 2+250km) Re-exacavation of Gazir Branch khal (Ch-0+000km to 1+050km) Re-exacavation of Naya khal (Ch-0+000km to 0+850km) Re-exacavation of Dhupar khal (Ch-0+000km to 0+775km) Ref. Lined Section 15 Nos. On 10 Khals, And SP Identf. Signboard (2 nos.) Construction of WMCA Office Building-(A), Office furniture-(B), Electification works-(C)
|
|
|
12.09
|
1.00
|
117.16
|
OTM
|
115.08
|
01/03/2021
|
23/08/2021
|
30/05/2021
|
100
|
113.25
|
98
|
30/11/2022
|
|
|
270
|
Pirojpur
|
3
|
mothbaria
|
37
|
748
|
SP42022/Sapleza Subproject
|
Re-Excavation of Vaizora Akon Barir Khal (Ch.0+000 Km to 2+350 Km) Re-Excavation of Purba Shapleza Khal (Ch.0+700 Km to 2+200Km) Re-Excavation of Naptar Khal (Ch.0+000km to 2+150km) Re-Excavation of Vaizora Akon Barir Branch Khal (Ch.0+000km to 1+350km) Const. of 11 Nos. Reference Lined on 4 Khals, SP Identification sign board 2 Nos. and SP Indication Post 2 Nos.
|
|
|
8.05
|
0.00
|
66.68
|
LCS
|
66.68
|
05/02/2023
|
13/03/2023
|
|
74
|
51.10
|
76
|
30/11/2022
|
|
|
271
|
Pirojpur
|
3
|
mothbaria
|
37
|
748
|
SP14205/Rajarhat-Mirukhali FCD Subproject
|
Re-Excavation of Ruwer Khal (Ch.0+000 Km to 2+600 Km) Re-Excavation of Chandmia Khal (Ch.0+700 Km to 2+600 Km) Re-Excavation of Basha-Bari Khal (Ch.0+000 Km to 1+000 Km) Re-Sectioning of Bazarhat Mirukhali Embankment (Ch.0+000 Km to 2+990 Km) Const. of 6 Nos. Ref. lined Section on 3 Khals, SP Identf. sign board 2, SP Indication Post 2 and Demarcation Post. 8 Nos.
|
|
|
8.49
|
0.00
|
57.38
|
LCS
|
57.38
|
20/02/2023
|
13/03/2023
|
|
81
|
43.21
|
75
|
30/11/2022
|
|
|
272
|
Pirojpur
|
3
|
mothbaria
|
37
|
748
|
SP14134/Tushkhali FCD Subproject
|
Re-excavation Bashguria Khal (ch. 0 - 7290 m) Reference line section (8nos.) Basher Shako (8nos.)
|
|
|
7.29
|
0.00
|
51.72
|
palas Das
|
51.72
|
27/01/2019
|
10/03/2019
|
30/05/2019
|
100
|
46.46
|
89
|
30/11/2022
|
|
|
273
|
Pirojpur
|
3
|
nazirpur
|
11
|
748
|
SP62036/Joypur FCD Subproject
|
Re-Excavation of Katakhali Khal (Ch.0+000 Km to 2+200 Km) Re-Excavation of Modniya Khal (Ch.0+000 Km to 0+775Km) Re-Excavation of Uttar Joypur Hazra Bari Khal (Ch.0+000km to 0+375km) Re-Excavation of Uttar Mridha Bari Khal (Ch.0+000km to 1+000km) Re-Excavation of Uttar Joypur Varanir Khal (Ch.0+000km to 1+725km) Re-Excavation of Bewlbadan Khal (Ch.0+000km to 2+900km) Re-Excavation of Sikder Barir Sanjog Khal (Ch.0+000 km to 1+950km) Re-Excavation of Sikder Barir Khal (Ch.0+000km to 0+800 km) Re-Excavation of Sikder Bari Branch Khal (Ch.0+000km to 0+200km) Cons. of Lined sections 17 Nos. on 3 Khal, SP Identification Signboard 2 Nos. & Posts 2Nos Construction of WMCA office
|
|
|
11.92
|
1.00
|
133.45
|
OTM
|
131.37
|
13/11/2022
|
27/02/2023
|
28/04/2023
|
98
|
120.98
|
92
|
30/11/2022
|
|
|
274
|
Pirojpur
|
3
|
nesarabad
|
28
|
748
|
SP42023/Jalabaria Subproject
|
Khairati Barir Kandir Khal re-xcavation (Ch:0.00m - 1100m) Dilip Haldar Barir Khal re-xcavation (Ch:500m - 1500m) Pantashalar Branch Khal re-xcavation (Ch:0.00m - 900m) Mridha Bharani Khal re-xcavation (Ch:0.00m - 1300m) Mridha Branch Khal re-xcavation (Ch:0.00m - 300m) Thakur Barir Bharani Khal re-xcavation (Ch:0.00m - 650m) Idbar Barir Khal re-xcavation (Ch:0.00m - 950m) Const. of 12 Nos. Ref. lined Section on 07 Khals, SP Identf. sign board 2, SP Area Indication Post 2 Nos.
