Small Scale Water Resources Development Project (Phase-2) (SSWRDP-JICA-2)

Serial District Name District Code/ID Upazila Name Upazila Code/ID Project ID Package No Scheme Name Road ID Length of Scheme(Km) - Road Length of Scheme(m) - Bridge/Culverts Building Quantity Estimated Amount(LAC) Contractor Name Contract Amount(LAC) Date of Contract (DD/MM/YYYY) Date of commencement (DD/MM/YYYY) Date of Completion (DD/MM/YYYY) Physical Progress(%) Financial Progress (Amount) (LAC) Financial Progress(%) Date of Progress Update (DD/MM/YYYY) Remarks
1 Dhaka 24 dhamrai 215 750 SP23045 Manukhali Subproject :Re-excavation of Manukhali Branch 1.40 km Khal (Ch.0+000km to Ch.1+400km)   1.40 0.00 0.00 9.59 LCS 9.59 08/05/2019 31/05/2019 100 9.59 100 30/06/2020 Completed.
2 Faridpur 31 faridpur-s 258 750 SP71006 Kadmi khal Sub-project : Re-excavationof kadmi khal(Ch.1+000km to Ch.6+400km)   4.40 0.00 0.00 180.85 LCS 0.00 18/03/2020 18/04/2020 70 0.00 0 30/06/2020 On going
3 Faridpur 31 madhukhali 262 750 SP32009 Satgavia Sub-project : Construction of Pipe culvert at (Ch.2+190km),Construction of Pipe culvert at (Ch.3+600km),Re-sectioning fram level road (Ch.1+000km to Ch.4+923km)   3.92 0.00 0.00 91.96 LCS 0.00 18/03/2020 30/04/2020 90 0.00 0 30/06/2020 Tender Approved
4 Gaibandha 60 saghata 428 750 SP45128 Nilkuthi Bhangamore Subproject : Constructiong of Regulator at Ch.1+850 km, Re-sectioning of Embankment (Ch.0+000km to Ch.3+460km)   3.46 0.00 0.00 21.46 LCS 0.00 01/02/2020 0 0.00 0 30/06/2020 Tender Opening
5 Gaibandha 60 saghata 428 750 SP23090 Pachabasta-Tenachira Subproject :   0.00 0.00 23.20 LCS 0.00 01/01/1900 0 0.00 0 30/06/2020 Tender approved
6 Gaibandha 60 sundarganj 439 750 SP1102 Langa Khal Subproject : Re-excavation of Langa 6.45km Khal (Ch.7+050km to Ch.13+500km)   6.45 0.00 0.00 156.50 LCS 156.50 08/04/2019 30/05/2019 100 156.50 100 30/06/2020 Completed.
7 Gopalganj 28 tungipara 232 750 SP33060 Lebuta Bashbari Sub-project: Re-excavation of Rajendra-Gangnir Khal (Ch.0+000km to Ch. 2+908km), Re-excavation of of Bairagir Khal at (Ch.0+000km to Ch. 0+865km), Re-excavation of Choto Pakuria Khal at (Ch.0+000km to Ch. 0+600km), Reexcavation of Tarikull   11.00 0.00 0.00 167.61 LCS 0.00 12/02/2020 11/03/2020 10 0.00 0 30/06/2020 On going
8 Gopalganj 28 tungipara 232 750 SP35160 Sriramkandi-Ghoperdangh Sub-project: Reexcavation of Sriramkandi-Ghoperdangh main Khal (Ch.0+000km to Ch. 6+600km), Reexcavation of link Khal from live stock Office to moti munshi Khal at (Ch.0+000km to Ch. +800km), Reexcavation of link Khal from s. basun   11.60 0.00 0.00 274.84 LCS 0.00 15/02/2020 25/03/2020 60 0.00 0 30/06/2020 On going
9 Gopalganj 28 tungipara 232 750 SP35188 Boro Dumuria Khal Sub-project:Construction of open fundation culvert(at ch.3+112km), Reexcavation of Bhogo Khali Khal (Ch.0+000km to Ch. 1+400km), Reexcavation of Talukder Khal (Ch.0+000km to Ch. 2+83km), Reexcavation of Matabari Khal (Ch.0+000km to Ch.   8.20 0.00 0.00 111.43 LCS 0.00 05/02/2020 20/03/2020 50 0.00 0 30/06/2020 On going