|
|
|
6.20
|
0.00
|
85.52
|
LCS
|
85.51
|
22/02/2024
|
19/03/2024
|
|
81
|
59.71
|
69
|
30/11/2022
|
|
|
275
|
Pirojpur
|
3
|
pirojpur-s
|
9
|
748
|
SP14132/Sariktala-Dumurtala FCD Subproject
|
Goborkhana branch khal re-excavation(ch.00-2600m) Monpasha khal re-excavation(ch.00-2430m) Nager khal re-excavation(ch.00-1940m) Referenced line section(9 Nos.) Bamboo bridge(6 Nos.) WMCA Office
|
|
|
6.97
|
1.00
|
127.61
|
Tapon Saha
|
126.60
|
03/11/2018
|
05/02/2019
|
30/04/2019
|
100
|
124.48
|
98
|
30/11/2022
|
|
|
276
|
Rajshahi
|
48
|
charghat
|
365
|
748
|
SP14143/Barkatpur Baladiar DR Subproject
|
Borkotpur-Baladia khal re-excavation(ch.1000-2300m) Referenced line section(2 Nos.) Bamboo bridge(2 Nos.)
|
|
|
1.30
|
0.00
|
23.94
|
LCS-7
|
23.94
|
10/03/2019
|
08/04/2019
|
30/04/2019
|
100
|
22.17
|
92
|
30/11/2022
|
|
|
277
|
Rajshahi
|
48
|
godagari
|
338
|
748
|
SP25236/Baliaghata Subproejct
|
Construction of RCC Pumping Platform near Mohananda River (1no), Small Size Pumping Platfrom (2nos.) Construction of RCC Over Head Tank near Ajram Pond. Re-Construction of 1-500mm dia UPVC Buried Pipe Lines, FF1 Line From Ch.(1343m to1483 m) Construction of 1-315mm UPVC Buried Pipe Line,NO line From Ch.(0.0 to 1550 m) Construction of 1-250mm dia UPVC Buried Pipe Branch Lines OP From Ch.(1550 m+1920 m) Construction of 1-250mm dia UPVC Buried Pipes Branch Lines PP2 From Ch.(1920 m+2720 m) Construction of 1-250mm dia UPVC Buried Pipes Branch Lines OQ From Ch.(1550 m+1870 m) Construction of 1-250mm dia UPVC Buried Pipes Branch Lines QQ2 From Ch.(1870 m+2670 m) Non-Tender Items: 125mm Brick Work, Supplying, Fitting, Fixing MS grills
|
|
|
0.00
|
0.00
|
201.51
|
Borsa enter prize & Rithin Enter Prize
|
185.65
|
05/02/2020
|
14/12/2020
|
10/10/2021
|
100
|
185.65
|
100
|
30/11/2022
|
|
|
278
|
Rajshahi
|
48
|
godagari
|
338
|
748
|
SP25235/Kashimpur CAD Sub-project
|
Re-Construction of 1-500mm dia UPVC Buried Pipe C-D-E-F Line From (Ch: 0.00m-1236.00m.) Construction of RCC Open Branch Canal BR-5 from (Ch: 0.00m-450.00m.) Project Identification Signboard. Const. of Laying 1-450mm dia Upvc Buried Pipe Branch Canal-1, line C-C4-1 from RCC Sump to Header Tank Near Asmail Land). Length= 1350m - 2023-24 Const. of Laying 1-250mm dia Upvc Buried Pipe Branch Line C4-C5 (Asmail Land to South side). Length= 300m - 2023-24 Const. of RCC Open Irrigation Canal Line C-D (0.50m X 0.50m) (South side of Existing RCC Sump). Length= 280m. & Sump Extension - 2023-24
|
|
|
0.00
|
0.00
|
243.25
|
OTM
|
218.93
|
28/10/2020
|
25/04/2024
|
28/06/2022
|
50
|
117.99
|
53
|
30/11/2022
|
|
|
279
|
Rajshahi
|
48
|
godagari
|
338
|
748
|
SP25227/Hatnabad Subproject
|
Construction of RCC Irrigation Open Canal Line: B-B1 From Ch.0+000 km to 0+150 km Construction of RCC Irrigation Open Canal Line: C1-C2 From Ch.0+000 km to 0+110 km. Plastering & Bottom Patent Stone of Brick Main and Plastering & Bottom Patent Stone & Vertical Extension Brick Branch Canal Line: E-F from Ch.0+500 km to 685 km Construction of RCC Irrigation Open Canal Line: F-F1 From Ch.0+000 km to 0+150 km. Laying of 1-250mm Dia Upvc Buried Pipe Line: G-G1 from Ch. 0+000 km to 0+700 km Laying of 1-250mm Dia Upvc Buried Pipe Line: G-G2 from Ch. 0+000 km to 0+150 km Laying of 2-280mm Dia Upvc Buried Pipe Line: G-H from Ch. 0+000 km to 1+650 km Laying of 1-250mm Dia Upvc Buried Pipe Line: H-H1 from Ch. 0+000 km to 0+500 km Laying of 1-250mm Dia Upvc Buried Pipe Line: H-H2 from Ch. 0+000 km to 0+650 km Laying of 1-250mm Dia Upvc Buried Pipe Line: H-H3 from Ch. 0+000 km to 0+380 km Laying of 1-250mm Dia Upvc Buried Pipe Line: H-H4 from Ch. 0+000 km to 0+300 km Construction of Brick Header Tank ( 3.60m x 3.60 m x 2.10m ) near Mirdha Pond Construction of Rcc Pump Operating Platform (2-3.0m x 2.0m ) at Existing Header Tank & Mirdha Pond & (1-6.0m x 2.0m) at River Bank, 28 Nos Brick Name Plate, 2 Nos. SPISP & 2 Nos. SPIP. Laying of 1-280mm Dia uPVC Buried Pressure Pipe Line G-H from Ch. 0+000km to 1+650km - 2023-24
|
|
|
0.00
|
0.00
|
221.09
|
OTM
|
198.99
|
17/04/2023
|
30/04/2024
|
16/01/2024
|
92
|
149.25
|
75
|
30/11/2022
|
|
|
280
|
Rajshahi
|
48
|
godagari
|
338
|
748
|
SP12037/Dudhai-Bhanpur Khal WCS Subproject
|
Dudhai - Bhanpur Khal Re-excavation (ch0.00-2500m) Reference Line Section (4nos) (ch 100m, 1200m, 1800m, 2400m), SP Identification signboard (2Nos.)
|
|
|
2.50
|
0.00
|
31.92
|
LCS
|
31.92
|
09/09/2020
|
28/01/2021
|
10/04/2021
|
100
|
31.86
|
100
|
30/11/2022
|
|
|
281
|
Rajshahi
|
48
|
mohanpur
|
368
|
748
|
SP45198/Shutki Beel Subproject
|
Const of Rem. works of (2v-1.50mx1.80m) Regulator at ch. 3600m of Khal, SP Identf. S.Board Construction of Remaining works of WMCA office -
|
|
|
0.00
|
1.00
|
30.73
|
M/S Rudro Enterprise
|
31.91
|
13/04/2022
|
01/09/2022
|
02/03/2023
|
100
|
31.80
|
100
|
30/11/2022
|
|
|
282
|
Rajshahi
|
48
|
tanore
|
371
|
748
|
SP62031/Gurail Chalk Kazizia Subproject
|
Gurail Chalk Kazizia Khal Re-excavation. (Ch-0+000km to 4+720km) Ref. Lined Section 05 Nos. On 1 Khal and SP Identf. Signboard (2 nos.) Construction of Gurail Chalk Kazizia Khal WRS-1 (3v-1.50mx2.00m) at Ch. 0+175m of Khal Construction of Gurail Chalk Kazizia Khal WRS-2 (2v-1.50mx1.80m) at Ch. 2+340m of Khal Construction of WMCA office
|
|
|
4.72
|
3.00
|
256.16
|
OTM
|
247.23
|
18/09/2022
|
21/12/2022
|
30/04/2023
|
100
|
241.21
|
97
|
30/11/2022
|
|
|
283
|
Rajshahi
|
48
|
tanore
|
371
|
748
|
SP23070/Banial-Elamdahi Khal Subproject
|
Baniyal-Islamdahi Khal Re-excavation - Upstream (Ch0.00-3300m) Reference Line Section (4nos), Subproject Identification signboard (2nos.) and Provisional Sum, Baniyal-Ilamdahi Khal Re-excavation - Downstream (Ch.0+000 Km to 2+000 Km) 2022-23 Reference Line Section (3Nos), SP Identification signboard (2Nos.) and Demarcation Post (6Nos.) 2022-23
|
|
|
5.30
|
0.00
|
52.58
|
LCS
|
52.28
|
27/04/2024
|
24/03/2024
|
30/04/2024
|
100
|
52.19
|
100
|
30/11/2022
|
|
|
284
|
Rajshahi
|
48
|
tanore
|
371
|
748
|
SP22024/Hatisal Ghritakanchan Subproject
|
Re-excavation of Hatishail Ghritakanchan Khal (Ch-0+00km to 3+500km) Ref. Lined Section 5 Nos. On 1 Khals, And SP Identf. Signboard (2 nos.)