10 Habiganj 63 azmiriganj 472 750 SP35180 Hirabari-Monsur khal Sub-project: Re-excavation of Kachura khal(Additional) (Ch.6+600km to Ch.10+004km), Re-excavation of pabiajuri khal(Additional) (Ch.0+000km to Ch.3+700km)   7.11 0.00 0.00 188.95 LCS 0.00 22/01/2020 30/04/2020 100 0.00 0 30/06/2020 On going
11 Habiganj 63 nabiganj 475 750 SP32023 Raipura Boro khal Sub-project: Re-excavation of Raipura Boro khal (Ch.0+000km to Ch.5+300km)   5.30 0.00 0.00 158.43 LCS 151.67 01/01/1900 0 0.00 0 30/06/2020 Approved
12 Habiganj 63 nabiganj 475 750 SP31004 Arua-Kalkalia Sub-project: Re-excavation of Arua-Kalkalia Khal 3.875 km (Ch.1+700km to Ch.5+575km) and Reference Bed Block 4 Nos (Ch.2+00km, 3+00km, 4+00km & 5+00km)   3.88 0.00 0.00 126.85 LCS 126.85 22/03/2019 30/04/2019 100 11.20 0 30/06/2020 On going
13 Jamalpur 27 sarishabari 207 750 SP32017 Rothkhola-Kamarbari Subproject:Houshi Khal Regulator at Ch. 0+140km.(2Vent 1.5mx1.50m),Re-excavation of Houshi 3.60 km Khal (Ch. 0+000 km to 3+600 km)and Re-sectoning of Rothkhola-Kamarbari 0.90 km Embankment.(Ch.0+700km to 1+600km)   4.50 0.00 0.00 140.31 LCS 137.09 31/03/2019 20/04/2019 100 76.00 100 30/06/2020 Completed.
14 Kurigram 56 bhurungamari 404 750 SP15262 Char-Bhurugamari Subproject: Re-sectioning of Embankment at (Ch.0+000 km to Ch. 8+100km)   8.10 0.00 0.00 112.04 LCS 0.00 01/01/1900 20 0.00 0 30/06/2020 On going
15 Kurigram 56 rowmari 437 750 SP25311 Dhanar-Char Subproject:Re-sectioning of Dhanar-Char of 8.814 km Embankment (Ch.0+546km to Ch. 9+360km)   8.81 0.00 0.00 129.35 LCS 129.35 16/04/2019 16/10/2019 100 129.35 100 30/06/2020 Completed.
16 Lalmonirhat 54 aditmari 393 750 SP24120 Charrali Bill-Shakowa Subpoject:Re-excavation of Charrali Bill-Shakowa 4.50 Khal (Ch.0+00km to Ch. 4+500km) and Construction of Bamboo 5Nos Bridges on 0.75 Khal   5.25 0.00 0.00 45.03 LCS 45.03 10/04/2019 31/05/2019 100 45.03 100 30/06/2020 Completed.
17 Madaripur 30 kalkini 226 750 SP35252 Uttarkandi-Mathabhanga Sub-project:Re-excavation of Dakkhin kandi Khal (Ch.0+000km to Ch.3+100km), Re-excavation of Dakkhin kandi Br. Khal-1(Ch.0+000km-Ch.0+593km), Re-excavation of Dakkhin kandi Br. Khal-2(Ch.0+000km-Ch.0+950km),Re-excavation of Chai c   9.98 0.00 0.00 143.30 LCS 0.00 24/02/2020 30/04/2020 100 0.00 0 30/06/2020 On going
18 Madaripur 30 kalkini 226 750 SP34112 Alipur-Enayetnagar Sub-project:Re-excavation of Uttor -Majher kandi Khal (Ch.0+000km to Ch.2+729km), Re-excavation of Junior Madrasa Khal(Ch.0+000km-Ch.0+765km), Re-excavation of kata khali Khal (Ch.0+000km-Ch.0+680km),Re-excavation of Model School Khal   14.50 0.00 0.00 221.48 LCS 0.00 25/02/2020 30/04/2020 100 0.00 0 30/06/2020 On going
19 Madaripur 30 kalkini 226 750 SP35240 Palordi-Alinagar Sub-project:Re-excavation of Jhorerpar Khal 4.50 km (Ch.3+900km-Ch.8+400km), Re-excavation of Kasimpur Khal 0.70km (Ch.0+000km-Ch.0+700km,Re-excavation of Lamchori Khal 0.63 km(Ch.0+000km-Ch.0+630km),Re-excavation of Minajdi Khal 1.80 km(   14.97 0.00 0.00 136.31 LCS 136.31 02/04/2019 30/04/2019 100 128.44 94 30/06/2020 Completed.