|
|
|
3.50
|
0.00
|
46.08
|
LCS
|
46.08
|
20/02/2022
|
20/03/2022
|
24/04/2022
|
100
|
45.64
|
100
|
30/11/2022
|
|
|
285
|
Rajshahi
|
48
|
tanore
|
371
|
748
|
SP15243/Bankeshor-Nabutala DR & WCS Subproject
|
Re-Excavation of Bankeshor Nabutala Khal (Ch.0+000 Km to 2+500 Km) Const. of 03 Nos. Reference lined Section on 1 Khal, SP Identf. sign board 2 Nos., Demercation Post 10 Nos. and SP Indication Post 2 Nos.
|
|
|
2.50
|
0.00
|
52.69
|
LCS
|
52.69
|
05/03/2023
|
23/03/2023
|
23/05/2023
|
100
|
50.73
|
96
|
30/11/2022
|
|
|
286
|
Rajshahi
|
48
|
tanore
|
371
|
748
|
SP14179/Dhamdhum-Mohammadpur DR & WCS Subproject
|
Re-excavation of Dhamdum-Mohammadpur Khal (Ch-2+850km to 6+350km) Reference Line Section (4nos) (ch 2900m, 3900m, 4900m, 5900m), SP Identification signboard & post (2Nos.)
|
|
|
3.50
|
0.00
|
46.38
|
LCS
|
46.34
|
15/10/2023
|
01/01/2024
|
30/04/2024
|
100
|
45.94
|
100
|
30/11/2022
|
|
|
287
|
Rajshahi
|
48
|
tanore
|
371
|
748
|
SP13095/Malbandha WCS Subproject
|
Construction of WMCA office, Electificatiion works of WMCA office and Supply Office Furniture of WMCA office
|
|
|
0.00
|
1.00
|
22.03
|
OTM
|
22.98
|
16/02/2023
|
28/05/2023
|
|
30
|
0.00
|
0
|
30/11/2022
|
|
|
288
|
Rangamati
|
17
|
kaptai
|
133
|
748
|
SP61014/Borogonia Tanchyangapara Subproject
|
Re-exacavation Tanchangapara Khal (Ch-1+950km to 4+200km) Ref. Lined Section 3 Nos. On 1 Khals, And SP Identf. Signboard 2Nos Construction of Tanchangapara Khal WRS-1 (4V-1.50mX1.80m) at Ch.2050m Khal Construction of Tanchangapara Khal WRS-2 (3V-1.50mX1.80m) at Ch.3340m Khal Construction of WMCA office building, Electic Work, Furniture
|
|
|
2.25
|
3.00
|
234.40
|
OTM
|
214.70
|
19/12/2021
|
13/03/2022
|
30/04/2022
|
95
|
196.30
|
91
|
30/11/2022
|
|
|
289
|
Rangamati
|
17
|
langadu
|
137
|
748
|
SP62042/Jubalakshmi Rajnagar Subproject
|
Re-Excavation of Jubalaxmi Khal (Ch.0+300 Km to 4+580Km) Re-Excavation of Jubalaxmi Rajnagar Branch Khal (Ch.0+000 Km to 2+309Km) Const. of 8 Nos. Ref. lined Section on 2 Khals, SP Identf. sign board 2, SP Indication Post 2 and Demarcation Post. 36 Nos. Construction of Jubolaxmi Rajnagar Khal Weir-1 (1bay-8.00mx1.20m) at Ch. 1+250km. Construction of Jubolaxmi Rajnagar Khal Weir-2 (1bay-5.00mx1.50m) at Ch. 2+625km Const. of WMCA office (12.0mx6.0m)
|
|
|
6.58
|
3.00
|
218.81
|
OTM
|
218.44
|
14/06/2023
|
21/06/2023
|
30/04/2023
|
100
|
218.32
|
100
|
30/11/2022
|
|
|
290
|
Satkhira
|
39
|
kalaroa
|
281
|
748
|
SP13092/Sonai Khal FCD Subproject
|
Re-excavation of Shialkhali Khal (Ch: 0 to 920 m) Ref. Line Section (1nos. Shialkhali-Ch:800m) and SP Identification Signboard & Post (2nos.)