20 Madaripur 30 kalkini 226 750 SP35238 Auliar Char Sub-project : Re-excavation of Gazaria Khal(Ch.0+000km to Ch.8+670km),Re-excavation of Gazaria kechur Khal (Ch.0+000km to Ch.0+850km), Re-excavation of Shibpur Khal (Ch.0+000km-Ch.4+800km), Re-excavation of Dhakar Hati Shaks Khal (Ch.0+000km-   15.70 0.00 0.00 232.73 LCS 0.00 24/03/2020 30/04/2019 100 0.00 0 30/06/2020 On going
21 Madaripur 30 kalkini 226 750 SP34114 Char-Laksmipur Sub-project : Re-excavation of Khan Bari 1.10 km Khal(Ch.0+000km to Ch.1+000km),Re-excavation of Hindu Para 1.50 km Khal (Ch.0+000km to Ch.1+500km) and Re-excavation of Ray Sardar Bari 1.10 km Khal (Ch.2+000km-Ch.3+100km)   3.70 0.00 0.00 68.04 LCS 68.04 10/04/2019 30/04/2019 100 65.58 97 30/06/2020 Completed.
22 Manikganj 34 ghior 260 750 SP25206 BKS Subproject :Re-excavation of Embankment (Ch.0+00km to Ch.2+200 km)   4.45 0.00 0.00 102.55 LCS 0.00 22/01/2020 0 0.00 0 30/06/2020 On going
23 Manikganj 34 manikganj-s 242 750 SP71004 Nalora Char Betila Gobindopur Khal Subproject :Constuction of Regulator (at ch.0+185 km),Constuction of Regulator (at ch.1+580 km),Re-sectoring of Embankment(Ch.0+000km to Ch.2+600 km)   2.60 0.00 0.00 252.66 LCS 0.00 01/01/1900 0 0.00 0 30/06/2020 Re-tender
24 Manikganj 34 manikganj-s 242 750 SP71005 KBBT kata khal Subproject :Constuction of kata khali khal (at ch.0+475 km),Re-excavation of kata khali khal (Ch.0+00km to Ch.4+500 km)   4.50 0.00 0.00 226.72 LCS 0.00 01/01/1900 20 0.00 0 30/06/2020 Tender Approved
25 Magura 34 salikha 269 750 SP23066 Atrail Beel Subproject :Re-excavation of Kasunda-Mamna Khal (Ch.0+00km to Ch.1+300 km), Re-excavation of Binora-Angarpara Khal (Ch.0+00km to Ch.1+700 km), Re-sectoring of Embankment (Ch.0+00km to Ch.2+350 km)   2.00 0.00 0.00 48.91 LCS 0.00 22/01/2020 30/04/2020 50 0.00 0 30/06/2020 On going
26 Moulvibazar 62 kamalganj 449 750 SP35261 Forkanala Sub-project :Re-excavation of Forkanala khal (Ch.5+200km to Ch.7+000km) additional   1.80 0.00 0.00 96.88 LCS 0.00 09/01/2020 11/03/2020 70 0.00 0 30/06/2020 On going
27 Moulvibazar 62 moulvibazar-s 453 750 SP34128 Kodali-Chhara Sub-project :Re-excavation of 1.50 km Khal & Clearing Water Hyacinth (1.00km at D/S & 0.50km at U/S of WRS)   1.50 0.00 0.00 9.99 LCS 9.99 25/04/2019 26/05/2019 100 7.30 50 30/06/2020 Completed.
28 Moulvibazar 62 sreemangal 474 750 SP33101 Jag Chhara Khal Sub-project :Re-excavation of khai chhara khal (Ch.0+000km to Ch.2+500km), Re-excavation of bhaturi chhara khal (Ch.0+000km to Ch.2+275km), Re-excavation ofHakaloki chhara khal (Ch.0+000km to Ch.1+700km)   6.82 0.00 0.00 144.85 LCS 0.00 01/01/1900 85 0.00 0 30/06/2020 On going
29 Mymensingh 22 fulbaria 190 750 SP33088 Foliar Khal Sub-project: Foliar Khal WRS 2Vent 1.5mx1.80m, Re-excavation of Foliar Khal 4.10 km (Ch.0.00km to Ch.4.10km) and Re-sectioning of Embankment 1.861 (Ch.0+00km to Ch.1+861km)   5.96 0.00 0.00 145.62 LCS 145.62 10/03/2019 30/04/2019 90 20.50 0 30/06/2020 On going
30 Mymensingh 22 phulpur 216 750 SP32027 Kharia Nadi Sub-project: Construction of Regulator (at ch. 1+690km), Re-excavation of Kharia Nadi at (Ch.0+000km to Ch.12+800km), Re-excavation of suti khal at (Ch.0+00km to Ch.2+275km), Re-sectioning of Embankment   14.71 0.00 0.00 238.48 LCS 0.00 08/02/2020 30/04/2020 60 0.00 0 30/06/2020 On going
31 Netrokona 25 atpara 185 750 SP32010 Langulia Khal Sub-project:Construction of Bhogapara Khal (at ch.7+626km),Re-excavation of Khaliakhali khal at (ch.0+000km to 1+172km), Re-sectioning of Embankment at (Ch.0+000km to Ch.11+525km)   7.20 0.00 0.00 165.89 LCS 0.00 01/01/1900 0 0.00 0 30/06/2020 On going
32 Netrokona 25 kalmakanda 189 750 SP35198 Dosdhar-Ranigaon:Re-sectioning of Dosdhar-Ranigaon Embankment 10.10 km (Ch.0+000km to Ch.10+100km)   10.10 0.00 0.00 183.18 LCS 183.18 20/03/2019 30/04/2019 80 101.96 60 30/06/2020 On going
33 Netrokona 25 kalmakanda 189 750 SP31008 Pukuria-Uziakhali Sub-project: Re-sectioning of 4.50 km Embankment (Additional) (Ch.0+000km to Ch.4+500km)and Re-sectioning of Existing of 2.70 km Embankment (Rehabilitation) (Ch.2+700km to Ch.5+400km)   7.20 0.00 0.00 187.63 LCS 187.63 10/04/2019 30/04/2019 85 147.30 34 30/06/2020 On going
34 Netrokona 25 kendua 180 750 SP35178 Sonai Haor Sub-project:Suti Khal Regulator at Emb.Point of Suti Khal 1 Vent(1.2mX1.5m),Re-sectioning of Embankment(Rehabilitation) 1.60 km (Ch.0+00km to Ch.1+600km)and Re-sectioning of Embankment (Additional)0.80 km (Ch.0+00km to Ch.0+800km)   2.40 0.00 0.00 147.72 LCS 147.72 20/03/2019 30/04/2019 70 44.96 62 30/06/2020 On going
35 Nilphamari 55 dimla 397 750 SP13084 Chatnai WCS Subpoject: Re-sectioning of North side up strem (Ch.0+000km to Ch. 1+676km), Re-sectioning of south side up strem (Ch.0+480km to Ch. 1+760km), Re-sectioning of left side up strem (Ch.0+480km to Ch. 0+055km)   2.95 0.00 0.00 59.22 LCS 0.00 01/01/1900 20 0.00 0 30/06/2020 On going
36 Rajbari 29 baliakandi 221 750 SP33094 Chaltakhali khal Sub-project : Re-exavation of Chaltakhali khal(Ch.0+000km to Ch.4+200km), Re-sectioning of road cum embankment(Ch.0+000km to Ch.1+300km)   5.50 0.00 0.00 127.80 LCS 0.00 01/01/1900 40 0.00 0 30/06/2020 On going
37 Rajbari 29 baliakandi 221 750 SP35224 Ratandia Balughat Sub-project : Re-sectioning of road cum embankment-1(Ch.0+000km to Ch.1+600km), Re-sectioning of road cum embankment-2(Ch.0+000km to Ch.2+200km),Re-sectioning of road cum embankment-3(Ch.0+000km to Ch.1+180km)   4.98 0.00 0.00 203.80 LCS 0.00 10/03/2020 30/04/2020 0 0.00 0 30/06/2020 On going
38 Shariatpur 32 naria 236 750 SP13082 Maijpara-Muktarer Char Sub-project:Reexcavation of Jopsha Khal (Ch.0+000km to Ch. 5+00km), Construction of Embankment (Ch.3+00km to Ch. 4+00km)   6.00 0.00 0.00 224.12 LCS 0.00 16/02/2020 30/04/2020 75 0.00 0 30/06/2020 On going
39 Sunamganj 64 doarabazar 470 750 SP33096 Shahebergaon Sub-project:Construction of Regulator Sluice at (Ch. 0+371km), Construction of of Buried pipe network at (ch.00 to ch.2+200km) Re-sectioning of Embankment (at ch.0+000km to ch. 2+200km)   4.40 0.00 0.00 97.75 LCS 0.00 01/01/1900 0 0.00 0 30/06/2020 Approved on
40 Sunamganj 64 sunamganj-s 466 750 SP33092 Nokhorier Chhara Sub-project: Rehabilition of Nokhorier Chhara WRS at (Ch. 0+000km), Construction of WRS at ch.0 (700km), Construction of irrigation inlet str.1 at U/S of Nakhorier chhara existing 4v WRS, Construction of irrigation inlet str.2at ch. 0+   2.70 0.00 0.00 155.34 LCS 0.00 01/01/1900 0 0.00 0 30/06/2020 On going
41 Sunamganj 64 sunamganj-s 466 750 SP34104 Bongaon Chhara Sub-project: Rehabilition of Bongaon Chhara WRS at (Ch. 0+000km), Construction of irrigation inlet structure at (1+400km) on right bank, bank raising of bongaon chhara left bank(at ch.0+000km to ch. 1+400), Bank raising of bongaon chhara ri   2.80 0.00 0.00 67.20 LCS 0.00 01/01/1900 90 0.00 0 30/06/2020 On going
42 Sylhet 61 gowainghat 455 750 SP33054 Shialar Haor Sub-project: Re-sectioning of North East Embankment 1.70 km (Ch.0+600km to Ch.2+300km) and Re-sectioning of South West Embankment 2.10 km (Ch.2+700km to Ch.4+800km)   3.80 0.00 0.00 31.33 LCS 31.33 13/03/2019 30/04/2019 100 20.60 66 30/06/2020 Completed.