|
|
|
0.92
|
0.00
|
17.78
|
LCS-3
|
17.78
|
15/10/2023
|
28/12/2023
|
30/04/2024
|
100
|
17.07
|
96
|
30/11/2022
|
|
|
291
|
Satkhira
|
39
|
kalaroa
|
281
|
748
|
SP12015/Vorvoria Beel FCD Subproject
|
WMCA Office building and others
|
|
|
0.00
|
1.00
|
17.15
|
NOTM
|
16.30
|
21/05/2018
|
28/05/2018
|
26/04/2019
|
100
|
15.59
|
95
|
30/11/2022
|
|
|
292
|
Satkhira
|
39
|
satkhira-s
|
282
|
748
|
SP61005/Dantbhanga Khal Subproject
|
Dantbhanga Khal Regulator (5v-1.5m x 1.8m) at Ch-0+060km WMCA Office and Others Re-exacavation of Dantbhanga khal (Ch-0+000khm to 4+300km) Ref. lined section (5nos.), SP signboard
|
|
|
4.30
|
2.00
|
383.43
|
M.M. Builders & Eng. ltd., Gulshan-1 ,Dhaka
|
401.23
|
18/01/2022
|
25/01/2022
|
|
100
|
366.88
|
91
|
30/11/2022
|
|
|
293
|
Satkhira
|
39
|
tala
|
312
|
748
|
SP61001/Balia Bhangunkul Subproject
|
Re-sectioning of Balia Bhangakul Embankment Re-excavation of Jona Khal Re-excavation of Dumuria Kheshra Khal Re-excavation of Madiar Khal Re-excavation of Amtala Khal Re-excavation of Shahzadpur-Purbachar Khal Re-excavation of Hazratala Khal Const. of Reference Lined Section Jona Khal Regulator (ch 0 + 425 k.m.) Madiar Khal Regulator (ch 3 + 725 k.m.) Shazadpur Khal Regulator (ch 6 + 155 k.m.) Shaltala Khal Pipe Calvert (ch 3 + 440 k.m.) Shazadpur Khal Pipe Calvert (ch 6 + 865 k.m.) Hazratala Pipe Sluich (ch 10 + 285 k.m.) Dumuria Shasan Ghat Pipe Sluice (ch 2 + 687 k.m.) WMCA Office & Others
|
|
|
19.27
|
8.00
|
466.09
|
PBL-AE-JV, Gulshan-2,Dhaka-1212
|
483.67
|
10/05/2018
|
16/05/2018
|
30/05/2018
|
81
|
416.95
|
86
|
30/11/2022
|
|
|
294
|
Satkhira
|
39
|
tala
|
312
|
748
|
SP15335/Jetua-Kanaidha FCD Subproject
|
Repair & Maintainace of Kanaidia Duchar 1vent Regulator -. Repair & Maintainace of Jethua Ghar 2vent Regulator -. Repair & Maintainace of Kalaparia Khal 2vent Regulator -. Repair & Maintainace of Jethua Beel 2vent Regulator -. Construction of Baurar Khal Pipe Sluice 1vent. Construction of Baolar Ghat Pipe Sluice 1vent. Construction of Khaya Ghat Pipe Sluice 1vent.
|
|
|
0.00
|
3.00
|
19.35
|
Sk.Idrish Ali, Basatati, Bagerhat
|
18.99
|
31/08/2021
|
07/11/2021
|
|
100
|
17.55
|
92
|
30/11/2022
|
|
|
295
|
Sirajganj
|
52
|
belkuchi
|
382
|
748
|
SP12025/Chandi Beel FCD Subproject
|
Re-excavation of Chandi Khal (Ch-0+00km to 0+515km) Re-excavation of Shalakura Khal (Ch-0+00km to 0+600km) Ref. Lined Section 2 Nos. On 2 Khals, And SP Identf. Signboard (2 nos.) Repair & Maintenance work of 1vent (1.2mx1.8m) Regulater -.