43 Sylhet 61 gowainghat 455 750 SP34107 Binnakandi Subproject :RCC Irrigation Chanal (350m on L/S & 200m on R/S),Modification of Binna Chhara WRS to Increase Gate Height at Ch.1+575km , WMCA Office Road and Re-sectioning of 2.678 km Embankment & Re-excavation of Loop Cutting (120m)   2.68 0.00 0.00 109.63 LCS 116.62 13/03/2019 18/04/2019 100 19.61 61 30/06/2020 On going
44 Sylhet 61 Osmaninagar 491 750 SP35166 Haonia-Sonia Sub-project : Consrucion of Additional one vent structure on both side of sixting alica khal regular(1 vent 2.5mX2.0m), Re-exavation of vobani khal (Ch.0+000 km to ch 0+650 km), Re-exavation of Ratna khal (Ch.0+000 km to ch 0+490 km)   1.14 0.00 0.00 104.25 LCS 34.47 19/01/2020 30/04/2020 100 3.44 0 30/06/2020 On going
45 Sylhet 61 zakiganj 451 750 SP71001 Keshri Beel Sub-project : Header Tank (6.40mX4.2m),Buried Pipe Network(14.55km), WMCA Office(12mX6.0m)and Re-sectioning of Tokma Khal 2.65 km (Ch.0+00km to Ch.2+65 km)   2.65 0.00 0.00 698.37 LCS 731.43 15/12/2019 30/04/2020 30 93.00 0 30/06/2020 On going
46 Tangail 18 delduar 239 750 SP35231 Maistha beel Khal Subproject: Re-sectioning of embankment (Ch.0+000km to Ch.2+810km), Re-excavation of Maistha Khal (Ch.0+000km to Ch.0+380km),(Ch.0+400km to Ch.0+530km)   3.34 0.00 0.00 60.68 LCS 0.00 01/01/1900 0 0.00 0 30/06/2020 Approved
47 Tangail 18 mirzapur 143 750 SP71003 Kashab khali Khal Subproject: Re-excavation of Kashab khali Khal (Ch.0+000km to Ch.3+110km), Re-excavation of Kashab khali Khal Branch Khal (Ch.0+000km to Ch.0+230km)   3.30 0.00 0.00 175.57 LCS 0.00 08/01/2020 30/04/2020 83 0.00 0 30/06/2020 Tender approved
48 Tangail 18 mirzapur 143 750 SP71002 Bagjan Khal Subproject:Bagjan Khal Regulator (Ch.0+100 km), Re-excavation of Bagjan Khal (Ch.0+000km to Ch.3+40km), Re-excavation of Branch Khal (Ch.0+000km to Ch.0+210km)   3.60 0.00 0.00 179.16 LCS 0.00 08/01/2020 30/04/2020 54 0.00 0 30/06/2020 Tender approved
49 Tangail 18 shakhipur 142 750 SP35254 Tengra Madla Khal Subproject: Re-excavation of Tengra Madlai Khal (Ch.0+000km to Ch.5+525km), Re-excavation of Tengra Madla Khal Branch Khal (Ch.0+000km to Ch.1+750km)   7.20 0.00 0.00 165.89 LCS 0.00 29/12/2019 30/04/2020 72 0.00 0 30/06/2020 On going
50 Thakurgaon 57 baliadangi 411 750 SP24183 Amandhaman Khal Subpoject:Construction of Amandhaman Khal WRS (at Ch.6+200km), Re-excavation of Amandhaman Khal (Ch.0+000km to Ch. 14+800 km)   14.80 0.00 0.00 334.58 LCS 0.00 01/01/1900 100 0.00 0 30/06/2020 On going