|
|
|
1.11
|
0.00
|
19.27
|
S M Rofiqul Islam
|
18.82
|
23/03/2022
|
20/06/2022
|
16/03/2023
|
100
|
17.29
|
91
|
30/11/2022
|
|
|
296
|
Sirajganj
|
52
|
tarash
|
373
|
748
|
SP43037/Bhadrabati Khal (North) Subproject
|
Re-Excavation of Uttar Bhadrabati Khal (Ch.0+000 Km to 12+200Km) Construction of 6 Nos. Reference Lined sections, Sub-project Identification sign board 2 Nos. and Sub-project Indication Post 2 Nos.
|
|
|
12.20
|
0.00
|
206.96
|
LCS-9
|
206.96
|
19/02/2023
|
02/03/2023
|
|
87
|
124.11
|
59
|
30/11/2022
|
|
|
297
|
Sirajganj
|
52
|
tarash
|
373
|
748
|
SP43036/Bhadrabari South (Baruhash Khal) Subproject
|
Re-Excavation of Dakshin Vhadrabati Khal(Ch.0+000 Km to 15+295 Km) Const. of 9 Nos. Reference lined Section on 1 Khal and SP Identf. sign board 2 Nos. and SP Indication Post 2 Nos.
|
|
|
15.29
|
0.00
|
209.57
|
LCS-9
|
209.57
|
09/03/2023
|
16/03/2023
|
|
91
|
141.02
|
67
|
30/11/2022
|
|
|
298
|
Sirajganj
|
52
|
tarash
|
373
|
748
|
SP15241/Duar-Nimaichara DR & WCS Subproject
|
Duar-Nimaichara khal re-excavation Referenced line section Duar-Nimaichara khal re-excavation(ch.00-2100m) Referenced line section3nos(ch.100,1000,2000m) Bamboo bridge(3 Nos.)
|
|
|
4.20
|
0.00
|
80.79
|
Most. Mowazima Khatun
Md. Shafiqul Islam
|
80.79
|
27/03/2019
|
31/03/2019
|
30/05/2019
|
100
|
76.22
|
94
|
30/11/2022
|
|
|
299
|
Sirajganj
|
52
|
tarash
|
373
|
748
|
SP14183/Horisona-Kundol WCS Subproject
|
Harisona Kundoil khal re-excavation(ch.2000-6700m) Referenced line section(5 nos) Bamboo bridge(5 Nos.) Harisona Kundoil khal re-excavation(ch.00-2000m)
|
|
|
6.70
|
0.00
|
156.96
|
LCS
|
156.96
|
09/04/2018
|
18/03/2019
|
30/05/2018
|
100
|
146.60
|
93
|
30/11/2022
|
|
|
300
|
Sirajganj
|
52
|
tarash
|
373
|
748
|
SP14151/Mohisluti Baro Beel DR Subproject
|
Mohisluti Baro Beel khal re-excavation(ch.00-5615m) Referenced line section(6 Nos.) Bamboo Bridge(6 Nos.)
|
|
|
5.61
|
0.00
|
103.75
|
LCS
|
103.75
|
01/04/2019
|
04/04/2019
|
30/05/2019
|
100
|
88.12
|
84
|
30/11/2022
|
|
|
301
|
Sirajganj
|
52
|
ullapara
|
375
|
748
|
SP15239/Puthia-Falia FCD Subproject
|
Embank. Re-Section. (Ch: 1165.00-2600.00 m, ch:3000.00-6270.00 m, ch: 9350.00-11850.00 m) Sign Bo 2 Rehabilitation of Regulators (3 nos) at ch.1760m, 4830m, 9450m on Embackment -.
|
|
|
7.20
|
0.00
|
78.71
|
M/S.Sojib Enterprise.Gikera,Ullapara,Serajgonj.
|
78.63
|
19/01/2021
|
04/08/2021
|
20/03/2022
|
100
|
71.62
|
91
|
30/11/2022
|
|
|
302
|
Sirajganj
|
52
|
ullapara
|
375
|
748
|
SP13089/Dahapara-Goyhatta FCD Subproject
|
Re-sectioning of Dohopara-Goyhatta Embankment (Ch: 750 - 4950 m) Subproject Identification signboard (2 nos.)
|
|
|
4.20
|
0.00
|
41.07
|
LCS-3
|
41.07
|
28/01/2020
|
26/02/2020
|
06/05/2021
|
100
|
40.51
|
98
|
30/11/2022
|
|